Contract
No.: BT01-21 Date
Prepared: 9/2/2022
Buying
Agency: Contractor:
Contact
Person:
Prepared
By:
Phone: Phone:
Fax: Fax:
Email: Email:
Product
Code: ZCA Description:
$64,459.00
Cost Cost
598.4 149.6
673.2 74.8
(2) CB09-030 Q-8301-SC MAX RETRACTOR 1914.9
14660.9
CB01--013 ADD ANTI-RIDE TO REAR BUMPER 224.4
CB01-015 ROMEO RIM FRONT BUMPER 1421.21
201.96
897.6
97.24 37.4
CB02-013 STAINLESS STEEL BATTERY BOX AND TRAY 935.01 0
Subtotal B: 21886.62
Cost Cost
12500 2000
Subtotal C: 14500
17%
14 100845.62 = Subtotal D: 1411838.68
Subtotal E: 600
Cost Cost
27300
192892
Subtotal F: 220192
1632630.68
CB02-024 WIRING SCHEMATIC
CB06-028 THERMO KING 130,000 BTU SLR65 - ROOF MO
CB17-016 DRIVER'S SEAT COVER LEVEL 4
FAX - GRAPHICS WRAP
CB17-059 PASSENGER SEAT COVER (12)
5year/100K mile Starcraft warranty
Description Description
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary. (Note: Unpublished options are items which were not submitted and priced in Contractor's bid.) CB01-001 FRONT MUD FLAPS
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable. (Note: Published Options are options which were submitted and priced in Contractor's bid.) Description
CB05-009 5/8" MARINE TECH PLYWOOD FLOOR CB02-016 ROTARY DISCONNECT SWITCH CB05-005 ALTRO CHROMA
Description
D. Total Cost Before Any Applicable Trade-In / Other Allowances / Discounts (A+B+C) F. Trade-Ins / Special Discounts / Other Allowances / Freight / Installation / Miscellaneous Charges X Subtotal of A + B + C:
CB01-019 VALVE STEM EXTENDERS
Subtotal From Additional Sheet(s):
CONTRACT PRICING WORKSHEET
For MOTOR VEHICLES Only
22' Allstar 12 Passenger w/2 Wheelchair, E450
A. Product Item Base Unit Price Per Contractor's H-GAC Contract:
This Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents MUST be faxed to H-GAC @ 713-993-4548. Therefore please type or print legibly.
City of Fresno
Harpreet Kaur
559-621-1467
[email protected]
Creative Bus Sales, Inc.
Jay Holzhuter
650-222-2621
[email protected]
G. Total Purchase Price (D+E+F): Delivery Date: 4/15/2023 Subtotal From Additional Sheet(s):
Quantity Ordered:
For this transaction the percentage is: Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit Price plus Published Options (A+B).
Description Description
Material Surcharge -2022 FR per bus ($13,778)
PDI-Make Ready & Delivery per bus ($1,950)
E. H-GAC Order Processing Charge (Amount Per Current Policy)