Cities Index.
Exhibit M - Environmental Assessment No. T-6345/P22-00411/P22-00442 [August 12, 2022]

Fresno City Council
September 29, 2022

Document
Exhibit M - Environmental Assessment No. T-6345/P22-00411/P22-00442 [August 12, 2022]
Meeting
September 29, 2022
Body
Fresno City Council
Pages
55
Original file
156.7 MB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
CUL-3 (further continued from previous two pages)
resources found during the field survey or literature review shall include a paleontological monitor. The monitoring periodshall be determined by the qualified paleontologist. If additional paleontological/geological resources are found during
excavation and/or construction activities, the procedure identified above for the discovery of unknown resources shall be followed.

Verification comments:
[see Page 17] [see Page 17]
CUL-4: In the event that human remains are unearthed during excavation and grading activities of any future development project, all activity shall cease immediately. Pursuant to Health and Safety Code (HSC) Section 7050.5, no further
disturbance shall occur until the County Coronerhas made the necessary findings as to origin and disposition pursuant to PRC Section 5097.98(a). If the remains are determined to be of Native American descent, the coroner shall within 24 hours notify the Native American Heritage Commission (NAHC). The NAHC shall then contact the most
(continued on next page)
Prior to
commencement
of, and during,
construction
activities

DARM X X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 21 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
CUL-4 (continued from previous page)
likely descendent of the deceased Native American, who shall then serve as the consultant on how to proceed with the remains.

Pursuant to PRC Section 5097.98(b), upon the discovery of Native American remains, the landowner shall ensure that the immediate vicinity, according to generally accepted cultural or archaeological standards or practices, where the Native American human remains are located is not damaged or
disturbed by further development activity until the landowner has discussed and conferred with the most likely descendants regarding th recommendations, if applicable, taking into account the possibility of multiple human remains. The
landowner shall discuss and confer with the descendants all reasonable options regarding the descendants' preferences for treatment.

Verification comments:
[see previous
page]
[see previous
page]
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 22 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Hazards and Hazardous Materials
HAZ-1: Re-designate the existing vacant land proposed for low density residential located northwest of the intersection of East Garland Avenue and North Dearing Avenue and located within Fresno Yosemite International Airport Zone 1-RPZ,to Open Space.

Verification comments:

Prior to
development
approvals
DARM X
HAZ-2: Limit the proposed low density residential (1 to 3 dwelling units per acre) located northwest of the airport and located within Fresno Yosemite International Airport Zone 3-Inner Turning Area, to 2 dwelling units per acre or less.

Verification comments:

Prior to
development
approvals
DARM X
HAZ-3: Re-designate the current area within Fresno Yosemite International Airport Zone 5-Sideline located northeast of the airport to Public Facilities-Airport or Open Space.

Verification comments:

Prior to
development
approvals
DARM X

I I I I I

I I I I I

I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 23 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Hazards and Hazardous Materials (continued):

HAZ-4: Re-designate the current vacant lots at the northeast corner of Kearney Boulevard and South Thorne Avenue to
Public Facilities-Airport or Open Space.

Verification comments:

Prior to
development
approvals
DARM X
HAZ-5: Prohibit residential uses within Safety Zone 1 northwest of the Hawes Avenue and South Thorne Avenue intersection.

Verification comments:

Prior to
development
approvals
DARM X
HAZ-6: Establish an alternative Emergency Operations Center in the event the current Emergency Operations Center is under redevelopment or blocked.

Verification comments:

Prior to
redevelopment
of the current
Emergency
Operations
Center
Fresno Fire
Department
and Mayor/
City Manager’s
Office
X

I I I I I

I I I I I

I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 24 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Hydrology and Water Quality
HYD-1: The City shall develop and implement water
conservation measures to reduce the per capita water use to 215 gallons per capita per day.

Verification comments:

Prior to water
demand
exceeding water
supply
Department of
Public Utilities
(DPU)
X X
HYD-2: The City shall continue to be an active participant in the Kings Water Authority and the implementation of the Kings Basin IRWMP.

Verification comments:

Ongoing DPU X X
HYD-5.1: The City and partnering agencies shall implement the following measures to reduce the impacts on the capacity of existing or planned storm drainage Master Plan collection systems to less than significant.
• Implement the existing Storm Drainage Master Plan(SDMP) for collection systems in drainage areas where theamount of imperviousness is unaffected by the change in land uses. (continued on next page)
Prior to
exceedance of
capacity of
existing
stormwater
drainage
facilities
Fresno
Metropolitan
Flood Control
District
(FMFCD),
DARM, and
PW
X X X

I I I I I

I I I I I

I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 25 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Hydrology and Water Quality (continued):

HYD-5.1 (continued from previous page)
• Update the SDMP in those drainage areas where the
amount of imperviousness increased due to the change in land uses to determine the changes in the collection
systems that would need to occur to provide adequate
capacity for the stormwater runoff from the increased
imperviousness.
• Implement the updated SDMP to provide stormwater
collection systems that have sufficient capacity to convey the peak runoff rates from the areas of increased
imperviousness.

Require developments that increase site imperviousness to install, operate, and maintain FMFCD approved on-site
detention systems to reduce the peak runoff rates resulting from the increased imperviousness to the peak runoff rates that will not exceed the capacity of the existing stormwater collection systems.

Verification comments:
[see previous
page]
[see previous
page]
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 26 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Hydrology and Water Quality (continued):

HYD-5.2: The City and partnering agencies shall implement the following measures to reduce the impacts on the capacity of existing or planned storm drainage Master Plan retention basins to less than significant:

Consult the SDMP to analyze the impacts to existing and planned retention basins to determine remedial measures required to reduce the impact on retention basin capacity to less than significant. Remedial measures would include:
• Increase the size of the retention basin through the purchase of more land or deepening the basin or a combination for planned retention basins.
• Increase the size of the emergency relief pump capacity required to pump excess runoff volume out of the basin and into adjacent canal that convey the stormwater to a disposal facility for existing retention basins.
• Require developments that increase runoff volume to install, operate, and maintain, Low Impact Development (LID)
measures to reduce runoff volume to the runoff volume that will not exceed the capacity of the existing retention basins.

Verification comments:

Prior to
exceedance of
capacity of
existing retention
basin facilities
FMFCD,
DARM, and
PW

X X X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 27 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Hydrology and Water Quality (continued):

HYD-5.3: The City and partnering agencies shall implement the following measures to reduce the impacts on the capacity of existing or planned storm drainage Master Plan urban detention (stormwater quality) basins to less than significant.

Consult the SDMP to determine the impacts to the urban
detention basin weir overflow rates and determine remedial measures required to reduce the impact on the detention basin capacity to less than significant. Remedial measures would include:
• Modify overflow weir to maintain the suspended solids removal rates adopted by the FMFCD Board of Directors.
• Increase the size of the urban detention basin to increase residence time by purchasing more land. The existing
detention basins are already at the adopted design depth. • Require developments that increase runoff volume to install, operate, and maintain, Low Impact Development (LID)
measures to reduce peak runoff rates and runoffvolume to the runoff rates and volumes that will not exceedthe weir overflow rates of the existing urban detention basins.

Verification comments:

Prior to
exceedance of
capacity of
existing urban
detention basin
(stormwater
quality) facilities
FMFCD,
DARM, and
PW

X X X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 28 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Hydrology and Water Quality (continued):

HYD-5.4: The City shall implement the following measures to reduce the impacts on the capacity of existing or planned storm drainage Master Plan pump disposal systems to less than significant.
• Consult the SDMP to determine the extent and degree to which the capacity of the existing pump system will be
exceeded.
• Require new developments to install, operate, and maintain FMFCD design standard on-site detention facilities to reduce peak stormwater runoff rates to existing planned peak runoff rates.
• Provide additional pump system capacity to maximum
allowed by existing permitting to increase the capacity to match or exceed the peak runoff rates determined by the SDMP.

Verification comments:

Prior to
exceedance of
capacity of
existing pump
disposal systems
FMFCD,
DARM, and
PW

X X X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 29 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Hydrology and Water Quality (continued):
• HYD-5.5: The City shall work with FMFCD to develop and adopt an update to the SDMP for the Southeast
Development Area that would be adequately designed to
collect, convey and dispose of runoff at the rates and
volumes which would be generated by the planned land
uses in that area.

Verification comments:

Prior to
development
approvals in the
Southeast
Development
Area
FMFCD,
DARM, and
PW
X
Public Services:

PS-1: As future fire facilities are planned, the fire department shall evaluate if specific environmental effects would occur.

Typical impacts from fire facilities include noise, traffic, and lighting. Typical mitigation to reduce these impacts includes:
• Noise: Barriers and setbacks on the fire department sites. • Traffic: Traffic devices for circulation and a “keep clear zone” during emergency responses.
• Lighting: Provision of hoods and deflectors on lighting fixtures on the fire department sites.

Verification comments:

During the
planning process
for future fire
department
facilities

DARM X X

I I I I I

I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 30 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Public Services (continued):

PS-2: As future police facilities are planned, the police department shall evaluate if specific environmental effects would occur. Typical impacts from police facilities include noise, traffic, and lighting. Typical mitigation to reduce potential impacts from police department facilities includes:
• Noise: Barriers and setbacks on the police department sites. • Traffic: Traffic devices for circulation.
• Lighting: Provision of hoods and deflectors on lighting fixtures on the police department sites.

Verification comments:

During the
planning process
for future Police
Department
facilities

DARM X X
PS-3: As future public and private school facilities are planned, school districts shall evaluate if specific environmental effects would occur with regard to public schools, and DARM shall evaluate other school facilities. Typical impacts from school facilities include noise, traffic, andlighting. Typical mitigation to reduce potential impacts from school facilities includes:
(continued on next page)
During the
planning process
for future school
facilities
DARM, local
school districts,
and the
Division of the
State Architect
X X X

I I I I I

I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 31 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Public Services (continued):

PS-3 (continued from previous page)
• Noise: Barriers and setbacks placed on school sites.
• Traffic: Traffic devices for circulation.
• Lighting: Provision of hoods and deflectors on lighting fixtures for stadium lights.

Verification comments:
[see previous
page]
[see previous
page]
PS-4: As future parks and recreational facilities are planned, the City shall evaluate if specific environmental effects would occur. Typical impacts from school facilities include noise, traffic, and lighting. Typical mitigation to reduce potential impacts from park and recreational facilities includes:
• Noise: Barriers and setbacks placed on school sites.
• Traffic: Traffic devices for circulation.
• Lighting: Provision of hoods and deflectors on lighting fixtures for outdoor play area/field lights.

Verification comments:

During the
planning process
for future park
and recreation
facilities

DARM X X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 32 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Public Services (continued):

PS-5: As future detention, court, library, and hospital facilities are planned, the appropriate agencies shall evaluate if specific environmental effects would occur. Typical impacts from court, library, and hospital facilities include noise, traffic, and lighting.

Typical mitigation to reduce potential impacts includes:
• Noise: Barriers and setbacks placed on school sites.
• Traffic: Traffic devices for circulation.
• Lighting: Provision of hoods and deflectors on outdoor lighting fixtures.

Verification comments:

During the
planning process
for future
detention, court,
library, and
hospital facilities
DARM, to the
extent that
agencies
constructing
these facilities
are subject to
City of Fresno
regulation
X
Utilities and Service Systems
USS-1: The City shall develop and implement a wastewater master plan update.

Verification comments:

Prior to
wastewater
conveyance and
treatment
demand
exceeding
capacity

DPU X X

I I I I I

I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 33 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems (continued):

USS-2: Prior to exceeding existing wastewater treatment capacity, the City shall evaluate the wastewater system and shall not approve additional development that contributes wastewater to the wastewater treatment facility that could exceed capacity until additional capacity is provided. By approximately the year 2025, the City shall construct the following improvements:
• Construct an approximately 70 MGD expansion of the
Regional Wastewater Treatment and Reclamation Facility
and obtain revised waste discharge permits as the
generation of wastewater is increased.
• Construct an approximately 0.49 MGD expansion of the
North Facility and obtain revised waste discharge permits as the generation of wastewater is increased.

Verification comments:

Prior to
exceeding
existing
wastewater
treatment
capacity

DPU X X
USS-3: Prior to exceeding existing wastewater treatment capacity, the City shall evaluate the wastewater system and shall not approve additional development that contributes wastewater to the wastewater treatment facility that could exceed capacity until additional capacity is provided. After (continued on next page)
Prior to
exceeding
existing
wastewater
treatment
capacity

DPU X X

I I I I I

I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 34 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems (continued):

USS-3 (continued from previous page)
approximately the year 2025, the City shall construct the following improvements:
• Construct an approximately 24 MGD wastewater treatment facility within the Southeast Development Area and obtain revised waste discharge requirements as the generation of wastewater is increased.
• Construct an approximately 9.6 MGD expansion of the
Regional Wastewater Treatment and Reclamation Facility
and obtain revised waste discharge permits as the
generation of wastewater is increased.

Verification comments:
[see previous
page]
[see previous
page]
USS-4: A Traffic Control/Traffic Management Plan to address traffic impacts during construction of water and sewer facilities shall be prepared and implemented, subject to approval by the City (and Fresno County, when work is being done in unincorporated area roadways). The plan shall identify access and parking restrictions, pavement markings and signage, and hours of construction and for deliveries. It shall include haul routes, the notification plan, and coordination withemergency service providers and schools.

Verification comments:

Prior to
construction of
water and sewer
facilities
PW for work in
the City; PW
and Fresno
County Public
Works and
Planning when
unincorporated
area roadways
are involved

X X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 35 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems (continued):

USS-5: Prior to exceeding capacity within the existing
wastewater collection system facilities, the City shall evaluate the wastewater collection system and shall not approve
additional development that would generate additional
wastewater and exceed the capacity of a facility until additional capacity is provided. By approximately the year 2025, the following capacity improvements shall be provided.
• Orange Avenue Trunk Sewer: This facility shall be improved between Dakota and Jensen Avenues. Approximately
37,240 feet of new sewer main shall be installed and
approximately 5,760 feet of existing sewer main shall be rehabilitated. The size of the new sewer main shall range from 27 inches to 42 inches in diameter. The associated project designations in the 2006 Wastewater Master Plan are RS03A, RL02, C01-REP, C02-REP, C03-REP, C04-REP,
C05-REP, C06-REL and C07-REP.
• Marks Avenue Trunk Sewer: This facility shall be improved between Clinton Avenue and Kearney Boulevard.

Approximately 12,150 feet of new sewer main shall be
installed. The size of the new sewer main shall range from 33 inches to 60 inches in diameter. The associated project designations in the 2006 Wastewater Master Plan are CM1- REP and CM2-REP.
(continued on next page)
Prior to
exceeding
capacity within
the existing
wastewater
collection system
facilities

DPU X X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 36 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems (continued):

USS-5 (continued from previous page)
• North Avenue Trunk Sewer: This facility shall be improved between Polk and Fruit Avenues and also between Orange
and Maple Avenues. Approximately 25,700 feet of new
sewer main shall be installed. The size of the new sewer main shall range from 48 inches to 66 inches in diameter.

The associated project designations in the 2006Wastewater Master Plan are CN1-REL1 and CN3-REL1.
• Ashlan Avenue Trunk Sewer: This facility shall be improved between Hughes and West Avenues and also between Fruit
and Blackstone Avenues. Approximately 9,260 feet ofnew
sewer main shall be installed. The size of the new sewer main shall range from 24 inches to 36 inches indiameter.

The associated project designations in the 2006 Wastewater Master Plan are CA1-REL and CA2-REP.

Verification comments:
[see previous
page]
[see previous
page]
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 37 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems (continued):

USS-6: Prior to exceeding capacity within the existing 28 pipeline segments shown in Figures 1 and 2 in Appendix J-1, the City shall evaluate the wastewater collection system and shall not approve additional development that would generate additional wastewater and exceed the capacity of one of the 28 pipeline segments until additional capacity is provided.

Verification comments:

Prior to
exceeding
capacity within
the existing 28
pipeline segments shown in
Figures 1 and 2
in Appendix J-1
of the MEIR

DPU X X
USS-7: Prior to exceeding existing water supply capacity, the City shall evaluate the water supply system and shall not approve additional development that demand additional water until additional capacity is provided. By approximately the year 2025, the following capacity improvements shall be provided. • Construct an approximately 80 million gallon per day (MGD) surface water treatment facility near the intersection of Armstrong and Olive Avenues, in accordance with Chapter 9 and Figure 9-1 of the City of Fresno MetropolitanWater Resources Management Plan Update (2014 Metro Plan
Update) Phase 2 Report, dated January 2012.
(continued on next page)
Prior to
exceeding
existing water
supply capacity

DPU X X

I I I I I

I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 38 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems (continued):

USS-7 (continued from previous page)
• Construct an approximately 30 MGD expansion of the
existing northeast surface water treatment facility for a total capacity of 60 MGD, in accordance with Chapter 9 and
Figure 9-1 of the 2014 Metro Plan Update.
• Construct an approximately 20 MGD surface water
treatment facility in the southwest portion of the City, in accordance with Chapter 9 and Figure 9-1 of the 2014 Metro Plan Update.

Verification comments:
[see previous
page]
[see previous
page]
USS-8: Prior to exceeding capacity within the existing water conveyance facilities, the City shall evaluate the water conveyance system and shall not approve additional
development that would demand additional water and exceed the capacity of a facility until additional capacity is provided. The following capacity improvements shall be provided by
approximately 2025.
• Construct 65 new groundwater wells, in accordance with Chapter 9 and Figure 9-1 of the 2014 Metro Plan Update. (continued on next page)
Prior to
exceeding
capacity within
the existing
water
conveyance
facilities

DPU X X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 39 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems (continued):

USS-8 (continued from previous page)
• Construct a 2.0 million gallon potable water reservoir (Reservoir T2) near the intersection of Clovis and California Avenues, in accordance with Chapter 9 and Figure 9-1 of the 2014 Metro Plan Update.
• Construct a 3.0 million gallon potable water reservoir (Reservoir T3) near the intersection of Temperance and
Dakota Avenues, in accordance with Chapter 9 and Figure 9-1 of the 2014 Metro Plan Update.
• Construct a 3.0 million gallon potable water reservoir (Reservoir T4) in the Downtown Planning Area, in
accordance with Chapter 9 and Figure 9-1 of the 2014 Metro Plan Update.
• Construct a 4.0 million gallon potable water reservoir (Reservoir T5) near the intersection of Ashlan and Chestnut Avenues, in accordance with Chapter 9 and Figure 9-1 of the 2014 Metro Plan Update.
• Construct a 4.0 million gallon potable water reservoir (Reservoir T6) near the intersection of Ashlan Avenue and Highway 99, in accordance with Chapter 9 and Figure 9-1 of the 2014 Metro Plan Update.
(continued on next page)
[see previous
page]
[see previous
page]
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 40 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems (continued):

USS-8 (continued from previous two pages)
• Construct 50.3 miles of regional water transmission mains ranging in size from 24-inch to 48-inch diameter, in
accordance with Chapter 9 and Figure 9-1 of the 2014
Metro Plan Update.
• Construct 95.9 miles of 16-inch diameter transmission grid mains, in accordance with Chapter 9 and Figure 9-1 of the 2014 Metro Plan Update.

Verification comments:
[see Page 37] [see Page 37]
USS-9: Prior to exceeding capacity within the existing water conveyance facilities, the City shall evaluate the water conveyance system and shall not approve additional
development that would demand additional water and exceed the capacity of a facility until additional capacity is provided. The following capacity improvements shall be provided after approximately the year 2025 and additional water conveyance facilities shall be provided prior to exceedance of capacity within the water conveyance facilities to accommodate full buildout of the General Plan Update.
(continued on next page)
Prior to
exceeding
capacity within
the existing
water
conveyance
facilities

DPU X X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 41 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems (continued):

USS-9 (continued from previous page)
• Construct a 4.0 million gallon potable water reservoir (SEDA Reservoir 1) within the northern part of the Southeast
Development Area.
• Construct a 4.0 million gallon potable water reservoir (SEDA Reservoir 2) within the southern part of the Southeast
Development Area.

Additional water conveyance facilities shall be provided prior to exceedance of capacity within the water conveyance
facilities to accommodate full buildout of the General Plan Update.

Verification comments:
[see previous
page]
[see previous
page]
USS-10: In order to maintain Fresno Irrigation District canal operability, FMFCD shall maintain operational intermittent flows during the dry season, within defined channel capacity and downstream capture capabilities, for recharge.

Verification comments:

During the dry
season
Fresno
Irrigation
District (FID)

X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 42 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems - Biological Resources:

USS-11: When FMFCD proposes to provide drainage service outside of urbanized areas:
(a) FMFCD shall conduct preliminary investigations on
undeveloped lands outside of highly urbanized areas.

These investigations shall examine wetland hydrology,
vegetation and soil types. These preliminary
investigations shall be the basis for making a
determination on whether or not more in-depth wetland
studies shall be necessary. If the proposed project site does not exhibit wetland hydrology, support a prevalence of wetland vegetation and wetland soil types then no
further action is required.
(b) Where proposed activities could have an impact on areas verified by the Corps as jurisdictional wetlands or waters of the U.S. (urban and rural streams, seasonal wetlands, and vernal pools), FMFCD shall obtain the necessary
Clean Water Act, Section 404 permits for activities where fill material shall be placed in a wetland, obstruct the flow or circulation of waters of the United States, impair or reduce the reach of such waters. As part of FMFCD’s
Memorandum of Understanding with CDFG, Section 404
and 401 permits would be obtained from the U.S. Army
Corps of Engineers and from the
(continued on next page)
Prior to
development
approvals
outside of highly
urbanized areas
California
Regional
Water Quality
Control Board
(RWQCB), and
USACE

X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 43 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems - Biological Resources (continued):

USS-11 (continued from previous page)
Regional Water Quality Control Board for any activity
involving filling of jurisdictional waters). At a minimum, to meet “no net loss policy,” the permits shall require
replacement of wetland habitat at a 1:1 ratio.
(c) Where proposed activities could have an impact on areas verified by the Corps as jurisdictional wetlands or waters of the U.S. (urban and rural streams, seasonal wetlands, and vernal pools), FMFCD shall submit and implement a
wetland mitigation plan based on the wetland acreage
verified by the U.S. Army Corps of Engineers. The
wetland mitigation plan shall be prepared by a qualified biologist or wetland scientist experienced in wetland
creation, and shall include the following or equally
effective elements:
i. Specific location, size, and existing hydrology and
soils within the wetland creation area.
ii. Wetland mitigation techniques, seed source,
planting specifications, and required buffer
setbacks. In addition, the mitigation plan shall
ensure adequate water supply is provided to the
created wetlands in order to maintain the proper
(continued on next page)
[see previous
page]
[see previous
page]
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 44 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems - Biological Resources (continued):

USS-11 (continued from previous two pages)
hydrologic regimes required by the different types
of wetlands created. Provisions to ensure the
wetland water supply is maintained in perpetuity
shall be included in the plan.
iii. A monitoring program for restored, enhanced, created, and preserved wetlands on the project site. A
monitoring program is required to meet three
objectives; 1) establish a wetland creation success
criteria to be met; 2) to specify monitoring
methodology; 3) to identify as far as is possible,
specific remedial actions that will be required inorder to achieve the success criteria; and 4) todocument
the degree of success achieved in establishing
wetland vegetation.
(d) A monitoring plan shall be developed and implemented by a qualified biologist to monitor results of any on-site wetland restoration and creation for five years. The
monitoring plan shall include specific success criteria, frequency and timing of monitoring, and assessment of
whether or not maintenance activities are being carried out and how these shall be adjusted if necessary.
(continued on next page)
[see Page 41] [see Page 41]
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 45 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems - Biological Resources (continued):

USS-11 (continued from previous three pages)
If monitoring reveals that success criteria are not being met, remedial habitat creation or restoration should be designed and implemented by a qualified biologist and
subject to five years of monitoring as described above.

Or
(e) In lieu of developing a mitigation plan that outlines the avoidance, purchase, or creation of wetlands, FMFCD
could purchase mitigation credits through a Corps
approved Mitigation Bank.

Verification comments:
[see Page 41] [see Page 41]
USS-12: When FMFCD proposes to provide drainage service outside in areas that support seasonal wetlands or vernalpools:
(a) During facility design and prior to initiation of ground disturbing activities in areas that support seasonal
wetlands or vernal pools, FMFCD shall conduct a
preliminary rare plant assessment. The assessment will
determine the likelihood on whether or not the project
site could support rare plants. If it is determined that the project site would not support rare plants, then no further (continued on next page)
During facility
design and prior
to initiation of
ground
disturbing
activities in
areas that
support seasonal
wetlands or
vernal pools
California
Department of
Fish & Wildlife
(CDFW) and
U.S. Fish and
Wildlife Service
(USFWS)

X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 46 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems - Biological Resources (continued):

USS-12 (continued from previous page)
action is required. However, if the project site has the potential to support rare plants; then a rare plant survey shall be conducted. Rare plant surveys shall be
conducted by qualified biologists in accordance with the most current CDFG/USFWS guidelines or protocols and
shall be conducted at the time of year when the plants in question are identifiable.
(b) Based on the results of the survey, prior to design approval, FMFCD shall coordinate with CDFG and/or
implement a Section 7 consultation with USFWS, shall
determine whether the project facility would result in a significant impact to any special status plant species.

Evaluation of project impacts shall consider the following:
• The status of the species in question (e.g., officially listed by the State or Federal Endangered Species
Acts).
• The relative density and distribution of the on-site
occurrence versus typical occurrences of the species
in question.
(continued on next page)
[see previous
page]
[see previous
page]
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 47 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems - Biological Resources (continued):

USS-12 (continued from previous two pages)
• The habitat quality of the on-site occurrence relative to historic, current or potential distribution of the
population.
(c) Prior to design approval, and in consultation with the CDFG and/or the USFWS, FMFCD shall prepare and implement
a mitigation plan, in accordance with any applicable State and/or federal statutes or laws, thatreduces impacts to a less than significant level.

Verification comments:
[see Page 44] [see Page 44]
USS-13: When FMFCD proposes to provide drainage service outside in areas that support seasonal wetlands or vernalpools:
(a) During facility design and prior to initiation of ground disturbing activities in areas that support seasonal
wetlands or vernal pools, FMFCD shall conduct a
preliminary survey to determine the presence of listed
vernal pool crustaceans.
(continued on next page)
During facility
design and prior
to initiation of
ground
disturbing
activities in
areas that
support seasonal
wetlands or
vernal pools
CDFW and
USFWS

X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 48 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems - Biological Resources (continued):

USS-13 (continued from previous page)
(b) If potential habitat (vernal pools, seasonally inundated areas) or fairy shrimp exist within areas proposed to be disturbed, FMFCD shall complete the first and second
phase of fairy shrimp presence or absence surveys. If an absence finding is determined and accepted by the
USFWS, then no further mitigation shall be required for fairy shrimp.
(c) If fairy shrimp are found to be present within vernal pools or other areas of inundation to be impacted by the
implementation of storm drainage facilities, FMFCD shall mitigate impacts on fairy shrimp habitat in accordance
with the USFWS requirements of the Programmatic
Biological Opinion. This shall include on-site or off-site creation and/or preservation of fairy shrimp habitat at ratios ranging from 3:1 to 5:1 depending on the habitat impacted and the choice of on-site or off-site mitigation.

Or mitigation shall be the purchase of mitigation credit through an accredited mitigation bank.

Verification comments:
[see previous
page]
[see previous
page]
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 49 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems - Biological Resources (continued):

USS-14: When FMFCD proposes to construct drainage
facilities in an area where elderberry bushes may occur:
(a) During facility design and prior to initiation of construction activities, FMFCD shall conduct a project- specific survey for all potential Valley Elderberry Longhorn Beetle (VELB) habitats (elderberry shrubs),including a stem count and an assessment of historic or current VELB habitat.
(b) FMFCD shall avoid and protect all potential identified VELB habitat where feasible.
(c) Where avoidance is infeasible, develop and implement a VELB mitigation plan in accordance with the most current USFWS mitigation guidelines for unavoidable take of
VELB habitat pursuant to either Section 7 or Section 10(a) of the Federal Endangered Species Act. The mitigation
plan shall include, but might not be limitedto, relocation of elderberry shrubs, planting of elderberry shrubs, and
monitoring of relocated and planted elderberry shrubs.

Verification comments:

During facility
design and prior
to initiation of
construction
activities
CDFW and
USFWS

X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 50 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems - Biological Resources (continued):

USS-15: Prior to ground disturbing activities during nesting season (March through July) for a project that supports bird nesting habitat, FMFCD shall conduct a survey of trees. If nests are found during the survey, a qualified biologist shall assess the nesting activity on the project site. If active nests are located, no construction activities shall be allowed within 250 feet of the nest until the young have fledged. If construction activities are planned during the no n-breeding period (August through February), a nest survey is not necessary.

Verification comments:

Prior to ground
disturbing
activities during
nesting season
(March through
July) for a
project that
supports bird
nesting habitat
CDFW and
USFWS
X
USS-16: When FMFCD proposes to construct drainage
facilities in an area that supports bird nesting habitat:
(a) FMFCD shall conduct a pre-construction breeding- season survey (approximately February 1 through August31) of
proposed project sites in suitable habitat (levee and canal berms, open grasslands with suitable burrows) during the same calendar year that construction is planned to begin.

If phased construction procedures are planned for the
proposed project, the results of the above survey shall be valid only for the season when it is conducted.
(continued on next page)
Prior to ground
disturbing
activities during
nesting season
(March through
July) for a
project that
supports bird
nesting habitat
CDFW and
USFWS
X

I I I I I

I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 51 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems - Biological Resources (continued):

USS-16 (continued from previous page)
(b) During the construction stage, FMFCD shall avoid all burrowing owl nest sites potentially disturbed by project construction during the breeding season while the nest is occupied with adults and/or young. The occupied nest site shall be monitored by a qualified biologist to determine when the nest is no longer used. Avoidance shall include the establishment of a 160-foot diameter non-disturbance buffer zone around the nest site. Disturbance of any nest sites shall only occur outside of the breeding season and when the nests are unoccupied based on monitoring by a
qualified biologist. The buffer zone shall be delineated by highly visible temporary construction fencing.

Based on approval by CDFG, pre-construction and prebreeding season exclusion measures may be implemented to preclude burrowing owl occupation of the project site prior to project-related disturbance. Burrowing owls can be passively excluded from potential nest sites in the construction area, either by closing the burrows or placing one-way doors in the burrows according to current CDFG protocol. Burrows shall be examined not more than 30 days before construction to ensure that no owls have recolonized the area of construction. (continued on next page)
[see previous
page]
[see previous
page]
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 52 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems - Biological Resources (continued):

USS-16 (continued from previous two pages)
For each burrow destroyed, a new burrow shall be created (by installing artificial burrows at a ratio of 2:1 on protected lands nearby.

Verification comments:
[see Page 49] [see Page 49]
USS-17: When FMFCD proposes to construct drainage
facilities in the San Joaquin River corridor:
(a) FMFCD shall not conduct instream activities in the San Joaquin River between October 15 and April 15. If this is not feasible, FMFCD shall consult with the National Marine Fisheries Service and CDFW on the appropriate measures
to be implemented in order to protect listed salmonids in the San Joaquin River.
(b) Riparian vegetation shading the main channel that is removed or damaged shall be replaced at a ratio and
quantity sufficient to maintain the existing shading of the channel. The location of replacement trees on or within (continued on next page)
During instream
activities
conducted
between
October 15 and
April 15
National
Marine
Fisheries
Service
(NMFS),
CDFW, and
Central Valley
Flood
Protection
Board
(CVFPB)

X I I I I I
-
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 53 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems / Biological Resources (continued):

USS-17 (continued from previous page)
FMFCD berms, detention ponds or river channels shall
be approved by FMFCD and the Central Valley Flood
Protection Board.

Verification comments:
[see previous
page]
[see previous
page]
Utilities and Service Systems – Recreation / Trails:

USS-18: When FMFCD updates its District Service Plan:

Prior to final design approval of all elements of the District Services Plan, FMFCD shall consult with Fresno County, City of Fresno, and City of Clovis to determine if any element would temporarily disrupt or permanently displace adopted existing or planned trails and associated recreational facilities as a result of the proposed District Services Plan. If the proposed project would not temporarily disrupt or permanently displace adopted existing or planned trails, no further mitigation is necessary. If the proposed project would have an effect on the trails and associated facilities, FMFCD shall implement the following:
(continued on next page)
Prior to final
design approval
of all elements of
the District
Services Plan

DARM, PW,
City of Clovis,
and County of
Fresno

X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 54 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems – Recreation / Trails (continued):

USS-18 (continued from previous page)
(a) If short-term disruption of adopted existing or planned trails and associated recreational facilities occur, FMFCD shall consult and coordinate with Fresno County, City of Fresno, and City of Clovis to temporarily re-route the trails and associated facilities.
(b) If permanent displacement of the adopted existing or planned trails and associated recreational facilities occur, the appropriate design modifications to prevent permanent displacement shall be implemented in the final project
design or FMFCD shall replace these facilities.

Verification comments:
[see previous
page]
[see previous
page]
Utilities and Service Systems – Air Quality:

USS-19: When District drainage facilities are constructed, FMFCD shall:
(a) Minimize idling time of construction equipment vehicles to no more than ten minutes, or require that engines be shut off when not in use.
(continued on next page)
During storm
water drainage
facility
construction
activities
Fresno
Metropolitan
Flood Control
District and

SJVAPCD

X I I I I I
PROJECT REQUIREMENT CHECKLIST FOR EA NO. T-6345/P22-00411/P22-00442 August 12, 2022 A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 55 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems – Air Quality (continued):

USS-19 (continued from previous page)
(b) Construction shall be curtailed as much as possible when the Air Quality Index (AQI) is above 150. AQI forecasts can be found on the SJVAPCD web site.
(c) Off-road trucks should be equipped with on-road engines if possible.
(d) Construction equipment should have engines that meet the current off-road engine emission standard (as certified by CARB), or be re-powered with an engine that meets this
standard.

Verification comments:
[see previous
page]
[see previous
page]
Utilities and Service Systems – Adequacy of Storm Water Drainage Facilities:

USS-20: Prior to exceeding capacity within the existing storm water drainage facilities, the City shall coordinate with FMFCD to evaluate the storm water drainage system and shall not approve additional development that would convey additional storm water to a facility that would experience an exceedance of capacity until the necessary additional capacity is provided.

Verification comments:

Prior to
exceeding
capacity within
the existing storm
water drainage
facilities

FMFCD, PW,
and DARM

X X X I I I I I
A - Incorporated into Project
B - Project Requirement Complete
C - Project Requirement in Progress
D - Responsible Agency Contacted
E - Part of City-Wide Program
F - Not Applicable

Page 1 ends

PROJECT REQUIREMENT WHEN

IMPLEMENTED

COMPLIANCE

VERIFIED BY A B C D E F
Utilities and Service Systems – Adequacy of Water Supply Capacity:

USS-21: Prior to exceeding existing water supply capacity, the City shall evaluate the water supply system and shall not approve additional development that demand additional water until additional capacity is provided. By approximately the year 2025, the City shall construct an approximately 25,000 AF/year tertiary recycled water expansion to the Fresno- Clovis Regional Wastewater Reclamation Facility in accordance with the 2013 Recycled Water Master Plan and the 2014 City of Fresno Metropolitan Water Resources Management Plan
update.

Implementation of Mitigation Measure USS-5 is also required prior to approximately the year 2025.

Verification comments:

Prior to
exceeding
existing water
supply capacity
DPU and
DARM
X X X
Utilities and Service Systems – Adequacy of Landfill Capacity:

USS-22: Prior to exceeding landfill capacity, the City shall evaluate additional landfill locations and shall not approve additional development that could contribute solid waste to a landfill that is at capacity until additional capacity is provided.

Verification comments:

Prior to
exceeding
landfill capacity
DPU and
DARM
X X

I I I I I

I I I I I
Autumn Ridge Residential Development
Local Transportation Analysis - Appendix
July 7, 2022
Prepared by:

VRPA Technologies, Inc.
4630 W. Jennifer, Suite 105
Fresno, CA 93722
Project Manager: Erik Ruehr
VRPA TECHNOlOGIES. INC.

APPENDIX A
General Plan and Development Code Update
~ Wl'PA -,:u,c_ -'-
City of Fresno
General Plan and Development Code Update
Master Environmental Impact Report Transportation and Traffic It should be noted that this traditional methodology used to analyze the roadway system does not consider the potential impact on walking, bicycling, and transit. Pedestrians, bicyclists, and transit riders are all users of the roadway system but may not be fully recognized in the traffic operations analysis and the calculation of LOS. The LOS thresholds in Table 5.14-2 are based on driver's comfort and convenience. Identifying the need for roadway improvements based on the resulting roadway LOS can have unintended impacts to other modes such as increasing the walking time for pedestrians. In evaluating the roadway system, a lower vehicle LOS may be desired when balanced against other community values related to resource protection, social equity, economic development, and consideration of pedestrians, bicyclists, and transit users.

Table 5.14-2: Roadway Functional Class and Peak Hour Level-of-Service Thresholds I I l Peak Hour Level of Service Capacity Threshold
Functional Class Median Lanes A B C D E
N/A1 4 2,720 4,460 6,630 7,720 8,630
3+Aux2 2,360 3,860 5,640 6,730 7,530
Freeway 3 2,000 3,270 4,660 5,740 6,430
2+Aux 1,650 2,700 3,850 4,760 5,340
2 1,300 2,130 3,050 3,790 4,260
Divided 6 2,410 3,960 5,730 7,450 8,450
State Expressway 4 1,610 2,650 3,810 4,960 5,630
2 810 1,340 1,890 2,470 2,810
Raised 6 1,860 6,170 6,520
Median 5 1,520 5,110 5,430
City Expressway
4 1,180 4,050 4,340
2 520 1,910 2,160
Raised 6 4,910 6,240
Super Arterial Median 5 4,040 5,195
4 3,170 4,150
Raised 8 2,120 7,070 7,490
Median 6 1,560 5,270 5,610
5 1,280 4,370 4,670
4 1,000 3,470 3,730
Arterial
3 720 2,555 2,795
2 440 1,640 1,860
TWLTL3 4 940 3,290 3,550
2 420 1,550 1,760
FirstCarbon Solutions 5.14-7
M:\DriveT@VOll\shared\31680016- Fresno General Plan MEIR\Fresno GP MEIR_FINAL 7.22.14\31680016 Sec 05-14 Transportation MEIR 7.22.14.doc Transportation and Traffic
City of Fresno
General Plan and Development Code Update
Master Environmental Impact Report
i I l Peak Hour Level of Service Capacity Threshold
Functional Class Median Lanes A I B C D E
Undivided 4 770 2,740 2,980
2 340 1,270 1,480
TWLTL 4 940 3,290 3,550
2 420 1,550 1,760
Collector
Undivided 4 770 2,740 2,980
2 340 1,270 1,480
Undivided 3 1,960 2,240 2,430 2,610
One-Way 2 1,250 1,490 1,620 1,740
1 550 740 800 870
Rural State Undivided 2 310 570 1,020 1,730 2,470
Highway
Divided 4 1,950 3,580 3,780
Rural Arterial
Undivided 2 570 1,230 1,310
Rural Undivided 2 700 930 1,000
Collector/Local
Notes: 1 N/A- Not applicable for operational class 2 Aux - Auxiliary Lane 3 TWLTL-Two-way Left-turn Lane - LOS is not achievable because of type of facility.

Source: Fehr & Peers 2012.

Exhibit 5.14-2 shows existing AM peak hour traffic volumes (two-way total) and LOS (See Appendix H-3 for detail) and Exhibit 5.14-3 shows existing PM peak hour traffic volumes (two-way total) and LOS (See Appendix H-4 for detail). Exhibit 5.14-4 illustrates the planned roadway number of lanes.

Most roadways operate at LOS D or better during the AM and PM peak hours, except for the following, which operate at LOS E and F:

City of Fresno
• Willow Avenue - Copper to Behymer Avenue (LOS E during the PM peak hour) • Willow Avenue - Behymer Avenue to Shepherd Avenue (LOS F during the PM peak hour) • Golden State Boulevard - Shaw Avenue to Swift Avenue (LOS F during the PM peak hour) • Golden State Boulevard - Motel Drive to Ashlan Avenue (LOS E during the PM peak hour) • Nees Avenue - Jordan Avenue to Paula Avenue (LOS E during the PM peak hour) • Cornelia Avenue - Ashlan Avenue to Griffith Way (LOS E during the PM peak hour) • Marks Avenue - Dakota Avenue to Weber Avenue (LOS E during the PM peak hour) • Clinton Avenue - Valentine Avenue to Marks Avenue (LOS F during the PM peak hour)

5.14-8 FirstCarbon Solutions M:\DriveT@VOll\shared\31680016- Fresno General Plan MEIR\ Fresno GP MEIR_FINAL 7.22.14\ 31680016 Sec OS-14 Transportation MEIR 7.22.14.doc

APPENDIX B
Traffic Count Data Worksheets
~ Wl'PA -,:u,c_ -'-
National Data & Surveying Serviceslntersection Turning Movement Count Location: S Willow Ave & E Butler Ave
City: Fresno Project ID: 21-090096-001
Control: Signalized Date: 10/5/2021
Data -Totals
SWilo Ave S Wil w Ave E Butler Av E Butler Ave

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
0 1 0 0 0 0 0 0 0 1 0 0 1 1 0 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
7:00 AM 9 0 12 0 0 0 0 0 0 13 6 0 8 30 0 0 78
7:15 AM 8 0 26 0 0 0 0 0 0 37 14 0 32 63 0 0 180
7:30 AM 29 0 45 0 0 0 0 0 0 69 31 0 57 102 0 0 333
7:45 AM 35 0 62 0 0 0 0 0 0 73 36 0 56 100 0 0 362
8:00 AM 17 0 12 0 0 0 0 0 0 41 13 0 31 76 0 0 190
8:15 AM 19 0 10 0 0 0 0 0 0 28 8 0 7 36 0 0 108
8:30 AM 19 0 7 0 0 0 0 0 0 18 8 0 16 47 0 0 115
8:45 AM 28 0 11 0 0 0 0 0 0 25 6 0 6 49 0 0 125

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES : 164 0 185 0 0 0 0 0 0 304 122 0 213 503 0 0 1491 APPROACH "Io's : 46.99% 0.00% 53.01% 0.00% 0.00% 71.36% 28.64% 0.00% 29.75% 70.25% 0.00% 0.00% 0 ,1 - 08:1 TOTAL PEAK HR VOL : 89 0 145 0 0 0 0 0 0 220 94 0 176 341 0 0 1065 PEAK HR FACTOR : 0.636 0.000 0.585 0.000 0.000 0.000 0.000 0.000 0.000 0.753 0.653 0.000 0.772 0.836 0.000 0.000 0.735 0.603 0.720 0.813

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
0 1 0 0 0 0 0 0 0 1 0 0 1 1 0 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
4:00 PM 27 0 24 0 0 0 0 0 0 52 19 0 17 47 0 0 186
4:15 PM 20 0 21 0 0 0 0 0 0 63 8 0 24 so 0 0 186
4:30 PM 27 0 28 0 0 0 0 0 0 43 15 0 20 57 0 0 190
4:45 PM 22 0 25 0 0 0 0 0 0 52 14 0 29 68 0 0 210
5:00 PM 25 0 25 0 0 0 0 0 0 73 21 0 31 65 0 0 240
5:15 PM 23 0 23 0 0 0 0 0 0 68 23 0 24 68 0 0 229
5:30 PM 18 0 27 0 0 0 0 0 0 66 13 0 18 49 0 0 191
5:45 PM 15 0 15 0 0 0 0 0 0 55 19 0 19 46 0 0 169

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES : 177 0 188 0 0 0 0 0 0 472 132 0 182 450 0 0 1601 APPROACH "Io's : 48.49% 0.00% 51.51% 0.00% 0.00% 78.15% 21.85% 0.00% 28.80% 71.20% 0.00% 0.00% 0 : p - 05: p TOTAL
PEAK HR VOL : 88 0 100 0 0 0 0 0 0 259 71 0 102 250 0 0 870 PEAK HR FACTOR : 0.880 0.000 0.926 0.000 0.000 0.000 0.000 0.000 0.000 0.887 0.772 0.000 0.823 0.919 0.000 0.000 0.906 0.940 0.878 0.907 National Data & Surveying Serviceslntersection Turning Movement Count Location: S Willow Ave & E Church Ave
City: Fresno Project ID: 21-090096-002
Control: 4-Way Stop Date: 10/ 5/2021
Data -Totals
SWilo Ave S Wil w Ave E Church Ave E Church Ave

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
0 1 0 0 0 1 1 0 0 1 1 0 0 1 1 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
7:00 AM 2 9 6 0 4 8 2 0 2 31 4 0 7 43 7 0 125
7:15 AM 7 19 6 0 9 14 16 0 13 37 8 1 11 55 8 0 204
7:30 AM 8 29 11 0 35 16 23 0 26 47 7 0 10 62 24 0 298
7:45 AM 11 30 23 0 49 18 42 0 26 56 13 0 13 62 54 0 397 8:00 AM 5 14 24 0 20 13 12 0 5 62 5 0 15 54 6 0 235
8:15 AM 2 13 14 0 6 10 5 0 9 42 5 0 28 40 10 0 184
8:30 AM 0 15 7 0 3 6 5 0 1 27 7 0 5 31 8 0 115
8:45 AM 0 15 6 0 1 6 2 0 2 20 3 0 6 27 6 0 94

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES : 35 144 97 0 127 91 107 0 84 322 52 1 95 374 123 0 1652 APPROACH "Io's : 12.68% 52.17% 35.14% 0.00% 39.08% 28.00% 32.92% 0.00% 18.30% 70.15% 11.33% 0.22% 16.05% 63.18% 20.78% 0.00% 0 ,1 - 08:1 TOTAL
PEAK HR VOL : 31 92 64 0 113 61 93 0 70 202 33 1 49 233 92 0 1134 PEAK HR FACTOR : 0.705 0.767 0.667 0.000 0.577 0.847 0.554 0.000 0.673 0.815 0.635 0.250 0.817 0.940 0.426 0.000 0.714 0.730 0.612 0.805 0.725

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
0 1 0 0 0 1 1 0 0 1 1 0 0 1 1 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
4:00 PM 9 18 10 0 4 14 15 0 12 56 3 0 10 54 6 0 211
4:15 PM 7 23 9 0 1 15 9 0 7 61 2 0 13 so 5 0 202
4:30 PM 2 32 18 0 5 12 7 0 4 71 7 0 7 40 8 0 213
4:45 PM 10 19 9 0 5 18 9 0 6 76 7 0 16 60 8 0 243
5:00 PM 6 24 9 0 10 15 18 0 14 45 6 0 9 41 9 0 206
5:15 PM 6 16 4 0 8 23 13 0 8 71 9 0 10 52 14 0 234
5:30 PM 7 28 8 0 10 16 11 0 9 62 4 0 12 60 8 0 235
5:45 PM 9 13 18 0 8 11 18 0 8 58 1 0 8 71 8 0 231

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES : 56 173 85 0 51 124 100 0 68 500 39 0 85 428 66 0 1775 APPROACH "Io's : 17.83% 55.10% 27.07% 0.00% 18.55% 45.09% 36.36% 0.00% 11.20% 82.37% 6.43% 0.00% 14.68% 73.92% 11.40% 0.00% 0 : p - 05: p TOTAL
PEAK HR VOL : 29 87 30 0 33 72 51 0 37 254 26 0 47 213 39 0 918 PEAK HR FACTOR : 0.725 0.777 0.833 0.000 0.825 0.783 0.708 0.000 0.661 0.836 0.722 0.000 0.734 0.888 0.696 0.000 0.944 0.849 0.886 0.890 0.890 National Data & Surveying Serviceslntersection Turning Movement Count Location: S Willow Ave & E Jensen Ave
City: Fresno Project ID: 21-090096-003
Control: Signalized Date: 10/ 5/2021
Data -Totals
SWilo Ave S Wil w Ave EJ n n Ave E Jensen Ave

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
1 1 0 0 1 1 1 0 1 2 0 0 1 2 0 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
7:00 AM 1 1 4 0 2 6 19 0 2 53 8 0 5 187 2 0 290
7:15 AM 3 1 1 0 4 8 23 0 8 67 4 0 7 186 10 1 323
7:30 AM 7 5 6 0 12 6 35 0 14 103 5 2 8 260 10 0 473
7:45 AM 7 4 0 0 7 12 23 0 18 82 14 0 11 255 8 0 441
8:00 AM 4 1 4 0 11 2 17 0 8 70 4 1 13 138 13 0 286
8:15 AM 4 2 3 0 4 3 12 0 7 65 10 0 12 136 5 0 263
8:30 AM 6 6 3 0 3 1 11 0 4 54 6 1 8 106 5 1 215
8:45 AM 4 5 4 0 1 3 16 0 6 57 7 0 6 87 3 0 199

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES : 36 25 25 0 44 41 156 0 67 551 58 4 70 1355 56 2 2490 APPROACH "Io's : 41.86% 29.07% 29.07% 0.00% 18.26% 17.01% 64.73% 0.00% 9.85% 81.03% 8.53% 0.59% 4.72% 91.37% 3.78% 0.13% 0 .00 - 08:00 TOTAL
PEAK HR VOL : 18 11 11 0 25 32 100 0 42 305 31 2 31 888 30 1 1527 PEAK HR FACTOR : 0.643 0.550 0.458 0.000 0.521 0.667 0.714 0.000 0.583 0.740 0.554 0.250 0.705 0.854 0.750 0.250 0.807 0.556 0.741 0.766 0.854

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
1 1 0 0 1 1 1 0 1 2 0 0 1 2 0 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
4:00 PM 9 12 6 0 7 6 10 0 14 150 6 2 3 99 6 0 330
4:15 PM 9 11 7 0 7 4 15 0 13 188 11 6 0 97 9 1 378
4:30 PM 11 19 8 0 7 2 4 0 26 172 6 6 4 107 5 0 377
4:45 PM 9 10 12 0 7 5 8 0 12 124 2 5 3 119 10 0 326
5:00 PM 20 20 14 0 1 3 12 0 21 191 6 4 5 67 6 0 370
5:15 PM 10 8 11 0 5 3 12 0 10 162 6 2 0 90 8 0 327
5:30 PM 11 6 4 0 9 4 12 0 26 145 4 2 3 92 7 0 325
5:45 PM 6 12 9 0 4 1 11 0 18 109 3 2 2 113 5 0 295

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES : 85 98 71 0 47 28 84 0 140 1241 44 29 20 784 56 1 2728 APPROACH "Io's : 33.46% 38.58% 27.95% 0.00% 29.56% 17.61% 52.83% 0.00% 9.63% 85.35% 3.03% 1.99% 2.32% 91.06% 6.50% 0.12% 0 : p - 05: p TOTAL
PEAK HR VOL : 49 60 41 0 22 14 39 0 72 675 25 21 12 390 30 1 1451 PEAK HR FACTOR : 0.613 0.750 0.732 0.000 0.786 0.700 0.650 0.000 0.692 0.884 0.568 0.875 0.600 0.819 0.750 0.250 0.960 0.694 0.721 0.893 0.820

APPENDIX C
Synchro 10(HCM 6th Edition) Worksheets
~ Wl'PA -,:u,c_ -'-

EXISTING CONDITIONS
HCM 6th Signalized Intersection Summary
1: Willow Avenue & Butler Avenue
-+
Movement EBT
Lane Configurations ft.

Traffic Volume (veh/h) 220
Future Volume (veh/h) 220
Initial Q (Qb), veh 0
Ped-Bike Adj(A_pbT)
Parking Bus, Ad" 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1856
Adj Flow Rate, veh/h 297
Peak Hour Factor 0.74
Percent Heavy Veh, % 3
Cap, veh/h 368
Arrive On Green 0.30
Sat Flow, veh/h 1233
Grp Volume(v), veh/h 0
Grp Sat Flow(s),veh/h/ln 0
Q Serve(g_s), s 0.0
Cycle Q Clear(g_c), s 0.0
Prop In Lane
Lane Grp Cap(c), veh/h 0
V/C Ratio(X) 0.00
Avail Cap(c_a), veh/h 0
HCM Platoon Ratio 1.00
Upstream Filter(I) 0.00
Uniform Delay (d), s/veh 0.0
Iner Delay (d2), s/veh 0.0
Initial Q Delay(d3),s/veh 0.0
o/oile BackOfQ(50%),veh/ln 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0
LnGre LOS A
Approach Vol, veh/h 424
Approach Delay, s/veh 20.7
Approach LOS C
irimer - Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+l1), s
Green Ext Time (p_c), s
Intersection Summa~
HCM 6th Ctrl Delay
HCM 6th LOS
Existing Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
\'
EBR
94 94
0 1.00

1.00 1856
127

0.74 3
157

0.30 527
424
1761

12.2 12.2

0.30 526

0.81 922

1.00 1.00

17.7 3.0

0.0 4.5

20.7 C
2 18.2

5.4 25.6

12.0 0.8
"f +-

WBL WBT
"'i t
176 341
176 341
0 0

1.00 1.00 1.00
No
1856 1856
238 461

0.74 0.74
3 3
300 1052

0.17 0.57
1767 1856
238 461
1767 1856

7.1 7.8

7.1 7.8

1.00 300 1052

0.79 0.44
634 1821

1.00 1.00

1.00 1.00
21 .7 6.8

4.7 0.3

0.0 0.0

2.9 2.1

26.5 7.1
C A
699

13.7 B
3 4

14.7 21 .7

5.4 5.4

19.6 28.6

9.1 14.2

0.5 2.1

18.1 B
~
NBL
V
89 89
0 1.00

1.00 No
1856
120

0.74 3
146

0.24 621
317
1642

10.0 10.0

0.38 386

0.82 770

1.00 1.00

19.8 4.4

0.0 3.7

24.2 C
317

24.2 C
~
NBR
145
145
0 1.00

1.00 1856
196

0.74 3
239

0.24 1015
0 0

0.0 0.0

0.62 0

0.00 0

1.00 0.00

0.0 0.0

0.0 0.0

0.0 A
8 36.4

5.4 53.6

9.8 3.0
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
3: Willow Avenue & Jensen Avenue
.,.,.
-+ -,. f +- -\.. ~ t
Movement EBL EBT EBR WBL WBT WBR NBL NBT
Lane Configurations "i tf+ "i tf+ "i f+
Traffic Volume (veh/h) 44 305 31 32 888 30 18 11
Future Volume (veh/h) 44 305 31 32 888 30 18 11
Initial Q (Qb), veh 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 54 377 38 40 1096 37 22 14
Peak Hour Factor 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 Percent Heavy Veh, % 3 3 3 3 3 3 3 3
Cap, veh/h 82 1221 122 71 1291 44 48 255
Arrive On Green 0.05 0.38 0.38 0.04 0.37 0.37 0.03 0.30 Sat Flow, veh/h 1767 3236 324 1767 3480 117 1767 851
Grp Volume(v), veh/h 54 204 211 40 555 578 22 0
Grp Sat Flow(s),veh/h/ln 1767 1763 1797 1767 1763 1834 1767 0 Q Serve(g_s), s 3.0 8.2 8.3 2.2 29.0 29.0 1.2 0.0
Cycle Q Clear(g_c), s 3.0 8.2 8.3 2.2 29.0 29.0 1.2 0.0 Prop In Lane 1.00 0.18 1.00 0.06 1.00
Lane Grp Cap(c), veh/h 82 665 678 71 654 681 48 0
V/C Ratio(X) 0.66 0.31 0.31 0.56 0.85 0.85 0.45 0.00
Avail Cap(c_a), veh/h 169 910 928 129 869 905 111 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 47.1 22.0 22.0 47.3 29.0 29.0 48.1 0.0 Iner Delay (d2), s/veh 8.6 0.3 0.3 6.8 6.1 5.9 6.5 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 o/oile BackOfQ(50%),veh/ln 1.5 3.1 3.2 1.1 12.1 12.5 0.6 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 55.6 22.3 22.3 54.1 35.1 34.9 54.6 0.0 LnGre LOS E C C D D C D A
Approach Vol, veh/h 469 1173 50
Approach Delay, s/veh 26.1 35.7 38.1
Approach LOS C D D
irimer - Assigned Phs 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.9 36.6 10.5 44.4 9.3 36.2 11 .2 43.7 Change Period (Y+Rc), s 5.4 6.5 6.5 6.5 6.5 * 6.5 6.5 6.5 Max Green Setting (Gmax), s 6.6 29.4 7.3 51.8 6.3 * 30 9.6 49.5 Max Q Clear Time (g_c+l1), s 3.7 3.2 4.2 10.3 3.2 6.5 5.0 31 .0 Green Ext Time (p_c), s 0.0 0.1 0.0 2.1 0.0 0.5 0.0 6.2 Intersection Summa~
HCM 6th Ctrl Delay 32.2
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.

Existing Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
~
NBR
11 11
0 1.00

1.00 1856
14 0.81
3 255

0.30 851
28 1702

1.2 1.2

0.50 510

0.05 510

1.00 1.00

25.0 0.2

0.0 0.5

25.2 C
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,,
25 32 100
25 32 100
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
31 40 123

0.81 0.81 0.81
3 3 3
61 549 465

0.03 0.30 0.30
1767 1856 1572
31 40 123
1767 1856 1572

1.7 1.6 4.5

1.7 1.6 4.5

1.00 1.00
61 549 465

0.51 0.07 0.26
116 549 465

1.00 1.00 1.00

1.00 1.00 1.00

47.6 25.4 15.2

6.4 0.3 1.4

0.0 0.0 0.0

0.9 0.7 2.2

54.0 25.7 16.6
D C B
194

24.4 C
Synchro 10 Report
Page2
Queues
1: Willow Avenue & Butler Avenue
-+
Lane Groue EBT
Lane Group Flow (vph) 424
v/c Ratio 0.77
Control Delay 32.1
Queue Delay 0.0
Total Delay 32.1
Queue Length 50th (ft) 147
Queue Length 95th (ft) 233
Internal Link Dist (ft) 1512
Turn Bay Length (ft)
Base Capacity (vph) 808
Starvation Cap Reductn 0
Spillback Cap Reductn 0
Storage Cap Reductn 0
Reduced v/c Ratio 0.52
Intersection Summa!)'.

Existing Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
f
WBL
238

0.64 35.8

0.0 35.8
89 159
100
539
0 0
0 0.44
+-
WBT
461

0.42 9.2

0.0 9.2
87 147
2571
1472
0 0
0 0.31
"\
NBL
316

0.70 27.2

0.0 27.2
85 142
3098
720
0 0
0 0.44
11/07/2021
Synchro 10 Report

Page 1 ends

Queues
3: Willow Avenue & Jensen Avenue
.,.,.
-+
Lane Groue EBL EBT
Lane Group Flow (vph) 54 415
v/c Ratio 0.38 0.28
Control Delay 58.4 19.9
Queue Delay 0.0 0.0
Total Delay 58.4 19.9
Queue Length 50th (ft) 38 104
Queue Length 95th (ft) 74 124
Internal Link Dist (ft) 2543
Turn Bay Length (ft) 250
Base Capacity (vph) 175
Starvation Cap Reductn 0
Spillback Cap Reductn 0
Storage Cap Reductn 0
Reduced v/c Ratio 0.31
Intersection Summa!)'.

Existing Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
1868
0 0
0 0.22
"f
WBL
40 0.33

59.6 0.0

59.6 28
61 125
133
0 0
0 0.30
+-
WBT
1133

0.84 35.5

0.0 35.5
389
410
2787
1798
0 0
0 0.63
~ t '.

NBL NBT SBL
22 28 31

0.20 0.05 0.27

57.6 22.3 59.0

0.0 0.0 0.0

57.6 22.3 59.0
16 8 22
40 29 51
592
150 150
114 531 120
0 0 0
0 0 0
0 0 0

0.19 0.05 0.26
!
SBT
40 0.06

31.5 0.0

31.5 18
48 1750
620
0 0
0 0.06
.,,
SBR
123

0.19 0.7

0.0 0.7
0 0
659
0 0
0 0.19
11/07/2021
Synchro 10 Report
Page2
HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 43.8
Intersection LOS E
Movement EBL EBT
Lane Configurations 4
Traffic Vol, veh/h 70 202
Future Vol, veh/h 70 202
Peak Hour Factor 0.71 0.71
Heavy Vehicles, % 3 3
MvmtFlow 99 285
Number of Lanes 0 1
roach EB
Opposing Approach WB
Opposing Lanes 2
Conflicting Approach Left SB
Conflicting Lanes Left 2
Conflicting Approach Right NB
Conflicting Lanes Right 1
HCM Control Delay 57.3

HCM LOS F
Lane NBLn1
Vol Left, % 17%
Vol Thru, % 49%
Vol Right,% 34%
Sign Control Stop
Traffic Vol by Lane 187
LT Vol 31
Through Vol 92
RT Vol 64
Lane Flow Rate 263
Geometry Grp 6
Degree of Util (X) 0.69
Departure Headway (Hd) 9.426
Convergence, Y/N Yes
Cap 385
Service Time 7.484
HCM Lane V/C Ratio 0.683
HCM Control Delay 31.1
HCM Lane LOS D
HCM 95th-tile Q 5
Existing Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.

EBR
.,,
33 33

0.71 3
46 1
EBLn1
26%
74%
0%
Stop
272
70 202
0 383
7 0.948

8.912
Yes
410

6.641

0.934

62.8 F

10.7 WBL
49 49

0.71 3
69 0
WB
EB
2 NB
1 SB
2 53.7
F
EBLn2
0%
0%
100%
Stop
33 0
0 33
46 7

0.104

8.047
Yes
447

5.776

0.103

11.7 B

0.3 WBT WBR NBL
4 .,
233 92 31
233 92 31

0.71 0.71 0.71
3 3 3
328 130 44
1 1 0
NB
SB
2 EB
2 WB
2 31.1
D
WBLn1 WBLn2 SBLn1
17% 0% 65%
83% 0% 35%
0% 100% 0%
Stop Stop Stop
282 92 174
49 0 113
233 0 61
0 92 0
397 130 245
7 7 7

0.968 0.286 0.648

8.778 7.957 9.52
Yes Yes Yes
413 452 380

6.509 5.688 7.255

0.961 0.288 0.645

66.7 13.9 28.2
F B D

11.4 1.2 4.4

NBT NBR
~
92 64
92 64

0.71 0.71
3 3
130 90
1 0
SBLn2
0%
0%
100%
Stop
93 0
0 93
131
7 0.307

8.451
Yes
426

6.186

0.308

14.9 B

1.3 11/07/2021
SBL SBT SBR.
4 .,,
113 61 93
113 61 93

0.71 0.71 0.71
3 3 3
159 86 131
0 1 1
SB
NB
1 WB
2 EB
2 23.6
C
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
1: Willow Avenue & Butler Avenue
-+ \' "f +- ~
Movement EBT EBR WBL WBT NBL
Lane Configurations ft. "'i t V
Traffic Volume (veh/h) 259 71 102 250 88
Future Volume (veh/h) 259 71 102 250 88
Initial Q (Qb), veh 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 285 78 112 275 97
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91
Percent Heavy Veh, % 3 3 3 3 3
Cap, veh/h 399 109 189 979 156
Arrive On Green 0.28 0.28 0.11 0.53 0.20
Sat Flow, veh/h 1403 384 1767 1856 774
Grp Volume(v), veh/h 0 363 112 275 208
Grp Sat Flow(s),veh/h/ln 0 1786 1767 1856 1659
Q Serve(g_s), s 0.0 7.3 2.4 3.3 4.6
Cycle Q Clear(g_c), s 0.0 7.3 2.4 3.3 4.6
Prop In Lane 0.21 1.00 0.47
Lane Grp Cap(c), veh/h 0 509 189 979 334
V/C Ratio(X) 0.00 0.71 0.59 0.28 0.62
Avail Cap(c_a), veh/h 0 1464 648 2453 1109
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 12.8 16.9 5.2 14.5
Iner Delay (d2), s/veh 0.0 1.9 2.9 0.2 1.9
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 0.0 2.4 0.9 0.6 1.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 14.7 19.9 5.4 16.4
LnGre LOS A B B A B
Approach Vol, veh/h 363 387 208
Approach Delay, s/veh 14.7 9.6 16.4
Approach LOS B A B
irimer - Assigned Phs 2 3 4
Phs Duration (G+Y+Rc), s 13.4 9.7 16.7
Change Period (Y+Rc), s 5.4 5.4 5.4
Max Green Setting (Gmax), s 26.6 14.6 32.6
Max Q Clear Time (g_c+l1), s 6.6 4.4 9.3
Green Ext Time (p_c), s 0.6 0.2 2.1
Intersection Summa~
HCM 6th Ctrl Delay 13.0
HCM 6th LOS B
Notes
User approved volume balancing among the lanes for turning movement.

Existing Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
~
NBR
100
100
0 1.00

1.00 1856
110

0.91 3
176

0.20 877
0 0

0.0 0.0

0.53 0

0.00 0

1.00 0.00

0.0 0.0

0.0 0.0

0.0 A
8 26.4

5.4 52.6

5.3 1.6
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
3: Willow Avenue & Jensen Avenue
.,.,.
-+ -,. f +- -\.. ~ t
Movement EBL EBT EBR WBL WBT WBR NBL NBT
Lane Configurations "i tf+ "i tf+ "i f+
Traffic Volume (veh/h) 93 675 25 13 390 30 49 60
Future Volume (veh/h) 93 675 25 13 390 30 49 60
Initial Q (Qb), veh 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 97 703 26 14 406 31 51 62
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 3 3 3 3 3 3 3 3
Cap, veh/h 200 893 33 35 546 42 87 411
Arrive On Green 0.11 0.26 0.26 0.02 0.16 0.16 0.05 0.40 Sat Flow, veh/h 1767 3467 128 1767 3320 253 1767 1020
Grp Volume(v), veh/h 97 357 372 14 215 222 51 0
Grp Sat Flow(s),veh/h/ln 1767 1763 1832 1767 1763 1810 1767 0 Q Serve(g_s), s 4.4 16.2 16.2 0.7 9.9 10.0 2.4 0.0
Cycle Q Clear(g_c), s 4.4 16.2 16.2 0.7 9.9 10.0 2.4 0.0 Prop In Lane 1.00 0.07 1.00 0.14 1.00
Lane Grp Cap(c), veh/h 200 454 472 35 290 298 87 0
V/C Ratio(X) 0.49 0.79 0.79 0.40 0.74 0.75 0.59 0.00
Avail Cap(c_a), veh/h 381 895 930 175 689 707 258 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 35.7 29.6 29.6 41 .5 34.1 34.1 39.9 0.0 Iner Delay (d2), s/veh 1.8 3.1 3.0 7.2 3.7 3.7 6.1 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 o/oile BackOfQ(50%),veh/ln 1.9 6.5 6.8 0.3 4.2 4.3 1.1 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 37.5 32.7 32.6 48.7 37.8 37.8 46.0 0.0 LnGre LOS D C C D D D D A
Approach Vol, veh/h 826 451 156
Approach Delay, s/veh 33.2 38.2 26.3
Approach LOS C D C
irimer - Assigned Phs 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.9 41 .0 8.2 28.6 10.7 38.2 16.2 20.6 Change Period (Y+Rc), s 5.4 6.5 6.5 6.5 6.5 * 6.5 6.5 6.5 Max Green Setting (Gmax), s 8.6 34.5 8.5 43.5 12.5 * 31 18.5 33.5 Max Q Clear Time (g_c+l1), s 3.1 5.3 2.7 18.2 4.4 2.8 6.4 12.0 Green Ext Time (p_c), s 0.0 0.5 0.0 3.9 0.0 0.1 0.1 2.1 Intersection Summa~
HCM 6th Ctrl Delay 33.3
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.

Existing Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
~
NBR
41 41
0 1.00

1.00 1856
43 0.96
3 285

0.40 708
105
1728

3.3 3.3

0.41 696

0.15 696

1.00 1.00

16.3 0.5

0.0 1.2

16.8 B
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,,
22 14 39
22 14 39
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
23 15 41

0.96 0.96 0.96
3 3 3
52 686 582

0.03 0.37 0.37
1767 1856 1572
23 15 41
1767 1856 1572

1.1 0.4 0.8

1.1 0.4 0.8

1.00 1.00
52 686 582

0.44 0.02 0.07
177 686 582

1.00 1.00 1.00

1.00 1.00 1.00

40.9 17.2 5.9

5.7 0.1 0.2

0.0 0.0 0.0

0.5 0.2 0.5

46.6 17.2 6.1
D B A
79 20.0
C
Synchro 10 Report
Page2
Queues
1: Willow Avenue & Butler Avenue
-+
Lane Groue EBT
Lane Group Flow (vph) 363
v/c Ratio 0.62
Control Delay 21.4
Queue Delay 0.0
Total Delay 21.4
Queue Length 50th (ft) 88
Queue Length 95th (ft) 217
Internal Link Dist (ft) 1512
Turn Bay Length (ft)
Base Capacity (vph) 1207
Starvation Cap Reductn 0
Spillback Cap Reductn 0
Storage Cap Reductn 0
Reduced v/c Ratio 0.30
Intersection Summa!)'.

Existing Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
f
WBL
112

0.35 26.1

0.0 26.1
30 93
100
547
0 0
0 0.20
+-
WBT
275

0.28 6.9

0.0 6.9
34 93
2571
1691
0 0
0 0.16
"\
NBL
207

0.48 18.7

0.0 18.7
38 114
3098
979
0 0
0 0.21
11/07/2021
Synchro 10 Report

Page 1 ends

Queues
3: Willow Avenue & Jensen Avenue
.,.,.
-+
Lane Groue EBL EBT
Lane Group Flow (vph) 97 729
v/c Ratio 0.43 0.61
Control Delay 45.3 27.4
Queue Delay 0.0 0.0
Total Delay 45.3 27.4
Queue Length 50th (ft) 53 171
Queue Length 95th (ft) 112 301
Internal Link Dist (ft) 2543
Turn Bay Length (ft) 250
Base Capacity (vph) 386
Starvation Cap Reductn 0
Spillback Cap Reductn 0
Storage Cap Reductn 0
Reduced v/c Ratio 0.25
Intersection Summa!)'.

Existing Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
1794
0 0
0 0.41
"f
WBL
14 0.10

47.2 0.0

47.2 8
31 125
176
0 0
0 0.08
+-
WBT
437

0.61 37.8

0.0 37.8
122
201
2787
1376
0 0
0 0.32
~ t '.

NBL NBT SBL
51 106 23

0.31 0.14 0.16

47.4 17.1 47.3

0.0 0.0 0.0

47.4 17.1 47.3
28 23 13
73 83 43
592
150 150
258 759 178
0 0 0
0 0 0
0 0 0

0.20 0.14 0.13
!
SBT
15 0.02

25.6 0.0

25.6 6
24 1750
730
0 0
0 0.02
.,,
SBR
41 0.06

0.2 0.0

0.2 0
0 741
0 0
0 0.06
11/07/2021
Synchro 10 Report
Page2
HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 12.9
Intersection LOS B
Movement EBL EBT
Lane Configurations 4
Traffic Vol, veh/h 47 213
Future Vol, veh/h 47 213
Peak Hour Factor 0.94 0.94
Heavy Vehicles, % 3 3
MvmtFlow 50 227
Number of Lanes 0 1
roach EB
Opposing Approach WB
Opposing Lanes 2
Conflicting Approach Left SB
Conflicting Lanes Left 2
Conflicting Approach Right NB
Conflicting Lanes Right 1
HCM Control Delay 13.6

HCM LOS B
Lane NBLn1
Vol Left, % 20%
Vol Thru, % 60%
Vol Right,% 21%
Sign Control Stop
Traffic Vol by Lane 146
LT Vol 29
Through Vol 87
RT Vol 30
Lane Flow Rate 155
Geometry Grp 6
Degree of Util (X) 0.286
Departure Headway (Hd) 6.629
Convergence, Y/N Yes
Cap 541
Service Time 4.696
HCM Lane V/C Ratio 0.287
HCM Control Delay 12.4
HCM Lane LOS B
HCM 95th-tile Q 1.2
Existing Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.

EBR
.,,
39 39

0.94 3
41 1
EBLn1
18%
82%
0%
Stop
260
47 213
0 277
7 0.474

6.169
Yes
584

3.925

0.474

14.4 B

2.5 WBL
47 47

0.94 3
50 0
WB
EB
2 NB
1 SB
2 13.6
B
EBLn2
0%
0%
100%
Stop
39 0
0 39
41 7

0.062

5.367
Yes
665

3.122

0.062

8.5 A

0.2 WBT WBR NBL
4 .,
213 39 29
213 39 29

0.94 0.94 0.94
3 3 3
227 41 31
1 1 0
NB
SB
2 EB
2 WB
2 12.4
B
WBLn1 WBLn2 SBLn1
18% 0% 31%
82% 0% 69%
0% 100% 0%
Stop Stop Stop
260 39 105
47 0 33
213 0 72
0 39 0
277 41 112
7 7 7

0.474 0.062 0.212

6.169 5.367 6.841
Yes Yes Yes
584 665 523

3.925 3.122 4.608

0.474 0.062 0.214

14.4 8.5 11.5
B A B

2.5 0.2 0.8

NBT NBR
~
87 30
87 30

0.94 0.94
3 3
93 32
1 0
SBLn2
0%
0%
100%
Stop
51 0
0 51
54 7

0.09 5.969
Yes
597

3.736

0.09 9.3
A

0.3 11/07/2021
SBL SBT SBR.
4 .,,
33 72 51
33 72 51

0.94 0.94 0.94
3 3 3
35 77 54
0 1 1
SB
NB
1 WB
2 EB
2 10.8
B
Synchro 10 Report

Page 1 ends

EXISTING PLUS PROJECT CONDITIONS
HCM 6th Signalized Intersection Summary
1: Willow Avenue & Butler Avenue
-+ \' "f
Movement EBT EBR WBL
Lane Configurations ft. "'i
Traffic Volume (veh/h) 220 108 184
Future Volume (veh/h) 220 108 184
Initial Q (Qb), veh 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1856 1856 1856
Adj Flow Rate, veh/h 297 146 249
Peak Hour Factor 0.74 0.74 0.74
Percent Heavy Veh, % 3 3 3
Cap, veh/h 351 173 303
Arrive On Green 0.30 0.30 0.17
Sat Flow, veh/h 1174 577 1767
Grp Volume(v), veh/h 0 443 249
Grp Sat Flow(s),veh/h/ln 0 1752 1767
Q Serve(g_s), s 0.0 15.4 8.8
Cycle Q Clear(g_c), s 0.0 15.4 8.8
Prop In Lane 0.33 1.00
Lane Grp Cap(c), veh/h 0 524 303
V/C Ratio(X) 0.00 0.85 0.82
Avail Cap(c_a), veh/h 0 771 533
HCM Platoon Ratio 1.00 1.00 1.00
Upstream Filter(I) 0.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 21.4 25.9
Iner Delay (d2), s/veh 0.0 5.8 5.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 0.0 6.4 3.8
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 27.2 31.4
LnGre LOS A C C
Approach Vol, veh/h 443
Approach Delay, s/veh 27.2
Approach LOS C
irimer - Assigned Phs 2 3
Phs Duration (G+Y+Rc), s 23.6 16.6
Change Period (Y+Rc), s 5.4 5.4
Max Green Setting (Gmax), s 25.6 19.6
Max Q Clear Time (g_c+l1), s 17.3 10.8
Green Ext Time (p_c), s 0.9 0.5
Intersection Summa~
HCM 6th Ctrl Delay 23.8
HCM 6th LOS C
Existing Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
+-
WBT
t
341
341
0 1.00
No
1856
461

0.74 3
1028

0.55 1856
461
1856

9.6 9.6
1028

0.45 1531

1.00 1.00

8.6 0.3

0.0 3.0

8.9 A
710

16.8 B
4 24.8

5.4 28.6

17.4 2.0
~
NBL
V
132
132
0 1.00

1.00 No
1856
178

0.74 3
202

0.28 723
407
1653

15.3 15.3

0.44 463

0.88 651

1.00 1.00

22.3 9.9

0.0 6.5

32.2 C
407

32.2 C
~
NBR
169
169
0 1.00

1.00 1856
228

0.74 3
259

0.28 926
0 0

0.0 0.0

0.56 0

0.00 0

1.00 0.00

0.0 0.0

0.0 0.0

0.0 A
8 41.4

5.4 53.6
11 .6

3.0 11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
3: Willow Avenue & Jensen Avenue
.,.,.
-+ -,. f +- -\.. ~ t
Movement EBL EBT EBR WBL WBT WBR NBL NBT
Lane Configurations "i tf+ "i tf+ "i f+
Traffic Volume (veh/h) 51 305 31 32 888 31 18 11
Future Volume (veh/h) 51 305 31 32 888 31 18 11
Initial Q (Qb), veh 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 63 377 38 40 1096 38 22 14
Peak Hour Factor 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 Percent Heavy Veh, % 3 3 3 3 3 3 3 3
Cap, veh/h 87 1230 123 71 1289 45 48 253
Arrive On Green 0.05 0.38 0.38 0.04 0.37 0.37 0.03 0.30 Sat Flow, veh/h 1767 3236 324 1767 3476 121 1767 851
Grp Volume(v), veh/h 63 204 211 40 556 578 22 0
Grp Sat Flow(s),veh/h/ln 1767 1763 1797 1767 1763 1834 1767 0 Q Serve(g_s), s 3.5 8.2 8.3 2.2 29.2 29.2 1.2 0.0
Cycle Q Clear(g_c), s 3.5 8.2 8.3 2.2 29.2 29.2 1.2 0.0 Prop In Lane 1.00 0.18 1.00 0.07 1.00
Lane Grp Cap(c), veh/h 87 670 683 71 654 680 48 0
V/C Ratio(X) 0.72 0.31 0.31 0.56 0.85 0.85 0.45 0.00
Avail Cap(c_a), veh/h 168 906 923 128 865 900 110 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 47.3 21 .9 21 .9 47.5 29.1 29.1 48.3 0.0 Iner Delay (d2), s/veh 10.7 0.3 0.3 6.9 6.3 6.1 6.5 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 o/oile BackOfQ(50%),veh/ln 1.7 3.1 3.2 1.1 12.2 12.6 0.6 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 58.0 22.2 22.2 54.4 35.4 35.2 54.8 0.0 LnGre LOS E C C D D D D A
Approach Vol, veh/h 478 1174 50
Approach Delay, s/veh 26.9 35.9 38.4
Approach LOS C D D
irimer - Assigned Phs 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.0 36.4 10.5 44.8 9.3 36.2 11 .5 43.9 Change Period (Y+Rc), s 5.4 6.5 6.5 6.5 6.5 * 6.5 6.5 6.5 Max Green Setting (Gmax), s 6.6 29.4 7.3 51.8 6.3 * 30 9.6 49.5 Max Q Clear Time (g_c+l1), s 3.8 3.2 4.2 10.3 3.2 7.5 5.5 31 .2 Green Ext Time (p_c), s 0.0 0.1 0.0 2.1 0.0 0.6 0.0 6.2 Intersection Summa~
HCM 6th Ctrl Delay 32.4
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.

Existing Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
~
NBR
11 11
0 1.00

1.00 1856
14 0.81
3 253

0.30 851
28 1702

1.2 1.2

0.50 505

0.06 505

1.00 1.00

25.3 0.2

0.0 0.5

25.5 C
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,,
27 33 120
27 33 120
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
33 41 148

0.81 0.81 0.81
3 3 3
63 547 463

0.04 0.29 0.29
1767 1856 1572
33 41 148
1767 1856 1572

1.8 1.6 5.5

1.8 1.6 5.5

1.00 1.00
63 547 463

0.52 0.08 0.32
116 547 463

1.00 1.00 1.00

1.00 1.00 1.00

47.8 25.7 15.5

6.5 0.3 1.8

0.0 0.0 0.0

0.9 0.7 2.7

54.2 25.9 17.3
D C B
222

24.4 C
Synchro 10 Report
Page2
Queues
1: Willow Avenue & Butler Avenue
-+ f +-
Lane Groue EBT WBL WBT
Lane Group Flow (vph) 443 249 461
v/c Ratio 0.81 0.69 0.43
Control Delay 36.9 41.0 10.7
Queue Delay 0.0 0.0 0.0
Total Delay 36.9 41.0 10.7
Queue Length 50th (ft) 189 116 117
Queue Length 95th (ft) 244 166 147
Internal Link Dist (ft) 1512 2571
Turn Bay Length (ft) 100
Base Capacity (vph) 721 479 1354
Starvation Cap Reductn 0 0 0
Spillback Cap Reductn 0 0 0
Storage Cap Reductn 0 0 0
Reduced v/c Ratio 0.61 0.52 0.34
Intersection Summa!)'.

Existing Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
"\
NBL
406

0.81 36.4

0.0 36.4
155
210
3098
643
0 0
0 0.63
11/07/2021
Synchro 10 Report

Page 1 ends

Queues
3: Willow Avenue & Jensen Avenue
.,.,.
-+ "f
Lane Groue EBL EBT WBL
Lane Group Flow (vph) 63 415 40
v/c Ratio 0.43 0.28 0.33
Control Delay 60.2 19.9 59.8
Queue Delay 0.0 0.0 0.0
Total Delay 60.2 19.9 59.8
Queue Length 50th (ft) 45 104 29
Queue Length 95th (ft) 84 124 61
Internal Link Dist (ft) 2543
Turn Bay Length (ft) 250 125
Base Capacity (vph) 174 1862 132
Starvation Cap Reductn 0 0 0
Spillback Cap Reductn 0 0 0
Storage Cap Reductn 0 0 0
Reduced v/c Ratio 0.36 0.22 0.30
Intersection Summa!)'.

Existing Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
+-
WBT
1134

0.84 35.6

0.0 35.6
393
411
2787
1791
0 0
0 0.63
~ t '.

NBL NBT SBL
22 28 33

0.20 0.05 0.29

57.7 22.4 59.6

0.0 0.0 0.0

57.7 22.4 59.6
16 8 24
40 29 54
592
150 150
114 530 119
0 0 0
0 0 0
0 0 0

0.19 0.05 0.28
!
SBT
41 0.07

31.6 0.0

31.6 19
49 1750
617
0 0
0 0.07
.,,
SBR
148

0.23 2.5

0.0 2.5
0 6
657
0 0
0 0.23
11/07/2021
Synchro 10 Report
Page2
HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 51 .1
Intersection LOS F
Movement EBL EBT EBR
Lane Configurations 4 .,,
Traffic Vol, veh/h 74 202 33
Future Vol, veh/h 74 202 33
Peak Hour Factor 0.71 0.71 0.71
Heavy Vehicles, % 3 3 3
MvmtFlow 104 285 46
Number of Lanes 0 1 1
roach EB
Opposing Approach WB
Opposing Lanes 2
Conflicting Approach Left SB
Conflicting Lanes Left 2
Conflicting Approach Right NB
Conflicting Lanes Right 1
HCM Control Delay 66.2

HCM LOS F
Lane NBLn1 EBLn1
Vol Left, % 16% 27%
Vol Thru, % 51% 73%
Vol Right,% 33% 0%
Sign Control Stop Stop
Traffic Vol by Lane 195 276
LT Vol 31 74
Through Vol 100 202
RT Vol 64 0
Lane Flow Rate 275 389
Geometry Grp 6 7
Degree of Util (X) 0.736 0.984
Departure Headway (Hd) 9.872 9.309
Convergence, Y/N Yes Yes
Cap 368 393
Service Time 7.872 7.009
HCM Lane V/C Ratio 0.747 0.99
HCM Control Delay 35.9 72.7
HCM Lane LOS E F
HCM 95th-tile Q 5.7 11.6
Existing Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.

WBL
49 49

0.71 3
69 0
WB
EB
2 NB
1 SB
2 64.3
F
EBLn2
0%
0%
100%
Stop
33 0
0 33
46 7

0.106

8.435
Yes
428

6.135

0.107

12.1 B

0.4 WBT WBR NBL
4 .,
233 93 31
233 93 31

0.71 0.71 0.71
3 3 3
328 131 44
1 1 0
NB
SB
2 EB
2 WB
2 35.9
E
WBLn1 WBLn2 SBLn1
17% 0% 58%
83% 0% 42%
0% 100% 0%
Stop Stop Stop
282 93 201
49 0 116
233 0 85
0 93 0
397 131 283
7 7 7

1.017 0.305 0.75

9.219 8.395 9.746
Yes Yes Yes
397 434 374

6.863 6.039 7.446
1 0.302 0.757

80.6 14.7 36.5
F B E

12.7 1.3 5.9

NBT NBR
~
100 64
100 64

0.71 0.71
3 3
141 90
1 0
SBLn2
0%
0%
100%
Stop
106
0 0
106
149
7 0.353

8.712
Yes
415

6.412

0.359

16.1 C

1.6 11/07/2021
SBL SBT SBR.
4 .,,
116 85 106
116 85 106

0.71 0.71 0.71
3 3 3
163 120 149
0 1 1
SB
NB
1 WB
2 EB
2 29.5
D
Synchro 10 Report

Page 1 ends

HCM 6th TWSC
4: Willow Avenue & North Project Driveway
Intersection
Int Delay, s/veh 1.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations V ~ 4'
Traffic Vol, veh/h 20 36 288 7 12 278
Future Vol, veh/h 20 36 288 7 12 278
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0
Veh in Median Storage, # 0 0
Grade, % 0 0
Peak Hour Factor 92 92 92 92 92
Heavy Vehicles, % 3 3 3 3 3
MvmtFlow 22 39 313 8 13
Ma·or/Minor Minor1 Ma·or1 Ma·or2
Conflicting Flow All 645 317 0 0 321
Stage 1 317
Stage 2 328
Critical Hdwy 6.43 6.23 - 4.13
Critical Hdwy Stg 1 5.43
Critical Hdwy Stg 2 5.43
Follow-up Hdwy 3.527 3.327 - 2.227
Pot Cap-1 Maneuver 435 721 - 1233
Stage 1 736
Stage 2 728
Platoon blocked, %
Mov Cap-1 Maneuver 429 721 - 1233
Mov Cap-2 Maneuver 429
Stage 1 736
Stage 2 719
roach WB NB SB
HCM Control Delay, s 11.9 0 0.3

HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL
Capacity (veh/h) - 580 1233
HCM Lane V/C Ratio - 0.105 0.011
HCM Control Delay (s) - 11.9 8
HCM Lane LOS B A
HCM 95th %tile Q(veh) 0.3 0
Existing Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
0 0
92 3
302
0 SBT
0 A
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th TWSC
5: Willow Avenue & South Project Driveway
Intersection
Int Delay, s/veh 1.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations V ~ 4'
Traffic Vol, veh/h 21 34 261 7 11 287
Future Vol, veh/h 21 34 261 7 11 287
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0
Veh in Median Storage, # 0 0
Grade, % 0 0
Peak Hour Factor 92 92 92 92 92
Heavy Vehicles, % 3 3 3 3 3
MvmtFlow 23 37 284 8 12
Ma·or/Minor Minor1 Ma·or1 Ma·or2
Conflicting Flow All 624 288 0 0 292
Stage 1 288
Stage 2 336
Critical Hdwy 6.43 6.23 - 4.13
Critical Hdwy Stg 1 5.43
Critical Hdwy Stg 2 5.43
Follow-up Hdwy 3.527 3.327 - 2.227
Pot Cap-1 Maneuver 448 749 - 1264
Stage 1 759
Stage 2 722
Platoon blocked, %
Mov Cap-1 Maneuver 443 749 - 1264
Mov Cap-2 Maneuver 443
Stage 1 759
Stage 2 714
roach WB NB SB
HCM Control Delay, s 11.8 0 0.3

HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL
Capacity (veh/h) - 593 1264
HCM Lane V/C Ratio - 0.101 0.009
HCM Control Delay (s) - 11.8 7.9
HCM Lane LOS B A
HCM 95th %tile Q(veh) 0.3 0
Existing Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
0 0
92 3
312
0 SBT
0 A
11/07/2021
Synchro 10 Report
Page2
HCM 6th Signalized Intersection Summary
1: Willow Avenue & Butler Avenue
-+ \' "f +- ~
Movement EBT EBR WBL WBT NBL
Lane Configurations ft. "'i t V
Traffic Volume (veh/h) 259 120 130 250 117
Future Volume (veh/h) 259 120 130 250 117
Initial Q (Qb), veh 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 285 132 143 275 129
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91
Percent Heavy Veh, % 3 3 3 3 3
Cap, veh/h 377 175 199 1019 172
Arrive On Green 0.31 0.31 0.11 0.55 0.21
Sat Flow, veh/h 1200 556 1767 1856 836
Grp Volume(v), veh/h 0 417 143 275 257
Grp Sat Flow(s),veh/h/ln 0 1756 1767 1856 1666
Q Serve(g_s), s 0.0 9.4 3.4 3.5 6.4
Cycle Q Clear(g_c), s 0.0 9.4 3.4 3.5 6.4
Prop In Lane 0.32 1.00 0.50
Lane Grp Cap(c), veh/h 0 552 199 1019 343
V/C Ratio(X) 0.00 0.76 0.72 0.27 0.75
Avail Cap(c_a), veh/h 0 1297 585 2212 1004
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 13.6 18.9 5.3 16.4
Iner Delay (d2), s/veh 0.0 2.1 4.8 0.1 3.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 0.0 3.1 1.4 0.7 2.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 15.8 23.7 5.4 19.7
LnGre LOS A B C A B
Approach Vol, veh/h 417 418 257
Approach Delay, s/veh 15.8 11 .7 19.7
Approach LOS B B B
irimer - Assigned Phs 2 3 4
Phs Duration (G+Y+Rc), s 14.5 10.4 19.3
Change Period (Y+Rc), s 5.4 5.4 5.4
Max Green Setting (Gmax), s 26.6 14.6 32.6
Max Q Clear Time (g_c+l1), s 8.4 5.4 11 .4
Green Ext Time (p_c), s 0.7 0.2 2.4
Intersection Summa~
HCM 6th Ctrl Delay 15.1
HCM 6th LOS B
Notes
User approved volume balancing among the lanes for turning movement.

Existing Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
~
NBR
116
116
0 1.00

1.00 1856
127

0.91 3
170

0.21 823
0 0

0.0 0.0

0.49 0

0.00 0

1.00 0.00

0.0 0.0

0.0 0.0

0.0 A
8 29.6

5.4 52.6

5.5 1.6
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
3: Willow Avenue & Jensen Avenue
.,.,.
-+ -,. f +- -\.. ~ t
Movement EBL EBT EBR WBL WBT WBR NBL NBT
Lane Configurations "i tf+ "i tf+ "i f+
Traffic Volume (veh/h) 116 675 25 13 390 33 49 61
Future Volume (veh/h) 116 675 25 13 390 33 49 61
Initial Q (Qb), veh 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 121 703 26 14 406 34 51 64
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 3 3 3 3 3 3 3 3
Cap, veh/h 198 893 33 35 545 45 87 416
Arrive On Green 0.11 0.26 0.26 0.02 0.17 0.17 0.05 0.40 Sat Flow, veh/h 1767 3467 128 1767 3294 275 1767 1035
Grp Volume(v), veh/h 121 357 372 14 216 224 51 0
Grp Sat Flow(s),veh/h/ln 1767 1763 1832 1767 1763 1806 1767 0 Q Serve(g_s), s 5.6 16.2 16.2 0.7 10.0 10.1 2.4 0.0
Cycle Q Clear(g_c), s 5.6 16.2 16.2 0.7 10.0 10.1 2.4 0.0 Prop In Lane 1.00 0.07 1.00 0.15 1.00
Lane Grp Cap(c), veh/h 198 454 472 35 292 299 87 0
V/C Ratio(X) 0.61 0.79 0.79 0.40 0.74 0.75 0.59 0.00
Avail Cap(c_a), veh/h 381 893 929 175 688 705 257 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 36.3 29.7 29.7 41 .6 34.1 34.1 39.9 0.0 Iner Delay (d2), s/veh 3.0 3.1 3.0 7.2 3.7 3.7 6.1 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 o/oile BackOfQ(50%),veh/ln 2.4 6.5 6.8 0.3 4.2 4.4 1.1 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 39.4 32.7 32.6 48.7 37.8 37.8 46.1 0.0 LnGre LOS D C C D D D D A
Approach Vol, veh/h 850 454 158
Approach Delay, s/veh 33.6 38.2 26.3
Approach LOS C D C
irimer - Assigned Phs 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.0 41 .0 8.2 28.6 10.7 38.3 16.1 20.7 Change Period (Y+Rc), s 5.4 6.5 6.5 6.5 6.5 * 6.5 6.5 6.5 Max Green Setting (Gmax), s 8.6 34.5 8.5 43.5 12.5 * 31 18.5 33.5 Max Q Clear Time (g_c+l1), s 3.1 5.4 2.7 18.2 4.4 3.1 7.6 12.1 Green Ext Time (p_c), s 0.0 0.5 0.0 3.9 0.0 0.2 0.2 2.1 Intersection Summa~
HCM 6th Ctrl Delay 33.3
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.

Existing Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
~
NBR
41 41
0 1.00

1.00 1856
43 0.96
3 280

0.40 695
107
1730

3.4 3.4

0.40 696

0.15 696

1.00 1.00

16.4 0.5

0.0 1.3

16.8 B
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,,
23 15 52
23 15 52
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
24 16 54

0.96 0.96 0.96
3 3 3
54 687 583

0.03 0.37 0.37
1767 1856 1572
24 16 54
1767 1856 1572

1.1 0.5 1.1

1.1 0.5 1.1

1.00 1.00
54 687 583

0.45 0.02 0.09
177 687 583

1.00 1.00 1.00

1.00 1.00 1.00

40.9 17.2 6.0

5.7 0.1 0.3

0.0 0.0 0.0

0.6 0.2 0.7

46.6 17.2 6.3
D B A
94 18.4
B
Synchro 10 Report
Page2
Queues
1: Willow Avenue & Butler Avenue
-+ f +-
Lane Groue EBT WBL WBT
Lane Group Flow (vph) 417 143 275
v/c Ratio 0.68 0.44 0.27
Control Delay 23.5 31.0 7.3
Queue Delay 0.0 0.0 0.0
Total Delay 23.5 31.0 7.3
Queue Length 50th (ft) 117 45 40
Queue Length 95th (ft) 261 128 98
Internal Link Dist (ft) 1512 2571
Turn Bay Length (ft) 100
Base Capacity (vph) 1094 499 1579
Starvation Cap Reductn 0 0 0
Spillback Cap Reductn 0 0 0
Storage Cap Reductn 0 0 0
Reduced v/c Ratio 0.38 0.29 0.17
Intersection Summa!)'.

Existing Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
"\
NBL
256

0.58 23.7

0.0 23.7
62 166
3098
898
0 0
0 0.29
11/07/2021
Synchro 10 Report

Page 1 ends

Queues
3: Willow Avenue & Jensen Avenue
.,.,.
-+ "f
Lane Groue EBL EBT WBL
Lane Group Flow (vph) 121 729 14
v/c Ratio 0.53 0.58 0.11
Control Delay 48.2 27.1 47.9
Queue Delay 0.0 0.0 0.0
Total Delay 48.2 27.1 47.9
Queue Length 50th (ft) 68 171 8
Queue Length 95th (ft) 136 301 31
Internal Link Dist (ft) 2543
Turn Bay Length (ft) 250 125
Base Capacity (vph) 359 1668 163
Starvation Cap Reductn 0 0 0
Spillback Cap Reductn 0 0 0
Storage Cap Reductn 0 0 0
Reduced v/c Ratio 0.34 0.44 0.09
Intersection Summa!)'.

Existing Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
+-
WBT
440

0.68 41.7

0.0 41.7
125
201
2787
1279
0 0
0 0.34
~ t '.

NBL NBT SBL
51 107 24

0.32 0.14 0.18

48.9 17.2 48.5

0.0 0.0 0.0

48.9 17.2 48.5
29 25 14
73 85 44
592
150 150
240 743 165
0 0 0
0 0 0
0 0 0

0.21 0.14 0.15
!
SBT
16 0.02

25.9 0.0

25.9 6
25 1750
655
0 0
0 0.02
.,,
SBR
54 0.08

0.2 0.0

0.2 0
0 685
0 0
0 0.08
11/07/2021
Synchro 10 Report
Page2
HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 14.1
Intersection LOS B
Movement EBL EBT EBR
Lane Configurations 4 .,,
Traffic Vol, veh/h 62 213 39
Future Vol, veh/h 62 213 39
Peak Hour Factor 0.94 0.94 0.94
Heavy Vehicles, % 3 3 3
MvmtFlow 66 227 41
Number of Lanes 0 1 1
roach EB
Opposing Approach WB
Opposing Lanes 2
Conflicting Approach Left SB
Conflicting Lanes Left 2
Conflicting Approach Right NB
Conflicting Lanes Right 1
HCM Control Delay 15.3

HCM LOS C
Lane NBLn1 EBLn1
Vol Left, % 17% 23%
Vol Thru, % 66% 77%
Vol Right,% 17% 0%
Sign Control Stop Stop
Traffic Vol by Lane 174 275
LT Vol 29 62
Through Vol 115 213
RT Vol 30 0
Lane Flow Rate 185 293
Geometry Grp 6 7
Degree of Util (X) 0.352 0.525
Departure Headway (Hd) 6.845 6.463
Convergence, Y/N Yes Yes
Cap 522 556
Service Time 4.937 4.24
HCM Lane V/C Ratio 0.354 0.527
HCM Control Delay 13.7 16.2
HCM Lane LOS B C
HCM 95th-tile Q 1.6 3
Existing Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.

WBL
47 47

0.94 3
50 0
WB
EB
2 NB
1 SB
2 14.6
B
EBLn2
0%
0%
100%
Stop
39 0
0 39
41 7

0.065

5.635
Yes
631

3.412

0.065

8.8 A

0.2 WBT WBR NBL
4 .,
213 43 29
213 43 29

0.94 0.94 0.94
3 3 3
227 46 31
1 1 0
NB
SB
2 EB
2 WB
2 13.7
B
WBLn1 WBLn2 SBLn1
18% 0% 28%
82% 0% 72%
0% 100% 0%
Stop Stop Stop
260 43 123
47 0 35
213 0 88
0 43 0
277 46 131
7 7 7

0.496 0.072 0.256

6.461 5.657 7.033
Yes Yes Yes
553 628 508

4.241 3.436 4.826

0.501 0.073 0.258

15.5 8.9 12.3
C A B

2.7 0.2 1

NBT NBR
~
115 30
115 30

0.94 0.94
3 3
122 32
1 0
SBLn2
0%
0%
100%
Stop
60 0
0 60
64 7

0.109

6.175
Yes
575

3.967

0.111

9.7 A

0.4 11/07/2021
SBL SBT SBR.
4 .,,
35 88 60
35 88 60

0.94 0.94 0.94
3 3 3
37 94 64
0 1 1
SB
NB
1 WB
2 EB
2 11.4
B
Synchro 10 Report

Page 1 ends

HCM 6th TWSC
4: Willow Avenue & North Project Driveway
Intersection
Int Delay, s/veh 1.4
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations V ~ 4'
Traffic Vol, veh/h 13 24 196 22 40 195
Future Vol, veh/h 13 24 196 22 40 195
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0
Veh in Median Storage, # 0 0
Grade, % 0 0
Peak Hour Factor 92 92 92 92 92
Heavy Vehicles, % 3 3 3 3 3
MvmtFlow 14 26 213 24 43
Ma·or/Minor Minor1 Ma·or1 Ma·or2
Conflicting Flow All 523 225 0 0 237
Stage 1 225
Stage 2 298
Critical Hdwy 6.43 6.23 - 4.13
Critical Hdwy Stg 1 5.43
Critical Hdwy Stg 2 5.43
Follow-up Hdwy 3.527 3.327 - 2.227
Pot Cap-1 Maneuver 513 812 - 1324
Stage 1 810
Stage 2 751
Platoon blocked, %
Mov Cap-1 Maneuver 494 812 - 1324
Mov Cap-2 Maneuver 494
Stage 1 810
Stage 2 723
roach WB NB SB
HCM Control Delay, s 10.8 0 1.3

HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL
Capacity (veh/h) - 662 1324
HCM Lane V/C Ratio - 0.061 0.033
HCM Control Delay (s) - 10.8 7.8
HCM Lane LOS B A
HCM 95th %tile Q(veh) 0.2 0.1
Existing Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
0 0
92 3
212
0 SBT
0 A
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th TWSC
5: Willow Avenue & South Project Driveway
Intersection
Int Delay, s/veh 1.5
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations V ~ 4'
Traffic Vol, veh/h 14 23 195 24 39 169
Future Vol, veh/h 14 23 195 24 39 169
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0
Veh in Median Storage, # 0 0
Grade, % 0 0
Peak Hour Factor 92 92 92 92 92
Heavy Vehicles, % 3 3 3 3 3
MvmtFlow 15 25 212 26 42
Ma·or/Minor Minor1 Ma·or1 Ma·or2
Conflicting Flow All 493 225 0 0 238
Stage 1 225
Stage 2 268
Critical Hdwy 6.43 6.23 - 4.13
Critical Hdwy Stg 1 5.43
Critical Hdwy Stg 2 5.43
Follow-up Hdwy 3.527 3.327 - 2.227
Pot Cap-1 Maneuver 534 812 - 1323
Stage 1 810
Stage 2 775
Platoon blocked, %
Mov Cap-1 Maneuver 515 812 - 1323
Mov Cap-2 Maneuver 515
Stage 1 810
Stage 2 748
roach WB NB SB
HCM Control Delay, s 10.7 0 1.5

HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL
Capacity (veh/h) - 667 1323
HCM Lane V/C Ratio - 0.06 0.032
HCM Control Delay (s) - 10.7 7.8
HCM Lane LOS B A
HCM 95th %tile Q(veh) 0.2 0.1
Existing Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
0 0
92 3
184
0 SBT
0 A
11/07/2021
Synchro 10 Report
Page2

NEAR-TERM CONDITIONS
HCM 6th Signalized Intersection Summary
1: Willow Avenue & Butler Avenue
-+ \' "f +- ~
Movement EBT EBR WBL WBT NBL
Lane Configurations ft. "'i t V
Traffic Volume (veh/h) 245 131 192 387 162
Future Volume (veh/h) 245 131 192 387 162
Initial Q (Qb), veh 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 331 177 259 523 219
Peak Hour Factor 0.74 0.74 0.74 0.74 0.74
Percent Heavy Veh, % 3 3 3 3 3
Cap, veh/h 365 195 301 1040 240
Arrive On Green 0.32 0.32 0.17 0.56 0.30
Sat Flow, veh/h 1138 608 1767 1856 794
Grp Volume(v), veh/h 0 508 259 523 458
Grp Sat Flow(s),veh/h/ln 0 1746 1767 1856 1661
Q Serve(g_s), s 0.0 21 .9 11 .2 13.5 20.9
Cycle Q Clear(g_c), s 0.0 21.9 11.2 13.5 20.9
Prop In Lane 0.35 1.00 0.48
Lane Grp Cap(c), veh/h 0 561 301 1040 501
V/C Ratio(X) 0.00 0.91 0.86 0.50 0.91
Avail Cap(c_a), veh/h 0 637 374 1197 605
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 25.5 31 .6 10.6 26.4
Iner Delay (d2), s/veh 0.0 15.5 15.3 0.4 16.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 0.0 10.6 5.7 4.6 9.8
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 41.0 46.9 10.9 42.8
LnGre LOS A D D B D
Approach Vol, veh/h 508 782 458
Approach Delay, s/veh 41 .0 22.9 42.8
Approach LOS D C D
irimer - Assigned Phs 2 3 4
Phs Duration (G+Y+Rc), s 29.1 18.8 30.6
Change Period (Y+Rc), s 5.4 5.4 5.4
Max Green Setting (Gmax), s 28.6 16.6 28.6
Max Q Clear Time (g_c+l1), s 22.9 13.2 23.9
Green Ext Time (p_c), s 0.8 0.2 1.3
Intersection Summa~
HCM 6th Ctrl Delay 33.4
HCM 6th LOS C
Notes
User approved volume balancing among the lanes for turning movement.

Near-Term Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
~
NBR
176
176
0 1.00

1.00 1856
238

0.74 3
261

0.30 863
0 0

0.0 0.0

0.52 0

0.00 0

1.00 0.00

0.0 0.0

0.0 0.0

0.0 A
8 49.4

5.4 50.6

15.5 3.4
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
3: Willow Avenue & Jensen Avenue
.,.,.
-+ -,.

Movement EBL EBT EBR
Lane Configurations "i tf+
Traffic Volume (veh/h) 70 420 32
Future Volume (veh/h) 70 420 32
Initial Q (Qb), veh 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1856 1856 1856
Adj Flow Rate, veh/h 86 519 40
Peak Hour Factor 0.81 0.81 0.81
Percent Heavy Veh, % 3 3 3
Cap, veh/h 109 1456 112
Arrive On Green 0.06 0.44 0.44
Sat Flow, veh/h 1767 3317 255
Grp Volume(v), veh/h 86 275 284
Grp Sat Flow(s),veh/h/ln 1767 1763 1810
Q Serve(g_s), s 5.4 11 .6 11 .6
Cycle Q Clear(g_c), s 5.4 11.6 11.6
Prop In Lane 1.00 0.14
Lane Grp Cap(c), veh/h 109 774 794
V/C Ratio(X) 0.79 0.36 0.36
Avail Cap(c_a), veh/h 151 836 859
HCM Platoon Ratio 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00
Uniform Delay (d), s/veh 51 .6 20.8 20.8
Iner Delay (d2), s/veh 17.3 0.3 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 2.8 4.4 4.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 68.9 21.1 21.1
LnGre LOS E C C
Approach Vol, veh/h 645
Approach Delay, s/veh 27.5
Approach LOS C
irimer - Assigned Phs 2 3
Phs Duration (G+Y+Rc), s 10.0 35.2 10.8
Change Period (Y+Rc), s 5.4 6.5 6.5
Max Green Setting (Gmax), s 6.3 28.7 7.2
Max Q Clear Time (g_c+l1), s 5.0 3.4 4.5
Green Ext Time (p_c), s 0.0 0.1 0.0
Intersection Summa~
HCM 6th Ctrl Delay 37.7
HCM 6th LOS D
Near-Term Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
f
WBL
"i
33 33
0 1.00

1.00 1856
41 0.81
3 68

0.04 1767
41 1767

2.5 2.5

1.00 68

0.60 114

1.00 1.00

52.7 8.1

0.0 1.2

60.9 E
4 55.4

6.5 52.9

13.6 3.0
+-
WBT
tf+
1039
1039
0 1.00
No
1856
1283

0.81 3
1422

0.42 3417
661
1763

39.1 39.1
733

0.90 800

1.00 1.00

30.4 12.7

0.0 17.5

43.1 D
1388

43.6 D
5 9.5

6.5 6.1

3.4 0.0
-\.. ~ t ~

WBR NBL NBT NBR
"i f+
52 18 12 11
52 18 12 11
0 0 0 0

1.00 1.00 1.00

1.00 1.00 1.00 1.00
No
1856 1856 1856 1856
64 22 15 14

0.81 0.81 0.81 0.81
3 3 3 3
71 47 227 212

0.42 0.03 0.26 0.26
170 1767 883 824
686 22 0 29
1825 1767 0 1707

39.2 1.4 0.0 1.4

39.2 1.4 0.0 1.4

0.09 1.00 0.48
759 47 0 439

0.90 0.47 0.00 0.07
828 97 0 439

1.00 1.00 1.00 1.00

1.00 1.00 0.00 1.00

30.5 53.5 0.0 31 .3

12.6 7.1 0.0 0.3

0.0 0.0 0.0 0.0

18.1 0.7 0.0 0.6

43.0 60.6 0.0 31.6

D E A C
51 44.1
D
6 7 8

35.8 13.4 52.9

5.4 6.5 6.5

28.9 9.5 50.6

9.8 7.4 41 .2

0.7 0.0 5.2
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,,
39 34 141
39 34 141
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
48 42 174

0.81 0.81 0.81
3 3 3
74 506 428

0.04 0.27 0.27
1767 1856 1572
48 42 174
1767 1856 1572

3.0 1.9 7.8

3.0 1.9 7.8

1.00 1.00
74 506 428

0.65 0.08 0.41
100 506 428

1.00 1.00 1.00

1.00 1.00 1.00

52.6 30.2 19.6

9.4 0.3 2.8

0.0 0.0 0.0

1.5 0.9 3.8

62.0 30.5 22.4
E C C
264

30.9 C
Synchro 10 Report
Page2
Queues
1: Willow Avenue & Butler Avenue
-+ f +-
Lane Groue EBT WBL WBT
Lane Group Flow (vph) 508 259 523
v/c Ratio 0.88 0.79 0.50
Control Delay 44.8 52.3 13.1
Queue Delay 0.0 0.0 0.0
Total Delay 44.8 52.3 13.1
Queue Length 50th (ft) 249 139 161
Queue Length 95th (ft) 288 180 188
Internal Link Dist (ft) 1512 2571
Turn Bay Length (ft) 100
Base Capacity (vph) 652 366 1176
Starvation Cap Reductn 0 0 0
Spillback Cap Reductn 0 0 0
Storage Cap Reductn 0 0 0
Reduced v/c Ratio 0.78 0.71 0.44
Intersection Summa!)'.

Near-Term Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
"\
NBL
457

0.85 40.4

0.0 40.4
204
237
3098
644
0 0
0 0.71
11/07/2021
Synchro 10 Report

Page 1 ends

Queues
3: Willow Avenue & Jensen Avenue
.,.,.
-+ "f
Lane Groue EBL EBT WBL
Lane Group Flow (vph) 86 559 41
v/c Ratio 0.61 0.36 0.37
Control Delay 72.3 21.7 64.4
Queue Delay 0.0 0.0 0.0
Total Delay 72.3 21.7 64.4
Queue Length 50th (ft) 66 146 31
Queue Length 95th (ft) 109 167 62
Internal Link Dist (ft) 2543
Turn Bay Length (ft) 250 125
Base Capacity (vph) 153 1696 116
Starvation Cap Reductn 0 0 0
Spillback Cap Reductn 0 0 0
Storage Cap Reductn 0 0 0
Reduced v/c Ratio 0.56 0.33 0.35
Intersection Summa!)'.

Near-Term Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
+-
WBT
1347

0.90 39.8

0.0 39.8
507
515
2787
1626
0 0
0 0.83
~ t '.

NBL NBT SBL
22 29 48

0.22 0.06 0.48

60.5 22.9 71.9

0.0 0.0 0.0

60.5 22.9 71.9
17 9 37
40 30 70
592
150 150
98 463 101
0 0 0
0 0 0
0 0 0

0.22 0.06 0.48
!
SBT
42 0.08

35.1 0.0

35.1 25
50 1750
534
0 0
0 0.08
.,,
SBR
174

0.29 3.8

0.0 3.8
0 17
602
0 0
0 0.29
11/07/2021
Synchro 10 Report
Page2
HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 82
Intersection LOS F
Movement EBL EBT EBR
Lane Configurations 4 .,,
Traffic Vol, veh/h 76 213 35
Future Vol, veh/h 76 213 35
Peak Hour Factor 0.71 0.71 0.71
Heavy Vehicles, % 3 3 3
MvmtFlow 107 300 49
Number of Lanes 0 1 1
roach EB
Opposing Approach WB
Opposing Lanes 2
Conflicting Approach Left SB
Conflicting Lanes Left 2
Conflicting Approach Right NB
Conflicting Lanes Right 1
HCM Control Delay 97.2

HCM LOS F
Lane NBLn1 EBLn1
Vol Left, % 15% 26%
Vol Thru, % 56% 74%
Vol Right,% 30% 0%
Sign Control Stop Stop
Traffic Vol by Lane 247 289
LT Vol 36 76
Through Vol 138 213
RT Vol 73 0
Lane Flow Rate 348 407
Geometry Grp 6 7
Degree of Util (X) 0.954 1.092
Departure Headway (Hd) 10.688 10.217
Convergence, Y/N Yes Yes
Cap 341 358
Service Time 8.688 7.917
HCM Lane V/C Ratio 1.021 1.137
HCM Control Delay 71.9 107.4
HCM Lane LOS F F
HCM 95th-tile Q 10.1 14.2
Near-Term Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.

WBL
57 57

0.71 3
80 0
WB
EB
2 NB
1 SB
2 105.1
F
EBLn2
0%
0%
100%
Stop
35 0
0 35
49 7

0.121

9.338
Yes
386

7.038

0.127

13.3 B

0.4 WBT WBR NBL
4 .,
254 95 36
254 95 36

0.71 0.71 0.71
3 3 3
358 134 51
1 1 0
NB
SB
2 EB
2 WB
2 71.9
F
WBLn1 WBLn2 SBLn1
18% 0% 51%
82% 0% 49%
0% 100% 0%
Stop Stop Stop
311 95 235
57 0 119
254 0 116
0 95 0
438 134 331
7 7 7

1.167 0.327 0.907

10.076 9.24 10.586
Yes Yes Yes
364 392 344

7.776 6.94 8.286

1.203 0.342 0.962
132.2 16.4 61.3
F C F

16.8 1.4 9

NBT NBR
~
138 73
138 73

0.71 0.71
3 3
194 103
1 0
SBLn2
0%
0%
100%
Stop
109
0 0
109
154
7 0.38

9.581
Yes
378

7.281

0.407
18 C

1.7 11/07/2021
SBL SBT SBR.
4 .,,
119 116 109
119 116 109

0.71 0.71 0.71
3 3 3
168 163 154
0 1 1
SB
NB
1 WB
2 EB
2 47.6
E
Synchro 10 Report

Page 1 ends

HCM 6th TWSC
4: Willow Avenue & North Project Driveway
Intersection
Int Delay, s/veh 1.1
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations V ~ 4'
Traffic Vol, veh/h 20 36 330 7 12 314
Future Vol, veh/h 20 36 330 7 12 314
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0
Veh in Median Storage, # 0 0
Grade, % 0 0
Peak Hour Factor 92 92 92 92 92
Heavy Vehicles, % 3 3 3 3 3
MvmtFlow 22 39 359 8 13
Ma·or/Minor Minor1 Ma·or1 Ma·or2
Conflicting Flow All 730 363 0 0 367
Stage 1 363
Stage 2 367
Critical Hdwy 6.43 6.23 - 4.13
Critical Hdwy Stg 1 5.43
Critical Hdwy Stg 2 5.43
Follow-up Hdwy 3.527 3.327 - 2.227
Pot Cap-1 Maneuver 388 680 - 1186
Stage 1 702
Stage 2 699
Platoon blocked, %
Mov Cap-1 Maneuver 383 680 - 1186
Mov Cap-2 Maneuver 383
Stage 1 702
Stage 2 689
roach WB NB SB
HCM Control Delay, s 12.6 0 0.3

HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL
Capacity (veh/h) - 533 1186
HCM Lane V/C Ratio - 0.114 0.011
HCM Control Delay (s) - 12.6 8.1
HCM Lane LOS B A
HCM 95th %tile Q(veh) 0.4 0
Near-Term Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
0 0
92 3
341
0 SBT
0 A
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th TWSC
5: Willow Avenue & South Project Driveway
Intersection
Int Delay, s/veh 1.1
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations V ~ 4'
Traffic Vol, veh/h 21 34 303 7 11 323
Future Vol, veh/h 21 34 303 7 11 323
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0
Veh in Median Storage, # 0 0
Grade, % 0 0
Peak Hour Factor 92 92 92 92 92
Heavy Vehicles, % 3 3 3 3 3
MvmtFlow 23 37 329 8 12
Ma·or/Minor Minor1 Ma·or1 Ma·or2
Conflicting Flow All 708 333 0 0 337
Stage 1 333
Stage 2 375
Critical Hdwy 6.43 6.23 - 4.13
Critical Hdwy Stg 1 5.43
Critical Hdwy Stg 2 5.43
Follow-up Hdwy 3.527 3.327 - 2.227
Pot Cap-1 Maneuver 400 706 - 1217
Stage 1 724
Stage 2 693
Platoon blocked, %
Mov Cap-1 Maneuver 395 706 - 1217
Mov Cap-2 Maneuver 395
Stage 1 724
Stage 2 685
roach WB NB SB
HCM Control Delay, s 12.4 0 0.3

HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL
Capacity (veh/h) - 543 1217
HCM Lane V/C Ratio - 0.11 0.01
HCM Control Delay (s) - 12.4 8
HCM Lane LOS B A
HCM 95th %tile Q(veh) 0.4 0
Near-Term Plus Project Conditions 10/25/2021 AM Peak
VRPA Technologies, Inc.
0 0
92 3
351
0 SBT
0 A
11/07/2021
Synchro 10 Report
Page2
HCM 6th Signalized Intersection Summary
1: Willow Avenue & Butler Avenue
-+ \' "f +- ~
Movement EBT EBR WBL WBT NBL
Lane Configurations ft. "'i t V
Traffic Volume (veh/h) 317 147 135 291 140
Future Volume (veh/h) 317 147 135 291 140
Initial Q (Qb), veh 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 348 162 148 320 154
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91
Percent Heavy Veh, % 3 3 3 3 3
Cap, veh/h 431 201 193 1064 193
Arrive On Green 0.36 0.36 0.11 0.57 0.22
Sat Flow, veh/h 1198 558 1767 1856 891
Grp Volume(v), veh/h 0 510 148 320 289
Grp Sat Flow(s),veh/h/ln 0 1755 1767 1856 1672
Q Serve(g_s), s 0.0 13.5 4.2 4.6 8.4
Cycle Q Clear(g_c), s 0.0 13.5 4.2 4.6 8.4
Prop In Lane 0.32 1.00 0.53
Lane Grp Cap(c), veh/h 0 632 193 1064 363
V/C Ratio(X) 0.00 0.81 0.77 0.30 0.80
Avail Cap(c_a), veh/h 0 1177 466 1927 829
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 14.9 22.4 5.7 19.1
Iner Delay (d2), s/veh 0.0 2.5 6.3 0.2 4.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 0.0 4.6 1.9 1.1 3.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 17.4 28.6 5.8 23.1
LnGre LOS A B C A C
Approach Vol, veh/h 510 468 289
Approach Delay, s/veh 17.4 13.0 23.1
Approach LOS B B C
irimer - Assigned Phs 2 3 4
Phs Duration (G+Y+Rc), s 16.6 11 .0 24.0
Change Period (Y+Rc), s 5.4 5.4 5.4
Max Green Setting (Gmax), s 25.6 13.6 34.6
Max Q Clear Time (g_c+l1), s 10.4 6.2 15.5
Green Ext Time (p_c), s 0.8 0.2 3.0
Intersection Summa~
HCM 6th Ctrl Delay 17.1
HCM 6th LOS B
Notes
User approved volume balancing among the lanes for turning movement.

Near-Term Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
~
NBR
122
122
0 1.00

1.00 1856
134

0.91 3
168

0.22 775
0 0

0.0 0.0

0.46 0

0.00 0

1.00 0.00

0.0 0.0

0.0 0.0

0.0 A
8 35.0

5.4 53.6

6.6 1.9
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
3: Willow Avenue & Jensen Avenue
.,.,.
-+ -,. f +- -\.. ~ t
Movement EBL EBT EBR WBL WBT WBR NBL NBT
Lane Configurations "i tf+ "i tf+ "i f+
Traffic Volume (veh/h) 143 859 26 13 515 51 50 63
Future Volume (veh/h) 143 859 26 13 515 51 50 63
Initial Q (Qb), veh 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 149 895 27 14 536 53 52 66
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 3 3 3 3 3 3 3 3
Cap, veh/h 220 1088 33 35 669 66 84 372
Arrive On Green 0.12 0.31 0.31 0.02 0.21 0.21 0.05 0.36 Sat Flow, veh/h 1767 3494 105 1767 3241 320 1767 1039
Grp Volume(v), veh/h 149 452 470 14 291 298 52 0
Grp Sat Flow(s),veh/h/ln 1767 1763 1837 1767 1763 1798 1767 0 Q Serve(g_s), s 7.6 22.4 22.4 0.7 14.8 14.9 2.7 0.0
Cycle Q Clear(g_c), s 7.6 22.4 22.4 0.7 14.8 14.9 2.7 0.0 Prop In Lane 1.00 0.06 1.00 0.18 1.00
Lane Grp Cap(c), veh/h 220 549 572 35 364 371 84 0
V/C Ratio(X) 0.68 0.82 0.82 0.41 0.80 0.80 0.62 0.00
Avail Cap(c_a), veh/h 384 851 887 122 589 601 197 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 39.5 30.0 30.0 45.7 35.5 35.6 44.1 0.0 Iner Delay (d2), s/veh 3.6 3.8 3.7 7.5 4.1 4.1 7.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 o/oile BackOfQ(50%),veh/ln 3.3 9.1 9.5 0.4 6.2 6.4 1.3 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 43.1 33.9 33.7 53.1 39.6 39.7 51.4 0.0 LnGre LOS D C C D D D D A
Approach Vol, veh/h 1071 603 162
Approach Delay, s/veh 35.1 40.0 31 .0
Approach LOS D D C
irimer - Assigned Phs 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.8 40.3 8.3 35.8 11.0 39.1 18.2 26.0 Change Period (Y+Rc), s 5.4 6.5 6.5 6.5 6.5 * 6.5 6.5 6.5 Max Green Setting (Gmax), s 9.6 33.5 6.5 45.5 10.5 * 33 20.5 31.5 Max Q Clear Time (g_c+l1), s 4.6 6.1 2.7 24.4 4.7 4.0 9.6 16.9 Green Ext Time (p_c), s 0.0 0.5 0.0 5.0 0.0 0.3 0.2 2.6 Intersection Summa~
HCM 6th Ctrl Delay 35.4
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.

Near-Term Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
~
NBR
42 42
0 1.00

1.00 1856
44 0.96
3 248

0.36 692
110
1731

4.1 4.1

0.40 620

0.18 620

1.00 1.00

20.7 0.6

0.0 1.6

21.3 C
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,,
48 15 78
48 15 78
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
50 16 81

0.96 0.96 0.96
3 3 3
82 642 544

0.05 0.35 0.35
1767 1856 1572
50 16 81
1767 1856 1572

2.6 0.5 2.0

2.6 0.5 2.0

1.00 1.00
82 642 544

0.61 0.02 0.15
180 642 544

1.00 1.00 1.00

1.00 1.00 1.00

44.1 20.3 7.6

7.1 0.1 0.6

0.0 0.0 0.0

1.3 0.2 1.2

51.2 20.4 8.2
D C A
147

24.2 C
Synchro 10 Report
Page2
Queues
1: Willow Avenue & Butler Avenue
-+ f +-
Lane Groue EBT WBL WBT
Lane Group Flow (vph) 510 148 320
v/c Ratio 0.76 0.49 0.31
Control Delay 27.2 36.4 8.2
Queue Delay 0.0 0.0 0.0
Total Delay 27.2 36.4 8.2
Queue Length 50th (ft) 172 56 55
Queue Length 95th (ft) 352 141 127
Internal Link Dist (ft) 1512 2571
Turn Bay Length (ft) 100
Base Capacity (vph) 1052 417 1482
Starvation Cap Reductn 0 0 0
Spillback Cap Reductn 0 0 0
Storage Cap Reductn 0 0 0
Reduced v/c Ratio 0.48 0.35 0.22
Intersection Summa!)'.

Near-Term Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
"\
NBL
288

0.63 27.7

0.0 27.7
88 197
3098
781
0 0
0 0.37
11/07/2021
Synchro 10 Report

Page 1 ends

Queues
3: Willow Avenue & Jensen Avenue
.,.,.
-+ "f
Lane Groue EBL EBT WBL
Lane Group Flow (vph) 149 922 14
v/c Ratio 0.61 0.69 0.13
Control Delay 54.1 30.6 54.4
Queue Delay 0.0 0.0 0.0
Total Delay 54.1 30.6 54.4
Queue Length 50th (ft) 94 247 9
Queue Length 95th (ft) 175 388 33
Internal Link Dist (ft) 2543
Turn Bay Length (ft) 250 125
Base Capacity (vph) 361 1600 114
Starvation Cap Reductn 0 0 0
Spillback Cap Reductn 0 0 0
Storage Cap Reductn 0 0 0
Reduced v/c Ratio 0.41 0.58 0.12
Intersection Summa!)'.

Near-Term Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
+-
WBT
589

0.76 44.5

0.0 44.5
191
274
2787
1102
0 0
0 0.53
~ t '.

NBL NBT SBL
52 110 50

0.36 0.18 0.36

56.1 23.1 56.7

0.0 0.0 0.0

56.1 23.1 56.7
33 38 32
80 96 79
592
150 150
185 603 169
0 0 0
0 0 0
0 0 0

0.28 0.18 0.30
!
SBT
16 0.03

29.7 0.0

29.7 7
27 1750
622
0 0
0 0.03
.,,
SBR
81 0.12

0.4 0.0

0.4 0
0 660
0 0
0 0.12
11/07/2021
Synchro 10 Report
Page2
HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 18.8
Intersection LOS C
Movement EBL EBT EBR
Lane Configurations 4 .,,
Traffic Vol, veh/h 63 244 44
Future Vol, veh/h 63 244 44
Peak Hour Factor 0.94 0.94 0.94
Heavy Vehicles, % 3 3 3
MvmtFlow 67 260 47
Number of Lanes 0 1 1
roach EB
Opposing Approach WB
Opposing Lanes 2
Conflicting Approach Left SB
Conflicting Lanes Left 2
Conflicting Approach Right NB
Conflicting Lanes Right 1
HCM Control Delay 21.1

HCM LOS C
Lane NBLn1 EBLn1
Vol Left, % 14% 21%
Vol Thru, % 67% 79%
Vol Right,% 19% 0%
Sign Control Stop Stop
Traffic Vol by Lane 228 307
LT Vol 32 63
Through Vol 152 244
RT Vol 44 0
Lane Flow Rate 243 327
Geometry Grp 6 7
Degree of Util (X) 0.508 0.654
Departure Headway (Hd) 7.544 7.212
Convergence, Y/N Yes Yes
Cap 475 500
Service Time 5.616 4.978
HCM Lane V/C Ratio 0.512 0.654
HCM Control Delay 18.2 22.7
HCM Lane LOS C C
HCM 95th-tile Q 2.8 4.7
Near-Term Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.

WBL
60 60

0.94 3
64 0
WB
EB
2 NB
1 SB
2 19.9
C
EBLn2
0%
0%
100%
Stop
44 0
0 44
47 7

0.083

6.388
Yes
558

4.154

0.084

9.7 A

0.3 WBT WBR NBL
4 .,
232 44 32
232 44 32

0.94 0.94 0.94
3 3 3
247 47 34
1 1 0
NB
SB
2 EB
2 WB
2 18.2
C
WBLn1 WBLn2 SBLn1
21% 0% 22%
79% 0% 78%
0% 100% 0%
Stop Stop Stop
292 44 165
60 0 36
232 0 129
0 44 0
311 47 176
7 7 7

0.625 0.084 0.377

7.247 6.423 7.741
Yes Yes Yes
497 556 463

5.013 4.188 5.515

0.626 0.085 0.38

21.4 9.8 15.2
C A C

4.2 0.3 1.7

NBT NBR
~
152 44
152 44

0.94 0.94
3 3
162 47
1 0
SBLn2
0%
0%
100%
Stop
61 0
0 61
65 7

0.125

6.91 Yes
517

4.683

0.126

10.7 B

0.4 11/07/2021
SBL SBT SBR.
4 .,,
36 129 61
36 129 61

0.94 0.94 0.94
3 3 3
38 137 65
0 1 1
SB
NB
1 WB
2 EB
2 14
B
Synchro 10 Report

Page 1 ends

HCM 6th TWSC
4: Willow Avenue & North Project Driveway
Intersection
Int Delay, s/veh 1.3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations V ~ 4'
Traffic Vol, veh/h 13 24 235 22 40 238
Future Vol, veh/h 13 24 235 22 40 238
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0
Veh in Median Storage, # 0 0
Grade, % 0 0
Peak Hour Factor 92 92 92 92 92
Heavy Vehicles, % 3 3 3 3 3
MvmtFlow 14 26 255 24 43
Ma·or/Minor Minor1 Ma·or1 Ma·or2
Conflicting Flow All 612 267 0 0 279
Stage 1 267
Stage 2 345
Critical Hdwy 6.43 6.23 - 4.13
Critical Hdwy Stg 1 5.43
Critical Hdwy Stg 2 5.43
Follow-up Hdwy 3.527 3.327 - 2.227
Pot Cap-1 Maneuver 455 769 - 1278
Stage 1 775
Stage 2 715
Platoon blocked, %
Mov Cap-1 Maneuver 437 769 - 1278
Mov Cap-2 Maneuver 437
Stage 1 775
Stage 2 687
roach WB NB SB
HCM Control Delay, s 11.4 0 1.1

HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL
Capacity (veh/h) - 607 1278
HCM Lane V/C Ratio - 0.066 0.034
HCM Control Delay (s) - 11.4 7.9
HCM Lane LOS B A
HCM 95th %tile Q(veh) 0.2 0.1
Near-Term Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
0 0
92 3
259
0 SBT
0 A
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th TWSC
5: Willow Avenue & South Project Driveway
Intersection
Int Delay, s/veh 1.3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations V ~ 4'
Traffic Vol, veh/h 14 23 234 24 39 212
Future Vol, veh/h 14 23 234 24 39 212
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0
Veh in Median Storage, # 0 0
Grade, % 0 0
Peak Hour Factor 92 92 92 92 92
Heavy Vehicles, % 3 3 3 3 3
MvmtFlow 15 25 254 26 42
Ma·or/Minor Minor1 Ma·or1 Ma·or2
Conflicting Flow All 581 267 0 0 280
Stage 1 267
Stage 2 314
Critical Hdwy 6.43 6.23 - 4.13
Critical Hdwy Stg 1 5.43
Critical Hdwy Stg 2 5.43
Follow-up Hdwy 3.527 3.327 - 2.227
Pot Cap-1 Maneuver 474 769 - 1277
Stage 1 775
Stage 2 738
Platoon blocked, %
Mov Cap-1 Maneuver 456 769 - 1277
Mov Cap-2 Maneuver 456
Stage 1 775
Stage 2 710
roach WB NB SB
HCM Control Delay, s 11.3 0 1.2

HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL
Capacity (veh/h) - 610 1277
HCM Lane V/C Ratio - 0.066 0.033
HCM Control Delay (s) - 11.3 7.9
HCM Lane LOS B A
HCM 95th %tile Q(veh) 0.2 0.1
Near-Term Plus Project Conditions 10/25/2021 PM Peak
VRPA Technologies, Inc.
0 0
92 3
230
0 SBT
0 A
11/07/2021
Synchro 10 Report
Page2
CUMULATIVE YEAR 2042 CONDITIONS
HCM 6th Signalized Intersection Summary
1: Willow Avenue & Butler Avenue
-+ \' "f +- ~
Movement EBT EBR WBL WBT NBL
Lane Configurations ft. "'i t V
Traffic Volume (veh/h) 389 178 299 610 176
Future Volume (veh/h) 389 178 299 610 176
Initial Q (Qb), veh 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 423 193 325 663 191
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3 3
Cap, veh/h 442 202 352 1137 201
Arrive On Green 0.37 0.37 0.20 0.61 0.29
Sat Flow, veh/h 1206 550 1767 1856 684
Grp Volume(v), veh/h 0 616 325 663 460
Grp Sat Flow(s),veh/h/ln 0 1756 1767 1856 1648
Q Serve(g_s), s 0.0 39.5 20.8 24.9 31 .6
Cycle Q Clear(g_c), s 0.0 39.5 20.8 24.9 31.6
Prop In Lane 0.31 1.00 0.42
Lane Grp Cap(c), veh/h 0 644 352 1137 484
V/C Ratio(X) 0.00 0.96 0.92 0.58 0.95
Avail Cap(c_a), veh/h 0 663 376 1182 508
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 35.7 45.4 13.5 40.0
Iner Delay (d2), s/veh 0.0 24.4 27.0 0.7 27.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 0.0 20.5 11.5 9.6 16.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 60.1 72.3 14.2 67.1
LnGre LOS A E E B E
Approach Vol, veh/h 616 988 460
Approach Delay, s/veh 60.1 33.3 67.1
Approach LOS E C E
irimer - Assigned Phs 2 3 4
Phs Duration (G+Y+Rc), s 39.4 28.4 47.8
Change Period (Y+Rc), s 5.4 5.4 5.4
Max Green Setting (Gmax), s 35.6 24.6 43.6
Max Q Clear Time (g_c+l1), s 33.6 22.8 41 .5
Green Ext Time (p_c), s 0.4 0.2 0.8
Intersection Summa~
HCM 6th Ctrl Delay 48.8
HCM 6th LOS D
Notes
User approved volume balancing among the lanes for turning movement.

Cumulative Year 2042 Without Project Conditions 10/25/2021 AM Peak VRPA Technologies, Inc.
~
NBR
247
247
0 1.00

1.00 1856
268

0.92 3
282

0.29 960
0 0

0.0 0.0

0.58 0

0.00 0

1.00 0.00

0.0 0.0

0.0 0.0

0.0 A
8 76.2

5.4 73.6

26.9 4.9
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
3: Willow Avenue & Jensen Avenue
.,.,.
-+ -,. f +-
Movement EBL EBT EBR WBL WBT
Lane Configurations "i tf+ "i tf+
Traffic Volume (veh/h) 92 619 52 54 1620
Future Volume (veh/h) 92 619 52 54 1620
Initial Q (Qb), veh 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 100 673 57 59 1761
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3 3
Cap, veh/h 96 1487 126 76 1517
Arrive On Green 0.05 0.45 0.45 0.04 0.44
Sat Flow, veh/h 1767 3290 278 1767 3442
Grp Volume(v), veh/h 100 360 370 59 897
Grp Sat Flow(s),veh/h/ln 1767 1763 1805 1767 1763
Q Serve(g_s), s 6.5 16.8 16.8 3.9 52.5
Cycle Q Clear(g_c), s 6.5 16.8 16.8 3.9 52.5
Prop In Lane 1.00 0.15 1.00
Lane Grp Cap(c), veh/h 96 797 816 76 777
V/C Ratio(X) 1.04 0.45 0.45 0.77 1.15
Avail Cap(c_a), veh/h 96 797 816 142 777
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 56.3 22.5 22.5 56.4 33.3
Iner Delay (d2), s/veh 102.0 0.4 0.4 15.1 83.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 5.5 6.5 6.7 2.0 38.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 158.3 22.9 22.9 71.5 117.1
LnGre LOS F C C E F
Approach Vol, veh/h 830 1897
Approach Delay, s/veh 39.2 118.1
Approach LOS D F
irimer - Assigned Phs 2 3 4 5
Phs Duration (G+Y+Rc), s 10.5 36.6 11 .6 60.4 10.5
Change Period (Y+Rc), s 5.4 6.5 6.5 6.5 6.5
Max Green Setting (Gmax), s 6.0 30.1 9.6 49.4 6.5
Max Q Clear Time (g_c+l1), s 5.9 4.1 5.9 18.8 4.2
Green Ext Time (p_c), s 0.0 0.1 0.0 4.0 0.0
Intersection Summa~
HCM 6th Ctrl Delay 87.4
HCM 6th LOS F
Cumulative Year 2042 Without Project Conditions 10/25/2021 AM Peak VRPA Technologies, Inc.
-\.. ~ t

WBR NBL NBT
"i f+
71 30 18
71 30 18
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
77 33 20

0.92 0.92 0.92
3 3 3
66 59 215

0.44 0.03 0.25
150 1767 851
941 33 0
1829 1767 0

52.5 2.2 0.0

52.5 2.2 0.0

0.08 1.00
806 59 0

1.17 0.56 0.00
806 96 0

1.00 1.00 1.00

1.00 1.00 0.00

33.3 56.7 0.0

88.7 8.0 0.0

0.0 0.0 0.0

40.8 1.1 0.0
122.0 64.7 0.0
F E A
73 48.1
D
6 7 8

36.6 13.0 59.0

5.4 6.5 6.5

29.6 6.5 52.5

12.3 8.5 54.5

0.8 0.0 0.0
~
NBR
18 18
0 1.00

1.00 1856
20 0.92
3 215

0.25 851
40 1702

2.1 2.1

0.50 430

0.09 430

1.00 1.00

34.1 0.4

0.0 0.9

34.5 C
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,,
53 54 187
53 54 187
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
58 59 203

0.92 0.92 0.92
3 3 3
76 487 412

0.04 0.26 0.26
1767 1856 1572
58 59 203
1767 1856 1572

3.9 2.9 10.3

3.9 2.9 10.3

1.00 1.00
76 487 412

0.76 0.12 0.49
89 487 412

1.00 1.00 1.00

1.00 1.00 1.00

56.4 33.5 23.3

27.6 0.5 4.2

0.0 0.0 0.0

2.3 1.4 4.0

84.0 34.0 27.4
F C C
320

38.9 D
Synchro 10 Report
Page2
Queues
1: Willow Avenue & Butler Avenue
-+ f +- "\
Lane Groue EBT WBL WBT NBL
Lane Group Flow (vph) 616 325 663 459
v/c Ratio 0.93 0.89 0.58 0.90
Control Delay 56.9 71.8 15.5 56.8
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 56.9 71.8 15.5 56.8
Queue Length 50th (ft) 445 248 291 297
Queue Length 95th (ft) #682 #417 402 #480
Internal Link Dist (ft) 1512 2571 3098
Turn Bay Length (ft) 100
Base Capacity (vph) 709 389 1227 576
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.87 0.84 0.54 0.80
Intersection Summa!)'.
# 95th percentile volume exceeds capacity, queue may be longer.

Queue shown is maximum after two cycles.

Cumulative Year 2042 Without Project Conditions 10/25/2021 AM Peak VRPA Technologies, Inc.
11/07/2021
Synchro 10 Report

Page 1 ends

Queues
3: Willow Avenue & Jensen Avenue
.,.,.
-+ "f +- ~
Lane Groue EBL EBT WBL WBT NBL
Lane Group Flow (vph) 100 730 59 1838 33
v/c Ratio 1.04 0.46 0.47 1.18 0.35
Control Delay 158.3 24.9 65.6 118.7 65.3
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 158.3 24.9 65.6 118.7 65.3
Queue Length 50th (ft) -85 214 44 -914 25
Queue Length 95th (ft) #199 273 89 #1056 60
Internal Link Dist (ft) 2543 2787
Turn Bay Length (ft) 250 125 150
Base Capacity (vph) 96 1573 143 1559 96
Starvation Cap Reductn 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0
Reduced v/c Ratio 1.04 0.46 0.41 1.18 0.34
Intersection Summa!)'.

Volume exceeds capacity, queue is theoretically infinite.

Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.

Queue shown is maximum after two cycles.

Cumulative Year 2042 Without Project Conditions 10/25/2021 AM Peak VRPA Technologies, Inc.
t '.

NBT SBL
40 58

0.09 0.65

21.4 88.4

0.0 0.0

21.4 88.4
12 45
41 #113
592
150
451 89
0 0
0 0
0 0

0.09 0.65
!
SBT
59 0.12

34.9 0.0

34.9 36
72 1750
510
0 0
0 0.12
.,,
SBR
203

0.35 6.2

0.0 6.2
0 55
584
0 0
0 0.35
11/07/2021
Synchro 10 Report
Page2
HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 148.3
Intersection LOS F
Movement EBL EBT EBR WBL WBT
Lane Configurations 4 .,, 4
Traffic Vol, veh/h 118 345 56 89 406
Future Vol, veh/h 118 345 56 89 406
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 3 3 3 3 3
MvmtFlow 128 375 61 97 441
Number of Lanes 0 1 1 0 1
roach EB WB
Opposing Approach WB EB
Opposing Lanes 2 2
Conflicting Approach Left SB NB
Conflicting Lanes Left 2 1
Conflicting Approach Right NB SB
Conflicting Lanes Right 1 2
HCM Control Delay 193.8 195.7

HCM LOS F F
Lane NBLn1 EBLn1 EBLn2 WBLn1
Vol Left, % 16% 25% 0% 18%
Vol Thru, % 53% 75% 0% 82%
Vol Right,% 32% 0% 100% 0%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 361 463 56 495
LT Vol 56 118 0 89
Through Vol 191 345 0 406
RT Vol 114 0 56 0
Lane Flow Rate 392 503 61 538
Geometry Grp 6 7 7 7
Degree of Util (X) 1.086 1.374 0.152 1.459
Departure Headway (Hd) 11.877 10.952 10.071 10.99
Convergence, Y/N Yes Yes Yes Yes
Cap 310 337 359 334
Service Time 9.877 8.652 7.771 8.69
HCM Lane V/C Ratio 1.265 1.493 0.17 1.611
HCM Control Delay 112.8 215.5 14.6 250.7
HCM Lane LOS F F B F
HCM 95th-tile Q 12.9 22.8 0.5 25.8
Cumulative Year 2042 Without Project Conditions 10/25/2021 AM Peak VRPA Technologies, Inc.

WBR NBL
.,
155 56
155 56

0.92 0.92
3 3
168 61
1 0
NB
SB
2 EB
2 WB
2 112.8
F
WBLn2 SBLn1
0% 59%
0% 41%
100% 0%
Stop Stop
155 321
0 190
0 131
155 0
168 349
7 7

0.42 0.974

10.149 11.77
Yes Yes
357 311

7.849 9.47

0.471 1.122
20 80.7
C F
2 10.1

NBT NBR
~
191 114
191 114

0.92 0.92
3 3
208 124
1 0
SBLn2
0%
0%
100%
Stop
156
0 0
156
170
7 0.427

10.71 Yes
339

8.41 0.501

21.2 C

2.1 11/07/2021
SBL SBT SBR.
4 .,,
190 131 156
190 131 156

0.92 0.92 0.92
3 3 3
207 142 170
0 1 1
SB
NB
1 WB
2 EB
2 61.2
F
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
1: Willow Avenue & Butler Avenue
-+ \' "f +- ~
Movement EBT EBR WBL WBT NBL
Lane Configurations ft. "'i t V
Traffic Volume (veh/h) 487 144 174 455 169
Future Volume (veh/h) 487 144 174 455 169
Initial Q (Qb), veh 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 529 157 189 495 184
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3 3
Cap, veh/h 577 171 228 1144 204
Arrive On Green 0.42 0.42 0.13 0.62 0.25
Sat Flow, veh/h 1374 408 1767 1856 825
Grp Volume(v), veh/h 0 686 189 495 371
Grp Sat Flow(s),veh/h/ln 0 1782 1767 1856 1664
Q Serve(g_s), s 0.0 28.9 8.3 11 .1 17.1
Cycle Q Clear(g_c), s 0.0 28.9 8.3 11.1 17.1
Prop In Lane 0.23 1.00 0.50
Lane Grp Cap(c), veh/h 0 748 228 1144 412
V/C Ratio(X) 0.00 0.92 0.83 0.43 0.90
Avail Cap(c_a), veh/h 0 844 280 1299 494
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 21 .8 33.7 8.0 28.9
Iner Delay (d2), s/veh 0.0 13.8 15.7 0.3 17.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 0.0 13.4 4.3 3.5 8.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 35.6 49.4 8.2 46.2
LnGre LOS A D D A D
Approach Vol, veh/h 686 684 371
Approach Delay, s/veh 35.6 19.6 46.2
Approach LOS D B D
irimer - Assigned Phs 2 3 4
Phs Duration (G+Y+Rc), s 25.1 15.6 38.7
Change Period (Y+Rc), s 5.4 5.4 5.4
Max Green Setting (Gmax), s 23.6 12.6 37.6
Max Q Clear Time (g_c+l1), s 19.1 10.3 30.9
Green Ext Time (p_c), s 0.5 0.1 2.5
Intersection Summa~
HCM 6th Ctrl Delay 31 .6
HCM 6th LOS C
Notes
User approved volume balancing among the lanes for turning movement.

Cumulative Year 2042 Without Project Conditions 10/25/2021 PM Peak VRPA Technologies, Inc.
~
NBR
171
171
0 1.00

1.00 1856
186

0.92 3
207

0.25 834
0 0

0.0 0.0

0.50 0

0.00 0

1.00 0.00

0.0 0.0

0.0 0.0

0.0 A
8 54.4

5.4 55.6

13.1 3.2
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
3: Willow Avenue & Jensen Avenue
.,.,.
-+ -,. f +-
Movement EBL EBT EBR WBL WBT
Lane Configurations "i tf+ "i tf+
Traffic Volume (veh/h) 181 1301 42 22 770
Future Volume (veh/h) 181 1301 42 22 770
Initial Q (Qb), veh 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 197 1414 46 24 837
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3 3
Cap, veh/h 310 1535 50 50 960
Arrive On Green 0.18 0.44 0.44 0.03 0.29
Sat Flow, veh/h 1767 3485 113 1767 3277
Grp Volume(v), veh/h 197 714 746 24 450
Grp Sat Flow(s),veh/h/ln 1767 1763 1835 1767 1763
Q Serve(g_s), s 11 .7 43.2 43.4 1.5 27.5
Cycle Q Clear(g_c), s 11.7 43.2 43.4 1.5 27.5
Prop In Lane 1.00 0.06 1.00
Lane Grp Cap(c), veh/h 310 777 809 50 516
V/C Ratio(X) 0.63 0.92 0.92 0.48 0.87
Avail Cap(c_a), veh/h 310 817 850 95 627
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 43.3 29.8 29.9 54.3 38.0
Iner Delay (d2), s/veh 4.2 15.1 14.9 7.1 11.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 5.2 19.6 20.4 0.7 12.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 47.5 44.9 44.8 61.4 49.2
LnGre LOS D D D E D
Approach Vol, veh/h 1657 935
Approach Delay, s/veh 45.2 49.4
Approach LOS D D
irimer - Assigned Phs 2 3 4 5
Phs Duration (G+Y+Rc), s 10.8 36.4 9.7 56.4 18.1
Change Period (Y+Rc), s 5.4 6.5 6.5 6.5 6.5
Max Green Setting (Gmax), s 6.6 29.9 6.1 52.5 12.8
Max Q Clear Time (g_c+l1), s 6.2 12.0 3.5 45.4 7.4
Green Ext Time (p_c), s 0.0 0.8 0.0 4.5 0.1
Intersection Summa~
HCM 6th Ctrl Delay 46.6
HCM 6th LOS D
Cumulative Year 2042 Without Project Conditions 10/25/2021 PM Peak VRPA Technologies, Inc.
-\.. ~ t ~

WBR NBL NBT NBR
"i f+
68 82 101 69
68 82 101 69
0 0 0 0

1.00 1.00 1.00

1.00 1.00 1.00 1.00
No
1856 1856 1856 1856
74 89 110 75

0.92 0.92 0.92 0.92
3 3 3 3
85 181 271 185

0.29 0.10 0.26 0.26
290 1767 1028 701
461 89 0 185
1803 1767 0 1729

27.5 5.4 0.0 10.0

27.5 5.4 0.0 10.0

0.16 1.00 0.41
528 181 0 456

0.87 0.49 0.00 0.41
641 200 0 456

1.00 1.00 1.00 1.00

1.00 1.00 0.00 1.00

38.0 48.1 0.0 34.4

10.9 2.1 0.0 2.7

0.0 0.0 0.0 0.0

12.9 2.4 0.0 4.3

48.9 50.1 0.0 37.0

D D A D
274
41 .3
D
6 7 8

29.1 26.4 39.7

5.4 6.5 6.5

23.7 18.3 40.3

8.0 13.7 29.5

0.3 0.2 3.7
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,,
61 24 91
61 24 91
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
66 26 99

0.92 0.92 0.92
3 3 3
84 388 329

0.05 0.21 0.21
1767 1856 1572
66 26 99
1767 1856 1572

4.2 1.3 6.0

4.2 1.3 6.0

1.00 1.00
84 388 329

0.78 0.07 0.30
103 388 329

1.00 1.00 1.00

1.00 1.00 1.00

53.4 35.9 37.8

26.3 0.3 2.3

0.0 0.0 0.0

2.4 0.6 2.4

79.7 36.3 40.2
E D D
191

53.3 D
Synchro 10 Report
Page2
Queues
1: Willow Avenue & Butler Avenue
-+ f +- "\
Lane Groue EBT WBL WBT NBL
Lane Group Flow (vph) 686 189 495 370
v/c Ratio 0.91 0.75 0.43 0.83
Control Delay 41.9 55.7 9.8 42.8
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 41.9 55.7 9.8 42.8
Queue Length 50th (ft) 341 104 130 166
Queue Length 95th (ft) #573 #211 200 #301
Internal Link Dist (ft) 1512 2571 3098
Turn Bay Length (ft) 100
Base Capacity (vph) 842 273 1270 529
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.81 0.69 0.39 0.70
Intersection Summa!)'.
# 95th percentile volume exceeds capacity, queue may be longer.

Queue shown is maximum after two cycles.

Cumulative Year 2042 Without Project Conditions 10/25/2021 PM Peak VRPA Technologies, Inc.
11/07/2021
Synchro 10 Report

Page 1 ends

Queues
3: Willow Avenue & Jensen Avenue
.,.,.
-+ "f +- ~
Lane Groue EBL EBT WBL WBT NBL
Lane Group Flow (vph) 197 1460 24 911 89
v/c Ratio 0.75 0.91 0.24 0.84 0.49
Control Delay 65.5 38.8 60.9 43.3 59.5
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 65.5 38.8 60.9 43.3 59.5
Queue Length 50th (ft) 144 563 18 340 66
Queue Length 95th (ft) #254 #730 47 411 121
Internal Link Dist (ft) 2543 2787
Turn Bay Length (ft) 250 125 150
Base Capacity (vph) 302 1700 98 1292 206
Starvation Cap Reductn 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0
Reduced v/c Ratio 0.65 0.86 0.24 0.71 0.43
Intersection Summa!)'.
# 95th percentile volume exceeds capacity, queue may be longer.

Queue shown is maximum after two cycles.

Cumulative Year 2042 Without Project Conditions 10/25/2021 PM Peak VRPA Technologies, Inc.
t '.

NBT SBL
185 66

0.37 0.63

33.0 80.8

0.0 0.0

33.0 80.8
102 51
172 #124
592
150
497 106
0 0
0 0
0 0

0.37 0.62
!
SBT
26 0.06

39.5 0.0

39.5 17
42 1750
435
0 0
0 0.06
.,,
SBR
99 0.19

0.8 0.0

0.8 0
0 529
0 0
0 0.19
11/07/2021
Synchro 10 Report
Page2
HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 101 .9
Intersection LOS F
Movement EBL EBT EBR WBL WBT
Lane Configurations 4 .,, 4
Traffic Vol, veh/h 79 384 70 91 372
Future Vol, veh/h 79 384 70 91 372
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 3 3 3 3 3
MvmtFlow 86 417 76 99 404
Number of Lanes 0 1 1 0 1
roach EB WB
Opposing Approach WB EB
Opposing Lanes 2 2
Conflicting Approach Left SB NB
Conflicting Lanes Left 2 1
Conflicting Approach Right NB SB
Conflicting Lanes Right 1 2
HCM Control Delay 137.5 139.1

HCM LOS F F
Lane NBLn1 EBLn1 EBLn2 WBLn1
Vol Left, % 17% 17% 0% 20%
Vol Thru, % 61% 83% 0% 80%
Vol Right,% 21% 0% 100% 0%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 295 463 70 463
LT Vol 51 79 0 91
Through Vol 181 384 0 372
RT Vol 63 0 70 0
Lane Flow Rate 321 503 76 503
Geometry Grp 6 7 7 7
Degree of Util (X) 0.834 1.239 0.171 1.241
Departure Headway (Hd) 10.509 9.463 8.638 9.472
Convergence, Y/N Yes Yes Yes Yes
Cap 346 388 418 388
Service Time 8.509 7.163 6.338 7.172
HCM Lane V/C Ratio 0.928 1.296 0.182 1.296
HCM Control Delay 49.2 156.3 13.1 157.1
HCM Lane LOS E F B F
HCM 95th-tile Q 7.4 20.1 0.6 20.2
Cumulative Year 2042 Without Project Conditions 10/25/2021 PM Peak VRPA Technologies, Inc.

WBR NBL
.,
66 51
66 51

0.92 0.92
3 3
72 55
1 0
NB
SB
2 EB
2 WB
2 49.2
E
WBLn2 SBLn1
0% 26%
0% 74%
100% 0%
Stop Stop
66 215
0 55
0 160
66 0
72 234
7 7

0.161 0.618

8.633 10.578
Yes Yes
418 344

6.333 8.278

0.172 0.68
13 29
B D

0.6 3.9

NBT NBR
~
181 63
181 63

0.92 0.92
3 3
197 68
1 0
SBLn2
0%
0%
100%
Stop
86 0
0 86
93 7

0.226

9.704
Yes
372

7.404

0.25 15.2
C

0.9 11/07/2021
SBL SBT SBR.
4 .,,
55 160 86
55 160 86

0.92 0.92 0.92
3 3 3
60 174 93
0 1 1
SB
NB
1 WB
2 EB
2 25.1
D
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
1: Willow Avenue & Butler Avenue
-+ \' "f +- ~
Movement EBT EBR WBL WBT NBL
Lane Configurations ft. "'i t V
Traffic Volume (veh/h) 389 192 307 610 220
Future Volume (veh/h) 389 192 307 610 220
Initial Q (Qb), veh 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 423 209 334 663 239
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3 3
Cap, veh/h 415 205 358 1118 227
Arrive On Green 0.35 0.35 0.20 0.60 0.31
Sat Flow, veh/h 1172 579 1767 1856 739
Grp Volume(v), veh/h 0 632 334 663 535
Grp Sat Flow(s),veh/h/ln 0 1751 1767 1856 1654
Q Serve(g_s), s 0.0 42.4 22.2 26.5 36.8
Cycle Q Clear(g_c), s 0.0 42.4 22.2 26.5 36.8
Prop In Lane 0.33 1.00 0.45
Lane Grp Cap(c), veh/h 0 620 358 1118 509
V/C Ratio(X) 0.00 1.02 0.93 0.59 1.05
Avail Cap(c_a), veh/h 0 620 363 1123 509
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 38.6 46.9 14.7 41.4
Iner Delay (d2), s/veh 0.0 40.9 30.2 0.8 54.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 0.0 24.5 12.5 10.4 22.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 79.5 77.1 15.6 95.6
LnGre LOS A F E B F
Approach Vol, veh/h 632 997 535
Approach Delay, s/veh 79.5 36.2 95.6
Approach LOS E D F
irimer - Assigned Phs 2 3 4
Phs Duration (G+Y+Rc), s 42.2 29.7 47.8
Change Period (Y+Rc), s 5.4 5.4 5.4
Max Green Setting (Gmax), s 36.8 24.6 42.4
Max Q Clear Time (g_c+l1), s 38.8 24.2 44.4
Green Ext Time (p_c), s 0.0 0.0 0.0
Intersection Summa~
HCM 6th Ctrl Delay 63.5
HCM 6th LOS E
Notes
User approved volume balancing among the lanes for turning movement.

Cumulative Year 2042 Plus Project Conditions 10/25/2021 AM Peak VRPA Technologies, Inc.
~
NBR
271
271
0 1.00

1.00 1856
295

0.92 3
281

0.31 912
0 0

0.0 0.0

0.55 0

0.00 0

1.00 0.00

0.0 0.0

0.0 0.0

0.0 A
8 77.5

5.4 72.4

28.5 4.9
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
3: Willow Avenue & Jensen Avenue
.,.,.
-+ -,. f
Movement EBL EBT EBR WBL
Lane Configurations "i tf+ "i
Traffic Volume (veh/h) 99 619 52 54
Future Volume (veh/h) 99 619 52 54
Initial Q (Qb), veh 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856
Adj Flow Rate, veh/h 108 673 57 59
Peak Hour Factor 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3
Cap, veh/h 96 1486 126 76
Arrive On Green 0.05 0.45 0.45 0.04
Sat Flow, veh/h 1767 3290 278 1767
Grp Volume(v), veh/h 108 360 370 59
Grp Sat Flow(s),veh/h/ln 1767 1763 1805 1767
Q Serve(g_s), s 6.5 16.8 16.8 3.9
Cycle Q Clear(g_c), s 6.5 16.8 16.8 3.9
Prop In Lane 1.00 0.15 1.00
Lane Grp Cap(c), veh/h 96 796 816 76
V/C Ratio(X) 1.12 0.45 0.45 0.77
Avail Cap(c_a), veh/h 96 796 816 142
HCM Platoon Ratio 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 56.3 22.5 22.5 56.4
Iner Delay (d2), s/veh 127.9 0.4 0.4 15.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 6.2 6.5 6.7 2.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 184.2 22.9 22.9 71.5
LnGre LOS F C C E
Approach Vol, veh/h 838
Approach Delay, s/veh 43.7
Approach LOS D
irimer - Assigned Phs 2 3 4
Phs Duration (G+Y+Rc), s 10.6 36.6 11 .6 60.4
Change Period (Y+Rc), s 5.4 6.5 6.5 6.5
Max Green Setting (Gmax), s 6.0 30.1 9.6 49.4
Max Q Clear Time (g_c+l1), s 6.0 4.2 5.9 18.8
Green Ext Time (p_c), s 0.0 0.1 0.0 4.0
Intersection Summa~
HCM 6th Ctrl Delay 88.5
HCM 6th LOS F
Cumulative Year 2042 Plus Project Conditions 10/25/2021 AM Peak VRPA Technologies, Inc.
+-
WBT
tf+
1620
1620
0 1.00
No
1856
1761

0.92 3
1515

0.44 3440
897
1763

52.5 52.5
776

1.16 776

1.00 1.00

33.3 84.3

0.0 38.3
117.7
F
1898
118.7
F
5 10.5

6.5 6.5

4.2 0.0
-\.. ~ t ~

WBR NBL NBT NBR
"i f+
72 30 19 18
72 30 19 18
0 0 0 0

1.00 1.00 1.00

1.00 1.00 1.00 1.00
No
1856 1856 1856 1856
78 33 21 20

0.92 0.92 0.92 0.92
3 3 3 3
67 59 221 210

0.44 0.03 0.25 0.25
151 1767 874 832
942 33 0 41
1828 1767 0 1706

52.5 2.2 0.0 2.2

52.5 2.2 0.0 2.2

0.08 1.00 0.49
805 59 0 431

1.17 0.56 0.00 0.10
805 96 0 431

1.00 1.00 1.00 1.00

1.00 1.00 0.00 1.00

33.3 56.7 0.0 34.1

89.3 8.0 0.0 0.4

0.0 0.0 0.0 0.0

40.9 1.1 0.0 0.9
122.7 64.7 0.0 34.6

F E A C
74 48.0
D
6 7 8

36.7 13.0 59.0

5.4 6.5 6.5

29.6 6.5 52.5

13.6 8.5 54.5

0.9 0.0 0.0
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,,
55 55 207
55 55 207
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
60 60 225

0.92 0.92 0.92
3 3 3
77 487 413

0.04 0.26 0.26
1767 1856 1572
60 60 225
1767 1856 1572

4.0 2.9 11 .6

4.0 2.9 11.6

1.00 1.00
77 487 413

0.78 0.12 0.54
89 487 413

1.00 1.00 1.00

1.00 1.00 1.00

56.4 33.5 23.6

31.1 0.5 5.1

0.0 0.0 0.0

2.4 1.4 4.6

87.5 34.0 28.7
F C C
345

39.9 D
Synchro 10 Report
Page2
Queues
1: Willow Avenue & Butler Avenue
-+ f +- "\
Lane Groue EBT WBL WBT NBL
Lane Group Flow (vph) 632 334 663 534
v/c Ratio 0.99 0.94 0.60 0.97
Control Delay 70.1 82.6 17.5 70.2
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 70.1 82.6 17.5 70.2
Queue Length 50th (ft) 471 256 299 376
Queue Length 95th (ft) #724 #434 414 #607
Internal Link Dist (ft) 1512 2571 3098
Turn Bay Length (ft) 100
Base Capacity (vph) 640 361 1119 551
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.99 0.93 0.59 0.97
Intersection Summa!)'.
# 95th percentile volume exceeds capacity, queue may be longer.

Queue shown is maximum after two cycles.

Cumulative Year 2042 Plus Project Conditions 10/25/2021 AM Peak VRPA Technologies, Inc.
11/07/2021
Synchro 10 Report

Page 1 ends

Queues
3: Willow Avenue & Jensen Avenue
.,.,.
-+ "f +-
Lane Groue EBL EBT WBL WBT
Lane Group Flow (vph) 108 730 59 1839
v/c Ratio 1.12 0.46 0.47 1.18
Control Delay 180.3 24.9 65.6 119.0
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 180.3 24.9 65.6 119.0
Queue Length 50th (ft) -98 214 44 -915
Queue Length 95th (ft) #217 273 89 #1056
Internal Link Dist (ft) 2543 2787
Turn Bay Length (ft) 250 125
Base Capacity (vph) 96 1573 143 1559
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 1.13 0.46 0.41 1.18
Intersection Summa!)'.

Volume exceeds capacity, queue is theoretically infinite.

Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.

Queue shown is maximum after two cycles.

Cumulative Year 2042 Plus Project Conditions 10/25/2021 AM Peak VRPA Technologies, Inc.
~ t '.

NBL NBT SBL
33 41 60

0.35 0.09 0.67

65.3 21.8 90.9

0.0 0.0 0.0

65.3 21.8 90.9
25 12 47
60 42 #118
592
150 150
96 452 89
0 0 0
0 0 0
0 0 0

0.34 0.09 0.67
!
SBT
60 0.12

34.9 0.0

34.9 36
73 1750
510
0 0
0 0.12
.,,
SBR
225

0.39 8.3

0.0 8.3
10 74
584
0 0
0 0.39
11/07/2021
Synchro 10 Report
Page2
HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 156.8
Intersection LOS F
Movement EBL EBT EBR WBL WBT
Lane Configurations 4 .,, 4
Traffic Vol, veh/h 122 345 56 89 406
Future Vol, veh/h 122 345 56 89 406
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 3 3 3 3 3
MvmtFlow 133 375 61 97 441
Number of Lanes 0 1 1 0 1
roach EB WB
Opposing Approach WB EB
Opposing Lanes 2 2
Conflicting Approach Left SB NB
Conflicting Lanes Left 2 1
Conflicting Approach Right NB SB
Conflicting Lanes Right 1 2
HCM Control Delay 203.7 200.3

HCM LOS F F
Lane NBLn1 EBLn1 EBLn2 WBLn1
Vol Left, % 15% 26% 0% 18%
Vol Thru, % 54% 74% 0% 82%
Vol Right,% 31% 0% 100% 0%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 369 467 56 495
LT Vol 56 122 0 89
Through Vol 199 345 0 406
RT Vol 114 0 56 0
Lane Flow Rate 401 508 61 538
Geometry Grp 6 7 7 7
Degree of Util (X) 1.122 1.399 0.154 1.472
Departure Headway (Hd) 12.115 11.154 10.268 11.232
Convergence, Y/N Yes Yes Yes Yes
Cap 305 330 351 328
Service Time 10.115 8.854 7.968 8.932
HCM Lane V/C Ratio 1.315 1.539 0.174 1.64
HCM Control Delay 125.5 226.4 14.8 256.9
HCM Lane LOS F F B F
HCM 95th-tile Q 13.7 23.3 0.5 25.8
Cumulative Year 2042 Plus Project Conditions 10/25/2021 AM Peak VRPA Technologies, Inc.

WBR NBL
.,
156 56
156 56

0.92 0.92
3 3
170 61
1 0
NB
SB
2 EB
2 WB
2 125.5
F
WBLn2 SBLn1
0% 55%
0% 45%
100% 0%
Stop Stop
156 349
0 193
0 156
156 0
170 379
7 7

0.427 1.057

10.388 11.895
Yes Yes
349 307

8.088 9.595

0.487 1.235

20.6 103.7
C F

2.1 12.1

NBT NBR
~
199 114
199 114

0.92 0.92
3 3
216 124
1 0
SBLn2
0%
0%
100%
Stop
170
0 0
170
185
7 0.465

10.854
Yes
334

8.554

0.554

22.6 C

2.4 11/07/2021
SBL SBT SBR.
4 .,,
193 156 170
193 156 170

0.92 0.92 0.92
3 3 3
210 170 185
0 1 1
SB
NB
1 WB
2 EB
2 77.1
F
Synchro 10 Report

Page 1 ends

HCM 6th TWSC
4: Willow Avenue & North Project Driveway
Intersection
Int Delay, s/veh
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations V ~ 4'
Traffic Vol, veh/h 20 36 497 7 12 488
Future Vol, veh/h 20 36 497 7 12 488
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0
Veh in Median Storage, # 0 0 0
Grade, % 0 0 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 3 3 3 3 3 3
MvmtFlow 22 39 540 8 13 530
Ma·or/Minor Minor1 Ma·or1 Ma·or2
Conflicting Flow All 1100 544 0 0 548 0
Stage 1 544
Stage 2 556
Critical Hdwy 6.43 6.23 - 4.13
Critical Hdwy Stg 1 5.43
Critical Hdwy Stg 2 5.43
Follow-up Hdwy 3.527 3.327 - 2.227
Pot Cap-1 Maneuver 234 537 - 1016
Stage 1 580
Stage 2 572
Platoon blocked, %
Mov Cap-1 Maneuver 230 537 - 1016
Mov Cap-2 Maneuver 230
Stage 1 580
Stage 2 562
roach WB NB SB
HCM Control Delay, s 16.9 0 0.2

HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - 364 1016
HCM Lane V/C Ratio - 0.167 0.013
HCM Control Delay (s) - 16.9 8.6 0
HCM Lane LOS C A A
HCM 95th %tile Q(veh) 0.6 0
Cumulative Year 2042 Plus Project Conditions 10/25/2021 AM Peak VRPA Technologies, Inc.
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th TWSC
5: Willow Avenue & South Project Driveway
Intersection
Int Delay, s/veh
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations V ~ 4'
Traffic Vol, veh/h 21 34 470 7 11 497
Future Vol, veh/h 21 34 470 7 11 497
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0
Veh in Median Storage, # 0 0 0
Grade, % 0 0 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 3 3 3 3 3 3
MvmtFlow 23 37 511 8 12 540
Ma·or/Minor Minor1 Ma·or1 Ma·or2
Conflicting Flow All 1079 515 0 0 519 0
Stage 1 515
Stage 2 564
Critical Hdwy 6.43 6.23 - 4.13
Critical Hdwy Stg 1 5.43
Critical Hdwy Stg 2 5.43
Follow-up Hdwy 3.527 3.327 - 2.227
Pot Cap-1 Maneuver 241 558 - 1042
Stage 1 598
Stage 2 567
Platoon blocked, %
Mov Cap-1 Maneuver 237 558 - 1042
Mov Cap-2 Maneuver 237
Stage 1 598
Stage 2 558
roach WB NB SB
HCM Control Delay, s 16.7 0 0.2

HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - 368 1042
HCM Lane V/C Ratio - 0.162 0.011
HCM Control Delay (s) - 16.7 8.5 0
HCM Lane LOS C A A
HCM 95th %tile Q(veh) 0.6 0
Cumulative Year 2042 Plus Project Conditions 10/25/2021 AM Peak VRPA Technologies, Inc.
11/07/2021
Synchro 10 Report
Page2
HCM 6th Signalized Intersection Summary
1: Willow Avenue & Butler Avenue
-+ \' "f +- ~
Movement EBT EBR WBL WBT NBL
Lane Configurations ft. "'i t V
Traffic Volume (veh/h) 487 193 202 455 198
Future Volume (veh/h) 487 193 202 455 198
Initial Q (Qb), veh 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 529 210 220 495 215
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3 3
Cap, veh/h 529 210 254 1154 221
Arrive On Green 0.42 0.42 0.14 0.62 0.26
Sat Flow, veh/h 1264 502 1767 1856 856
Grp Volume(v), veh/h 0 739 220 495 419
Grp Sat Flow(s),veh/h/ln 0 1765 1767 1856 1667
Q Serve(g_s), s 0.0 37.6 10.9 12.4 22.4
Cycle Q Clear(g_c), s 0.0 37.6 10.9 12.4 22.4
Prop In Lane 0.28 1.00 0.51
Lane Grp Cap(c), veh/h 0 738 254 1154 430
V/C Ratio(X) 0.00 1.00 0.87 0.43 0.97
Avail Cap(c_a), veh/h 0 738 256 1156 430
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 26.1 37.7 8.8 33.0
Iner Delay (d2), s/veh 0.0 33.3 25.5 0.3 36.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 0.0 21.0 6.3 4.2 12.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 59.5 63.1 9.0 69.5
LnGre LOS A F E A E
Approach Vol, veh/h 739 715 419
Approach Delay, s/veh 59.5 25.7 69.5
Approach LOS E C E
irimer - Assigned Phs 2 3 4
Phs Duration (G+Y+Rc), s 28.6 18.3 43.0
Change Period (Y+Rc), s 5.4 5.4 5.4
Max Green Setting (Gmax), s 23.2 13.0 37.6
Max Q Clear Time (g_c+l1), s 24.4 12.9 39.6
Green Ext Time (p_c), s 0.0 0.0 0.0
Intersection Summa~
HCM 6th Ctrl Delay 48.8
HCM 6th LOS D
Notes
User approved volume balancing among the lanes for turning movement.

Cumulative Year 2042 Plus Project Conditions 10/25/2021 PM Peak VRPA Technologies, Inc.
~
NBR
187
187
0 1.00

1.00 1856
203

0.92 3
208

0.26 808
0 0

0.0 0.0

0.48 0

0.00 0

1.00 0.00

0.0 0.0

0.0 0.0

0.0 A
8 61.3

5.4 56.0

14.4 3.2
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
3: Willow Avenue & Jensen Avenue
.,.,.
-+ -,. f
Movement EBL EBT EBR WBL
Lane Configurations "i tf+ "i
Traffic Volume (veh/h) 204 1301 42 22
Future Volume (veh/h) 204 1301 42 22
Initial Q (Qb), veh 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856
Adj Flow Rate, veh/h 222 1414 46 24
Peak Hour Factor 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3
Cap, veh/h 313 1535 50 50
Arrive On Green 0.18 0.44 0.44 0.03
Sat Flow, veh/h 1767 3485 113 1767
Grp Volume(v), veh/h 222 714 746 24
Grp Sat Flow(s),veh/h/ln 1767 1763 1835 1767
Q Serve(g_s), s 13.4 43.3 43.5 1.5
Cycle Q Clear(g_c), s 13.4 43.3 43.5 1.5
Prop In Lane 1.00 0.06 1.00
Lane Grp Cap(c), veh/h 313 776 808 50
V/C Ratio(X) 0.71 0.92 0.92 0.48
Avail Cap(c_a), veh/h 313 816 849 95
HCM Platoon Ratio 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 43.9 29.9 29.9 54.3
Iner Delay (d2), s/veh 7.3 15.1 15.0 7.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 6.2 19.6 20.5 0.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 51.2 45.0 44.9 61.5
LnGre LOS D D D E
Approach Vol, veh/h 1682
Approach Delay, s/veh 45.8
Approach LOS D
irimer - Assigned Phs 2 3 4
Phs Duration (G+Y+Rc), s 10.9 36.4 9.7 56.5
Change Period (Y+Rc), s 5.4 6.5 6.5 6.5
Max Green Setting (Gmax), s 6.6 29.9 6.1 52.5
Max Q Clear Time (g_c+l1), s 6.3 12.1 3.5 45.5
Green Ext Time (p_c), s 0.0 0.8 0.0 4.5
Intersection Summa~
HCM 6th Ctrl Delay 47.5
HCM 6th LOS D
Cumulative Year 2042 Plus Project Conditions 10/25/2021 PM Peak VRPA Technologies, Inc.
+-
WBT
tf+
770
770
0 1.00
No
1856
837

0.92 3
951

0.29 3264
452
1763

27.7 27.7
514

0.88 601

1.00 1.00

38.3 12.7

0.0 12.9

51.0 D
938
51 .2
D
5 18.2

6.5 12.8

7.4 0.1
-\.. ~ t ~

WBR NBL NBT NBR
"i f+
71 82 102 69
71 82 102 69
0 0 0 0

1.00 1.00 1.00

1.00 1.00 1.00 1.00
No
1856 1856 1856 1856
77 89 111 75

0.92 0.92 0.92 0.92
3 3 3 3
87 182 272 184

0.29 0.10 0.26 0.26
300 1767 1032 698
462 89 0 186
1801 1767 0 1730

27.7 5.4 0.0 10.1

27.7 5.4 0.0 10.1

0.17 1.00 0.40
525 182 0 456

0.88 0.49 0.00 0.41
615 199 0 456

1.00 1.00 1.00 1.00

1.00 1.00 0.00 1.00

38.3 48.0 0.0 34.5

12.5 2.0 0.0 2.7

0.0 0.0 0.0 0.0

13.2 2.4 0.0 4.3

50.8 50.1 0.0 37.2

D D A D
275
41 .3
D
6 7 8

29.1 26.6 39.6

5.4 6.5 6.5

23.7 19.9 38.7

8.9 15.4 29.7

0.3 0.2 3.3
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,,
62 24 104
62 24 104
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
67 26 113

0.92 0.92 0.92
3 3 3
86 388 329

0.05 0.21 0.21
1767 1856 1572
67 26 113
1767 1856 1572

4.3 1.3 6.9

4.3 1.3 6.9

1.00 1.00
86 388 329

0.78 0.07 0.34
103 388 329

1.00 1.00 1.00

1.00 1.00 1.00

53.4 36.0 38.2

26.9 0.3 2.8

0.0 0.0 0.0

2.5 0.6 2.8

80.2 36.3 41.1
F D D
206

53.2 D
Synchro 10 Report
Page2
Queues
1: Willow Avenue & Butler Avenue
-+ f +- "\
Lane Groue EBT WBL WBT NBL
Lane Group Flow (vph) 739 220 495 418
v/c Ratio 0.97 0.87 0.43 0.91
Control Delay 51.9 70.2 10.0 55.0
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 51.9 70.2 10.0 55.0
Queue Length 50th (ft) 391 124 132 204
Queue Length 95th (ft) #642 #252 197 #376
Internal Link Dist (ft) 1512 2571 3098
Turn Bay Length (ft) 100
Base Capacity (vph) 773 259 1173 479
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.96 0.85 0.42 0.87
Intersection Summa!)'.
# 95th percentile volume exceeds capacity, queue may be longer.

Queue shown is maximum after two cycles.

Cumulative Year 2042 Plus Project Conditions 10/25/2021 PM Peak VRPA Technologies, Inc.
11/07/2021
Synchro 10 Report

Page 1 ends

Queues
3: Willow Avenue & Jensen Avenue
.,.,.
-+ "f +-
Lane Groue EBL EBT WBL WBT
Lane Group Flow (vph) 222 1460 24 914
v/c Ratio 0.80 0.90 0.25 0.86
Control Delay 67.5 38.1 61.0 45.6
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 67.5 38.1 61.0 45.6
Queue Length 50th (ft) 164 563 18 342
Queue Length 95th (ft) #282 #730 47 421
Internal Link Dist (ft) 2543 2787
Turn Bay Length (ft) 250 125
Base Capacity (vph) 321 1702 97 1229
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.69 0.86 0.25 0.74
Intersection Summa!)'.
# 95th percentile volume exceeds capacity, queue may be longer.

Queue shown is maximum after two cycles.

Cumulative Year 2042 Plus Project Conditions 10/25/2021 PM Peak VRPA Technologies, Inc.
~ t '.

NBL NBT SBL
89 186 67

0.50 0.38 0.64

59.9 33.2 82.0

0.0 0.0 0.0

59.9 33.2 82.0
66 103 52
121 173 #127
592
150 150
204 494 105
0 0 0
0 0 0
0 0 0

0.44 0.38 0.64
!
SBT
26 0.06

39.5 0.0

39.5 17
42 1750
431
0 0
0 0.06
.,,
SBR
113

0.21 0.9

0.0 0.9
0 0
527
0 0
0 0.21
11/07/2021
Synchro 10 Report
Page2
HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 120.2
Intersection LOS F
Movement EBL EBT EBR WBL WBT
Lane Configurations 4 .,, 4
Traffic Vol, veh/h 94 384 70 91 372
Future Vol, veh/h 94 384 70 91 372
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 3 3 3 3 3
MvmtFlow 102 417 76 99 404
Number of Lanes 0 1 1 0 1
roach EB WB
Opposing Approach WB EB
Opposing Lanes 2 2
Conflicting Approach Left SB NB
Conflicting Lanes Left 2 1
Conflicting Approach Right NB SB
Conflicting Lanes Right 1 2
HCM Control Delay 170.9 156.2

HCM LOS F F
Lane NBLn1 EBLn1 EBLn2 WBLn1
Vol Left, % 16% 20% 0% 20%
Vol Thru, % 65% 80% 0% 80%
Vol Right,% 20% 0% 100% 0%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 323 478 70 463
LT Vol 51 94 0 91
Through Vol 209 384 0 372
RT Vol 63 0 70 0
Lane Flow Rate 351 520 76 503
Geometry Grp 6 7 7 7
Degree of Util (X) 0.929 1.33 0.178 1.288
Departure Headway (Hd) 10.983 9.927 9.084 9.992
Convergence, Y/N Yes Yes Yes Yes
Cap 334 369 397 367
Service Time 8.983 7.627 6.784 7.692
HCM Lane V/C Ratio 1.051 1.409 0.191 1.371
HCM Control Delay 67.6 193.9 13.7 177.4
HCM Lane LOS F F B F
HCM 95th-tile Q 9.3 22.9 0.6 21.2
Cumulative Year 2042 Plus Project Conditions 10/25/2021 PM Peak VRPA Technologies, Inc.

WBR NBL
.,
69 51
69 51

0.92 0.92
3 3
75 55
1 0
NB
SB
2 EB
2 WB
2 67.6
F
WBLn2 SBLn1
0% 25%
0% 75%
100% 0%
Stop Stop
69 234
0 58
0 176
69 0
75 254
7 7

0.175 0.686

9.149 11.029
Yes Yes
395 331

6.849 8.729

0.19 0.767

13.8 34.7
B D

0.6 4.8

NBT NBR
~
209 63
209 63

0.92 0.92
3 3
227 68
1 0
SBLn2
0%
0%
100%
Stop
95 0
0 95
103
7 0.255

10.156
Yes
356

7.856

0.289

16.3 C
1 11/07/2021
SBL SBT SBR.
4 .,,
58 176 95
58 176 95

0.92 0.92 0.92
3 3 3
63 191 103
0 1 1
SB
NB
1 WB
2 EB
2 29.4
D
Synchro 10 Report

Page 1 ends

HCM 6th TWSC
4: Willow Avenue & North Project Driveway
Intersection
Int Delay, s/veh 1.1
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations V ~ 4'
Traffic Vol, veh/h 13 24 349 22 40 340
Future Vol, veh/h 13 24 349 22 40 340
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0
Veh in Median Storage, # 0 0 0
Grade, % 0 0 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 3 3 3 3 3 3
MvmtFlow 14 26 379 24 43 370
Ma·or/Minor Minor1 Ma·or1 Ma·or2
Conflicting Flow All 847 391 0 0 403 0
Stage 1 391
Stage 2 456
Critical Hdwy 6.43 6.23 - 4.13
Critical Hdwy Stg 1 5.43
Critical Hdwy Stg 2 5.43
Follow-up Hdwy 3.527 3.327 - 2.227
Pot Cap-1 Maneuver 331 655 - 1150
Stage 1 681
Stage 2 636
Platoon blocked, %
Mov Cap-1 Maneuver 315 655 - 1150
Mov Cap-2 Maneuver 315
Stage 1 681
Stage 2 606
roach WB NB SB
HCM Control Delay, s 13.3 0 0.9

HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - 475 1150
HCM Lane V/C Ratio - 0.085 0.038
HCM Control Delay (s) - 13.3 8.3 0
HCM Lane LOS B A A
HCM 95th %tile Q(veh) 0.3 0.1
Cumulative Year 2042 Plus Project Conditions 10/25/2021 PM Peak VRPA Technologies, Inc.
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th TWSC
5: Willow Avenue & South Project Driveway
Intersection
Int Delay, s/veh 1.1
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations V ~ 4'
Traffic Vol, veh/h 14 23 348 24 39 314
Future Vol, veh/h 14 23 348 24 39 314
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0
Veh in Median Storage, # 0 0 0
Grade, % 0 0 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 3 3 3 3 3 3
MvmtFlow 15 25 378 26 42 341
Ma·or/Minor Minor1 Ma·or1 Ma·or2
Conflicting Flow All 816 391 0 0 404 0
Stage 1 391
Stage 2 425
Critical Hdwy 6.43 6.23 - 4.13
Critical Hdwy Stg 1 5.43
Critical Hdwy Stg 2 5.43
Follow-up Hdwy 3.527 3.327 - 2.227
Pot Cap-1 Maneuver 345 655 - 1149
Stage 1 681
Stage 2 657
Platoon blocked, %
Mov Cap-1 Maneuver 329 655 - 1149
Mov Cap-2 Maneuver 329
Stage 1 681
Stage 2 627
roach WB NB SB
HCM Control Delay, s 13.3 0 0.9

HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - 476 1149
HCM Lane V/C Ratio - 0.084 0.037
HCM Control Delay (s) - 13.3 8.3 0
HCM Lane LOS B A A
HCM 95th %tile Q(veh) 0.3 0.1
Cumulative Year 2042 Plus Project Conditions 10/25/2021 PM Peak VRPA Technologies, Inc.
11/07/2021
Synchro 10 Report
Page2

MITIGATION
HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 22.1
Intersection LOS C
Movement EBL EBT EBR WBL
Lane Configurations "i t .,, 'I
Traffic Vol, veh/h 74 202 33 49
Future Vol, veh/h 74 202 33 49
Peak Hour Factor 0.71 0.71 0.71 0.71
Heavy Vehicles, % 3 3 3 3
MvmtFlow 104 285 46 69
Number of Lanes 1 1 1 1
roach EB WB
Opposing Approach WB EB
Opposing Lanes 3 3
Conflicting Approach Left SB NB
Conflicting Lanes Left 3 3
Conflicting Approach Right NB SB
Conflicting Lanes Right 3 3
HCM Control Delay 24.3 27.9

HCM LOS C D
Lane NBLn1 NBLn2 NBLn3
Vol Left, % 100% 0% 0%
Vol Thru, % 0% 100% 0%
Vol Right,% 0% 0% 100%
Sign Control Stop Stop Stop
Traffic Vol by Lane 31 100 64
LT Vol 31 0 0
Through Vol 0 100 0
RT Vol 0 0 64
Lane Flow Rate 44 141 90
Geometry Grp 8 8 8
Degree of Util (X) 0.119 0.365 0.216
Departure Headway (Hd) 9.838 9.338 8.638
Convergence, Y/N Yes Yes Yes
Cap 365 386 416
Service Time 7.593 7.093 6.393
HCM Lane V/C Ratio 0.121 0.365 0.216
HCM Control Delay 13.9 17.4 13.8
HCM Lane LOS B C B
HCM 95th-tile Q 0.4 1.6 0.8
Existing Plus Project Conditions 10/25/2021 AM Peak Mitigation VRPA Technologies, Inc.

WBT WBR
t .,
233 93
233 93

0.71 0.71
3 3
328 131
1 1
EBLn1 EBLn2
100% 0%
0% 100%
0% 0%
Stop Stop
74 202
74 0
0 202
0 0
104 285
8 8

0.269 0.696

9.308 8.808
Yes Yes
387 410

7.058 6.558

0.269 0.695

15.5 29.5
C D

1.1 5.2

NBL NBT NBR
'I t .,,
31 100 64
31 100 64

0.71 0.71 0.71
3 3 3
44 141 90
1 1 1
NB
SB
3 EB
3 WB
3 15.7
C
EBLn3 WBLn1 WBLn2
0% 100% 0%
0% 0% 100%
100% 0% 0%
Stop Stop Stop
33 49 233
0 49 0
0 0 233
33 0 0
46 69 328
8 8 8

0.105 0.175 0.785

8.108 9.11 8.61
Yes Yes Yes
442 394 420

5.858 6.857 6.357

0.104 0.175 0.781

11.8 13.8 36.5
B B E

0.3 0.6 6.8
11/07/2021
SBL SBT SBR.
"i t .,,
116 85 106
116 85 106

0.71 0.71 0.71
3 3 3
163 120 149
1 1 1
SB
NB
3 WB
3 EB
3 16.7
C
WBLn3 SBLn1 SBLn2
0% 100% 0%
0% 0% 100%
100% 0% 0%
Stop Stop Stop
93 116 85
0 116 0
0 0 85
93 0 0
131 163 120
8 8 8

0.288 0.427 0.296

7.91 9.403 8.903
Yes Yes Yes
455 384 403

5.657 7.151 6.651

0.288 0.424 0.298

13.8 19 15.4
B C C

1.2 2.1 1.2
Synchro 10 Report

Page 1 ends

HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 12.2
Intersection LOS B
Movement EBL EBT EBR WBL
Lane Configurations "i t .,, 'I
Traffic Vol, veh/h 62 213 39 47
Future Vol, veh/h 62 213 39 47
Peak Hour Factor 0.94 0.94 0.94 0.94
Heavy Vehicles, % 3 3 3 3
MvmtFlow 66 227 41 50
Number of Lanes 1 1 1 1
roach EB WB
Opposing Approach WB EB
Opposing Lanes 3 3
Conflicting Approach Left SB NB
Conflicting Lanes Left 3 3
Conflicting Approach Right NB SB
Conflicting Lanes Right 3 3
HCM Control Delay 12.8 12.9

HCM LOS B B
Lane NBLn1 NBLn2 NBLn3
Vol Left, % 100% 0% 0%
Vol Thru, % 0% 100% 0%
Vol Right,% 0% 0% 100%
Sign Control Stop Stop Stop
Traffic Vol by Lane 29 115 30
LT Vol 29 0 0
Through Vol 0 115 0
RT Vol 0 0 30
Lane Flow Rate 31 122 32
Geometry Grp 8 8 8
Degree of Util (X) 0.064 0.239 0.056
Departure Headway (Hd) 7.519 7.019 6.319
Convergence, Y/N Yes Yes Yes
Cap 474 509 563
Service Time 5.3 4.8 4.1
HCM Lane V/C Ratio 0.065 0.24 0.057
HCM Control Delay 10.8 12 9.5
HCM Lane LOS B B A
HCM 95th-tile Q 0.2 0.9 0.2
Existing Plus Project Conditions 10/25/2021 PM Peak Mitigation VRPA Technologies, Inc.

WBT WBR
t .,
213 43
213 43

0.94 0.94
3 3
227 46
1 1
EBLn1 EBLn2
100% 0%
0% 100%
0% 0%
Stop Stop
62 213
62 0
0 213
0 0
66 227
8 8

0.13 0.414

7.085 6.585
Yes Yes
504 544

4.857 4.357

0.131 0.417

10.9 14
B B

0.4 2

NBL NBT NBR
'I t .,,
29 115 30
29 115 30

0.94 0.94 0.94
3 3 3
31 122 32
1 1 1
NB
SB
3 EB
3 WB
3 11.4
B
EBLn3 WBLn1 WBLn2
0% 100% 0%
0% 0% 100%
100% 0% 0%
Stop Stop Stop
39 47 213
0 47 0
0 0 213
39 0 0
41 50 227
8 8 8

0.068 0.099 0.416

5.885 7.111 6.611
Yes Yes Yes
605 502 542

3.657 4.881 4.381

0.068 0.1 0.419

9.1 10.7 14.1
A B B

0.2 0.3 2
11/07/2021
SBL SBT SBR.
"i t .,,
35 88 60
35 88 60

0.94 0.94 0.94
3 3 3
37 94 64
1 1 1
SB
NB
3 WB
3 EB
3 10.8
B
WBLn3 SBLn1 SBLn2
0% 100% 0%
0% 0% 100%
100% 0% 0%
Stop Stop Stop
43 35 88
0 35 0
0 0 88
43 0 0
46 37 94
8 8 8

0.075 0.078 0.182

5.911 7.509 7.009
Yes Yes Yes
602 475 509

3.681 5.288 4.788

0.076 0.078 0.185

9.2 10.9 11.4
A B B

0.2 0.3 0.7
Synchro 10 Report

Page 1 ends

HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 30.9
Intersection LOS D
Movement EBL EBT EBR WBL
Lane Configurations "i t .,, 'I
Traffic Vol, veh/h 76 213 35 57
Future Vol, veh/h 76 213 35 57
Peak Hour Factor 0.71 0.71 0.71 0.71
Heavy Vehicles, % 3 3 3 3
MvmtFlow 107 300 49 80
Number of Lanes 1 1 1 1
roach EB WB
Opposing Approach WB EB
Opposing Lanes 3 3
Conflicting Approach Left SB NB
Conflicting Lanes Left 3 3
Conflicting Approach Right NB SB
Conflicting Lanes Right 3 3
HCM Control Delay 33.5 44.7

HCM LOS D E
Lane NBLn1 NBLn2 NBLn3
Vol Left, % 100% 0% 0%
Vol Thru, % 0% 100% 0%
Vol Right,% 0% 0% 100%
Sign Control Stop Stop Stop
Traffic Vol by Lane 36 138 73
LT Vol 36 0 0
Through Vol 0 138 0
RT Vol 0 0 73
Lane Flow Rate 51 194 103
Geometry Grp 8 8 8
Degree of Util (X) 0.149 0.543 0.267
Departure Headway (Hd) 10.549 10.049 9.349
Convergence, Y/N Yes Yes Yes
Cap 339 358 382
Service Time 8.339 7.839 7.139
HCM Lane V/C Ratio 0.15 0.542 0.27
HCM Control Delay 15.2 24.3 15.5
HCM Lane LOS C C C
HCM 95th-tile Q 0.5 3.1 1.1
Near-Term Plus Project Conditions 10/25/2021 AM Peak Mitigation VRPA Technologies, Inc.

WBT
t
254
254

0.71 3
358
1 EBLn1
100%
0%
0%
Stop
76 76
0 0
107
8 0.302

10.169
Yes
352

7.956

0.304

17.3 C

1.2 WBR NBL NBT
., 'I t
95 36 138
95 36 138

0.71 0.71 0.71
3 3 3
134 51 194
1 1 1
NB
SB
3 EB
3 WB
3 20.4
C
EBLn2 EBLn3 WBLn1
0% 0% 100%
100% 0% 0%
0% 100% 0%
Stop Stop Stop
213 35 57
0 0 57
213 0 0
0 35 0
300 49 80
8 8 8

0.806 0.123 0.221

9.669 8.969 9.895
Yes Yes Yes
375 398 362

7.456 6.756 7.676

0.8 0.123 0.221

42.6 13 15.5
E B C
7 0.4 0.8
NBR
.,,
73 73

0.71 3
103
1 WBLn2
0%
100%
0%
Stop
254
0 254
0 358
8 0.934

9.395
Yes
386

7.176

0.927

62.2 F

10.1 11/07/2021
SBL SBT SBR.
"i t .,,
119 116 109
119 116 109

0.71 0.71 0.71
3 3 3
168 163 154
1 1 1
SB
NB
3 WB
3 EB
3 19.8
C
WBLn3 SBLn1 SBLn2
0% 100% 0%
0% 0% 100%
100% 0% 0%
Stop Stop Stop
95 119 116
0 119 0
0 0 116
95 0 0
134 168 163
8 8 8

0.323 0.474 0.439

8.695 10.174 9.674
Yes Yes Yes
412 354 371

6.476 7.958 7.458

0.325 0.475 0.439

15.6 21.9 19.9
C C C

1.4 2.4 2.2
Synchro 10 Report

Page 1 ends

HCM 6thAWSC
2: Willow Avenue & Church Avenue
Intersection
Intersection Delay, s/veh 14.3
Intersection LOS B
Movement EBL EBT EBR WBL
Lane Configurations "i t .,, 'I
Traffic Vol, veh/h 63 244 44 60
Future Vol, veh/h 63 244 44 60
Peak Hour Factor 0.94 0.94 0.94 0.94
Heavy Vehicles, % 3 3 3 3
MvmtFlow 67 260 47 64
Number of Lanes 1 1 1 1
roach EB WB
Opposing Approach WB EB
Opposing Lanes 3 3
Conflicting Approach Left SB NB
Conflicting Lanes Left 3 3
Conflicting Approach Right NB SB
Conflicting Lanes Right 3 3
HCM Control Delay 15.5 15.1

HCM LOS C C
Lane NBLn1 NBLn2 NBLn3
Vol Left, % 100% 0% 0%
Vol Thru, % 0% 100% 0%
Vol Right,% 0% 0% 100%
Sign Control Stop Stop Stop
Traffic Vol by Lane 32 152 44
LT Vol 32 0 0
Through Vol 0 152 0
RT Vol 0 0 44
Lane Flow Rate 34 162 47
Geometry Grp 8 8 8
Degree of Util (X) 0.077 0.341 0.09
Departure Headway (Hd) 8.098 7.598 6.898
Convergence, Y/N Yes Yes Yes
Cap 443 474 519
Service Time 5.844 5.344 4.644
HCM Lane V/C Ratio 0.077 0.342 0.091
HCM Control Delay 11.5 14.2 10.3
HCM Lane LOS B B B
HCM 95th-tile Q 0.2 1.5 0.3
Near-Term Plus Project Conditions 10/25/2021 PM Peak Mitigation VRPA Technologies, Inc.

WBT
t
232
232

0.94 3
247
1 EBLn1
100%
0%
0%
Stop
63 63
0 0
67 8

0.144

7.709
Yes
466

5.449

0.144

11.7 B

0.5 WBR NBL NBT NBR
., 'I t .,,
44 32 152 44
44 32 152 44

0.94 0.94 0.94 0.94
3 3 3 3
47 34 162 47
1 1 1 1
NB
SB
3 EB
3 WB
3 13.1
B
EBLn2 EBLn3 WBLn1 WBLn2
0% 0% 100% 0%
100% 0% 0% 100%
0% 100% 0% 0%
Stop Stop Stop Stop
244 44 60 232
0 0 60 0
244 0 0 232
0 44 0 0
260 47 64 247
8 8 8 8

0.52 0.085 0.137 0.497

7.209 6.509 7.743 7.243
Yes Yes Yes Yes
501 550 463 499

4.949 4.249 5.487 4.987

0.519 0.085 0.138 0.495

17.5 9.9 11.7 17

C A B C
3 0.3 0.5 2.7
11/07/2021
SBL SBT SBR.
"i t .,,
36 129 61
36 129 61

0.94 0.94 0.94
3 3 3
38 137 65
1 1 1
SB
NB
3 WB
3 EB
3 12.4
B
WBLn3 SBLn1 SBLn2
0% 100% 0%
0% 0% 100%
100% 0% 0%
Stop Stop Stop
44 36 129
0 36 0
0 0 129
44 0 0
47 38 137
8 8 8

0.085 0.086 0.29

6.543 8.113 7.613
Yes Yes Yes
547 442 472

4.287 5.859 5.359

0.086 0.086 0.29

9.9 11.6 13.5
A B B

0.3 0.3 1.2
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
1: Willow Avenue & Butler Avenue
-+ \' "f +- ~ ~
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations + .,, "'i t V
Traffic Volume (veh/h) 389 192 307 610 220 271
Future Volume (veh/h) 389 192 307 610 220 271
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 423 209 334 663 239
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3 3
Cap, veh/h 473 401 372 982 254
Arrive On Green 0.26 0.26 0.21 0.53 0.34
Sat Flow, veh/h 1856 1572 1767 1856 739
Grp Volume(v), veh/h 423 209 334 663 535
Grp Sat Flow(s),veh/h/ln 1856 1572 1767 1856 1654
Q Serve(g_s), s 18.6 9.7 15.6 22.1 26.6
Cycle Q Clear(g_c), s 18.6 9.7 15.6 22.1 26.6
Prop In Lane 1.00 1.00 0.45
Lane Grp Cap(c), veh/h 473 401 372 982 568
V/C Ratio(X) 0.89 0.52 0.90 0.68 0.94
Avail Cap(c_a), veh/h 518 439 410 1066 599
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 30.4 27.1 32.5 14.6 27.0
Iner Delay (d2), s/veh 16.8 1.0 20.9 1.5 23.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 10.0 3.5 8.4 8.4 13.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 47.2 28.1 53.5 16.1 49.9
LnGre LOS D C D B D
Approach Vol, veh/h 632 997 535
Approach Delay, s/veh 40.9 28.6 49.9
Approach LOS D C D
irimer - Assigned Phs 2 3 4
Phs Duration (G+Y+Rc), s 34.4 23.2 27.0
Change Period (Y+Rc), s 5.4 5.4 5.4
Max Green Setting (Gmax), s 30.6 19.6 23.6
Max Q Clear Time (g_c+l1), s 28.6 17.6 20.6
Green Ext Time (p_c), s 0.5 0.2 1.0
Intersection Summa~
HCM 6th Ctrl Delay 37.5
HCM 6th LOS D
Notes
User approved volume balancing among the lanes for turning movement.

Cumulative Year 2042 Plus Project Conditions 10/25/2021 AM Peak Mitigation VRPA Technologies, Inc.
295

0.92 3
313

0.34 912
0 0

0.0 0.0

0.55 0

0.00 0

1.00 0.00

0.0 0.0

0.0 0.0

0.0 A
8 50.2

5.4 48.6

24.1 4.4
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
1: Willow Avenue & Butler Avenue
-+ \' "f +- ~ ~
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations + .,, "'i t V
Traffic Volume (veh/h) 487 193 202 455 198 187
Future Volume (veh/h) 487 193 202 455 198 187
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 529 210 220 495 215
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3 3
Cap, veh/h 635 538 264 1054 238
Arrive On Green 0.34 0.34 0.15 0.57 0.28
Sat Flow, veh/h 1856 1572 1767 1856 856
Grp Volume(v), veh/h 529 210 220 495 419
Grp Sat Flow(s),veh/h/ln 1856 1572 1767 1856 1667
Q Serve(g_s), s 18.5 7.2 8.5 11 .1 17.1
Cycle Q Clear(g_c), s 18.5 7.2 8.5 11.1 17.1
Prop In Lane 1.00 1.00 0.51
Lane Grp Cap(c), veh/h 635 538 264 1054 465
V/C Ratio(X) 0.83 0.39 0.83 0.47 0.90
Avail Cap(c_a), veh/h 989 838 326 1473 548
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 21 .3 17.6 29.2 9.0 24.5
Iner Delay (d2), s/veh 3.6 0.5 14.1 0.3 16.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 7.7 2.4 4.4 3.5 8.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 25.0 18.1 43.3 9.3 40.8
LnGre LOS C B D A D
Approach Vol, veh/h 739 715 419
Approach Delay, s/veh 23.0 19.7 40.8
Approach LOS C B D
irimer - Assigned Phs 2 3 4
Phs Duration (G+Y+Rc), s 25.1 15.9 29.5
Change Period (Y+Rc), s 5.4 5.4 5.4
Max Green Setting (Gmax), s 23.2 13.0 37.6
Max Q Clear Time (g_c+l1), s 19.1 10.5 20.5
Green Ext Time (p_c), s 0.6 0.1 3.6
Intersection Summa~
HCM 6th Ctrl Delay 25.8
HCM 6th LOS C
Notes
User approved volume balancing among the lanes for turning movement.

Cumulative Year 2042 Plus Project Conditions 10/25/2021 PM Peak Mitigation VRPA Technologies, Inc.
203

0.92 3
225

0.28 808
0 0

0.0 0.0

0.48 0

0.00 0

1.00 0.00

0.0 0.0

0.0 0.0

0.0 A
8 45.5

5.4 56.0

13.1 3.2
11/07/2021
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
2: Willow Avenue & Church Avenue
.,.,.
-+ -,. f +- -\..

Movement EBL EBT EBR WBL WBT WBR
Lane Configurations "i + ., "i + .,
Traffic Volume (veh/h) 122 345 56 89 406 156
Future Volume (veh/h) 122 345 56 89 406 156
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.95
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 133 375 61 97 441 170
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3 3 3
Cap, veh/h 171 597 492 125 548 442
Arrive On Green 0.10 0.32 0.32 0.07 0.30 0.30
Sat Flow, veh/h 1767 1856 1531 1767 1856 1498
Grp Volume(v), veh/h 133 375 61 97 441 170
Grp Sat Flow(s),veh/h/ln 1767 1856 1531 1767 1856 1498
Q Serve(g_s), s 4.5 10.4 1.7 3.3 13.3 5.5
Cycle Q Clear(g_c), s 4.5 10.4 1.7 3.3 13.3 5.5
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 171 597 492 125 548 442
V/C Ratio(X) 0.78 0.63 0.12 0.78 0.80 0.38
Avail Cap(c_a), veh/h 306 927 765 224 841 679
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 26.8 17.5 14.5 27.7 19.8 17.0
Iner Delay (d2), s/veh 7.4 1.1 0.1 10.0 3.3 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 2.1 4.0 0.5 1.6 5.4 1.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 34.2 18.6 14.7 37.7 23.1 17.5
LnGre LOS C B B D C B
Approach Vol, veh/h 569 708
Approach Delay, s/veh 21 .8 23.7
Approach LOS C C
irimer - Assigned Phs 2 3 4 5 6
Phs Duration (G+Y+Rc), s 13.5 14.4 8.8 24.0 7.7 20.2
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 14.5 19.5 7.7 30.3 8.8 25.2 Max Q Clear Time (g_c+l1), s 9.0 8.7 5.3 12.4 4.1 6.5
Green Ext Time (p_c), s 0.3 1.1 0.0 2.1 0.0 1.4
Intersection Summa~
HCM 6th Ctrl Delay 22.5
HCM 6th LOS C
Cumulative Year 2042 Plus Project Conditions 10/25/2021 AM Peak Mitigation VRPA Technologies, Inc.
~ t ~

NBL NBT NBR
"i + .,
56 199 114
56 199 114
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
61 216 124

0.92 0.92 0.92
3 3 3
94 303 257

0.05 0.16 0.16
1767 1856 1572
61 216 124
1767 1856 1572

2.1 6.7 3.2

2.1 6.7 3.2

1.00 1.00
94 303 257

0.65 0.71 0.48
256 596 505

1.00 1.00 1.00

1.00 1.00 1.00

28.2 24.0 12.6

7.4 3.1 1.4

0.0 0.0 0.0

1.0 2.8 1.5

35.6 27.1 14.0
D C B
401

24.3 C
7 8

10.4 22.4

4.5 4.5

10.5 27.5

6.5 15.3

0.1 2.5
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,
193 156 170
193 156 170
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
210 170 185

0.92 0.92 0.92
3 3 3
261 479 405

0.15 0.26 0.26
1767 1856 1566
210 170 185
1767 1856 1566

7.0 4.5 4.0

7.0 4.5 4.0

1.00 1.00
261 479 405

0.80 0.35 0.46
422 771 651

1.00 1.00 1.00

1.00 1.00 1.00

25.0 18.4 8.5

5.7 0.4 0.8

0.0 0.0 0.0

3.0 1.8 1.9

30.7 18.8 9.3
C B A
565

20.1 C
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
2: Willow Avenue & Church Avenue
.,.,.
-+ -,. f +- -\..

Movement EBL EBT EBR WBL WBT WBR
Lane Configurations "i + ., "i + .,
Traffic Volume (veh/h) 94 384 70 91 372 69
Future Volume (veh/h) 94 384 70 91 372 69
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 102 417 76 99 404 75
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3 3 3
Cap, veh/h 138 556 472 136 554 470
Arrive On Green 0.08 0.30 0.30 0.08 0.30 0.30
Sat Flow, veh/h 1767 1856 1572 1767 1856 1572
Grp Volume(v), veh/h 102 417 76 99 404 75
Grp Sat Flow(s),veh/h/ln 1767 1856 1572 1767 1856 1572
Q Serve(g_s), s 2.7 9.5 1.1 2.6 9.2 1.6
Cycle Q Clear(g_c), s 2.7 9.5 1.1 2.6 9.2 1.6
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 138 556 472 136 554 470
V/C Ratio(X) 0.74 0.75 0.16 0.73 0.73 0.16
Avail Cap(c_a), veh/h 444 1257 1065 403 1213 1028
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 21 .2 14.8 5.1 21 .2 14.8 12.1 Iner Delay (d2), s/veh 7.4 2.1 0.2 7.1 1.9 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 1.2 3.4 0.5 1.2 3.3 0.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 28.6 16.9 5.2 28.3 16.6 12.3
LnGre LOS C B A C B B
Approach Vol, veh/h 595 578
Approach Delay, s/veh 17.4 18.1
Approach LOS B B
irimer - Assigned Phs 2 3 4 5 6
Phs Duration (G+Y+Rc), s 7.3 12.9 8.1 18.6 7.1 13.2
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 8.9 20.6 10.7 31 .8 7.1 22.4 Max Q Clear Time (g_c+l1), s 3.6 7.4 4.6 11 .5 3.4 6.4
Green Ext Time (p_c), s 0.0 1.1 0.1 2.6 0.0 1.1
Intersection Summa~
HCM 6th Ctrl Delay 18.4
HCM 6th LOS B
Cumulative Year 2042 Plus Project Conditions 10/25/2021 PM Peak Mitigation VRPA Technologies, Inc.
~ t ~

NBL NBT NBR
"i + .,
51 209 63
51 209 63
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
55 227 68

0.92 0.92 0.92
3 3 3
96 334 283

0.05 0.18 0.18
1767 1856 1572
55 227 68
1767 1856 1572

1.4 5.4 1.2

1.4 5.4 1.2

1.00 1.00
96 334 283

0.57 0.68 0.24
267 814 690

1.00 1.00 1.00

1.00 1.00 1.00
21 .7 18.0 7.5

5.2 2.4 0.4

0.0 0.0 0.0

0.6 2.1 0.5

26.9 20.4 7.9
C C A
350

19.0 B
7 8

8.2 18.5

4.5 4.5

11.8 30.7

4.7 11 .2

0.1 2.4
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,
58 176 95
58 176 95
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
63 191 103

0.92 0.92 0.92
3 3 3
105 343 291

0.06 0.19 0.19
1767 1856 1572
63 191 103
1767 1856 1572

1.6 4.4 2.7

1.6 4.4 2.7

1.00 1.00
105 343 291

0.60 0.56 0.35
335 885 750

1.00 1.00 1.00

1.00 1.00 1.00
21 .5 17.4 16.7

5.3 1.4 0.7

0.0 0.0 0.0

0.7 1.7 0.9

26.8 18.8 17.4
C B B
357

19.8 B
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
3: Willow Avenue & Jensen Avenue
.,.,.
-+ -,. f +- -\..

Movement EBL EBT EBR WBL WBT WBR
Lane Configurations "i tf+ "i ttf+
Traffic Volume (veh/h) 99 619 52 54 1620 72
Future Volume (veh/h) 99 619 52 54 1620 72
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 108 673 57 59 1761 78
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3 3 3
Cap, veh/h 134 1419 120 79 1992 88
Arrive On Green 0.08 0.43 0.43 0.04 0.40 0.40
Sat Flow, veh/h 1767 3290 278 1767 4973 220
Grp Volume(v), veh/h 108 360 370 59 1195 644
Grp Sat Flow(s),veh/h/ln 1767 1763 1805 1767 1689 1816
Q Serve(g_s), s 6.8 16.5 16.5 3.7 37.1 37.2
Cycle Q Clear(g_c), s 6.8 16.5 16.5 3.7 37.1 37.2
Prop In Lane 1.00 0.15 1.00 0.12
Lane Grp Cap(c), veh/h 134 761 779 79 1353 727
V/C Ratio(X) 0.81 0.47 0.47 0.75 0.88 0.88
Avail Cap(c_a), veh/h 177 766 784 152 1420 763
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 51.4 23.0 23.0 53.3 31.4 31.4
Iner Delay (d2), s/veh 18.2 0.5 0.5 13.0 6.7 11.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 3.6 6.4 6.5 1.9 15.0 17.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 69.7 23.4 23.4 66.3 38.2 43.1
LnGre LOS E C C E D D
Approach Vol, veh/h 838 1898
Approach Delay, s/veh 29.4 40.7
Approach LOS C D
irimer - Assigned Phs 2 3 4 5 6
Phs Duration (G+Y+Rc), s 10.5 35.7 11 .6 55.3 10.4 35.8 Change Period (Y+Rc), s 5.4 6.5 6.5 6.5 6.5 5.4
Max Green Setting (Gmax), s 7.1 29.2 9.7 49.1 6.5 29.8
Max Q Clear Time (g_c+l1), s 5.8 4.1 5.7 18.5 4.1 12.4
Green Ext Time (p_c), s 0.0 0.1 0.0 4.0 0.0 0.9
Intersection Summa~
HCM 6th Ctrl Delay 37.1
HCM 6th LOS D
Cumulative Year 2042 Plus Project Conditions 10/25/2021 AM Peak Mitigation VRPA Technologies, Inc.
~ t ~

NBL NBT NBR
"i f+
30 19 18
30 19 18
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
33 21 20

0.92 0.92 0.92
3 3 3
61 226 215

0.03 0.26 0.26
1767 874 832
33 0 41
1767 0 1706

2.1 0.0 2.1

2.1 0.0 2.1

1.00 0.49
61 0 441

0.55 0.00 0.09
102 0 441

1.00 1.00 1.00

1.00 0.00 1.00

53.7 0.0 31 .8

7.4 0.0 0.4

0.0 0.0 0.0

1.0 0.0 0.9

61.1 0.0 32.3
E A C
74 45.1
D
7 8

15.0 51.8

6.5 6.5

11.3 47.5

8.8 39.2

0.0 6.1
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,,
55 55 207
55 55 207
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
60 60 225

0.92 0.92 0.92
3 3 3
80 499 423

0.05 0.27 0.27
1767 1856 1572
60 60 225
1767 1856 1572

3.8 2.8 10.4

3.8 2.8 10.4

1.00 1.00
80 499 423

0.75 0.12 0.53
111 499 423

1.00 1.00 1.00

1.00 1.00 1.00

53.3 31 .2 19.9

16.8 0.5 4.7

0.0 0.0 0.0

2.0 1.3 4.0

70.2 31.7 24.7
E C C
345

33.8 C
Synchro 10 Report

Page 1 ends

HCM 6th Signalized Intersection Summary
3: Willow Avenue & Jensen Avenue
.,.,.
-+ -,. f +- -\..

Movement EBL EBT EBR WBL WBT WBR
Lane Configurations "i tf+ "i ttf+
Traffic Volume (veh/h) 204 1301 42 22 770 71
Future Volume (veh/h) 204 1301 42 22 770 71
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Ad" 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 222 1414 46 24 837 77
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 3 3 3 3 3 3
Cap, veh/h 254 1535 50 50 1533 140
Arrive On Green 0.14 0.44 0.44 0.03 0.32 0.32
Sat Flow, veh/h 1767 3485 113 1767 4722 433
Grp Volume(v), veh/h 222 714 746 24 598 316
Grp Sat Flow(s),veh/h/ln 1767 1763 1835 1767 1689 1778
Q Serve(g_s), s 14.0 43.3 43.5 1.5 16.5 16.6
Cycle Q Clear(g_c), s 14.0 43.3 43.5 1.5 16.5 16.6
Prop In Lane 1.00 0.06 1.00 0.24
Lane Grp Cap(c), veh/h 254 776 808 50 1096 577
V/C Ratio(X) 0.87 0.92 0.92 0.48 0.55 0.55
Avail Cap(c_a), veh/h 391 816 849 95 1096 577
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 47.5 29.9 29.9 54.3 31.4 31 .5 Iner Delay (d2), s/veh 12.8 15.1 15.0 7.1 0.6 1.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
o/oile BackOfQ(50%),veh/ln 6.7 19.6 20.5 0.7 6.4 6.8
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 60.4 45.0 44.9 61.5 32.0 32.6
LnGre LOS E D D E C C
Approach Vol, veh/h 1682 938
Approach Delay, s/veh 47.0 32.9
Approach LOS D C
irimer - Assigned Phs 2 3 4 5 6
Phs Duration (G+Y+Rc), s 10.9 36.4 9.7 56.5 18.2 29.1
Change Period (Y+Rc), s 5.4 6.5 6.5 6.5 6.5 5.4
Max Green Setting (Gmax), s 6.6 29.9 6.1 52.5 12.8 23.7 Max Q Clear Time (g_c+l1), s 6.3 12.1 3.5 45.5 7.4 6.8
Green Ext Time (p_c), s 0.0 0.8 0.0 4.5 0.1 0.4
Intersection Summa~
HCM 6th Ctrl Delay 41 .9
HCM 6th LOS D
Cumulative Year 2042 Plus Project Conditions 10/25/2021 PM Peak Mitigation VRPA Technologies, Inc.
~ t ~

NBL NBT NBR
"i f+
82 102 69
82 102 69
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
89 111 75

0.92 0.92 0.92
3 3 3
182 272 184

0.10 0.26 0.26
1767 1032 698
89 0 186
1767 0 1730

5.4 0.0 10.1

5.4 0.0 10.1

1.00 0.40
182 0 456

0.49 0.00 0.41
199 0 456

1.00 1.00 1.00

1.00 0.00 1.00

48.0 0.0 34.5

2.0 0.0 2.7

0.0 0.0 0.0

2.4 0.0 4.3

50.1 0.0 37.2
D A D
275
41 .3
D
7 8

22.8 43.3

6.5 6.5

25.1 33.5

16.0 18.6

0.4 4.5
11/07/2021
~ ! -cl'
SBL SBT SB~
"i + .,,
62 24 104
62 24 104
0 0 0

1.00 1.00

1.00 1.00 1.00
No
1856 1856 1856
67 26 113

0.92 0.92 0.92
3 3 3
86 388 329

0.05 0.21 0.21
1767 1856 1572
67 26 113
1767 1856 1572

4.3 1.3 4.8

4.3 1.3 4.8

1.00 1.00
86 388 329

0.78 0.07 0.34
103 388 329

1.00 1.00 1.00

1.00 1.00 1.00

53.4 36.0 18.0

26.9 0.3 2.8

0.0 0.0 0.0

2.5 0.6 2.7

80.2 36.3 20.8
F D C
206

42.1 D
Synchro 10 Report

Page 1 ends

APPENDIX D
Collision Data Worksheets
~ Wl'PA -,:u,c_ -'-
11/5/21 , 6:57 PM TIMS - SWITRS Query & Map: Results
SWITRS Query & Map
Result Summary
Date
County
City
01/01/2016-12/31/2020
Fresno
Fresno
Change Filters Download Raw Data
Total Crashes 3,910 Total Victims 242 Killed & State 2,650 (67.8%) 5,395 Injured Highway
Ped Crashes 249 (6.4%) Bike Crashes
Map
Results Map: 3,806 of 3,91 O (97.3%) Crashes Mapped.

Cluster Heatmap Traffic I Bicycling
Mayfair
E t,kKll'lle~ AY EMCl(Jnlt!)'AYf
TOWER DISTRICT ,.
92(2.4%) Motorcycle 189 (4.8%)
Crashes
List Unmapped Crashes
I l 'C.:21 1U I U.:2'C'I I IIL C
International Airpon
E Mci(Jt'IIE!)' A:~f
.. ., L J
"' n
[
.

Las Palmas
Belrnont A,,.t!
Roosevelt High School Ferg
CT A.vi:
... m11y Regional a)
M, dical Center T ,s,")
Fresno
siPark~ ,,,"!
EH11l"ltit11)1onfll1rd
9 Wal mart Supercenter f+'
Chuk1-,
,chool9
·ord B. Gaston 0
Middle School y
EB11tl•A:1111
\,") .,. ® ~<>
The Big Fresno Fair
9 Pick- JIIQ Calwa
EJcnsenAve
1s Complex
/NartllAve
Google
OMV Office~
Commercial Testing T
@
®
Fresno Truck Ce
WinCo Foods. E Klng!- C&ri,·011 Rd

ROOSEVELT
Malaga
Goldleaf
., Fresno County r.. ! Blossom Trail T
f ;
Cecile i
E Central Ave
., RMepdallal©l!Oll1
https://tims.berkeley.edu/tools/query/summary.php 1/1
Number of Crashes by Crash Severity
3910 Crashes
3k
1/)
Q) 2k
.c
1/)
ro
I..
u
'+-
0 0 lk 947 (24%)
z
230 (6%) 254 (6%)
0 - - -
2479 (63%)
1 - Fatal 2 - Injury
(Severe)
3 - Injury 4 - Injury
Crash Severity
e 1 - Fatal
e 3 - Injury (Other Visible)
(Other Visible) (Complaint of
Pain)
e 2 - Injury (Severe)
e 4 - Injury (Complaint of Pain)
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 7182524
Crash Information
County Fresno
City Fresno
Date & Time (M/D/Y) 02/01/2016 17:39
Location (Intersection) Chestnut Av & Florence Av
Dist. & Dir. from At Intersection
Intersection
State Highway No
Geocoded Location 36.71778, -119.73662
Type of Crash H - Other
Motor Vehicle Involved G - Bicycle
With
Crash Severity 3 - Injury (Other Visible)
PCF Violation Category 11 - Pedestrian Violation
Weather A- Clear
Alcohol Involved No
Pedestrian Accident No Bicycle Accident Yes
Motorcycle Accident No Truck Accident No
Parties: 2
Party Party Type Statewide Vehicle Type
Number
Map View
Map Satellite
E Aorenc:e Av~
El ;:: i ffemkdPrYt ,.
!
Pedro Miguel Gardening ,,,
q i
g
"' 'il
C.
g
!
■
QHan,
ShOJ
T""'P
Go gle .. !=. p - ¥ Keyboit,--dabonc.a Mi,,i>~:202:t"Goog~ Ten:sa!~ Rep,on -, 1'.1"'_..pemx Street View
At Party Movement Preceding
Fault Direction Collision
1 2
4 - Bicyclist L - Bicycle Yes West B - Proceeding Straight 1 - Driver (including Hit and B - Proceeding Straight
Run)
Victims: 1
Party Number
1 https://tims.berkeley.edu/
Victim Role
4 - Bicyclist
A - Passenger Car/Station Wagon No North
l
Victim Gender
M - Male
Victim Age
9 l
Victim Degree of Injury
6 - Suspected Minor Injury
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 8014686
Crash Information
County
City
Date & Time (M/D/Y)
Location (Intersection)
Dist. & Dir. from
Intersection
Fresno
Fresno
02/12/2016 23:43
South Chestnut Av & East Church Av
At Intersection
Map View
y
Map Satellite
Joe & Linda OoHar General B ' Dotlarstore Y
El
9 ■
El 7-Eleven T fOIJl•Dell"leJY
' EChurchAve EChurchAve
State Highway
Geocoded Location
No
,ne,y Church
,as1 campus
Type of Crash
Motor Vehicle Involved
With

36.71418, -119.7366399
G - Vehicle/Pedestrian
B - Pedestrian
Crash Severity 2 - Injury (Severe)
PCF Violation Category - - Not Stated
Weather A - Clear
Alcohol Involved Yes
Pedestrian Accident
Motorcycle Accident
Parties: 3
Yes Bicycle Accident
No Truck Accident
No
No
Party Party Type Statewide Vehicle Type
Number
Aynesworth O
Elementary School Y
(") "'
=r
::
5 s Go g ~ le ~.-d1bor~ Mepda--~~l Goog~ Tem-..so'°Uu, Report io l'.l"'...pffl"ot Street View
At Party Movement Preceding
Fault Direction Collision
1 1 - Driver (including Hit and A - Passenger Car/Station Wagon No South B - Proceeding Straight Run)
2 2 - Pedestrian
3 2 - Pedestrian
Victims: 2
Party Number
2 3
https://tims.berkeley.edu/
Victim Role
3 - Pedestrian
3 - Pedestrian
N - Pedestrian
N - Pedestrian
Victim Gender
M - Male
M - Male
Victim Age
37 13
No
No
West R - Other
West R - Other
Victim Degree of Injury
5 - Suspected Serious Injury
7 - Possible Injury
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 8404643
Crash Information
County
City
Date & Time (M/D/Y)
Location (Intersection)
Dist. & Dir. from
Intersection
Fresno
Fresno
11/05/2017 01 :19
Jensen Av & Chestnut Av
At Intersection
Map View .............. ..._ ............ ,..... ..... ~ ...........

Map Satellite
"' "' f ; : ,& g ! !
EHoxteAve
EJensen Ave
'
0 ~.,,..,.,, .. ,,. ~
■ ..
!!?.

J
s
< ►
..

Rayman·s Mini Mart Liquor-•
' qfl Service
EJensenAve E Jensen Ave
"' V,
" 0
~ ' AutoZone Auto Pans
:J: Auto parts stcni State Highway
Geocoded Location
No , Flore Di Pas1a. 1nc j s ! s
Type of Crash
Motor Vehicle Involved
With

36.70703, -119.7365299
D - Broadside
C - Other Motor Vehicle
Crash Severity 1 - Fatal
PCF Violation Category 01 - Driving or Bicycling Under the Influence of Alcohol or Drug
Weather A - Clear
Alcohol Involved Yes
Pedestrian Accident
Motorcycle Accident
Parties: 2
No
No
Bicycle Accident
Truck Accident
No
No
Party Party Type Statewide Vehicle Type
Number
Go gle
Street View
~ ..
ft Kroeger Eqwpment
T &SUpply
At Party Movement Preceding
Fault Direction Collision
1 1 - Driver (including Hit and A - Passenger Car/Station Wagon Yes West B - Proceeding Straight Run)
2 1 - Driver (including Hit and
Run)
Victims: 4
Party Number
1 1
2 Victim Role
1 1 - Driver
2 - Passenger
11 -Driver
https://tims.berkeley.edu/
A - Passenger Car/Station Wagon
l
Victim Gender
M - Male
M - Male
F - Female
Victim Age
30 31
44 No East E - Making Left Turn
l
Victim Degree of Injury
I 1 - Killed
1 - Killed
5 - Suspected Serious Injury
Party Number
2 Victim Role
2 - Passenger
Victim Gender
F - Female
Victim Age
20 Victim Degree of Injury
6 - Suspected Minor Injury
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 8404672
Crash Information
County Fresno
City Fresno
Date & Time (M/D/Y) 09/27/2017 18:17
Location (Intersection) Butler Av & Winery Av
Dist. & Dir. from 177.00 ft West
Intersection
State Highway No
Geocoded Location 36.72865, -119.7325336
Type of Crash G - Vehicle/Pedestrian
Motor Vehicle Involved B - Pedestrian
With
Crash Severity 1 - Fatal
PCF Violation Category 03 - Unsafe Speed
Weather A- Clear
Alcohol Involved No
Pedestrian Accident Yes Bicycle Accident
Motorcycle Accident No Truck Accident
Parties: 2
No
No
Map View
Map Satellite
ermarkets out. · Del~
~
k:h1ban
1 ........ ,
~aletena E Butler Ave
1a a1tt1 BTH2
11'12 11'15
E)
f Butler Church0
" 3
E Butler Ave
~House E T09'rnH'nd A'te f E Townwnd Ave .,
fl TH2 rn3 lttS TH6 Tlf71H& TH10

0. ~
! HH2 HH3 HH4 HH6 HH9 HH11
..>UUUll'CI rai l'\. l'"\pGII
' ■
Cat Homes (
E Butleri
f Fresno Pacific EH .. 10<\Avo •
b· .,, University
G oi ~f1.tw1!Vt.SU~f"l(e,Jbo.d1ho.--...acs Me;d~::a-:102:l 'Goog,! Te:!'T..so'°Uu Report io l'.l"'...pffl"cr Street View
Party Party Type Statewide Vehicle Type At Party Movement Preceding Number
1 1 - Driver (including Hit and
Run)
2 2 - Pedestrian
Victims: 1
Party Number
2 https://tims.berkeley.edu/
Victim Role
3 - Pedestrian
A - Passenger Car/Station Wagon
N - Pedestrian
Victim Gender
F - Female
Victim Age
41 Fault Direction Collision
Yes West B - Proceeding Straight
No North t --Not Stated
Victim Degree of Injury
11 -Killed
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 8404673
Crash Information
County Fresno
City Fresno
Date & Time (M/D/Y) 08/22/2017 06:08
Location (Intersection) Chestnut Av & Dwight Wy
Dist. & Dir. from 140.00 ft South
Intersection
State Highway No
Geocoded Location 36.72185, -119.73671
Type of Crash G - Vehicle/Pedestrian
Motor Vehicle Involved B - Pedestrian
With
Crash Severity 1 - Fatal
PCF Violation Category 11 - Pedestrian Violation
Weather A- Clear
Alcohol Involved No
Pedestrian Accident Yes Bicycle Accident No
Motorcycle Accident No Truck Accident No
Parties: 2
Party Party Type Statewide Vehicle Type
Number
Map View
Map Satellite ■
El
E Woodward Ave ~ Senior Citizens ViJli
'1i
a,ai,,y c.,.a1 ~ ~
..

El
EAtchtSO" An Grizzly City IP
Auto Detailing e
q t
i
El EGearyA.ff
ti)
Q
A
Go gle Keybo.;t,--d1honaru. Ma-pdr ... ~ t G,oog'.i! Tem-.s oft.Jw Report -, cr_apffl"or Street View
At Party Movement Preceding
Fault Direction Collision
1 2
2 - Pedestrian N - Pedestrian Yes South I - - Not Stated 1 - Driver (including Hit and
Run)
Victims: 1
Party Number
1 https://tims.berkeley.edu/
Victim Role
3 - Pedestrian
A - Passenger Car/Station Wagon No North B - Proceeding Straight l
Victim Gender
M - Male
Victim Age
62 l
Victim Degree of Injury
11 -Killed
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 8465835
Crash Information
County
City
Date & Time (M/D/Y)
Location (Intersection)
Dist. & Dir. from
Intersection
State Highway
Geocoded Location
Type of Crash
Fresno
Fresno
02/17/2019 18:50
Chestnut Av & Burns Av

66.00 ft North
No

36.712513, -119.7366562
C- Rear End
Map View --·· n..ita-stoJe ','
Map Satellite El
1nery
:.asl Campus
Church •
IS
Ayneswonh ~
Elemen1ary School Y
EBurmAve
St Anthony Mary A Claret Church Y en
n
.,,.
::: ~ ~
■ EChurchAve EChur
Motor Vehicle Involved
With
C - Other Motor Vehicle Go gle Ke,bo.a,--d1honaru. M.;>ifs:a-®'202:lGoog,! Tem-..so'"Uu, Report ., l'.l"'...pError Street View
Crash Severity 1 - Fatal
PCF Violation Category 01 - Driving or Bicycling Under the Influence of Alcohol or Drug
Weather
Alcohol Involved
B - Cloudy
Yes
Pedestrian Accident
Motorcycle Accident
No
No
Bicycle Accident
Truck Accident
No
No
Parties: 3
Party Party Type
Number
1 1 - Driver (including Hit and
Run)
2 1 - Driver (including Hit and
Run)
3 1 - Driver (including Hit and
Run)
Victims: 8
Party Number Victim Role
1 1 - Driver
https://tims.berkeley.edu/
Statewide Vehicle Type
A - Passenger Car/Station Wagon
A - Passenger Car/Station Wagon
A - Passenger Car/Station Wagon
l
Victim Gender
M - Male
Victim Age
31 At Party Movement Preceding
Fault Direction Collision
Yes North B - Proceeding Straight
No North A- Stopped
No North B - Proceeding Straight
l
Victim Degree of Injury
6 - Suspected Minor Injury
Party Number Victim Role Victim Gender Victim Age Victim Degree of Injury 2 1 1 - Driver M - Male 59 6 - Suspected Minor Injury
2 2 - Passenger F - Female 29 6 - Suspected Minor Injury 2 2 - Passenger M - Male 3 6 - Suspected Minor Injury
2 2 - Passenger M - Male 19 1 - Killed
2 2 - Passenger M - Male 5 6 - Suspected Minor Injury
3 2 - Passenger F - Female 44 0 - No Injury
3 2 - Passenger M - Male 10 0 - No Injury
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 8465884
Crash Information
County
City
Date & Time (M/D/Y)
Location (Intersection)
Dist. & Dir. from
Intersection
State Highway
Geocoded Location
Type of Crash
Motor Vehicle Involved
With
Crash Severity
PCF Violation Category
Weather
Alcohol Involved
Pedestrian Accident
Motorcycle Accident
Parties: 1
Party Party Type
Number
Fresno
Fresno
04/21/2019 02:21
Peach Av & San Joaquin Crossing Gate

5.00 ft West
No

36.7223053, -119.7185364
E - Hit Object
I - Fixed Object
1 - Fatal
01 - Driving or Bicycling Under the
Influence of Alcohol or Drug
A- Clear
Yes
No Bicycle Accident No
No Truck Accident No
Statewide Vehicle Type
Map View
Map Satellite ■
E Woodward Ave
E Dwight Way
~canal
Go gle
Street View
At Party Movement Preceding
Fault Direction Collision
1 1 - Driver (including Hit and
Run)
A - Passenger Car/Station Wagon Yes South B - Proceeding Straight Victims: 1
Party Number
1 https://tims.berkeley.edu/
Victim Role
1 - Driver
l
Victim Gender
M - Male
Victim Age
21 l
Victim Degree of Injury
1 - Killed 7
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 81132447
Crash Information
County
City
Date & Time (M/D/Y)
Location (Intersection)
Dist. & Dir. from
Intersection
State Highway
Geocoded Location
Type of Crash
Fresno
Fresno
11/28/2019 11 :07
E Butler Ave & S. Chestnut Avenue

18.00 ft West
No

36.7286682, -119.7366028
C- Rear End
Map View
Map Satellite
9 Tamales huerta
Ta!<eout
EButlerAve
Cypress Point 9
Vallarta supermarkets
lakeout • Del~
Metro bv T-Mobile ~ Cell phone store T
El
9 tch,ban
'""""''
E Butler Ave umted Paletena ? 1 N=na BIB1 Blff2
;;
El ~
~ NonhHal TH12
u, Seminary House E TOWRS(
..
■
"'
Wiebe Education Center r TH2 TH3 TH
en Ba,;ts,cnHal
(")
~ ~ ~ T ~ Hiebert Librarv
g
,,
~ HH2. I
Fresno
UnivE
Motor Vehicle Involved
With
C - Other Motor Vehicle Go gle ~it,--d,honaru. lbp~~, Gcog~ Tenr..,s,c;SIJ.s.!_: .iu?«u.a-...;, EC"O( ' Street View
Crash Severity 4 - Injury (Complaint of Pain)
PCF Violation Category - - Not Stated
Weather A - Clear
Alcohol Involved No
Pedestrian Accident
Motorcycle Accident
Parties: 2
No
No
Bicycle Accident
Truck Accident
No
No
Party Party Type Statewide Vehicle Type
Number
1 1 - Driver (including Hit and
Run)
2 1 - Driver (including Hit and
Run)
Victims: 1
Party Number
2 https://tims.berkeley.edu/
Victim Role
2 - Passenger
A - Passenger Car/Station Wagon
A - Passenger Car/Station Wagon
l
Victim Gender
F - Female
Victim Age
69 At Party Movement Preceding
Fault Direction Collision
No
No
East B - Proceeding Straight
East A- Stopped
l
Victim Degree of Injury
7 - Possible Injury
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 81191568
Crash Information
County Fresno
City Fresno
Date & Time (M/D/Y) 01/09/2020 05:10
Location (Intersection) 5045 E Butler Av & Pierce Ave
Dist. & Dir. from At Intersection
Intersection
State Highway No
Geocoded Location 36.7286606, -119.7263489
Type of Crash G - Vehicle/Pedestrian
Motor Vehicle Involved B - Pedestrian
With
Crash Severity 3 - Injury (Other Visible)
PCF Violation Category 00 - Unknown
Weather A- Clear
Alcohol Involved No
Pedestrian Accident Yes Bicycle Accident
Motorcycle Accident No Truck Accident
Parties: 2
No
No
Map View
Map Satellite
ranoTowne
j omoniums
9 E Townsend A-te
"'
~
E Butler Ave
lnte.mal Revenue ft Service (IRS) "t"
E Butler Ave
t.:li lntema ■ 1u T submi~ n
E Townsend Ave
E~aton.Aff i '°
Go gle ~ it 1 K@ybo.;t,--d1honaru. 1.!ilpdiilit ~ l Goog~ Te:m-..soflJH Report ., l'.l"APffl"Ol' Street View
Party Party Type Statewide Vehicle Type At Party Movement Preceding Number
1 1 - Driver (including Hit and
Run)
2 2 - Pedestrian
Victims: 1
Party Number
2 https://tims.berkeley.edu/
Victim Role
3 - Pedestrian
A - Passenger Car/Station Wagon
N - Pedestrian
Victim Gender
F - Female
Victim Age
66 Fault Direction Collision
No West I E - Making Left Turn l
No North B - Proceeding Straight
Victim Degree of Injury
6 - Suspected Minor Injury
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 81212049
Crash Information
County Fresno
City Fresno
Date & Time (M/D/Y) 03/17/2020 09:23
Location (Intersection) Chestnut Ave & Butler Ave
Dist. & Dir. from At Intersection
Intersection
State Highway No
Geocoded Location 36.7286682, -119.7365417
Type of Crash D - Broadside
Motor Vehicle Involved C - Other Motor Vehicle
With
Crash Severity 4 - Injury (Complaint of Pain)
PCF Violation Category 09 - Automobile Right of Way
Weather A- Clear
Alcohol Involved No
Pedestrian Accident No Bicycle Accident No
Motorcycle Accident No Truck Accident No
Parties: 2
Party Party Type Statewide Vehicle Type
Number
Map View y .::,e,..,tUU1
Map Satellite
~ Tamales huerta
,.....,,
E Butler Ave
Cypress Point q
Vallana Supermarkets
lakeoul · Oel.-y
■
Metro bv T-Mobile ~ Cel phooestore T
B
~
E Butler Ave United Palete11a ! f ;;::ria snu BTH2
5 e ~
,2! Noon Hal TH12 Hl
(.)
"' Seminafy House E TOWNl.'f
WiebeEducl:JDnCeffl.er
r.n BamchH~
9 ~ ~ !a Hiebert librarv
"'
[ TH2 lHJ THS
g
,.
~ HH2 H
Fresno I
Unive
C
Go gle Keybc.ik.--d1honaru. Ma,;,d~®202 'Goog~ lera-..stf!Jit:_~ . ~ur..!;>Er:-Of Street View
At Party Movement Preceding
Fault Direction Collision
1 1 - Driver (including Hit and A - Passenger Car/Station Wagon Yes North I E - Making Left Turn Run) l
2 1 - Driver (including Hit and
Run)
Victims: 1
Party Number
1 Victim Role
11 -Driver
https://tims.berkeley.edu/
A - Passenger Car/Station Wagon
l
Victim Gender
F - Female
Victim Age
59 No South B - Proceeding Straight
l
Victim Degree of Injury
7 - Possible Injury
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 81222778
Crash Information
County Fresno
City Fresno
Date & Time (M/D/Y) 04/05/2020 14:25
Location (Intersection) Jensen Ave & Chestnut Ave
Dist. & Dir. from 320.00 ft East
Intersection
State Highway No
Geocoded Location 36.7070694, -119.7354431
Type of Crash C- Rear End
Motor Vehicle Involved C - Other Motor Vehicle
With
Crash Severity 4 - Injury (Complaint of Pain)
PCF Violation Category 03 - Unsafe Speed
Weather C - Raining
Alcohol Involved No
Pedestrian Accident No Bicycle Accident
Motorcycle Accident No Truck Accident
Parties: 2
No
No
Map View 1rserv1ce v,
Map Satellite ~ !!l.
e
Di Pasta. Inc
~
s
~ ..
"'
Rayman's Mini Mart LiquorstOfe
Q
EJensenA.,e
9F1 Service
EJensenAve
B AutoZone Auto Pans Y Auto pans store
g ft Kroeger Equipment
:ll T &Supply
~
■
A Kin
T Gro
Go gle ~--d1honar-CS M.pd.~®202:l Goog~ Tem-..sO:Uu, Report ., l'.l"'...pError Street View
Party Party Type Statewide Vehicle Type At Party Movement Preceding Number
1 2
1 - Driver (including Hit and
Run)
1 - Driver (including Hit and
Run)
Victims: 2
Party Number Victim Role
2 2
https://tims.berkeley.edu/
2 - Passenger
2 - Passenger
Fault Direction Collision
D - Pickup or Panel Truck Yes East B - Proceeding Straight A - Passenger Car/Station Wagon No East B - Proceeding Straight l
Victim Gender
F - Female
F - Female
Victim Age
4 5
l
Victim Degree of Injury
7 - Possible Injury
7 - Possible Injury
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 81228699
Crash Information
County Fresno
City Fresno
Date & Time (M/D/Y) 04/16/2020 16:46
Location (Intersection) Chestnut Ave & Butler Ave
Dist. & Dir. from At Intersection
Intersection
State Highway No
Geocoded Location 36.7286682, -119.7365417
Type of Crash D - Broadside
Motor Vehicle Involved C - Other Motor Vehicle
With
Crash Severity 4 - Injury (Complaint of Pain)
PCF Violation Category 17 - Other Hazardous Violation
Weather A- Clear
Alcohol Involved No
Pedestrian Accident No Bicycle Accident No
Motorcycle Accident No Truck Accident No
Parties: 2
Party Party Type Statewide Vehicle Type
Number
Map View y .::,e,..,tUU1
Map Satellite
Vallana Supermarkets
lakeoul · Oel.-y
■
Metro bv T-Mobile ~ Cel phooestore T
E Butler Ave
~ Tamales huerta
,.....,,
Cypress Point q
B
~
E Butler Ave United Palete11a ! f ;;::ria snu BTH2
5 e ~
,2! Noon Hal TH12 Hl
(.)
"' Seminafy House E TOWNl.'f
WiebeEducl:JDnCeffl.er
r.n BamchH~
9 ~ ~ !a Hiebert librarv
"'
[ TH2 lHJ THS
g
,.
~ HH2 H
Fresno I
Unive
C
Go gle Keybc.ik.--d1honaru. Ma,;,d~®202 'Goog~ lera-..stf!Jit:_~ . ~ur..!;>Er:-Of Street View
At Party Movement Preceding
Fault Direction Collision
1 1 - Driver (including Hit and
Run)
A - Passenger Car/Station Wagon Yes South B - Proceeding Straight 2 1 - Driver (including Hit and
Run)
Victims: 1
Party Number
1 Victim Role
11 -Driver
https://tims.berkeley.edu/
1--Not Stated
Victim Gender
F - Female
Victim Age
58 No West B - Proceeding Straight
l
Victim Degree of Injury
7 - Possible Injury
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 81241866
Crash Information
County Fresno
City Fresno
Date & Time (M/D/Y) 05/24/2020 20:52
Location (Intersection) E Butler Ave & S Chestnut Ave
Dist. & Dir. from At Intersection
Intersection
State Highway No
Geocoded Location 36.7286682, -119.7365417
Type of Crash G - Vehicle/Pedestrian
Motor Vehicle Involved B - Pedestrian
With
Crash Severity 3 - Injury (Other Visible)
PCF Violation Category 11 - Pedestrian Violation
Weather A- Clear
Alcohol Involved No
Pedestrian Accident Yes Bicycle Accident No
Motorcycle Accident No Truck Accident No
Parties: 2
Party Party Type Statewide Vehicle Type
Number
1 2
2 - Pedestrian
1 - Driver (including Hit and
Run)
Victims: 1
Party Number Victim Role
1 3 - Pedestrian
https://tims.berkeley.edu/
N - Pedestrian
D - Pickup or Panel Truck
l
Victim Gender
M - Male
Victim Age
35 Map View y .::,e,..,tUU1
Map Satellite
E Butler Ave
~ Tamales huerta
,.....,,
Vallana Supermarkets
lakeoul · Oel.-y
Metro bv T-Mobile ~ Cel phooestore T
B
~
E Butler Ave United Palete11a ! f ;;::ria snu BTH2
5 e ~
■
,2! Noon Hal TH12 Hl
Cypress Point q
(.)
"' Seminafy House E TOWNl.'f
WiebeEducl:JDnCeffl.er
r.n BamchH~
9 ~ ~ !a Hiebert librarv
"'
[ TH2 lHJ THS
g
,.
~ HH2 H
Fresno I
Unive
C
Go gle Keybc.ik.--d1honaru. Ma,;,d~®202 'Goog~ lera-..stf!Jit:_~ . ~ur..!;>Er:-Of Street View
At Party Movement Preceding
Fault Direction Collision
Yes North I - - Not Stated
No East B - Proceeding Straight
l
Victim Degree of Injury
6 - Suspected Minor Injury
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 81259416
Crash Information
County
City
Date & Time (M/D/Y)
Location (Intersection)
Dist. & Dir. from
Intersection
State Highway
Geocoded Location
Type of Crash
Motor Vehicle Involved
With
Crash Severity
PCF Violation Category
Weather
Alcohol Involved
Pedestrian Accident
Motorcycle Accident
Parties: 2
Party Party Type
Number
Fresno
Fresno
06/23/2020 14:38
Church Ave & Peach Ave
167.00 ft East
No

36.7148895, -119.7179642
B - Sideswipe
C - Other Motor Vehicle
4 - Injury (Complaint of Pain)
08 - Improper Turning
A- Clear
No
No Bicycle Accident No
No Truck Accident No
Statewide Vehicle Type
Map View
Map Satellite
,urchAve
Go gle
Street View
Ponce·s Tacos r --.eo1.11
' Storey 8emen1ary School
9 ■
At Party Movement Preceding
Fault Direction Collision
1 1 - Driver (including Hit and
Run)
A - Passenger Car/Station Wagon Yes East I F - Making U-Turn 7 2 1 - Driver (including Hit and B - Proceeding Straight Run)
Victims: 1
Party Number Victim Role
1 11 -Driver
https://tims.berkeley.edu/
A - Passenger Car/Station Wagon No
l
Victim Gender
F - Female
Victim Age
71 East
l
Victim Degree of Injury
7 - Possible Injury
2021/11/06 TIMS - Transportation Injury Mapping System
Crash Details for: Case ID 81270019
Crash Information Map View .............. ..._ ............ ,..... ..... ~ ...........

County Fresno Map Satellite
City Fresno "' "'
Date & Time (M/D/Y) 07/13/2020 09:25
f ; : ,& g ! !
Location (Intersection) Jensen Ave & Chestnut Ave EHoxteAve Dist. & Dir. from At Intersection
Intersection EJensen Ave
State Highway No ' , Flore Di Pas1a. 1nc
Geocoded Location 36.7070313, -119.7365265
Type of Crash A- Head-On
Motor Vehicle Involved C - Other Motor Vehicle Go gle
With Street View
Crash Severity 3 - Injury (Other Visible)
PCF Violation Category 12 - Traffic Signals and Signs
Weather A- Clear
Alcohol Involved No
Pedestrian Accident No Bicycle Accident No
Motorcycle Accident No Truck Accident No
Parties: 4
~GO""'""'
"' "
j
!
BerkeleySafeTREC
0 ~
..
!!?.

J
s
< ►
..

V,
0 ~
:J:
s
s
~ ..
■
Rayman·s Mini Mart Liquor-•
' qfl Service
EJensenAve E Jensen Ave
' AutoZone Auto Pans Auto parts stcni
ft Kroeger Eqwpment
T &SUpply
Party Party Type Statewide Vehicle Type At Party Movement Preceding Number
1 1 - Driver (including Hit and
Run)
2 1 - Driver (including Hit and
Run)
3 1 - Driver (including Hit and
Run)
4 1 - Driver (including Hit and
Run)
Victims: 1
Party Number Victim Role
https://tims.berkeley.edu/
Fault Direction Collision
A - Passenger Car/Station Wagon Yes East B - Proceeding Straight A - Passenger Car/Station Wagon No South B - Proceeding Straight A - Passenger Car/Station Wagon No East A- Stopped
A - Passenger Car/Station Wagon No East A- Stopped
l l
Victim Gender Victim Age Victim Degree of Injury
Party Number
4 Victim Role 11 -Driver Victim Gender
M - Male
Victim Age
56 Victim Degree of Injury
6 - Suspected Minor Injury
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 81296551
Crash Information
County Fresno
City Fresno
Date & Time (M/D/Y) 08/28/2020 13:32
Location (Intersection) Chestnut Ave & Burns Ave
Dist. & Dir. from At Intersection
Intersection
State Highway No
Geocoded Location 36.7123299, -119.7366562
Type of Crash D - Broadside
Map View
,, Map Satellite
y
1nery Church
:astcampus
.,,e-A.ve
IS
AyneswonhO
8ementary School Y
EBumsAff
e
"' (")
St Anthony Mary 0 Claret Church Y "'
9 :::
._1t !
EChurchA•e EChur ■
Motor Vehicle Involved C - Other Motor Vehicle Go gle ~ - "' )> ~ [email protected],--d1bor-...al!S M.pd3:a '®1:02:1 Goog'.'o! Tem-..s o'"Uu, Report ., l'.l"'...pError With Street View
Crash Severity 4 - Injury (Complaint of Pain)
PCF Violation Category 09 - Automobile Right of Way
Weather A- Clear
Alcohol Involved No
Pedestrian Accident No Bicycle Accident No
Motorcycle Accident No Truck Accident No
Parties: 2
Party Party Type Statewide Vehicle Type
Number
1 1 - Driver (including Hit and A - Passenger Car/Station Wagon Run)
2 1 - Driver (including Hit and
Run)
Victims: 2
Party Number Victim Role
1 1 1 - Driver
2 1 - Driver
https://tims.berkeley.edu/
A - Passenger Car/Station Wagon
l
Victim Gender
F - Female
F - Female
Victim Age
27 34
At Party Movement Preceding
Fault Direction Collision
Yes
No
East I E - Making Left Turn
South B - Proceeding Straight
l
Victim Degree of Injury
7 - Possible Injury
7 - Possible Injury
l
2021/11/06 TIMS - Transportation Injury Mapping System
Crash Details for: Case ID 81302624
Crash Information Map View .............. ..._ ............ ,..... ..... ~ ...........

County Fresno Map Satellite ~GO""'""'
City Fresno "' "'
Date & Time (M/D/Y) 09/05/2020 22:42
f ; : ,& g ! !
Location (Intersection) Jensen Ave & Chestnut Ave EHoxteAve Dist. & Dir. from At Intersection
Intersection EJensen Ave
State Highway No ' "' "
, Flore Di Pas1a. 1nc j
!
Geocoded Location 36.7070313, -119.7365265
Type of Crash D - Broadside
Motor Vehicle Involved C - Other Motor Vehicle Go gle
With Street View
Crash Severity 4 - Injury (Complaint of Pain)
PCF Violation Category 22 - Other Improper Driving
Weather A- Clear
Alcohol Involved No
Pedestrian Accident No Bicycle Accident No
Motorcycle Accident No Truck Accident No
Parties: 2
Party Party Type Statewide Vehicle Type At Party
Number Fault Direction
1 1 - Driver (including Hit and J - Emergency Vehicle Yes West Run)
2 1 - Driver (including Hit and A - Passenger Car/Station Wagon No South Run) l l
BerkeleySafeTREC
0 ~
..
!!?.

J
s
< ►
..

V,
0 ~
:J:
s
s
~ ..
■
Rayman·s Mini Mart Liquor-•
' qfl Service
EJensenAve E Jensen Ave
' AutoZone Auto Pans Auto parts stcni
ft Kroeger Eqwpment
T &SUpply
Movement Preceding
Collision
B - Proceeding Straight
B - Proceeding Straight
Victims: 1
Party Number
1 Victim Role
2 - Passenger
Victim Gender
M - Male
Victim Age
24 Victim Degree of Injury
7 - Possible Injury
https://tims.berkeley.edu/
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 81347370
Crash Information
County Fresno
City Fresno
Date & Time (M/D/Y) 10/25/2020 17:57
Location (Intersection) Peach Ave & Florence Ave
Dist. & Dir. from At Intersection
Intersection
State Highway Info N/A
Map View
Map Satellite
(I)
,,
:g
E Gea,ySI
..
0 i
■
Geocoded Location 36.7185402, -119.7185593 "'""""
0 ::r
)>
~
Type of Crash E - Hit Object
Motor Vehicle Involved I - Fixed Object
With
Crash Severity 4 - Injury (Complaint of Pain)
PCF Violation Category 08 - Improper Turning
Weather A- Clear
Alcohol Involved No
Pedestrian Accident No Bicycle Accident No
Motorcycle Accident No Truck Accident No
Parties: 1
Party Party Type Statewide Vehicle Type
Number
1 1 - Driver (including Hit and
Run)
Victims: 1
Party Number
1 https://tims.berkeley.edu/
Victim Role
2 - Passenger
D - Pickup or Panel Truck
l
Victim Gender
M - Male
Victim Age
19 Go gle ~ "' ... -d.mortor...s ll-.;,~~wz, T~.:sofUu, Report ., l'.l"'...pError Street View
At Party Movement Preceding
Fault Direction Collision
Yes South B - Proceeding Straight
l
Victim Degree of Injury
7 - Possible Injury 7
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 81352022
Crash Information
County
City
Date & Time (M/D/Y)
Location (Intersection)
Dist. & Dir. from
Intersection
State Highway Info
Geocoded Location
Type of Crash
Motor Vehicle Involved
With
Crash Severity
PCF Violation Category
Weather
Alcohol Involved
Pedestrian Accident
Motorcycle Accident
Parties: 2
Party Party Type
Number
Fresno
Fresno
08/16/2020 12:05
Peach Ave & Church Ave
At Intersection
N/A

36.714901, -119.7185287
D - Broadside
I - Fixed Object
4 - Injury (Complaint of Pain)
08 - Improper Turning
A- Clear
No
No Bicycle Accident No
No Truck Accident No
Statewide Vehicle Type
Map View
Map Satellite
E~Ave
EChurc:hAve
Go gle
Street View
Cl)
~
~
"
Storey Elementary School
9 ■
At Party Movement Preceding
Fault Direction Collision
1 1 - Driver (including Hit and
Run)
B - Passenger Car with Trailer Yes North D - Making Right Turn 2 1 - Driver (including Hit and
Run)
Victims: 1
Party Number
2 Victim Role
11 -Driver
https://tims.berkeley.edu/
A - Passenger Car/Station Wagon No North B - Proceeding Straight l
Victim Gender
F - Female
Victim Age
22 l
Victim Degree of Injury
7 - Possible Injury
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 81383835
Crash Information
County Fresno
City Fresno
Date & Time (M/D/Y) 12/29/2020 11 :23
Location (Intersection) Peach Ave & Church Ave
Dist. & Dir. from 221.00 ft North
Intersection
State Highway No
Geocoded Location 36.7155075, -119.7185364
Type of Crash F - Overturned
Motor Vehicle Involved J - Other Object
With
Crash Severity 4 - Injury (Complaint of Pain)
PCF Violation Category 03 - Unsafe Speed
Weather A- Clear
Alcohol Involved No
Pedestrian Accident No Bicycle Accident
Motorcycle Accident No Truck Accident
Parties: 1
No
No
Map View
"'- Map Satellite
£Truman Ave
E Belgnrr.ia A"e
EChurthAve
Ponce's Tacos
, .. -
'
(I)
.,,
Storey Bementary
School
9 ■
Go gle K@ybo&--dffl0ft.ar...s ll..;, <B"...;; ®2:0'ZI Tenr..soflh:e iuport io crAJ' emx Street View
Party Party Type Statewide Vehicle Type At Party Movement Preceding Number
1 1 - Driver (including Hit and
Run)
Victims: 1
Party Number
1 https://tims.berkeley.edu/
Victim Role
1 - Driver
Fault Direction Collision
A - Passenger Car/Station Wagon Yes North B - Proceeding Straight l
Victim Gender
M - Male
Victim Age
31 l
Victim Degree of Injury
7 - Possible Injury 7
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 90665176
Crash Information
County Fresno
City Fresno
Date & Time (M/D/Y) 02/09/2018 14:42
Location (Intersection) Willow Ave & Truman Ave
Dist. & Dir. from 105.00 ft North
Intersection
State Highway No
Geocoded Location 36.7174683, -119.7274704
Type of Crash D - Broadside
Motor Vehicle Involved G - Bicycle
With
Crash Severity 3 - Injury (Other Visible)
PCF Violation Category 08 - Improper Turning
Weather A- Clear
Alcohol Involved No
Pedestrian Accident No Bicycle Accident Yes
Motorcycle Accident No Truck Accident No
Parties: 2
Party Party Type Statewide Vehicle Type
Number
1 4 - Bicyclist
2 1 - Driver (including Hit and
Run)
Victims: 1
Party Number
1 https://tims.berkeley.edu/
Victim Role
4 - Bicyclist
L - Bicycle
H - Schoolbus
l
Victim Gender
M - Male
Victim Age
63 Map View
Map Satellite
Go gle
Street View
At Party
Fault Direction
Yes West
No North
,li
l
■
ft Visalia Hmong Y Seventh-Day Adv,
Movement Preceding
Collision
M - Other Unsafe
Turning 7
B - Proceeding Straight
Victim Degree of Injury
6 - Suspected Minor Injury
2021/11/06 TIMS - Transportation Injury Mapping System
BerkeleySafeTREC
Crash Details for: Case ID 90791900
Crash Information
County
City
Date & Time (M/D/Y)
Location (Intersection)
Dist. & Dir. from
Intersection
State Highway
Geocoded Location
Type of Crash
Motor Vehicle Involved
With
Fresno
Fresno
08/08/2018 21 :25
Jensen Avenue E/b & South Helm
Avenue
164.00 ft West
No

36.7075844, -119.7234802
G - Vehicle/Pedestrian
B - Pedestrian
Crash Severity 2 - Injury (Severe)
PCF Violation Category 11 - Pedestrian Violation
Weather A - Clear
Alcohol Involved Yes
Pedestrian Accident
Motorcycle Accident
Parties: 2
Yes Bicycle Accident
No Truck Accident
No
No
Map View
Map Satellite an:•ff e1,d
e
1wing9'
Propane
pon, INC
Go gle
woodhaveoln
' The Willows of santiago
EJensenAve
Street View
■
EJensenAve E Jensen
eofUl'l"lm0'1CIAve
Party Party Type Statewide Vehicle Type At Party Movement Preceding Number
1 2
2 - Pedestrian
1 - Driver (including Hit and
Run)
Victims: 1
Party Number Victim Role
1 3 - Pedestrian
https://tims.berkeley.edu/
Fault Direction Collision
N - Pedestrian Yes East I - - Not Stated
A - Passenger Car/Station Wagon No East B - Proceeding Straight l
Victim Gender
M - Male
Victim Age
45 l
Victim Degree of Injury
5 - Suspected Serious Injury

APPENDIX E
2042 Future Loaded Network
~ Wl'PA -,:u,c_ -'-
Jensen
McKin el y
Ol vi e
Nor ht
C al y ot n
Tulare
AmericaA
n
dams
Lane Kings Canyon
L ni co nl
Central
Belmont
But el r Church
Ventura Huntington SR 168/180
Annada el
Muscat
Central
Tulare
McK ni el y
Jensen
McKinley
Olive
Adams
Nor ht
Butler
2 703
24 3240
9898
59 11592 11692
10618
3159
6861
111
763 628 924
223
248 15762
31824
2594
39 43756727 4061
80 5641
2992
3572
3128
2612
5917
1399
4047
3396
6219
2902
3835
5777
3879
749
25444
6176 82
11175
3028
11518 14201
5539
6475
15 923 951 299 849
182 367
135
137
443
459
772 907
192
950
8354 2879
3687
854
15799
13445
5660
31192
17437
16144
4819
46819
1610
4945
1860
7711
1437 1131
7008 6070 5348
5710
4909 3326
1267
4053
7897 7999
9786
7024
6103
3297 4709 5450
5936 5940
3248 3220
5687
1334 1335
2511
1417
2378
2514
3973 3915
1970
1854
1853
12119
1568
4939
10077
5700
13401
19765
3058
21151 11020
12436
13309
2428
2228
13718
2476
18628
1715
18479
12045
14245
4528
6162
15964
4033
382
18887
6659
2109
3747
2252
4092
3051
3619
7023
1773
3603
3000
9222
8116
5418
3088
10187
5254
2707
10009
10270
935
1312
11143
10053
7375
2749
7488
0 0
0 7504
0 5917
0 16
FACTYP
FC42_BASE_LOADEDNETWORK
Legend
Centroid Collector
Ramps
I Local I Collector I Arterial I Expressway I Freeway, Highway I 21 Chestnut
______ ..
104
3494 DeWolf I
I
I
I
I
I
Fowler I
"' i
I 13047 I
........
........
........
-
.... "' I I
3489 I
/
4988
4336
162
13063
4451
I
co
(0
0 ....
0,
"' g:
"'
"' 0,
.... "'
co
"'
I
409 ~ rang_e 668 I 343
12548
1178 871
,,
,,
,,
,,
Clovis1053010295 ,.
rl------
I
I
I
l12352 TempEfrance 12446l 12533
I
I I \ I I I
. !
"' 0,
"'
3474 3758 3703
"' (0
::,
l1)
Q.
,,llla
iD
'437 8726
I I
083 I 14962 ~ ap_le
-I I I --~
11836 112054
1974 I 2518
.... ,_...
0,
I
__ I .,
1181
130
1497
3739
m
0,
0 0
10006
\ I
7933 ' ~ 72110138 10335 1 9160
4282~130 / 3376 088
---, 12387 1,2341
2051 135
20965 , 20866 1:12;37
0 -
£01
0,
\
1911\ -
r- :~ ,~
15717 16802 I 15040/ 1380
0,
0,
--
720
7035
8:
16552
0,
....
(0
0,
0 6748 I Armstron
19423 20071
__ ,

APPENDIX F

TRAFFIC SIGNAL WARRANTS
Church Ave @ Willow Ave
Figure 4C-4. Warrant 3, Peak Hour (70% Factor)
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
MINOR
STREET 300
HIGHERVOLUME
APPROACH - 200
VPH
100
1----+--------+--- 2 OR MORE LANES & 2 OR MORE LANES---+------<

I I I I
2 OR MORE LANES & 1 LANE
300 400 500 600 700 800 900 1000 1100 1200 1300
MAJOR STREET-TOTAL OF BOTH APPROACHESVEHICLES PER HOUR (VPH) *Note: 100 vph appl ies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor-street approach with one lane.

Legend:

X AM X PM Existing
X AM X PM Existing + Project
Church Ave @ Willow Ave
Figure 4C-4. Warrant 3, Peak Hour (70% Factor)
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
MINOR
STREET 300
HIGHERVOLUME
APPROACH - 200
VPH
100
300 400 500 600 700 800 900 1000 1100 1200 1300
MAJOR STREET-TOTAL OF BOTH APPROACHESVEHICLES PER HOUR (VPH) *Note: 100 vph appl ies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor-street approach with one lane.

Legend:

X AM X PM Near Term + Project
24 Hour Roadway Segment Count
Church Avenue, East of Willow Avenue
City of Fresno
10/25/2021
West
Time East Bound Bound Total
12:00-1:00 AM 63 72 135
1:00-2:00 AM 37 42 80
2:00-3:00 AM 37 42 80
3:00-4:00 AM 77 87 163
4:00-5:00 AM 112 127 239
5:00-6:00 AM 349 396 745
6:00-7:00 AM 443 502 944
7:00-8:00 AM 663 752 1415
8:00-9:00 AM 486 550 1036
9:00-10:00 AM 319 362 681
10:00-11:00 AM 331 375 705
11:00-12:00 AM 323 366 689
12:00-1:00 PM 430 487 917
1:00-2:00 PM 377 428 805
2:00-3:00 PM 465 527 992
3:00-4:00 PM 450 510 960
4:00-5:00 PM 424 481 905
5:00-6:00 PM 551 752 1303
6:00-7:00 PM 278 315 594
7:00-8:00 PM 222 252 474
8:00-9:00 PM 168 191 359
9:00-10:00 PM 106 121 227
10:00-11:00 PM 78 89 167
11:00-12:00 PM 58 66 124
Total 6849 7891 14739
Note: Traffic Counts estimated based on PM peak hour
intersection turning movement count at Church Avenue/ Willow Avenue taken on 10/5/2021 and 24 hour roadway segment count at peach Avenue/ North Avenue taken on 9/13/18.
24 Hour Roadway Segment Count
Willow Avenue, North of Church Avenue
City of Fresno
10/25/2021
Time North Bound South Bound Total
12:00-1:00 AM 38 42 80
1:00-2:00 AM 17 18 35
2:00-3:00 AM 14 15 29
3:00-4:00 AM 20 22 42
4:00-5:00 AM 25 27 51
5:00-6:00 AM 115 126 241
6:00-7:00 AM 146 160 305
7:00-8:00 AM 225 247 472
8:00-9:00 AM 170 186 356
9:00-10:00 AM 112 123 234
10:00-11:00 AM 141 154 295
11:00-12:00 AM 132 144 276
12:00-1:00 PM 156 171 327
1:00-2:00 PM 196 215 411
2:00-3:00 PM 219 240 459
3:00-4:00 PM 234 257 491
4:00-5:00 PM 228 250 478
5:00-6:00 PM 291 319 610
6:00-7:00 PM 139 153 292
7:00-8:00 PM 173 190 363
8:00-9:00 PM 101 111 212
9:00-10:00 PM 43 47 90
10:00-11:00 PM 29 32 61
11:00-12:00 PM 37 40 77
Total 3000 3289 6289
Note: Traffic Counts estimated based on PM peak hour intersection turning movement count at Church Avenue/ Willow Avenue taken on 10/5/2021 and 24 hour roadway segment count at peach Avenue/ North Avenue taken on 9/13/18.

Highest Four Hour Count and Eight Hour
Count
Church Avenue, East of Willow Avenue
Total of Both Directions on Major Street
10/25/2021
West
Time East Bound Bound Total
7:00-8:00 AM 663 752
5:00-6:00 PM 551 752
8:00-9:00 AM 486 550
2:00-3:00 PM 465 527
3:00-4:00 PM 450 510
6:00-7:00 AM 443 502
12:00-1:00 PM 430 487
4:00-5:00 PM 424 481
1:00-2:00 PM 377 428
5:00-6:00 AM 349 396
10:00-11:00 AM 331 375
11:00-12:00 AM 323 366
9:00-10:00 AM 319 362
6:00-7:00 PM 278 315
7:00-8:00 PM 222 252
8:00-9:00 PM 168 191
4:00-5:00 AM 112 127
9:00-10:00 PM 106 121
10:00-11:00 PM 78 89
3:00-4:00 AM 77 87
12:00-1:00 AM 63 72
11:00-12:00 PM 58 66
1:00-2:00 AM 37 42
2:00-3:00 AM 37 42
Legend
xx Highest Four Hour Count
xx Highest Eight Hour Count
1415
1303
1036
992
960
944
917
905
805
745
705
689
681
594
474
359
239
227
167
163
135
124
80 80
Highest Four Hour Count and
Eight Hour Count
Willow Avenue, North of Church
Avenue
Highest Minor Street Direction
10/25/2021
Time South Bound
5:00-6:00 PM 319
3:00-4:00 PM 257
4:00-5:00 PM 250
7:00-8:00 AM 247
2:00-3:00 PM 240
1:00-2:00 PM 215
7:00-8:00 PM 190
8:00-9:00 AM 186
12:00-1:00 PM 171
6:00-7:00 AM 160
10:00-11:00 AM 154
6:00-7:00 PM 153
11:00-12:00 AM 144
5:00-6:00 AM 126
9:00-10:00 AM 123
8:00-9:00 PM 111
9:00-10:00 PM 47
12:00-1:00 AM 42
11:00-12:00 PM 40
10:00-11:00 PM 32
4:00-5:00 AM 27
3:00-4:00 AM 22
1:00-2:00 AM 18
2:00-3:00 AM 15
Legend
xx Highest Four Hour
Count
Highest Eight Hour
xx Count
Church Ave @ Willow Ave
Figure 4C-4. Warrant 3, Peak Hour (70% Factor)
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON ~iijR STREET) 400
MINOR
STREET 300
HIGHERVOLUME
APPROACH - 200
VPH
100
X M
300 400 500 600 700 800 900 1000 1100 1200 1300
MAJOR STREET-TOTAL OF BOTH APPROACHESVEHICLES PER HOUR (VPH) *Note: 100 vph appl ies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor-street approach with one lane.

Legend:

X AM X PM 2042 No Project
X AM X PM 2042 + Project
Warrant 1A: Minimum Vehicular Volume
Analysis
No of lanes
Major Street 1
Minor Street 2
Threshhold Threshhold

RURAL RURAL
350 140
7:00 AM MET
5:00 PM MET
8:00 AM MET
2:00 PM MET
3:00 PM MET
6:00 AM MET
12:00 PM MET
4:00 PM MET
Number of hours for which warrant met 8
Percentage by which warrant met 100.0%
Warrant
Warrants

MET/NOT
Volume on
major street
(total of both
approaches)
Veh/hour on higher
volume minor street
(one direction only)
Time
Major Street(Church
Avenue) Minor Street (Willow Avenue)
1415 247
1303 319
1036 186
992 240
960 257
944 160
917 171
905 250
MET
The warrant is satisfied when, for each of any 8 hours of an average day, the traffic volumes given in the table below exist on the major street and on the higher-volume minor street approach to the intersection.

Number of lanes for moving traffic
on each approach
Major Street
2 or more
2 or more
1 Minor Street
1 1
2 or more
2 or more
Vehicles per hour on
major street
(total ofboth approaches)
500
600
600
500
Vehicles per hour on
higher-volume minorstreet approach
(one direction only)
150
150
200
200
When the 85-percentile speed of major-street exceeds 40 mph in either an urban or rural area, or when the intersection lies within the built-up area of an isolated community having a population of less than 10,000, the Minimum Vehicular Volume warrant is 70 percent of the requirements above.

II II II
Warrant 1B: Interruption of Continuous Traffic
Analysis
No of lanes
Major Street 1
Minor Street 2
Threshhold Threshhold

RURAL RURAL
525 70
7:00 AM MET
5:00 PM MET
8:00 AM MET
2:00 PM MET
3:00 PM MET
6:00 AM MET
12:00 PM MET
4:00 PM MET
Number of hours for which warrant met 8
Percentage by which warrant met 100.0%
Warrant
917 171
905 250
MET
992 240
960 257
944 160
1415 247
1303 319
1036 186
Warrants

MET/NOT
Volume on
major (total of
both
approaches)
Veh/hour on
higher volume
minor (one
direction only)
Time
Major Street(Church Avenue)
Minor Street (Willow
Avenue)
The warrant is satisfied when, for each of any 8 hours of an average day, the traffic volumes given in the table below exist on the major street and on the higher-volume minor street approach to the intersection, and signal installation will not seriously disrupt progressive traffic flow.

Number of lanes for moving traffic Vehicles per hour on Vehicles per hour on on each approach major street higher-volume minor-
(total ofboth approaches) street approach
Major Street Minor Street (one direction only)
1 750 75
2 or more 1 900 75
2 or more 2 or more 900 100
1 2 or more 750 100
The major-street and minor -street volumes are for the same 8 hours. During those 8 hours, the direction of higher volume on the minor street may be on one approach during some hours and on the opposite approach during other hours.

When the 85-percentile speed of major-street exceeds 40 mph in either an urban or rural area, or when the intersection lies within the built-up area of an isolated community having a population of less than 10,000, the Interruption of Continuous Traffic warrant is 70 percent of the requirements above.

II II II
Tool Version: Report Date: 8/3/2022
Name:

Jurisdiction
APN No.

Single-family: 199 DU Multi-family: 0 DU
Total: 199 DU Percent Affordable: 0 %
Non-Residential Office: 0 EMP Others: TSF
Included
in the project TDM Quantification
% VMT/Capita
Reduction
% VMT/Employment
Reduction
No N/A
No N/A

10.3 County VMT / Capita: 16.1
Significant Impact: No

8.4 County VMT / Employee: 25.7
Significant Impact: No
Project TDM measures (VMT reduction strategies)
Fresno COG Vehicle Miles Traveled Analysis Tool Summary Report Version 1.38
Project Information
autumn ridge
Jurisdiction
48102001
Project Land Use
Residential
TDM Strategy
Implement Project Specific Vanpool Program
Implement Project Specific Carpool Program
Project VMT Results
Residential
Project's VMT/Capita (10.3) is less than County VMT/Capita (14.0 using 13% as threshold) Project VMT per Capita:

Office
Project VMT per Capita with TDM
Measures:

10.3 Significant Impact with
TDM measures: No
Project VMT per Capita with TDM
Measures:

Significant Impact with
TDM measures:

8.4 No
Project's VMT/Employee (8.4) is less than County's VMT/Employee (22.4 using 13% as threshold) Project VMT per Employee:

12.3 10.3 10.3 0.0

16.1 0
5 10
15 20
25 30
35 TAZ Project Project + TDM
VMT per Capita
County Average

8.4 8.4 8.4

25.7 0
5 10
15 20
25 30
35 40
TAZ Project Project + TDM
VMT per Employee
County Average
Fresno Council orGovcrnmcnls

BIOLOGICAL RESOURCE EVALUATION

DR HORTON

AUTUMN RIDGE PROJECT
AUGUST 2020

BIOLOGICAL RESOURCE EVALUATION

AUTUMN RIDGE PROJECT, FRESNO

COUNTY, CALIFORNIA
Prepared for:

DR Horton – Central Valley Division
419 W Murray Avenue
Visalia, CA 93291
Contact Person: Cliff Ronk, Entitlements Manager
Phone: 559-280-0998
Consultant:
601 E Pollasky Ave, Suite 301
Clovis, CA 93612
Contact: Curtis Uptain
Phone: (559) 449-2400
Fax: (559) 435-2905
© Copyright by Quad Knopf, Inc.

Unauthorized use prohibited.

Project #200272
Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page i

TABLE OF CONTENTS
Executive Summary ....................................................................................................................................... 1 SECTION 1 - Introduction ............................................................................................................................ 2

1.1 - Project Location .................................................................................................................................... 2

1.2 - Project Description .............................................................................................................................. 2

1.3 - Purpose, Goals, and Objectives for this Report ........................................................................... 5 SECTION 2 - Methods .................................................................................................................................... 6

2.1 - Literature Review and Database Analysis .................................................................................... 6

2.2 - Reconnaissance Survey ...................................................................................................................... 7 SECTION 3 - Environmental Setting ......................................................................................................... 8

3.1 - Topography ............................................................................................................................................ 8

3.2 - Climate ..................................................................................................................................................... 8

3.3 - Land Use .................................................................................................................................................. 8

3.4 - Soils ........................................................................................................................................................... 8

3.5 - Hydrology ............................................................................................................................................. 11

3.6 - General Biological Conditions ......................................................................................................... 14 SECTION 4 - Findings .................................................................................................................................. 16

4.1 - Sensitive Natural Communities ...................................................................................................... 16

4.1.1 - Results of Literature Review and Database Searches.............................................. 16

4.1.2 - Presence of Sensitive Natural Communities................................................................ 16

4.2 - Special-Status Plants ......................................................................................................................... 16

4.2.1 - Results of Literature Review and Database Searches.............................................. 16

4.2.2 - Presence of Special-Status Plants .................................................................................... 17

4.3 - Special-Status Wildlife ...................................................................................................................... 17

4.3.1 - Results of Literature Review and Database Searches.............................................. 17

4.3.2 - Presence of Special-Status Wildlife................................................................................. 17

4.4 - Nesting Migratory Birds and Raptors .......................................................................................... 19

4.4.1 - Presence of Nesting Birds and Raptors ......................................................................... 19

4.5 - Critical Habitat, Movement Corridors, and Linkages .............................................................. 20

4.5.1 - Results of Literature Review and Database Searches.............................................. 20

4.5.2 - Presence of Movement Corridors and Linkages ........................................................ 20

4.6 - Wetlands and Other Waters ............................................................................................................ 20

4.6.1 - Results of Literature Review and Database Searches.............................................. 20

4.6.2 - Presence of Wetlands and Other Waters ...................................................................... 20 Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page ii
SECTION 5 - Potential Project Impacts .................................................................................................. 22

5.1 - Potential Impacts to Sensitive Vegetation Communities and Special-Status Plant Species ............................................................................................................................................................. 22

5.2 - Potential Impacts to Special-Status Wildlife Species ............................................................... 22

5.3 - Potential Impacts to Nesting Birds and Raptors ....................................................................... 22

5.4 - Potential Impacts to Movement Corridors and Linkages ....................................................... 22

5.5 - Potential Impacts to Wetlands and Waters ................................................................................ 22 SECTION 6 - Recommendations .............................................................................................................. 23 SECTION 7 - Summary and Conclusions ............................................................................................... 24 SECTION 8 - References ............................................................................................................................. 25 Appendices
Appendix A Database Search Results
Appendix B Representative Site Photos
List of Figures
Figure 1-1 Regional Map ....................................................................................................................................3 Figure 1-2 Project Vicinity Map.......................................................................................................................4 Figure 3-1 Land Use Map ...................................................................................................................................9 Figure 3-2 Soils Map ......................................................................................................................................... 10 Figure 3-3 NWI/NHD Map.............................................................................................................................. 12 Figure 3-4 FEMA Flood Zone Map............................................................................................................... 13 Figure 3-5 Biological Resources Map......................................................................................................... 15 Figure 4-1 Critical Habitat Map .................................................................................................................... 21 List of Tables
Table 4-1 Special-Status Plant Species Occurring in the Region of the Autumn Ridge Project...................................................................................................................................... 16 Table 4-2 Special-Status Wildlife Species Occurring in the Region of the ................................... 18 Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 1

EXECUTIVE SUMMARY
This Biological Resource Evaluation report includes the results of a database search and onsite biological survey conducted by Quad Knopf, Inc. (QK) at the Autumn Ridge Project site.

The primary focus of this report is to provide regulatory agencies with biological resource information about the condition and sensitivity of natural resources currently existing on and adjacent to the Project. Included is information about sensitive natural communities, special-status plant and wildlife species, wildlife movement corridors, and wetlands and water. The report includes an analysis of potential impacts to those resources and recommended measures to minimize and avoid impacts.

The proposed Project is to the southeast of the City of Fresno, within Fresno County, California. The 38.37-acre Project site is approximately 3.25 miles east of State Route 99. It is bounded by the San Joaquin Valley Railroad to the north, a housing development and retention pond to the south, an undeveloped lot to the east, and South Willow Avenue to the west.

The Project is the construction of a single-family residential subdivision that includes a 5- acre Open Space – Park. The single-family residential subdivision will consist of 38 lots, resulting in approximately 5.1 units per acre. An access drive will be constructed to the west of the Project site to allow access from S. Willow Avenue and a stubbed access point will be constructed to the east of the site in order to facilitate connections for future subdivisions.

A review of the literature and agency databases was conducted to obtain information on the occurrences of natural communities and special-status species known from the vicinity of the Project. A biological reconnaissance survey was conducted on August 13, 2020, by QK Environmental Scientist Dylan Ayers. The on-site survey consisted of walking meandering pedestrian transects spaced 50 to 100 feet apart throughout the Biological Survey Area.

No special-status species or diagnostic signs of special status species was present. Habitat on the site was not suitable to support any special-status plant species. There is little potential for special status wildlife species to occur on the site. The San Joaquin Kit Fox, Swainson’s Hawk, American Badger, and burrowing owl are absent from the site. The Project will have no effect on these species. Nesting migratory birds and raptors have some potential to occur at the Project. BMPs and avoidance measures for nesting birds are recommended to ensure project impacts are minimized.

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 2
SECTION 1 - INTRODUCTION

1.1 - Project Location
The proposed Project is just outside of the southeast boundary of the City of Fresno, within Fresno County, California (Figures 1-1 and 1-2). It is approximately 3.25 miles east of State Route (SR) 99 near East Jensen Avenue and South Peach Avenue. The 38.37-acre Project site is bounded by San Joaquin Valley Railroad to the north, a housing development and retention pond to the south, an undeveloped lot to the east, and South Willow Avenue to the west.

The approximate latitude and longitude are 36.719999 and -119.725448. The Project is within the Malaga U.S. Geological Survey (USGS) 7.5-minute quadrangle and the eight surround quadrangles include Clovis, Round Mountain, Sanger, Selma, Conejo, Caruthers, Fresno South, and Fresno North. The Project site lies within Township 14S, Section 18, and Range 21E of the Mount Diablo meridian.

1.2 - Project Description
The Project, known as the Autumn Ridge Project, is the construction of a single-family residential subdivision that includes an Open Space – Park of approximately five acres. The single-family residential subdivision will consist of 38 lots, with approximately 5.1 units per acre. An access drive will be constructed to the west of the Project site to allow access from S. Willow Avenue and a stubbed access point will be constructed to the east of the Project site to facilitate connections for future subdivisions.

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 3
Figure 1-1
Regional Map
Autumn Ridge Project,
Fresno County, California
Clo1 is
Miles 7.5
D Project Location
0 Miles 100 0 Ensenada
Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 4
Figure 1-2
Project Vicinity Map
Autumn Ridge Project,
Fresno County, California
(/)
a mil n Ave
E W t<enz1e Av
E Nevada Ave
I: llliro1s Ave
E Tulare St
E HuntIn tonAve
E 1on ecIto Av
n J uinVatk1y
EFlo 1 nceAv
>
<
'5
C
~
E - u
C (/) nt · Cl>
> Park <
E W sl11ngton Ave Cl>
z - J
,.

Eastga
Shopping
Center
I: K1n:is Canyon Rd
I: Bull r Ave
Fresno Pacific
Unrvers1ty
D
<
.c
u
r.,
if
(/)
-9,! E Chu h Av
ve Ave
F
no
~
(/)
E Commerce Ave
I C:J Project Site
... ' I
'
[ Anro I Av
E Tulare St Miles
F Inyo St
°o "umb1a Dr S
r - ,
E Orth Ave
Cl>
>
E
1 -~ E ChL >
0 (.)
tn
E Byrd
Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 5

1.3 - Purpose, Goals, and Objectives for this Report
This Biological Resource Evaluation (BRE) report provides results of a biological survey conducted by Quad Knopf, Inc. (QK) at the Autumn Ridge Project site. The primary focus of this report is to provide regulatory agencies with biological resource information about the condition and sensitivity of natural resources currently existing on and adjacent to the Project site. This report provides information about sensitive natural communities, specialstatus species, wildlife movement corridors, and wetlands and waters, and provides an analysis of potential impacts to those resources and recommended measures to minimize and avoid impacts.

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 6
SECTION 2 - METHODS

2.1 - Literature Review and Database Analysis
The following sources were reviewed for information on special-status biological resources in the Project vicinity:
• CDFW’s California Natural Diversity Database (CDFW 2020a) • CDFW’s Biogeographic Information and Observation System (CDFW 2020b) • CDFW’s Special Animals List (CDFW 2020c)
• CDFW’s California Wildlife Habitat Relationships (CWHR) System (Mayer and Laudenslayer 1988)
• California Native Plant Society (CNPS) Inventory of Rare and Endangered Plants of California (CNPS 2020)
• USFWS Information for Planning and Consultation (IPAC) system (USFWS 2020a) • USFWS Critical Habitat Mapper (USFWS 2020b)
• USFWS National Wetlands Inventory (USFWS 2020c)
• USGS National Hydrography Dataset (USGS 2020)
• Federal Emergency Management Agency (FEMA) flood zone maps (FEMA 2020) • U.S. Department of Agriculture, Natural Resources Conservation Service (NRCS) Web Soil Survey (NRCS 2020)
• Current and historical aerial imagery (Google LLC 2020, Netroline 2020) QK conducted a review of the literature and agency databases to obtain information on occurrences of natural communities and special-status species known from the vicinity of the Project. The California Natural Diversity Database (CDFW 2020a), California Native Plant Society (CNPS) Database (CNPS 2020), and U.S. Fish and Wildlife Service (USFWS) Threatened and Endangered Species List (USFWS 2020a) were reviewed in August 2020 to assess whether occurrences of sensitive natural communities, federally-listed species, Statelisted species, other species of special concern, or USFWS Critical Habitat Units that have been documented within the Malaga, Clovis, Round Mountain, Sanger, Selma, Conejo, Caruthers, Fresno South, and Fresno North U.S. Geological Survey (USGS) 7.5-minute quadrangles that encompass and surround the Project site. To satisfy other standard search criteria, California Natural Diversity Database (CNDDB) records within a 10-mile radius of the Project were queried separately from the broader database search. The results of the database search are presented in Appendix A.

The IPAC list from the USFS provides a list of special-status species, including migratory birds that are known to occur within the region of the selected quadrangles, but it does not provide any information on records of occurrences. The CNDDB provides element-specific spatial information on individual documented occurrences of special-status species and sensitive natural vegetation communities. The CNPS database provides similar information but at a much lower spatial resolution than the CNDDB and includes additional plant species that are considered sensitive by CNPS. Wildlife species designated as “Fully Protected” by California Fish and Game Code Sections 5050 (Fully Protected reptiles and amphibians), Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 7
3511 (Fully Protected birds), and 4700 (Fully Protected mammals) are also included in the final list of species that were evaluated in this report.

A review of the National Wetlands Inventory (NWI; USFWS 2020b) was completed to identify whether wetlands had previously been documented on or adjacent to the Project site. The NWI, which is operated by the USFWS, is a collection of wetland and riparian maps that depicts graphic representations of the type, size, and locations of wetland, deep water, and riparian habitats in the United States. Regional hydrologic information from the USGS National Hydrologic dataset (NHD) was obtained to evaluate the potential occurrence of blueline streams within the Project area.

Soils data were obtained from the Natural Resource Conservation District, United States Department of Agriculture (USDA 2020), climate information was obtained from Weather Underground, and land use information was obtained from available aerial imagery.

Information about flood zones were obtained from the Federal Emergency Management Agency, Department of Homeland Security (FEMA 2020).

Results of the database inquiries were reviewed to extract pertinent information on site conditions and evaluate the potential for sensitive biological resources to occur within or near the Project site. Only those resources with potential to be present and affected by the project were included and considered in this document. The potential presence of natural communities and special-status species was based on distributional ranges overlapping the Project and the presence of habitat and/or primary constituent habitat elements that would support those sensitive biological resources.

2.2 - Reconnaissance Survey
A biological reconnaissance survey was conducted on August 13, 2020, by QK biologist Dylan Ayers. The reconnaissance survey consisted of walking meandering pedestrian transects spaced 50 to 100 feet apart throughout accessible portions of the Biological Survey Area (BSA), which included the Project site and a surrounding 500-foot buffer. The survey was conducted to determine the locations and extent of land use and natural vegetation communities, the potential for occurrences of special-status plant and wildlife species, and to verify the presence of wetlands and waters. A list of all plants, wildlife, and wildlife sign (e.g. scat, burrows, feather, tracks, etc.) observed was compiled. Representative photographs were taken at key areas to document waters and habitat conditions at the Project site (Appendix B).

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 8
SECTION 3 - ENVIRONMENTAL SETTING

3.1 - Topography
The Project site occurs on relatively flat, level terrain at an approximate elevation of 306 feet above mean sea level (see Figure 1-2). Most of the Project site has been previously disturbed by current and historical agriculture activities. Historical aerial imagery shows the land has been farmed for decades (Google LLC 2020).

3.2 - Climate
The climatic conditions of the region are typical of the southern San Joaquin Valley, consisting of a hot, dry summers and mild, wet winters, which is characteristic of a Mediterranean climate. Average maximum temperatures range from approximately 54.6°F in January to 98.3°F in July, with several days recorded above 100°F each summer (WRCC 2020). The average annual precipitation is 10.89 inches, with the most rain occurring from October through April. During the winter months, a dense fog often occurs after rain events.

3.3 - Land Use
The Project site is just outside the southeastern boundary of the City of Fresno in an area of residential development, undeveloped lots, and agriculture. To the south and east of the Project there is a mix of residential, rural residential, undeveloped lots, and agricultural uses.

Areas to the north and west are mostly consisting of residential, commercial, and industrial uses with some scattered undeveloped or vacant properties (Figure 3-1). The Project site is zoned for Residential Single-Family, Medium Density. Fresno Pacific University is located to the northwest of the Project (see Figure 1-2).

3.4 - Soils
Two soil types occur within the Project site (Figure 3-2, USDA-NRCS 2020).

Atwater Soil: The Atwater series consists of very deep, well drained soils formed in granitic alluvium. Atwater soils occur on gently undulating to rolling dunes formed from granitic alluvium. They occur at elevations of less than 500 feet, in a semiarid, mesothermal climate with mean annual rainfall of 9 to 20 inches, with hot, dry summers and cool, moist winters.

This soil is well drained with moderately rapid permeability and slow runoff. These soils are used mainly for production of truck crops, grapes (Vitis sp.), tree fruits, nuts, grain, and alfalfa (Medicago sativa). Vegetation consists of annual grasses, weeds, and low-growing shrubs. Atwater series soils are not hydric.

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 9
Figure 3-1
Land Use Map
Autumn Ridge Project,
Fresno County, California
Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 10
Figure 3-2
Soils Map
Autumn Ridge Project,
Fresno County, California
.,~
34 0
I ~ Feet 5~0 1
34 35
- - --
35 35 14
21 -
34 C'J Project Site

SSURGO SOILS
- 12: Hanford sandy loam
- 14: Hanford fine sandy loam
35 35
- 21: Atwater sandy loam 12
- 32 : Exeter sandy loam
------------ - 34: Greenfield sandy loam r 32 - 35 : Ramona loam QIV
Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 11
Ramona Soil: The Ramona series is a member of the fine-loamy, mixed, thermic family of Typic Haploxeralfs. The Ramona soils are nearly level to moderately steep. They are on terraces and fans at elevations of 250 to 3,500 feet. They formed in alluvium derived mostly from granitic and related rock sources. The climate is dry sub humid mesothermal with warm dry summers and cool moist winters. Mean annual precipitation is 10 to 20 inches.

Ramona soils are mostly used for production of grain, grain-hay, pasture, irrigated citrus, olives (Olea europaea), truck crops, and deciduous fruits. Uncultivated areas have a cover of annual grasses, forbs, chamise, or chaparral. Ramona soils are not hydric.

3.5 - Hydrology
The Project site is in the South Valley Floor Hydrologic Unit, within the Tulare Lake Hydrologic Region (CDWR 2020). The Tulare Lake Hydrologic Region encompasses approximately 10.5 million acres and includes the drainage area south of the San Joaquin River within the San Joaquin Valley. The Kings, Kaweah, Tule, and Kern rivers, which drain the west face of the Sierra Nevada Mountains, provide the bulk of the surface water supply native to the basin. Imported surface supplies enter the basin through the San Luis Canal/California Aqueduct System, the Friant-Kern Canal, and the Delta-Mendota Canal. Of these significant water features, the Kings River is the nearest to the Project, occurring as close as 12.5 miles east of the site. The Kings River flows west out of the mountains, southwest through the cities of Sanger and Kingsburg, and then south where it ultimately joins with the Tule River.

No wetlands or other water features occur on the Project site. The National Hydrography database (NHD) and National Wetlands Inventory (NWI) shows one stream feature, the Braley Canal, and one pond feature near the site. A freshwater pond, identified as PUBFx (USFWS 2020c), corresponds with a dry basin found within the BSA to the east of the site. A large, inundated retention pond occurs directly south of the Project and a dry basin occurs just east of the site. Both these features occur within the BSA and can be seen in Figure 3-3 (and in Figure 3-5). Both features are manmade and had no hydrologic connection with the Project site. The Project site occurs within 0.2% annual flood zone as defined by the FEMA (Figure 3-4, FEMA 2020).

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 12
Figure 3-3
NWI/NHD Map
Autumn Ridge Project,
Fresno County, California
.,
E r<enz1e Av
E Nevad;i Ave
t llliro1s Ave
E Tulare St R5UBF.,x
'\__J
(/)
;i mil n Ave
E Huntin ton Ave
E n ec1lo Av
r--,
P~ x
Ventura Canyon Canal
Eastga
Sho pping
Ce nt r
R5UBFx t: r<. 1r s 1..,a nyon "'a
~ E A\• <l:
~
~ t Bull r Ave (/)
<
PUBFx ~
0 r.,
Fresno Pac ific i!'
U nrvers 1t y (/J
F. Flo 1 nee Av
Braley ~ R5l:JBFx
- · _ wBFx
lVe Ave
a rd Ave
Cah
Park
4)
>
<l:
_gi E Chu h Av
.g
.i!.
(/)
PUBFx PUBFx
PUBFx
-~en• dy p e. ~e
PUBFx
c:J Project Site
National Hydrography Dataset
Canal Ditch
F _ .,,_, Stream River - Interm ittent no
National Wetlands Inventory
Freshwater Pond
- Riverine
(/)
R4SBCx
11 i-----cc---R5UB£x ____ ~---
Anro al Av
·0
1~ Miles
PUBF.x
(/)
E orth Ave
>
0 (.)
Ill
ojs I
PU_§ Fx
E
E ChL
E Byrd
Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 13
Figure 3-4
FEMA Flood Zone Map
Autumn Ridge Project,
Fresno County, California
0 E Hunt1ngtonAve
IP
~
~
► <:
"'
'11
>
<:
("l
~ (.
:,
~ (")
C 0/umbt Dr S i
□ (/)
E
..
>
,.
., E Ch >
0 u
en
E Byrd
r·,
e
E Commerce Av
F_..--________ ____.:=-... ___ ~
no CJ Project Site
- 1% Annual Chance Flood Hazard
- 0.2% Annual Chance Flood Hazard
E orth Ave
Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 14

3.6 - General Biological Conditions
The Project is surrounded by residential developments, fallowed lands, orchards, light commercial areas, a school facility, a railroad, and unused lands. One plant community occurs in this area, Annual Grassland (Mayer and Laudenslayer 1988). Grassland habitat occurs throughout the site and shows signs of being routinely disked. A grassfire had recently occurred on-site and more than half of the on-site grassland habitat had been burned. The site was previously an orchard and some trees were still present, mostly on the northern half of the site. Trash from dumping and multiple on-site homeless camps were found across the site but most of this use was concentrated near the main entrance at South Willow Avenue.

The Annual Grassland community was dominated by wild oat (Avena fatua) with some ripgut brome (Bromus diandrus) and barley (Hordeum sp.) occurring in limited areas. Most of the grasses on-site were turned over and desiccated after recent disking, making identification difficult. Sub-dominant herbaceous plant species present included black mustard (Brassica nigra), prickly lettuce (Lactuca serriola), telegraph weed (Heterotheca grandiflora), horseweed (Erigeron canadensis), and black mustard (Brassica nigra).

The existing agricultural trees on-site consisted of pistachio (Pistacia vera) with several large walnut (Juglans sp.) trees scattered in the northern half of the site. Multiple large ornamental trees were present within the BSA, primarily within adjacent residential areas.

These areas contain common ornamental shrubs and herbaceous species.

Most of the Project site is covered in small mammal burrows (Figure 3-5). Burrow complexes with confirmed ground squirrel activity were recorded to show the general distribution of burrows on-site. Several burrow complexes were discovered within accessible areas of the BSA which included a dry basin east of the site. One large den entrance was present inside this basin, though it was not clear if the excavation was manmade or created by an animal.

Two adult red-tailed hawks were observed on-site though no active raptor nests were found within the BSA.

No wetlands occur on the Project site, though a large retention pond exists to the south of the site within the BSA and a dry basin was east of the site within the BSA (Figure 3-5). The dry basin showed no signs of being inundated recently and its use is not clear.

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 15
Figure 3-5
Biological Resources Map
Autumn Ridge Project,
Fresno County, California
CJ Project Site
c::J BSA
[::J Dry Basin
- Retention Pond
0 Small Mammal Burrow Complex
Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 16
SECTION 4 - FINDINGS

4.1 - Sensitive Natural Communities

4.1.1 - RESULTS OF LITERATURE REVIEW AND DATABASE SEARCHES Only one sensitive natural vegetation community, Northern Claypan Vernal Pool, is known to occur within 10-miles of the Project. The nearest occurrence is 9.4-miles northwest of the Project.

4.1.2 - PRESENCE OF SENSITIVE NATURAL COMMUNITIES
There are no occurrences of any sensitive natural community, including Northern Claypan Vernal Pool, at the Project site.

4.2 - Special-Status Plants

4.2.1 - RESULTS OF LITERATURE REVIEW AND DATABASE SEARCHES There were 12 special-status plant species identified in the CNDDB, CNPS, and USFWS databases that occur in the Project Region (Table 4-1). There are seven special-status plant species with historical occurrence records within 10 miles of the Project site. None of these special-status plants are known to historically occur on the Project site.

Table 4-1
Special-Status Plant Species Occurring in the Region of the Autumn Ridge Project
(Source: CNDDB 2020, CNPS 2020, and USFWS 2020)
Scientific Name Common name Status
Castilleja campestris var.
succulenta
succulent owl's-clover 1B.2, FT
Caulanthus californicus California jewelflower 1B.1, FE Eryngium spinosepalum spiny-sepaled button-celery 1B.2
Imperata brevifolia California satintail 2B.1
Lagophylla dichotoma forked hare-leaf 1B.1
Leptosiphon serrulatus Madera leptosiphon 1B.2
Mielichhoferia shevockii Shevock's copper moss 1B.2
Orcuttia inaequalis San Joaquin Valley Orcutt grass 1B.2, FT Pseudobahia peirsonii San Joaquin adobe sunburst 1B.1, FT Sagittaria sanfordii Sanford's arrowhead 1B.2
Tropidocarpum capparideum caper-fruited tropidocarpum 1B.1 Tuctoria greenei Greene's tuctoria 1B.1, FE
Sources:

California Department of Fish and Wildlife. 2020. California Natural Diversity Data Base, California Department of Fish and Wildlife Sacramento, CA. Quads: Malaga, Clovis, Round Mountain, Sanger, Selma, Conejo, Caruthers, Fresno South, and Fresno North
Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 17
California Native Plant Society (CNPS). 2020. Inventory of Rare and Endangered Plants (online edition, v6-05b 4-11-05).

Rare Plant Scientific Advisory Committee. California Native Plant Society. Sacramento, CA. Quads: Malaga, Clovis, Round Mountain, Sanger, Selma, Conejo, Caruthers, Fresno South, and Fresno North United States Fish and Wildlife Service. 2020. Federal Endangered and Threatened Species that Occur in or may be Affected by Projects in the U.S.G.S 7 ½ Minute Quad. USFWS. Sacramento, CA. Quads: Malaga, Clovis, Round Mountain, Sanger, Selma, Conejo, Caruthers, Fresno South, and Fresno North Abbreviations:
1A California Native Plant Society List 1A Species- Plants Presumed Extinct in California 1B.1 California Native Plant Society List 1B Species-Plants Categorized as Rare, Threatened, or Endangered in California and Elsewhere; Seriously Endangered in California 1B.2 California Native Plant Society List 1B Species-Plants Categorized as Rare, Threatened, or Endangered in California and Elsewhere; Fairly Endangered in California. 1B.3 California Native Plant Society List 1B Species-Plants Categorized as Rare, Threatened, or Endangered in California and Elsewhere; Not Very Endangered in California FE Federal Endangered Species
FT Federal Threatened Species

4.2.2 - PRESENCE OF SPECIAL-STATUS PLANTS
No special-status plant species were present within the BSA. Although the field survey did not coincide with the optimum survey period for all sensitive plant species that could exist on the site, there is no habitat that would support special status plant species within the Project site because of the repeated disking, trash dumps, recent grassfire, historical land use, and the presence of multiple homeless camps. Based upon existing habitat conditions, only Sanford’s arrowhead (Sagittaria sanfordii) could potentially occur in the inundated areas of the adjacent retention pond that occurs to the south of the Project. It is unlikely that this species would occur because of the repeated mowing that occurs in this pond when it is dry, fluctuating water levels, high temperatures and low oxygen content, and the high levels of maintenance associated with this managed feature.

4.3 - Special-Status Wildlife

4.3.1 - RESULTS OF LITERATURE REVIEW AND DATABASE SEARCHES There were 22 special-status wildlife species identified in the CNDDB, CNPS, and USFWS database queries that could potentially occur on the Project site (Table 4-2). There were 30 special-status wildlife species documented within a 10-mile radius of the Project site. There are no historical records on-site though the site is located at the southeastern edge of 10- mile occurrence records for 9 special-status wildlife species.

4.3.2 - PRESENCE OF SPECIAL-STATUS WILDLIFE
No special-status wildlife species or their sign were observed within the BSA. Most of the Project site is highly disturbed and contains no habitat that would support most of the special-status wildlife species listed in Table 4-2. There are no vernal pools or wetlands that would support aquatic species such as the crustaceans, red-legged frog, and tiger salamander. The delta smelt, pond turtle, listed snake species, horned lizard, and bluntnosed leopard lizard are also unlikely to occur at the Project due to the lack of appropriate habitat.

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 18
Table 4-2
Special-Status Wildlife Species Occurring in the Region of the Autumn Ridge Project
(Source: CNDDB 2020, CNPS 2020, and USFWS 2020)
Scientific Name Common name Status
Invertebrates
Bombus crotchii Crotch bumble bee CC
Desmocerus californicus dimorphus valley elderberry longhorn beetle S1S2 beetle
FT
Crustaceans
Branchinecta lynchi vernal pool fairy shrimp FT
Fish
Hypomesus transpacificus delta smelt FE, CT
Amphibians
Ambystoma californiense California tiger salamander FT
Rana draytonii California red-legged frog FT
Reptiles
Anniella pulchra Northern California legless lizard CSC Arizona elegans occidentails California glossy snake CSC Emys marmorata western pond turtle CSC
Gambelia sila blunt-nosed leopard lizard FE, CE, FP
Phrynosoma blainvillii coast horned lizard CSC
Thamnophis gigas giant garter snake FT, CT
Birds
Agelaius tricolor tricolored blackbird CT, CSC
Athene cunicularia burrowing owl CSC
Buteo swainsoni Swainson's hawk CT
Coccyzus americanus occidentalis western yellow-billed cuckoo FT, CE Vireo bellii pusillus least Bell’s vireo FE, CE
Mammals
Antrozous pallidus pallid bat CSC
Dipodomys nitratoides exilis Fresno kangaroo rat FE, CE Eumops perotis californicus western mastiff bat CSC
Taxidea taxus American badger CSC
Vulpes macrotis mutica San Joaquin kit fox FE, CT

Sources:

California Department of Fish and Wildlife. 2020. California Natural Diversity Data Base, California Department of Fish and Wildlife Sacramento, CA. Quads: Malaga, Clovis, Round Mountain, Sanger, Selma, Conejo, Caruthers, Fresno South, and Fresno North.

California Native Plant Society (CNPS). 2020. Inventory of Rare and Endangered Plants (online edition, v6-05b 4-11-05).

Rare Plant Scientific Advisory Committee. California Native Plant Society. Sacramento, CA. Quads: Malaga, Clovis, Round Mountain, Sanger, Selma, Conejo, Caruthers, Fresno South, and Fresno North United States Fish and Wildlife Service. 2020. Federal Endangered and Threatened Species that Occur in or may be Affected by Projects U.S.G.S 7 ½ Minute Quads. USFWS. Sacramento, CA. Quads: Malaga, Clovis, Round Mountain, Sanger, Selma, Conejo, Caruthers, Fresno South, and Fresno North Abbreviations:

FE Federal Endangered Species
FT Federal Threatened Species
Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 19
FP Fully Protected Animal, CDFW
MBTA Species Protected Under the Auspices of the Migratory Bird Treaty Act CC Califonria Candidate Species
CE California Endangered Species
CT California Threatened Species
CSC California Department of Fish and Game Species of Special Concern G1 Global Conservation Status: Critically Imperiled
G2 Global Conservation Status: Imperiled
G3 Global Conservation Status: Vulnerable
The San Joaquin kit fox is unlikely to occur on any portion of the Project site. The nearest record of occurrence for this species was from the 1980’s and is more than 8.4 miles southeast of the Project near Sanger. The annual grassland habitat that exists on-site is limited and highly degraded and disturbed by surrounding urban development, trash dumping, repeated disking, a recent grassfire, multiple homeless camps, and nearby road traffic. One inactive mammal den entrance was found off the site but within the BSA at a dry basin. The entrance was unusually large and was accompanied by other oddly sized entrances within 30 feet of the entrance. Each void contained trash and other foreign materials. No diagnostic sign of any large mammal was found in or near the opening. While there are abundant prey items on-site, site conditions documented within the BSA make it unlikely that San Joaquin Kit fox would be present, even as transient foragers. Likewise, the American badger, which has similar habitat requirements, is unlikely to occur on any portion of the Project site. Proposed Project activities would have no effect on these species.

The Swainson’s hawk is unlikely to occur at the Project. The most recent record of occurrence in the region was from 2016 on the west side of State Route 99, 3.5 miles southwest of the Project. While there is foraging habit on-site, there were no potential Swainson’s hawk nests observed on the site, there were few trees of a size that would support nesting Swainson’s hawks, and the disturbances and human activity in the area limit the potential for Swainson’s hawks to use the site as a breeding area. Sixteen small mammal burrow complexes were mapped during the reconnaissance survey, but many more active burrows and burrow complexes likely exist on-site. Two red-tailed hawks were observed hunting on the southern half of the site and other raptors may use the site to forage.

4.4 - Nesting Migratory Birds and Raptors

4.4.1 - PRESENCE OF NESTING BIRDS AND RAPTORS
There were no nests of migratory birds or raptors on the Project site at the time of the survey.

There was one walnut tree on-site that could potentially serve as nesting habitat, but most of the existing trees were either dead or degraded pistachio trees. Many of the trees were eliminated by the recent fire. More than two-dozen mourning doves, which are a ground nesting species, were observed during the reconnaissance survey. No ground nests were found. A pair of red-tailed hawks was hunting on the southern side of the site, but no active nest was present. There is nesting habitat outside the Project site within the BSA, but that habitat is limited mostly to ornamental tree species. There are several large eucalyptus trees (Eucalyptus sp.) north of the site adjacent to an existing active orchard, but no nests were found in those trees or in any other tree observed within the BSA.

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 20

4.5 - Critical Habitat, Movement Corridors, and Linkages

4.5.1 - RESULTS OF LITERATURE REVIEW AND DATABASE SEARCHES No designated Critical Habitat occurs on the Project site. The nearest USFWS-designated Critical Habitat Unit is for Fleshy Owl’s Clover, located approximately 10.2 miles to the northeast of the Project (Figure 4-1).

4.5.2 - PRESENCE OF MOVEMENT CORRIDORS AND LINKAGES
There are no important movement corridors or linkages that intersect the Project site.

4.6 - Wetlands and Other Waters

4.6.1 - RESULTS OF LITERATURE REVIEW AND DATABASE SEARCHES No wetland features are known to exist at the Project site (see Figures 3-3 and 3-5). The NHD identified one blueline feature, the Bradley Canal, occurring along the northern border of the Project. The NWI shows one freshwater pond feature located outside of the site on the eastern border of the Project.

4.6.2 - PRESENCE OF WETLANDS AND OTHER WATERS
All wetland features and blueline features identified by the NWI and NHD database search were visited during the survey. There were wetlands or stream features on-site. The Braley Canal does not exist on-site and the freshwater pond indicated by NWI was located off of the site This pond, more accurately described as a dry basin, showed no evidence of recent inundation and did not support any wetland vegetation. Small mammal burrow entrances were common within this basin and the basin contained at least one large burrow entrance.

The presence of these burrows indicate that the site has been dry for quite some time. A large, inundated retention pond occurs off the project site but within the BSA to the south of the site. It is a managed feature that appears to be maintained regularly. No wetland vegetation occurs around the edges of this feature.

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 21
Figure 4-1
Critical Habitat Map
Autumn Ridge Project,
Fresno County, California
San Joaquin
Orcutt grass
San Joaquin
Orcutt grass
California
tiger
Salamander
R 1s 1n C1
£:,,, Project Location
J
Fleshy
owl's:clover
) __.
rut
- USFWS Critical Habitat
California tiger
Salamander
grass
San Joaquin
Orcutt
grass
Vernal pool
fairy shrimp
Clov
owl's-clover
fS""' 1
Fleshy owl's-clover
----1so ----E-K1ngs - nyon Ro
San e r
Fowl r
P rhe r
ings ur
:i:

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 22
SECTION 5 - POTENTIAL PROJECT IMPACTS

5.1 - Potential Impacts to Sensitive Vegetation Communities and SpecialStatus Plant Species No sensitive vegetation communities or special-status plant species occur on-site. The only habitat that could potentially support special-status plant species is in the inundated retention pond south of the project site within the BSA, where Sanford’s arrowhead could potentially occur. However, it is unlikely that Sanford’s arrowhead would occur. The Project would not impact sensitive natural communities or special-status plant species.

5.2 - Potential Impacts to Special-Status Wildlife Species Some special status species could potentially be present at the Project, but their potential for occurrence, even as transients, is very unlikely. The San Joaquin kit fox, American badger, and western burrowing owl are unlikely to occur on or near the Project and Project activities would have no effect on these species. No potential nests of the Swainson’s hawk were present on the Project site or within the BSA. The Project will result in the removal of on-site agricultural trees, but the loss of these trees will not represent a loss in nesting habitat for the Swainson’s hawk. No special-status wildlife species or diagnostic signs of special-status wildlife species were observed on the Project site, and the degraded condition of the site would tend to preclude those species from occurring. The Project is anticipated to have no impact to special-status wildlife species.

5.3 - Potential Impacts to Nesting Birds and Raptors
Although there were no active bird nests observed on the Project site, there is a potential for bird nests to become established prior to Project development. Accordingly, there would be a potential for Project activities to result in the loss of active migratory bird and raptor nests, and to cause nest abandonment or nest failure and interference with breeding bird behaviors including foraging, feeding, and rearing behaviors. These impacts would be limited to the areas of the Project site that support nesting and foraging habitat. Similarly, there could be active bird nests off site but within the BSA that could be impacted by Project development.

5.4 - Potential Impacts to Movement Corridors and Linkages Project activities would not impact any movement corridors or wildlife linkages.

5.5 - Potential Impacts to Wetlands and Waters
No wetland or stream features exist on the Project and there would be no impacts to wetland or stream resources.

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 23
SECTION 6 - RECOMMENDATIONS
Although there were no special-status plant or wildlife species found on the site, there is some potential that Project activities could attract wildlife of various species and lead to possible impacts, We recommend that the below list of Best Management Practices (BMP) be followed.
• A worker environmental Awareness Training Program should be prepared and presented to all workers that will be on-site during construction activities; • Project-related vehicles should observe a 20 mph speed limit in all project areas, except on County roads and State and federal highways; this is particularly important at night when animals are most active. To the extent possible, nighttime construction should be minimized. Off-road traffic outside of designated project areas should be prohibited;
• the contractor should cover all excavated, steep-walled holes or trenches more than 2 feet deep at the close of each working day with plywood or similar materials, or provide one or more escape ramps constructed of earth fill or wooden planks. Before such holes or trenches are filled, the contractor should thoroughly inspect them for trapped animals;
• Wildlife are attracted to den-like structures such as pipes and may enter stored pipe becoming trapped or injured. All construction pipes, culverts, or similar structures with a diameter of 4 inches or greater that are stored at a construction site for one or more overnight periods should be thoroughly examined for wildlife before the pipe is subsequently buried, capped, or otherwise used or moved in anyway. • All trash and food items should be discarded into closed containers and properly disposed at the end of each workday;
• To prevent harassment, mortality of wildlife, or destruction of dens by dogs or cats, no pets should be permitted on project sites; and
To ensure the protection of nesting migratory birds and raptors, it is recommended that:
• If Project activities are scheduled during the breeding bird season, from January 15th through September 15th, then a preconstruction survey for nesting birds should be conducted within the project footprint and within 500-feet from the outside boundaries of the Project footprint. Construction activities should not be conducted within 250 feet of an active bird nest or within 500 feet of an active raptor nest. That avoidance distance could be reduced if a biological monitor determines that activities are not affecting the breeding success of the nesting birds.

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 24
SECTION 7 - SUMMARY AND CONCLUSIONS
Based on the findings of biological field investigations, there is no potential for special-status plant species and little potential for special status wildlife species to occur on the site. The San Joaquin Kit Fox, Swainson’s Hawk, American Badger, and burrowing owl are absent from the site. The Project will have no effect to these species. Nesting migratory birds and raptors have some potential to occur at the Project. BMPs and avoidance measures for nesting birds are recommended to ensure project impacts are minimized.

This Biological Resource Evaluation report has been performed in accordance with professionally accepted biological investigation practices conducted at this time and in this geographic area. The findings and opinions conveyed in this report are based on findings derived from a comprehensive database and literature search and an on-site field examination. The biological investigation is limited by the scope of work performed. Survey results for certain taxa conducted as part of this assessment may not have been performed during a blooming period or particular portion of the season when positive identification of one or more species would be possible, if present, and therefore, cannot be considered definitive. The biological surveys are limited also by environmental conditions present at the time of the surveys. In general, biological (or protocol) surveys do not guarantee that the organisms are not present and would not be discovered in the future within the site. Mobile animal species could occupy the site on a transient basis or re-establish populations in the future. No other guarantees or warranties, expressed or implied, are provided.

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 25
SECTION 8 - REFERENCES
California Department of Fish and Wildlife (CDFW). 2020a. California Natural Diversity Database (CNDDB), from https://map.dfg.ca.gov/rarefind/view/RareFind.aspx.

California Department of Fish and Wildlife (CDFW). 2020b. Biogeographic Information and Observation System (BIOS). www.wildlife.ca.gov/data/BIOS California Department of Fish and Wildlife (CDFW). 2020c. CDFW’s Special Animals List California Department of Water Resources Water Management Planning Tool (CDWR). 2020. https://gis.water.ca.gov/app/boundaries/
California Native Plant Society (CNPS). 2020. Inventory of Rare and Endangered Plants.

Updated online and accessed via: www.rareplants.cnps.org.

Federal Emergency Management Agency (FEMA) 2020. On-line Map Service Center.

Live Oak Associates. 2006. Biological Evaluation, Tract 5232, Fresno County, California.

Mayer, K.E. and W.F. Laundenslayer, Jr. 1988. A guide to wildlife habitats of California. State of California. Resources Agency, Department of Fish and Game. Sacramento, CA. 166 pp. As updated online at: https://www.wildlife.ca.gov/Data/CWHR/WildlifeHabitats U.S. Army Corps of Engineers. 1987. Corps of Engineers Wetlands Delineation Manual.

Technical Report Y-87-1, Department of the Army Environmental Laboratory. U.S.

Army Corps of Engineers Waterways Experiment Station, Wetlands Research Program, Vicksburg, MS.
____. 2008. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Arid West Region. Version 2.0. September 2008. ERDC/EL TR-08-28. Department of the Army Environmental Laboratory. U.S. Army Corps of Engineers Waterways Experiment Station, Wetlands Research Program, Vicksburg, MS.

U.S. Department of Agriculture, Natural Resources Conservation Service. 2020. Web Soil Survey. http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx ____. 2020. Official Soil Series Descriptions. Available online:
https://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/home/?cid=nrcs142p2_ 053587. Accessed January 2019.

United States Fish and Wildlife Service (USFWS). 1973. The Endangered Species Act of 1973, as amended (16 U.S.C 1531 et seq.).

USFWS. 1998.Recovery Plan for Upland Species of the San Joaquin Valley, CA. https://ecos.fws.gov/docs/recovery_plans/1998/980930a.pdf.

Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page 26
USFWS. 2010. San Joaquin kit fox (Vulpes macrotis mutica) 5-year review: summary and evaluation. Sacramento Fish and Wildlife Office, Sacramento CA. 122 pp.

USFWS. 2020a. Information for Planning and Consultation online project planning tool. Available at: https://ecos.fws.gov/ipac/
USFWS. 2020b. Critical Habitat Portal. Available at:
https://ecos.fws.gov/ecp/report/table/critical-habitat.html USFWS. 2020c. National Wetlands Inventory Wetlands Mapper.U.S. Geological Survey. 2020.

National Hydrography Dataset (NHD). GIS data. https://nhd.usgs.gov/data.html.

Accessed July 2020.

U.S. Geological Survey (USGS). 2020. National Hydrography Dataset. https://www.usgs.gov/core-science-systems/ngp/national-hydrography Western Region Climate Center. 2020. Cooperative Climatological Data Summaries. Station ID: Fresno Yosemite Intl AP, California 043257. Accessed July 2020. http://www.wrcc.dri.edu/climatedata/climsum/

APPENDIX A

DATABASE SEARCH RESULTS

AUTUMN RIDGE PROJECT, FRESNO, FRESNO COUNTY, CALIFORNIA Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page A-1
Selected Elements by Scientific Name
California Department of Fish and Wildlife
California Natural Diversity Database
Query Criteria: Quad<span style='color:Red'> IS </span>(Clovis (3611976)<span style='color:Red'> OR c/span>Malaga (361 1966)<span style='color:Red'> OR </span>Conejo (3611956)<span style='color:Red'> OR c/span>Selma (3611955)<span style='color:Red'> OR </ span>Fresno South (3611967)<span style='color:Red'> OR </span>Fresno North (3611977)<span style='color:Red'> OR </span>Sanger (3611965)<span style='color:Red'> OR </span>Round Mountain (3611975)<span style='color:Red'> OR </span>Caruthers (3611957)) Rare Plant
Rank/CDFW
Species Element Code Federal Status State Status Global Rank State Rank SSC or FP Agelaius tricolor ABPBXB0020 None Threatened G2G3 S1S2 SSC tricolored blackbird
Ambystoma californiense AAAAA01180 Threatened Threatened G2G3 S2S3 WL California ttger salamander
Annie/la pulchra ARACC01020 None None G3 S3 SSC
northern California legless lizard
Antrozous pallidus AMACC10010 None None G5 S3 SSC
pallid bat
Ardeaalba ABNGA04040 None None G5 S4
great egret
Arizona elegans occidentalis ARADB01017 None None G5T2 S2 SSC California glossy snake
Athene cunicu/aria ABNSB10010 None None G4 S3 SSC
burrowing owl
Bombus crotchii IIHYM24480 None Candidate G3G4 S1S2
Crotch bumble bee Endangered
Branchinecta lynchi ICBRA03030 Threatened None G3 S3
vernal pool fairy shrimp
Branchinec ta mesovallensis ICBRA03150 None None G2 S2S3 midvalley fairy shrimp
Buteo swainsonl ABNKC19070 None Threatened G5 S3
Swainson's hawk
Castilleja campestris var. succulents PDSCR0D3Z1 Threatened Endangered G4?T2T3 S2S3 18.2 succulent owl's-clover
Cau/anthus califomicus PDBRA31010 Endangered Endangered G1 S1 18.1 California jewelflower
Coccyzus americanus occidentalis ABNRB02022 Threatened Endangered G5T2T3 S1 western yellow-bil~d cuckoo
Desmocerus ca/ifornicus dlmorphus IICOL48011 Threatened None G3T2 S2 valley elderberry longhorn beetle
Dlpodomys nltratoldes exllis AMAFD03151 Endangered Endangered G3TH SH Fresno kangaroo rat
Efferia antiochi IIDIP07010 None None G1G2 S1S2
Antioch efferian robberfly
Egretta thula ABNGA06030 None None GS S4
snowy egret
Emys mannorata ARAAD02030 None None G3G4 S3 SSC
western pond turtle
Commercial Version•· Dated July, 3 2020 - Biogeographic Data Branch Page 1 of3 Report Printed on Wednesday, July 22, 2020 Information Exp ires 113/2021 Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page A-2
Selected Elements by Scientific Name
Ca
Ca
liforni
liforni
a D
a
e
Na
pa
tur
rtm
a
e
l
n
Di
t of
vers
Fi
i
s
ty
h a
D
nd
ata
Wild
base
life
~ Rare Plant
Rank/CDFW
Species Element Code Federal Status State Status Global Rank State Rank SSC or FP Eryngium spinosepalum PDAPI0Z0Y0 None None G2 S2 1B.2
spiny-sepaled button-celery
Eumops perotis californicus AMACD02011 None None GST4 S3S4 SSC western mastiff bat
lmperata brevifolia PMPOA3D020 None None G4 S3 2B.1
California satintail
Lagophy/la dichotoma PDASTSJ070 None None G2 S2 1B.1
forked hare-leaf
Lasiurus cinereus AMACC0S030 None None GS S4
hoary bat
Lasthenla chrysantha PDASTSL030 None None GNR SNR 1B.1
alkali-sink goldfields
Leptosiphon serrulatus PDPLM09130 None None G3 S3 1B.2
Madera leptosiphon
Underielta occidentalis ICBRA06010 None None G2G3 S2S3
California linderiella
Lytta molesta IICOL4C030 None None G2 S2
molestan blister beetle
Metapogon hurdi IIDIP08010 None None G1G2 S1S2
Hurd's metapogon robberfly
Northern Claypan Vernal Pool CTT44120CA None None G1 S1.1 Northern Claypan Vernal Pool
Northern Hardpan Vernal Pool CTT44110CA None None G3 S3.1 Northern Hardpan Vernal Pool
Nycticorax nycticorax ABNGA11010 None None GS S4
black-crowned night heron
Orcuttia inaequalis PMPOA4G060 Threatened Endangered G1 S1 1B.1 San Joaquin Valley Orcutt grass
Perognathus inomatus AMAFD01060 None None G2G3 S2S3
San Joaquin Pocket Mouse
Phafacrocorax auritus ABNFD01020 None None GS S4 WI.
double-crested cormorant
Phrynosoma blainvillii ARACF12100 None None G3G4 S3S4 SSC coast homed lizard
Pseudobahia pelrsonil PDAST7P030 Threatened Endangered G1 S1 1B.1 San Joaquin adobe sunburst
Sagittaria sanfordil PMALI040QO None None G3 S3 1B.2
Sanford's arrowhead
Spea hammondii AAABF02020 None None G3 S3 SSC
western spadefoot
Taxidea taxus AMAJF04010 None None GS S3 SSC
American badger
Commercial Version -- Dated July, 3 2020 - Biogeographic Data Branch Page 2 of3 Report Printed on Wednesday, July 22, 2020 Information Expires 11312021 Autumn Ridge Project August 2020
DR Horton – Central Valley Division Page A-3
Species
Tropidocarpum capparideum
caper-fruited tropidocarpum
Tuctoria greenei
Greene's tuctoria
Vireo be/Iii pusillus
least Bell's vireo
Vulpes macrotis mutica
San Joaquin kit fox
Selected Elements by Scientific Name
California Department of Fish and Wildlife
California Natural Diversity Database
Element Code Federal Status State Status
PDBRA2R010 None None
PMPOA6N010 Endangered Rare
ABPBW01114 Endangered Endangered
AMAJA03041 Endangered Threatened
Commercial Version -- Dated July, 3 2020 -- Biogeographic Data Branch Report Printed on Wednesday, July 22, 2020
~ Rare Plant
Rank/CDFW
Global Rank State Rank SSC or FP
G1
G1
GST2
G4T2
S1 1B.1
S1 1B.1
S2
S2
Record Count: 44

Page 3 ends
← All documents from this meeting