RESOLUTION NO. ____________
A RESOLUTION OF THE COUNCIL OF THE CITY OF
FRESNO, CALIFORNIA, ADOPTING FINDINGS
PURSUANT TO CALIFORNIA ENVIRONMENTAL QUALITY
ACT (CEQA) GUIDELINES SECTIONS 15091 AND 15093
AS REQUIRED FOR RESPONSIBLE AGENCIES BY CEQA
GUIDELINES SECTION 15096 FOR THE SB 1383
REGULATIONS SHORT -LIVED CLIMATE POLLUTANTS:
ORGANIC WASTE METHANE EMISSION REDUCTION
WHEREAS, on September 19, 2016, the Governor of the State of California approved Senate Bill No. 1383 (“SB 1383”) which amended portions of the California Health and Safety Code and Public Resources Code relating to methane; and WHEREAS, SB 1383 required the California Department of Recourses Recycling and Recovery (“CalRecycle”) to adopt regulations that achieve specified targets for reducing organic waste in landfills; and
WHEREAS, CalRecycle developed regulations titled “Short-lived Climate Pollutants (SLCP): Organic Waste Methane Emission Reduction”, and pursuant to the California Environmental Quali ty Act (“CEQA") prepared an Environmental Impact Report for the project identified by State Clearinghouse No. 2018122023 (“SLCP EIR”) , which is incorporated herein by reference; and
WHEREAS, the SLCP EIR was certified by CalRecycle along with approval of regulations necessary to implement SB 1383 and a Notice of Determination was filed December 30, 2019; and
WHEREAS, in order to compl y with SB 1383 and the related CalRecycle Regulations, the City must amend its agreement with its franchise haulers, to add additional
2 of 5
services and requirements due to the City’s state- mandated obligation to implement organic waste collection and related services pursuant to SB 1383; and WHEREAS, Republic Waste Services and Mid- Valley Disposal are such commercial solid waste service providers; and
WHEREAS, an amendment to the Agreement s is a project for the purposes of CEQA Guidelines Section 15378; and
WHEREAS, the amendment of the Commercial Solid Waste Franchise Agreements is within the scope of the project contemplated by the SLCP EIR and is a potential future action contemplated by the SLCP EIR; and
WHEREAS, California Environmental Quality Act (CEQA) Guidelines Section 15096 allows a Responsible Agency to consider an EIR prepared by a Lead Agency for a project when the approval relates to a portion of the project assessed by the Lead Agency’s EIR; and
WHEREAS, pursuant to CEQA Guidelines Section 15096(f), prior to reaching a decision on a project, the Responsible Agency must consider the environmental effects of the project as shown in the Lead Agency’s EIR, and shall also complete an analysis regarding the necessity of a subsequent EIR pursuant to CEQA Guidelines Section 15162; and
WHEREAS, a Responsible Agency that relies on an EIR prepared by a Lead Agency, shall also make the findings required by Section 15091 for each significant effect of the project and shall make findings pursuant to Section 15093 if necessary; and WHEREAS, the City of Fresno is a Responsible Agency within the meaning of CEQA Guidelines Section 15381 for the Short -lived Climate Pollutants (SLCP): Organic Waste Methane Emission Reduction.
3 of 5
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Fresno, based upon the testimony and information presented at the hearing and upon review and consideration of the environmental documentation provided, as follows:
1. The recitals set forth above are hereby incorporated into this Resolution.
2. The Council finds in accordance with its own independent judgment that:
a. Approval of the Second Amendment to the Commercial Solid Waste Franchise Agreements with Republic Waste Services and Mid- Valley Disposal are a further discretionary approval of the Short -lived Climate Pollutants (SLCP):
Organic Waste Methane Emission Reduction Project, and is within the scope of the SLCP EIR ;
b. None of the conditions described in Section 15162 of the CEQA Guidelines calling for preparation of a subsequent EIR or Mitigated Negative Declaration have occurred;
c. The Second Amendment to the Commercial Solid Waste Franchise Agreements with Republic Waste Services and Mid- Valley Disposal does not propose changes to the Short-lived Climate Pollutants (SLCP): Organic Waste Methane Emission Reduction Project, and is instead an approval that implements a portion of that project;
d. There is no substantial evidence in the record that the Second Amendment to the Commercial Solid Waste Franchise Agreements with Republic Waste Services and Mid-Valley Disposal may have additional significant effects on the environment that were not identified in the SLCP EIR, and that all applicable mitigation measures of the prior EIR have been applied to the project; e. In addition, pursuant to Public Resources Code, Section 4 of 5
21157.6(b)(1), Council finds that no substantial changes have occurred with respect to the circumstances under which the prior EIR was adopted; and, that no new information, which was not known and could not have been known at the time that the prior EIR, has become available. Accordingly, a subsequent EIR is not required.
2. The Council adopts findings pursuant to CEQA Guidelines 15091 and 15093, as required by CEQA Guidelines 15096, attached hereto as Exhibit A.
3. This resolution shall be effective upon final approval.
5 of 5
* * * * * * * * * * * * * *
STATE OF CALIFORNIA )
COUNTY OF FRESNO ) ss.
CITY OF FRESNO )
I, TODD STERMER, City Clerk of the City of Fresno, certify that the foregoing resolution was adopted by the Council of the City of Fresno, at a regular meeting held on the day of , 2023.
AYES :
NOES :
ABSENT :
ABSTAIN :
TODD STERMER, CMC
City Clerk
BY:
Deputy Date
APPROVED AS TO FORM:
ANDREW JANZ
City Attorney
BY:
Angela M. Karst Date Senior Deputy City Attorney
Attachments: Exhibit A
1 SB 1383 REGULATIONS, SHORT-LIVED CLIMATE POLLUTANTS: ORGANIC WASTE
METHANE EMISSION REDUCTIONS ENVIRONMENTAL IMPACT REPORT FINDINGS and STATEMENT OF OVERRIDING CONSIDERATIONS
Introduction
The Department of Resources Recycling and Recovery (CalRecycle), as the lead agency for the proposed SB 1383 Regulations (Proposed Regulations), prepared a Draft Environmental Impact Report (EIR) to comply with the requirements of the California Environmental Quality Act (CEQA) (Pub. Resources Code, §21000, et seq.). The Draft EIR, entitled Draft Environmental Impact Report, SB 1383 Regulations, Short-Lived Climate Pollutants: Organic Waste Methane Emission Reduction, provided an analysis of the potential environmental impacts associated with the Proposed Regulations. Following circulation of the Draft EIR for a 45-day public review and comment period from July 30, 2019 through September 13, 2019, CalRecycle prepared the Final Environmental Impact Report, SB 1383 Regulations, Short- Lived Climate Pollutants: Organic Waste Methane Emission Reduction (Final EIR) which includes revisions to the Draft EIR. The Final EIR was posted on CalRecycle’s webpage on December 31, 2019. While modifications have been made to the EIR to ensure it reflects the proposed project as accurately as possible, these changes merely clarify, amplify, or make insignificant modifications to the otherwise-adequate Draft EIR. Therefore, there is no significant new information that would require the Final EIR to be recirculated.
The Final EIR is based on the expected compliance responses of the regulated entities covered by the Proposed Regulations. Although the policy aspects and requirements of the Proposed Regulations do not directly change the physical environment, there are potential indirect physical changes to the environment that could result from reasonably foreseeable actions undertaken by entities in response to the Proposed Regulations. These indirect impacts are the focus of the programmatic-level impacts analysis in the Final EIR.
As it pertains to CalRecycle, SB 1383 established targets to achieve a 50 percent reduction in the level of the statewide disposal of organic waste from the 2014 level by 2020 and a 75 percent reduction by 2025. The law requires CalRecycle to adopt regulations designed to achieve the organic waste disposal reduction targets. The law also directs CalRecycle to include provisions in the regulations designed to achieve a target that not less than 20 percent of the amount of edible food currently disposed of is recovered for human consumption by 2025.
Redirecting organic waste from landfills and into beneficial uses in accordance with the Proposed Regulations is expected to result in environmental, public health, and economic benefits. CalRecycle has identified the following potential beneficial outcomes of the proposed regulation, discussed further herein: reducing greenhouse gas emissions, feeding the hungry, creating valuable materials such as soil amendments and biogas and transportation fuels, employment, benefits to California businesses, and increased soil health.
CEQA places the burden on the approving agency to affirmatively show that it has considered feasible mitigation and alternatives that can lessen or avoid identified impacts 2 through a statement of findings for each identified significant impact. (Pub. Resources Code, §21081.) CEQA Guidelines section 15091 provides direction on the content of the statement of findings. That section states that one or more of the following findings should be identified for each impact:
• Changes or alterations have been required in, or incorporated into, such projects which avoid or substantially lessen the significant environmental effect as identified in the final environmental impact report.
• Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adopted by such other agency, or can and should be adopted by such other agency.
• Specific economic, legal, social, technological, or other considerations, including provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or project alternatives identified in the environmental impact report.
Because the potential adverse impacts identified in this programmatic level EIR are potential indirect impacts associated with the compliance responses of covered entities, the authority to determine site- or project-specific mitigation is within the purview of jurisdictions with local permitting authority, such as city or county governments and local air districts. Except in limited circumstances noted in the EIR and herein, CalRecycle does not have the ability to determine with any specificity the project level impacts, nor the authority to require project level mitigation in approving the Proposed Regulations, as discussed in the findings below.
An agency may approve a project with unavoidable (unmitigated) adverse environmental impacts. When doing so, CEQA requires the agency to make a statement in the record of its views on the ultimate balancing of the merits of approving the project despite the environmental impacts in a “statement of overriding considerations” (Pub. Resources Code, §21081(b); Cal. Code Regs, tit. 14, §15093.) The following presents CalRecycle’s statement of findings for each significant adverse impact identified in the EIR, accompanied by a brief explanation, and its statement of overriding considerations.
STATEMENT OF FINDINGS
CalRecycle has independently reviewed and considered the entire record, including the information contained in the EIR, public testimony, written comments received, and the written responses to environmental comments, all of which are hereby incorporated by reference. CalRecycle makes the following written findings for each significant adverse impact identified, accompanied by a brief explanation of the rationale for each finding. These findings are supported by substantial evidence in the record.
3 Aesthetics
Finding and Explanation
Impact 3.1-1: Short-Term, Substantial Degradation of a Scenic Vista or Visual Character or Quality of Public Views, or Damage to Scenic Resources in a State Scenic Highway from Construction of Facilities in Response to the Proposed Regulations
Varying degrees of temporary degradation of public views would result during construction of facilities in response to the Proposed Regulations. Although there is uncertainty regarding the location of these facilities, construction activities and equipment associated with new facilities or modifications to existing facilities could introduce or increase the presence of visible artificial elements in areas of scenic importance, such as areas visible from State scenic highways. This impact would be potentially significant.
The EIR includes Mitigation Measure 3.1-1: Implement Aesthetic Resource Protection Measures during Construction of New or Modified Facilities in Response to the Proposed Regulations. As described in Section 1.2 of the EIR, the authority of CalRecycle and LEAs is statutorily limited. They do not have authority to require implementation of mitigation measures that would reduce potentially significant construction-related aesthetics impacts.
Therefore, CalRecycle finds that mitigation measures to reduce construction-related aesthetics impacts can and should be implemented by local jurisdictions with land use authority. Site-specific, project impacts and mitigation would be identified during a project’s local review process. A proposed project would be approved by a local government and potentially another permitting agency that can apply conditions of approval.
The following mitigation measures can and should be required by agencies with project approval authority to avoid or minimize impacts on aesthetic resources:
• Proponents of new facilities constructed as a result of reasonably foreseeable compliance responses would coordinate with State or local land use agencies to seek entitlements for development. This process would involve the completion of all necessary environmental review requirements (e.g., CEQA). The local or State land use agency or governing body must follow all applicable environmental regulations as part of approval of a development project.
• Project proponents would implement all feasible mitigation identified during the environmental review to reduce or substantially lessen the potentially significant aesthetic impacts of the project. Actions may include equipment storage siting during construction within a property, daily clean-up of the construction site, and temporary fencing to prevent views of construction areas.
• To the extent feasible, the sites selected for use as construction staging and laydown areas would be areas that are already disturbed or are in locations of low visual sensitivity. Where feasible, construction staging and laydown areas for equipment, personal vehicles, and material storage would be sited to take advantage of natural screening opportunities provided by existing structures, topography, and vegetation.
Temporary visual screens would be used where helpful if existing landscape features would not screen views of the areas.
4 • All construction and maintenance areas would be kept clean and tidy, areas where construction materials and equipment are stored would be screened from view or be located in areas generally not visible to the public, and disturbed soil would be revegetated, where feasible.
• To the greatest extent feasible, alteration of the visual setting of important scenic landscape features, areas in a setting for observation from State scenic highways, national or state historic sites, public trails, and cultural resources will be avoided when siting projects and their associated elements.
Mitigation Measure 3.1-1 would reduce aesthetic impacts because project design features, such as storage siting and selection of construction laydown areas, would be incorporated to reduce impacts on scenic vistas, visual character, or quality of public views of scenic resources associated with a State scenic highway. However, adoption and implementation of these mitigation measures are beyond the authority of CalRecycle and LEAs. The authority to review site-specific, project-level impacts and require project-level mitigation lies primarily with local land use and/or permitting agencies for individual projects. Consequently, although it is reasonable to expect that impacts would be reduced to a less-than-significant level by land use and/or permitting agency conditions of approval, the degree to which another agency would require mitigation is uncertain. Therefore, CalRecycle takes a conservative approach in its post-mitigation significance conclusion and finds that short-term, construction-related aesthetic impacts resulting from the development of new facilities associated with the Proposed Regulations could be potentially significant and unavoidable.
Impact 3.1-2: Long-Term, Substantial Degradation of a Scenic Vista or Visual Character or Quality of Public Views, or Damage to Scenic Resources in a State Scenic Highway from Operation of Facilities in Response to the Proposed Regulations
Implementation of the Proposed Regulations would result in operation of new or modified organic waste handling and processing facilities at or near existing facilities or in urban areas zoned for industrial or solid waste handling facilities. The new or modified facilities would be similar in visual character to other nearby industrial or solid waste facilities. Thus, operations at these facilities would not substantially degrade the character or quality of public views.
Long-term effects on aesthetics could occur from operation of new or modified facilities in response to the Proposed Regulations. New organic waste recovery and processing facilities that are located in agricultural or other areas not previously developed for solid waste, agricultural, or wastewater treatment facilities could degrade public views from a scenic vista, degrade the visual character or quality of public views of the site, or disrupt views from a State scenic highway. The long-term operational impacts on scenic vistas, visual character, or quality of public views or on scenic resources in a State scenic highway associated with operation of facilities in response to the Proposed Regulations would be potentially significant.
The EIR includes Mitigation Measure 3.1-2: Implement Aesthetic Resource Protection Measures during Operation of New or Modified Facilities in Response to the Proposed Regulations. Consideration of a project’s long-term aesthetic effects is typically subject to the purview of a local jurisdiction, based on its planning policies, ordinances, and/or design 5 guidelines. Conditions of approval in a solid waste facility permit would not extend to regulating aesthetic impacts on a scenic vista, visual character, or quality of public view on scenic resources in a State scenic highway system. Site-specific, project impacts and mitigation measures would be identified during a project’s local review process. A proposed project would be approved by a local government and potentially another permitting agency that can apply conditions of approval. Therefore, CalRecycle finds that mitigation measures to reduce long-term aesthetics impacts can and should be implemented by local jurisdictions with land use authority.
The following mitigation measures can and should be required by agencies with project approval authority to avoid or minimize impacts on aesthetic resources:
• Proponents of new facilities constructed as a result of reasonably foreseeable compliance responses would coordinate with State or local land use agencies to seek entitlements for development. This process would involve the completion of all necessary environmental review requirements (e.g., CEQA). The local or State land use agency or governing body must follow all applicable environmental regulations as part of approval of a development project.
• All feasible mitigation identified during the environmental review to reduce or substantially lessen the potentially significant scenic or aesthetic impacts of the project would be implemented. Actions may include facility or equipment siting within a property, visual screening by vegetation, fencing or walls to prevent views of operating areas, exterior paint colors that blend with landscapes, and lowest feasible height of visible equipment and structures.
• The color and finish of the surfaces of all project structures and buildings visible to the public would be carried out to (1) minimize visual intrusion and contrast by blending with the landscape and (2) comply with local design policies and ordinances. The project proponent would submit a surface treatment plan to the lead agency for review and approval.
• All operation and maintenance areas would be kept clean and tidy, areas where construction materials and equipment are stored would be screened from view or located in areas generally not visible to the public, and disturbed soil would be revegetated, where feasible.
Mitigation Measure 3.1-2 would reduce aesthetic impacts because project design features, such as visual screening, building surface types, and landscape designs would be selected and implemented to reduce impacts on scenic vistas, visual character, or quality of public views or on scenic resources. However, adoption and implementation of these mitigation measures are beyond the authority of CalRecycle and LEAs. The authority to review site- specific, project-level impacts and require project-level mitigation lies primarily with local land use and/or permitting agencies for individual projects. Consequently, although it is reasonable to expect that impacts would be reduced to a less-than-significant level by land use and/or permitting agency conditions of approval, the degree to which another agency would require mitigation is uncertain. Therefore, CalRecycle takes a conservative approach in its post-mitigation significance conclusion and finds that long-term operational scenic impacts 6 resulting from the development of new or modified facilities associated with the Proposed Regulations could be potentially significant and unavoidable.
Impact 3.1-4: Temporary or Permanent New Sources of Substantial Light or Glare That Would Adversely Affect Day or Nighttime Views in Areas near Project Sites
Substantial light or glare that would adversely affect day or nighttime views could be generated by construction activities or during operation of new or expanded organic waste handling facilities developed in response to the Proposed Regulations. Construction activities would not be anticipated to result in new sources of substantial light or glare because of the short-term and temporary nature of those activities. However, operation of new or modified facilities in rural areas could include infrastructure containing reflective surfaces and could require safety lighting that would be noticeable in those areas. Implementation of the proposed project would result in potentially significant impacts related to permanent new sources of substantial light or glare that would adversely affect day or nighttime views in areas near specific organic waste handling facilities.
The EIR includes Mitigation Measure 3.1-4: Implement Light and Glare Reduction Measures during Operation of New or Modified Facilities in Response to the Proposed Regulations.
Consideration of a project’s long-term aesthetic effects is typically subject to the purview of a local jurisdiction, based on its planning policies, ordinances, and/or design guidelines.
Conditions of approval in a solid waste facility permit would not extend to regulating issues such as the potential for new sources of light and glare to affect day or nighttime views. Site- specific, project impacts and mitigation measures would be identified during a project’s local review process. A proposed project would be approved by a local government and potentially another permitting agency that can apply conditions of approval. Therefore, CalRecycle finds that mitigation measures to reduce impacts due to temporary or permanent new sources of substantial light or glare can and should be implemented by local jurisdictions with land use authority.
The following mitigation measures can and should be required by agencies with project approval authority to avoid or minimize light and glare impacts:
• Proponents of new facilities constructed as a result of reasonably foreseeable compliance responses would coordinate with State or local land use agencies to seek entitlements for development. This process would involve the completion of all necessary environmental review requirements (e.g., CEQA). The local or State land use agency or governing body must follow all applicable environmental regulations as part of approval of a development project.
• All feasible mitigation identified during the environmental review to reduce or substantially lessen the potentially significant light and glare impacts of the project would be implemented. Actions may include low-height lighting design, window glazing design, or minimized reflective surfaces.
• The color and finish of the surfaces of all project structures and buildings visible to the public would be carried out to (1) minimize glare and (2) comply with local design policies and ordinances. The project proponent would submit a surface treatment plan to the lead agency for review and approval.
7 • The project proponent would contact the lead agency to discuss the documentation required in a lighting mitigation plan, submit to the lead agency a plan describing the measures that demonstrate compliance with lighting requirements, and notify the lead agency that the lighting has been completed and is ready for inspection.
Mitigation Measure 3.1-4 would reduce aesthetic impacts because project design features, such as lighting and building surface types, would be selected to reduce light and glare effects. However, adoption and implementation of these mitigation measures are beyond the authority of CalRecycle and LEAs. The authority to review site-specific, project-level impacts and require project-level mitigation lies primarily with local land use and/or permitting agencies for individual projects. Consequently, although it is reasonable to expect that impacts would be reduced to a less-than-significant level by land use and/or permitting agency conditions of approval, the degree to which another agency would require mitigation is uncertain. Therefore, CalRecycle takes a conservative approach in its post-mitigation significance conclusion and finds that long-term operational glare and nighttime lighting impacts resulting from the development of new or modified facilities associated with the Proposed Regulations could be potentially significant and unavoidable.
Agriculture and Forestry Resources
Finding and Explanation
Impact 3.2-1: Conversion of Farmland to Nonagricultural Use or Conflict with a Williamson Act Contract or Zoning for Agricultural Use
Construction and operation of new or modified organic waste recovery facilities could result in significant temporary, long-term, or permanent conversion of Prime Farmland, Farmland of Statewide Importance, and Unique Farmland and conflicts with Williamson Act contracts and agricultural zoning. However, the specific locations and scale of possible future facilities are not known. Therefore, the precise scale of conversion of farmland and conflicts with zoning or Williamson Act contracts cannot be determined at this time. Because there could be substantial conversion of farmland and conflicts with agricultural zoning and Williamson Act contracts, this impact would be potentially significant.
The EIR includes Mitigation Measure 3.2-1: Implement Agricultural Resource Protection Measures during Construction and Operation of New or Modified Facilities Built in Response to the Proposed Regulations. As described in Section 1.2 of the EIR the authority of CalRecycle and LEAs is statutorily limited. They do not have authority to require implementation of mitigation measures that would reduce potentially significant impacts related to the location of specific facilities, including those on agricultural lands. Mitigation measures to reduce impacts on agricultural lands can and should be implemented by local jurisdictions with land use authority. Site-specific, project impacts and mitigation would be identified during a project’s local review process. A proposed project would be approved by a local government and potentially another permitting agency that can apply conditions of approval. Therefore, CalRecycle finds that mitigation measures to avoid or minimize impacts on agricultural resources can and should be implemented by local jurisdictions with land use authority.
8 The following mitigation measures can and should be required by agencies with project approval authority to avoid or minimize impacts on agricultural resources:
• Proponents of new facilities constructed as a result of reasonably foreseeable compliance responses would coordinate with local or State land use agencies to seek entitlements for development. This process would involve the completion of all necessary environmental review requirements (e.g., CEQA). The local or State land use agency or governing body must comply with all applicable regulations as part of approval of a development project.
• Project proponents would implement all feasible mitigation identified during the environmental review to reduce or substantially lessen the potentially significant environmental impacts of the project. Examples of types of mitigation to protect Farmland include:
Designing proposed projects to minimize, to the greatest extent feasible, the loss of the highest value Farmland; or
For projects that will result in permanent conversion of Farmland, preserve in perpetuity other Farmland through acquisition of an agricultural conservation easement, or contributing funds to a land trust or other entity qualified to preserve Farmland in perpetuity (at a target ratio of 1:1, depending on the nature of the conversion and the characteristics of the Farmland to be converted, to compensate for permanent loss).
• Any mitigation specifically required for a new or modified facility would be determined by the local lead agency, and future environmental documents by local and State lead agencies should include analysis of:
Avoidance of lands designated as Important Farmland as defined by the FMMP, and
The feasibility of using farmland that is not designated as Important Farmland before deciding on the conversion of Important Farmland.
• The feasibility, proximity, and value of the proposed project sites should be balanced before a decision is made to locate a facility on land designated as Important Farmland.
• Any action resulting in the conversion of Important Farmland should consider mitigation for the loss of such farmland. Any such mitigation should be completed before a grading or building permit is issued by providing the permitting agency with written evidence that the mitigation has been implemented. Mitigation may include but would not be limited to:
Permanent preservation of off-site Important Farmland (State-defined Prime Farmland, Farmland of Statewide Importance, and Unique Farmland) of equal or better agricultural quality, at a ratio of at least 1:1 (preservation may include the purchase of agricultural conservation easement[s], purchase of credits from 9 an established agricultural farmland mitigation bank, and contribution of agricultural land or equivalent funding to an organization that provides for the preservation of farmland toward the ultimate purchase of an agricultural conservation easement), and
Participation in any agricultural land mitigation program, including programs maintained by local governments that provide equal or more effective mitigation than the measures listed.
Mitigation Measure 3.2-1 would reduce potentially significant impacts to agricultural resources because plans would be incorporated into project design to minimize conversion of Farmland to other uses and compensation would be sought for permanent loss of Farmland.
However, adoption and implementation of these mitigation measures are beyond the authority of CalRecycle and LEAs. The authority to review site-specific, project-level impacts and require project-level mitigation lies primarily with local land use and/or permitting agencies for individual projects. Consequently, although it is reasonable to expect that impacts would be reduced to a less-than-significant level by land use and/or permitting agency conditions of approval, the degree to which another agency would require mitigation is uncertain. Therefore, CalRecycle takes a conservative approach in its post-mitigation significance conclusion and finds that agricultural and forest resources impacts associated with the Proposed Regulations could be potentially significant and unavoidable.
Impact 3.2-2: Conflict with Existing Zoning for Forestland, Timberland, or Timberland Zoned Timberland Production or Loss of Forestland from Conversion to Nonforest Use
Construction and operation of new or modified organic waste recovery facilities could result in significant temporary or permanent conversion of forestland or timberland and could conflict with zoning for forestland, timberland, or lands zoned as TPZ. The specific locations and scale of possible future facilities are not currently known; thus, the precise scale of conversion of forestland or timberland and conflicts with zoning cannot be determined at this time. Because there could be substantial conversion of forestland and timberland and conflicts with TPZ zoning, this impact would be potentially significant.
The EIR includes Mitigation Measure 3.2-2: Implement Forest Resource Protection Measures during Construction and Operation of New or Modified Facilities Built in Response to the Proposed Regulations. As described in Section 1.2 of the EIR, the authority of CalRecycle and LEAs is statutorily limited. They do not have authority to require implementation of mitigation measures that would reduce potentially significant impacts related to the location of specific facilities, including those on forestland or timberland. Mitigation measures to reduce impacts on forestland and timberland can and should be implemented by local jurisdictions with land use authority. Site-specific, project impacts and mitigation would be identified during a project’s local review process. A proposed project would be approved by a local government and potentially another permitting agency that can apply conditions of approval.
Therefore CalRecycle finds that mitigation measures to avoid or minimize impacts on temporary or permanent conversion of forestland or timberland and could conflict with zoning for forestland, timberland, or lands zoned as TPZ can and should be implemented by local jurisdictions with land use authority.
10 The following mitigation measures can and should be required by agencies with project approval authority to avoid or minimize impacts on forestland and timberland:
• Proponents of new facilities constructed as a result of reasonably foreseeable compliance responses would coordinate with local or State land use agencies to seek entitlements for development. This process would involve the completion of all necessary environmental review requirements (e.g., CEQA). The local or State land use agency or governing body must comply with all applicable regulations as part of approval of a development project.
• Project proponents would implement all feasible mitigation identified during the environmental review to reduce or substantially lessen the potentially significant environmental impacts of the project. Examples of types of mitigation to protect Farmland include:
Avoid land protected as forestland and timberland through site selection or project design. Where feasible, project proponents should take into account the value of the forest, not only in terms of direct products, such as wood, but also as part of the watershed ecosystem, when selecting a project site. Wherever possible, nonprotected sites should be preferred and selected instead of protected sites; and
F or projects that would result in permanent conversion of forestland, other forestland would be preserved in perpetuity through a conservation easement or by acquiring lands or contributing funds to a land trust or other agency (at a target ratio of 1:1, depending on the nature of the conversion and the characteristics of the forestland to be converted, to compensate for permanent loss).
Mitigation Measure 3.2-2 would reduce potentially significant impacts to forest resources because plans would be incorporated into project design to minimize adverse effects on forest land and compensation for permanent conversion would be acquired. However, adoption and implementation of these mitigation measures are beyond the authority of CalRecycle and LEAs. The authority to review site-specific, project-level impacts and require project-level mitigation lies primarily with local land use and/or permitting agencies for individual projects. Consequently, although it is reasonable to expect that impacts would be reduced to a less-than-significant level by land use and/or permitting agency conditions of approval, the degree to which another agency would require mitigation is uncertain.
Therefore, CalRecycle takes a conservative approach in its post-mitigation significance conclusion and finds that forestland and timberland impacts associated with the Proposed Regulations could be potentially significant and unavoidable.
Impact 3.2-3: Changes in the Existing Environment That, Because of Their Location or Nature, Indirectly Result in Conversion of Farmland to Nonagricultural Use or Conversion of Forestland to Nonforest Use
Construction of new or modified organic waste facilities built in response to the Proposed Regulations could result in activities that adversely affect the viability of surrounding agricultural or forest uses. Construction activities could therefore indirectly convert Farmland 11 to nonagricultural use or forestland to nonforest use. The specific locations and scale of possible future facilities are not known; thus, the precise extent and nature of indirect conversion of forestland and Farmland from construction activities cannot be identified at this time. Because there could be substantial indirect conversion of Farmland and forestland from implementation of the Proposed Regulations, this impact would be potentially significant.
The EIR includes Mitigation Measure 3.2-3: Implement Agricultural and Forest Resource Protection Measures during Construction and Operation of New or Modified Facilities Built in Response to the Proposed Regulations. As described in the EIR, the authority of CalRecycle and LEAs is statutorily limited. They do not have authority to require implementation of mitigation measures that would reduce potentially significant impacts related to the location of specific facilities, including those on agricultural and forest lands. Therefore, CalRecycle finds that mitigation measures to reduce impacts on agricultural and forest resources can and should be implemented by local jurisdictions with land use authority. Site-specific, project impacts and mitigation would be identified during a project’s local review process. A proposed project would be approved by a local government and potentially another permitting agency that can apply conditions of approval.
The following mitigation measures can and should be required by agencies with project approval authority to avoid or minimize impacts on agricultural and forest resources:
• Proponents of new facilities constructed as a result of reasonably foreseeable compliance response would coordinate with local or State land use agencies to seek entitlements for development. This process would involve the completion of all necessary environmental review requirements (e.g., CEQA). The local or State land use agency or governing body must comply with all applicable regulations as part of approval of a development project.
• Project proponents would implement all feasible mitigation identified during the environmental review to reduce or substantially lessen the potentially significant environmental impacts of the project. Examples of types of mitigation to protect Farmland and forest resources include:
Designing proposed projects to minimize, to the greatest extent feasible, the loss of the highest value Farmland;
For projects that will result in permanent conversion of Farmland, preserve in perpetuity other Farmland through acquisition of an agricultural conservation easement, or contributing funds to a land trust or other entity qualified to preserve Farmland in perpetuity (at a target ratio of 1:1, depending on the nature of the conversion and the characteristics of the Farmland to be converted, to compensate for permanent loss);
Avoid land protected as forestland and timberland through site selection or project design. Where feasible, project proponents should take into account the value of the forest, not only in terms of direct products, such as wood, but also as part of the watershed ecosystem, when selecting a project site. Wherever possible, nonprotected sites should be preferred and selected instead of protected sites; and
12 For projects that would result in permanent conversion of forestland, other forestland would be preserved in perpetuity through a conservation easement or by acquiring lands or contributing funds to a land trust or other agency (at a target ratio of 1:1, depending on the nature of the conversion and the characteristics of the forestland to be converted, to compensate for permanent loss).
• Project proponents would comply with local plans, policies, ordinances, rules, and regulations regarding air quality–related emissions and associated exposure (e.g., construction-related fugitive particulate matter [PM] dust regulations, indirect source review, and payment into off-site mitigation funds).
• For projects located in PM nonattainment areas, project proponents shall prepare and comply with a dust abatement plan that addresses emissions of fugitive dust during construction and operation of the project.
• An invasive species management plan would be developed and implemented for any project the construction or operation of which could lead to the introduction or facilitation of invasive species establishment. The plan would ensure that invasive plant species and populations are kept below preconstruction abundance and distribution levels.
Mitigation Measure 3.2-3 would reduce potentially significant impacts to agricultural and forest resources because plans would be incorporated into project design to minimize adverse effects on Farmland and forest land. However, adoption and implementation of these mitigation measures are beyond the authority of CalRecycle and LEAs.
The authority to review site-specific, project-level impacts and require project-level mitigation lies primarily with local land use and/or permitting agencies for individual projects.
Consequently, although it is reasonable to expect that impacts would be reduced to a less- than-significant level by land use and/or permitting agency conditions of approval, the degree to which another agency would require mitigation is uncertain. Therefore, CalRecycle takes a conservative approach in its post-mitigation significance conclusion and finds that agricultural and forest resources impacts associated with the Proposed Regulations could be potentially significant and unavoidable.
Air Quality
Finding and Explanation
Impact 3.3-1: Short-Term Construction-Related Emissions of ROG, NOX, PM10, and PM2.5
Construction of organic waste recovery facilities under the Proposed Regulations would result in ground-disturbing activities and require use of heavy-duty equipment. These activities would generate emissions of ROG, NOX, PM10, and PM2.5¬ that could exceed local air districts’ thresholds of significance. Construction-generated emissions of criteria air pollutants and precursors would be potentially significant.
13 The EIR includes Mitigation Measure 3.3-1: Implement All Feasible On- and Off-Site Mitigation Measures to Reduce Construction-Generated Air Pollutants to Below a Lead Agency–Approved Threshold of Significance. As described in the EIR, the authority of CalRecycle and LEAs is statutorily limited. They do not have authority to include permit conditions regulating air quality. Lead agencies would evaluate a project’s construction emissions against the applicable threshold of significance developed by a lead agency and/or air district. In cases where these thresholds are exceeded, mitigation measures to reduce construction-generated air pollutants can and should be implemented by local jurisdiction with permitting authority. Site-specific, project impacts and mitigation measures would be identified during a project’s local review process. A proposed project would be approved by a local government and/or the applicable air district as conditions of approval. Therefore, CalRecycle finds that mitigation measures to mimimize or avoid short-term construction- related emissions impacts can and should be implemented by local jurisdictions with land use authority and local air districts.
The following mitigation measures can and should be required by agencies with project approval authority to avoid or minimize impacts on construction-generated air pollutants:
• Project proponents shall apply for, secure, and comply with all appropriate air quality permits for project construction from the local agencies with air quality jurisdiction and from other applicable agencies, if appropriate, prior to construction mobilization.
• Project proponents shall comply with the CAA and the CAAA (e.g., New Source Review and Best Available Control Technology criteria, if applicable).
• Project proponents shall comply with local plans, policies, ordinances, rules, and regulations regarding air quality–related emissions and associated exposure (e.g., construction-related fugitive PM dust regulations, indirect source review, and payment into off-site mitigation funds).
• For projects located in PM nonattainment areas, project proponents shall prepare and comply with a dust abatement plan that addresses emissions of fugitive dust during construction of the project.
• Project proponents shall apply EPA Tier 3 or 4 emissions standards for projects found to generate exhaust NOX emissions in exceedance of an applicable threshold of significance.
• Project proponents shall use all feasible biodiesel-, combined natural gas–, and electricity-powered heavy-duty equipment for projects that generate emissions in exceedance of an applicable threshold.
• Project proponents shall implement idling and speed restrictions on project sites.
Mitigation Measure 3.3-1 would reduce construction-related air emission because requirements would be placed on fuels, equipment, and other construction-related activities during development or renovation of individual facilities. However, adoption and implementation of these mitigation measures are beyond the authority of CalRecycle and LEAs. The authority to review site-specific, project-level impacts and require project-level mitigation lies primarily with local land use and/or permitting agencies for individual projects. 14 Consequently, although it is reasonable to expect that impacts would be reduced to a less- than-significant level by land use and/or permitting agency conditions of approval, the degree to which another agency would require mitigation is uncertain. Therefore, CalRecycle takes a conservative approach in its post-mitigation significance conclusion and finds that construction-related air emissions could be potentially significant and unavoidable.
Impact 3.3-2: Long-Term Operational Emissions of ROG, NOX, PM10, and PM2.5
Operation of organic waste recovery facilities under the Proposed Regulations would result in reductions of ROG, NOX, PM10, and PM2.5 associated with the diversion of organic materials from landfills to facilities with the capacity to implement strategies to reduce such emissions. However, AD and composting facilities, and other organic waste recovery facilities, would also generate air pollution from the on- and off-road mobile sector. On-road vehicles (e.g., refuse and other collection trucks, commute-related automobiles) accessing organic waste recovery facilities would generate emissions of criteria air pollutants and precursors. New emissions could occur at AD and composting facilities either from diesel engine grinders, flaring of biogas or both, which could contribute to an exceedance of an air quality standard. These emissions could surpass the applicable thresholds of significance of a local air district and lead to adverse health impacts related to exposure of criteria air pollutants. Therefore, operation-related air quality impacts would be potentially significant.
The EIR includes Mitigation Measure 3.3-2: Implement All Feasible On- and Off-Site Mitigation Measures to Reduce Operation-Related Air Pollutants to Below a Lead Agency– Approved Threshold of Significance. As described in the EIR, the authority of CalRecycle and LEAs is statutorily limited. They do not have authority to include permit conditions regulating air quality. Lead agencies would evaluate a project’s operational emissions against the applicable threshold of significance developed by a lead agency and/or air district. In cases where these thresholds are exceeded, CalRecycle finds that mitigation measures to reduce operation-related air pollutants can and should be implemented by local jurisdictions with permitting authority and applicable air districts. Site-specific, project impacts and mitigation measures would be identified during a project’s local review process. A proposed project would be approved by a local government and/or the applicable air district as conditions of approval.
The following mitigation measures can and should be required by agencies with project approval authority to avoid or minimize impacts on operation-related air pollutants:
• Project proponents shall comply with the CAA and CAAA (e.g., New Source Review and Best Available Control Technology criteria, if applicable).
• Project proponents shall comply with local plans, policies, ordinances, rules, and regulations regarding air quality–related emissions and associated exposure (e.g., indirect source review, vehicle idling limitations, and payment into off-site mitigation funds).
• Project applicants shall establish a requirement pertaining to the use of biogas for electricity and facility-related vehicles.
15 • Project applicants shall establish a maximum rate at which flaring may occur at a facility.
• Project applicants whose projects would generate criteria pollutants and ozone precursors in exceedance of an applicable threshold shall conduct air dispersion modeling if feasible.
• Project applicants whose projects would introduce substantial transportation emissions to an air basin or county in nonattainment for any of the NAAQS or CAAQS shall: