CEQA EIR Addendum
Parkway Drive Realignment Project
December 2023
Prepared for:
City of Fresno
Andrew Benelli, PE, Assistant Public Works Director
Public Works Department
2600 Fresno Street, Room 4064
Fresno, California 93721
Prepared by:
450 Lincoln Avenue, Suite 103
Salinas, California 93901
This page intentionally left blank.
CEQA EIR Addendum i December 2023
Parkway Drive Realignment Project
Table of Contents
Section 1 Introduction ............................................................................................................ 1
1.1 Project Overview ............................................................................................. 1
1.2 Project Background of Previously Certified EIR .............................................. 1
1.3 Project Description .......................................................................................... 1
1.4 Purpose of this Addendum and Basis for Decision to Prepare Addendum ..... 5 Section 2 Determination ....................................................................................................... 11 Section 3 Environmental Checklist ..................................................................................... 13
3.1 Aesthetics ...................................................................................................... 13
3.2 Agricultural and Forest Resources ................................................................ 15
3.3 Air Quality ...................................................................................................... 18
3.4 Biological Resources ..................................................................................... 22
3.5 Cultural Resources ........................................................................................ 26
3.6 Energy ........................................................................................................... 28
3.7 Geology and Soils ......................................................................................... 29
3.8 Greenhouse Gas Emissions .......................................................................... 34
3.9 Hazards and Hazardous Materials ................................................................ 35
3.10 Hydrology and Water Quality ......................................................................... 39
3.11 Land Use and Planning ................................................................................. 44
3.12 Mineral Resources ......................................................................................... 46
3.13 Noise ............................................................................................................. 47
3.14 Population and Housing ................................................................................ 50
3.15 Public Services .............................................................................................. 52
3.16 Recreation ..................................................................................................... 54
3.17 Transportation ............................................................................................... 55
3.18 Tribal Cultural Resources .............................................................................. 57
3.19 Utilities and Service Systems ........................................................................ 59
3.20 Wildfire ........................................................................................................... 62
3.21 Mandatory Findings of Significance ............................................................... 64 Section 4 References and List of Preparers ....................................................................... 67
4.1 References .................................................................................................... 67
4.2 List of Preparers ............................................................................................ 67 Figures
Figure 1. Regional Location .......................................................................................................... 7 Figure 2. Project Site .................................................................................................................... 9
CEQA EIR Addendum ii December 2023
Parkway Drive Realignment Project
This page intentionally left blank.
CEQA EIR Addendum iii December 2023
Parkway Drive Realignment Project
Acronyms and Abbreviations
2023 EIR South Fresno State Route 99 Corridor Project Final Environmental Impact Report/Environmental Assessment
BMP best management practice
Caltrans California Department of Transportation
CEQA California Environmental Quality Act
City City of Fresno
County Fresno County
EIR Environmental Impact Report
FMFCD Fresno Metropolitan Flood Control District
GHG greenhouse gas
NPDES National Pollutant Discharge Elimination System
PM2.5 fine particulate matter measuring no more than 2.5 microns in diameter
PM10 particulate matter less than 10 microns in diameter project Parkway Drive Realignment Project
CEQA EIR Addendum iv December 2023
Parkway Drive Realignment Project
This page intentionally left blank.
CEQA EIR Addendum 1 December 2023
Parkway Drive Realignment Project
Section 1 Introduction
1.1 Project Overview
As the lead agency, the City of Fresno (City) is preparing an Addendum to the 2023 South Fresno State Route 99 Corridor Project Final Environmental Impact Report/Environmental Assessment (State Clearinghouse No. 2019039121) (2023 EIR) in compliance with the California Environmental Quality Act (CEQA) to address the realignment of Parkway Drive (project), located south of the North Avenue/State Route 99 interchange in the City of Fresno, Fresno County, California (Figure 1, Regional Location).
1.2 Project Background of Previously Certified EIR
In January 2023, the California Department of Transportation (Caltrans) certified the 2023 EIR for the improvement of two existing interchanges on State Route 99—at American Avenue and North Avenue—in the southern portion of the City and Fresno County (County) in California . The proposed project included the replacement of three existing interchanges with three new interchanges on State Route 99 in the County between Post Mile 12.5 and Post Mile 19.1. All three locations would include reconstructing and widening the overcrossings to accommodate additional lanes, constructing and/or reconstructing the on - and off-ramps, constructing auxiliary lanes on State Route 99, and reconfiguring adjacent local roads and intersections.
This Addendum is being prepared to address the realignment of Parkway Drive south of the North Avenue/State Route 99 interchange. The proposed project is located at the southern end of the City of Fresno in Fresno County, which is situated in the center of the San Joaquin Valley (Figure 1).
The project site is located near an area that is dominated by light and heavy industrial uses.
1.3 Project Description
1.3.1 Project Features
The City proposes to realign the existing Parkway Drive to accommodate the improvements to the State Route 99 interchange at North Avenue (Figure 2, Project Site). The realigned Parkway Drive would be approximately 1,350 feet long and would be constructed to the Fresno Standard Plan P-54 with a 72 -foot right -of-way. The roadway would include an 11-foot travel lane in each direction, a 12-foot continuous left-turn lane, and 7-foot bike lanes in each direction. The realigned roadway would not include sidewalks, streetlights, or landscaping. In accordance with the Fresno Standard Plan P-54, no parking would be allowed. Curb and gutter would not be installed with the project but would be installed at a later date when adjacent properties are developed. As part of the realignment, an existing City water main would need to be relocated. Drainage inlets and a short pipeline would be installed to direct all stormwater to the existing the Fresno Metropolitan
CEQA EIR Addendum 2 December 2023
Parkway Drive Realignment Project
Flood Control District (FMFCD) Basin AW1. The existing Parkway Drive would be demolished and replaced with Caltrans Basin 1 per the 2023 EIR.
1.3.2 Construction Activities and Best Management Practices Construction would take approximately 24 months to complete, and activities would include excavation, grading, and paving. Construction is anticipated to occur between the hours identified in the City’s Noise Ordinance, Monday through Friday between 7:00 a.m. and 7:00 p.m., as permitted by the City’s Municipal Code, Section 10-109, and consistent with the City’s Noise Ordinance, and not during evening or more noise-sensitive time periods.
The following best management practices (BMPs) shall be implemented by the state and/or their construction contractor. Additionally, a Construction Traffic Management Pl an would be implemented for safety and to ensure access by emergency service providers.
Air Quality
• Water or dust palliative shall be applied to the site and equipment as often as necessary to control fugitive dust emissions. Fugitive emissions generally must meet a “no visible dust” criterion either at the point of emissions or at the right-of-way line, depending on local regulations.
• Soil binder shall be spread on any unpaved roads used for construction purposes and on all project construction parking areas.
• Construction equipment and vehicles shall be properly tuned and maintained. All construction equipment shall use low -sulfur fuel as required by California Code of Regulations, Title 17, Section 93114.
• A Dust Control Plan shall be developed documenting sprinkling, temporary paving, speed limits, and timely revegetation of disturbed slopes as needed to minimize construction impacts to existing communities.
• Trackout reduction measures, such as gravel pads at project access points to minimize dust and mud deposits on roads affected by construction traffic, shall be used. • All transported loads of soils and wet materials shall be covered before transport, or adequate freeboard (space from the top of the material to the top of the truck) shall be provided to minimize the emission of dust (particulate matter) during transportation. • Dust and mud that are deposited on paved, public roads due to construction activity and traffic shall be promptly and regularly removed to decrease particulate matter emissions. • To the extent feasible, construction traffic shall be scheduled and routed to reduce congestion and related air quality impacts caused by idling vehicles along local roads during peak travel times.
• Mulch shall be placed, or vegetation shall be planted as soon as practical after grading to reduce windblown particulate matter in the area.
CEQA EIR Addendum 3 December 2023
Parkway Drive Realignment Project
• Idling shall be limited to 5 minutes for delivery and dump trucks and other diesel - powered equipment during construction.
• Construction equipment and vehicles shall be properly tuned and maintained. All construction equipment shall use low sulfur fuel as required by California Code of Regulations, Title 17, Section 93114.
• A Construction Traffic Management Pla n shall be prepared and implemented .
Construction traffic shall be scheduled and routed to reduce congestion and related air quality impacts caused by idling vehicles along local roads during peak travel times.
Biological Resources
Migratory Birds
• A pre-construction survey for migratory birds within the study area shall be conducted 30 days before the start of construction.
• If migratory birds are found to be nesting within the project area, a no-work buffer zone (300 feet) may be established around an active nest and/or a qualified biologist shall monitor an active nest during construction activities within the established buffer. • Work may be temporarily suspended if nesting activity cannot be prevented. • If removal of nest trees was deemed necessary, removal shall occur during the time of year when the nests are not used (between October 1 and January 30).
Swainson’s Hawk
• Prior to construction, pre -construction surveys shall be conducted according to the Recommended Timing and Methodology for Swainson’s Hawk Nesting Surveys in California’s Central Valley (Swainson’s Hawk Technical Advisory Commission 2000). • Surveys shall be conducted no less than 30 days prior to construction. • If an active Swainson’s hawk nest is detected, minimization efforts shall be coordinated with the California Department of Fish and Wildlife and may include a no-work buffer zone (600 feet) around an active nest , and/or a qualified biologist shall monitor an active nest during construction activities within the established buffer. • If the 600-foot no-work buffer zone cannot be maintained, an Incidental Take Permit may be required by the California Department of Fish and Wildlife.
Hazards and Hazardous Materials
• Residual organochlorine pesticides (and associated elevated arsenic concentrations) may be present in shallow soil within the project study area due to historical non-regulated agricultural operations. The pesticide and arsenic levels on properties that were for agricultural use are not anticipated to exceed regulatory health -based screening thresholds for commercial/industrial land use but shall be tested.
CEQA EIR Addendum 4 December 2023
Parkway Drive Realignment Project
• Appropriate standard specifications and plans addressing all hazardous waste concerns shall be included into the construction package to ensure all regulatory requirements are met for proper handling and disposal of materials/wastes.
Noise
• All equipment shall have sound -control devices no less effective than those provided on the original equipment. Each internal combustion engine used for any purpose on the job or related to the job shall be equipped with a muffler of a type recommended by the manufacturer. No internal combustion engine shall be operated on the job site without an appropriate muffler.
• Construction methods or equipment that would provide the lowest level of noise impact (for example, avoid impact pile driving near residences and consider alternative methods that are also suitable for the soil condition) shall be used. • Idling equipment shall be turned off.
• Truck loading, unloading, and hauling operations shall be restricted so that noise and vibration are kept to a minimum through residential neighborhoods to the greatest possible extent.
Paleontological Resources
• The Paleontological Mitigation Plan shall be prepared by a paleontological subconsultant. • All project personnel shall receive training by a qualified paleontologist before the start of work.
• Recovered fossils shall be prepared to the point of identification and placed in an approved paleontological repository.
• All open excavations more than 5 feet deep in native sediments of the Modesto Formation shall be monitored full time by a qualified paleontologist. • All construction/project personnel must complete a construction safety orientation. A procedure for interfacing paleontological and construction personnel shall need to be developed in consultation with the resident engineer.
• A pre-construction paleontological sensitivity training for earthmoving personnel shall be conducted, and documentation of training (sign-in sheets, hardhat stickers) shall be kept with project records (filed on site and in the Department Task Order Manager’s office). • The professional paleontologist shall designate a paleontological monitor to be present during qualifying earthmoving activities, as previously defined.
CEQA EIR Addendum 5 December 2023
Parkway Drive Realignment Project
1.4 Purpose of this Addendum and Basis for Decision to
Prepare Addendum
The purpose of this Addendum and analysis herein is to demonstrate that the project represents a minor modification to the 2023 EIR project, and therefore, an Addendum to the 20 23 EIR is the appropriate documentation pursuant to CEQA Guidelines, Sections 15162 and 15164.
CEQA Guidelines, Section 15164(a), states that a lead agency shall prepare an Addendum to a previously certified EIR if some changes or additions are necessary , but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred.
CEQA Guidelines, Section 15162 (a)(1), states that a subsequent EIR shall be prepared if substantial changes are proposed in the project that will require major revisions of the previous EIR due to the involvement of new significant effects or a substantial increase in the severity of previously identified significant effects.
This Addendum is intended to inform the City’s consideration and action on the project by demonstrating that the project would not result in any new significant or substantially more severe impacts than were identified in the 2023 EIR. The City’s approval of this Addendum requires concurrence by the City Council that all procedures required by the City were followed. Pursuant to CEQA Guidelines, Section 15164(c), this Addendum need not be circulated for public review.
The Addendum is only required to address those environmental topics addressed in the original 2023 EIR. This precedent has been set in two appellate court decisions upholding the preparation of an Addendum for a previously certified EIR : Concerned Dublin Citizens V. City of Dublin, 214 Cal.App.4th 1301 (2013), and Citizens for Responsible Equitable Environmental Development V.
City of San Diego, 196 Cal.App.4th 515 (2011). In both cases , the lead agency prepared an Addendum to a previously certified EIR. These appellate court decisions indicate that the issues discussed in an Addendum are limited to those addressed in the original EIR. They also indicate that “changed circumstances” means physical changes, not legal changes. Based on this approach, only the topics originally addressed in the certified EIR are required to be addressed in the Addendum.
Thus, any CEQA topics that have been added or modified since 2023 are not required to be addressed. This Addendum addresses all the topics addressed in the 2023 EIR. The 2023 EIR and all the technical reports and references therein are hereby incorporated by reference (Caltrans 2023).
The following environmental resources, if checked below, would be potentially affected by this project and would involve at least one significant impact that substantially exceeds or is otherwise outside the scope of activities evaluated for potential envi ronmental effects of the larger project (South Fresno State Route 99 Corridor Project ) evaluated in the 2023 EIR. If “None” is checked below, this project is deemed entirely consistent with and covered by the environmental analysis contained in the 2023 EIR.
CEQA EIR Addendum 6 December 2023
Parkway Drive Realignment Project
☐ Agricultural Resources ☐ Air Quality ☐ Biological Resources ☐ Cultural Resources ☐ Geology/Soils ☐ Global Climate Change ☐ Hazards/Hazardous
Materials
☐ Hydrology/Water Quality ☐ Land Use and Planning
☐ Noise and Vibration ☐ Public Services and
Recreation
☐ Transportation and
Circulation
☐ Utilities ☒ None
Date: 11/27/2023 - Last saved by: Matthew.Dornbach - Path: C:\GIS\Projects\City of Fresno\ParkwayDrive\Map Docs\Figure1_RegionalLocation.aprx Corcoran
Lemoore
Station
Lemoore
Hanford
Woodville
Tulare
Visalia
Riverdale
Selma
Reedley
Sanger
Squaw
Valley
Clovis
Fresno
Auberry
Madera
Madera
Acres
ÄÆ43
ÄÆ41
ÄÆ63
ÄÆ145
ÄÆ152
ÄÆ99
ÄÆ198
ÄÆ99
ÄÆ99
ÄÆ180
ÄÆ180
ÄÆ33
ÄÆ216
ÄÆ233
ÄÆ41
ÄÆ63
ÄÆ33
ÄÆ269
ÄÆ201
ÄÆ269
ÄÆ198
ÄÆ137
ÄÆ198
ÄÆ180
ÄÆ43
ÄÆ41
ÄÆ168
F
r
e
s
n
o
C
o
u
n
t
y
Kings County
F r e s n o
C
o
u
n
t y
M
a d e r a C o u n t y
F
r
e
s
n
o
C
o
u
n
t y
Tulare County
K
in
g
s
C
o
u
n
t y
T
u
l a
r
e
C
o
u
n
t
y
§¨¦
5 Parkway Drive Realignment
Regional Location
Source: ESRI 2021.
±
0 105
Miles
Project Site
!(^
Incorporated Areas
Figure 1
CEQA EIR Addendum 8 December 2023
Parkway Drive Realignment Project
This page intentionally left blank.
Source: Microsoft Corporation, Maxar Imagery 2023, & CNES Distribution Airbus DS 2023.
C:\GIS\Projects\City of San Diego\Midway Rising\Map Docs\NOP Feet
0 1000500 Figure 2
Project Site
Parkway Drive Realignment
N
CEQA EIR Addendum 10 December 2023
Parkway Drive Realignment Project
This page intentionally left blank.
CEQA EIR Addendum 11 December 2023
Parkway Drive Realignment Project
Section 2 Determination
On the basis of this initial evaluation:
☒ I find that the proposed project WOULD NOT have any significant effects on the environment that either have not already been analyzed in the prior 2023 EIR or that are more significant than previously analyzed. Pursuant to CEQA Guidelines , Section 15168(c), CEQA does not apply to such effects. A Notice of Determination (Section 15094) will be filed.
☐ I find that the proposed project will have effects that have not been analyzed in the prior 2023 EIR. With respect to those effects that are subject to CEQA, I find that such effects WOULD NOT be significant, and a NEGATIVE DECLARATION will be prepared. ☐ I find that the proposed project will have effects that either have not been analyzed in the prior 2023 EIR or are more significant than described in the prior 2023 EIR. I find that although those effects could be significant, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent.
A MITIGATED NEGATIVE DECLARATION will be prepared.
☐ I find that the proposed project would have effects that either have not been analyzed in a prior 2023 EIR or are more significant than described in the prior 2023 EIR. I find that those effects WOULD be significant, and an ENVIRONMENTAL IMPACT REPORT is required to analyze those effects that are subject to CEQA.
Lead Agency Representative, Title Date
City of Fresno
CEQA EIR Addendum 12 December 2023
Parkway Drive Realignment Project
This page intentionally left blank.
CEQA EIR Addendum 13 December 2023
Parkway Drive Realignment Project
Section 3 Environmental Checklist
3.1 Aesthetics
Except as provided in Public
Resources Code Section 21099, would
the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Have a substantial adverse effect on
a scenic vista?
NI No No No None
b. Substantially damage scenic
resources, including, but not
limited to, trees, rock
outcroppings, and historic
buildings within a state scenic
highway?
NI No No No None
c. In non-urbanized areas,
substantially degrade the existing
visual character or quality of
public views of the site and its
surroundings? (Public views are
those that are experienced from a
publicly accessible vantage
point.) If the project is in an
urbanized area, would the project
conflict with applicable zoning and
other regulations governing
scenic quality?
NI No No No None
d. Create a new source of substantial
light or glare which would adversely
affect day or nighttime views in the
area?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) The 2023 EIR concluded that no scenic vistas are within the South Fresno State Route 99 Corridor Project area, and no impact would occur.
The proposed project would occur within the same location as previously analyzed in the 2023 EIR. Consistent with the 2023 EIR, the realignment of Parkway Drive would not result in a substantial effect on a scenic vista. No impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding scenic vistas. b) The 2023 EIR concluded that the S outh Fresno State Route 99 Corridor Project area is not located within a designated scenic highway and would not impact scenic resources. No impact would occur.
CEQA EIR Addendum 14 December 2023
Parkway Drive Realignment Project
The proposed project would occur within the same location as previously analyzed in the 2023 EIR. Consistent with the 2023 EIR, the realignment of Parkway Drive project area is not located within a designated scenic highway and would not result in impacts to scenic resources.
No impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding scenic resources. c) The 2023 EIR concludes that the South Fresno State Route 99 Corridor Project aligns with applicable zoning and regulations governing scenic quality. Replacement planting and aesthetic treatments would be coordinated with the Fresno 99 Beautification Master Plan and consistent with improvements constructed on State Route 99 north of the project area.
The proposed project would occur within the same location, which is in an urbanized area, as previously analyzed in the 2023 EIR. Consistent with the 2023 EIR, the realignment of Parkway Drive would not conflict with applicable zoning and regulations governing scenic quality. The project would be required to comply with the Fresno 99 Beautification Master Plan. Consistent with the 2023 EIR, the project would remove only those trees and shrubs required for the construction of the new roadway facilities.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding applicable zoning and other regulations governing scenic quality. d) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not result in new sources of light or glare.
The proposed project would occur within the same location as previously analyzed in the 2023 EIR. The project would not construct streetlights, and therefore, consistent with the 2023 EIR, the project would not result in any new sources of light or glare. If night construction is necessary, light spillage from portable sources would be minimized. At a minimum, the construction contractor would be required to minimize project -related light and glare to the maximum extent feasible, given safety considerations . Color-corrected halide lights could be used. Portable lights would be operated at the lowest allowable wattage and height and would be raised to a height no greater than 20 feet. All lights would be screened and directed downward toward work activities and away from the night sky, highway users , and highway neighbors to the maximum extent possible. The number of nighttime lights used would be minimized to the greatest extent possible. No impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding a new source of substantial light or glare.
In summary, the project would result in no impacts to aesthetics, and no mitigation would be required.
CEQA EIR Addendum 15 December 2023
Parkway Drive Realignment Project
3.2 Agricultural and Forest Resources
In determining whether impacts to
agricultural resources are significant
environmental effects, lead agencies
may refer to the California Agricultural
Land Evaluation and Site Assessment
Model (1997) prepared by the
California Dept. of Conservation as an
optional model to use in assessing
impacts on agriculture and farmland.
In determining whether impacts to
forest resources, including timberland,
are significant environmental effects,
lead agencies may refer to information
compiled by the California Department
of Forestry and Fire Protection
regarding the state’s inventory of
forest land, including the Forest and
Range Assessment Project and the
Forest Legacy Assessment project;
and forest carbon measurement
methodology provided in Forest
Protocols adopted by the California Air
Resources Board. Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Convert Prime Farmland, Unique
Farmland, or Farmland of Statewide
Importance (Farmland), as shown on
the maps prepared pursuant to the
Farmland Mapping and Monitoring
Program of the California Resources
Agency, to non-agricultural use?
NI No No No None
b. Conflict with existing zoning for
agricultural use, or a Williamson
Act contract?
NI No No No None
c. Conflict with existing zoning for,
or cause rezoning of, forest land
(as defined in Public Resources
Code section 12220(g)),
timberland (as defined by Public
Resources Code section 4526),
or timberland zoned Timberland
Production (as defined by
Government Code section
51104(g))?
NI No No No None
CEQA EIR Addendum 16 December 2023
Parkway Drive Realignment Project
In determining whether impacts to
agricultural resources are significant
environmental effects, lead agencies
may refer to the California Agricultural
Land Evaluation and Site Assessment
Model (1997) prepared by the
California Dept. of Conservation as an
optional model to use in assessing
impacts on agriculture and farmland.
In determining whether impacts to
forest resources, including timberland,
are significant environmental effects,
lead agencies may refer to information
compiled by the California Department
of Forestry and Fire Protection
regarding the state’s inventory of
forest land, including the Forest and
Range Assessment Project and the
Forest Legacy Assessment project;
and forest carbon measurement
methodology provided in Forest
Protocols adopted by the California Air
Resources Board. Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
d. Result in the loss of forest land or
conversion of forest land to non-
forest use?
NI No No No None
e. Involve other changes in the
existing environment which, due to
their location or nature, could result
in conversion of Farmland, to non-
agricultural use or conversion of
forest land to non-forest use?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project area is considered to be “committed to urban development” because the land converted would be narrow strips along the highway. In addition, according to the Farmland Protection Policy Act, as amended, the land is “not to be considered as farmland.” Therefore, no impact would occur, and no mitigation would be required.
The project is south of the North Avenue interchange with State Route 99 within the larger South Fresno State Route 99 Corridor Project area as analyzed in the 2023 EIR . Consistent with the 2023 EIR, the project would not co nvert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance to non-agricultural use, and no impacts would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding Prime Farmland, Unique Farmland, or Farmland of Statewide Importance.
CEQA EIR Addendum 17 December 2023
Parkway Drive Realignment Project
b, c, d, e) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project area is not under a Williamson Act contract and does not contain forest and timberland. The impacts were determined to be less than significant with no mitigation required. The 2023 EIR concluded that a sliver of land next to the existing American Avenue interchange would be converted from agriculture to transportation. However, the project would improve an existing transportation facility that currently serves the farming activity in the area and provides for the transportation of farming goods and services. No impact would occur. The project is south of the North Avenue interchange with State Route 99 within the larger South Fresno State Route 99 Corridor Project area as analyzed in the 2023 EIR. Consistent with the 2023 EIR, the project would not conflict with existing zoning for agricultural use or a Williamson Act contract. The project would not conflict with zoning for, or cause rezoning of, forest land or timberland and would not result in the loss or conversion of forest land to non-forest use. Furthermore, the project would not involve other changes in the existing environment that, due to their location or nature, could result in conversion of Farmland to non-agricultural use or conversion of forest land to non-forest use.
The project impact would be less than significant with no mitigation required.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding existing zoning for an agricultural use or a Williamson Act contract; existing zoning or rezoning of forest land, timberland, or timberland zoned Timberland Production; the loss of forest land or conversion of forest land to a non-forest use; or other changes that could result in the conversion of Farmland to non-agricultural use or conversion of forest land to non-forest use.
In summary, the project would result in no impacts to agricultural resources, and no mitigation would be required.
CEQA EIR Addendum 18 December 2023
Parkway Drive Realignment Project
3.3 Air Quality
Where available, the significance
criteria established by the
applicable air quality management
district or air pollution control
district may be relied upon to make
the following determinations.
Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Conflict with or obstruct
implementation of the applicable
air quality plan
SU No No No None
b. Result in a cumulatively
considerable net increase of any
criteria pollutant for which the
project region is non-attainment
under an applicable federal or
state ambient air quality
standard?
LTS No No No None
c. Expose sensitive receptors to
substantial pollutant
concentrations?
LTS No No No None
d. Result in other emissions (such
as those leading to odors)
adversely affecting a substantial
number of people?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) The 2 023 EIR determined that the South Fresno State Route 99 Corridor Project would increase carbon dioxide emissions, a greenhouse gas (GHG), and, therefore, would conflict with current air quality plans that require reduction of GHG emissions. The 2023 EIR included design features and measures to reduce GHG emissions such as Complete Streets elements with landscaping; bicycle and pedestrian facilities to encourage active transportation over use of gasoline-powered vehicles; the installation of Intelligent Transportation System elements designed to improve traffic efficiency and reduce congestion on roadways , thereby lowering vehicle emissions; construction of roundabouts; and installation of electric charging stations.
However, the 2023 EIR concluded that Caltrans currently does not have established regulatory, industry-wide methods to accurately measure whether the project features and measures would reduce emissions enough to mitigate the project impacts , and thus, impacts would remain significant and unavoidable.
The project is south of the North Avenue interchange with State Route 99 within the larger South Fresno State Route 99 Corridor Project area as analyzed in the 2023 EIR. Consistent with the
CEQA EIR Addendum 19 December 2023
Parkway Drive Realignment Project
2023 EIR, the project would result in the increase in carbon dioxide emissions and would conflict with current air quality plans, and impacts would remain significant and unavoidable.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding conflicting or obstructing the implementation of an air quality plan.
b) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project improves the operations of an existing interchange along with local intersections and would not result in a cumulatively considerable net increase of ozone, particulate matter less than 10 microns in diameter (PM10) and fine particulate matter measuring no more than 2.5 microns in diameter (PM2.5), for which the project region is in non -attainment under applicable federal or state ambient air quality standards. Therefore, the impact was determined to be less than significant with no mitigation required.
The project is the realignment of Parkway Drive. The realignment was considered part of the North Avenue interchange improvements analyzed in the South Fresno State Route 99 Corridor Project Air Quality Report. Therefore, consistent with the 2023 EIR , the project would not result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non -attainment. Consistent with the 2023 EIR, d uring construction, short-term degradation of air quality may occur due to the release of particulate emissions (airborne dust) generated by excavation, grading, hauling, and other construction -related activities. As described in Section 1.3.2, Construction Activities and Best Management Practices, the project would incorporate the following project design features to further reduce criteria pollutants:
• Water or dust palliative shall be applied to the site and equipment as often as necessary to control fugitive dust emissions. Fugitive emissions generally must meet a “no visible dust” criterion either at the point of emissions or at the right-of-way line, depending on local regulations.
• Soil binder shall be spread on any unpaved roads used for construction purposes and on all project construction parking areas.
• Construction equipment and vehicles shall be properly tuned and maintained. All construction equipment shall use low -sulfur fuel as required by California Code of Regulations, Title 17, Section 93114.
• A Dust Control Plan shall be developed documenting sprinkling, temporary paving, speed limits, and timely revegetation of disturbed slopes as needed to minimize construction impacts to existing communities.
• Trackout reduction measures, such as gravel pads at project access points to minimize dust and mud deposits on roads affected by construction traffic, shall be used.
CEQA EIR Addendum 20 December 2023
Parkway Drive Realignment Project
• All transported loads of soils and wet materials shall be covered before transport, or adequate freeboard (space from the top of the material to the top of the truck) shall be provided to minimize the emission of dust (particulate matter) during transportation. • Dust and mud that are deposited on paved, public roads due to construction activity and traffic shall be promptly and regularly removed to decrease particulate matter emissions. • To the extent feasible, construction traffic shall be scheduled and routed to reduce congestion and related air quality impacts caused by idling vehicles along local roads during peak travel times.
• Mulch shall be placed, or vegetation shall be planted as soon as practical after grading to reduce windblown particulate matter in the area.
The project impacts would be less than significant with no mitigation required.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding air quality standard violations.
c) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project would not expose sensitive receptors to substantial pollutant concentrations. Therefore, impacts would be less than significant with no mitigation required. Emissions from construction equipment are expected and would include toxic air contaminants such as diesel exhaust particulate matter.
However, implementation of Caltrans Standard Specifications in Section 14, as well as other measures included in the project, would lessen potential impacts from the project.
The project would be south of the North Avenue interchange with State Route 99 within the larger South Fresno State Route 99 Corridor Project area as analyzed in the 2023 EIR. No sensitive receptors are adjacent to the project site. Similar to the 2023 EIR, emission s during construction would include diesel exhaust particulate matter. Implementation of the following project design features would reduce potential impacts:
• Idling shall be limited to 5 minutes for delivery and dump trucks and other diesel - powered equipment during construction.
• Construction equipment and vehicles shall be properly tuned and maintained. All construction equipment shall use low sulfur fuel as required by California Code of Regulations, Title 17, Section 93114.
• A Construction Traffic Management Plan shall be prepared and implemented .
Construction traffic shall be scheduled and routed to reduce congestion and related air quality impacts caused by idling vehicles along local roads during peak travel times.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding odors.
CEQA EIR Addendum 21 December 2023
Parkway Drive Realignment Project
d) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not result in other emissions such as odors adversely affecting a substantial number of people .
Therefore, the impact was determined to be less than significant with no mitigation required.
The project would be south of the North Avenue interchange with State Route 99 within the larger South Fresno State Route 99 Corridor Project area as analyzed in the 2023 EIR.
Construction associated with the proposed project could result in minor amounts of odor compounds associated with diesel -heavy equipment exhaust and asphalt paving. Such odors would quickly disperse to below detectable levels as distance from the site increases. However, consistent with the 2023 EIR, the project would implement project design features as discussed in Section 3.3(c). Consistent with the 2023 EIR, neither project construction nor operation would result in other emissions, including those leading to odors, that would adversely affect a substantial number of people. The project impact would be less than significant with n o mitigation required.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding odors.
In summary, project impacts to air quality resources would be less than significant , and no mitigation would be required.
CEQA EIR Addendum 22 December 2023
Parkway Drive Realignment Project
3.4 Biological Resources
Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Have a substantial adverse effect,
either directly or through habitat
modifications, on any species
identified as a candidate, sensitive,
or special-status species in local or
regional plans, policies, or
regulations, or by the California
Department of Fish and Wildlife or
U.S. Fish and Wildlife Service?
NI No No No None
b. Have a substantial adverse effect on
any riparian habitat or other sensitive
natural community identified in local
or regional plans, policies,
regulations or by the California
Department of Fish and Wildlife or
U.S. Fish and Wildlife Service?
NI No No No None
c. Have a substantial adverse effect on
state or federally protected wetlands
(including, but not limited to, marsh,
vernal pool, coastal, etc.) through
direct removal, filling, hydrological
interruption, or other means?
NI No No No None
d. Interfere substantially with the
movement of any native resident or
migratory fish or wildlife species or
with established native resident or
migratory wildlife corridors, or
impede the use of native wildlife
nursery sites?
NI No No No None
e. Conflict with any local policies or
ordinances protecting biological
resources, such as a tree
preservation policy or ordinance?
NI No No No None
f. Conflict with the provisions of an
adopted Habitat Conservation Plan,
Natural Community Conservation
Plan, or other approved local,
regional, or state habitat
conservation plan?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
CEQA EIR Addendum 23 December 2023
Parkway Drive Realignment Project
a) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not result in impacts to species, habitat, candidate species, or sensitive or special-status species because no such species or habitat are in the project area.
The project is south of the North Avenue interchange with State Route 99 within the larger South Fresno State Route 99 Corridor Project area as analyzed in the 2023 EIR. Consistent with the 2023 EIR, the project area does not contain critical habitat for state or federally listed species, and no state or federally listed or candidate species is expected to be present or affected by the project because no known special -status species meet the status requirements. The project impacts would be less than significant with no mitigation required.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding candidate, sensitive, or special-status species.
b) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project area did not contain riparian habitat or other sensitive natural communities identified in local or regional plans, policies, or regulations or by the California Department of Fish and Wildlife or U.S.
Fish and Wildlife Service, and no impact would occur.
The project is south of the North Avenue interchange with State Route 99 within the larger South Fresno State Route 99 Corridor Project area as analyzed in the 2023 EIR. The project site does not contain riparian habitat or other sensitive natural communities identified in local or regional plans, policies, or regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service. Consistent with the 2023 EIR, no impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects related to riparian habitat or other sensitive natural community.
c) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project area did not contain state or federally protected wetlands, and no impacts would occur.
The project is south of the North Avenue interchange with State Route 99 within the larger South Fresno State Route 99 Corridor Project area as analyzed in the 2023 EIR. The project site does not contain state or federally protected wetlands. Consistent with the 2023 EIR, no impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding state or federally protected wetlands.
CEQA EIR Addendum 24 December 2023
Parkway Drive Realignment Project
d) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not interfere with the movement of fish or wildlife species with the implementation of avoidance and minimization measures, which include a pre-construction survey for migratory birds and Swainson’s hawk (Buteo swainsoni) during the nesting season in the project area.
The project is south of the North Avenue interchange with State Route 99 within the larger South Fresno State Route 99 Corridor Project area as analyzed in the 2023 EIR. There is a potential that migratory birds, such as the red -tailed hawk (Buteo jamaicensis) and Swainson’s hawk, could migrate into the area. Consistent with the 2023 EIR, as described in Section 1.3.2, the following measures shall be implemented to ensure that the project would not interfere with the movement of fish or wildlife species.
Migratory Birds
• A pre-construction survey for migratory birds within the study area shall be conducted 30 days before the start of construction.
• If migratory birds are found to be nesting within the project area, a no-work buffer zone (300 feet) may be established around an active nest and/or a qualified biologist shall monitor an active nest during construction activities within the established buffer. • Work may be temporarily suspended if nesting activity cannot be prevented. • If removal of nest trees was deemed necessary, removal shall occur during the time of year when the nests are not used (between October 1 and January 30).
Swainson’s Hawk
• Prior to construction, pre -construction surveys shall be conducted according to the Recommended Timing and Methodology for Swainson’s Hawk Nesting Surveys in California’s Central Valley (Swainson’s Hawk Technical Advisory Commission 2000).
• Surveys shall be conducted no less than 30 days prior to construction. • If an active Swainson’s hawk nest is detected, minimization efforts shall be coordinated with the California Department of Fish and Wildlife and may include a no-work buffer zone (600 feet) around an active nest , and/or a qualified biologist shall monitor an active nest during construction activities within the established buffer. • If the 600-foot no-work buffer zone cannot be maintained, an Incidental Take Permit may be required by the California Department of Fish and Wildlife.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding the movement of any native resident or migratory fish or wildlife species.
CEQA EIR Addendum 25 December 2023
Parkway Drive Realignment Project
e) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project would not conflict with any local policies or ordinances protecting biological resources.
The project is south of the North Avenue interchange with State Route 99 within the larger South Fresno State Route 99 Corridor Project area as analyzed in the 2023 EIR. Consistent with the 2023 EIR, no impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance.
f) The 2023 EIR determined that no Habitat Conservation Plans exist for the South Fresno State Route 99 Corridor Project area, and no impacts would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR. Consistent with the 2023 EIR, no Habitat Conservation Plans exist for the project area. Therefore, no impacts would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state Habitat Conservation Plan.
In summary, the project would result in no impacts to biological resources, and no mitigation would be required.
CEQA EIR Addendum 26 December 2023
Parkway Drive Realignment Project
3.5 Cultural Resources
Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Cause a substantial adverse
change in the significance of a
historical resource pursuant to
Section 15064.5?
NI No No No None
b. Cause a substantial adverse
change in the significance of an
archaeological resource pursuant to
Section 15064.5?
NI No No No None
c. Disturb any human remains,
including those interred outside of
dedicated cemeteries?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not cause a substantial change to the significance of a historical resource pursuant to CEQA Guidelines, Section 15064.5.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR . Based on the 2020 Historic Resource Evaluation Report and 2020 Historic Property Survey Report prepared for the larger project, the project site does not contain historic al resources and would not result in a substantial change to the significance of a historical resource pursuant to CEQA Guidelines, Section 15064.5. No impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding historical resources.
b) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not cause a substantial change to the significance of an archaeological resource pursuant to CEQA Guidelines, Section 15064.5.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR. Based on the 2020 Archaeological Study Report prepared for the larger project, the project site does not contain archaeological resources and would not result in a substantial change to the significance of an archaeological resource pursuant to CEQA Guidelines, Section 15064.5. No impact would occur.
CEQA EIR Addendum 27 December 2023
Parkway Drive Realignment Project
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding archaeological resources.
c) The 2023 EIR concluded that no human remains are expected in the South Fresno State Route 99 Corridor Project area. However, the 2023 EIR further concluded that if human remains are discovered during construction, compliance with California Health and Safety Code , Section 7050.5, would be required.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR , and no human remains are expected on the project site. Consistent with the 20 23 EIR, should human remains be encountered during construction , the project would be required to comply with California Health and Safety Code, Section 7050.5, for the treatment of human remains. In addition, the Native American Heritage Commission would be notified if the remains are Native American, pursuant to California Public Resources Code, Section 5097.98, and the most likely descendant would be notified. Therefore, no impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding human remains.
In summary, the project would result in no impacts to cultural resources, and no mitigation would be required.
CEQA EIR Addendum 28 December 2023
Parkway Drive Realignment Project
3.6 Energy
Would the project result in:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Expose people or structures to
potential substantial adverse
effects, including the risk of loss,
injury, or death involving:
NI No No No None
b. Conflict with or obstruct a state or
local plan for renewable energy
or energy efficiency?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not result in a significant impact during construction or operation for wasteful, inefficient, or unnecessary consumption of energy.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR . Short-term impacts are mainly related to the construction phase of a project and are recognized to be short in duration. The operation of off -road equipment, trucks, and worker traffic would be the primary source of energy consumption during construction of the project.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding wasteful, inefficient, or unnecessary consumption of energy. b) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not conflict with or obstruct state or local plans for renewable energy or energy efficiency.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR. Consistent with the 2023 EIR, the project would comply with all federal, state, and local rules and regulations to this effect.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding state or local plans for renewable energy or energy efficiency.
In summary, the project would result in no impacts to energy, and no mitigation would be required.
CEQA EIR Addendum 29 December 2023
Parkway Drive Realignment Project
3.7 Geology and Soils
Would the project result in:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Directly or indirectly cause
potential substantial adverse
effects, including the risk of loss,
injury, or death involving:
NI No No No None
i) Rupture of a known earthquake
fault, as delineated on the most
recent Alquist-Priolo Earthquake
Fault Zoning Map issued by the
State Geologist for the area or
based on other substantial
evidence of a known fault? Refer
to Division of Mines and Geology
Special Publication 42?
NI No No No None
ii) Strong seismic ground shaking? NI No No No None
iii) Seismic-related ground failure,
including liquefaction?
NI No No No None
iv) Landslides? NI No No No None
b. Result in substantial soil erosion
or the loss of topsoil?
NI No No No None
c. Be located on a geologic unit or
soil that is unstable, or that would
become unstable as a result of
the project, and potentially result
in on-site or off-site landslide,
lateral spreading, subsidence,
liquefaction or collapse?
NI No No No None
d. Be located on expansive soil, as
defined in Table 18-1-B of the
Uniform Building Code (1994),
creating substantial direct or
indirect risks to life or property?
NI No No No None
e. Have soils incapable of
adequately supporting the use of
septic tanks or alternative
wastewater disposal systems
where sewers are not available
for the disposal of wastewater?
NI No No No None
f. Directly or indirectly destroy a
unique paleontological resource
or site or unique geologic
feature?
LTS No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
CEQA EIR Addendum 30 December 2023
Parkway Drive Realignment Project
a.i) The 2023 EIR did not identify any faults identified as Alquist-Priolo Earthquake Fault Zones. The 2023 EIR concluded that construction would not expose people or structures to potential substantial adverse effects from these types of earthquake fault zones, and no impact would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 and is not in an Alquist-Priolo Earthquake Fault Zone. Consistent with the 2023 EIR, project impacts would be less than significant with no mitigation required.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map.
a.ii, iii) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project area has not historically had strong seismic ground shaking and does not support conditions for liquefaction or lateral spreading. The 2023 EIR concluded that no impact would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR . Consistent with the 2023 EIR, the project site’s underlying soil would not be prone to liquefaction, lateral spreading, and expansion. Therefore, consistent with the 2023 EIR, no impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding strong seismic ground shaking and seismic-related ground failure including liquefaction or lateral spreading. a.iv) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project is in an area where the topography is flat, and there is no risk of landslides from or to the project. As such, the 2023 EIR concluded that there is a negligible level of risk related to landslides , and no impact would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR. The flat nature of the topography surrounding the project site would not support the conditions for the surrounding slope to fail, such as during a seismic event or saturated surface runoff conditions. Consistent with the 2023 EIR, no impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding landslides. b) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not cause substantial soil erosion or loss of topsoil because the project would abide by Caltrans
CEQA EIR Addendum 31 December 2023
Parkway Drive Realignment Project
Statewide Storm Water Permit requirements, which include features and measures to be included in the project design and during construction to prevent soil erosion or topsoil loss.
The project would include appropriate B MPs to prevent soil erosion or loss of topsoil.
Therefore, no impact would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR . Consistent with the 2023 EIR, construction activities could result in adverse effects of soil erosion and loss of topsoil. As stated in Section 1.3.2, the project would implement several BMPs to avoid and minimize the loss of topsoil and soil erosion.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding soi l erosion or loss of topsoil.
c) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project would not be on an unstable geologic unit or soil that is unstable or that would become unstable as a result of the project and that , with the implementation of Caltrans engineering standards , would ensure stability and not cause instability, landslides, lateral spreading, subsidence, liquefaction, or collapse. No impact would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 and would not be on unstable geological unit or soil that is unstable. Consistent with the 2023 EIR and as stated in Section 1.3.1 , Project Features , the project would implement engineering standards , including Fresno Standard Plan P -54, that would ensure stability, and no impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding geologic unit or soil that is unstable or that would become unstable as a result of the project and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse. d) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project would not be located on expansive soil as defined in the Uniform Building Code (1994), and no impact would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 and, thus, would not be on expansive soils. Consistent with the 2023 EIR, no impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding expansive soils.
CEQA EIR Addendum 32 December 2023
Parkway Drive Realignment Project
e) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project would not require the installation of septic tanks or wastewater disposal systems for the disposal of wastewater, and no impact would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR . The project would realign the existing Parkway Drive and would not require the installation of septic tanks or wastewater disposal systems for the disposal of wastewater . Consistent with the 2023 EIR, no impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater. f) The 2023 EIR determined that p aleontological resources could potentially lie in sediments beneath the South Fresno State Route 99 Corridor Project area. The 2023 EIR concluded that construction activities could impact sensitive paleontological resources where ground disturbance activities such as trenching and grading exceed 3 feet in depth . Measures were required to be implemented to protect resources during construction , which would reduce impacts to less than significant.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 . Consistent with the 2023 EIR, construction activities that would result in excavations of greater than 3 feet could impact sensitive paleontological resources. As stated in Section 1.3.2, t he project would include the following measures to reduce impacts to less than significant:
• The Paleontological Mitigation Plan shall be prepared by a paleontological subconsultant. • All project personnel shall receive training by a qualified paleontologist before the start of work.
• Recovered fossils shall be prepared to the point of identification and placed in an approved paleontological repository.
• All open excavations more than 5 feet deep in native sediments of the Modesto Formation shall be monitored full time by a qualified paleontologist. • All construction/project personnel must complete a construction safety orientation. A procedure for interfacing paleontological and construction personnel shall need to be developed in consultation with the resident engineer.
CEQA EIR Addendum 33 December 2023
Parkway Drive Realignment Project
• A pre-construction paleontological sensitivity training for earthmoving personnel shall be conducted, and documentation of training (sign-in sheets, hardhat stickers) shall be kept with project records (filed on site and in the Department Task Order Manager’s office). • The professional paleontologist shall designate a paleontological monitor to be present during qualifying earthmoving activities, as previously defined.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding paleontological resources.
In summary, project impacts to geology and soils would be less than significant, and no mitigation would be required.
CEQA EIR Addendum 34 December 2023
Parkway Drive Realignment Project
3.8 Greenhouse Gas Emissions
Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstance
s Involving
New Impacts?
New Info
Requiring
New Analysis
or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Generate greenhouse gas
emissions, either directly or
indirectly, that may have a
significant impact on the
environment?
SU No No No None
b. Conflict with an applicable plan,
policy or regulation adopted for the
purpose of reducing the emissions
of greenhouse gases?
SU No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a, b) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project would increase carbon dioxide emissions, a GHG, and, therefore, conflict with current Air Quality Plans that require reduction of GHG emissions. The 2023 EIR included design features and measures to reduce GHG emissions, such as Complete Streets elements with landscaping ; bicycle and pedestrian facilities to encourage active transportation over use of gasoline powered vehicles; the installation of Intelligent Transportation System elements designed to improve traffic efficiency and reduce congestion on roadways, thereby lowering vehicle emissions; construction of roundabouts; and installation of electric charging station. However, the 2023 EIR concluded that Caltrans currently does not have established regulatory, industry-wide methods to accurately measure whether the project features and measures would reduce emissions enough to mitigate the project impacts, and impacts would remain significant and unavoidable.
The project would realign Parkway Drive , which is south of the North Avenue interchange with State Route 99 within the larger South Fresno State Route 99 Corridor Project area as analyzed in the 2023 EIR. Consistent with the 2023 EIR, the project would result in an increase in carbon dioxide emissions and , thus, would conflict with current Air Quality Pla ns that require the reduction in GHG emissions. Impacts would remain significant and unavoidable.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding GHG emissions.
In summary, project impacts to global climate change or GHG emissions would be significant and unavoidable.
CEQA EIR Addendum 35 December 2023
Parkway Drive Realignment Project
3.9 Hazards and Hazardous Materials
Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Create a significant hazard to the
public or the environment through
the routine transport, use, or
disposal of hazardous materials?
NI No No No None
b. Create a significant hazard to the
public or the environment through
reasonably foreseeable upset and
accident conditions involving the
release of hazardous materials into
the environment?
NI No No No None
c. Emit hazardous emissions or
handle hazardous or acutely
hazardous materials,
substances, or waste within one -
quarter mile of an existing or
proposed school?
NI No No No None
d. Be located on a site which is
included on a list of hazardous
materials sites compiled pursuant to
Government Code Section 65962.5
and, as a result, would it create a
significant hazard to the public or
the environment?
NI No No No None
e. For a project located within an
airport land use plan or, where
such a plan has not been adopted,
within two miles of a public airport
or public use airport, result in a
safety hazard or excessive noise
for people residing or working in
the project area?
NI No No No None
f. Impair implementation of or
physically interfere with an adopted
emergency response plan or
emergency evacuation plan?
NI No No No None
g. Expose people or structures, either
directly or indirectly, to a significant
risk of loss, injury or death involving
wildland fires?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a, b) The 2023 EIR concluded that construction and operational activities would not create a significant hazard to the public or the environment through the routine transport, use, or
CEQA EIR Addendum 36 December 2023
Parkway Drive Realignment Project
disposal of hazardous materials. Soils within the vicinity of roadways may be contaminated with aerially deposited lead, and agricultural soils may be contaminated with pesticides and other materials. Avoidance and minimization measures were included to address the removal of these materials, including the requirement for a Health and Safety Plan to test soils before construction and appropriately dispose of contaminated materials.
The project would realign Parkway Drive, which is south of the North Avenue interchange with State Route 99 within the larger South Fresno State Route 99 Corridor Project area as analyzed in the 2023 EIR. Construction equipment that would be used to build the proposed project has the potential to release oils, greases, solvents, and other finishing materials through accidental spills. Spill or upset of these materials could have the potential to impact surrounding land uses; however, federal, state, and local controls have been enacted to r educe the effects of such potential hazardous materials spills. In addition, consistent with the 2023 EIR, soils within the vicinity of roadways may be contaminated with aerially deposited lead, and agricultural soils may be contaminated with pesticides and other materials. As stated in Section 1.3.2, the project would include the following measures to reduce impacts to less than significant:
• Residual organochlorine pesticides (and associated elevated arsenic concentrations) may be present in shallow soil within the project study area due to historical non-regulated agricultural operations. The pesticide and arsenic levels on properties that were for agricultural use are not anticipated to exceed regulatory health -based screening thresholds for commercial/industrial land use but shall be tested. • Appropriate standard specifications and plans addressing all hazardous waste concerns shall be included into the construction package to ensure all regulatory requirements are met for proper handling and disposal of materials/wastes.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding hazards to the public or the environment through the routine transport, use, or disposal of hazardous materials and foreseeable upset and accident conditions involving the release of hazardous materials into the environment.
c) The 2023 EIR concluded that construction and operation of the project would not emit hazardous materials and that no schools are within 0.25 mile of the project. No impact would occur.
The project would realign Parkway Drive, which is south of the North Avenue interchange with State Route 99 within the larger South Fresno State Route 99 Corridor Project area as analyzed in the 2023 EIR. Consistent with the 2023 EIR, the project would not emit hazardous materials and is not within 0.25 mile of a school. No impacts would occur.
CEQA EIR Addendum 37 December 2023
Parkway Drive Realignment Project
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding hazardous emissions hazardous or acutely hazardous materials, substances, or waste within
0.25 mile of an existing or proposed school.
d) The 2023 EIR concluded that there was no documentation of hazardous materials violations or discharge within 1 mile of the project area, and as a result , the South Fresno State Route 99 Corridor Project would not create a significant hazard to the public or the environment. There would be no impact, and no mitigation would be required.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR. The 2020 Initial Site Assessment prepared for the South Fresno State Route 99 Corridor Project included the project area within its search radius. Based on the 2020 Initial Site Assessment , former leaking underground storage tank site s with possible soil contamination were identified within 1 ,000 feet of the project area. However, these cases are closed, and it was determined that they would not result in impacts to the proposed project. Therefore, consistent with the 2023 EIR, there would be no impact, and no mitigation would be required.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding hazardous materials sites.
e) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project area is not within an Airport Land Use Plan or where such a plan has not been adopted or within 2 miles of a public airport or public use airport and that project implementation would not result in a safety hazard for construction workers or future residents. The 2023 EIR concluded that n o impacts would occur, and no mitigation would be required.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR. The Fresno Chandler Executive Airport is approximately 4 miles north of the project site. Therefore, consistent with the 2023 EIR, the project would not result in a safety hazard or excessive noise for people residing or working in the project area. No impacts would occur, and no mitigation would be required.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding safety hazards for construction workers or future residents.
f) The 2023 EIR determined that Emergency Response Plans would not be impacted because the conditions for emergency responders and related response plans would be improved. The 2023 EIR concluded that no impacts would occur, and no mitigation would be required.
CEQA EIR Addendum 38 December 2023
Parkway Drive Realignment Project
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR. The City maintains an Office of Emergency Services function for its jurisdictional responsibility area and coordinates with County Office of Emergency Services regarding disaster preparedness, response, and recovery activities. The project is not expected to impair implementation of or physically interfere with an adopted Emergency Response Plan or Emergency Evacuation Pla n. Therefore, consistent with the 2023 EIR, impacts would be less than significant with no mitigation required.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding impairing or physically interfering with an adopted Emergency Response Plan or Emergency Evacuation Plan. g) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project was in an urban developed area and was not in an area vulnerable to wildland fi res. The 2023 EIR concluded that people or structures would not be exposed to a significant loss, injury, or death involving wildland fires, and no impact would occur.
The project site is in an urban setting and would not be subject to wildland fire s. In addition, no structures are proposed. Consistent with the 2023 EIR, the project would not expose people or structures to a significant loss, injury, or death involving wildland fires. The impact would be less than significant with no mitigation required.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding wildland fires.
In summary, the project would result in no impacts to hazards and hazardous materia ls, and no mitigation would be required.
CEQA EIR Addendum 39 December 2023
Parkway Drive Realignment Project
3.10 Hydrology and Water Quality
Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Violate any water quality standards
or waste discharge requirements?
LTS w/ M No No No None
b. Substantially decrease groundwater
supplies or interfere substantially with
groundwater recharge such that the
project may impede sustainable
groundwater management of the
basin?
NI No No No None
c. Substantially alter the existing
drainage pattern of the site or area,
including through the alteration of the
course of a stream or river or through
the addition of impervious surfaces,
in a manner which would:
i) Result in substantial erosion or
siltation on-site or off-site;
NI No No No None
ii) Substantially increase the rate or
amount of surface runoff in a manner
which would result in flooding on-site
or off-site;
NI No No No None
iii) Create or contribute runoff water
which would exceed the capacity of
existing or planned stormwater
drainage systems or provide
substantial additional sources of
polluted runoff; or
NI No No No None
iv) Impede or redirect flood flows? NI No No No None
d. In flood hazard, tsunami, or. seiche
zones, risk release of pollutants due
to project inundation?
NI No No No None
e. Conflict with or obstruct
implementation of a water quality
control plan or sustainable
groundwater management plan?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) The 2023 EIR concluded that construction and operation activities could violate water quality standards and waste discharge requirements or degrade surface water or groundwater. However the 2023 EIR concluded that impacts would be reduced with implementation of the Caltrans Statewide Stormwater Program and through compliance with the State Water Resources Control Board Order Number 99-06-DWQ, National Pollutant Discharge Elimination System (NPDES)
CEQA EIR Addendum 40 December 2023
Parkway Drive Realignment Project
Number CAS000003, NPDES Permit, Statewide Storm Water Permit , and Waste Discharge Requirements for Caltrans. Therefore, the 2023 EIR concluded that no impacts would occur, and no mitigation would be required.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. Consistent with the 2023 EIR, temporary increases in erosion of exposed soils during construction of the facility could result in minor on or off -site water quality impacts, particularly if rainfall events occur during the active construction phase. As described in Section 1.3.2, the project includes implementation of erosion and sedimentation BMPs throughout project construction to protect water quality and reduce sedimentation runoff in the project area. The project would be required to prepare a Stormwater Pollution Prevention Plan in compliance with the General Permit for Discharges of Storm Water Associated with Construction Activity (i.e., General Permit Order Number 2012-0006-DWQ). Implementation of the Stormwater Pollution Prevention Plan and associated BMPs would minimize the potential for the project to result in substantial soil erosion or loss of topsoil. Post-construction stormwater flows would be directed toward inlets along Parkway Drive that would flow into FMFCD Basin AW1.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding water quality standards or waste discharge requirements.
b) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not decrease groundwater supply , interfere with groundwater recharge , or substantially impede groundwater management. The project would improve an existing facility and install an upgraded stormwater system, including stormwater basins to capture stormwater.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 . The proposed project would not use groundwater during construction or operation. However, the current condition of the project site is vacant and undeveloped; therefore, the development of the proposed project would introduce impervious surfaces to the project site. As stated in Section 1.3.1, s tormwater flows would be directed toward inlets along Parkway Drive that would flow into the existing FMFCD Basin. The project would not decrease groundwater supply or interfere with groundwater recharge or substantially impede groundwater management. No impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding groundwater recharge.
CEQA EIR Addendum 41 December 2023
Parkway Drive Realignment Project
c.i) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not substantially alter existing drainage of the area to result in substantial erosion or siltation on or off site. Stormwater policies and practices would be implemented and managed during construction to ensure that all measures to control erosion and siltation are followed (State Water Resources Control Board Order Number 99-06-DWQ, NPDES Number CAS000003, NPDES Permit, Statewide Stormwater Permit, and Waste Discharge Requirements for Caltrans).
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. Construction of the proposed project would require grading and excavation of soil, which would loosen sediment and could result in erosion or siltation.
However, as stated in Section 1.3.2, the project would include construction BMPs to reduce erosion or siltation. Consistent with the 2023 EIR, adherence to the existing requirements and implementation of the required BMPs would ensure that erosion and siltation associated with construction activities would be minimized. After construction, the project would not alter the natural drainage path or divert any water from the existing natural conditions or drainage boundaries. As stated in Section 1.3.1, s tormwater flows would be directed to inlets along Parkway Drive. No impacts would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding substantial erosion or siltation on or off site.
c.ii) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not increase the rate or amount of surface runoff. The project is not in an area known for flooding.
The project would install a stormwater system to capture all runoff from the state facility.
Stormwater policies and practices would be managed during construction to ensure that all measures to control surface runoff are followed (State Water Resources Control Board Order Number 99-06-DWQ, NPDES Number CAS000003, N PDES Permit, Statewide Stormwater Permit, and Waste Discharge Requirements for Caltrans).
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. Consistent with the 2023 EIR, the project would not alter the natural drainage path or divert any water from the existing natural conditions or drainage boundaries. As described in Section 1.3.1, stormwater flows would be directed to inlets along Parkway Drive to capture all runoff from the roadway. No impacts would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding the rate or amount of surface runoff in a manner that would result in flooding on or off site.
CEQA EIR Addendum 42 December 2023
Parkway Drive Realignment Project
c.iii) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not create or contribute runoff water that would exceed the capacity of the drainage systems or add substantial additional sources of polluted runoff because a stormwater system is proposed to address this concern to capture all runoff from the state facility, which would include treatment of the runoff water. Stormwater policies and practices would be managed during construction to ensure that all measures to control surface runoff are followed (State Water Resources Control Board Order Number 99 -06-DWQ, NPDES Number CAS000003, N PDES Permit, Statewide Stormwater Permit, and Waste Discharge Requirements for Caltrans).
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. Consistent with the 2023 EIR, development of the proposed project would result in the addition of impervious surfaces that would result in an increase in stormwater runoff. As described in Section 1.3.1, stormwater flows would be directed to inlets along Parkway Drive to capture all runoff from the roadway. Therefore, the project would not create or contribute runoff water that would exceed the capacity of the drainage systems or add substantial additional sources of polluted runoff.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding the capacity of the drainage systems or add substantial additional sources of polluted runoff. c.iv) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not impact a floodplain. A Location Hydraulic Study and Floodplain Evaluation Report was completed in November 2018 for the project. Flood Insurance Rate Maps dated February 18, 2009, indicate that the project area lies in “Zone X,” defined as outside the 0.2 percent annual chance floodplain. The project would comply with Executive Order 11988 (Floodplain Management) as outlined in Code of Federal Regulations , Title 23, Section 650, Subpart A, which directs all federal agencies to refrain from conducting, supporting, or allowing actions in floodplains.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR. Consistent with the 2023 EIR, the project is not in a floodplain. Further, as described in Section 1.3.1, a ll stormwater runoff would be directed to inlets along Parkway Drive. No impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding flood flows. d) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project was not in an area where flood hazard, tsunami, seiche, or inundation is likely to occur (Location Hydraulic Study and Floodplain Evaluation Report).
CEQA EIR Addendum 43 December 2023
Parkway Drive Realignment Project
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR. Consistent with the 2023 EIR , the project site is not in a flood hazard, tsunami, or seiche zone (i.e., standing waves on river, reservoirs, ponds, and lakes), and no oceans, rivers, reservoirs, ponds, or lakes are on the site or within its vicinity.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding release of pollutants due to project inundation.
e) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project does not conflict with or obstruct any known Water Quality Control Plan or Sustainable Groundwater Management Plan. No concerns regarding flooding or conflicting or obstructing Water Quality Control Plans or Sustainable Groundwater Management Plans have been identified (Location Hydraulic Study and Floodplain Evaluation Report).
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR. Consistent with the 2023 EIR, the project would not conflict with or obstruct any known Water Quality Control Pla n or Sustainable Groundwater Management Plan.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding any known Water Quality Control Plan or Sustainable Groundwater Management Plan.
In summary, the project would result in no impacts to hydrology and water quali ty, and no mitigation would be required.
CEQA EIR Addendum 44 December 2023
Parkway Drive Realignment Project
3.11 Land Use and Planning
Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Physically divide an established
community?
NI No No No None
b. Cause a significant environmental
impact due to a conflict with any
land use plan, policy, or
regulation adopted for the
purpose of avoiding or mitigating
an environmental effect?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would upgrade two existing interchanges that would serve all users , and would not physically divide an existing community. No impact would occur, and no mitigation would be required.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 . Consistent with the 2023 EIR, the project would not physically divide an existing community because Parkway Drive roadway exists and would be realigned in generally the same location. No impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding physically dividing a community.
b) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project aligns with City and County land use plans, policies, and regulations, as well as applicable state and federal plans, policies, and regulations regarding land use planning. The 2023 EIR concluded that implementation would not conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. No impact would occur and no mitigation would be required.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. Consistent with the 2023 EIR, the project would not conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. No impact would occur, and no mitigation would be required.
CEQA EIR Addendum 45 December 2023
Parkway Drive Realignment Project
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding conflicting with any land use plan, policy, or regulation.
In summary, the project would result in no impacts to land use and planning , and no mitigation would be required.
CEQA EIR Addendum 46 December 2023
Parkway Drive Realignment Project
3.12 Mineral Resources
Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Result in the loss of availability
of a known mineral resource
that would be of value to the
region and the residents of the
state?
NI No No No None
b. Result in the loss of availability
of a locally-important mineral
resource recovery site
delineated on a local general
plan, specific plan or other land
use plan?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a, b) The 2023 EIR determined that there are no known mineral resources of value and/or recovery sites for important mineral resources on a local General Plan, Specific Plan, or other land use plan that includes the South Fresno State Route 99 Corridor Project area. The 20 23 EIR concluded that there would be no impact to mineral resources or result in the loss of a locally important mineral resource recovery site, and no mitigation would be required.
Consistent with the 2 023 EIR, implementation of the project would not result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state or result in the loss of a locally important mineral resource recovery site. There would be no impact to mineral resources.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding mineral resources.
In summary, the project would result in no impacts to mineral resources, and no mitigation would be required.
CEQA EIR Addendum 47 December 2023
Parkway Drive Realignment Project
3.13 Noise
Would the project result in:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Generation of a substantial
temporary or permanent increase
in ambient noise levels in the
vicinity of the project in excess of
standards established in the local
general plan or noise ordinance, or
applicable standards of other
agencies?
NI No No No None
b. Generation of excessive
groundborne vibration or
groundborne noise levels?
NI No No No None
c. For a project located within the
vicinity of a private airstrip or an
airport land use plan or, where such
a plan has not been adopted, within
2 miles of a public airport or public
use airport, would the project
expose people residing or working
in the project area to excessive
noise levels?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) The 2023 EIR determined that there would be no substantial permanent increases in noise or vibration, and temporary noise would be managed by applying measures to avoid and minimize construction noise according to local Noise Ordinances. Therefore, the 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not result in the g eneration of a substantial temporary or permanent increase in ambient noise levels within the vicinity of the project in excess of standards established in the local General Plan or Noise Ordinanc e or applicable standards of other agencies.
The project involves the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 as analyzed in the 2023 EIR . Consistent with the 2023 EIR, noise from construction activities may intermittently dominate the noise environment in the immediate area of construction. Short-term noise would be generated by construction activities, which are estimated to take approximately 24 months. As described in Section 1.3.2, construction is anticipated to occur between the hours identified in the City’s Noise Ordinance, Monday through Friday between 7:00 a.m. and 7:00 p.m., as permitted by the City’s Municipal Code, Section 10-109, and not during evening or more noise -sensitive time periods. Ambient
CEQA EIR Addendum 48 December 2023
Parkway Drive Realignment Project
noise from construction activities would cease upon completion of project construction.
Therefore, short‐term construction impacts associated with the exposure of persons to or the generation of short -term noise levels in excess of standards established in the local General Plan or Noise Ordinance or applicable standards of other agencies would be less than significant. In addition , as described in Section 1.3.2, the project would implement the following noise control measures to minimize noise disturbances during construction:
• All equipment shall have sound -control devices no less effective than those provided on the original equipment. Each internal combustion engine used for any purpose on the job or related to the job shall be equipped with a muffler of a type recommended by the manufacturer. No internal combustion engine shall be operated on the job site without an appropriate muffler.
• Construction methods or equipment that would provide the lowest level of noise impact (for example, avoid impact pile driving near residences and consider alternative methods that are also suitable for the soil condition) shall be used. • Idling equipment shall be turned off.
• Truck loading, unloading, and hauling operations shall be restricted so that noise and vibration are kept to a minimum through residential neighborhoods to the greatest possible extent.
After construction, no residential units with outdoor locations for frequent human use would be adjacent to the project site ; therefore, consistent with the 2023 EIR, traffic noise impacts associated with implementing the proposed project would not occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding increases in ambient noise levels.
b) The 2023 EIR concluded that construction would not generate excessive groundborne vibration or noise, and there would be no excessive temporary increase with application of measures during construction.
The project involves the realignment of Parkway Drive and would use typical construction equipment associated with roadway paving, as described in Section 1.3.2. Consistent with the 2023 EIR, the project would not generate excessive groundborne vibration or noise.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding excessive groundborne vibration or noise.
c) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project area is not located within an Airport Land Use Plan or where such a plan has not been adopted or within
CEQA EIR Addendum 49 December 2023
Parkway Drive Realignment Project
2 miles of a public airport or public use airport and that project implementation would not result in excessive noise levels. The 2023 EIR concluded that no impacts would occur, and no mitigation would be required.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. The Fresno Chandler Executive Airport is approximately 4 miles north of the project site. Therefore, consistent with the 2023 EIR, the project would not result in excessive noise for people residing or working in the project area. No impacts would occur, and no mitigation would be required.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding airport noise.
In summary, the project would result in no impacts to noise, and no mitigation would be required.
CEQA EIR Addendum 50 December 2023
Parkway Drive Realignment Project
3.14 Population and Housing
Would the project result in:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Induce substantial unplanned
population growth in an area, either
directly (for example, by proposing
new homes and businesses) or
indirectly (for example, through
extension of roads or other
infrastructure)?
NI No No No None
b. Displace substantial numbers of
existing people or housing,
necessitating the construction of
replacement housing elsewhere?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) The 20 23 EIR determined that the South Fresno State Route 99 Corridor Project would reconstruct existing infrastructure and would not extend a road or other infrastructure that would induce unplanned growth in the area. The 2023 EIR concluded that induced unplanned growth would not occur in the area.
The purpose of the project is to realign the existing Parkway Drive to accommodate the interchange improvements at North Avenue and State Route 99 . The project would modify existing infrastructure and would not remove a current obstacle to growth with the road realignment. Consistent with the 20 23 EIR, project would not induce unplanned growth indirectly, and no impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding substantial unplanned population growth.
b) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not displace or replace substantial numbers of people or housing, and no impacts would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 . The project site is vacant and would not result in the displacement of numbers of existing people or housing, necessitating the construction of replacement housing elsewhere. No impact would occur.
CEQA EIR Addendum 51 December 2023
Parkway Drive Realignment Project
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding the displacement of a substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere.
In summary, the project would result in no impacts to population and housing, and no mitigation would be required.
CEQA EIR Addendum 52 December 2023
Parkway Drive Realignment Project
3.15 Public Services
Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Result in substantial adverse
physical impacts associated with
the provision of new or physically
altered governmental facilities,
need for new or physically altered
governmental facilities, the
construction of which could cause
significant environmental impacts,
in order to maintain acceptable
service ratios, response times or
other performance objectives for
any of the public services:
i) Fire protection? NI No No No None
ii) Police protection? NI No No No None
iii) Schools? NI No No No None
iv) Parks? NI No No No None
v) Other public facilities? NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a.i, ii) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project would improve conditions for fire and police protection and improve response times and concluded that no impact would occur.
The purpose of the project is to realign the existing Parkway Drive to accommodate the interchange improvements at North Avenue and State Route 99. Consistent with the 2023 EIR, the project would not generate a need for increased police or fire service or result in substantial adverse physical impacts associated with the provision of new or physically altered fire and police protection facilities.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding fire and police protection facilities.
a.iii) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project would improve access to local schools and concluded that no impact would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. The project is a road improvement project, and no increased
CEQA EIR Addendum 53 December 2023
Parkway Drive Realignment Project
demand for schools would occur as a result of the project. Therefore, consistent with the 2023 EIR, the project would not result in substantial adverse physical impacts associated with the provision of new or physically altered schools.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding school facilities. a.iv) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project would improve access to parks and concluded that no impact would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 . The project is a road improvement project and would not result in an increase in population that would result in a demand for parks. Therefore, consistent with the 2023 EIR , the project would not result in substantial adverse physical impacts associated with the provision of new or physically altered parks.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding parks. a.v) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project would not result in an increase in residents that would require other public services , such as libraries or post offices . Thus, the project would not result in the need for new or altered facilities to provide other public services, and no impact would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 . The project is a road improvement project and would not result in an increase in residents that would require other public services, such as libraries or post offices. Therefore, consistent with the 2023 EIR, the project would not result in substantial adverse physical impacts associated with the provision of new other public facilities.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding other public facilities.
In summary, the project would result in no impacts to public services , and no mitigation would be required.
CEQA EIR Addendum 54 December 2023
Parkway Drive Realignment Project
3.16 Recreation
Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Increase the use of existing
neighborhood and regional parks or
other recreational facilities such that
substantial physical deterioration of
the facility would occur or be
accelerated?
NI No No No None
b. Include recreational facilities or
require the construction or
expansion of recreational facilities
which might have an adverse
physical effect on the environment?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project would not cause an increase in the use of existing neighborhood or regional parks or other recreational facilities so that physical deterioration of the facilities would occur or be accelerated. The 2023 EIR concluded that no impact would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. The project is a road improvement project and would not result in an increase in population that would result in increased use of or need to expand existing recreational facilities. Therefore, consistent with the 2023 EIR, no impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding recreation. b) The 2023 EIR determined that the South Fresno State Route 99 Corridor Project would not include recreational facilities or require the construction or expansion of recreational facilities that might have an adverse effect on the environment. The 2023 EIR concluded that no impact would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 . The project is a road improvement project and does not include recreational facilities or require the construction or expansion of recreational facilities.
Consistent with the 2023 EIR, no impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding recreation.
In summary, the project would result in no impacts to recreation, and no mitigation would be required.
CEQA EIR Addendum 55 December 2023
Parkway Drive Realignment Project
3.17 Transportation
Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Conflict with a program plan,
ordinance or policy addressing the
circulation system, including transit,
roadway, bicycle and pedestrian
facilities?
NI No No No None
b. Conflict with or be inconsistent with
the California Environmental Quality
Act Guidelines Section 15064.3,
subdivision (b)?
NI No No No None
c. Substantially increase hazards due
to a geometric design feature (e.g.,
sharp curves or dangerous
intersections) or incompatible uses
(e.g., farm equipment)?
NI No No No None
d. Result in inadequate emergency
access?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project aligns with all transportation programs, ordinances, and policies addressing traffic circulation in the project area and , where relevant , has considered improvements for transit, roadway, bicycle , and pedestrian facilities. The 2023 EIR concluded that no impact would occur, and no mitigation would be required.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. Consistent with the 2023 EIR, the project would not conflict with transportation programs, ordinance, and policies addressing traffic circulation. No impact would occur. Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding a program, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities.
b) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would be in compliance with the criteria set forth in the Caltrans Policy Memo randum (September 10, 2020) regarding analysis of transportation impacts under C EQA for projects on the State Highway System and that the project type is “unaffected by the use of vehicle miles traveled as a measure of transportation impacts” because the impacts are assumed “not to lead to a
CEQA EIR Addendum 56 December 2023
Parkway Drive Realignment Project
measurable and substantial increase in vehicle travel.” The 2023 EIR concluded that no impacts would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 . Consistent with the 2023 EIR, the project is considered a project type that is “unaffected by the use of vehicle miles traveled as a measure of transportation impacts” because the impacts are assumed “not to lead to a measurable and substantial increase in vehicle travel.” No impact would occur. Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding vehicle miles traveled. c) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project is categorically compatible with existing uses and meets all safety standards, policies , and guidelines for transportation facilities.
Like the existing roadway, the realigned Parkway Drive would be relatively flat and straight, and the project would not introduce design features or incompatible uses that would increase or create traffic hazards.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding increase in hazards.
d) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would improve access for emergency service providers.
Construction may require temporary lane or roadway closures. As stated in Section 1.3.2, the project would be required to implement a Construction Traffic Management Plan, which would ensure access by emergency service providers during construction.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding conflict with adopted policies, plans, or programs regarding emergency access.
In summary, to the project would result in no impacts to transportation and circulation , and no mitigation would be required.
CEQA EIR Addendum 57 December 2023
Parkway Drive Realignment Project
3.18 Tribal Cultural Resources
Would the project cause a
substantial adverse change in the
significance of a tribal cultural
resource, defined in Public
Resources Code Section 21074 as
either a site, feature, place, cultural
landscape that is geographically
defined in terms of the size and
scope of the landscape, sacred
place, or object with cultural value
to a California Native American
tribe, and that is:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstance
s Involving
New
Impacts?
New Info
Requiring
New Analysis
or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Listed or eligible for listing in the
California Register of Historical
Resources, or in a local register of
historical resources as defined in
Public Resources Code Section
5020.1(k), or
NI No No No None
b. A resource determined by the lead
agency, in its discretion and
supported by substantial evidence, to
be significant pursuant to criteria set
forth in subdivision (c) of Public
Resources Code Section 5024.1. In
applying the criteria set forth in
subdivision (c) of Public Resources
Code Section 5024.1, the lead
agency shall consider the
significance of the resource to a
California Native American tribe.
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) The 2023 EIR concluded that there are no resources that are listed or eligible for the California Register of Historical Resources or resources in a local register of historical resources as defined in California Public Resources Code, Section 5020.1(k).
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. Consistent with the 2023 EIR, the project would not result in impacts to resources that are listed or eligible for the California Register of Historical Resources. No impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding Tribal Cultural Resources.
b) The 2023 EIR concluded that no resources were identified as significant pursuant to criteria set forth in California Public Resources Code, Section 5024.1(c).
CEQA EIR Addendum 58 December 2023
Parkway Drive Realignment Project
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. Consistent with the 2023 EIR, the project would not result in impacts to resources that were identified as significant pursuant to criteria set forth in California Public Resources Code, Section 5024.1(c). No impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding Tribal Cultural Resources.
In summary, project would result in no impacts to Tribal Cultural Res ources, and no mitigation would be required.
CEQA EIR Addendum 59 December 2023
Parkway Drive Realignment Project
3.19 Utilities and Service Systems
Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstance
s Involving
New
Impacts?
New Info
Requiring
New Analysis
or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Require or result in the relocation or
construction of new or expanded
water, wastewater treatment or
stormwater drainage, electric
power, natural gas, or
telecommunications facilities, the
construction or relocation of which
could cause significant
environmental effects?
LTS No No No None
b. Have sufficient water supplies
available to serve the project and
reasonably foreseeable future
development during normal, dry and
multiple dry years?
NI No No No None
c. Result in a determination by the
wastewater treatment provider
which serves or may serve the
project that it has adequate capacity
to serve the project’s projected
demand in addition to the provider’s
existing commitments?
NI No No No None
d. Generate solid waste in excess of
state or local standards, or in
excess of the capacity of local
infrastructure, or otherwise impair
the attainment of solid waste
reduction goals?
NI No No No None
e. Comply with federal, state, and local
management and reduction statutes
and regulations related to solid
waste?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) The 2023 EIR concluded that construction and/or relocation of water and stormwater drainage, electric power, natural gas, and telecommunications facilities would be included in the South Fresno State Route 99 Corridor Project but would not cause significant environmental effects.
These utilities are on public land, mostly within state, City, and County transportation rights- of-way where negative impacts are not anticipated. The main impact identified would be temporary and intermittent interruption of services while utilities are being relocated and upgraded. No mitigation would be required.
CEQA EIR Addendum 60 December 2023
Parkway Drive Realignment Project
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. The realignment would require the relocation of a City water main. Consistent with the 2023 EIR, the relocation is part of the overall project and would not result in significant environmental impacts not already disclosed in this Addendum. No impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding new water facilities and sufficient water supplies.
b) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not require the use of water for operational activities. During construction, water is available from outside sources, by contractors, to meet all requirements during construction, including conservation requirements. No impact would occur.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99 . Consistent with the 2023 EIR, the operation of the project would not require the use of water. During construction, water would be available from outside sources to meet all requirements during construction. No impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding sufficient water supply.
c) The 2023 EIR concluded that no wastewater treatment providers would be needed for the South Fresno State Route 99 Corridor Project. No impact would occur.
The project includes the realignment of Parkway Drive. which is adjacent to the North Avenue interchange with State Route 99 , and would not include any uses that would generate wastewater. Therefore, c onsistent with the 2023 EIR, the project would not generate wastewater that could affect the capacity of wastewater treatment. No impact would occur.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding adequate wastewater treatment capacity.
d) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not generate solid waste in excess of state or local standards or in excess of capacity of local infrastructure or otherwise impair the attainment of solid waste reduction goals.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. Consistent with the 2023 EIR, the project would not generate
CEQA EIR Addendum 61 December 2023
Parkway Drive Realignment Project
solid waste in excess of state or location standards or in excess of the capacity of local infrastructure. Further, the project would not impair the attainment of solid waste reduction goals and would not be inconsistent with federal, state, or local management and/or reduction statutes and regulations related to solid waste. Impacts would be less than significant with no mitigation required. The project would be required to comply with the City’s Construction & Demolition Debris Recycling Program, which requires the diversion of at least 65 percent of waste generated during construction. Operational activities would not generate solid waste.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding solid waste generation.
e) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would comply with all federal, state, and local management and reduction statutes and regulations related to solid waste.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. Consistent with the 2023 EIR, the project would comply with all federal, state, and local management and reduction statutes and regulations related to solid waste.
The project would be required to comply with the City’s Construction & Demolition Debris Recycling Program, which requires the diversion of at least 65 percent of waste generated during construction. Operational activities would not generate solid waste.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding statues and regulations related to solid waste.
In summary, the project would result in no impact s to public utilities , and no mitigation would be required.
CEQA EIR Addendum 62 December 2023
Parkway Drive Realignment Project
3.20 Wildfire
If located in or near state
responsibility areas or lands
classified as very high fire hazard
severity zones, would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Substantially impair an adopted
emergency response plan or
emergency evacuation plan?
NI No No No None
b. Due to slope, prevailing winds, and
other factors, exacerbate wildfire
risks, and thereby expose project
occupants to, pollutant
concentrations from a wildfire or the
uncontrolled spread of a wildfire?
NI No No No None
c. Require the installation or
maintenance of associated
infrastructure (such as roads, fuel
breaks, emergency water sources,
power lines or other utilities) that
may exacerbate fire risk or that may
result in temporary or ongoing
impacts to the environment?
NI No No No None
d. Expose people or structures to
significant risks, including
downslope or downstream flooding
or landslides, as a result of runoff,
post-fire slope instability, or
drainage changes?
NI No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a, b, c, d) The 2023 EIR concluded that the South Fresno State Route 99 Corridor Project area would not be within or near a designated High Fire Hazard Severity Zon e or in an area identified as vulnerable to wildfires , would not impair an adopted Emergency Response Plan or exacerbate wildfire risks , and would not require the installation or maintenance of infrastructure that may exacerbate fire risk or that may result in temporary or ongoing fire risk to the environment. In addition, the 2023 EIR concluded that the South Fresno State Route 99 Corridor Project would not expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post -fire slope instability, or drainage changes.
The project includes the realignment of Parkway Drive, which is adjacent to the North Avenue interchange with State Route 99. The project is not in or near state responsibility areas or lands classified as Very High Fire Hazard Severity Zones. Therefore, consistent with the 2023 EIR, the project would not impair an adopted Emergency Response Plan or exacerbate wildfire
CEQA EIR Addendum 63 December 2023
Parkway Drive Realignment Project
risks, would not require the installation or maintenance of infrastructure that may exacerbate fire risk or that may result in temporary or ongoing fire risk to the environment, and would not expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes.
Therefore, the project would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects regarding wildfires.
In summary, project would result in no impacts to wildfires, and no mitigation would be required.
CEQA EIR Addendum 64 December 2023
Parkway Drive Realignment Project
3.21 Mandatory Findings of Significance
Would the project:
2023 EIR
Impact
Conclusion
Does the
Proposed
Change
Involve New
Impacts?
New
Circumstances
Involving New
Impacts?
New Info
Requiring
New
Analysis or
Verification?
Applicable
2023 EIR
Mitigation
Measures
a. Have the potential to substantially
degrade the quality of the
environment, substantially reduce
the habitat of a fish or wildlife
species, cause a fish or wildlife
population to drop below self-
sustaining levels, threaten to
eliminate a plant or animal
community, substantially reduce
the number or restrict the range of
a rare or endangered plant or
animal or eliminate important
examples of the major periods of
California history or prehistory?
LTS No No No None
b. Have impacts that are individually
limited, but cumulatively
considerable? (“Cumulatively
considerable” means that the
incremental effects of a project are
considerable when viewed in
connection with the effects of past
projects, the effects of other
current projects, and the effects of
probable future projects)?
LTS No No No None
c. Have environmental effects that
will cause substantial adverse
effects on human beings, either
directly or indirectly?
SU No No No None
NI = No Impact; LTS = Less than Significant (without Mitigation); LTS w/ M = Less than Significant with Mitigation; SU = Significant and Unavoidable; MM = mitigation measure. The MM number in this checklist corresponds with the MM number in the 2023 EIR and is presented in its entirety in this Addendum.
a) Similar to the 2023 EIR, the project would not substantially degrade the quality of the environment. The project would not reduce the habitat of fish or wildlife, cause fish or wildlife population to drop, threaten to eliminate plant or animal communities, reduce the number or restrict the range of rare or endangered plant or animal species, or eliminate important examples of California history or prehistory. There is a potential that migratory birds, such as the red-tailed hawk and Swainson’s hawk , could migrate into the area . With implementation of the following avoidance and minimization measures, direct and indirect impacts to migratory birds and Swainson’s hawk would not occur.
CEQA EIR Addendum 65 December 2023
Parkway Drive Realignment Project
b) The 2023 EIR did not identified significant and cumulative impact s. The proposed project would not result in new or more severe impacts, no new significant cumulative impacts would occur, no conditions have changed, and no new information has become available since certification of the 2023 EIR that would alter the previous analysis. c) Effects of the project would not result in substantial adverse effects on human beings beyond those identified in the 20 23 EIR. No conditions have changed, and no new information has become available since certification of the 2023 EIR that would alter this analysis. All impacts with the potential to affect human beings were determined to be significant and unavoidable similar to the 2023 EIR.
CEQA EIR Addendum 66 December 2023
Parkway Drive Realignment Project
This page intentionally left blank.
CEQA EIR Addendum 67 December 2023
Parkway Drive Realignment Project
Section 4 References and List of Preparers
4.1 References
Caltrans (California Department of Transportation). 2023. 2023 South Fresno State Route 99 Corridor Project Final Environmental Impact Report/Environmental Assessment. SCH No. 2019039121.
Swainson’s Hawk Technical Advisory Commission. 2000. Recommended Timing and Methodology for Swainson’s Hawk Nesting Surveys in California’s Central Valley.
4.2 List of Preparers
City of Fresno
Andrew Benelli, PE, Assistant Public Works Director
Harris & Associates
Kate Elliott, Project Director
David Mack, Project Manager
Esther Daigneault, CEQA Analyst
Lindsey Messner, Technical Editor
Matthew Dornbach, GIS Analyst
CEQA EIR Addendum 68 December 2023
Parkway Drive Realignment Project