Capital Project Expenditures by Fund FY2014-2023
Project Proj Descr
22048
Fed Grants
22056
State Grants
22063 TCC
Grant
22504
Mea "C" Tier 1
22506 Mea
"C" Street
Maint
22507
Mea "C"
ADA
22508
Mea "C" Flex
22509
Mea "C" Trails
22510
Mea "C" Bike
22511
Mea "C"
Original
22512
Mea "C" TOD
22513
Mea "C"
Advcmnt
Expenditures
2014-2023
Offsets Planned
Infrastructure for
Impact Fees
Total Expenditures
Reducing Impact Fee
Burden
PW00044 Minor Public Improvements 613,940.48 2,471.60 616,412.08 NO - PW00080 21005 Palm & Belmont Topo and PSE / Miscellaneous Bike Routes (0.00) 819,788.83 819,788.83 NO - PW00212 Peach-Belmont to Butler 4,396,654.64 1,488,723.92 5,885,378.56 NO - PW00268 ADA Infrastructure Compliance 636,720.33 636,720.33 NO - PW00307 Hndn: Valentine to Marks Widen 23,937.85 14,680.43 38,618.28 YES 38,618.28 PW00312 Underpass: Fresno N. of Nees 137,088.35 137,088.35 NO - PW00315 TS: Peach & McKenzie Trail 6,188.85 6,188.85 NO - PW00338 Vetrns Blvd/Hwy 99 & UPRR Pass 88,383.16 3,869,213.03 3,957,596.19 YES 3,957,596.19 PW00361 Major Street Sidewalks 27,083.88 27,083.88 NO - PW00373 FRE040401 SR99 Olive Ave Inchg 880,336.92 880,336.92 YES 880,336.92 PW00376 FRE020622 SR99 Ventura St Inchg 444,071.92 444,071.92 YES 444,071.92 PW00388 SR180 Fowler Ave Inchg 9,362.48 9,362.48 NO -
PW00393 SR41 Shaw Ave Inchg 904,704.18 904,704.18 YES 904,704.18 PW00427 Jensen Overpass Rehab 1,056,616.45 1,056,616.45 NO - PW00429 Sugar Pine Enhnce Nees - Chest 4,829.12 4,829.12 NO - PW00430 Willow Ave Wide Nees to Sheprd 953,906.56 1,147,827.48 110,662.73 3,960.00 2,216,356.77 YES 2,216,356.77 PW00439 Traff Synch - Shaw Ave. 1,147,476.28 1,147,476.28 NO - PW00446 O Street/41 Ramp Widening 183.44 183.44 NO -
PW00461 ADA Infrastructure - Minor Cap 292,388.76 292,388.76 NO - PW00468 Willow Ave Shepherd to Behymer 113,703.27 44,008.82 157,712.09 YES 157,712.09 PW00472 Willow/Shepherd Connect Trail 6,079.45 6,079.45 NO - PW00509 Shaw Ave ITS SR 41 to SR168 500,266.61 708,503.39 1,208,770.00 NO - PW00513 Broadway Streetscape 762,832.76 762,832.76 NO - PW00514 TS Mckinley Hughes & Marks 759,420.81 759,420.81 YES 759,420.81 PW00526 TS Cedar & Woodward 428,880.31 428,880.31 NO -
PW00529 Official Plan LInes RSTP Grant Shaw Ave - Grantland to Polk and S Temperance - Jensen to SR180. 171,638.59 171,638.59 NO - PW00531 NorthPoint Trail 74,908.95 74,908.95 NO -
PW00533 180 West Frontage Road 1,333,676.73 2,682,376.83 4,016,053.56 NO - PW00534 Peach Ave Widening Jensen to Butler 1,710.17 3,000.00 468,922.25 473,632.42 NO - PW00542 Willow ITS Ashlan to Intrnatnl 1,102,650.92 1,102,650.92 NO - PW00545 Willow Barstow to Escalon 954,916.76 940,126.31 113,520.88 2,008,563.95 NO - PW00548 Bike Lns Fresno CA to C Street 40,833.84 43,585.71 84,419.55 NO - PW00549 FRE090137 Friant Nees Palm ITS Corridor 1,137,555.45 1,137,555.45 NO - PW00550 FRE090137 Shields Wireless ITS Corridor 902,739.62 902,739.62 NO - PW00551 Bike Ln Shields West to Maple 68,954.72 75,703.17 144,657.89 NO - PW00552 Bike Ln Gttysbrg Blkstn - Wine 144,602.16 144,602.16 NO - PW00555 FRE090611 Calif. SR99 to Tulare 689,228.69 689,228.69 NO - PW00556 Ashlan Valentine to Parkway 51.71 51.71 NO -
PW00568 Herndon MP Trail Val to Marks 232,551.73 104,315.28 336,867.01 NO - PW00569 ITS Fresno Olive to Herndon 75.96 75.96 NO -
PW00574 Ashlan Blackstone to First 479.35 479.35 NO -
PW00576 Sugar Pine Underpass Shepherd 1,081,913.39 583,764.27 1,665,677.66 NO - PW00581 Herndon W Aux SR41 - Fresno 1,202,043.33 100.38 85,870.75 1,288,014.46 NO - PW00582 Herndon Widen Brawley Valentin 1,353,620.46 1,139,811.33 2,493,431.79 YES 2,493,431.79 PW00583 Fresno TS Upgrade M to R 1,085,410.79 1,085,410.79 NO - PW00584 Herndon W RT Pocket Blkstn 593,471.99 593,471.99 NO - PW00585 Sugar Pine Trail Pk & Ride Wil 591,212.78 591,212.78 NO - PW00586 Herndon Trail Gap Fruit - Harrison 88,996.33 231,241.94 320,238.27 NO - PW00588 Bike Ln Milbrk Shields - Getty 269,441.86 240,722.76 510,164.62 NO - PW00589 TS Bullard & Cecilia 222,869.51 222,869.51 YES 222,869.51 PW00590 TS Chestnut & Shepherd 315,288.17 315,288.17 YES 315,288.17 PW00591 TS Shields & Sunnyside 370,808.72 370,808.72 YES 370,808.72 PW00592 TS Millbrook & Spruce 253,039.92 253,039.92 YES 253,039.92 PW00593 TS Perrin & Sommerville 292,525.15 292,525.15 YES 292,525.15 PW00594 TS Brawley & Shields 553,597.12 553,597.12 YES 553,597.12 PW00595 TS Champ & Liberty Hill/Saybrk 276,344.62 276,344.62 NO - PW00596 TS Butler & Willow 422,326.87 422,326.87 NO -
PW00605 CA & Marks Improvements 39.03 39.03 NO -
PW00606 FRE090611 Weber Overlay Clinton - Valent 134.59 134.59 NO - PW00614 Monterey Street Bridge Demo 77,397.43 77,397.43 NO - PW00615 TS Peach & Church SR2S 271,915.36 165,262.27 437,177.63 YES 437,177.63 PW00616 West Ave Wireless ITS Corridor 305,213.98 305,213.98 NO - PW00617 Bullard Wireless ITS Corridor 799,782.69 799,782.69 NO - PW00618 First Wireless ITS Corridor 1,252,948.88 1,252,948.88 NO - PW00619 OPL Temperance & North Aves 70,747.72 32,470.08 103,217.80 NO - PW00620 Herndon Overlay Blkstn Cedar 1,466,160.97 1,466,160.97 NO - PW00621 Downtown Planting & Irrigation 462,792.33 462,792.33 NO - PW00622 ITS McKinley Ave Wireless 905,160.46 905,160.46 NO - PW00623 ITS Nees Ave Wireless 357,741.81 357,741.81 NO - PW00624 ITS Tulare Ave Wireless 820,650.32 820,650.32 NO - PW00625 ITS Master Plan 7,644.83 7,644.83 NO -
PW00626 Ashlan Ave Wireless ITS Corr 486,898.75 486,898.75 NO - PW00628 FRE040401 TS: Palm and Sierra 260,453.20 260,453.20 NO - PW00629 Jensen EB Overlay Chest to Wil 208,765.51 208,765.51 NO - PW00630 North Ave Overlay Cedar to Wil 480,296.09 480,296.09 NO - PW00632 FRE040401 Millbrook & Shields LT Phasing 249,124.96 249,124.96 NO - PW00633 Copper Trail Friant to Chest 2,137,969.06 2,137,969.06 NO - PW00634 FRE071901 SRTS Pinedale Elem Sidewalks 294,300.14 294,300.14 NO - PW00636 FRE090611 Cedar Overlay Dakota to Gettys 578,094.12 578,094.12 NO - PW00637 FRE090611 Van Ness Overlay RR to Inyo 569,240.38 569,240.38 NO - PW00638 FRE071901 SRTS Pinedale Elem Education 7,403.05 7,403.05 NO - PW00639 Sugar Pine Trail Crossing at Nees and SR41 1,364.57 23,820.00 445,225.19 470,409.76 NO - PW00648 FRE090611 Chestnut Overlay UPRR - Jensen 576,746.37 576,746.37 NO - PW00649 Friant Overlay Champ - Copper 1,102,268.55 1,102,268.55 NO - PW00650 FRE090611 Nees Overlay Millbrk to Cedar 490,002.49 490,002.49 NO - PW00651 FRE090611 Orange Overlay Butler to CA 363,621.78 363,621.78 NO - PW00652 FRE090611 Fresno Overlay Gettysbrg - Sierra 1,125,408.57 1,125,408.57 NO - PW00660 FRE071901 SRTS Florence Ave Balderas 95,587.70 95,587.70 NO - PW00661 Fulton Mall Recon Engineering 16,653,831.73 94,550.00 3,646,357.95 20,394,739.68 NO - PW00662 Downtown Housing Infill Fees 50.75 889,285.00 889,335.75 NO - PW00663 HSR Master Co-op Agreement 403,576.31 403,576.31 NO - PW00665 Sugar Pine Trail Drink Fountain 49,127.91 48,278.31 97,406.22 NO - PW00666 Eaton Trail Resurfacing 220,495.91 220,495.91 NO - PW00667 Children's Safe Kids Project 43.39 43.39 NO -
PW00668 Herndon EB Wide Brawley-Blythe 95.48 625,125.96 621,506.45 1,246,727.89 YES 1,246,727.89 PW00669 Veterans Blvd Right-Of-Way 14,045,487.74 1,977,166.15 16,022,653.89 NO - PW00670 Sect 130 RR Clovis & McKinley 33,105.82 33,105.82 NO - PW00671 Sect 130 RR Fresno & Q Street 14,767.90 14,767.90 NO - PW00674 FRE040401 TS Palm & McKinley 426,253.97 426,253.97 NO - PW00675 FRE040401 TS Bulldog & Cedar 348,051.14 348,051.14 NO - PW00676 TS Shields & Weber 865,877.62 865,877.62 YES 865,877.62 PW00677 Herndon Overlay Blkstn to West 1,256,966.75 1,256,966.75 NO - PW00678 TS Clinton & Valentine 404,847.03 404,847.03 YES 404,847.03 PW00679 Herndon/BNSF Bridge Widening (Polk to Milburn) 1,196,259.71 0.00 1,196,259.71 YES 1,196,259.71 PW00680 TS Blackstone & Fedora 274,136.27 274,136.27 NO - PW00681 Friant Rehab Nees to Fresno 692,266.26 692,266.26 NO - PW00682 TS Audubon & Cole 155,424.30 155,424.30 YES 155,424.30 PW00683 Veterans/UPRR/HSR Overpass 49.89 5,478,453.10 5,478,502.99 NO - PW00684 TS Shields & Temperance 159,011.63 159,011.63 YES 159,011.63 PW00685 Friant SB Widening at Shepherd 6,274.92 6,274.92 NO - PW00689 ITS Van Ness & Fresno 1,247,230.57 1,247,230.57 NO - PW00690 Herndon WB Brawley to Blythe 980,534.98 69,217.00 59,436.85 1,109,188.83 YES 1,109,188.83 PW00692 TS Barstow & Brawley 359,442.37 359,442.37 YES 359,442.37 PW00695 Bankside Trail Blkstn-Van Ness 2,499.52 2,499.52 NO - PW00697 FRE040401 TS Clinton & Vassar 8,339.00 8,339.00 NO - PW00698 FRE040401 TS Tulare & R 401,611.63 401,611.63 NO - PW00699 FRE150045 Master Trail Plan Update 221,259.17 48,417.68 36,522.00 306,198.85 NO - PW00700 FRE040501 Bridge Assess Program 12,809.62 12,809.62 NO - PW00701 Broadway San Joaquin to Amador "Fulton Village" 10,413.25 63,000.00 73,413.25 NO - PW00702 Broadway Calaveras-San Joaquin "Broadway" 7,494.06 456,250.00 463,744.06 NO - PW00703 L Street Calaveras-San Joaquin "L Street" 6,969.14 75,244.12 82,213.26 NO - PW00706 Veterans Trail Hayes to Polk 500,500.00 500,500.00 NO - PW00707 FRE040501 TS LT Palm & Clinton 489,531.46 5,928.49 495,459.95 NO - PW00708 Cedar Bike Ln Clinton to McKin 76,617.15 76,617.15 NO - PW00710 Intersection Improvements Central & Orange 444,396.44 444,396.44 YES 444,396.44 PW00711 Inter Improve Central & Cedar 7,561.93 7,561.93 NO - PW00712 North Ave Overlay Elm to Fig 619,025.57 619,025.57 NO - PW00713 Inter Improve Blackstone & Shields 2,274,000.08 2,274,000.08 NO - PW00714 Street Sweeper Vehicles 631,651.09 631,651.09 NO - PW00716 Neighborhood Street Improve 223,006.84 112,915.46 335,922.30 NO - PW00717 Met Block Offsite Improvements 234,240.88 234,240.88 NO - PW00718 Brdway Street Imp Calaveras-SJ 3,469.62 218,451.28 221,920.90 NO - PW00720 Ped & Bike Trail Develop Reimb 644,793.42 644,793.42 NO - PW00723 Barstow Bike Ln & Sidewalk 6,488.66 6,488.66 NO - PW00724 FRE020133 Herndon Trail Ingram - College 395,158.53 220,600.00 615,758.53 NO - PW00725 Shields Bankside Trail Fresno to First (Seg 2) 1,646,217.35 293,262.27 149,059.00 2,088,538.62 NO - PW00726 Orange Avenue Sidewalks 367,027.26 367,027.26 NO - PW00727 CNG Sweeper Vehicle 315,725.17 315,725.17 NO -
PW00728 FRE150045 Bike Ln Butler Hzlwood - Peach 196,291.15 302,178.84 498,469.99 NO - PW00729 FRE150045 SRTS Clinton & Thorne Hamilton 398,900.12 398,900.12 NO - PW00730
FRE150045 SRTS Hughes Sidewalks Hedges-Floradora (Adams Elementary) 178,656.94 178,656.94 NO -
PW00731 FRE090611 Blackstone Overlay Shaw-Ashlan 1,912,013.80 1,912,013.80 NO - PW00733 FRE090611 Clovis Overlay Jensen-CA/UPRR 1,103,190.36 1,103,190.36 NO - PW00734 FRE090611 Shields Overlay Blackstone-Palm 810,168.58 810,168.58 NO - PW00735 FRE092610 TS Tulare & N 685,873.94 685,873.94 NO - PW00736 Tulare Ave Clovis to Argyle 120.30 120.30 NO -
PW00740 Bridge Maint Deck Rehab 1 341,255.90 341,255.90 NO - PW00742 ITS Shaw Ave SR99 to SR41 Adaptive 354,050.91 256.50 354,307.41 NO - PW00743 ITS Herndon from Golden State to Willow Adaptive 2,112,841.36 2,112,841.36 NO - PW00744 BPMP Bridge Maint Deck Rehab 2 (Progrm Maint Only) 17,063.10 17,063.10 NO - PW00745 Fancher Creek Trail Clovis-Argyle 98,483.17 98,483.17 NO - PW00747 Blackstone Street Lighting Divisadero to Shields 1,223,600.60 1,223,600.60 NO - PW00748 FRE090611 Blackstone AC Overlay Shields to Dakota 775,538.95 775,538.95 NO - PW00749 FRE020617 Shaw EB Overlay Blythe-Brawley 318,975.53 318,975.53 NO - PW00750 FRE020617 McKinley Overlay Marks-Hughes 528,232.14 528,232.14 NO - PW00751 FRE020617 Clinton AC Overlay Blackstn-Maroa 466,365.70 466,365.70 NO - PW00752 Orange Overlay CA-Jensen 660,758.86 660,758.86 NO - PW00753 FRE020617 Shields Overlay Sunnyside-Fwlr 514,762.27 514,762.27 NO - PW00758 FRE090611 Bullard Ave Repaving(Cty/Cnty) 912,772.42 171,625.49 1,084,397.91 NO - PW00759 Fairview Trail Repairs/Recon 215.95 198,668.53 198,884.48 NO - PW00761 Streetlight LED Upgrade 60,977.37 60,977.37 NO - PW00762 Herndon Canal Trail - Shields to McKinley (Seg 3) 280,002.35 130,744.89 410,747.24 NO - PW00763 McKinley Avenue Trail - Millbrook to Clovis (Seg 4) 151,816.38 403,068.50 554,884.88 NO - PW00764 Clovis Avenue Trail - McKinley to Shields (Seg 5) 1,606,135.32 365,737.13 1,971,872.45 NO - PW00767 Ashlan - Effie to SR41 Sidewalk 54,644.85 178,532.85 233,177.70 NO - PW00768 TS Chestnut & Shields LT Phasing (City/Cty) 514,177.06 514,177.06 NO - PW00769 FRE040401 TS Belmont & Fulton 480,295.43 480,295.43 NO - PW00771 BPMP Bridge Deck Rehab Phase 2 221,120.70 221,120.70 NO - PW00772 Friant Road Median Cap, Fresno to Nees 35.29 35.29 NO - PW00774 Shields Ave Trail - Blackstone to Fresno (Seg 1) 119,726.50 13,037.86 274.53 551,076.74 684,115.63 NO - PW00780 TS Dakota and West LT Phasing 459,957.33 459,957.33 NO - PW00782 Street Lighting Major Repair Projects 74.11 163,391.70 163,465.81 NO - PW00784 Abby AC Overlay - Divisadero to Olive 550,289.14 550,289.14 NO - PW00785 First Street AC Overlay - Alluvial to Herndon 873,855.40 873,855.40 NO - PW00786 Jensen AC Overlay - Cornelia to Chateau 3,165,097.96 3,165,097.96 NO - PW00787 SB Friant Ave AC Overlay - Champlain to Shepherd SB 856,390.06 856,390.06 NO - PW00788 Inyo AC Overlay - Van Ness to P 1,010,814.48 1,010,814.48 NO - PW00789 Ashlan AC Overlay - Valentine to West 1,461,481.01 1,461,481.01 NO - PW00790 Jensen AC Overlay - SR41 to MLK 266,261.32 317.75 2,682.86 269,261.93 NO - PW00791 Blackstone AC Overlay - Dakota to Ashlan 2,015,498.71 2,015,498.71 NO - PW00792 Belmont AC Overlay - Cedar to Chestnut 1,130,251.16 1,130,251.16 NO - PW00793 Ashlan AC Overlay - First to Millbrook 513,276.38 513,276.38 NO - PW00795 Olive Ave Streetscape - Yosemite to Roosevelt 1,202,668.60 1,202,668.60 NO - PW00796 Polk Ave Street Reconstruction Shaw to Gettysburg 115,015.47 22.81 150,555.41 265,593.69 NO - PW00797 South Van Ness Industrial Area 174,884.53 174,884.53 NO - PW00801 Sect 130 RR McKinley and BNSF 57.08 57.08 NO -
PW00802 South Stadium Development 19,727.48 19,727.48 NO - PW00803 Citywide Street Light LED Retrofit - Phase 2 705,462.06 705,462.06 NO - PW00805 Eaton Trail Extension - Palm Bluffs River Access (Palm to SR41) 149,318.88 149,318.88 NO - PW00807 TS Gates and San Jose 652,692.87 652,692.87 YES 652,692.87 PW00808 TS Divisadero and Mariposa 746,230.15 746,230.15 NO - PW00809
ITS Adaptive Blackstone Ave McKinley to Divisadero; ITS Adaptive Abby - Olive to Divisadero 1,697,842.39 57,920.45 1,755,762.84 NO - PW00810 ITS Adaptive Blackstone / Friant - McKinley to Shepherd 2,619,274.21 2,619,274.21 NO - PW00811 ITS Adaptive Ventura/Kings Canyon Van Ness to Chestnut 2,213,775.56 2,213,775.56 NO - PW00812 TS Tulare and Q 2,649.27 2,649.27 NO -
PW00814 Urban Forest Tree Inventory 577,321.71 577,321.71 NO - PW00815 Central Ave Street Improvements East to Orange 269.16 269.16 NO - PW00816
NSI7S - Webster Neighborhood Canal Barricade (On Clark St from Hammond to Floradora) 383,792.89 383,792.89 NO -
PW00817 Stadium Streetlighting at Bulldog Lane and Millbrook 50,204.43 50,204.43 NO - PW00822 R/W Acquisition - CUP-08-172 144.20 144.20 NO - PW00823 Trail Network Expansion Feasibility Plan 294.34 370,855.42 53.23 371,202.99 NO - PW00825
Downtown Fresno Courthouse Park Interconnectivity Project (Traffic Signals on L Street intersection of Fresno/Tulare Streets) 802,144.88 44.20 802,189.08 NO - PW00826 R/W Acquisition - Tract 5538 307.98 307.98 NO - PW00827 Herndon Ave Golden State to Willow Signalized Intersection 117,554.66 117,554.66 NO - PW00828 Shaw Ave. Ped. Countdown Heads West to Chestnut 88,108.49 88,108.49 NO - PW00829
Blackstone/Abby and Ventura/Kings Canyon BRT Corridor
Improvements 153,667.49 153,667.49 NO -
PW00830 TS Marks and Nielsen 190,353.36 190,353.36 YES 190,353.36 PW00831 Systemic Safety Analysis Report Program( NI) 197,960.71 14,959.00 212,919.71 NO - PW00836 TS LT Barstow and Palm Avenues 1,048.95 1,048.95 NO - PW00837 TS California and Walnut Avenues 190.75 190.75 YES 190.75 PW00839 TS Armstrong and Lane 113.21 113.21 NO -
PW00841 TS LT Clinton and Fresno - PE/ROW ONLY 14,743.96 14,743.96 NO - PW00842 MLK Center Active Transportation Infrastructure Project 720,486.36 179.36 30,704.35 751,370.07 NO - PW00843 McKinley Ave Widening - Marks to Hughes 234,950.03 96.33 235,046.36 YES 235,046.36 PW00844 TCC Chinatown Urban Greening (Kern and F Street #6) 425.77 362,086.31 362,512.08 NO - PW00845 TCC Chinatown Urban Greening (#1 STI) 380.81 86,459.18 86,839.99 NO - PW00846 TCC Mariposa Plaza 2,240.88 462,992.13 465,233.01 NO - PW00847 Chinatown Urban Greening Project (China Alley) 234.91 234.91 NO - PW00849
TCC SW Fresno Green Trails and Cycle Paths Initiative (Fanning Ditch) 336.55 410,249.30 410,585.85 NO -
PW00850 Blackstone/McKinley/BNSF Grade Separation (feasibility study) 155.93 68,924.87 69,080.80 NO - PW00851 North Avenue/UPRR Grade Separation (feasibility study) 185,494.21 185,494.21 NO - PW00854 Bullard AC Overlay - Cedar to First 1,119,215.15 1,119,215.15 NO - PW00857 MLK Magnet Park 1,346,599.51 1,346,599.51 NO -
PW00858 TCC Community Engagement Plan (L) 236,359.78 236,359.78 NO - PW00859 Blackstone Underground Easement 102,012.37 102,012.37 NO - PW00860
Maple Ave Cycle Track & Ped Scramble Shaw to Gettysburg (CON Only) 56,825.33 60,067.19 62,110.81 179,003.33 NO - PW00861 TCC Grant Administration 721,103.58 721,103.58 NO - PW00862 TCC Chinatown Project (L) 10,807,592.38 10,807,592.38 NO - PW00863 TCC EOC Partnership 1,195,494.98 1,195,494.98 NO - PW00864 TCC Grid Solar Single Family (L) 666,488.07 666,488.07 NO - PW00865 TCC Grid Solar Multi Family (L) 69,932.02 69,932.02 NO - PW00866 TCC Clean Shared Mobility (L) 1,618,503.14 1,618,503.14 NO - PW00867 TCC Annadale Mode Shift (L) 343,000.00 343,000.00 NO - PW00869 TCC Yosemite Village (L) 366,213.75 366,213.75 NO - PW00870 TCC Inside Out Community Garden 79,986.00 79,986.00 NO - PW00871 TCC SW Fresno Food Hub Community Orchard Project (L) 62,981.23 62,981.23 NO - PW00872 TCC SW Fresno Food Hub Urban Heat Island Mitigation (L) 17,085.30 17,085.30 NO - PW00873 TCC SW Fresno Food Hub Urban Edible Food Rescue & Dist (L) 208,187.85 208,187.85 NO - PW00874 TCC Workforce Development Plan 405,979.49 405,979.49 NO - PW00875 TCC SW Urban Forest Expansion 203,799.77 203,799.77 NO - PW00876 TCC FCC Satellite Campus 12,094,773.71 12,094,773.71 NO - PW00877 TCC Community Engagement Plan 134,570.50 134,570.50 NO - PW00878 SRTS MidTown School Multimodal Interconnectivity Project 62,921.16 240,046.22 302,967.38 NO - PW00879 Fresno VanNess and BRT Adaptive Signal Control Tech 522.88 94.05 55,027.50 339.98 55,984.41 NO - PW00880
South Fresno Pedestrian Countdown Equip Belmont Delno to Clovis 395,444.65 395,444.65 NO -
PW00881 First Street - Ventura to Nees Corridor Improvements 115,336.92 115,336.92 NO - PW00882 Fresno Street - B to Friant Corridor Improvements 623,805.06 623,805.06 NO - PW00883 Veterans Blvd-Phase 4a Shaw to Barstow (CON Only) 519.57 3,402,305.38 95,742.37 5,637.87 3,504,205.19 YES 3,504,205.19 PW00885 TS LT Butler and Cedar 33.25 0.00 33.25 NO -
PW00888 Fancher Creek Parkway Plan 613.73 227,722.46 188.35 844.59 229,369.13 NO - PW00891 Ashlan Widening Polk-Cornelia 149,191.44 0.00 149,191.44 YES 149,191.44 PW00893 Muir Elem Safe Routes to School 2,172.05 2,172.05 NO - PW00894 TS LT McKinley and Blythe Ave; McKinley Elem Safe Routes 84,978.67 84,978.67 NO - PW00897 Central Ave Widening - Cedar to Orange 267.32 267.32 NO - PW00898 Ashlan Ave ITS - Cornelia to Blackstone 1,177,434.42 1,177,434.42 NO - PW00901 TOD Tower at Van Ness & Olive 862.20 317,920.07 318,782.27 NO - PW00902 Merced Street Reconnection 1,179.06 114,229.82 115,408.88 NO - PW00903 TS Butler and 8th & Orange and Lowe- Winchell 1,174.87 353,176.06 30.94 354,381.87 NO - PW00904 High Speed Rail Develop Svcs Phase II 247.63 25,046.24 25,293.87 NO - PW00905
TS Gettysburg and Polk & Sidewalks-Inspiration Park (ATP CON Only) 55,996.89 788,351.15 20.10 57,700.55 902,068.69 YES 902,068.69 PW00906
First St Cycle Track Tulare to Ventura/Hazelwood (ATP CON Only) 99.14 377,774.01 377,873.15 NO -
PW00907 Barton/Florence Sidewalks - Calwa Park 570.26 102,483.62 103,053.88 NO - PW00908 TS Fresno and Browing Avenue -Robinson Elementary 2,075.65 188,635.54 190,711.19 NO - PW00909 HAWK Peach and McKenzie Trail 214,842.85 56.74 214,899.59 NO - PW00910 Tulare Complete Street - 6th to Cedar Avenue 278,358.77 380.91 278,739.68 NO - PW00911 Chestnut AC Overlay - Kings Canyon to Butler 224,902.92 11.83 (11.83) 224,902.92 NO - PW00915 TCC Technical Assistance Grant 133,522.89 133,522.89 NO - PW00916 Trail Network Wayfinding Plan 121,709.27 11,488.46 133,197.73 NO - PW00918 Electrical Vehicle Charging Program 348,235.38 348,235.38 NO - PW00922 Jensen ITS Adaptive Elm to Temperance 615,325.53 615,325.53 NO - PW00923 Veterans Phase 4b-Riverside to Herndon Connection 701.02 6,698.07 3,340,601.17 3,348,000.26 YES 3,348,000.26 PW00925 Highway City Neighborhood Street Revitalization 43.60 43.60 NO - PW00926 TOD Blackstone & McKinley (Lingo) 330.34 675,935.45 161.55 416,530.87 1,092,958.21 NO - PW00927
Veterans Blvd Phase 3 - SR99 Interchange and Extension
Construction 9,317,177.37 9,794,342.94 11,054.66 19,122,574.97 NO - PW00928 Cedar Ave Complete Streets Jensen to Church 161,131.13 161,131.13 NO - PW00929 Blackstone AC Overlay Minarets to Nees 282,802.34 0.00 282,802.34 NO - PW00930 Shaw Ave Street Lighting, Cedar to Chestnut 85,921.89 85,921.89 NO - PW00933 Ericson Elem Neighborhood Reconstruction 38.13 38.13 NO - PW00937 Blackstone-McKinley Grade Separation 557.49 557.49 NO - PW00944 Storm Drains Clinton West of Valentine 840.06 840.06 NO - PW00946 Palm and Belmont Class IV Cycle Track 44,880.04 9,136.91 54,016.95 NO - PW00947 South Fresno AB617 Truck Rerouting Study 185.39 161,686.96 161,872.35 NO - PW00949 Urban Management Plan 19/20 288.07 148,909.04 73.09 149,270.20 NO - PW00953 Dynamic Downtown Part 2 359.28 359.28 NO -
PW00955 ITS Friant Ave adaptive Traffic Signal Synchronization Project 139,804.52 139,804.52 NO - PW00956 Blackstone Ave - McKinley to Shields: Smart Mobility 195,083.48 195,083.48 NO - PW00958
TS Amador_Trinity & Church_Waldby (Kids Crossing: Safe Routes to School in South Fresno) 824.92 72,724.59 73,549.51 YES 73,549.51 PW00961 TS LT Cedar & Teague 51.18 51.18 YES 51.18
PW00969 R/W Acquisition Tract 6162 93.96 93.96 NO -
PW00972 Barstow Class IV Bike Ln; Blackstone to Cedar 63.55 1,044.20 1,021.88 662.43 198.27 129,359.08 132,349.41 NO - PW00974 Vehicle Miles Traveled Mitigation Program 81.65 37,636.25 37,717.90 NO - PW00975 TCC Workforce Admin 50,300.40 50,300.40 NO -
PW00976 TCC SCCCCD Welding Program 609,674.20 609,674.20 NO - PW00978
TS/scramble Chestnut and Weldon. HAWK First & Home; Cross, Walk & Roll! Ericson & Mayfair Elementary Schools (Central Fresno SRTS) 23,645.17 10,379.82 34,024.99 NO -
PW00979 Fresno Rapid Rectangular Flashing Beacon (RRFB) Project 2,786.08 35,161.23 69.79 0.00 38,017.10 NO - PW00980 Citywide Pedestrian Countdown Heads 3,987.20 31,438.69 35,425.89 NO - PW00984 R/W Acquisition - TS Grandland Barstow 107.00 107.00 NO - PW00986 River West Eaton Trail Extension 634,067.71 634,067.71 NO - PW00987 Florence Ave Street Rehab & Sidewalks, Maple to Chestnut. 70.72 70.72 NO - PW00999 Eaton Trailhead N/O Ft Washing 1,604.59 1,604.59 NO - PW01002 TS Barstow and Bond 19,002.82 0.00 19,002.82 NO - PW01003 Herndon Ave AC Overlay Valentine to Mark 32,726.78 32,726.78 NO - PW01004 First Street Class IV and resurfacing Olive to Tulare 22,510.74 22,510.74 NO - PW01005 Clovis Adaptive ITS Shields to American 5,813.92 5,813.92 NO - PW01006 California Complete Streets Project Fruit to Mayor 21,901.74 21,901.74 NO - PW01007 Palm Ave Adaptive ITS Herndon to Shaw. 30,798.81 30,798.81 NO - PW01008
Chestnut Avenue Neighborhood Sidewalks (Bakman
Elementary) 1,080.99 1,080.99 NO -
PW01009 Cedar AveAC Overlay Herndon-Alluvial 27,641.85 27,641.85 NO - PW01010 E St Reconst El Dorado-Ventura 6,110.70 6,110.70 NO - PW01011 Shaw AC Rehabiliation/Overlay Fruit-950 east of Palm 21,345.49 21,345.49 NO - PW01012 Downtown Neighborhood Beautification 3,161.26 198,926.03 1,063.59 0.00 203,150.88 NO - PW01018 Clinton-Hughes-Shields-West Neighborhood 4,521.91 4,521.91 NO - PW01019 Gettysburg-First-Fairmont-Millbrook Neighborhood (0.00) 279,290.28 0.00 279,290.28 NO - PW01020 TS Audubon & Del Mar 286.54 286.54 YES 286.54
PW01022 Major Street Beautification 13,682.32 0.00 13,682.32 NO - PW01023 Blackstone Smart Mobility, SR-180 to Pine Avenue (PE Only) 9,420.96 9,420.96 NO - PW01024 Friant Rd SB Rt Turn Lane Extension 350.72 418.50 769.22 NO - PW01046 NI SS4A - COF Vision Zero Action Plan 269.02 269.02 NO - PW01048 San Pablo Park - Caltrans Art 5,067.31 5,067.31 NO - Total 123,077,039.26 28,101,703.50 32,693,958.28 27,620,079.25 1,242,184.61 942,791.41 2,990,508.24 5,905,269.41 2,045,542.09 11,339,832.63 6,441,270.93 1,599,686.26 243,999,865.87 29,294,367.14