The analysis does not include parcels that do not contain residences nor does it make a distinction of active versus inactive service.
Stormwater Drainage
The stormwater drainage analysis includes review of the existing curb and gutter facilities in the DUC areas. Adequate stormwater drainage is defined as having curb and gutter located between a parcel containing one or more residences and the adjacent street(s) throughout the entire DUC area. FEMA Flood Zones are also given to indicate the likelihood that an area would face a significant flood threat.9
Zone X: Areas determined to be outside the 0.2% annual chance floodplain.
Zone XS: Zone X (shaded). Areas of 0.2% annual chance flood; areas of 1% annual chance flood with average depths of less than 1 foot or with drainage areas less than 1 square mile; and areas protected by levees from 1% annual chance flood.
Zone A: No Base Flood Elevations determined.
Zone AE: Floodway Areas. The floodway is the channel of a stream [or canal] plus any adjacent floodplain areas that must be kept free of encroachment so that the 1% annual chance flood can be carried without substantial increases in flood heights.
Structural Fire Protection
Fire protection service is provided through the City of Fresno Fire Department and through response agreements with the City of Clovis Fire Department and the Fresno County Fire Protection District. Adequate structural fire protection is defined as having all parcels located within a four minute-response area. Only two DUC areas are not completely within this area.
9 Flood Insurance Rate Map for Fresno County. Federal Emergency Management Agency, 2009.
B3 Attach #1 of 3
3-70 FRESNO GENERAL PLAN
Accessibility to fire hydrants is also important to the structural fire protection of DUCs, yet it was not possible to give an accurate analysis for fire hydrant coverage due to the constraints in mapping the (conservative) 500 foot range of coverage from a hydrant to a parcel via travel path. However, maps showing the 500 foot circular radius around fire hydrants is given in Appendix A to denote a general awareness of where fire hydrant coverage is sparse and where it is abundant. It should be noted that in areas without fire hydrant protection, the fire department will deploy a water tender and draft from seasonal irrigation canals as available to supplement the 500-700 gallons of fire suppression water carried on each apparatus. However, this alternate means of fire suppression results in significant delays or inability to mount an interior fire attack in a house, which affects rescue of the inhabitants and the deployment of adequate hose streams to protect adjacent structures.
B3 Attach #1 of 3
3-71
Chapter 3: Urban Form, Land Use, and Design
In the following table, information is given for each DUC that exhibits the extent to which adequate infrastructure (as defined for each category) exists in those areas.
The number of parcels with residences within each DUC was determined through visual interpretation of aerial maps and Google Maps Street View. Maps and additional data are included in Chapter 3, Appendix A.
TABLE 3-3: DUC INFRASTRUCTURE CONDITIONS SUMMARY
#
Water1 Wastewater1 Stormwater Drainage Structural Fire
Protection
Connected
Line
Connected
Line Curb & Gutter FEMA
Flood Zone
Within 4 Minute
Zone
1 4 of 18 | 22% 7 of 18 | 39% No Zone X 100%
2 8 of 39 | 21% 1 of 39 | 3% No Zone X 100%
3 0 of 249 | 0% 0 of 249 | 0% No Zone X & Zone XS 100%
4 131 of 221 | 59% 53 of 221 | 24% No Zone X & Zone XS 100% 5 0 of 14 | 0% 0 of 14 | 0% No Zone X & Zone XS 3.6%
6 0 of 39 | 0% 0 of 39 | 0% No Zone X & Zone A 100%
7 0 of 12 | 0% 0 of 12 | 0% No Zone X 100%
8 0 of 25 | 0% 0 of 25 | 0% No Zone X 100%
9 1 N/A2 1 N/A2 N/A Zone X 60%
10 0 of 4 | 0% |
12 N/A2
0 of 4 | 0% |
12 N/A2 No Zone X 100%
11 0 of 15 | 0% 0 of 15 | 0% No Zone X 100%
12 327 of 330 | 99% 324 of 330 | 98% Yes Zone X & Zone XS 100% 13 13 of 14 | 93% 0 of 14 | 0% No Zone XS 100%
14 104 N/A3 83 of 104 | 80% No Zone X, Zone XS, &
Zone AE 100%
15a 462 N/A3 416 of 462 | 90% No Zone X & Zone XS 100%
15b 122 of 131 | 93% | 5
N/A3 125 of 136 | 92% No Zone X & Zone XS 100%
16 159 of 159 | 100% |
441 N/A3 587 of 600 | 98% No Zone XS 100%
17 976 of 976 | 100% 976 of 976 | 100% No Zone X & Zone XS 100% 18 1195 of 1195 | 100% 1195 of 1195 | 100% Yes Zone X, Zone XS, & Zone AE 100%
19 56 of 60 | 93% 60 of 60 | 100% No Zone XS 100%
20 272 of 272 | 100% 264 of 272 | 97% No
(missing 3 parcels) Zone X 100%
1 Counts of parcels with one or more residences are considered as a close approximation. 2 These parcels are located within the boundaries of the Malaga Water District. 3 These parcels are located within the boundaries of the Bakman Water District.
B3 Attach #1 of 3
3-72 FRESNO GENERAL PLAN
Water Districts
As noted in Table 3-4, some DUCs or portions of DUCs are served by the Malaga and Bakman Water Districts. While the active service in these areas may be more limited than the actual district boundaries, they are nevertheless excluded from the analysis because an activation or system upgrade in these areas would be managed by the respective water district, not the City.
Potential Funding Mechanisms to Address Deficiencies
SB 244 does not require cities to provide infrastructure directly to DUC areas, however, it does require cities to evaluate potential funding mechanisms that would make such service extensions feasible. The following alternatives are provided as potential funding mechanisms that could be utilized by entities within the governmental, private, and non-profit realms.
New Development
One way to address existing deficiencies is through new private development where the installation, upgrade, or expansion of infrastructure would be required to serve the new development. This type of development typically occurs on a limited, site-specific basis and is thus unlikely to address area-wide infrastructure needs within large areas that are nonadjacent to the city limits. However, for small areas like DUC Area 1 or in areas like DUC Area 15b, where infrastructure is missing from only a small number of parcels, private development could be effective in completing the community’s total infrastructure needs.
Service Districts
Another mechanism to provide infrastructure is to establish an assessment district to bond for infrastructure construction and pay for it over time. A district would fund the cost of the infrastructure within a designated area through the fairly proportioned financial contributions of each benefiting landowner. To form a district, property owners vote to affirm the establishment of the district and assessment through a special election. This method would be most effective in areas that are missing significant portions of infrastructure such as water and sewer mains along major corridors.
Grants and Loans
There are numerous state, federal, and regional grants and loans that can provide funding for infrastructure projects within DUCs. Some examples include:
B3 Attach #1 of 3
3-73
Chapter 3: Urban Form, Land Use, and Design
STATE WATER RESOURCES CONTROL BOARD DRINKING WATER STATE REVOLVING FUND10 The DWRSF is a State-managed fund that can supply low-interest to no-interest loans to provide drinking water infrastructure to disadvantaged communities.
Eligible applicants include cities, counties, districts, for-profit and non-profit community water systems, public school districts and other non-community water systems, and systems that are created by the project. The repayment terms are 20 years or longer and the principal balance may be forgiven for publicly owned water systems or non-profit mutual water companies that serve disadvantaged communities.
STATE WATER RESOURCES CONTROL BOARD CLEAN WATER STATE REVOLVING FUND10 The CWSRF provides low interest financing agreements (dependent on General Obligation Bond Rate) for wastewater and stormwater treatment projects.
Eligible applicants include cities, counties, districts, state agencies, tribal governments/organizations, agencies approved under Section 208 of the Clean Water Act, 501(c)(3)s, and National Estuary Programs. The repayment terms are up to 30 years or the useful life of the project. A percentage of the total project cost up to the full amount may be waived for projects benefiting DACs.11
STATE WATER RESOURCES CONTROL BOARD DIVISION OF FINANCIAL ASSISTANCE The Division of Financial Assistance is in charge of implementing the State Water Resources Control Board’s financial assistance programs and contains a link to current funding sources on its website at
www.waterboards.ca.gov/water_issues/programs/grants_loans GROUNDWATER QUALITY FUNDING ASSISTANCE12
The Groundwater Grant Program holds approximately $744 million dollars for the prevention and cleanup of contamination of groundwater-sourced drinking water. Up to $160 million has been specifically set aside for project serving disadvantaged communities (DACs) and economically distressed areas (EDAs).
Eligible applicants include public agencies, non-profits, tribal organizations, public utilities, and mutual water companies. Grants range from $100,000 - $1 million for planning and $500,000 - unrestricted for implementation. Funds are 10 “Below-Market Financing for Wastewater & Water Quality.” State of California Clean Water State Revolving Fund.
11 "Proposition 1 - Small Community Wastewater." State Water Resources Control Board, 15 Sept. 2015. 12 “WaterBoard Groundwater Funding Programs.” California Water Boards.
B3 Attach #1 of 3
3-74 FRESNO GENERAL PLAN
available from 2018 to 2021. Minimum local matching is 50%, however this may be reduced or waived for projects that benefit a DAC or EDA.
INTEGRATED REGIONAL WATER MANAGEMENT (IRWM) GRANT PROGRAM13 The IRWM Grant is administered by the Department of Water Resources and contains approximately $474.3 million in funding to be applied to projects that will adapt water systems to climate change, improve collaboration in regional water management, and increase regional water self-reliance (reducing reliance on the Sacramento-San Joaquin Delta). Of this $102 million is set aside for assistance to disadvantaged communities (DACs). Eligible applicants include public agencies, non-profits, tribal organizations, public utilities, and mutual water companies. Minimum local matching is 50%, however this may be reduced or waived for projects that benefit a DAC or EDA.
INFRASTRUCTURE STATE REVOLVING FUND (ISRF) LOAN PROGRAM14 The California Infrastructure and Economic Development Bank manages the ISRF program to provide low-cost financing for infrastructure projects in amounts ranging from $50,000 to $25 million with terms of up to 30 years.
Municipal agencies and non-profit entities with municipal sponsors are eligible for funding.
USDA RURAL DEVELOPMENT WATER & WASTE DISPOSAL LOAN & GRANT PROGRAM15 The United States Department of Agriculture manages a Water & Waste Disposal Loan & Grant Program that offers long-term (up to 40 years), lowinterest loans (sometimes combined with grants) for the construction or improvement of drinking water, sewer, solid waste, and storm water facilities in rural communities. The program may be pursued by state and local government entities, non-profits, and federally recognized tribes. 13 “Proposition 1 IRWM Grant Program.” California Department of Water Resources. 22 Feb. 2016. 14 California Infrastructure and Economic Development Bank. Criteria, Priorities and Guidelines for the Selection of Projects for Financing Under the Infrastructure State Revolving Fund (ISRF) Program. Adopted August 25, 2015.
15 “Water & Waste Disposal Loan & Grants Program..” United States Department of Agriculture, Rural Development.
B3 Attach #1 of 3
3-75
Chapter 3: Urban Form, Land Use, and Design
COMMUNITY DEVELOPMENT BLOCK GRANT FUND16
Administered by the United States Department of Housing and Urban Development, CDBG Funds are used to benefit low- and moderate-income communities, blighted communities, and communities that face issues of health and welfare. The fund may be used by the state and by cities and counties and can be applied toward infrastructure improvements.17
16 "CDBG Entitlement Program Eligibility Requirements." US Department of Housing & Urban Development, 2014.
17 "Expenditure Report: Use of CDBG Funds by Fresno County, CA." US Department of Housing & Urban Development, Office of Community Planning and Development. 12 Jan. 2015 B3 Attach #1 of 3
3-76 FRESNO GENERAL PLAN
B3 Attach #1 of 3
DECEMBER 2014 3-77
Chapter 3: Urban Form, Land Use, and Design
B3 Attach #1 of 3
4 MOBILITY AND
TRANSPORTATION
The purpose of the Mobility and Transportation Element is to provide an efficient, multi-modal transportation system that will meet the needs of all residents throughout the planning period. The Element is based on a fundamental philosophy that travel needs can be met through a comprehensive program of transportation planning, land use planning, growth management strategies, and a new Complete Streets concept. This Element includes objectives and policies for all modes and all users of streets and highways, transit, sidewalks and trails, and bicycle transportation modes, as well as parking, goods movement strategies, and the City’s airports.
B3 Attach #1 of 3
4.1 CONTEXT
This element has a strong connection to the Urban Form, Land Use, and Design Element, as the intensity, type, and location of land uses directly affects demand for transportation, and the idea of Complete Neighborhoods and pedestrian-oriented shopping districts must be supported by a well-connected system of Complete Streets, transit, and pedestrian and bicycle networks. A good transportation system also is critical to achieving the economic goals of this General Plan. Issues of transportation and connectivity also influence issues in other elements, such as supporting healthy communities; a resilient city; fiscal sustainability; improving air quality; access to police, fire, and medical services; and the ability to go for a walk. The appearance and function of public roadways is also one of the major components of a city’s character and functionality, and one of the City government’s main investments in the public realm and sense of place of its community.
Relationship to General Plan Goals
The Mobility and Transportation Element supports a number of General Plan goals, in particular the following:
1. Increase opportunity, economic development, business and job creation.1 Use urban form, land use, and Development Code policies to streamline permit approval, promote local educational excellence and workforce relevance, significantly increase business development and expansion, attract and retain talented people, create jobs and sustained economic growth, strategically locate employment lands and facilities, and avoid over-saturation of a single type of housing, retail or employment.
3. Emphasize conservation, successful adaptation to climate and changing resource conditions, and performance effectiveness in the use of energy, water, land, buildings, natural resources, and fiscal resources required for the longterm sustainability of Fresno.
9. Promote a city of healthy communities and improve quality of life in established neighborhoods.
Emphasize supporting established neighborhoods in Fresno with safe, well maintained, and accessible streets, public utilities, education and job training, proximity to jobs, retail services, and health care, affordable housing, youth development opportunities, open space and parks, transportation options, and opportunities for home grown businesses.
1 The commentary in italics following certain goals is not part of the goal itself, but is instead advisory language intended to further discuss and clarify the goal to help guide the objectives of this General Plan 4-2 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
11. Emphasize and plan for all modes of travel on local and Major Streets in Fresno.
Facilitate travel by walking, biking, transit, and motor vehicle with interconnected and linked neighborhoods, districts, major campuses and public facilities, shopping centers and other service centers, and regional transportation such as air, rail, bus and highways.
13. Emphasize the City as a role model for good growth management planning, efficient processing and permit streamlining, effective urban development policies, environmental quality, and a strong economy. Work collaboratively with other jurisdictions and institutions to further these values throughout the region.
Positively influence the same attributes in other jurisdictions of the San Joaquin Valley –and thus the potential for regional sustainability - and improve the standing and credibility of the City to pursue appropriate State, LAFCO, and other regional policies that would curb sprawl and prevent new unincorporated community development which compete with and threaten the success of sustainable policies and development practices in Fresno.
14. Provide a network of well-maintained parks, open spaces, athletic facilities, and walking and biking trails connecting the city’s districts and neighborhoods to attract and retain a broad range of individuals, benefit the health of residents, and provide the level of public amenities required to encourage and support development of higher density urban living and transit use.
16. Protect and improve public health and safety.
4.2 STRATEGIC INITIATIVES
Fresno has an effective and well-planned transportation system that is one of the strengths of the city. Looking ahead, however, the City has unmet transportation needs.
A “re-think” is needed to consider how to meet them, given emerging concerns about urban form and economic development, performance measures for multi-modal planning, fiscal realities, and environmental considerations, as well as the State mandate that the concept of Complete Streets be integrated into the local general plan. How all of these ideas can be brought together is the focus of this section.
Complete Streets
The California Complete Streets Act (Act) requires general plans updated after January 30, 2011 to develop a plan for a multi-modal transportation system. The goal of the Act is to encourage cities to rethink policies that emphasize automobile circulation and prioritize motor vehicle improvements, and come up with creative solutions that DECEMBER 2014 4-3
B3 Attach #1 of 3
emphasize all modes of transportation. Complete Streets design has many advantages.
When people have more transportation options, there are fewer traffic jams and the overall capacity of the transportation network increases. Additionally, increased transit ridership, walking, and biking can reduce air pollution, energy consumption, and greenhouse gas emissions, while improving the overall travel experience for road users.
Providing more transportation options will allow the City to meet its future travel demands without solely relying on motorized vehicles.
Specifically, the legislation requires roadways to be designed to accommodate all users and provide a balance of multiple uses. Users could include motorists, pedestrians, bicyclists, children, older adults, persons with disabilities, and users of public transportation. Each street segment is not required to be Complete Street on its own; rather, all streets within the system as a whole must be considered. However, major thoroughfares such as Fresno’s Arterials are among those roadways that should be Complete Streets along their entire length. The only exception would be if an immediately proximate roadway offered a faster, safer, and more convenient route, such as a bike boulevard running parallel to a heavy traffic corridor.
While there is no standard design template for a Complete Street, it generally includes one or more of the following features: bicycle lanes, wide shoulders, well-designed and well placed crosswalks, crossing islands in appropriate midblock locations, bus pullouts or special bus lanes, audible and accessible pedestrian signals, sidewalk bulb-outs, center medians, street trees, planter strips and ground cover. Complete Streets create a sense of place and improve public safety due to their emphasis on comprehensively encouraging pedestrian activity.
Using Performance Standards for Multi-Modal Systems
The City’s current method of evaluating roadway performance needs to be updated to bring it in line with best practices for transportation planning and the Complete Streets legislation and align with General Plan goals for a multi-modal system. The current performance criteria dictate the number of street lanes constructed in order to prevent traffic congestion from exceeding a certain level, without consideration of other transportation modes that also should be accommodated. Issues with the City’s traditional approach to roadway performance include:
• The current “one size fits all” approach that treats all areas of the city the same; • The absence of other modes of travel—walking, bikes, transit—from the criteria; and
• The City’s past practice of giving relatively high priority to vehicle travel level of service. This emphasizes keeping traffic congestion low but requires a roadway 4-4 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
system that is expensive to construct and maintain to serve the city’s peak 15- minute travel time (rush hour). This also distorts the land development market and does not support the General Plan’s urban form concepts.
System Capacity Design
Related to the City’s high performance standards, Fresno’s roadway system is built to handle a very short peak period of usage. The city does not have a full rush “hour,” but rather a peak 15-minute period at most major intersections. Similar to a giant parking lot built to accommodate shoppers on the busiest day of the year only, but which is relatively empty most of the time, the street system is designed for a very small portion of overall demand.
This approach does create minimal traffic congestion at peak times, but results in an over-supply of capacity the majority of the time. It also requires a large amount of land to be devoted to streets, using up land that could be used for residential and commercial development, parks, schools and civic facilities. It creates environmental impacts and discourages travel by other modes—which paradoxically increases the amount of traffic on Fresno’s streets. It is also expensive for the City to maintain this robust roadway system.
Making Use of Excess Capacity
Fresno’s existing street system has excess capacity in several key areas due to the recent construction of the freeway system. The City can take advantage of this situation by promoting denser development on these streets, which will make the most efficient use of an existing public resource, increase opportunities for economic development and property values, and encourage a diversity of development types.
Comprehensive Connectivity
Fresno has transportation facilities that meet most modes of circulation, but the systems for pedestrians and bicycles are largely incomplete. In certain areas of Fresno, there is also difficulty in getting from one neighborhood to another, and to local stores, services, and public facilities such as schools and parks, by any means other than private automobile. Completing these citywide networks will encourage faster and simpler travel routes for work, errands, and recreation.
A well-connected street system offers a choice of routes and enables more direct connections. At the neighborhood scale a street grid facilitates walking, as convenience and direct routes are very important to pedestrians. What is good for walking is also good for transit: in a well-connected street system, buses can travel along routes easily reached on foot from the neighborhood interior. At a district or city scale, a grid DECEMBER 2014 4-5
B3 Attach #1 of 3
provides ideal conditions for a robust bicycle network. Cyclists prefer direct routes with moderate or low auto traffic; streets meeting both these descriptions can only be found in a system where streets connect across and not only within neighborhoods. Critically, a connective pattern is good for automobile traffic. With many routes to choose from, cars are able to distribute across the system rather than relying on a few major roads.
This is also a valuable component of safe and efficient emergency vehicle response.
Air Transportation
Regional, national and global connectivity is provided by the City’s two public airports, Fresno Yosemite International (FYI) and Fresno Chandler Executive Airport (FCH), and one private airport open to public use, Sierra Sky Park. FYI has excellent connectivity throughout the United States and world with ten airlines serving 12 non-stop destinations (five of which are major gateways). This also fosters healthy competition between the air carriers and stabilizes airfares. As of February 2014, FYI has connectivity to 242 domestic destinations and 74 international destinations across all seven continents - through just one connecting flight. FCH serves as a critical reliever airport to FYI and is the busiest general aviation airport in the Central Valley. It plays a significant role in accommodating business and corporate connectivity to the region and throughout California. The airport-related Objectives and Implementation Policies identified in this element address the continued viability of both FYI and FCH.
Parking and Goods Movement
Fresno does not have any particular issue with parking and goods movement, but faces similar concerns of many other cities, which is ensuring adequate infrastructure and logistics to keep the costs of economic development low, while simultaneously aiming to improve visual appearance, enhance the safety of walking and biking, and reduce the costs of road maintenance. The reliance of both inter-regional and local goods movement on State Route 99 is an important issue for both Fresno and the San Joaquin Valley, and plans for future development will need to avoid loading unnecessary personal traffic onto this crucial corridor when possible. 4-6 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
A well-connected, multi-modal transportation system serves all Fresnans.
4.3 ROADWAYS AND AUTOMOBILES
The City and County public roadway network, together with State highway routes, comprise the predominant transportation infrastructure in and around Fresno.
Although this network primarily serves travel by private automobiles, it also accommodates persons travelling by most modes, as well as the distribution of goods and services. Streets and highways are also the most widespread element of the public realm, constitute a prominent urban form defining feature, and establish a common environment and image of the city.
Automobile travel has been the main emphasis of transportation planning and is the dominant mode in Fresno. According to Fresno Council of Governments’ (FCOG) Travel Demand Model (2012), about 91.2 percent of the total average daily trips beginning or ending in the County are made by private vehicles. About 7.4 percent of the daily average trips are made by walking and bicycling, and less than one percent (0.86 percent) use transit, based on the most recent U.S Census journey to work data.
In Fresno, the roadway system configuration has been primarily based on a traditional grid pattern. The oldest part of the city (the traditional Downtown area) is an urban grid oriented to the Union Pacific (originally Southern Pacific) railroad alignment that traverses the San Joaquin Valley in a northwest to southeast direction. Outside of this area the grid shifts to a north-south orientation based on Township, Range and Section lines. Almost all of the Arterial and Collector Streets (roadways) within the DECEMBER 2014 4-7
B3 Attach #1 of 3
Metropolitan Area are regularly spaced at half-mile intervals. This roadway pattern has been modified in the past several decades to include several curvilinear and diagonal alignments, and neighborhood street patterns have sometimes deviated from the grid pattern.
Over time, Fresno’s street circulation system and developed urban form have also been framed by limited access State highways that traverse the city. State Route 99 traverses the city from northwest to southeast, connecting Fresno to other communities throughout the central and southern San Joaquin Valley. State Routes 41 and 180 bisect the city north-south and east-west connecting Fresno to Yosemite and Kings Canyon National Parks, respectively. State Route 168 links Fresno to Clovis and Sierra Nevada recreational attractions at Shaver and Huntington Lakes to the northeast. The construction of the freeway system removed a substantial amount of the “through” traffic from the local roadway network (e.g.: Blackstone Avenue, Golden State Boulevard, Kings Canyon Road), freeing up capacity on the local streets except at intersections near freeway interchanges. This urban freeway system has shortened commute times from the northern areas of the city and Clovis, and to the east for bedroom communities and foothill communities, thus supporting the continued spread of urbanization onto productive agricultural land, increasing commute lengths, and vehicle miles travelled each day to and from work.
Roadway System
Figure MT-1: Circulation Diagram designates the planned roadway network of the General Plan. The planned roadway system focuses primarily upon roadways, which includes the Expressway, Superarterial, Arterial, and Collector Streets. For some roadways, especially in areas that are not yet developed with urban uses, the diagram indicates the future and not the present character of the road. The construction of planned roadways occurs during the course of a general plan’s implementation through the execution of the City’s capital improvements program utilizing funds from a variety of sources. In addition, portions of roadways are constructed by private property owners and developers in accordance with applicable property development standards.
Street Typologies
This General Plan establishes a refined street classification system to categorize roadways and other transportation facilities, as shown in Figure MT-1: Circulation Diagram. Each classification reflects the character of the facility as well as its function within the context of the entire transportation system. Each classification has standards considering a facility’s relation to surrounding land uses, existing rights-of-way, accessibility via other roadways, and appropriate travel speeds. While roadway classification types were originally based upon a priority given to various types and lengths of motor vehicle tips, they now give substantial consideration to the 4-8 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
accommodation of multiple travel modes and trips (public transportation, bicycle, pedestrian). This classification system will be used for engineering design and traffic operation standards. Scenic Corridors apply the corresponding classification listed here.
Freeway: Multiple-lane divided (median island separation) roadways on adopted State route alignments servicing through and crosstown traffic, with no access to abutting property and no at-grade intersections. Freeways are under the jurisdiction of the State, outside the control of the City. They have been assessed for the purposes of this General Plan due to their location within the Planning Area for the General Plan.
Expressway: Four- to six-lane divided (median island separation) roadways primarily serving through and crosstown vehicle traffic, with at-grade major street intersections located at approximately one-half mile intervals and no driveways for direct motor vehicle access to abutting property.
Superarterial: Four- to six-lane divided (median island separation) roadways with a primary purpose of moving multiple modes of travel traffic to and from major traffic generators and among subregions. A select number of motor vehicle access points to adjacent properties or local streets between the major street intersections may be approved by the City. Access points will be limited to right-turn entrance and exit vehicular movements, as well as select left-turn partial openings in medians from the Superarterials to surrounding properties or neighborhoods, limited to one location per half-mile. No left turns are allowed out of local streets or properties.
Arterial: Four- to six-lane divided (median island separation) roadways, with somewhat limited motor vehicle access to abutting properties, and with the primary purpose of moving traffic within and between neighborhoods and to and from freeways and expressways. In addition to major street intersections, appropriately designed and spaced local street intersections may allow left-turn movements to and from the arterial streets.
Collector: Two- to four-lane undivided (opposing travel lanes generally not separated by a median island) roadways, with the primary function of connecting local streets and arterials and neighborhood traffic generators and providing access to abutting properties. Local street intersections and motor vehicle access points from abutting properties are allowed consistent with the City’s engineering standards and accepted traffic engineering practices. Collectors typically have a center two-way left-turn lane.
Local: Two- to three-lane roadways designed to provide direct access to properties, while discouraging excessive speeds and volumes of motor vehicle travel incompatible with neighborhoods being served through the implementation of multiple, well DECEMBER 2014 4-9
B3 Attach #1 of 3
connected routes and traffic calming measures. The alignments of future local streets are typically not specified by the General Plan Circulation Diagram, but existing local streets may be depicted for informational purposes. In specific circumstances local streets are designated where necessary to assure adequate access and implementation of Complete Neighborhoods with well-connected routes for motor vehicle, bicycle and pedestrian travel.
Drive: A street that in addition to its transportation function provides opportunities for the enjoyment of natural and man-made scenic resources. The aesthetic values of scenic drives may be protected.
4-10 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Source and Methodology: Grocery Stores
mapped from Policymap data. Food Deserts
from the online USDA Economic Research
Service Food Desert Locator. Convenience
stores from City of Fresno Business License
information. Other data researched by
department sta and retrieved from City of
Fresno GIS. All data retrieved in September and
October 2011.
Disclaimer: This map is not a
nal product
or published document. Its purpose is to
facilitate conversation around the topic(s)
represented. There may be errors or omissions
and if any are found please contact the City
of Fresno DARM Department sta at
559-621-8003 or Contact Us at
S a n J o a q u i n R i v e r
SHAW AVE SHAW AVE
HERNDON AVE HERNDON AVE
BLACKSTONE AVE
WILLOW AVE
ASHLAN AVE
SHIELDS AVE
MCKINLEY AVE
Fresno Yosemite
International
Airport
California
State University
CEDAR AVE
Fresno
SHIELDS AVE SHIELDS AVE
ASHLAN AVE
MCKINLEY AVE
NEILSEN AVE
KINGS CANYON RD
HIGHLAND AVE
KINGS CANYON RD
OLIVE AVE OLIVE AVE
BELMONT AVE
BUTLER AVE
JENSEN AVE
NORTH AVE NORTH AVE
JENSEN AVE
CALIFORNIA AVE
KEARNEY BLVD
BELMONT AVE BELMONT AVE
BULLARD AVE
NEES AVE
SHEPHERD AVE
FIGARDEN
GRANTLAND AVE
GARFIELD AVE
BLYTHE AVE BLYTHE AVE
WHITES BRIDGE AVE
BRAWLEY AVE
MARKS AVE
CLINTON AVE
BRAWLEY AVE
POLK AVE
MARKS AVE
N. WEST AVE
PALM AVE
WEBER AVE
GOLDEN STATE BLVD
FRESNO ST WALNUT AVE
TULARE AVE
ELM AVE
EAST AVE
FIG AVE
CENTRAL AVE ORANGE AVE AMERICAN AVE CEDAR AVE CEDAR AVE
PEACH AVE
CHESTNUT AVE CHESTNUT AVE
CLOVIS AVE CLOVIS AVE
FOWLER AVE
TEMPERANCE AVE
JENSEN AVE
TEMPERANCE AVE
FIRST ST FIRST ST
BLACKSTONE AVE
FRESNO ST
VENTURA ST
GOLDEN STATE BLVD
VAN NESS AVE
H ST
P ST
DIVISADERO ST
H ST
G ST
VAN NESS AVE
MAROA AVE MAROA AVE
SIERRA AVE
BARSTOW AVE
VAN NESS BLVD
DANTE
BEHYMER AVE
INTERNATIONAL AVE
FRIANT RD
CALIFORNIA AVE
FRUIT AVE
DE WOLFE AVE
COPPER AVE
FT WASHINGTONRD FIRST ST
AUDUBON DR
DAKOTA AVE
FOWLER AVE
VAN NESS BLVD
WISHON AVE
BRYAN AVE
HAYES AVE
CORNELIA AVE
VALENTINE AVE
HUGHES AVE
CHERRY AVE
MAPLE AVE
WILLOW AVE
CALIFORNIA AVE
CHURCH AVE
LEONARD AVE
ARMSTRONG AVE
CLINTON AVE
MINNEWAWA
GETTYSBURG AVE
ALLUVIAL AVE
TEAGUE AVE MAPLE AVE
CHESTNUT AVE
PERRIN AVE
MILLBROOK AVE
GETTYSBURG
ALLUVIAL
SPRUCE
S ANTA FE
MILLBURN
BARSTOW
BULLARD
SAN JOSE
EMERSON
MCKINLEY AVE
TULARE AVE
ARMSTRONG AVE
DE WOLFE AVE
0 2 4
MILES
11/2
Planning Area
Sphere of Inuence
City Limits
Source: City of Fresno, 2014.
1. See Policies MT-3-a and MT-3-b for Scenic Corridors.
Note: The Fresno Air National Guard Base, a military airport, and the Fresno Yosemite International Airport are located in the area represented as Fresno Yosemite International Airport.
Figure MT-1:
Major Street
Circulation Diagram
Freeway
On/O
Ramps
Expressway
Super Arterial
Arterial
Collector
Expressway
Arterial
Drive
Collector
Scenic Corridors1
180
41 99
168
180
99 41
Fresno-Clovis Regional Wastewater
Reclamation Facility (RWRF)
B3 Attach #1 of 3
Street Design Standards
Over the past 35 years, the planned roadway hierarchy has shifted from being singularly focused on moving automobiles to a more complete multi-modal network.
However, the relationship of street function to land use characteristics has continued to focus upon ameliorating adverse impacts of traffic nuisances with landscaped setbacks, walls and parking areas separating buildings from the street and sidewalk public realm.
This system does not adequately account for land uses along streets that may be more focused on pedestrians, cyclists, and transit riders, as seen in Downtown, Activity Centers, and BRT Corridors. A new approach to street classification must now be considered to account for the specific characteristics sought in these areas.
The General Plan expands the roadway classification descriptions to include specific characteristics, such as pedestrian realm, on-street parking, number of vehicle lanes, bike lanes, and landscaped median, as shown in Table 4-1.
TABLE 4 1: ROADWAY CHARACTERISTIC MATRIX
-
Roadway Type Number Bike Lanes Pedestrian On- Median
of Facilities Street
Vehicle Parking
Lanes
Expressway 4 to 6 No Trail No Yes
Superarterial 4 to 6 Yes Sidewalks1 No Yes
Arterial 4 to 6 Yes Sidewalks1 Possible Yes
Collector 2 to 4 Yes Sidewalks Yes Possible
Local 2 to 3 Possible (or Trail) Sidewalks Yes Possible Source: Fehr & Peers, 2011.
1. Where called for by the General Plan, a trail may be required instead of a sidewalk.
Standards for Multi-Modal Level of Service
This General Plan calls for the City to use a more flexible system of multi-modal measures or indicators of “Level of Service” (LOS) provided by public roadways to evaluate current and projected conditions for each mode of travel and identify congestion points or deficiencies which need to be addressed in planning for future improvements. Historically, LOS analysis has been auto-oriented and relied upon a conventional perspective of the primary use of public streets by motor vehicles rather than considering all modes of travel, including public transportation, bicycling and walking. This system provides a ranking of the efficiency of a street segment or intersection with six categories ranging from A (free traffic flow with individual vehicles virtually unaffected by the presence of other vehicles) to F (forced, stop-and-go travel with the volume of vehicles substantially exceeding the capacity of the street and often 4-12 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
referred to as “gridlock”). A multi-modal LOS system would address the frequency of bus service or the width of sidewalk clear zones for pedestrians and how many people are served by a facility, whatever their mode of travel, rather than just how many cars get through an intersection.
Level of service is typically evaluated using a peak hour travel condition rather than a 24-hour average daily travel condition - when is traffic at its worst. LOS A, therefore, would appear to be a good grade to achieve. But it is actually a result of overbuilding the system, resulting in wasted money, resources, land, and increased impacts from the facility, such as encroaching closer than necessary to existing houses or removing of houses unnecessarily. However, LOS F is not always good either, resulting in increased commute times, more idling cars resulting in increased emissions, and driver frustration.
In analyzing current and future projected conditions there needs to be exceptions to standards where it would not be reasonably feasible to provide the sufficient street width to make improvements necessary to accommodate projected peak hour traffic volumes to attain the set LOS for that roadway or intersection. Congestion, especially if only for short periods of time, can be more fiscally prudent compared to the costs and impacts of facility improvements and maintenance that at the same time may contribute to an overbuilt system. Additionally, congestion can incentivize the use of transit or other modes of transportation that more efficiently move people, save tax dollars, and are better for local air quality.
Context-Sensitive LOS
A more dense urban development pattern will focus traffic increases within the urban core of the city when compared to a less dense pattern where development is located on the urban fringe. However, a denser development pattern brings with it more travel mode choices and can result in shorter trips and more trips made by bus, by bicycle or on foot, compared to a more dispersed pattern. Thus, more compact infill development tends to have a smaller impact per dwelling unit on roadway level of service and the demand for street widening and extension as compared with more dispersed development at the urban edge. An example of this is the congestion that currently occurs on Friant Road during the AM and PM peak periods in northeast Fresno due to low-density development on the urban fringe, as compared to the low level of congestion that occurs in the area around the Tower District. The General Plan envisions that a context-sensitive LOS system can be developed which will be more responsive to the City’s needs and support achieving the urban form concepts of the Plan.
DECEMBER 2014 4-13
B3 Attach #1 of 3
All-Day vs. Peak Period Use
LOS is measured based on traffic conditions during the morning and evening peak periods. Good or satisfactory conditions (“free flow” at LOS A to “tolerable delays” at LOS D) are ascribed to roadways where congestion does not become acute even during rush hour. Meeting this standard requires the construction of roadways that provide far more capacity than is needed for most hours of the day. Accommodating a LOS of D or better for vehicular traffic may necessitate six- and eight-lane roadways with dual left turn lanes. These roadways then become extremely wide and unfriendly for pedestrian and bicycle use. Responding to this problem, the General Plan sets a direction for a Complete Streets system that will be more efficiently used. This may mean a greater emphasis on distributing traffic across a more connective network, and a greater tolerance for peak-hour congestion.
Multi-Modal LOS
As mentioned above, the General Plan proposes a balanced transportation system that serves public transit, bicyclists and pedestrians as well as motor vehicles. This multimodal system will support more compact development patterns, which in turn will support other goals, including farmland preservation and neighborhood walkability.
Less reliance on the automobile is critical for Fresno if the city is to improve air quality and reduce greenhouse gas emissions. A multi-modal system will ensure mobility for all community members. Ultimately, a truly multi-modal system is more resilient from a transportation perspective, giving Fresno attributes it needs to manage congestion over the long-term.
Fresno can create a transportation system that performs well for all modes, in part by measuring performance with qualitative indicators for each mode based on inputs covering facility design, facility controls, and volumes. This multi-modal LOS concept is illustrated in Table 4-2. Implementing a multi-modal LOS standard would require the consideration of all travel modes when evaluating traffic congestion such that widening roads at the expense of walking and bicycling—a result that ironically is much more expensive for private development to build, the public sector to maintain, and adds more traffic to streets since other travel modes are no longer possible - would not explicitly be considered reasonable. A multi-modal LOS system will also help support the development of more intense land uses where desired by permitting localized automobile congestion if walking, biking, and transit systems operate at high levels. A multi-modal LOS standard does not define an overall grade for a roadway section, but provides information for each travel mode to properly assess, for that facility, the best approach to improve its travel capacity with the financing available. Based on a project’s location, the proposed improvements will be different. A more suburban intersection may add capacity with a double left turn lane where at a Downtown intersection it may be determined infeasible due to the lack of available right-of-way, or pedestrian islands are required to improve pedestrian flow and intersection wait times. 4-14 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
TABLE 4 2: MULTI MODAL LEVEL OF SERVICE INDICATORS
- -
D D D
LOS
A
B
Transit
(Good walk access to bus
stops, frequent service,
good bus stop amenities.)
Bicycle
(Few driveway and cross
street conflicts, good
pavement condition, ample
width of outside lane,
including parking and bike
lanes.)
Pedestrian
(Low traffic volumes, wide
buffer separating sidewalk
from traffic, numerous
street trees, and high
parking occupancy.)
C
D
E
F
(Poor walk access to bus
stops, infrequent service,
poor schedule adherence,
no bus stop amenities.)
(Poor pavement condition,
narrow width of outside
lane, frequent driveways
and cross streets.)
(High traffic volumes,
limited buffer separating
sidewalk from traffic, few
street trees, low parking
occupancy.)
Source: Dowling Associates, 2010.
Designing for Sustainable Transportation
Four approaches have guided policy development for transportation:
1. Reduce Vehicle Miles Traveled (VMT). Reducing VMT frequently involves providing more and better transportation options and improving land use so that frequent origins and destinations are closer. The main benefit of reducing VMTs is the benefit to Fresno’s air quality since vehicle emissions are one of the main sources of air pollution in our air basin. Reducing VMT frees up discretionary income for Fresno families by reducing money spent on fuel and vehicle wear and tear.
Reducing VMT supports economic development by shifting trips that don't need to drive, preserving scarce roadway capacity for goods movement and trips that do need to drive. Finally, reducing VMT helps people by (usually) increasing walking, bicycle and transit use, all of which increase physical activity and therefore health.
2. Prioritize Funding for Improvements in Areas That Have Reported Fatalities and Injuries. Reducing unanticipated congestion due to accidents adds benefits through trip reliability for freight and other high value trips. Reducing unanticipated congestion also reduces braking, acceleration and idling, all of which reduce fuel consumption and, therefore, greenhouse gas emissions.
3. Improve Travel Time Reliability. For high value trips (e.g., freight and commute), predictable/reliable travel times are often more valuable to users than DECEMBER 2014 4-15
B3 Attach #1 of 3
improvements to average travel time. Improving travel time reliability supports the economy by creating more reliable freight trips. Improving travel time reliability helps people by allowing them to avoid wasting time by leaving early in order to deal with unpredictable trip times. It also helps reliability and performance of emergency response vehicles.
4. Improve Speed Consistency. Improving speed consistency can help reduce fuel consumption. It is a measure based on speed, braking and acceleration. Pursuing traffic synchronization on major roadways will result in reduced travel time, smoother vehicle and transit flows, as well as reduced vehicle emissions and improved air quality.
4.4 BIKES AND PEDESTRIANS
Fresno has made a strong commitment to improving non-motorized travel. The City established a Bicycle-Pedestrian Advisory Committee in 2002 and subsequently completed the Bicycle, Pedestrian and Trails Master Plan (BMP), which was adopted by the City Council in 2010. In 2017, the City adopted the Active Transportation Plan (ATP) which is replaces the BMP. Although the ATP is a separate document and not part of this Plan, the General Plan supports the ATP’s aspirations for a comprehensive bicycle and pedestrian facilities network consisting of sidewalks, lanes, paths and trails while recognizing that the ATP identifies more facilities and programs than discussed in the General Plan. The ATP also identifies more detailed implementation strategies with cost estimates and prospective funding sources, evaluates priorities of prospective improvements, and identifies a complete inventory of both short-and long-range bicycle improvements.
Pedestrian Facilities and the Pedestrian Realm
Sidewalks
The presence of sidewalks and the quality of the pedestrian realm is a critical factor in the ability to walk around the city. Certain areas of Fresno lack continuous sidewalks, leaving pedestrians to share road space with cars. The City began addressing this problem with the “No Neighborhood Left Behind” program in 2005, which added new gutters, curbs, sidewalks, and streetlights to inner city neighborhoods at a budget of $45 million over six years starting in FY 2005, and has since been completed.
Accessible Design
Most of the city was built before the federal Americans with Disabilities Act (ADA) required streets to be accessible to persons in wheelchairs or with impaired mobility.
The City made significant progress in rebuilding sidewalks to add curb cuts or 4-16 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
accessibility ramps and will continue striving to do so with a focus on areas with the highest pedestrian usage.
Sidewalks and trails throughout Fresno offer residents alternative methods of moving through the city, including walking and bicycling.
DECEMBER 2014 4-17
B3 Attach #1 of 3
Blackstone
Armstrong
Alluvial
kk
Ò
kk
kk
kk
Firs East
")
Millbrook
t
kk
kk
kkkk
")Cedar Cedar
·|þ}99
eMapl
:
ils
tChestnu
Old Town Clovis Trail
San Joaquin River Parkway Path
and Trail1
Rails to Trails2
Peach
sHaye Hayes
kk
il
li
mpl
Polk Polk
")
Kearney
County/C
)
here
t
gnmen
emen
Bl he
wleyBra Brawl ")
")
ornia
s
l
t t
it
al tin ne eV Valenti
kk
·|þ}180
Annada
North
Musca
ting ra
l be conver
o Cit
y pre
Marks Marks
kk
le
t
il
West Wes
road. Shou
ed t
y coopera
ocati
t Frui
Wa
Frui Cen
·|þ}168owW
W i i ll llow
Fresno Yosem
Internationa
rport
Malaga
American
Pat
Trails sha
ti
ti
Fi Sunnyside Sunnyside ")
0 gure MT-2
Paths and Tra
")
kk
kk
Ò Fowl lerFow
0.5 Source
County/City Trail3
/Pedes
Fresno
kk
Class I Bicycle
Parks and
trian Path kk
kk Copper
Open Space International
High Cost Improvement
San Joaquin River Parkway Pa
and Trail Access Poi
s Behymer
Maroa
th Perrin
ne
m
kk tn s
Cornelia
Blythe
Van Ness
t
Garfield
Grantland
t
ey
Bryan
Pal
Shepherd
Existing
anned
kk kk Ò Teague
Nees ·|þ}41 Pl kkkk Nees k Ò k k Vista Poi k t Ò kk n Ò Alluvial kk kk k Ò k Planning Area
Sphere O
Herndon kk Herndon
f Infl Sierra ·|þ}99 California Sierra uence State Uni
Fresno
ityvers
Bullard
Barstow
Shaw
Gettysburg
Ashlan
Dakota
Shields
Clinton
McKinley
Olive
Belmont
Bullard City Limits
") ") Barstow
Shaw
Armstrong
Temperance
")
Gettysburg
sClovi
Locan
")
Ashlan
") e
Dakota
Shields
")
ite
l
Ai Clinton
McKinley
Olive
")
Belmont ")
Grantland
Nielsen Tulare
Whites Bridge
Bryan
Cornelia
")
Kings Canyon
Butler
·|þ}180
County/Ci Traty
ty
California
Church
Jensen
Annadale
North
Muscat
Central
Calif
Church
ity Trail Jensen
Fresno-Clovis
i l Wastewater
ility (RWRF
Reg
Reclamation Fac
ona ")
Peach Minnewawa
ClovisTemperance
Hughes
tnu
tnut
l
·|þ}41
er
Ches
Locan
tral Fig
Elm
1 2 3 4
Miles
Mapl
: City of Fresno, 2017
1. Conceptual alignmen ti ng j
lanned Parkway access and pro
ons, are subject t he acqu iti
ers, and pro ec -spec
f exi ng and proposed path and
jects, hei ea ures, uses, and
is on of lands and/ or easemen
ific, site-specif c env
il. All No hs and Tra
developed joi
ils adj
tly wi
ghbor
sdiction.
t t te: acent i i urisdic ions may be
th tha
t
t
o s ra o ne t
p t tr f n juri
locati
f
o t ts
illing sell j i i l No lete detail of t
tive Transpor
t ronmenta te: ike network can be found i Cherry Orange Comp
the Ac
he proposed b
tation P an.
rom w n
review. l
2. Required unless t
railroad lines be vaca
i
ed,
s an exi
they sha
ld ex ng
o a greenbelt
isti No be devel
ve Transportati
ve Transport ti
2 m
ll oped on s
on Plan, t
on Plan Amendmen
ide of road represented in the
o do otherwise would requi
te:
Ac
Ac
t . re
a t and minimum l th eng
3. Conceptual
adoption, and
a
i
, subjec
tation. C
/Coun
erred l
tive planni
on depicted.
t ty f il
f
ng o es.
Date: 4/7/2017
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
Comfort and Amenities
In a typical neighborhood, continuous sidewalks and ADA-compliant curb cuts may be satisfactory to provide for pedestrian movement. In areas where high pedestrian use exists or is desired, a successful pedestrian environment also requires street design that is comfortable and attractive to people on foot.
While sidewalk capacity is not generally an issue, sidewalks should be designed to comfortably accommodate people on foot, some of whom will walk in groups, use wheelchairs, or push strollers or delivery trolleys. The sidewalk should be ample enough to signal that walking is expected and encouraged. Trees should be provided at an adequate spacing, and placed to help provide a buffer between cars and pedestrians and shading in summer. On-street parking can be an important supporting component by providing an additional buffer between the sidewalk and vehicle travel lanes and an important vehicle calming mechanism encouraging lower vehicle operating speeds.
Finally, benches, fountains, and other amenities help to make pedestrian use a reality and a pleasure.
Bicycle Facilities
Bicycle facilities consist of three types of classification, as follows:
• Class I: Bicycle or multi-use (bicycle-pedestrian) path which is completely separated from vehicle traffic and typically a 10- to 12-foot wide concrete/asphalt-concrete paved surface with two-foot wide shoulders;
• Class II: Designated on-street bicycle lane which is identified with painted pavement striping and signing and is typically at least five feet in width; and • Class III: On-street bicycle route which is designated by signs and markings and utilizes the paved surface shared with a low volume of motorized vehicles. • Class IV: Separated on-street bicycle lane, commonly known as “cycle track,” which is physically separated from motor vehicle traffic by a minimum three foot buffer and vertical element, distinct from the sidewalk, designed exclusively for bicyclists, and seven feet in width.
As of 2017, Fresno has approximately 38 miles of Class I trails or paths, 426 miles of Class II bike lanes, and 21 miles of Class III bicycle routes, built over an approximately 40-year period generally beginning with adoption of the 1974 Fresno General Plan.
Class I paths have been built within abandoned rail spur lines and municipal parkland, and dedications have been made adjacent to canals or Expressways as a condition of property development, and on land along the San Joaquin River. The City is working to resolve issues identified by the Fresno Irrigation District to accomplish development of DECEMBER 2014 4-19
B3 Attach #1 of 3
path or trail improvements along canals. Currently within the urban area, the City has only been successful where new development has provided additional space adjacent to the canal. However, in the future the City will continue efforts to resolve impediments and implement paths along canal alignments.
Planned Improvements
Pedestrian
During the past 10 years, the City Council has made constructing improvements to meet ADA accessibility requirements for public street sidewalks a City priority. As resources have become available, the City has also pursued the construction of missing segments of partially completed bicycle-pedestrian paths. The objectives and policies in this element generally present the following ideas for improving the pedestrian environment:
• Continuous sidewalks will be required along public streets on both sides, within all new development. Sidewalks or alternative pedestrian routes will also be required within developments that utilize private street access; • New or improved pedestrian crossings and additional industry standard safety features such as pedestrian refuges, raised or lighted crossing areas, and signals will be built, as funding is available, where there is high pedestrian traffic; • Where freeways and railroads create major barriers to pedestrian travel, identify improvements for safe, grade separated pedestrian crossings to be built as funding is available;
• Lighting that provides comfort and visibility to pedestrians will be a priority on streets where pedestrian use is high and on streets transitioning from a more autooriented to more mixed-use character; • Develop connectivity requirements and/or maximum block size or block length standards to apply to new development to ensure support for pedestrian travel; • Certain areas where walking is or has the potential to be most common may be identified for the implementation of improvements to promote a high-quality pedestrian experience. These areas might include arboretum corridors, Main Street commercial; mixed-use centers or corridors; transit corridors; and areas around schools, following a safe routes to school model, which is addressed in the Healthy Communities Element; and
• Complete Streets and Multi-Modal roadway measures and performance characteristics, discussed elsewhere in this element, will also support greater walkability.
4-20 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
Bicycle
The City’s planned bikeway network will support significant increases in bicycle use. It strives to ensure that major destinations are well-served by Class II bike lanes, wellmarked Class III bike routes are extended into nearly all neighborhoods, an attractive system of Class I bike paths is provided in new growth areas and along key corridors where right-of-way exists, and Class IV separated bikeways are located along key streets to encourage the casual rider to bike to destinations outside their neighborhood. These four bicycle transportation components are described more below.
SEPARATE MULTI-USE PATHS (CLASS I)
Bike or multi-use (bicycle-pedestrian) paths are completely separated from vehicle traffic (Class I bikeways) and may be considered the most desirable type in terms of comfort, particularly by the casual bicyclist. New Class I bikeways will be investigated for all new growth areas, and will be developed in existing parts of the city where opportunities to obtain right-of-way may exist which would provide meaningful pathway connections.
IMPROVED BIKE LANES (CLASS II)
Providing Class I facilities may not be practical or cost effective in many parts of the developed urban area, and not necessarily preferable in terms of convenience and travel utility. Bike lanes (Class II facilities) are the heart of the bicycle network and will be accommodated along all roadways in new growth areas. They can often also be accommodated within already developed areas with the reconfiguration of travel lanes and on-street motor vehicle parking. Bike lanes will have a minimum width of at least five feet whenever possible. While this is adequate, bike lanes should be wider where space is available. They must be well striped and marked.
IMPROVED SHARED BIKE ROUTES (CLASS III)
Bike routes or bikeways (Class III facilities), which are identified with signage and lane markings indicating a shared roadway, have been identified as especially appropriate for bicycle use. As “the capillaries of the bikeway system,” Class III segments allow the bike system to provide critical links even where roadways are constrained and to extend into all neighborhoods. Class III facilities (routes and bikeways) will be expanded citywide and included in new development.
IMPROVED SEPARATED BIKEWAYS/CYCLE TRACKS (CLASS IV)
Separated Bikeways or cycle tracks (Class IV facilities) are on-street bicycle facilities that include a vertical physical barrier between the bikeway and moving traffic. These facilities have been identified as appropriate in areas with high motor traffic volume where Class II or Class III facilities would cause many bicycles to feel high levels of DECEMBER 2014 4-21
B3 Attach #1 of 3
-
stress. Cycle tracks necessitate wider right-of-way than Class II and III facilities and are best placed in areas with fewer driveways.
Table 4-3 summarizes Fresno’s existing bikeway system compared to the planned bikeway system in terms of mileage by facility type.
TABLE 4 3: BICYCLE NETWORK
Existing System - 2017 Planned System Change
Facility Type (miles) (miles)
Class I 38 165 203
Class II 426 703 1129
Class III 21 67 88
Class IV 0 2 2
Source: City of Fresno, 2017,
4.5 TRANSIT SERVICE
Transit is a term used to cover all forms of public transportation, such as buses and various forms of rail (light rail, subways, heavy rail).
Existing Transit Service
The City operates Fresno Area Express (FAX), the city’s major provider of urban public transportation services. The FAX fixed route conventional bus transportation system integrates with the City of Clovis’ fixed route system; together these systems potentially serve a population of 650,000. The FAX fixed route system is comprised of routes that typically follow many of the city’s Arterial roadways, which are generally spaced with a one-mile separation. The system currently includes 15 standard fixed routes of bus service and one express bus connection between the Riverpark regional commercial center, located at North Blackstone and East Nees Avenues, and Children’s Hospital of Central California, located on Avenue 9 in Madera County. Many routes converge on Downtown and meet at the main transit center located on “M” and Fresno Streets (County of Fresno’s Courthouse Park). Most of the FAX routes operate at 30-minute frequencies, with four routes providing 20-minute frequencies during peak commute periods.
A demand-response service, Handy Ride, provides transportation for older adults and persons with disabilities. The Fresno County Rural Transit Agency provides transit services to communities located outside of the Fresno Clovis Metropolitan Area. In addition, the Fresno County Economic Opportunities Commission provides transportation for access to specific social services.
4-22 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
The FAX bus system provides connections to the Amtrak passenger rail station and the Greyhound bus station, both of which are located in Downtown. Amtrak’s San Joaquin line provides seven trains daily traveling both northbound to the San Francisco Bay Area and southbound to Los Angeles. Greyhound has eleven daily buses to Los Angeles and five to San Francisco. Intercity bus service is also provided by Orange Belt Stages and Transportation Inter-Californias.
The FAX bus system has a fixed route system, primarily on major Arterial streets in the city, which offers residents another convenient method of moving around the city without their vehicles.
Access to Transit
Fresno’s bus lines travel along many of the city’s heavily traveled major Arterial roads that serve the most densely populated neighborhoods and most intense office and commercial employment centers. With the expansive urban growth that occurred during the past decade, there are notable exceptions to transit accessibility, primarily in the west, northwest, northeast, and southeastern edges of the urban area. The bus system has not been expanded commensurate with peripheral urban development over the past decade, leaving predominantly lower density developed areas on the city’s outer edges without public transit services. This appears generally due to a combination of insufficient resources and decreasing performance (excessive cost per passenger and low farebox recovery) of routes serving lower density urban edge development.
DECEMBER 2014 4-23
B3 Attach #1 of 3
Bus Rapid Transit (BRT)
A first phase Bus Rapid Transit (BRT) system is planned and funded to run along the Ventura Street/Kings Canyon Road and the Blackstone Avenue corridors, meeting in Downtown. This system is presently in the design stage with a planned implementation anticipated over the next few years.
The General Plan supports the proposed BRT system through its designation of complementary land uses along and near its routes, such as higher-density development and land uses that may gravitate toward use of BRT. The Fresno General Plan Land Use Diagram (Figure LU-1) designates mixed-use, multi-family residential uses, and Activity Centers along the BRT routes. In addition, Shaw Ave. will be served by enhanced bus service while BRT is envisioned on California Ave. as part of the second phase.
High Speed Train (HST)
In addition to airport, train, and bus travel mentioned above, the California High Speed Train (HST) will also serve as a regional transportation system (see MT-3: Regional Transportation) for Fresno and surrounding communities. The proposed HST line, if approved and funded, would ultimately extend through the San Joaquin Valley, linking San Francisco with Los Angeles. The Initial Construction Section is planned to start in Madera County to just north of Bakersfield, with a station located in Fresno’s Downtown, aligned with Mariposa Street. The HST tracks through Fresno’s Metropolitan Area would run generally parallel to the Union Pacific Railroad tracks and primarily at-grade, with some shorter sections being depressed (below surface grade) to clear existing structures, such as the interchange of State Routes 99 and 180. However, any road proposed to cross the HST alignment will be grade-separated from the HST (go over or under).
Implementation of a HST system would significantly increase the accessibility of Fresno to the major population and economic hubs of California. It also provides an opportunity for the redevelopment of the area around the station with a walkable district that includes offices, retail, and multi-family housing that takes advantage of the proximity of the HST station and captures value from disembarking passengers.
Although this General Plan anticipates the building of the HST, it is not necessary to carry out the purposes or to implement the intent of the General Plan.
While detailed planning has not yet occurred for the HST station, the City is examining and proposing to accommodate the access and space requirements and the potential effects upon surrounding properties and land uses through community and Specific Plans in the Downtown Planning Area and a HST Station Area Master Plan. When HST is built, the City ultimately plans to link the FAX and BRT systems with the HST station.
4-24 FRESNO GENERAL PLAN
B3 Attach #1 of 3
!i
i
ir
C
I
Fre,r,o-C/ov;, J
I
I Regional Wastewater
1 Recfamatlon Fac1l1ty (RWRF)
L---,
i ,- 1 �-1 i_J
i
!__J 1
__ J
_
L
_
, .• --J HER D
'!,�;,-:
' t-:
Figure MT-3:
Regional Transportation
� Main Rail Lines
-HST Alignment Fresno
◊ Amtrak Station
♦ HST Station/Greyhound Bus Terminal
Airport Lands
·---- Planning Area
-Sphere of Influence
---------- City Limits
CD .. a •'c:12=---======== w MILES
Source: City of Fresno DARM, 2014
B3 Attach #1 of 3
4.6 OBJECTIVES AND POLICIES
OBJECTIVE
MT-1 Create and maintain a transportation system that is safe, efficient, provides access in an equitable manner, and optimizes travel by all modes.
IMPLEMENTING POLICIES
MT-1-a Transportation Planning Consistent with the General Plan. Continue to review local, regional and inter-regional transportation plans and capital improvement plans, and advocate for the approval and funding of State highway and rail projects, consistent with the General Plan and discourage projects inconsistent with the General Plan.
MT-1-b Circulation Plan Diagram Implementation. Design and construct planned streets and highways that complement and enhance the existing network, as well as future improvements to the network consistent with the goals, objectives and policies of the General Plan, as shown on the Circulation Diagram (Figure MT-1), to ensure that each new and existing roadway continues to function as intended.
MT-1-c Plan Line Adoption. Prepare and adopt Official Plan Lines, or other appropriate documentation such as Director Determinations, for transportation corridors, roadways, and bicycle/pedestrian paths/trails, as necessary to preserve and/or obtain right-of-way needed for planned circulation improvements.
MT-1-d Integrate Land Use and Transportation Planning. Plan for and maintain a coordinated and well integrated land use pattern, local circulation network and transportation system that accommodates planned growth, reduces impacts on adjacent land uses, and preserves the integrity of established neighborhoods.
MT-1-e Ensure Interconnectivity Across Land Uses. Update development standards and design guidelines applicable to public and private property to achieve Activity Centers, neighborhoods and communities which are well connected by pedestrian, bicycle, appropriate public transportation and automobile travel facilities.
MT-1-f Match Travel Demand with Transportation Facilities. Designate the types and intensities of land uses at locations such that related travel 4-26 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
demands can be accommodated by a variety of viable transportation modes and support Complete Neighborhoods while avoiding the routing of excessive or incompatible traffic through local residential streets.
MT-1-g Complete Streets Concept Implementation. Provide transportation facilities based upon a Complete Streets concept that facilitates the balanced use of all viable travel modes (pedestrians, bicyclists, motor vehicle and transit users), meeting the transportation needs of all ages, income groups, and abilities and providing mobility for a variety of trip purposes, while also supporting other City goals.
Implementation actions will include:
• Meeting the needs of all users within the street system as a whole; each individual street does not need to provide all modes of travel, but travel by all modes must be accommodated throughout the Planning Area;
• Continuing to adopt refined street cross-section standards as appropriate in response to needs identified;
• Encouraging conversion of one-way streets to two-way streets to improve location circulation, access, and safety;
• Considering the impact of streets on public health by addressing storm water runoff quality, air quality, and water conservation among other factors; and
• Adhering to the water efficient landscape standards adopted by the City for median and streetscape plantings and irrigation methods.
MT-1-h Update Standards for Complete Streets. Update the City’s Engineering and Street Design Standards to ensure that roadway and streetscape design specifications reflect the Complete Streets concept, while also addressing the needs of through traffic, transit stops, bus turnouts, passenger loading needs, bike lanes, pedestrian accommodation, and short- and long-term parking.
Commentary: For instance, transit stops and bus turnouts may have higher priority than through traffic on important transit corridors; through traffic may have higher priority than parking on Arterials; and pedestrian and bicycle movement may have high priority in areas with high pedestrian interest and activity such as the Downtown Planning Area.
DECEMBER 2014 4-27
B3 Attach #1 of 3
MT-1-i Local Street Standards. Establish and implement local roadway standards addressing characteristics such as alignment, width, continuity and traffic calming, to provide efficient neighborhood circulation; to allow convenient access by residents, visitors, and public service and safety providers; and to promote neighborhood integrity and desired quality of life by limiting intrusive pass-through traffic.
MT-1-j Transportation Improvements Consistent with Community Character.
Prioritize transportation improvements that are consistent with the character of surrounding neighborhoods and supportive of safe, functional and Complete Neighborhoods; minimize negative impacts upon sensitive land uses such as residences, hospitals, schools, natural habitats, open space areas, and historic and cultural resources.
In implementing this policy, the City will design improvements to:
• Facilitate provision of multi-modal transportation opportunities; • Provide added safety, including appropriate traffic calming measures;
• Promote achievement of air quality standards;
• Provide capacity in a cost effective manner; and
• Create improved and equitable access with increased efficiency and connectivity.
MT-1-k Multi-Modal Level of Service Standards. Develop and use a tiered system of flexible, multi-modal Level of Service standards for streets designated by the Circulation Diagram (Figure MT-1). Strive to accommodate a peak hour vehicle LOS of D or better on street segments and at intersections, except where Policies MT-1-m through MT-1-p provide greater specificity. Establish minimum acceptable service levels for other modes and use them in the development review process.
MT-1-l Level of Service in the Downtown Area. Within the Downtown Planning Area accept vehicle LOS F conditions during peak hours for street segments and intersections specified in community and Specific Plans as may be adopted by the City. Where there is an overlap in policies regarding LOS in the Downtown Planning Area, this policy shall supersede.
MT-1-m Standards for Planned Bus Rapid Transit Corridors and Activity Centers. Independent of the Traffic Impact Zones identified in MT-2-i 4-28 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
and Figure MT-4, strive to maintain the following vehicle LOS standards on major roadway segments and intersections along Bus Rapid Transit Corridors and in Activity Centers:
• LOS E or better at all times, including peak travel times, unless the City Traffic Engineer determines that maintaining this LOS would be infeasible and/or conflict with the achievement of other General Plan policies.
• Accept LOS F conditions in Activity Centers and Bus Rapid Transit Corridors only if provisions are made to improve the overall system and/or promote non-vehicular transportation and transit as part of a development project or a City-initiated project. In accepting LOS F conditions, the City Traffic Engineer may request limited analyses of operational issues at locations near Activity Centers and along Bus Rapid Transit Corridors, such as queuing or left-turn movements.
• Give priority to maintaining pedestrian service first, followed by transit service and then by vehicle LOS, where conflicts between objectives for service capacity between different transportation modes occur.
• Identify pedestrian-priority and transit-priority streets where these modes would have priority in order to apply a multi-modal priority system, as part of the General Plan implementation.
MT-1-n Peak Hour Vehicle LOS. For planning purposes and implementation of Capital Improvement Projects, maintain a peak-hour vehicle LOS standard of D or better for all roadway areas outside of identified Activity Center and Bus Rapid Transit Corridor districts, unless the City Traffic Engineer determines that maintaining this LOS would be infeasible and/or conflict with the achievement of other General Plan policies.
MT-1-o LOS Deviations Outside of Activity Centers and Areas Designated for Mixed-Use. Accept vehicle LOS E or F conditions outside of identified multi-modal districts only if provisions commensurate with the level of impact and approved by the City Traffic Engineer are made to sufficiently improve the overall transportation system and/or promote non-vehicular transportation as part of a development project or Cityinitiated project.
MT-1-p Participate in Sustainable Communities Strategy/ Regional Transportation Plan. Continue to work with the Fresno Council of Governments in developing and updating the Sustainable
DECEMBER 2014 4-29
B3 Attach #1 of 3
Communities Strategy and Regional Transportation Plan, consistent with the goals, objectives and policies of the General Plan.
OBJECTIVE
MT-2 Make efficient use of the City's existing and proposed transportation system and strive to ensure the planning and provision of adequate resources to operate and maintain it.
IMPLEMENTING POLICIES
MT-2-a Intensification of Bus Rapid Transit Corridors. Where traffic has previously been diverted to freeways, encourage incentives for more intense development along transportation corridors, such as the Blackstone Corridor, where there is now additional capacity.
Commentary: The General Plan Land Use Diagram (Figure LU-1) shows corridors where increases in allowable densities are permitted.
MT-2-b Reduce Vehicle Miles Traveled and Trips. Partner with major employers and other responsible agencies, such the San Joaquin Valley Air Pollution Control District and the Fresno Council of Governments, to implement trip reduction strategies, such as eTRIP, to reduce total vehicle miles traveled and the total number of daily and peak hour vehicle trips, thereby making better use of the existing transportation system.
MT-2-c Reduce VMT through Infill Development. Provide incentives for infill development that would provide jobs and services closer to housing and multi-modal transportations corridors in order to reduce citywide vehicle miles travelled (VMT).
Commentary: This policy is intended to reduce regional trips and citywide congestion. Even if local congestion increases due to an increase in population from infill, this will eventually improve air quality by reducing per capita vehicle emissions and VMT through shorter commutes and increase in transit and non-motorized modes of travel. This will also reduce the need for regional travel demand transportation improvements.
MT-2-d Street Redesign where Excess Capacity Exists. Evaluate opportunities to reduce right of way and/or redesign streets to support nonautomobile travel modes along streets with excess roadway capacity 4-30 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
where adjacent land use is not expected to change over the planning period.
Commentary: Such strategies could include narrowing roads (road diets), adding landscape medians, adding street parking, and adding bike lanes.
MT-2-e Driveway and Access Consolidation. Take advantage of opportunities to consolidate driveways, access points, and curb cuts along designated major roadways when a change in development or a change in intensity occurs or when traffic operation or safety warrants.
MT-2-f Optimization of Roadway Operations. Optimize roadway operations by continuing to expand the use of techniques such as the City’s intelligent transportation system (ITS) to manage traffic signal timing coordination in order to improve traffic operations and increase traffic-carrying capacity, while reducing unnecessary congestion and decreasing air pollution emissions. In order to facilitate roadway optimization and as a potential revenue source for the optimization, the following strategies need to be implemented:
• Dig Once Policy. Install conduit for telecommunications use when trenching or construction occurs.
• Telecommunications Strategy. Develop a costing mechanism for allowing the use of excess conduit within the City for use by communication carriers. The Policy shall follow regulations of the California Public Utilities Commission.
• Grant Funding. Pursue grant funding to assist in construction and/or implementation of fiber-optic or other telecommunication infrastructure for additional public services such as education, economic development, reaching underserved populations, and public safety communications.
MT-2-g Transportation Demand Management and Transportation System Management. Pursue implementation of Transportation Demand Management and Transportation System Management strategies to reduce peak hour vehicle traffic and supplement the capacity of the transportation system.
Commentary: The City anticipates these strategies will reduce demand on the regional transportation system, limiting the need for major capital investments in those systems.
DECEMBER 2014 4-31
B3 Attach #1 of 3
MT-2-h
MT-2-i
Update TIS. Update the City’s Traffic Impact Study guidelines to address all modes of transportation and Complete Streets concepts consistent with the General Plan. The name should be expanded to encompass its assessment of various modes of transportation and connectivity in addition to traffic impacts. Once a regional fee plan or program is in place, the TIS may be used to carry out that plan or program.
Transportation Impact Studies. Require a Transportation Impact Study (currently named Traffic Impact Study) to assess the impacts of new development projects on existing and planned streets for projects meeting one or more of the following criteria, unless it is determined by the City Traffic Engineer that the project site and surrounding area already has appropriate multi-modal infrastructure improvements.
• When a project includes a General Plan amendment that changes the General Plan Land Use Designation.
• When the project will substantially change the off-site transportation system (auto, transit, bike or pedestrian) or connection to the system, as determined by the City Traffic Engineer.
• Transportation impact criteria are tiered based on a project’s location within the City’s Sphere of Influence. This is to assist with areas being incentivized for development. The four zones, as defined on Figure MT-4, are listed below. The following criteria apply:
o Traffic Impact Zone I (TIZ-I): TIZ-I represents the Downtown Planning Area. Maintain a peak hour LOS standard of F or better for all intersections and roadway segments. A TIS will be required for all development projected to generate 200 or more peak hour new vehicle trips.
o Traffic Impact Zone II (TIZ-II): TIZ-II generally represents areas of the City currently built up and wanting to
encourage infill development. Maintain a peak hour LOS
standard of E or better for all intersections and roadway segments. A TIS will be required for all development
projected to generate 200 or more peak hour new vehicle trips.
o Traffic Impact Zone III (TIZ-III): TIZ-III generally represents areas near or outside the City Limits but within the SOI as 4-32 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
of December 31, 2012. Maintain a peak hour LOS standard of D or better for all intersections and roadway segments. A TIS will be required for all development projected to generate 100 or more peak hour new vehicle trips.
o Traffic Impact Zone IV (TIZ-IV): TIZ-IV represents the southern employment areas within and planned by the City.
Maintain a peak hour LOS standard of E or better for all intersections and roadway segments. A TIS will be required for all development projected to generate 200 or more peak hour new vehicle trips.
MT-2-j Funding for Multi-Modal Transportation System. Continue to seek and secure adequate financing to construct and maintain a complete multi-modal system through such measures as development impact fees, local sales tax measures, special tax measures,
assessment/improvement districts, and regional, state and federal transportation funds and grants.
Commentary: This policy will be coordinated with policies and objectives for fiscal sustainability in the Economic Development and Fiscal Sustainability Element.
MT-2-k Funding for Complete Streets Retrofits. Continue to participate in a comprehensive analysis of transportation needs and the funding of transportation improvements, including State and federal grant funding to support Complete Street retrofit improvements, within the Fresno-Clovis Metropolitan Area.
Commentary: This will be done cooperatively with the Fresno Council of Governments, other government agencies, and public interest groups.
DECEMBER 2014 4-33
B3 Attach #1 of 3
KINGS CANYON RD
FIGA
DR
BLYTHE AVE
WEBER AVE
GOLDEN STATE BLVD
FRESNO ST
JENSEN AVE
GOLDEN STATE BLVD
H ST
VAN NESS AVE
FRIANT RD
FRIANT RD
FT WASHINGTON RD
VAN NESS AVE
VETERANS
AUDUBON DR
GATES
BULLARD AVE
San Jo a q u i n R ive r
99 Figure MT-4:
Traffic Impact Zones (TIZ)
A A VE VE FO FO WLER WLER
TEMPER TEMPER ANCE ANCE A A VE VE
AVE DE WOLFE
BRYAN AVE
HAYES AVE
POLK AVE
C AVE
BL
ORNELIA
YTHE AVE
BR WLEY VE WL Y A A A AV E E
V
BR
ALENTINE AVE
MARKS AVE
MARKS AVE
HUGHES AVE
ALLUVIAL AVE
WEST AVE WEST AVE
FRUIT FRUIT AVE AVE
WALNUT AVE
FIG
PALM AVE
AVE
MAROA AVE
ELM AVE
AVE
EAST
CHERRY
AVE FIRST FIRST FIRST ST ST ST
ORANGE AVE
CEDAR AVE
COPPER AVE
TIZ I
MAPLE AVE MAPLE AVE
AVE CHESTNUT CHESTNUT CHESTNUT AVE AVE
WILLOW AVE
PEACH AVE
AVE CLOVIS CLOVIS AVE
TIZ II
WILLOW AVE
BEHYMER AVE
TIZ III PERRIN AVE
SHEPHERD AVE TIZ IV
TEAGUE AVE County Islands
NEES AVE
Planning Area
BLACKSTONE AVE BLACKSTONE AVE
FRESNO ST
Sphere of Influence HERNDON AVE HERNDON AVE CEDAR AVE
RDEN City Limits
BULLARD AVE
BARSTOW AVE 168
Note: Descriptions of each TIZ can be SHAW AVE SHAW AVE found in Implementing Policy MT-2-i:
Transportation Impact Studies.
GARFIELD AVE
GRANTLAND AVE
GETTYSBURG AVE GETTYSBURG AVE
ASHLAN AVE ASHLAN AVE ASHLAN AVE
DAKOTA AVE DAKOTA AVE
SHIELDS AVE SHIELDS AVE SHIELDS AVE Fresno Yosemite
International CLINTON AVE CLINTON AVE Airport CLINTON AVE
MCKINLEY AVE MCKINLEY AVE MCKINLEY AVE
OLIVE AVE OLIVE AVE
HIGHLAND AVE
BELMONT AVE BELMONT AVE
TULARE AVE
KINGS CANYON RD 180 WHITESBRIDGE AVE
KEARNEY BLVD BUTLER AVE
CALIFORNIA AVE
CHURCH AVE
JENSEN AVE JENSEN AVE
Fresno-Clovis ANNADALE
Regional Wastewater
Reclamation Facility (RWRF) NORTH AVE NORTH AVE
CENTRAL AVE
41 0 1/2 1 2 4
99 MILES
AMERICAN AVE
Source: City of Fresno DARM, 2014
180
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
MT-2-l Region-Wide Transportation Impact Fees. Continue to support the implementation of metropolitan-wide and region-wide transportation impact fees sufficient to cover the proportional share of a development's impacts and need for a comprehensive multi-modal transportation system that is not funded by other sources. Work with the Council of Fresno County Governments, transportation agencies (e.g. Caltrans, Federal Transportation Agency) and other jurisdictions in the region to develop a method for determining:
• Regional transportation impacts of new development;
• Regional highways, streets, rail, trails, public transportation, and goods movement system components, consistent with the General Plan, necessary to mitigate those impacts and serve projected demands;
• Projected full lifetime costs of the regional transportation system components, including construction, operation, and maintenance; and
• Costs covered by established funding sources.
Commentary: This policy is consistent with and supports policies and objectives for fiscal sustainability in the Economic Development and Fiscal Sustainability Element.
MT-2-m Use VMT Analysis for CEQA. Use Vehicle Miles Traveled (VMT) as the criteria for evaluating transportation impacts under the California Environmental Quality Act (CEQA), pursuant to Senate Bill 743. Level of Service (LOS) may still be used for planning purposes and implementation of Capital Improvement Projects, however VMT shall be used for determining mitigation under CEQA beginning in July of 2020.
Commentary: In 2013, the State of California passed Senate Bill 743, which eliminated automobile Level of Service (LOS) from transportation analysis under CEQA and replaced it with VMT. This shift from LOS to VMT is intended to better align with other statewide transportation goals, including reduction of GHG emissions, the creation of multimodal networks, and the promotion of integrated land uses.
OBJECTIVE
MT-3 Identify, promote and preserve scenic or aesthetically unique corridors by application of appropriate policies and regulations.
DECEMBER 2014 4-35
B3 Attach #1 of 3
IMPLEMENTING POLICIES
MT-3-a Scenic Corridors. Implement measures to preserve and enhance scenic qualities along scenic corridors or boulevards, including:
• Van Ness Boulevard - Weldon to Shaw Avenues
• Van Ness Extension - Shaw Avenue to the San Joaquin River Bluff • Kearney Boulevard - Fresno Street to Polk Avenue
• Van Ness/Fulton couplet - Weldon Avenue to Divisadero • Butler Avenue - Peach to Fowler Avenues
• Minnewawa Avenue - Belmont Avenue to Central Canal
• Huntington Boulevard - First Street to Cedar Avenue
• Shepherd Avenue - Friant Road to Willow Avenue
• Audubon Drive - Blackstone to Herndon Avenues
• Friant Road - Audubon to Millerton Roads
• Tulare Avenue - Sunnyside to Armstrong Avenues
• Ashlan Avenue- Palm to Maroa Avenues
MT-3-b Preserve street trees lining designated scenic corridors or boulevards.
Replace trees of the predominant type and in a comparable pattern to existing plantings if there is no detriment to public safety.
OBJECTIVE
MT-4 Establish and maintain a continuous, safe, and easily accessible bikeways system throughout the metropolitan area to reduce vehicle use, improve air quality and the quality of life, and provide public health benefits.
IMPLEMENTING POLICIES
MT-4-a Active Transportation Plan. To the extent consistent with this General Plan, continue to implement and periodically update the Active Transportation Plan to meet State standards and requirements for recommended improvements and funding proposals as determined appropriate and feasible.
MT-4-b Bikeway Improvements. Establish and implement property development standards to assure that projects adjacent to designated bikeways provide adequate right-of-way and that necessary 4-36 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
improvements are constructed to implement the planned bikeway system shown on Figure MT-2 to provide for bikeways, to the extent feasible, when existing roadways are reconstructed; and alternative bikeway alignments or routes where inadequate right-of-way is available.
MT-4-c Bikeway Linkages. Provide linkages between bikeways, trails and paths, and other regional networks such as the San Joaquin River Trail and adjacent jurisdiction bicycle systems wherever possible.
MT-4-d Prioritization of Bikeway Improvements. Prioritize bikeway components that link existing separated sections of the system, or that are likely to serve the highest concentration of existing or potential cyclists, particularly in those neighborhoods with low vehicle ownership rates, or that are likely to serve destination areas with the highest demand such as schools, shopping areas, recreational and park areas, and employment centers.
MT-4-e Minimum Bike Lane Widths. Provide not less than 10 feet of street width (five feet for each travel direction) to implement bike lanes for designated Class II bikeways along roadways. Strive for 14 feet of street width (seven feet for each travel direction) for curbside bike lanes where right-of-way is available.
MT-4-f Bike Detection Devices. Include bicycle detection devices when new intersection traffic control signals are installed and strive to retrofit existing traffic control signals to provide bicycle detection and retiming of signal phases to make them more bicycle friendly.
MT-4-g Advocacy for Bike Accommodation. Advocate for the accommodation of bike facilities in new or upgraded State Route interchanges and railroad construction projects, and construction of bicycle crossings of freeways and railroads.
MT-4-h Bicycle Parking Facilities. Promote the installation of bicycle locking racks and bicycle parking facilities at public buildings, transit facilities, public and private parking lots, and recreational facilities. Establish standards for bicycle parking in the Development Code.
MT-4-i Bicycling and Public Transportation. Promote the integration of bicycling with other forms of transportation, including public transit.
Continue to provide bike racks or space for bicycles on FAX buses.
DECEMBER 2014 4-37
B3 Attach #1 of 3
MT-4-j Street Maintenance for Bicycle Safety. Provide regular sweeping and other necessary maintenance to clear bikeways of dirt, glass, gravel, and other debris and maintain the integrity of the bicycling network.
MT-4-k Bicycle Safety, Awareness, and Education. Promote bicycle ridership by providing secure bicycle facilities, promoting traffic safety awareness for both bicyclists and motorists, promoting the air quality benefits, promoting non-renewable energy savings, and promoting the public health benefits of physical activity.
OBJECTIVE
MT-5 Establish a well-integrated network of pedestrian facilities to accommodate safe, convenient, practical, and inviting travel by walking, including for those with physical mobility and vision impairments.
IMPLEMENTING POLICIES
MT-5-a Sidewalk Development. Pursue funding and implement standards for development of sidewalks on public streets, with priority given to meeting the needs of persons with physical and vision limitations; providing safe routes to school; completing pedestrian improvements in established neighborhoods with lower vehicle ownership rates; or providing pedestrian access to public transportation routes.
MT-5-b Sidewalk Requirements. Assure adequate access for pedestrians and people with disabilities in new residential developments per adopted City policies, consistent with the California Building Code and the Americans with Disabilities Act.
MT-5-c New Subdivision Design. Do not approve new single-family residential subdivisions with lots that front and access onto a major roadway, unless the City Traffic Engineer determines that no other feasible alternative means of vehicle access can be provided and that sufficient design measures can be implemented, such as an on-site driveway turnaround, landscaped buffering, or an on-street parking lane to assure a desirable and enduring residential environment.
Commentary: To make this determination, the City Traffic Engineer may require an evaluation of alternative means of access, including frontage roads, backup treatment, and substantial redesign of the subdivision proposal.
4-38 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
MT-5-d Pedestrian Safety. Minimize vehicular and pedestrian conflicts on both major and non-roadways through implementation of traffic access design and control standards addressing street intersections, median island openings and access driveways to facilitate accessibility while reducing congestion and increasing safety. Increase safety and accessibility for pedestrians with vision disabilities through the installation of Accessible Pedestrian Signals at signalized intersections.
MT-5-e Traffic Management in Established Neighborhoods. Establish acceptable design and improvement standards and provide traffic planning assistance to established neighborhoods to identify practical traffic management and calming methods to enhance the pedestrian environment with costs equitably assigned to properties receiving the benefits or generating excessive vehicle traffic.
MT-5-f Modifications to Street Standards. Continue to evaluate and adopt modifications to City street standards to achieve overall objectives of providing good access and travel opportunities while calming traffic, promoting pedestrian and other transportation options, and reducing the amount of land devoted to streets.
OBJECTIVE
MT-6 Establish a network of multi-purpose pedestrian and bicycle paths, as well as limited access trails, to link residential areas to local and regional open spaces and recreation areas and urban Activity Centers in order to enhance Fresno's recreational amenities and alternative transportation options.
IMPLEMENTING POLICIES
MT-6-a Link Residences to Destinations. Design a pedestrian and bicycle path network that links residential areas with Activity Centers, such as parks and recreational facilities, educational institutions, employment centers, cultural sites, and other focal points of the city environment.
MT-6-b Multi-Agency Planning for Paths and Trail System. Continue to participate in multi-agency planning and implementation partnerships for the coordinated development of the Fresno-Clovis Metropolitan Area planned path and trail system and with Madera County for the San Joaquin River Parkway trail system.
MT-6-c Link Paths and Trails and Recreational Facilities. Strive to provide path or trail connections to recreational facilities, including parks and DECEMBER 2014 4-39
B3 Attach #1 of 3
community centers where appropriate, and give priority to pathway improvements within neighborhoods characterized by lower vehicle ownership rates and lower per capita rates of parks and public open space.
MT-6-d Link Paths and Trails and Cultural Resources. Strive to designate and implement paths and trails to pass by environmental amenities, historic sites, and other cultural resources, where appropriate, and provide informational signage or other interpretation of those resources to the public.
MT-6-e Utilize Public Rights of Way. Pursue the attainment of path and trail corridors within abandoned railroad rights-of-way, canal alignments, PG&E transmission tower easements, limited access streets (Expressways, freeways), riverbottom/bluff areas, or other such rightsof-ways. Offer existing easements and rights-of-way to local agencies before selling them to private parties.
MT-6-f Path and Trail Designation Process. Develop a network of multipurpose path and trail corridors by using the Official Plan Line process or other processes as provided by the Development Code to obtain appropriate linear rights-of-way along riparian corridors, drainage and irrigation easements, utility easements, abandoned railroad rights-of-way, and major street corridors.
MT-6-g Path and Trail Development. Require all projects to incorporate planned multi-purpose path and trail development standards and corridor linkages consistent with the General Plan, applicable law and case-by-case determinations as a condition of project approval.
Commentary: This should be done pursuant to Figure MT-2: Paths and Trails, and the adopted ATP, as may amended.
MT-6-h Preference for Public Ownership. Avoid path and trail alignments that involve private ownership of sections of public path or trail right-ofway. Use the Director Determination process, if necessary, to adjust planned path or trail rights-of-way to avoid these situations by realigning along more visible, publicly owned routes.
MT-6-i Path and Trail Design Standards. Designate and design paths and trails in accordance with design standards established by the City that give consideration to all path and trail users (consistent with design, terrain and habitat limitations) and provide for appropriate widths, 4-40 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
surfacing, drainage, design speed, barriers, fences, signage, visibility, intersections, bridges, and street cleaning.
Commentary: Trail improvements and characteristics (e.g. accessibility, continuity, width and location, and surface treatment) within the Fancher Creek water conveyance and riparian corridor, and other alignments immediately adjacent to existing or planned residential land, will be determined by the City Council after providing for appropriate public participation.
MT-6-j Variety in Path and Trail Design. Provide for different levels and types of usable pedestrian and bicycle corridors, including broad, shaded sidewalks; jogging paths; paved and all terrain bicycle paths; throughblock passageways; and hiking trails. Where a designated multipurpose path route is adjacent to a public right-of-way which accommodates bike lane, allow for flexibility in path design, so that bike lanes may be substituted for the bicycle component of the multipurpose path where it is safe and appropriate to do so.
Commentary: This should be done pursuant to Figure MT-2: Paths and Trails, and the adopted ATP, as may amended.
MT-6-k Path and Trail Buffers. Use landscaping with appropriate and adequate physical and visual barriers (e.g., masonry walls, wroughtiron, or square-tube fencing) to screen path and trail rights-of ways and separate paths and trails from mining operations, drainage facilities, and similar locations as warranted.
MT-6-l Environmentally Sensitive Path and Trail Design. Develop paths and trails with minimum environmental impact by taking the following actions:
• Surface paths and trails with materials that are conducive to maintenance and safe travel, choosing materials that blend in with the surrounding area;
• Design paths and trails to follow contour lines where the least amount of grading (fewest cuts and fills) and least disturbance of the surrounding habitat will occur;
• Beautify path and trail rights-of-way in a manner consistent with intended use, safety, and maintenance;
• Use landscaping to stabilize slopes, create physical or visual barriers, and provide shaded areas; and
DECEMBER 2014 4-41
B3 Attach #1 of 3
• Preserve and incorporate native plant species into the landscaping.
MT-6-m Path and Trail Crossings. Limit vehicle access, to the extent feasible, where paths or trails are designated parallel and adjacent to roadways, with consideration given to other transportation, land use, and site design priorities and constraints.
MT-6-n Emergency Vehicle Access along Paths and Trails. Provide points of emergency vehicle access within the path and trail corridors, via parking areas, service roads, emergency access gates in fencing, and firebreaks.
Commentary: Service roads will be interconnected, where possible, to permit through travel by emergency vehicles.
OBJECTIVE
MT-7 Pursue a variety of funding sources to maximize implementation and development of the City's path and trail system.
IMPLEMENTING POLICIES
MT-7-a Urban Path and Trail Development Funds. Continue to seek grants and other funding sources for trail construction and maintenance, and support the enactment of State and federal legislation that will expand urban path and trail development funds.
MT-7-b Supporting Nonprofit Organizations. Support and assist nonprofit organizations whose purpose or charter is to promote and support public path and trail construction and maintenance. Establish an “Adopt a Path/Trail” program that allows private entities to maintain segments.
MT-7-c Citywide Funding Program for Path and Trail Network. Strive to establish an equitable citywide funding program for construction and maintenance of the path and trail network, in order to:
• Acquire right-of-way needed for paths and trails in alreadydeveloped neighborhoods and other areas, as identified in community plans, Specific Plans, and neighborhood plans; • Reimburse developers for public path and trail development costs that they may incur in excess of the trail cost attributable to the impact of their development project (this may require a citywide nexus study); and
4-42 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
• Seek funding sources to add to and adequately maintain the citywide path and trail network.
Commentary: This program could be folded into a comprehensive parks and trails funding program, supported by voter-approved sales tax revenues.
OBJECTIVE
MT-8 Provide public transit options that serve existing and future concentrations of residences, employment, recreation and civic uses and are feasible, efficient, safe, and minimize environmental impacts.
Commentary: Public transit services must meet accessibility standards for individuals with disabilities as required by applicable state and federal regulations.
IMPLEMENTING POLICIES
MT-8-a Street Design Coordinated with Transit. Coordinate the planning, design, and construction of the major roadway network with transit operators to facilitate efficient direct transit routing throughout the Planning Area.
Commentary: Neighborhoods with circuitous and discontinuous streets are more difficult for public transit to serve efficiently than those with consistently spaced linear or semi-grid patterns.
MT-8-b Transit Serving Residential and Employment Nodes. Identify the location of current and future residential and employment concentrations and Activity Centers throughout the transit service area in order to facilitate planning and implementation of optimal transit services for these uses. Work with California State University, Fresno to determine locations within the campus core for bus stops.
MT-8-c New Development Facilitating Transit. Continue to review development proposals in transportation corridors to ensure they are designed to facilitate transit. Coordinate all projects that have residential or employment densities suitable for transit services, so they are located along existing or planned transit corridors or that otherwise have the potential for transit orientation to FAX, and consider FAX’s comments in decision-making.
MT-8-d Coordination of Transportation Modes. Plan, design, and implement transportation system improvements promoting coordination and DECEMBER 2014 4-43
B3 Attach #1 of 3
continuity of transportation modes and facilities, such as shared parking or park and ride facilities at Activity Centers.
MT-8-e Regional Coordination. Continue to work with local and regional governmental institutions to promote efficient transportation policies and coordinated programs.
MT-8-f Multi-modal Downtown Transportation Facility. Support the development of a multi-modal transportation facility in Downtown.
Commentary: Additional details for the facility are anticipated to be addressed in a future community or Specific Plan, such as the proposed DNCP or FCSP.
MT-8-g High Speed Train. If the State moves forward with HST, ensure it is constructed through Fresno in a manner that minimizes impacts to surrounding property owners and creates the most opportunity for redevelopment around the HST station.
MT-8-h Move Forward with High Speed Train Station Area Planning. Work with local residents, property and business owners, and other stakeholders to develop a station area plan to provide the most opportunity for growth and prosperity in concert with development of the Fresno HST station.
MT-8-i Legislative Support. Monitor State and federal legislation that creates incentives to reduce auto dependency and support the use of alternatives to the single occupant vehicle and support legislation that is consistent with the General Plan.
MT-8-j Transit Services. Emphasize expansion of transit service in low income neighborhoods that lack appropriate service levels.
OBJECTIVE
MT-9 Provide public transit opportunities to the maximum number and diversity of people practicable in balance with providing service that is high in quality, convenient, frequent, reliable, cost- effective, and financially feasible.
IMPLEMENTING POLICIES
MT-9-a Equitable Transit Provision. Provide transit that can serve all residents, including older residents and persons with disabilities. 4-44 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
MT-9-b Transit Service Productivity Evaluation. Continue to evaluate transit service productivity and cost efficiency indicators in the City’s ShortRange Transit Plan, and make necessary and appropriate service adjustments when operationally and financially feasible.
Commentary: Short-range transportation planning
requirement for continued funding.
is a federal
MT-9-c Addressing Unmet Transit Needs. Continue to participate in the Council of Fresno County Governments’ annual unmet transit needs evaluation process, particularly with respect to identifying need for access to medical and educational services; perform market analysis to identify potential transit choice riders; and pursue public education and information programs to identify changes in demand
characteristics and opportunities to increase ridership.
MT-9-d Long-Range Transit Options. Advocate and participate in regional transportation analyses and identify appropriate long-range measures to support incorporation of light rail transit and other advanced transit service within major transportation corridors, freeway and railroad alignments.
MT-9-e Area Specific Transit Improvements. Continue to evaluate and pursue the planning and implementation of area specific transit improvements, such as street car facilities.
MT-9-f Encourage Telecommuting. Support measures that will facilitate expanded use of telecommunications technologies to reduce congestion, expansion of regional transportation facilities consistent with this General Plan, energy use, and air emissions (i.e., work at home, dispersed telecommute work centers, teleconferencing).
OBJECTIVE
MT-10 Establish parking standards that are strategically tuned to support neighborhoods, shopping districts and employment centers that have a complete range of transportation choices.
IMPLEMENTING POLICIES
MT-10-a Updating Parking Standards. Update off-street parking standards to reflect the context and location within activity areas of multiple uses and reductions appropriate for mixed residential and non-residential uses and proximity to existing or planned transit service.
DECEMBER 2014 4-45
B3 Attach #1 of 3
MT-10-b Shared Parking. Establish a strategy to promote the sharing of excess parking between uses within Activity Centers and BRT corridors, including specific provisions for this in the Development Code.
MT-10-c Transportation Demand Management Guidelines. Establish transportation demand management guidelines to allow for reduced off-street parking requirements.
MT-10-d Parking Maximums. Explore maximum off-street parking limits within Activity Centers proximate to BRT corridors, if such an Activity Center is determined compatible with promotion of a healthy and vigorous business environment.
MT-10-e Parking Cash-Out. Educate employers of 50 or more persons on their obligation to provide a “parking cash-out program” under State law and enforce compliance.
Commentary: Under such a program, an employer offers a cash allowance to an employee equivalent to the cost of parking the employer would otherwise provide, as an incentive to using alternative modes of transportation for commuting. These programs must be offered in any non-attainment area for air quality.
A 2009 amendment to State law on parking cash-out provides authority for cities to enforce these requirements, including penalties to be imposed on employers who do not provide the “parking cashout” allowance to employees.2 MT-10-f Parking Benefit Districts. Establish parking benefit districts to fund consolidated public parking where supported by local businesses.
Commentary: Net revenues collected from on-street parking pricing and permit revenues can be dedicated to funding public
improvements within designated Parking Benefit Districts, ensuring that revenue is used to benefit the blocks where the money is collected. State laws provide for public parking facility construction, operation and maintenance.
3 2 California Health & Safety Code §43845. 3 Vehicle Parking District of 1943, Parking District Law of 1951, and Parking and Business Improvement Area Law of 1989. Substantive requirements for assessment districts were changed with passage of Proposition 218 in 1996, and the law is evolving, so the City will determine the appropriate statutory authority to use for creation of parking benefit assessment districts and note statutory restrictions on the potential use of such funds. 4-46 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
OBJECTIVE
MT-11 Achieve necessary capacity increasing and inter-modal connectivity enhancing improvements to the goods movement transportation system to support the growth in critical farm product and value added industries.
Commentary: Connectivity enhancing improvements and strategies will be used to address necessary capacity and inter-modal connectivity.
IMPLEMENTING POLICIES
MT-11-a Improve Goods Movement for Product Export. Advocate for and pursue all appropriate and available local, regional, state and national planning and implementation opportunities to achieve necessary improvements to regional, interregional and international export opportunities beneficial to the Fresno area.
MT-11-b Railroad Improvements. Continue to participate in and advocate for collaborative efforts to improve railroad transportation facilities and reduce conflicts with the street system, including relocation and/or consolidation of the BNSF and UP mainline railroad track facilities.
MT-11-c Truck Route Designations. Continue to plan and designate truck routes within the Metropolitan Area to facilitate access to and from goods production and processing areas while minimizing conflicts with other transportation priorities.
MT-11-d Appropriate Truck Route Roadway Design. Incorporate provisions for trucks in design of routes designated for truck movement. Ensure that truck routes meet federal standards for intersections, pavement, and turning movements.
MT-11-e Railroad Crossing Improvements. Continue to improve and maintain the condition and safety of existing railroad crossings by upgrading surface conditions and installing signs and signals where warranted.
MT-11-f State Route 99 / Goods Movement. Partner with Caltrans to prioritize goods movements along State Route 99.
DECEMBER 2014 4-47
B3 Attach #1 of 3
OBJECTIVE
MT-12 Operate the City’s municipal airport facilities to meet present and anticipated demands in a manner that maintains compliance with federal regulations, enhances safety to the public, minimizes the adverse effects of aircraft operations on people, and promotes the economic health of the community.
IMPLEMENTING POLICIES
MT-12-a Funding for Airport Capital Improvements. Pursue appropriate funding sources and capital improvement budget enhancements that will:
• Provide a modern, safe, and efficient municipal airport terminal facility including the Federal Inspection Station and airfield; • Maintain airfield compliance with FAA Part 139 operating requirements;
• Maintain financial self-sufficiency and long-term sustainability; and
• Continue to implement the master plans for FYI Airport and Fresno Chandler Executive Airport to meet projected air passenger travel, air cargo transportation and general aviation demands.
MT-12-b Airport Ground Movement Improvements. Obtain and install a FAAapproved Surface Movement Guidance and Control System to allow for ground movement on the airfield in lower visibility conditions.
MT-12-c Airport Management and Viability. Pursue management policies to keep Fresno Yosemite International Airport and Fresno Chandler Executive Airport self-sustaining and financially viable in compliance with FAA grant assurances.
• Implement aircraft rescue and firefighting transition plan; • Implement the police transition plan;
• Seek alternate ways to improve the financial viability of the airports; and
• Seek non-reimbursable Port of Entry status with the U.S.
Department of Homeland Security.
4-48 FRESNO GENERAL PLAN
B3 Attach #1 of 3
Chapter 4: Mobility and Transportation
OBJECTIVE
MT-13 Improve the competitiveness of domestic and international air carrier service, and air cargo operations to and from Fresno Yosemite International Airport (FYI).
IMPLEMENTING POLICIES
MT-13-a Increase Competitiveness. Work with incumbent air carriers and new air carriers to increase the competitiveness of commercial air service to and from Fresno.
MT-13-b Marketing Air Travel. Create a marketing plan to attract the traveling public to the FYI and encourage tourists to use FYI Airport as a gateway to Yosemite and Sequoia/Kings Canyon National Parks.
MT-13-c Expanding Service. Continually solicit new airlines and seek expanded service from incumbent air carriers for both domestic and international flights. Provide incentives as market conditions dictate.
MT-13-d Airport Property Development. Develop airport properties as outlined in the applicable airport and environs master plans to support economic growth.
MT-13-e Aviation Support Services. Ensure necessary aviation support services are provided while promoting a business friendly, but competitive environment through appropriate land use policies.
MT-13-f Environmental Remediation of Hammer Field. Ensure that environmental remediation activities are conducted with the active participation of previous landowners and tenants.
Commentary: This will be done in accordance with the Settlement Agreement reached among the City, the Boeing Corporation, and the United States government regarding Hammer Field (Portions now site of FYI Airport).
DECEMBER 2014 4-49
B3 Attach #1 of 3
This page intentionally left blank.
4-50 FRESNO GENERAL PLAN
B3 Attach #1 of 3
5 PARKS, OPEN SPACE,
AND SCHOOLS
The Parks, Open Space, and Schools Element sets forth
policy guidance for a broad spectrum of open spaces and community facilities in Fresno. These spaces will provide areas appropriate for agricultural or resource production and conservation; parks and open spaces for recreation; areas for protection of natural resources; and school sites which support neighborhood identity and cohesion. A key need addressed in the element is the shortage of parks and recreation space, particularly in established areas of the city, and a lack of access to these facilities for all Fresnans. This element aims to provide those special places that support a sense of community and are vital to creating a livable and sustainable Fresno.
B3 Attach #1 of 3
5-2 FRESNO GENERAL PLAN
5.1 CONTEXT
Open space is one of the seven general plan elements required by California’s Planning and Zoning Law, Government Code section 65302(e). While a city is required to address the mandatory seven topics or elements, State law allows a general plan format that best fits the unique circumstances of the city. The City of Fresno has chosen to combine the required components of a local open space plan within the larger context of a Parks, Open Space, and Schools Element because of the close relation that these topics have to one another in Fresno.
Relationship to General Plan Goals
The objectives and policies in the Parks, Open Space, and Schools Element support the following General Plan goals:
6. Protect, preserve, and enhance natural, historic, and cultural resources.
Emphasize the continued protection of important natural, historic and cultural resources in the future development of Fresno. This includes both designated historic structures and neighborhoods, but also “urban artifacts” and neighborhoods that create the character of Fresno.
7. Provide for a diversity of districts, neighborhoods, housing types (including affordable housing), residential densities, job opportunities, recreation, open space, and educational venues that appeal to a broad range of people throughout the city.
8. Develop Complete Neighborhoods and districts with an efficient and diverse mix of residential densities, building types, and affordability which are designed to be healthy, attractive, and centered by schools, parks, and public and commercial services to provide a sense of place and that provide as many services as possible within walking distance.
Intentionally plan for Complete Neighborhoods as an outcome, and not a collection of subdivisions which do not result in Complete Neighborhoods.
9. Promote a city of healthy communities and improve quality of life in established neighborhoods.
Emphasize supporting established neighborhoods in Fresno with safe, well maintained, and accessible streets, public utilities, education and job training, proximity to jobs, retail services, healthy food, health care, affordable housing, youth development opportunities, open space and parks, transportation options, and opportunities for home grown businesses.
B3 Attach #1 of 3
DECEMBER 2014 5-3
Chapter 5: Parks, Open Space, and Schools
12. Resolve existing public infrastructure and service deficiencies, make full use of existing infrastructure, and invest in improvements to increase competitiveness and promote economic growth.
Emphasize the fair and necessary costs of maintaining sustainable water, sewer, streets, and other public infrastructure and service systems in rates, fees, financing and public investments to implement the General Plan.
Adequately address accumulated deferred maintenance, aging infrastructure, risks to service continuity, desired standards of service to meet quality-of-life goals, and required infrastructure to support growth, economic competitiveness and business development.
13. Emphasize the City as a role model for good growth management planning, efficient processing and permit streamlining, effective urban development policies, environmental quality, and a strong economy. Work collaboratively with other jurisdictions and institutions to further these values throughout the region.
Positively influence the same attributes in other jurisdictions of the San Joaquin Valley –and thus the potential for regional sustainability - and improve the standing and credibility of the City to pursue appropriate State, LAFCO, and other regional policies that would curb sprawl and prevent new unincorporated community development which compete with and threaten the success of sustainable policies and development practices in Fresno.
14. Provide a network of safe well-maintained parks, open spaces, athletic facilities, and walking and biking trails connecting the city’s districts and neighborhoods to attract and retain a broad range of individuals, benefit the health of residents, and provide the level of public amenities required to encourage and support development of higher density urban living and transit use.
Sufficient parks and recreation spaces are also needed in support of the higher residential densities associated with the Bus Rapid Transit (BRT) corridors and Activity Centers and in the new Complete Neighborhoods planned for Fresno and addressed in the Urban Form, Land Use and Design Element. Parks, open spaces, and schools also critical to residents’ physical activity levels are central to the public health strategy, as discussed in the Healthy Communities element.
Of Special Note, Parks Master Plan Update on December 14, 2017 On December 14, 2017, the City of Fresno adopted the Fresno Parks Master Plan (PMP) which was an update to the previously adopted 1989 Parks Master Plan. In comparison to this chapter of the General Plan, the Fresno Parks Master provides updated data and system overview, revised park classifications, additional goals, recommendations and B3 Attach #1 of 3
5-4 FRESNO GENERAL PLAN
strategies, and new design guidelines that support and enhance the objectives and policies found in this chapter. As a result, policy POSS-1-a has been revised and the PMP park classifications are to take precedence over the park classifications in this chapter which means that the goal of 2 acres/1,000 residences is to be achieved through Regional Parks, Open Space/Natural Areas, and Special Use Parks/Facilities.
5.2 PARKS AND RECREATION
Parks, natural open spaces, and greenways are an important component to urban form, and they provide both recreational and aesthetic assets that contribute to the creation of a desirable visual character. The City has devoted substantial resources over the past several decades to provide parks and greenways, including the adoption of an Urban Growth Management (UGM) policy that helped establish a park impact development fee in 1976. In 2008, the City Council approved the UGM Impact Fee and Reimbursement policy. Additionally, other agencies and entities, such as school districts, the Fresno Metropolitan Flood Control District (FMFCD), the San Joaquin River and Parkway Conservation Trust, and the San Joaquin River Conservancy, have made significant contributions to the provision of recreational and natural areas. Despite these efforts, Fresno, in 2012 and 2013 was ranked last out of the 40 and then 50 largest U.S. cities, respectively, for ParkScore, a measure that takes into account public open space acreage, services, investment, and access.1
City Staff, through diligent efforts,
increased the City’s ParkScore by 6.5 points from 2012 to 2013, and additional programs such as the City’s Residential Guidelines for Open Space have increased the amount of recreational open space within the Planning Area without adding costs to the General Fund.
This General Plan affirms Fresno’s commitment to creating and maintaining a park system that meets residents’ recreational needs, maximizes landscapes endowed by the natural environment, contributes to Fresno’s quality of life, and supports urban living.
Adoption of this element will guide the subsequent planning and implementation of the City’s parks and open space program.
1 "ParkScore Index." Trust for Public Land. <http://parkscore.tpl.org/city.php?city=Fresno>.
B3 Attach #1 of 3
DECEMBER 2014 5-5
Chapter 5: Parks, Open Space, and Schools
Parks provide a variety of important social, environmental, and health benefits for the Fresno community, and the City has devoted substantial resources over the past several decades to provide and improve parks and greenways.
Park Classifications
The City provides Fresno residents with several types of parks and facilities.2 Parks are defined as land owned, leased, or provided to the City and used for public recreational purposes. In addition, several FMFCD storm water detention basins also serve as passive and active parks (from April to November); and, there are joint use planning and operation of school district playgrounds and athletic facilities for public recreation.
In addition to the public parks discussed here, there are many private parks and public lands that provide similar services such as along the San Joaquin River. 3 Park types in
the General Plan are classified as follows and summarized in Table 5-1:
• Pocket Park. A park up to 0.5 to 2.0 acres in size, which is intended to serve the needs of a smaller, specific neighborhood located within a half-mile radius of the pocket park. Pocket Parks should include amenities to draw neighbors to the park such as a tot lot, picnic bench, or shade structure. New Pocket Parks developed 2 General Plan park standards and types may differ from PARCS Department operational classifications for existing facilities with various passive and active recreational facilities and features. 3 The banks of the San Joaquin River are under the jurisdiction of the State Lands Commission and open to the public for recreational use.
B3 Attach #1 of 3
5-6 FRESNO GENERAL PLAN
within new subdivisions are maintained as part of a Home Owners Association (HOA) or Community Facilities District (CFD). Fresno currently is served by 93 pocket parks.
• Neighborhood Park. A park of more than 2 and up to 10 acres in size, which provides basic recreational activities for neighborhoods located generally within a one-mile radius. There are two types of Neighborhood Parks, active and passive.
These parks contribute to neighborhood identity and accommodate a range of facilities, such as play fields and courts, children’s play structures, picnic tables, restrooms, and may include a small center with a multi-purpose room, but also passive recreational features such as walking trails, community gardens, or nature areas. Fresno has 62 neighborhood parks.
• Community Park. A park of more than 10 and up to 40 acres in size (typically at least 20 acres), which helps define a community or district and is intended to serve the more active recreational needs of persons who live or work up to a two to four-mile radius. These parks typically include facilities such as lighted sport fields and a community center building with a gym, meeting rooms, and restrooms.
Other features may include swimming pools, tennis courts, concession stands, community defining public art, courtyard or plaza. Fresno has 13 community parks. • Regional Park. A large park of more than 40 acres in size, which is meant to serve a large number of residents across a broad area of the city, or around 100,000 residents. Regional parks typically include community park features that allow for a variety of sports and active recreation. Some are large enough to enable Fresno to host local and regional tournaments or events that bring revenue to the City and local businesses in the form of additional patrons and tax revenue generated.
Regional parks also provide unique public facilities, such as the Shinzen Japanese Garden, the Chaffee Zoological Gardens, or natural areas with hiking trails, fishing opportunities, and access to the San Joaquin River. Parks that provide unique opportunities, such as river access, have been categorized as a regional park, even though they are less than 40 acres in size. Fresno presently has three City owned regional parks: Woodward, Roeding, and the Regional Sports Complex; and two regional parks owned by other public entities, Camp Pashayan (San Joaquin River Conservancy), and Clovis North High School play fields and facilities (Clovis Unified School District).
• Trail/Greenway/Parkway. A network of linear open spaces of varying size, typically intended to accommodate walking and bicycling opportunities for leisure, exercise and commuting purposes. These parkways typically include paved surfaces for bicyclists and walkers, and in appropriate locations may include equestrian trails.
Fresno has 19 paths and trails, which are planned to be expanded and eventually form a substantial portion of the Valley Arboretum. Fresno’s trail network is described in the Transportation and Mobility Element.
B3 Attach #1 of 3
DECEMBER 2014 5-7
Chapter 5: Parks, Open Space, and Schools
TABLE 5-1: DESIRABLE PARK FACILITY STANDARDS
Park Type Typical Size Service Area
Pocket 0.5 to 2 acres Up to ½ mile
Neighborhood 2.01 to 10 acres Up to 1 mile radius
Community 10.01 to 40 acres Up to 4 mile radius
Regional More than 40 acres1 100K residents
Trail/Greenway/Parkway Varies Entire city 1 Some parks with less than 40 acres may be classified as Regional if they provide a unique opportunity such as river access.
Source: City of Fresno.
The function and desirability of smaller open spaces, such as pocket parks, has been an ongoing issue for the City. These smaller spaces are often popular with residential developers because of their appeal to homeowners, and they may be the most realistic option to correct deficiencies within already-developed areas. However, the smaller size and scattered location of these sites had tended to increase maintenance costs, pose potential supervision and attractive nuisance challenges, and limit the range of recreational amenities and services that can be offered. In the past, the City has even occasionally decommissioned a pocket park for these or similar reasons. Requiring new pocket parks to have secure maintenance funds through an HOA or CFD provides three benefits: set maintenance funding for each pocket park; local control of the park; and does not add additional burden to the City’s PARCS Department maintenance program, allowing them to focus on the City’s neighborhood, community, and regional parks.
This change in how pocket parks are managed, and including amenities that attract local residents, has made them an attractive option to increase recreational space in the city with minimal to no impact on PARCS resources.
Existing Parks and Recreation Facilities
The City maintains approximately 1,617 acres of open space, nearly 230,000 square feet of building space dedicated to recreational/educational purposes distributed among 104 sites. Other facilities include 9 community pools, 4 splash parks, 518 picnic tables, 153 barbeque grills, 3 amphitheaters, 54 baseball/softball fields, 53 football/soccer fields, 40 basketball courts, 11 volleyball courts, 40 tennis courts, 7 skate parks, and 5 dog parks.
The park system also provides and maintains 115 acres of paths and trails for pedestrians and bicyclists.
The FMFCD and the City partner in the use of portions of storm water detention basins as park and open space features. These include trees and turf for passive recreation and play equipment or sports fields where flood control design parameters allow. There are currently 16 basins, totaling over 143 acres, which are open to the public from April to November, when they are not in use for stormwater detention.
These basins are often designed with two floor levels. The upper floor is available for recreational uses during the dry weather seasons, while the lower level may be used for ground water recharge purposes and to accommodate rainwater runoff from smaller B3 Attach #1 of 3
5-8 FRESNO GENERAL PLAN
storm events. The adaptation of stormwater detention basins for park use must be carefully balanced with the critical need to use these facilities to perform groundwater recharge.
Park Demand and Proposed Park Land
The City’s 2025 General Plan standard called for at least 3.0 acres of parkland to be provided per 1,000 residents (comprised of 0.75 acres neighborhood parks, 0.25 acres community parks, 2.0 acres regional parks). This standard is among the lowest in the Central Valley, where many cities have a standard of 4.0 or 5.0 acres per 1,000 residents. Under the Quimby Act, California State law sets a generally applicable standard of 3.0 acres of parkland per 1,000 residents as the maximum that can typically be required by a city or county as a condition of approval of a residential subdivision.
However, a city or county can exceed this limitation and require dedication and improvement of parkland up to a ratio of 5.0 acres per 1,000 residents if it can be demonstrated that the developed portion of the community meets or exceeds the higher standard. The Quimby Act limits do not preclude a city from establishing a higher parkland standard, just the amount that can be charged to a new residential development.
The current citywide park fee is based upon a ratio of 3.0 acres per 1,000 residents; this was established under the City’s previous Urban Growth Management Program and 1989 Master Plan for Parks and Recreation. This 3.0 acre parkland standard was maintained through the adoption of the 2025 Fresno General Plan, the subsequent Park Facilities Impact Fee & Parkland Dedication Study, and the adoption of the citywide Park Facilities Fee ordinance. In addition to public parks, the Park Facilities Impact Fee study also identified and examined additional open spaces that are publicly owned but have limited access, recreation, or leisure uses, such as golf courses, school playgrounds, or sports fields.
Citywide, Fresno has a current supply of 3.28 acres of City Park Space per 1,000 residents, which exceeds the City’s minimum standard by 0.28 acre. Including All Park Space in the City’s SOI increases that ratio to 4.65 acres per 1,000 residents.4 The 4 For this General Plan, Park categories include All Park Space within the City's SOI: parks owned and maintained by an HOA that are publicly accessible (no gate), public golf courses, SJRC parkland open to the public and directly accessible from the City; pocket parks maintained through Community Facility Districts (CFD); ponding basins with park improvements (excludes fenced-off flood areas); Clovis and Central Unified School District playgrounds, Fresno Unified's Burroughs Elementary and Yosemite Middle School (grass fields and courts, Kindergarten play areas, and parking areas only). City Park Space excludes golf courses and school lands because of their use limitations and where the City lacks jurisdiction over the park.
B3 Attach #1 of 3
DECEMBER 2014 5-9
Chapter 5: Parks, Open Space, and Schools
breakdown of these figures is shown in Table 5-2. The difference is due to the inclusion of the City’s two golf courses and school playgrounds and play fields. Since school district policies are not within the City’s control, those lands have been excluded from the City’s inventory. Nevertheless, Clovis and Central Unified’s policies for open playgrounds provide a very significant amount of recreational area for residents in those school districts. Including Fresno Unified’s Burroughs Elementary and Yosemite Middle School open space, city schools provide over 450 acres of recreational land. This could be greatly increased with the inclusion of additional Fresno Unified School facilities located in the central areas of the city, areas severely lacking in available park space.
Although overall the City exceeds the minimum standard of 3.0 acres per 1,000 residents, the provision of parkland is uneven across the city. The inclusion of open campus schools as parkland increases the disparity of park space in the established neighborhoods north and south of Shaw Avenue. Newer neighborhoods with larger amounts of parkland increase the citywide average and obscure the parkland deficiencies of many Fresno neighborhoods. In particular, many of the central neighborhoods in Fresno lack convenient access to parkland and fall well below the 3.0 acre standard, as shown in Table 5-3 and Figure POSS-1. The discrepancy between developments north and south of Shaw Avenue also demonstrates the effectiveness of park and open space fees and other policies in providing park space to the residents of newer residential developments as compared to past policies, although the city as a whole still remains well below other similar-sized cities.
TABLE 5-2: CITY PARK SPACE AND RATIO PER 1,000 RESIDENTS BY
PARK CATEGORY
Park
Category
City Park Space1 All Park Space in SOI2
Acres Number
of Parks
Acres per
1,000
Residents3
Acres Number
of
Parks
Acres per
1,000
Residents3
Community 198.324 13 0.40 557.69 33 1.13
Neighborhood 372.455 62 0.75 401.57 66 0.81
Pocket 61.574 93 0.12 61.57 93 0.12
TrailGreenwayParkway 115.194 19 0.23 115.19 19 0.23
Regional 877.05 5 1.77 940.11 6 1.90
Golf 223.62 2 0.45
Total 1,624.58 192 3.28 2,299.75 219 4.65
B3 Attach #1 of 3
5-10 FRESNO GENERAL PLAN
1. City Park Space includes parks owned and/or maintained by the City or parks where there is little likelihood that the use or access will change. City Park Space does not include lands controlled by other jurisdictions where policy changes could limit or eliminate those lands from use as parkland, such as school district properties. Parks under the jurisdiction of the San Joaquin River Conservancy currently open directly to city residents (Camp Pashayan, Jensen River Ranch) and Fresno Metropolitan Flood Control Basins improved for park use are included. Golf courses are not included because their use is limited to golf.
2. In addition, mutual-use agreements with schools provide 451.54 acres of Regional, Neighborhood, and Community Park space for Fresnans, which is not included in the total acres of City Park Space. Golf courses provide an additional 223.62 acres of open space.
3. Based on 2010 city population of 495,000.
4. Homeowners Associations account for 9.17 acres of the Pocket parks, 4.10 acres of Trail-Greenway-Parkway, and 7.74 acres of the Neighborhood parks under the City Park Space.
5. Ponding basins comprise 74.46 acres of the Neighborhood parks and 57.76 acres of the Community Parks under the City Park Space.
Source: City of Fresno.
TABLE 5-3: PARK ACREAGE IN DEVELOPMENT AREAS
Area Population2 City Park Space1 Pocket/Neighborhood/
Community Parks
Total
Acres
Acres per
1,000
Residents2
Total
Acres
Acres per
1,000
Residents2
Downtown
Planning Area 65,509 235.84 3.60 72.91 1.11
Established
Neighborhoods
South of Shaw 238,116 242.73 1.02 231.78 0.97
Established
Neighborhoods
North of Shaw 165,534 764.43 4.62 194.96 1.18
Combined
Development
Areas NW3 47,122 43.56 0.92 42.30 0.90
DA-1 South 15,056 296.55 19.70 48.92 3.25
Combined
Development
Areas East4 15,385 21.25 1.38 21.25 1.38
South Industrial
Area 11,316 20.23 1.79 20.23 1.79
Total 558,038 1,625 2.91 632 1.13
Using 2010 City
Population 495,000 1,625 3.28 632 1.28
1. City Park Space includes parks owned and/or maintained by the City or parks where there is little likelihood that the use or access will change. City Park Space does not include lands controlled by other jurisdictions where policy changes could limit or eliminate those lands from use as parkland, such as school district properties.
Parks under the jurisdiction of the San Joaquin River Conservancy currently open directly to city residents (Camp Pashayan, Jensen River Ranch) and Fresno Metropolitan Flood Control Basins improved for park use are included. Golf courses are not included because their use is limited to golf.
2. Based on Census Tract population totals that include population outside the 2010 City SOI and Planning Area.
3. Includes West Development areas north of SR 180 (DA-1 North, DA-4 West).
4. Includes East Development areas (DA-2 North & South, DA-3, DA-4 East).
Source: City of Fresno.
B3 Attach #1 of 3
DECEMBER 2014 5-11
Chapter 5: Parks, Open Space, and Schools
In Fresno, the neighborhood and community, and pocket parks are the backbone of the urban park system. They are large enough for play fields and programmed activities and may include sport courts and community centers. They provide open and accessible active and passive open space to neighborhoods, typically within walking or biking distance of many residences. Given the important role these facilities play in Fresno’s communities, it is appropriate for the City to achieve 3.0 acres of neighborhood, community, and pocket parks per 1,000 residents.
In Fresno, regional park facilities include trails, paths, and greenways that provide linear connections through and between communities. In addition, regional park facilities include an amphitheater, zoo, a regional sports park, and river access. These facilities provide walking and biking connectivity for the larger community, as well as spaces for leisurely enjoyment of the surrounding neighborhoods. Regional parks provide active and passive recreation and leisure activities at a larger scale, and it is appropriate for the City to continue to provide them at a ratio of 2 acres per 1,000 residents, the standard from the City’s 2025 General Plan.
To meet the standard of 3.0 acres of neighborhood, community, and pocket parks per 1,000 residents, a total of 2,313 acres of new parks will be needed to serve the estimated 771,000 residents in the city at General Plan Horizon. To achieve parity with other Valley cities, the City would need to increase the parkland ratio standard to 5.0 acres per 1,000 residents, and the City would need an additional 3,855 acres of parks from all categories. The overall ratio for parkland under this General Plan is 5 acres per 1,000 residents of which 3 acres per 1,000 residents is for Community, Neighborhood, and Pocket Parks.
As shown in Table 5-4, the established neighborhoods south of Shaw and the south industrial area have a deficit of 984 acres in City park space. Using provisions in the Quimby Act, which apply to new residential subdivisions, the City could provide an additional 1,275 acres of parkland and accomplish the overall City goal of providing parkland at a similar rate as other Valley cities. However, State laws concerning parkland dedication and fee limitations require that the open space facilities be proximate to the developments generating these fee revenues. The existing deficit of pocket, neighborhood, and community parks within the established neighborhoods south of Shaw, including the South Industrial Area, may not be considered proximate to developing areas. Thus, additional funding is needed to provide parks in these areas with deficits to equitably distribute the City’s parks and open space among all Fresnans.
Recent revisions to the Quimby Act through AB 1359 (2013) allows fees, paid pursuant to the act, to be used in a neighborhood other than the neighborhood being developed if specific conditions can be met. This may allow some flexibility but will not resolve the ongoing issue of limited park space in established neighborhoods.
B3 Attach #1 of 3
5-12 FRESNO GENERAL PLAN
A number of approaches will be pursued to meet both future and existing needs for parks:
• Focus funding efforts on increasing the number of Neighborhood and Community Parks, especially within the areas south of Shaw Avenue; • Increasing the City’s standard to 3.0 acres of usable parkland per 1,000 residents for combined Pocket, Neighborhood, and Community parks while striving for 5.0 acres or more of usable parkland per 1,000 residents for total City Park Space for the SOI;
• Seek dedicated funding sources for parkland acquisition, improvement, and ongoing maintenance costs, in both growth areas and established neighborhoods; • Strategically locate neighborhood and community parks along BRT corridors, in Activity Centers, and in established neighborhoods to support urban densities; • Allow flexibility in siting and sizing neighborhood parks; • Identify the sites of future regional parks, 40 to 100 acres in size, in the City’s Development Areas;
• Continue to evaluate and update the City’s Citywide Park Fee as applied to new residential development to assure priority park areas are acquired in existing and new residential neighborhoods;
• Identify underutilized and vacant land within the city that can be acquired and developed as parks to meet the needs of existing residents and cure deficiencies in established neighborhoods;
• Secure more joint use facilities, particularly with public schools; • Pursue joint use facilities with Police and Fire when siting new parks or police/fire stations. These joint facilities will provide added security for the parks and provide greater opportunity for police and fire personnel to interact with the public and neighborhood children;
• Add security measures to parks to protect facilities and patrons; • Identify opportunities to provide cultural parks consistent with the neighborhood; • Develop parks that meet specialized needs, such as certain sports activities or recreational facilities not provided elsewhere in the city; • Encourage development of recreation facilities that are open to the public and free of charge such as trails, greenways, and drainage basins developed with the intent of being predominantly used as a park; and
• Use low-impact design and landscaping strategies, including use of climatized and drought-resistant plants, for new and existing parks to minimize water demand B3 Attach #1 of 3
DECEMBER 2014 5-13
Chapter 5: Parks, Open Space, and Schools
and increase capacity for passive water storage and conservation that also provides scenic and recreational opportunities for users.
The General Plan aims to provide more neighborhood, community, and pocket parks, such as the skate park pictured above, throughout the city to improve access to parks, open spaces, and recreational areas for all Fresnans.
Planned Parks, Trails and Open Space
The General Plan proposes over 1,100 acres of land for new City parks by the General Plan 2035 build-out stage for development in the Fresno SOI. All new development will include neighborhood, community, trails, and regional scale parks, where feasible, meeting a minimum combined standard of three acres per 1,000 new residents for Pocket, Neighborhood, and Community Parks.
5 Other funding sources will be sought
for the additional two acres per 1,000 residents for Regional Parks, trails, and greenways. These parks are not all mapped on the Figure LU-1: Land Use Diagram, but will be identified through subsequent implementation planning after adoption of this General Plan. Implementation and ongoing maintenance of all park facilities will require new sources of dedicated ongoing revenue.
5 See Figure MT-2: Paths and Trails in Chapter 4, Mobility and Transportation.
B3 Attach #1 of 3
5-14 FRESNO GENERAL PLAN
Park maintenance in Development Areas can be funded with CFDs or landscaping and lighting districts. A new funding source for citywide parks maintenance may be needed, as discussed in the Economic Development and Fiscal Sustainability Element. Figure POSS-1: Parks and Open Space, shows the location of the major new parks that are proposed. These include regional parks with some neighborhood and community parks sited in key locations such as in Activity Centers or infill locations. San Joaquin River Parkway paths and trail access points are shown in Figure POSS-2.
Inspiration Park. Set on eight acres near Polk and Gettysburg Avenues, Inspiration Park (formerly referred to as Universally Accessible Park) will provide a Miracle League special-needs baseball field with special-needs designed children play areas, along with a sensory garden and wall, wheelchair accessible dog park, and rubberized basketball court in addition to other features.
B3 Attach #1 of 3
DECEMBER 2014 5-15
Chapter 5: Parks, Open Space, and Schools
TABLE 5-4: EXISTING CITY PARK SPACE AND POCKET/NEIGHBORHOOD/COMMUNITY PARK SPACE NEEDS BASED ON 5 ACRES AND 3 ACRES PER 1,000 RESIDENTS RATIOS Area City Park Space Pocket, Neighborhood, and Community Park Existing
Park Acres
Target Park
Acres to
Reach Ratio
of 5 acres per
1,000
Residents
Acres Needed
to Reach 5
Acres per
1,000
Residents
Ratio
Existing Park
Acres
Target Park
Acres to
Reach Ratio
of 3 acres per
1,000
Residents
Acres Needed to
Reach Ratio of 3
acres per 1,000
Residents
Downtown (DNCP) 235.84 327.55 91.70 72.91 196.53 123.62 Established
Neighborhoods
South of Shaw 242.73 1190.58 947.85 231.78 714.35 482.57 Established
Neighborhoods
North of Shaw 764.43 827.67 63.24 194.96 496.60 301.65
Combined DA
Northwest 43.56 235.61 192.05 42.30 141.37 99.06
Combined DA
Southwest 296.55 75.28 -221.27 48.92 45.17 -3.76
Combined DA East 21.25 76.93 55.68 21.25 46.16 24.91
South Industrial
Area 20.23 56.58 36.35 20.23 33.95 13.72
Total 1,625 2,725 1,100 632 1,635 1,003
1. Total based on 2010 SOI population of 545,000, Area ratios based on Census Tract populations within each area. City Park Space includes Regional, Trails, Neighborhood, Pocket, and Community Parks not including school properties.
Source: City of Fresno.
B3 Attach #1 of 3
5-16 FRESNO GENERAL PLAN
As summarized in Table 5-5, the amount of new parkland expected under the General Plan Horizon (2035) is around 1,100 acres of new parkland. It is both mapped and assumed to be provided by new development and added on infill sites in established neighborhoods.
TABLE 5-5: TOTAL EXISTING AND FUTURE PARK NEEDS
SCENARIOS
Park Space Categories Based on 2010
Population1
Based on Additional
Future Population at
General Plan Horizon
Total
All City Park Spaces at Ratio
of 5 Acres per 1,000
Residents 2,725 1,130 3,855
Pocket, Neighborhood, and
Community Parks at Ratio of
3 Acres per 1,000 Residents 1,635 678 2,313
1. Based on Table 5-4 SOI Population and Acreage Need at 3 and 5 acres per 1,000 residents.
Source: City of Fresno.
Subsequent implementation planning for parks following the General Plan adoption will be designed as a guiding blueprint for the City Council, City administration, and the public. It will strive to ensure the cohesive development of a parks and open space system that upholds the standards and goals set forth in the General Plan, and include a range of programs for all ages, interests, and neighborhoods. It will also help determine which parks and recreation facilities will be shared with school programs.
5.3 OPEN SPACE ACTION PLAN
Fresno’s Open Space Action Plan consists of the objectives, and policies presented in this element. These include policy direction for specific actions and programs which the City Council intends to pursue to implement the ideas for open space systems contained in this element. Additional detail on how the action plan will be implemented is in the Implementation Element, in the Table 12-1, “Summary of Implementation Actions for Plan Policies”. Taken together, these initiatives specifically respond to and are consistent with the Government Code’s requirements for an Open Space Action Plan that is to include “specific programs which the legislative body intends to pursue in implementing its open space plan” (Government Code Section 65564).
B3 Attach #1 of 3
S a n
J o a q u i n R i v e r
SHAW AVE SHAW AVE
HERNDON AVE HERNDON AVE
BLACKSTONE AVE
WILLOW AVE
ASHLAN AVE
SHIELDS AVE
MCKINLEY AVE
Fresno Yosemite
International
Airport
California
State University
Fresno
Fresno-Clovis
Regional Wastewater
Reclamation Facility
CEDAR AVE
SHIELDS AVE SHIELDS AVE
ASHLAN AVE
MCKINLEY AVE
KINGS CANYON RD HIGHLAND AVE
KINGS CANYON RD
OLIVE AVE OLIVE AVE
BELMONT AVE
BUTLER AVE
JENSEN AVE
NORTH AVE NORTH AVE
JENSEN AVE
KEARNEY BLVD
BELMONT AVE BELMONT AVE
BULLARD AVE
NEES AVE
SHEPHERD AVE
FIGARDEN
GRANTLAND AVE
GARFIELD AVE
BLYTHE AVE BLYTHE AVE
BRAWLEY AVE
MARKS AVE
CLINTON AVE
BRAWLEY AVE
POLK AVE
MARKS AVE
N. WEST AVE
PALM AVE
WEBER AVE
GOLDEN STATE BLVD
FRESNO ST WALNUT AVE FIG AVE
CENTRAL AVE
AMERICAN AVE CEDAR AVE
PEACH AVE
CHESTNUT AVE CHESTNUT AVE
CLOVIS AVE CLOVIS AVE
FOWLER AVE
TEMPERANCE AVE TEMPERANCE AVE
JENSEN AVE
FIRST ST FIRST ST
BLACKSTONE AVE
FRESNO ST
GOLDEN STATE BLVD
H ST
VAN NESS AVE
BARSTOW AVE
FRIANT RD
CALIFORNIA AVE
FRUIT AVE
DE WOLFE AVE
COPPER AVE
FTWASHINGTON RD
FIRST ST
AUDIBON DR
ASHLAN AVE
FOWLER AVE
MAROA AVE
Pocket Park
Neighborhood Park
Community Park
Regional Park
Golf Course
Existing Parks
Neighborhood Park
Community Park
Regional Park
Open Space
SEDA School/Park
Open Space Multi-Use
School
Vista Point
Future Parks
1/4 Mile
radius from
existing park
1/4 Mile
radius from
future park
S
S
S
S S S
S
S S
S
S
S S
S
S
S S
S S
S
S
S
S
S
S S
S
S
S
180
41 168
180
99 41
99 Figure POSS-1:
Parks and Open Space
0 2 4
MILES
1/2 1
Planning Area Boundary
Sphere of Inuence
City Limits
Source: City of Fresno, DARM Dept. 2014.
Notes: This
gure does not include all
Homeowner Association parks,
only those that provide public
access.
This
gure includes County of
Fresno Parks located within the
City of Fresno Planning Area
Boundary.
See Figure MT-2 for path and
trail locations.
B3 Attach #1 of 3
5-18 FRESNO GENERAL PLAN
This page intentionally left blank.
B3 Attach #1 of 3
1. 2.
3. 4.
5. 6.
7. 8.
9. 10.
11. 12.
13. Pedestrian Access
Multi-Modal Access with Parking
Multi-Modal Access with Parking
Multi-Modal Access with Parking
Pedestrian, Bicycle, Managment, and Emergency Access
Existing Golf Course Access, Future Multi-Modal Access with Parking Pedestrian and Bicycle Access
Pedestrian and Bicycle Access
Existing Scout Island Access, Future Pedestrian and Bicycle Access Pedestrian and Bicycle Access
Existing Parking, Planned Pedestrian Access
Multi-Modal Access with Parking
Pedestrian, Bicycle, Managment, and Emergency Access
Multi-Modal Access with Parking
Multi-Modal Access with Parking
Multi-Modal Access with Parking
Pedestrian and Bicycle Access
Pedestrian and Bicycle Access
Multi-Modal Access with Parking
Multi-Modal Access with Parking
Multi-Modal Access with Parking
Multi-Modal Access with Parking
Multi-Modal Access with Parking
Pedestrian and Bicycle Access
Multi-Modal Access with Parking
Multi-Modal Access with Parking
14. 15.
16. 17.
18. 19.
20. 21.
22. 23.
24. 25.
26. S a
n
J o a q u i n
R i v e r
HERNDON AVE
BLACKSTONE AVE
WILLOW AVE
NEES AVE
SHEPHERD AVE
MARKS AVE
FRIANT RD COPPER AVE
FT WASHINGTON RD
AUDUBON
DR
41 HERNDON AVE
SPRUCE AVE
GARFIELD AVE
ALLUVIAL AVE
RIO VISTA DR
MILLBURN
AVE
WEST AVE
VAN NESS BLVD
PALM AVE
ALLUVIAL AVE
TEAGUE AVE
PERRIN AVE
FIRST ST
MILLBROOK AVE
CEDER AVE
MAPLE AVE
CHESTNUT AVE
CHAMPLAIN DR
GOLDEN STATE
1 2 3
4 5
6 7 8
9 10
11 12
13 14
15 16
17 18
19 20 21
22 23 24
25 26
0 2 4
MILES
1/2 1
Existing
Planned
Vista Point
San Joaquin River Parkway Path & Trail1
Class I Bicycle/Pedestrian Path
Class I or III Bicycle Facility
County/City Trail2
Open Space
Multi-Use
Regional Park
Golf Course
Planning Area Boundary
Figure POSS-2:
San Joaquin River Parkway
Path & Trail Access Points Access Points:
Source: City of Fresno, DARM Dept 2013 Base Map
San Joaquin River Conservancy, 2013 Access Points. 1.Conceptual alignment of proposed path and trail. All planned Parkway access and projects,
their features, uses, and locations, are subject
to the acquisition of lands and/or easements
from willing sellers, and project-specic,
site-specic environmental review.
2. Conceptual alignment, subject to City/County
cooperative planning adoption, and
implementation. City preferred location
depicted.
B3 Attach #1 of 3
5-20 FRESNO GENERAL PLAN
OBJECTIVE
POSS-1 Provide an expanded, high quality and diversified park system, allowing for varied recreational opportunities for the entire Fresno community.
Commentary: The park system will be comprehensive; include greenways, trails and open space; allow for athletic, leisure and mobility opportunities; support planned land use intensities and patterns and buffers along transportation corridors; and accommodate groundwater and other resource management objectives.
IMPLEMENTING POLICIES
POSS-1-a Parkland standard. Implement a standard of at least three acres of public parkland per 1,000 residents for Pocket, Neighborhood, and Community parks throughout the city, while striving for five acres per 1,000 residents for all parks throughout the city, subject to identifying additional funding for Regional Parks, Open Space/Natural Areas, and Special Use Parks/Facilities.
POSS-1-b Parks Implementation Planning. Conduct ongoing planning to implement park policies established in this General Plan and continue to strive for well-maintained and fully accessible playgrounds, with accessible amenities, throughout the city.
• Keep an up-to-date inventory of existing and planned parks, including locations mapped on the Parks and Open Space
Diagram;
• Plan for acquiring new parkland designated in the General Plan, as shown in Figure POSS-1;
• Establish a standard protocol for working with new development to arrange for parkland acquisition and dedication;
• Establish a protocol for working with established neighborhoods to provide needed parks, including the fostering of neighborhood and district associations to help plan, acquire, improve and care for public parks, and coordinating new City service facilities to provide new open space;
• Establish detailed design, construction, and maintenance standards;
• Prepare an assessment of the recreation needs of existing and future residents;
B3 Attach #1 of 3
DECEMBER 2014 5-21
Chapter 5: Parks, Open Space, and Schools
• Create an action plan defining priorities, timeframes, and responsibilities;
• Adopt and implement a comprehensive financing strategy for land acquisition, park development, operations, and maintenance; • Identify opportunities for using existing or planned park space as passive stormwater storage, treatment, and conservation areas that also provide scenic and/or recreational opportunities; • Identify opportunities for siting and using existing or planned park space as passive “purple pipe” waste water storage, treatment, and conservation areas that also provide scenic and/or recreational opportunities; and
• Update the Parks Master Plan.
POSS-1-c Public Input in Park Planning. Continue to provide opportunities for public participation in the planning and development of park facilities and in creation of social, cultural, and recreational activities in the community.
POSS-1-d Additional parkland in certain areas. Strive to obtain additional parkland of sufficient size to adequately serve underserved neighborhood areas and along BRT corridors in support of new and intense residential and mixed use infill development.
• Identify, where appropriate, joint use opportunities in siting parks with other City service facility needs.
POSS-1-e Criteria for Parks in Development Areas. Continue to use park size and service area criteria for siting new parks and planning for parks in Development Areas:
Park Type
Size Range
(Acreage)
Population
Served
Service Area
Radius
Neighborhood 2.01 to 10 10,000 - 15,000 Up to 1 mile
Community 10.01 to 40 50,000 - 80,000 Up to 4 miles
Regional More than 401 100,000 100,000
residents 1 Or when amenities provide regional service.
POSS-1-f Parks and Open Space Diagram. Require parks to be sited and sized as shown on the Parks and Open Space Diagram (Figure POSS-1) of the General Plan, subject to the following:
• All new park designations carry dual land use designations, so that if a park is not needed, private development consistent with B3 Attach #1 of 3
5-22 FRESNO GENERAL PLAN
zoning and development standards may be approved. (See Figure LU-2: Dual Designation Diagram in the Urban Form, Land Use, and Design Element);
• Revised and/or additional park sites will be identified through subsequent implementation and planning in established
neighborhoods and Development Areas;
• Locations for future park sites as shown on Figure POSS-1 are schematic to the extent that park sites may be relocated as necessity and opportunity dictate, and a General Plan amendment is not required if the park continues to serve the target areas as determined by the Planning Director; and
• A park may be located on any suitable land in the general vicinity of the sites depicted. However, the zoning of potential park sites must be made consistent with the General Plan.
POSS-1-g Regional Urban Forest. Maintain and implement incrementally, through new development projects, additions to Fresno’s urban forest to delineate corridors and the boundaries of urban areas, and to provide tree canopy for bike lanes, sidewalks, parking lots, and trails.
OBJECTIVE
POSS-2 Ensure that adequate land, in appropriate locations, is designated and acquired for park and recreation uses in infill and growth areas.
IMPLEMENTING POLICIES
POSS-2-a Identify opportunities to site, develop and co-locate Fire and Police stations with needed parks and open space as joint-use facilities. • Capital Improvement Plans should be updated to reflect this policy.
Commentary: Co-location of public safety with parks provides added security for the park and creates an opportunity for public safety personnel to interact with the neighborhood.
POSS-2-b Park and Recreation Priorities. Use the following priorities and guidelines in acquiring and developing parks and recreation facilities:
• Acquire and develop neighborhood park space in existing developed neighborhoods that are deficient of such space and in B3 Attach #1 of 3
DECEMBER 2014 5-23
Chapter 5: Parks, Open Space, and Schools
areas along BRT corridors that are designated as priorities for encouraging new mixed-use transit-oriented development; • Provide accessible recreation facilities in established neighborhoods with emphasis on those neighborhoods currently underserved by recreation facilities;
Commentary: As funding permits, the City will strive to make all recreation facilities universally accessible for all residents.
Guidelines should also consider the provision for universally accessible facilities in established neighborhoods.
• Improve established neighborhood parks with emphasis on those neighborhoods with the greatest need;
• Acquire and develop neighborhood and community parks in new Development Areas;
• Recognize community parks as a special need in areas that lack these facilities or are planned for transit supportive urban densities, and explore all potential sources of revenue to secure and develop appropriate sites including joint use facilities; • Develop new special purpose parks, such as outdoor gym equipment, natural resource based trail parks, equestrian centers, dog parks, and amphitheaters, as well as alternative recreation facilities, such as community recreation centers, passive wildlife observation park, cultural heritage and diversity park, military veterans memorial park, and universal access open space park; and
• Acquire and develop park and open space in established neighborhoods and Development Areas, prioritizing existing neighborhoods with the greatest deficiencies, so that all residents have access to park or open space within one-half mile of their residence. Develop these facilities to be fully accessible to individuals with disabilities as required by law.
POSS-2-c Review of Development Applications. Coordinate review of all development applications (i.e., site plans, conditional use permits, and subdivision maps) in order to implement the parks and open space standards of this Plan.
• Assure the provision of adequate active and passive open spaces and facilities as appropriate within residential subdivisions through Development Code requirements for mandatory
dedication and improvement of land and/or development fees.
B3 Attach #1 of 3
5-24 FRESNO GENERAL PLAN
Commentary: Revisions to the Quimby Act by AB 1359, allows fees paid pursuant to the act to be used in a neighborhood other than the neighborhood being developed if specific conditions can be met.
• Require the provision of appropriate outdoor living areas or private open space in multi-family residential developments not subject to the Subdivision Map Act.
• Request open space easements where feasible and warranted to secure appropriate public use of sensitive areas with scenic or recreation values, and for buffering space for sensitive areas. • Require provision of appropriate open space areas in private projects, in the form of trails, enhanced landscaped setbacks, parks, and water features.
• Evaluate the merits of establishing a development bonus entitlement program in which development incentives (i.e., bonus densities, bonus floor area square footage) are provided for contributions to public recreational facilities on-site or in the vicinity of the development project.
POSS-2-d Recreation Opportunities near Freeway Corridors. Negotiate with Caltrans, other public agencies, and private property owners to develop remnant parcels along freeway corridors for appropriate recreational uses.
POSS-2-e Open Space Dedication for Residential Development. Ensure new residential developments provide adequate land for parks, open space, landscaping, and trails through the dedication of land or otherwise providing for Pocket Parks, planned trails, and other recreational space, maintained by an HOA, CFD, or other such entity.
Commentary: Thresholds for this requirement will be established when the Development Code is adopted.
POSS-2-f Freeway Landscaping. Support the expansion of the State Route 99 Beautification Association to the Fresno County Highway Beautification Association with related updates and implementation of the master landscape plans for each freeway.
B3 Attach #1 of 3
DECEMBER 2014 5-25
Chapter 5: Parks, Open Space, and Schools
OBJECTIVE
POSS-3 Ensure that park and recreational facilities make the most efficient use of land; that they are designed and managed to provide for the entire Fresno community; and that they represent positive examples of design and energy conservation.
IMPLEMENTING POLICIES
POSS-3-a Centralized Park Locations. Site parks central and accessible to the population served, while preserving the integrity of the surrounding neighborhood.
POSS-3-b Park Location and Walking Distance. Site Pocket and Neighborhood Parks within a half-mile walking distance of new residential development.
POSS-3-c Link Parks with Walkways. Link public open space to adjacent, schools, and residential uses and Activity Centers through a series of landscaped linear walkways and bikeways that enhance and encourage pedestrian use.
POSS-3-d Sidewalks to Connect Neighborhoods. Sidewalks should be designed for internal neighborhood circulation, and to connect neighborhoods to other residential areas, parks, community trails, shopping, and major streets.
POSS-3-e Minimum Park Size for Active Recreation. Minimize City acquisition or acceptance of dedication of park sites less than two acres in size for active recreational uses, except where maintenance costs are secured through a CFD, HOA, or other such mechanism.
POSS-3-f Park Design Guidelines. Create, maintain, and apply park design guidelines, with provisions for appropriate amenities for each park type, which may include:
• Minimum and maximum shade.
• Protections from shading by adjacent buildings.
• Accessibility to persons with disabilities.
• Street trees and landscaped median strips in adjacent arterial roads.
• Art and points of attraction.
B3 Attach #1 of 3
5-26 FRESNO GENERAL PLAN
• Landscape and hardscape features.
• Street furniture, signage, and lighting.
• Food sales and entertainment.
• Restroom facilities, play structures, and picnic shelters. • Landscape design synthesis with input from civil engineers and hydrologists, educators and daycare providers, fitness trainers and coaches, police officers and experts in crime prevention through environmental design, as appropriate.
• Solar panels, new LED lighting, and water efficiency
improvements. Sports field areas designed to allow periodic changes in field locations to minimize wear areas and provide sufficient fields to host regional, state, or national tournaments. • Using topography to create interesting and visually appealing spaces and forms.
• Use of waterways as a key design influence, a focus of restoration, and an opportunity to provide for public enjoyment of views. • Reflecting the agricultural and horticultural heritage of the site or area.
• Connecting with surrounding areas in a way that encourages expanded pedestrian activity.
• Creating individual places within a park that respond to the needs of a broad range of park users, from youth to the elderly. • Creating places of delight that engage the senses.
• Creating places that engage the mind, by treating park features as opportunities for interpretation and questioning.
• Using sustainable design practices, and highlighting these as opportunities for learning.
POSS-3-g Park Security and Design. Promote safety, attractiveness, and compatibility between parks and adjacent residential areas through design, maintenance, and enforcement of park regulations • Require the installation of security lighting for parking, points of access, and building areas at all public recreation and park sites. • Keep neighborhood eyes on parks to increase security.
POSS-3-h Coordination with School Districts. Continue to coordinate with school districts to explore opportunities for joint use of both outdoor B3 Attach #1 of 3
DECEMBER 2014 5-27
Chapter 5: Parks, Open Space, and Schools
and indoor recreation facilities, such as playgrounds, play fields, and gymnasiums, for City recreation programs.
POSS-3-i Joint Use with Drainage Facilities. Continue to seek joint use agreements for use of FMFCD stormwater drainage facilities.
Commentary: Proposals to use ponding basins (or parts of ponding basins) for recreation will need to be approved by the Department of Public Utilities to ensure minimal loss of capacity for groundwater recharge.
OBJECTIVE
POSS-4 Pursue sufficient and dedicated funding for parks acquisition, operations, and maintenance.
IMPLEMENTING POLICIES
POSS-4-a Supplemental Revenue. Seek revenue sources to supplement General Fund support for basic park maintenance and basic recreational services.
POSS-4-b Operation and Maintenance Financing. Continue to require new residential development to form lighting and landscaping maintenance districts or community facility districts or ensure other means of financing to pay for park operations and maintenance.
POSS-4-c Improvements in Established Neighborhoods. Seek agreements with formal neighborhood associations and institutions for improvements and ongoing maintenance of parks in established neighborhoods.
POSS-4-d Maintain Adopt-A-Park Program. Continue promoting the City’s Adopt-A-Park program that utilizes partnerships with local organizations to preserve, beautify and maintain Fresno's neighborhood parks.
5.4 VALLEY ARBORETUM
The concept of a Valley Arboretum was introduced by the Tree Fresno organization in 2012. An arboretum is defined as a place where trees, shrubs, and plants are grown in order to be observed scientifically and/or seen by the public for educational and ornamental purposes. The Tree Fresno organization presented the City with a description of 14 arboretum segments and a preliminary diagram, shown below, connecting these segments through Fresno and into adjoining parts of Fresno County B3 Attach #1 of 3
5-28 FRESNO GENERAL PLAN
and Clovis. Their vision is to establish a signature amenity for the region: a system of linear parks, like the Sugar Pine Trail, with different development standards, to improve Fresno’s quality-of-life and ParkScore and help make the region more investmentworthy to families and businesses.
The vision of the Valley Arboretum6 is to establish a link between the “botanical brothers” in the region: the Fresno State campus arboretum and horticulture center, the Clovis Botanical Gardens at Dry Creek Park, the Shinzen Garden at Woodward Park, and the Chaffee Zoological Gardens at Roeding Park with a potential expansion to include Kearney Park, Avocado Park, Lost Lake Park, and other trails in the four county region.
In concept, a Valley Arboretum complements and enhances a number of goals, objectives and policies in this General Plan: expanding Fresno’s urban forest; reducing 6 Diagram as presented to the City by Tree Fresno.
B3 Attach #1 of 3
DECEMBER 2014 5-29
Chapter 5: Parks, Open Space, and Schools
heat island effect; establishing green streets, Complete Streets, and Complete Neighborhoods; beautifying trails; connecting a network of paths with parks, greenways and parkways as well as neighborhoods and Activity Centers for recreation and transportation purposes; and increasing the attractiveness of the city to existing and potential residents, visitors, employers and employees.
Some of the items that need analysis prior to City consideration include the following:
• Segment locations and possible alternatives may be reviewed by City Departments, neighboring jurisdictions, local agencies and organizations, universities, school districts, and the public.
• The proposed Greenbelt Trails located along the periphery of Fresno’s SOI may not be as functional as alternative routes located in closer proximity to more populated areas of the city. The Valley Arboretum could provide much needed open space to communities that are underserved by parks and open space. • Additional routes may be needed in the older parts of the city that have a fair amount of pedestrian activity and would benefit from an improved street experience. Some of the Valley Arboretum could be located in such a way as to provide a sense of place in smaller segments to enhance potential main streets in Fresno.
• Some segments of the concept Arboretum may need to be adjusted to accommodate other community needs.
• Substituting some or all major street segments for local street segments may be advantageous. Relocating segments of the Valley Arboretum along local streets could provide a more enjoyable experience for recreational walkers and cyclists, while reserving major streets for transportation and commuter oriented cyclists. • The Valley Arboretum design needs to be further clarified to guarantee that there are neither conflicts with nor opportunities taken away from cyclists that have been represented in the General Plan.
• Representation of the Valley Arboretum design diversity and street cross sections for the various conditions found throughout the many segments identified and for those that may be proposed through a vetting process need to be shown. Street crossing design, safety features and the interface with abutting residential and commercial properties will also vary. The range in overall widths; the type and location of trees and other landscaping; landscaping buffer widths; trail width, location and type; and educational amenities and gateway locations need to be determined.
B3 Attach #1 of 3
5-30 FRESNO GENERAL PLAN
5.5 OPEN SPACE AND BIOLOGICAL RESOURCES
Overall, there are more than 4,000 acres of existing open space in the Planning Area.
Open space is distinguished here from parkland as discussed above. More than half of the existing open space, including private golf courses and parks in gated communities, is not accessible to the general public. Ponding/recharge basins, owned by the FMFCD, account for 1,273 acres; all serve as ponding basins for storm drainage while some also act as year-round groundwater recharge basins.
Six types of open space land are defined by the Government Code for General Plan purposes:
• Open space for public health and safety, including but not limited to, areas which require special management or regulation because of hazardous or special conditions such as earthquake fault zones, unstable soil areas, flood plains, watersheds, areas presenting high fire risks, areas required for the protection of water quality and water reservoirs and areas required for the protection and enhancement of air quality.
• Open space for the preservation of natural resources, including but not limited to, areas required for the preservation of plant and animal life, including habitat for fish and wildlife species; areas required for ecologic and other scientific study purposes; rivers, streams, bays and estuaries; and coastal beaches, lakeshores, banks of rivers and streams, and watershed lands.
• Open space used for the managed production of resources, including but not limited to, forest lands, rangeland, agricultural lands and areas of economic importance for the production of food or fiber; areas required for recharge of groundwater basins; bays, estuaries, marshes, rivers and streams which are important for the management of commercial fisheries; and areas containing major mineral deposits, including those in short supply.
• Open space for outdoor recreation, including but not limited to, areas of outstanding scenic, historic and cultural value; areas particularly suited for park and recreation purposes, including access to lakeshores, beaches, and rivers and streams; and areas which serve as links between major recreation and open space reservations, including utility easements, banks of rivers and streams, trails, and scenic highway corridors.
• Open space in support of the mission of military installations that comprises of areas adjacent to military installations, military training routes, and underlying restricted airspace that can provide additional buffer zones to military activities and complement the resource values of the military lands. • Open space for the protection of places, features, and objects for the preservation of Native American artifacts, sites and remains.
B3 Attach #1 of 3
DECEMBER 2014 5-31
Chapter 5: Parks, Open Space, and Schools
Central California is a unique biological enclave, with a rich diversity of flora and fauna.
This region’s climate, soils, hydrology, and geographic isolation fostered resident species found nowhere else on earth. Through agriculture, rural residential and urban development, these species and their habitats are being diminished and marginalized. In collaboration with federal, State, and local flood control and natural resource agencies, the City is striving to protect native plants by providing greater setbacks near sensitive environments; however, continued urbanization may reduce these species’ opportunities.
Special Status Species
The Planning Area includes a variety of rare plants and wildlife species, particularly along the San Joaquin River, which provides a concentrated riparian plant and animal sanctuary. This area of natural habitat is recognized as unique and scenic given its topographic variation in the characteristically flat San Joaquin Valley. It is a sensitive environment hosting a diversity of wildlife, fish, and plant species, and it contains the last remnants of a true riparian environment, due to the year–round presence of flowing water, which supports aquatic life. This riparian community provides nesting and roosting sites for raptors, herons, egrets, and other bird species (resident and migratory). It also contains special status species, such as the Valley Elderberry Long Horn Beetle (potential to be de-listed), as well as non-special status vegetation, such as cottonwood and willow trees. In short, this segment of the river provides habitat diversity of great value to wildlife.
Aside from the San Joaquin River, there are several canals that traverse the Planning Area that provide opportunities for both vegetation and wildlife; however, such opportunities are limited.
OBJECTIVE
POSS-5 Provide for long-term preservation, enhancement, and enjoyment of plant, wildlife, and aquatic habitat.
IMPLEMENTING POLICIES
POSS-5-a Habitat Area Acquisition. Support federal, State, and local programs to acquire significant habitat areas for permanent protection and/or conjunctive educational and recreational use.
POSS-5-b Habitat Conservation Plans. Participate in cooperative, multijurisdictional approaches for area-wide habitat conservation plans to preserve and protect rare, threatened, and endangered species.
B3 Attach #1 of 3
5-32 FRESNO GENERAL PLAN
POSS-5-c Buffers for Natural Areas. Require development projects, where appropriate and warranted, to incorporate natural features (such as ponds, hedgerows, and wooded strips) to serve as buffers for adjacent natural areas with high ecological value.
POSS-5-d Guidelines for Habitat Conservation. Establish guidelines for habitat conservation and mitigation programs, including:
• Protocols for the evaluation of a site's environmental setting and proposed design and operating parameters of proposed
mitigation measures.
• Methodology for the analysis depiction of land to be acquired or set aside for mitigation activities.
• Parameters for specification of the types and sources of plant material used for any re-vegetation, irrigation requirements, and post-planting maintenance and other operational measures to ensure successful mitigation.
• Monitoring at an appropriate frequency by qualified personnel and reporting of data collected to permitting agencies.
POSS-5-e Pursue development of conjunctive habitat and recreational trail uses in flood control and drainage projects.
Commentary: Establishment of wildlife and aquatic habitat is unsuitable along primary conveyance systems to existing and future water treatment facilities. Certain waterways may be excluded from habitat development for this reason.
POSS-5-f Regional Mitigation and Habitat Restoration. Coordinate habitat restoration programs with responsible agencies to take advantage of opportunities for a coordinated regional mitigation program.
POSS-5-g Assistance in Valley Arboretum Master Planning. Assist community organizations that have raised grant funds to pursue the preparation of a Valley Arboretum Master Plan and Implementation Program, including funding, to be coordinated with community groups, as well as related plans and policies for established neighborhoods and other areas with park deficiencies.
Commentary: It is anticipated that when completed, the Valley Arboretum Master Plan will be presented to the City Council for consideration as an amendment to the General Plan. See discussion at the end of this Element, Section 5.4 Valley Arboretum.
B3 Attach #1 of 3
DECEMBER 2014 5-33
Chapter 5: Parks, Open Space, and Schools
OBJECTIVE
POSS-6 Maintain and restore, where feasible, the ecological values of the San Joaquin River corridor.
IMPLEMENTING POLICIES
POSS-6-a San Joaquin River Parkway Master Plan. Support the San Joaquin River Conservancy in its efforts to update the San Joaquin River Parkway Master Plan by working with the other jurisdictions and the River Conservancy to create a comprehensive and feasible plan for preservation, conservation, and Parkway development.
POSS-6-b Effects of Stormwater Discharge. Support efforts to identify and mitigate cumulative adverse effects on aquatic life from stormwater discharge to the San Joaquin River.
• Avoid discharge of runoff from urban uses to the San Joaquin River or other riparian corridors.
• Approve development on sites having drainage (directly or indirectly) to the San Joaquin River or other riparian areas only upon a finding that adequate measures for preventing pollution of natural bodies of water from their runoff will be implemented. • Periodically monitor water quality and sediments near drainage outfalls to riparian areas. Institute remedial measures promptly if unacceptable levels of contaminant(s) occur.
OBJECTIVE
POSS-7 Support the San Joaquin River Conservancy in its collaborative, multiagency efforts to develop the San Joaquin River Parkway.
IMPLEMENTING POLICIES
POSS-7-a Preserve Wildlife Corridors. Acquire and expand natural reserves and wildlife corridors through purchase, easements, mitigation for proposed activities, or other mutually satisfactory transactions.
POSS-7-b Wildlife Corridor along San Joaquin River. Create a wildlife corridor to provide continuous open space land and water areas parallel to the San Joaquin River within the jurisdiction of the City.
• Preserve a minimum width of 200 feet of riparian vegetation on both sides of the river.
B3 Attach #1 of 3
5-34 FRESNO GENERAL PLAN
• Require the corridor to be wider when possible and/or necessary to protect additional areas of native plants and critical habitat (such as wildlife breeding areas). Re-establishment of a 200-foot or wider band of native plants is recommended in areas where 200 feet of riparian vegetation no longer exists along the river bank, to the maximum extent feasible from topologic and hydrologic standpoints.
• Allow exceptions where the minimum-width corridor is infeasible due to topography, hydrology, or other constraints. An offsetting expansion may be approved in those instances on the opposite side of the river. Incorporate the bluff face into the wildlife corridor where steep bluffs drop directly into or close to the river.
POSS-7-c Monitoring River Corridor Conditions. Undertake periodic monitoring to determine the status of conditions and mitigation measures required for projects within, and in the vicinity of, the river corridor. • Pursue a Memorandum of Understanding (MOU) or other
agreement so that the San Joaquin River Conservancy can perform, or participate in, this monitoring program in order to furnish additional expertise, provide for cost efficiency, and to ensure consistency throughout the river corridor.
• Based on information obtained from monitoring, modifications in special permits, reclamation plans, and other documents, operating parameters for uses may be necessary to insure human health and safety and the well-being of riparian plants and wildlife.
POSS-7-d Buffer Zones near Intensive Uses. Protect natural reserve areas and wildlife corridor areas in the San Joaquin River corridor whenever more intensive human uses exist or are proposed on adjacent lands.
Use buffer zones to allow multiple uses on parts of the parkway while still protecting wildlife and native plants.
• Require studies of appropriate buffer widths to be approved by State and federal wildlife agencies before variances from standard buffer zone widths are granted.
• Maintain natural riparian buffer zones with appropriate native plants (seed material and cuttings locally derived).
• Incorporate open space uses such as pasture, low-intensity agricultural activities, and the “rough” or marginal areas of golf B3 Attach #1 of 3
DECEMBER 2014 5-35
Chapter 5: Parks, Open Space, and Schools
courses, into buffer zones when they constitute an improvement in habitat over a previous use or degraded area. Evaluate and address the potential impacts of construction, cultural, and operational practices (such as grading, number of livestock per acre, lighting, and use of pesticides, herbicides, and fertilizers) before these uses are be approved for buffering.
• For nearby areas of the San Joaquin River corridor outside of the exclusive jurisdiction of the City, support efforts to work with other jurisdictions to achieve this policy.
POSS-7-e Natural Habitats and Historic Resources. Continue to protect and enhance the San Joaquin River Parkway environs’ unique and irreplaceable natural habitats and historic resources (including archaeological sites). Continue to maintain standards to protect public health, and provide for development of substantial recreational opportunities for all segments of the community by preserving open space on the bluffs and riverbottom while allowing appropriate recreational development respectful of private property rights. • In conjunction with other land use jurisdictions along the river corridor, determine whether to create a new or modified open space zone district applicable to the San Joaquin riverbottom environs, with provisions that would allow and support the multiple open space uses consistent with the multi-use open space plan designation in this area, and to minimize or prohibit new residential construction.
• Require existing undeveloped areas of the riverbottom to remain non-urbanized and establish controls to preserve and enhance the remaining riparian areas and minimize or prohibit new
residential uses.
POSS-7-f River Bluffs. Preserve the river bluffs as a unique geological feature in the San Joaquin Valley by maintaining and enforcing the requirements of the "BP" Bluff Preservation Overlay Zone District, maintaining the bluff area setback for buildings, structures, decks, pools and spas (which may be above or below grade), fencing, and steps, and maintaining designated vista points.
• Strive to assure that development of the parkway and other uses within the San Joaquin riverbottom environs are consistent with the mineral resources conservation zones; honor flood,
environmental, recreational and aesthetic issues; protect natural B3 Attach #1 of 3
5-36 FRESNO GENERAL PLAN
habitats and historic resources; and consider adjacent property owners.
• Take an active role in establishing park entrances. Provide all gates, trails and roads adequate access by emergency vehicles such as fire trucks, police cars, and ambulances.
• For safety reasons, access may be limited to points that have controlled access gates. Cooperation of private parties having legal control of riverbottom access shall be sought in this effort. • Continue to work toward the adoption of official plan lines for new segments of the San Joaquin River Trails and actively pursue completion of these segments to ensure that adequate and appropriate public access to the San Joaquin River and the Parkway is provided.
• Refer to Policy NS-2-d (Chapter 9, Noise and Safety) for additional information for sites within the BP Overlay District.
POSS-7-g San Joaquin River Parkway - River West Fresno Project Area. Support the extension of the Lewis Eaton Trail into the River West Fresno Project Area consistent with the San Joaquin River Parkway Master Plan and the following criteria:
• Public access into the River View Drive Area/Neighborhoods should be limited to cyclists and pedestrians with the exception of public safety, circulation, and/or other governmental/support service provider vehicles.
Commentary: Limitations on vehicular access through the River View Drive Area/Neighborhoods are not intended to restrict vehicular access to the neighborhoods themselves. Public right-ofway held by the City for public street purposes will remain accessible to the public consistent with the requirements of the California Vehicle Code.
• Proposed public parking facilities should be designed in order to accommodate as many vehicles as possible.
• Additional public parking should be located under and/or adjacent to the old San Joaquin Bridge and State Route 41 corridor.
• The feasibility of additional public parking and equestrian trailer parking near Spano Park should be considered and fully
evaluated.
B3 Attach #1 of 3
DECEMBER 2014 5-37
Chapter 5: Parks, Open Space, and Schools
• The location of public parking should not conflict with other recommendations in this policy.
• The trail alignment should, at the greatest extent possible, be located along and/or near the river for maximum public
enjoyment, view and access to the river by all users, and to allow for the best possible fire and public safety buffer for adjacent property owners while also taking into consideration
environmental impacts, design and maintenance costs, historical and required water flows and flooding, and/or other events that result in increases to water levels.
• Full development or public access should be avoided until adequate and sustainable funding needed to support annual operations and maintenance has been identified.
• The San Joaquin River Bluff and Protection Ordinance should be implemented prior to the completion of the project.
POSS-7-h Interlink City and San Joaquin River Parkway Trail Networks. Strive to connect the parkway trail network to other trails in the vicinity, in order to create a community and regional trail system that offers a variety of different route combinations and enhances public access to the parkway.
POSS-7-i Public Access to San Joaquin River Parkway Trail Networks. Strive to provide public access to the parkway from public streets, roads, and rights-of-way immediately adjacent to parkway properties, facilities, and trails such as those proposed in Figure POSS-2: San Joaquin River Parkway Path and Trail Access Points, Figure MT-2: Paths and Trails, as well as several public right-of-way alignments identified in Figure MT-1: Major Street Circulation Diagram, which could serve as public access points for vehicles, bicycles, equestrians and/or pedestrians:
1. Herndon and Parkway Avenues: pedestrian access
2. Weber Avenue: multi-modal access with parking
3. Riverside Avenue: multi-modal access with parking
4. Santa Fe and Bluff Avenues: multi-modal access with parking
5. Polk Avenue: pedestrian, bicycle, management, and emergency access
6. Milburn Avenue: existing golf course access and future multimodal access with parking
7. Valentine Avenue: pedestrian and bicycle access
B3 Attach #1 of 3
5-38 FRESNO GENERAL PLAN
8. Marks Avenue: pedestrian and bicycle access
9. Van Ness Boulevard: existing Scout Island access, future pedestrian and bicycle access
10. Harrison Avenue: pedestrian and bicycle access
11. Palm and Nees Avenues: multi-modal access with parking
12. Palm Avenue: existing parking and planned pedestrian access
13. Riverview and Bluff Avenue: pedestrian, bicycle, management, and emergency access
14. Perrin Alignment at State Route 41: multi-modal access with parking
15. Woodward Park Audubon Avenue Entrance: multi-modal access with parking
16. Woodward Park Friant Road Entrance: multi-modal access with parking
17. Shepherd Avenue and Friant Road: pedestrian and bicycle access
18. Champlain Avenue and Friant Road: pedestrian and bicycle access
19. Rice Road: multi-modal access with parking
20. Lanes Road: multi-modal access with parking
21. Copper Avenue and Friant Road: multi-modal access with parking
22. Old Friant Road: multi-modal access with parking
23. Old Friant Road: multi-modal access with parking
24. Old Friant Road and Copper River Drive: pedestrian and bicycle access
25. Old Friant Road at River Center: multi-modal access with parking
26. Old Friant Road: multi-modal access with parking
5.6 SCHOOLS
Schools often act as focal points for neighborhoods and can serve as gathering places and provide open space and recreation opportunities. The City does not operate any of the public schools in Fresno, but it does maintain a collaborative relationship with the school districts, reviewing and approving sites through the subdivision process to ensure that they are consistent with and supportive of the General Plan. The City can also make land use and urban form choices that enhance the role of school facilities in the community.
B3 Attach #1 of 3
DECEMBER 2014 5-39
Chapter 5: Parks, Open Space, and Schools
Existing Public Schools
Fresno is served by several school districts, and the school boundaries do not mirror the city limits. The City coordinates land use plans and subdivision approvals with local districts and cooperates with them to ensure that school fees are collected prior to the issuance of building permits. However, substantial population growth, changing demographic characteristics, and funding constraints have made it difficult for school districts to meet growing student capacity demands.
Most of the city is served by the Fresno Unified School District (FUSD), the fourth largest school district in the state, operating 95 schools with an enrollment of 70,704 students. FUSD adopted a District Facilities Master Plan in 2009 to revise and improve feeder patterns, adjust school boundaries to balance enrollment, improve building and site conditions, reduce the use of portable classrooms, and build new classrooms and facilities where needed. In accordance with the Master Plan, the District constructed a new middle school in southwest Fresno (Rutherford B. Gaston Sr.), which opened in 2014. The District Facilities Master Plan also calls for a new high school in the southeast area of the District, which would help accommodate new growth and help lessen overcrowding at existing high schools.
While the City does not operate any of the schools in Fresno, it works closely with the local school districts to coordinate land use plans and subdivision approvals.
Photo Courtesy of Karana Hattersley-Drayton.
Clovis Unified School District (CUSD) currently serves areas in Fresno north of Herndon Avenue and east of FYI Airport, and it will serve areas in the Southeast Development Area generally north of the Tulare Avenue alignment. It is the second largest school district in the city serving 40,677 students in 43 schools with B3 Attach #1 of 3
5-40 FRESNO GENERAL PLAN
approximately 40 percent of students in CUSD being Fresno residents. CUSD has one educational complex in Fresno that houses a middle and a high school. CUSD is in the early planning stages of its newest educational complex in the northern portion of SEDA.
Central Unified School District (Central USD) serves the northwestern and west portions of the city serving 14,547 students in 19 schools, and it will serve most of the new development in the Development Areas west of State Route 99. Fueled by residential construction in these areas since 2000, Central USD has experienced an influx of students and as a consequence they have constructed new schools.
Fortunately, the Central area contains large parcels of undeveloped land that provide the district flexibility when identifying new school sites.
Sanger Unified School District (Sanger USD) serves the southeast portion of the city serving 10,917 students in 20 schools, and at a 7.8 percent increase in enrollment over 5 years has experienced comparable growth to Central USD and slightly lower than Clovis USD at 8.4 percent. As Fresno experiences new development in the eastern fringe, student populations will undoubtedly increase. High school students living in Fresno and within the Sanger USD currently attend Sanger High School located several miles to the east of Fresno. A new Sanger Unified High School and Middle School are planned in the vicinity of a new Sanger Elementary School north of Jensen and west of Temperance Avenue.
The southwest portion of the city was served by the West Fresno School District, which contains an elementary school and a middle school. In July 2011, West Fresno USD merged into and became a part of the Washington Unified School District that serves 2,560 students in 4 schools. A large portion of the area south of Church Avenue in southwest Fresno is now within the Washington Unified School District.
Combined, the public school districts have the capacity to serve 144,000 school aged children between the grades of K-12, and private schools can serve another 4,200 students. With 136,000 students currently in the public school districts, there remains space for up to 8,000 additional students. Clovis, Fresno, Central and Sanger USDs are planning new schools to increase student capacities as they plan for future growth in the Fresno Planning Area.
Future Schools
Development under the General Plan by 2035 is expected to result in around 35,000 new school-aged students who would require another 28 elementary schools, 6 middle schools, and 4 high schools. The actual school need will depend on the location and phasing of new development, the capacity of existing schools, other growth within B3 Attach #1 of 3
DECEMBER 2014 5-41
Chapter 5: Parks, Open Space, and Schools
school districts outside of Fresno, and demographic shifts within existing residential neighborhoods.
The City is aware of several planned or proposed school sites and has designated these on Figure LU-1: Land Use Diagram, and Figure POSS-3: Schools and School Districts Diagram. Otherwise, future school facilities are permitted in a variety of land use and zoning districts. The State’s school facility size and service area characteristics will aid preparing master plans for Development Areas, supporting districts’ needs.
Higher Education
Fresno is home to a major four-year public university, California State University, Fresno, commonly known as Fresno State. It is located in the northeastern area of the city. Fresno State is one of the largest and best known of the 23 CSU campuses. It has one of the five public agricultural colleges in the state and maintains research farms within the city limits. Fresno State is largely a commuter campus, with relatively few students living on campus. The university is surrounded by urbanized land, generally low density residential neighborhoods; there are concentrations of apartment complexes west and south of the campus, as well as in the new Campus Pointe development on campus. The residential uses surrounding the university limit its potential for expansion and for the adjacent development of complementary uses, such as research and development, retail, and student housing.
Fresno is also home to Fresno Pacific University (FPU), the Central Valley's only accredited Christian university; San Joaquin Valley College; Heald College; UCSF Fresno Center for Medical Education and Research; UEI College; and other professional and technical training centers. Another key institution for higher education and training is the State Center Community College District (SCCCD), which operates Fresno City College in the center of the city and offers associates degrees and vocational training, as well as the Willow International College Center, a satellite campus on the northeastern edge of the city. The District is planning to add a satellite campus focused on vocational training in the southeastern corner of the city in SEDA.
B3 Attach #1 of 3
Elementary School
Middle School
High School
Elementary/Middle School
Elementary/Middle/High School
Middle/High School
Special School2
School with Park
College
E
M
H
E/M
E/M/H
SS
P
C
1 Includes existing and future schools
2 Special School is a future school as
dened by School District
M/H
Figure POSS-3:
Schools and School District1
Planning Area Boundary
Sphere of In
uence
City Limits
0 2 4
MILES
1/2 1
Source: City of Fresno, 2014
PUBLIC FACILITIES
Clovis Unified
School District
Fresno Unified
School District
Central
Unified
School
District
West Park
School
District
Orange Center
Elementary/
Fresno County
Office of Education
Fowler
Unified
Sanger
Unified
School
District
Clovis Unified
School District
C
E/M/H
E SS
SS
E
SS
SS
SS
SS
E SS
E
E
SS
SS
SS
M/H
SS
SS
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
M
E
E
E
E
E
E
E/M E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
H
H
H
H
H
H
H
H
H
M
M
M
M
M
M
M
M
M
M
E
M
M
M
E/M/H
E/M
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
Willow
International
Center
P
E
E
H
E
E
E
E
E
M
E
E
H
E
Washington
Union
School
District
Fresno Yosemite
International Airport
California
State University
Fresno
Fresno
City College
Fresno
Pacic
University
C
C
C
C
P
P
E
M
M
E
SS
E
M
E
SHAW AVE SHAW AVE
HERNDON AVE HERNDON AVE
WILLOW AVE
ASHLAN AVE
SHIELDS AVE
MCKINLEY AVE
CEDAR AVE
SHIELDS AVE SHIELDS AVE
ASHLAN AVE
MCKINLEY AVE
KINGS CANYON RD
HIGHLAND AVE
KINGS CANYON RD
OLIVE AVE OLIVE AVE
BUTLER AVE
JENSEN AVE
NORTH AVE NORTH AVE
JENSEN AVE
KEARNEY BLVD
BELMONT AVE BELMONT AVE
BULLARD AVE
NEES AVE
SHEPHERD AVE
GRANTLAND AVE
GARFIELD AVE
BLYTHE AVE
BRAWLEY AVE
MARKS AVE
CLINTON AVE
BRAWLEY AVE
POLK AVE
MARKS AVE
WEST AVE
PALM AVE
WEBER AVE
GOLDEN STATE BLVD
FRESNO ST WALNUT AVE FIG AVE
CENTRAL AVE
AMERICAN AVE
PEACH AVE
CEDAR AVE
CHESTNUT AVE
CLOVIS AVE CLOVIS AVE
FOWLER AVE
TEMPERANCE AVE
JENSEN AVE
TEMPERANCE AVE
FIRST ST FIRST ST
BLACKSTONE AVE
FRESNO ST
GOLDEN STATE BLVD
H ST
VAN NESS AVE BARSTOW AVE
FRIANT RD
CALIFORNIA AVE
FRUIT AVE
DE WOLFE AVE
COPPER AVE
FT WASHINGTON RD FIRST ST
ASHLAN AVE
FOWLER AVE
MAROA AVE
CHURCH AVE
ELM AVE
CHERRY AVE
EAST AVE
ORANGE AVE
MAPLE AVE
FRUIT AVE
WILLOW AVE
WEST AVE
HUGHES AVE
CLINTON AVE CLINTON AVE
DAKOTA AVE
VAN NESS AVE
ALLUVIAL AVE
BEHYMER AVE
PERRIN AVE
TEAGUE AVE
GETTYSBURG AVE GETTYSBURG AVE
VETERANS
AUDUBON DR
BRYAN AVE
HAYES AVE
CORNELIA AVE
VALENTINE AVE
CHESTNUT AVE
TULARE AVE
MCKINLEY AVE
GATES AVE
BULLARD AVE
WHITESBRIDGE AVE
MAPLE AVE
S a n J o a q u i n
Fresno-Clovis
Regional Wastewater
Reclamation Facility (RWRF)
ARMSTRONG AVE
R i v e r
BLVD
BLACKSTONE AVE
DAKOTA AVE
180
41 99
168
180
99 41
B3 Attach #1 of 3
DECEMBER 2014 5-43
Chapter 5: Parks, Open Space, and Schools
OBJECTIVE
POSS-8 Work cooperatively with school districts to find appropriate locations for schools to meet the needs of students and neighborhoods.
IMPLEMENTING POLICIES
POSS-8-a Support School Districts’ Programs. Support strategies and programs of school districts and the Fresno County Office of Education to provide access to and use of the highest quality educational programs and support services.
POSS-8-b Appropriate School Locations. Support school locations that facilitate safe and convenient access by pedestrian and bicycle routes, are compatible with surrounding land uses, and contribute to a positive neighborhood identity and Complete Neighborhoods. Commit to the following:
• Work with representatives of public and private schools during the preparation and amendment of plans and the processing of development proposals to ensure that General Plan policies are implemented.
• Require school districts to provide necessary street
improvements, pedestrian facilities, public facilities, and public services at each new school site as authorized by law.
• Continue to designate known school sites on the Land Use Diagram (Figure LU-1), and in community plans, Specific Plans, and other plans compatible with the locational criteria of each school district, and to facilitate safe and convenient walking and biking to schools in neighborhoods.
• Meet regularly with school district staff and trustees to provide ongoing communication and coordination of plans, projects, and priorities.
• Collaborate with school districts to plan and implement new school sites in a manner that supports and reinforces objectives to develop walkable Complete Neighborhoods.
POSS-8-c Park and School Site Coordination. Pursue the cooperative development and use of school sites with adjacent neighborhood parks for both school activities and non-school related recreational activities.
B3 Attach #1 of 3
5-44 FRESNO GENERAL PLAN
OBJECTIVE
POSS-9 Work with California State University, Fresno, and other institutions of higher learning in Fresno, to enhance the City’s workforce, job creation, and economic development, as well as its image and desirability as a place to live.
IMPLEMENTING POLICIES
POSS-9-a Economic Potential of Institutions of Higher Education in Fresno. Seek to leverage the human capital, research pursuits, and economic potential of California State University, Fresno (Fresno State), and all of Fresno’s institutions of higher education, whenever possible in economic development and land use decisions.
POSS-9-b Regular Coordination with Institutions of Higher Education in Fresno.
Encourage regular meetings with Fresno State, FPU and SCCCD leadership, including the Facilities Planning and Housing divisions.
POSS-9-c University Neighborhood Planning. Partner with Fresno State, FPU and SCCCD leadership to find funding for, develop, and implement a Specific Plan for the neighborhoods around the primary campuses of these and other higher education institutions in Fresno.
Commentary: Using Fresno State as an example, the Specific Plans will focus on updating land use designations, zoning, and infrastructure investments along Cedar Avenue, Shaw Avenue, and other city/school interface zones. The plan also will provide a framework for coordinating jointly beneficial actions, such as development of a research park near the campus and enhanced bus service connections.
B3 Attach #1 of 3
6 PUBLIC UTILITIES LIC UTILITIES
AND SERVICES AND SERVICES
The purpose of the Public Utilities and Services Element is to provide a policy framework for the City to manage
infrastructure and services, identify areas for improvement, and ensure that public utilities and services meet the needs of the community as the city grows. More specifically, the Public Utilities and Services Element addresses the
planning, provision, and maintenance of water, wastewater, solid waste systems, and other facilities operated by the City, as well as police and fire services. Details on fiscal management policies and strategies, which also have a
bearing on public utilities and services, are in the
Economic Development and Fiscal Sustainability Element.
B3 Attach #1 of 3
6-2 FRESNO GENERAL PLAN
One of the fundamental responsibilities of the City is to provide adequate public facilities and services that will support existing development as well as projected growth. As part of this mandate, the City provides police, fire protection, potable water, sewage collection and treatment, and solid waste pickup, while the Fresno Metropolitan Flood Control District (FMFCD) provides storm drainage and flood control. Continued urban development under the General Plan, within the city limits and the City’s Sphere of Influence (SOI) may require new or expanded facilities and increased service capacities. The capital costs of these facilities and services will be borne by the development community, consistent with the policies of the Economic Development and Fiscal Sustainability Element.
This Public Utilities and Services Element focuses on substantive issues related to public facilities and services, including service standards, design, and operational measures. Related issues are covered in other elements. Water conservation, for example, is addressed in the Resource Conservation and Resilience Element. Emergency response, flood hazards, and fire hazards are addressed in the Noise and Safety Element. Policies regarding the extension of utilities outside the city limits are in the Urban Form, Land Use, and Design Element.
Relationship to General Plan Goals
This Element provides objectives and policies that support a wide range of General Plan goals, in particular the following:
9. Promote a city of healthy communities and improve quality of life in established neighborhoods.
Emphasize supporting established neighborhoods in Fresno with safe, well maintained, and accessible streets, public utilities, education and job training, proximity to jobs, retail services, health care, affordable housing, youth development opportunities, open space and parks, transportation options, and opportunities for home grown businesses.
12. Resolve existing public infrastructure and service deficiencies, make full use of existing infrastructure, and invest in improvements to increase competitiveness and promote economic growth.
Emphasize the fair and necessary costs of maintaining sustainable water, sewer, streets, and other public infrastructure and service systems in rates, fees, financing and public investments to implement the General Plan.
Adequately address accumulated deferred maintenance, aging infrastructure, risks to service continuity, desired standards of service to meet quality-of-life goals, and required infrastructure to support growth, economic competitiveness and business development.
16. Protect and improve public health and safety.
B3 Attach #1 of 3
DECEMBER 2014 6-3
Chapter 6: Public Utilities and Services
6.1 POLICE
The Fresno Police Department (Police Department) Patrol Division provides a full range of police services, including uniformed patrol response to both emergency and nonemergency calls for service, crime prevention, pro-active tactical crime enforcement (including gang and violent crime suppression through the use of Impact Teams), and investigation of crimes utilizing District Detectives.
The Police Department currently operates out of four policing district stations in the Southwest, Southeast, Northwest, and Northeast geographic areas within the city. In 2011, the Central Policing District located at Broadway and Elizabeth Streets was closed due to budget reductions. From the four remaining policing districts, the Police Department responds to approximately 1,100 law enforcement calls per day utilizing a priority system to immediately respond to life threatening calls for service and crimes in progress. Other calls for service have a lesser priority and are handled as patrol officers become available.
These services are supplemented by the Police Department - Investigative Services Division, which is responsible for follow-up investigation on cases involving crimes against persons and property crimes, evaluation of crime and public safety intelligence information utilizing the Intelligence Unit, and pro-active investigation of vice/narcotics related crimes.
The Police Department - Support Division encompasses Traffic Enforcement and Accident Prevention, Communications, and Records Bureaus, as well as a Volunteer Services and Reserve Officers Unit. In addition to enforcement-related services, the Police Department provides extensive crime prevention assistance through residence and business security inspections; neighborhood and business watch group formation programs; and public presentations.
The Police Department - Professional Standards Division oversees the Commission of Accreditation for Law Enforcement Act (CALEA) compliance, as well as the Internal Affairs, Fiscal Affairs, Grant, and Policy and Procedure Units and the Accountability and Compliance, Training, and Personnel Bureaus.
Key Issues
Safety is a fundamental concern for the citizens of Fresno and of upmost importance to the City of Fresno. Fresno experiences violent crime at a rate similar to and at times better than other large populace cities in California and on par with cities in the San Joaquin Valley. In comparison, Fresno’s violent crime rate in 2012 was 5.4 per 1,000 persons while San Jose was 3.6, Anaheim 3.7, Sacramento 7.4, and Oakland 19.9, while B3 Attach #1 of 3
6-4 FRESNO GENERAL PLAN
in the San Joaquin Valley, Clovis was 2.2, Bakersfield 5.4, Stockton 15.5, Visalia 4.3, Hanford 5.6, Tulare 6.2, Madera 7.4, Merced 10, and Sanger 10.8. The city’s property crime rate of 50.9 per 1,000 persons in 2012 was higher than San Jose 29.2, Anaheim
29.2, Sacramento 41.9, and less than Oakland 65.9. In the San Joaquin Valley, it was more than Merced 50.8, Madera 25.8, Hanford 32.2, Clovis 41.1, Visalia 43.4, Tulare
39.4, Sanger 41.9, Bakersfield 49.9, and less than Stockton 51.
With much ingenuity, hard work and dedication the Police Department has had much success in countering crime in Fresno. For the third straight year, violent crime has decreased in Fresno with a seven percent reduction for 2013. This includes a 22 percent decline in homicides. Property crimes also fell in 2013 by 12 percent. For the first time in over a decade, every single crime category decreased in our city. This occurred despite the loss of experienced personnel and the strained criminal justice system in Fresno County.
From 2010 to 2013, the Police Department has concentrated resources and efforts to address the violent crime that is a hallmark of the Bulldog gang. This includes the focused efforts of the Multi-Agency Gang Enforcement Consortium (MAGEC), Street Violence Unit, and patrol resources and tactical teams. Continuing efforts have resulted in 135 search warrants authored, 261 Bulldog probation and compliance checks conducted, 112 shootings solved, and 98 illegal firearms taken off the streets.
The Police Department also formed the Gun Crimes Unit in 2011 as part of their overall violent crime reduction strategy. Since inception, the Gun Crimes Unit has reviewed 853 cases involving weapons in Fresno, authored 107 search warrants, recovered 54 illegal guns as a result of the investigations and sought Federal Prosecution of 6 cases by the United States Attorney’s Office.
B3 Attach #1 of 3
DECEMBER 2014 6-5
Chapter 6: Public Utilities and Services
In addition to enforcement efforts, the Police Department in collaboration with the Office of the Mayor set out in 2006 to create an environment where gang members and their associates can obtain educational services, job skills, and social skills to obtain success. The Mayor’s Gang Prevention Initiative (MGPI) provides a number of efforts designed to provide alternatives to the gang lifestyle through public/private collaborations such as Night Walks (community outreach in specified parts of the city with high concentration of gang incidents), Ceasefire (prevention, intervention and community-mobilization strategies to reduce violence), Street Outreach (former gang members trained as street outreach workers), and a tattoo removal program (removal of visible gang related tattoos which may inhibit their ability to seek employment).
In 2013, the Police Department formed the Homeless Task Force (HTF) to assist both the community and people experiencing homelessness by providing a safer environment, free from illegal and dangerous encampments. In that year, the HTF completed four major encampment cleanups and removed over 168 smaller settlements.
In addition, they made 73 felony arrests, 147 misdemeanor arrests, issued 180 citations and removed over 770 shopping carts from the street. The HTF is the first unit in the Department to wear personal video cameras that are used to record all property storage and release, as well as citizen contacts.
B3 Attach #1 of 3
6-6 FRESNO GENERAL PLAN
The Police Department Regional Training Center (RTC) opened in September of 2010 and is a unique training center among California’s law enforcement agencies. Since opening, personnel representing over 150 different agencies have trained at the RTC.
The RTC has become the host for an annual regional SWAT training day that is overseen by the FBI which draws about 300 participants. The RTC also provides facilities for the California Department of Corrections and Rehabilitation as they conduct monthly physical fitness testing of its entry level applicants for their position of correctional officer. In addition, the RTC hosts a portion of the annual fire symposium that is held in Fresno and the City allows fire agencies to use the RTC throughout the year. Many agencies now use the RTC as a venue where they provide their own training to their employees including the FBI, DEA, U.S. Probation, Veterans Affairs Police, California Department of Consumer Affairs to name a few.
The Police Department maintains national accreditation through the Commission on Accreditation for Law Enforcement Agencies (CALEA) which requires the agency to prove that the City meet national best practice standards for law enforcement. Having received initial accreditation in 2003, CALEA ensures continual compliance to their standards through rigorous on-site inspections, audits, public hearings and extensive reporting mechanisms every three years. By continually adhering to these strict standards, the agency will be seeking a “Gold” certification standard for excellence in law enforcement through the 2014 CALEA accreditation process.
For the purposes of planning for the future it is important to point out some of the needs the Police Department have which affect their ability to provide optimum service.
Over the past five years, staff reductions were necessary to meet budget constraints.
These reductions resulted in reduced service delivery for services such as handling lower priority field calls and prisoner processing, and increased call-delay time in the agency’s 9-1-1 Dispatch Center. The Police Department is diligently working toward restoring these services.
Other resource issues facing the Police Department include ongoing equipment needs such as patrol vehicles, radios, and computers. As an example, patrol vehicles have historically had a useful service life of five years and 100,000 miles. Due to budget constraints, these same vehicles now remain in the patrol fleet for more than seven years with many having over 170,000 miles. Extending the service time for other law enforcement equipment has also occurred including expanded years of service life for traffic enforcement motorcycles, plain cars, and other safety equipment used by police officers. Policies in the Economic Development and Fiscal Sustainability Element address these long-term resource needs.
A strained criminal justice system also creates critical issues for the Police Department.
The realignment of convicted prisoners from State incarceration to County of Fresno B3 Attach #1 of 3
DECEMBER 2014 6-7
Chapter 6: Public Utilities and Services
supervision under AB109 has increased the workload of patrol officers and investigators.
As inmates, released from State prison, continue their criminal enterprises out of custody, calls for police services, as well as additional investigative follow up are imposing significant impacts on the Police Departments already strained resources.
Liquor Stores
The location and prevalence of liquor stores can have a negative effect on neighborhood health. In recent public meetings, three interrelated concerns have arisen:
• Market saturation. Some neighborhoods feel they have an overabundance of Market saturation. establishments with off-sale or on-sale licenses to sell liquor. The Downtown and the area immediately east have a larger number of venues for the sale and consumption of alcoholic beverages within a small area than other areas of the city.
Blackstone and Shaw Avenues also feature a high concentration of these stores. • Fear of crime. Community members often see a strong relationship between Fear of crime. establishments with off-sale or on-sale licenses to sell liquor and rates of nuisances and crime.
• Danger to schools. Related to the above point, residents are concerned when Danger to schools. alcohol sales are allowed too close to schools because of the impact on teenage drinking.
The State Department of Alcoholic Beverage Control (ABC) manages the issuance of licenses for the sale of alcoholic beverages. ABC is allowed to deny licenses located in the immediate vicinity of churches and hospitals, within 600 feet of schools and public playgrounds, or within 100 feet of a residence. ABC can also restrict hours of sales.
State law limits the number of off-sale beer and wine licenses to no more than one per 2,500 city residents, although there is no restriction on the concentration of licensed establishments within the city.
Currently, the ability to use land within the city for alcoholic beverage sales is subject to Conditional Use Permit approval. While this requirement applies citywide, some neighborhoods feel saturated with liquor stores. The City has not developed an independent mechanism for assessing appropriate concentrations of alcohol sales establishments, however, and relies on information from the Police Department and the ABC in their consideration of permit applications. The Development Code update provides an opportunity for a more nuanced approach to controlling and abating nuisances associated with liquor stores and restaurants through Conditional Use Permit and other land use approvals that consider neighborhood needs and potential impacts.
B3 Attach #1 of 3
6-8 FRESNO GENERAL PLAN
OBJECTIVE
PU-1 Provide the level of law enforcement and crime prevention services necessary to maintain a safe, secure, and stable urban living environment through a Police Department that is dedicated to providing professional, ethical, efficient and innovative service with integrity, consistency and pride.
IMPLEMENTING POLICIES
PU-1-a Integration of Crime Data. Develop a mechanism to share pertinent Integration of Crime Data. gration of Crime Data. crime data from multiple sources with other law enforcement agencies as a means of improving service delivery, officer safety, and providing a safer community for the citizens of Fresno. • Strive to develop and implement data sharing agreements externally throughout County of Fresno Law Enforcement
Agencies with the intent of participating in region-wide data sharing agreements throughout the State of California.
• Utilize developing technologies internally to ensure that crime specific data is made available for first responders and criminal investigators.
• Develop advanced predictive policing capabilities to ensure that limited law enforcement resources are properly placed to reduce criminal activity in locations of the city that are identified as having a high probability of criminal activity.
• Fully implement a Real Time Crime Center which provides responding officers integrated computer data, video data from the Video Policing Unit, and up-to-date emergency dispatch information as a means of improving officer safety to critical incidents and service delivery to the community.
PU-1-b Involvement in General Plan. Facilitate Police Department Involvement in General Plan. lvement in General Plan. participation in the implementation of General Plan policies, including citizen participation efforts and the application of crime prevention design measures to reduce the exposure of neighborhoods to crime and to promote community security.
• Facilitate Police Department communication with citizen advisory committees.
• Refer appropriate development entitlements to the Police Department for review and comment.
B3 Attach #1 of 3
DECEMBER 2014 6-9
Chapter 6: Public Utilities and Services
PU-1-c Safety Considerations in Development Approval. Continue to identify Safety Considerations in Development Approval. ty Considerations in Development Approval. and apply appropriate safety, design and operational measures as conditions of development approval, including, but not limited to, street access control measures, lighting and visibility of access points and common areas, functional and secure on-site recreational and open space improvements within residential developments, and use of State licensed, uniformed security.
PU-1-d New Police Station Locations. Consideration will be given to co- New Police Station Locations. Police Station Locations. locating new police station facilities with other public property including, but not limited to, schools, parks, playgrounds, and community centers to create a synergy of participation in the neighborhood with the potential result of less vandalism and promotion of a better sense of security for the citizens using these facilities.
PU-1-e Communication with Public. Maximize communication and Communication with Public. unication with Public. cooperative efforts with residents and businesses in order to identify crime problems and optimize the effectiveness of crime prevention measures and law enforcement programs.
PU-1-f Law Enforcement Collaboration. Law Enforcement Collabora Enforcement Collaboration. Collaborate with community-based public, non-profit and private agencies to:
• Develop comprehensive narcotics and violence prevention programs designed to discourage delinquent behavior and narcotics abuse and to encourage viable alternative behaviors. • Develop a more concentrated understanding of how to assist and support citizens with a variety of disabilities, especially those with cognitive and developmental auditory disabilities.
• Maintain active involvement in youth development and
delinquency prevention activities.
PU-1-g Plan for Optimum Service. Create and adopt a program to provide Plan for Optimum Service. for Optimum Service. targeted police services and establish long-term steps for attaining and maintaining the optimum levels of service - 1.5 unrestricted officers per 1,000 residents.
Commentary: Commentary: The City’s fiscal management strategies will affect ntary:
planning for optimum service. The Economic Development and Fiscal Sustainability Element provides additional details.
B3 Attach #1 of 3
6-10 FRESNO GENERAL PLAN
PU-1-h Retail Conversion. Assist community groups seeking information on Retail Conversion. il Conversion. conversion of establishments with off-site or on-site liquor sales licenses to other retail products that better meet community needs.
PU-1-i Crime and Nuisances. Assist community and neighborhood groups Crime and Nuisances. e and Nuisances. seeking to reduce crime and nuisances they associate with high concentrations of establishments with off-sale or on-sale liquor licenses through Police Department consultations, other available services, and programs such as Neighborhood Watch.
PU-1-j Lighting and Safety. Ensure adequate lighting at off-sale liquor stores Lighting and Safety. ting and Safety. to help deter crime and to promote a more inviting and safe atmosphere around them.
6.2 FIRE
The City of Fresno Fire Department (Fire Department) offers a full range of services including fire prevention, suppression, emergency medical care, hazardous materials, urban search and rescue response, as well as emergency preparedness planning and public education coordination. This plan addresses the on-going need for the effectiveness and efficiency of the Fire Department’s fire suppression operations, emergency medical service, and special operations delivery in protecting the citizens of the jurisdiction and the occupational safety and health of its employees. The Fire Department in 2005, 2006, and 2007 contracted for services with the Airports Department and two adjacent fire protection districts and now operates 24 fires stations that serve a 336-square mile area. The contracting of services has provided an enhanced level of service through consolidation of communication center, and boundaryless fire station response districts. The City also has an automatic aid agreement with the City of Clovis whereby the nearest fire station responds to an emergency regardless of the jurisdiction within which it is located. The Fire Department also participates in a statewide mutual aid system, providing resources throughout the State of California upon request.
Historically, 60 to 65 percent of all calls for Fire Department services have been for medical emergencies, while seven percent have been for structure fires. Other firerelated calls include vegetation fires, vehicle fires, and debris fires. Fresno averages two working multiple alarm fires every day, which must be addressed despite the challenge of substantially reduced staffing levels. In addition to responding to calls, the Fire Department is involved in reviewing all building permits and subdivision maps to ensure access and fire suppression equipment (i.e., fire hydrants) are properly located.
Staff also conducts new construction inspections of fire protection systems and routine fire and life safety inspections of existing buildings.
B3 Attach #1 of 3
DECEMBER 2014 6-11
Chapter 6: Public Utilities and Services
The Fire Department provides comprehensive fire prevention services to all commercial, industrial, and residential establishments by routine fire and life safety inspections and public education. Fire risk factors have been substantially reduced through more restrictive statewide residential housing unit fire sprinkler mandates and adoption of a local fire sprinkler ordinance, in effect since 1979, requiring fire sprinklers in most buildings over 5,000 square feet; as a result, the frequency and severity of extended fire attacks has been reduced. In order to combat the threat of structure fires in new growth areas, the City developed urban growth management standards requiring new development to be within a four minute response service area of a fire station. While this standard may be increased by applying additional conditions of approval (i.e., building separation distances, traffic preemption, enhanced onsite fire protection systems), it is uncommon for residential development to be located outside of a fire station’s four minute response area.
Key Issues
Ability to Meet Response Time Standards
The City of Fresno Fire Departments target response time for its service area is 5 minutes and 20 seconds for 90 percent of emergency incident response. This time standard measures unit response from the time the unit was alerted to the emergency B3 Attach #1 of 3
6-12 FRESNO GENERAL PLAN
incident to the time the first unit arrived at the emergency incident. This response time standard is critical to saving lives before flashover occurs at fire incidents and arriving in time to provide basic life support in situations such as sudden cardiac arrest, trauma, impaired breathing and other severe medical emergencies. In 2013, the Fire Department response time was 6 minutes 26 seconds to 90 percent of fire and medical emergencies.
The Fire Department has been unable to meet target response times due to cuts in the number of units available to respond. In 2009, the Fire Department had 25 operational units available to respond to, however, due to the economic downturn in 2010, the Fire Department had to reduce the number of responding units to 19 (a 24 percent reduction in available work force) though the service level demands remained the same or higher. Industry standard defines an effective firefighting force as having 15 firefighters on a residential fire ground within 8 minutes 90 percent of the time. Today the department continues to provide service with 19 responding units providing an effective firefighting force on-scene only 64 percent of the time in 8 minutes. Note the FY2015 budget anticipates one additional engine company added to the service level.
Although there are currently 19 fire stations in the Metropolitan Area, staffing levels are a key issue that must be addressed. The national standard for firefighter staffing is 1 to
1.5 per 1,000 residents and the state average is 0.81 firefighters per 1,000 residents. The National Fire Protection Association Standard (NFPA) 1710 provides recommendations of minimum workforce standards to accomplish provisions of fire suppression and emergency medical services. Fresno Fire Department uses NFPA 1710 as a guidance document to establish its own minimum staffing standards to ensure sufficient workforce is present in the event of emergency situations.
In 2009, the Fire Department had 89 firefighters on duty each day (a minimum daily staffing) or 0.52 firefighters per 1,000 residents. In 2011, the daily minimum staffing dropped to 66 firefighters on duty each day or 0.39 firefighters per 1,000 residents, which is equivalent to the staffing levels held in 1958. Today, the current daily minimum staffing level is a total of 70 firefighters on duty each day which equates to
0.41 firefighters per 1,000 residents. This increase was realized through funding by the Staffing for Adequate Fire and Emergency Response Grants (SAFER).
This significant reduction in resources caused the Fire Department to change its operating model in an effort to keep apparatus available to respond within the desired response criteria for emergencies. More specifically, the Fire Department:
• Stopped responding to approximately 10,000 annual serious medical emergency calls;
B3 Attach #1 of 3
DECEMBER 2014 6-13
Chapter 6: Public Utilities and Services
• Moved all fire and life safety inspections to the Fire Department - Prevention Division; and
• Reduced availability for all public education outreach.
The Fire Department’s long-term planning target is to match daily staffing levels to service level demands.
The City is currently rated by the Insurance Services Office (ISO) as a Public Protection Class 3 (scale 1 to 10, with 1 being the best). An updated City of Fresno Fire Department Strategic Plan should include objectives that will identify strategies to improve and/or enhance emergency operations, community risk reduction (to include education, engineering and enforcement), training requirements, and support service functions that improve service delivery and potentially move the Fire Department into a Class 2 rating.
Ability to Provide Annual Fire Inspections and Fire Safety Education Fire prevention is not simply preventing fire. It is the systematic application of codes, standard, engineering principles, and an understanding of human behavior to achieve the objective of limiting the loss of life and property. The Fire Department is responsible for providing annual fire and life safety inspections of all commercial, industrial, institutional, and multi-family buildings and proactive fire safety public education programs. Due to current budget constraints, many low and moderate fire and life safety hazard buildings are not being inspected, and public education outreach has ceased. The eventual effect of these reductions in fire prevention services has yet to be determined, but it is anticipated that frequency of preventable fires will increase and the reliability of building fire protection systems will decrease, due to lack of inspection and maintenance of those systems. Furthermore in the Fire Department’s recent ISO review, full points were not received in the area of fire inspections due to deferral of consistent inspections by a reduced staff. Policies are currently being evaluated to address options for implementing a long-term plan to restore the Fire Department’s ability to conduct fire and life safety inspections on all appropriate occupancies, and when possible provide a self-certification option and appropriate fire and life safety education outreach programs to the community.
Facilities to Serve New Development
Existing facilities may not be adequate to maintain a sufficient level of services for future growth in Fresno. Increased population densities in the Downtown and mixeduse corridors and centers, at the locations shown on the Land Use Diagram (Figure LU1), may require commensurate increases in firefighter staffing, facilities, and equipment to maintain current levels of service. The location of fire stations may become more dependent on density and availability than running distances between fire stations.
B3 Attach #1 of 3
6-14 FRESNO GENERAL PLAN
Infill development may require reopening of the former Broadway/Elizabeth fire station, construction of a new station in the Downtown Planning Area, and/or restoring the number of fire apparatus and firefighters at the existing stations. Where infill development substantially increases density or building height, the existing public water main infrastructure may require upgrading due to increased domestic water demand reducing available water volume and pressure for firefighting and potential damage to aging water pipes when fire apparatus must pump large volumes of water for fire suppression purposes.
New development in Development Areas identified in Figure I-3 will need new and relocated fire stations. In DA-1 North, the City owns land near Shaw and Bryan Avenues and is currently in the process of finalizing details for the construction of permanent Fire Station 18. One site for a future fire station is needed to serve the southeast corner of Established Neighborhoods south of Shaw Avenue and the South Industrial Area.
Five future sites have been identified to build three future fire stations in Established Neighborhoods north of Shaw Avenue, one in DA-2 South, and one in DA-2 North. Also needed over the planning period are a new Training & Learning Center, Repair and Maintenance Facility, Joint Police/Fire Public Safety Complexes and Communications Center, possibly located in the Downtown.
In planning for new facility locations, consideration will be given to co-locating such facilities with other public property such as schools, parks, playgrounds, community centers, etc. to create a synergy of participation in the neighborhood with the potential result of less vandalism and promotion of a better sense of security for the citizens using these facilities.
OBJECTIVE
PU-2 Ensure that the Fire Department’s staffing and equipment resources are sufficient to meet all fire and emergency service level objectives and are provided in an efficient and cost effective manner.
IMPLEMENTING POLICIES
PU-2-a Unify Fire Protection. Pursue long-range transfer of fire protection Unify Fire Protection. y Fire Protection. service agreements with adjacent fire districts that, in concert with existing automatic aid agreements, will lead to the eventual unification of fire protection services in the greater Fresno area.
PU-2-b Maintain Ability. Maintain AMaintain Ability. bility. Strive to continually maintain the Fire Department’s ability to provide staffing and equipment resources to effectively prevent and mitigate emergencies in existing and new high-rise B3 Attach #1 of 3
DECEMBER 2014 6-15
Chapter 6: Public Utilities and Services
buildings and in other high-density residential and commercial development throughout the city.
PU-2-c Rescue Standards. Develop appropriate standards, as necessary, for Rescue Standards. ue Standards. rescue operations, including, but not limited to, confined space, high angle, swift water rescues, and the unique challenges of a high speed train corridor.
PU-2-d Station Siting. Station Siting. Use the General Plan, community plans, Specific Plans, tation Siting.tation Siting. neighborhood plans, and Concept Plans, the City’s Geographic Information Systems (GIS) database, and a fire station location program to achieve optimum siting of future fire stations.
PU-2-e Service Standards. Service Standards. Strive to achieve a community wide risk ervice Standards. vice Standards. management plan that include the following service level objectives 90 percent of the time:
• First Unit on Scene – First fire unit arriving with minimum of three firefighters within 5 minutes and 20 seconds from the time the unit was alerted to the emergency incident.
• Effective Response Force – Provide sufficient number of firefighters on the scene of an emergency within 9 minutes and 20 seconds from the time of unit alert to arrival. The effective response force is measured as 15 firefighters for low risk fire incidents and 21 firefighters for high risk fire incidents and is the number of personnel necessary to complete specific tasks required to contain and control fire minimizing loss of life and property.
PU-2-f Plan for Optimum Service. Create and adopt a program to provide Plan for Optimum Service. for Optimum Service. appropriate number of employees to effectively respond to call volume and type; and establish a long-term plan to attain a level of service of 0.81 firefighters per 1,000 residents.
Commentary: The City’s fiscal management strategies will affect Commentary:Commentary: Commentary:
planning for optimum service. The Economic Development and Fiscal Sustainability Element has additional details.
PU-2-g Community Facilities District for Emergency Services. Community Facilities District for Emergency Services unity Facilities District for Emergency Services. Develop strategies on the formation of Community Facilities Districts in new Development Areas to fund emergency services.
B3 Attach #1 of 3
6-16 FRESNO GENERAL PLAN
OBJECTIVE
PU-3 Enhance the level of fire protection to meet the increasing demand for services from an increasing population.
Commentary: Commentary:Commentary: Commentary: In addressing enhanced fire protection provide a community wide risk management model.
IMPLEMENTING POLICIES
PU-3-a Fire Prevention Inspections. Develop strategies to enable the Fire Prevention Inspections. Prevention Inspections. performance of annual fire and life safety inspection of all industrial, commercial, institutional, and multi-family residential buildings, in accordance with nationally recognized standards for the level of service necessary for a large Metropolitan Area, including a selfcertification program.
PU-3-b Reduction Strategies. Develop community risk reduction strategies Reduction Strategies. ction Strategies. that target high service demand areas, vulnerable populations (e.g. young children, older adults, non-English speaking residents, persons with disabilities, etc.), and high life hazard occupancies.
PU-3-c Public Education Strategies. Develop strategies to re-establish and Public Education Strategies. ic Education Strategies. enhance routine public education outreach to all sectors of the community.
PU-3-d Review Development Application Review Development ew Development ApplicationApplication Applications. Continue Fire Department review of development applications, provide comments and recommend conditions of approval that will ensure adequate on-site and off-site fire protection systems and features are provided.
PU-3-e Building Codes. Adopt and enforce amendments to construction and Building Codes. ding Codes. fire codes, as determined appropriate, to systematically reduce the level of risk to life and property from fire, commensurate with the City’s fire suppression capabilities.
PU-3-f Adequate Infrastructure. Continue to pursue the provision of Adequate Infrastructure. uate Infrastructure. adequate water supplies, hydrants, and appropriate property access to allow for adequate fire suppression throughout the City.
PU-3-g Cost Recovery. Continue to evaluate appropriate codes, policies, and Cost Recovery. Recovery. methods to generate fees or other sources of revenue to offset the ongoing personnel and maintenance costs of providing fire prevention and response services.
B3 Attach #1 of 3
DECEMBER 2014 6-17
Chapter 6: Public Utilities and Services
PU-3-h Annexations. Annexations xationsAnnexations. Develop annexation strategies to include the appropriate rights-of-way and easements necessary to provide cost effective emergency services.
PU-3-i New Fire New FireStation Locations. Station Locations. Station Locations. Consideration will be given to co-locating new Fire Station facilities with other public property including, but not limited to, police substations, schools, parks, playgrounds, and community centers to create a synergy of participation in the neighborhood with the potential result of less vandalism and promotion of a better sense of security for the citizens using these facilities.
6.3 WASTEWATER COLLECTION AND TREATMENT
The City is the Regional Sewer Agency for the Fresno-Clovis Metropolitan Area. The City owns and maintains the wastewater collection system that serves the City and the other participating agencies: County of Fresno, City of Clovis (Clovis), Pinedale Public Utility District, and Pinedale County Water District. The City also owns and operates the Fresno-Clovis Regional Wastewater Reclamation Facility (RWRF), located southwest of the city, and the North Fresno Water Reclamation Facility, located in northeast Fresno. The wastewater treatment and reclamation system includes: (1) collection and conveyance of wastewater; (2) treatment of raw wastewater; and (3) management of reclaimed water and bio solids. Aging infrastructure (collection and treatment), together with the need to pursue more advanced levels of reclamation and reuse are a concern over the long term, not only in the new growth areas but also in established neighborhoods and Downtown where increased density is planned.
The City’s existing wastewater system, shown in Figure PU-1: Wastewater System is comprised of an extensive system of main lines, connection points, manholes, and lift stations. The collections pipelines consist of smaller diameter pipes (4 to 12 inches) serving individual properties, larger collection pipelines (13 to 33 inches) typically referred to as “oversized sewers,” and sewer trunk interceptors (34 inches and larger) that convey sewage to the RWRF. The age and condition of the collection system varies considerably over the service area, with some pipelines dating back to the 1890s.
The City of Fresno Department of Public Utilities (DPU) manages a comprehensive sewer maintenance program in accordance with its Sewer System Management Plan.
The DPU is also responsible for preparing the Fresno Wastewater Collection System Master Plan, last updated in 2006. The 2006 Fresno Wastewater Collection System Master Plan (2006 Master Plan) concluded that the collection system receives “no appreciable groundwater infiltration” and relatively small amounts of rainfall-dependent infiltration or inflow, except for older areas of the Downtown. The 2006 Master Plan B3 Attach #1 of 3
6-18 FRESNO GENERAL PLAN
identified over 130 projects as necessary to accommodate the projected development anticipated by the 2025 Fresno General Plan; a greater number will be needed to serve development under this Plan.
The 2006 Master Plan anticipated that the RWRF would be operating at its full capacity, treating 80 million gallons of wastewater per day by 2010; however, the volume of wastewater has declined in recent years. Consequently, it is possible that the plant has sufficient capacity to accommodate growth for several years beyond what was previously anticipated. Nonetheless, the City is required by State statutes to begin planning for increased capacity when flows reach 75 percent of the current design capacity.
Wastewater presently receives primary (removal of materials that will float or settle) and secondary treatment (biological process to remove suspended and dissolved solids).
Upon treatment, the wastewater is distributed to a series of infiltration ponds where it is allowed to percolate through the soil (which serves as another level of treatment).
The City also conducts programs, such as a federally mandated Industrial Pretreatment Program, to prevent the introduction of pollutants into a publicly owned treatment works (collection system and treatment facilities) that could impact its infrastructure and pass through into receiving waters. Under the Industrial Pretreatment Program, industrial users are regulated through a Wastewater Discharge Permit that specifies discharge prohibitions and limitations. Failure to comply could result in penalties.
In addition, industries are billed for sewer depending on the amount of water used or effluent discharged and the strength of their wastewater measured as pounds of biochemical oxygen demand and pounds of total suspended solids. Reducing the strength of their wastewater to reduce sewer utility costs becomes an incentive for industrial users to improve their water quality and the amount of water used and/or discharged.
B3 Attach #1 of 3
180
41 99
168
180
99 41
LSCH
LS15 LS03
LS13
LS18
LS02
LSP01
LS05
LS10 LS06
LS04
LS16
LS14
LS12
NFWRF
LSP03
LSP02
LS01
LS20
Active
Private
Lift Stations
Sewer Pipe Diameter
4 -12 inches
13 - 33 inches
34 - 84 inches
Recharge Facility
Planning Area Boundary
Sphere of Inuence
City Limits
Figure PU-1:
Existing Wastewater System
0 2 4
MILES
1/2 1
Source: City of Fresno, 2014
SHAW AVE SHAW AVE
HERNDON AVE HERNDON AVE
BLACKSTONE AVE
WILLOW AVE
ASHLAN AVE
SHIELDS AVE
MCKINLEY AVE
CEDAR AVE
SHIELDS AVE SHIELDS AVE
ASHLAN AVE
MCKINLEY AVE
KINGS CANYON RD
HIGHLAND AVE
KINGS CANYON RD
OLIVE AVE OLIVE AVE
BUTLER AVE
JENSEN AVE
NORTH AVE NORTH AVE
JENSEN AVE
KEARNEY BLVD
BELMONT AVE BELMONT AVE
BULLARD AVE
NEES AVE
SHEPHERD AVE
FIGARDEN DR
GRANTLAND AVE
GARFIELD AVE
BLYTHE AVE
LB EHTY AVE
ARB YELW AVE
SKRAM AVE
CLINTON AVE
BRAWLEY AVE
KLOP AVE
SKRAM AVE
A TSEW VE
P MLA AVE
WEBER AVE
GOLDEN STATE BLVD
FRESNO ST W TUNLA AVE GIF AVE
CENTRAL AVE
AMERICAN AVE
HCAEP AVE
RADEC AVE
TUNTSEHC AVE TUNTSEHC AVE
SIVOLC AVE LC SIVO AVE
RELWOF AVE
ECNAREPMET AVE
JENSEN AVE
ECNAREPMET AVE
TSRIF ST TSRIF ST
BLACKSTONE AVE
FRESNO ST
GOLDEN STATE BLVD
H ST
EVA SSEN NAV
BARSTOW AVE
FRIANT RD
FRIANT RD
CALIFORNIA AVE
TIURF AVE
DE EFLOW AVE
COPPER AVE
FT WASHINGTON RD TSRIF ST
ASHLAN AVE
RELWOF AVE
AORAM AVE
CHURCH AVE
ANNADALE
MLE AVE
YRREHC AVE
TSAE AVE
EGNARO AVE
ELPAM AVE
LLIW WO AVE
TIURF AVE
TSEW AVE
SEHGUH AVE
CLINTON AVE CLINTON AVE
DAKOTA AVE VAN NESS AVE
ALLUVIAL AVE
BEHYMER AVE
PERRIN AVE
TEAGUE AVE
GETTYSBURG AVE GETTYSBURG AVE
VETERANS
AUDUBON DR
YRB NA AVE
HA SEY AVE
AILENROC AVE
V ENITNELA AVE
TUNTSEHC AVE
TULARE AVE
MCKINLEY AVE
GATES AVE
BULLARD AVE
WHITESBRIDGE AVE
ELPAM AVE
LANE
ALLUVIAL AVE
Fresno-Clovis
Regional Wastewater
Reclamation Facility (RWRF)
San Jo a q u i n R ive r
B3 Attach #1 of 3
6-20 FRESNO GENERAL PLAN
OBJECTIVE
PU-4 Ensure provision of adequate trunk sewer and collector main capacities to serve existing and planned urban development, consistent with the Wastewater Master Plan.
IMPLEMENTING POLICIES
PU-4-a Plan for Regional Needs. Coordinate and consult with the City of Plan for Regional Needs. for Regional Needs.
Clovis, pursuant to the Fresno-Clovis Sewerage System Joint Powers Agreement, so that planning and construction of sewer collection facilities will continue to meet the regional needs of the Metropolitan Area.
PU-4-b New Trunk Facilities. Pursue construction of new or replacement New Trunk Facilities. Trunk Facilities. sewer trunk facilities or other alternatives consistent with the Wastewater Master Plan to accommodate the uses as envisioned in this General Plan.
PU-4-c System Extension and Cost Recovery. Pursue enlargement or System Extension and Cost Recovery. em Extension and Cost Recovery. extension of the sewage collection system where necessary to serve planned urban development, with the capital costs and benefits allocated equitably and fairly between the existing users and new users.
Commentary: Consistent with fiscal management policies and Commentary:Commentary: Commentary:
strategies in the Economic Development and Fiscal Sustainability Element, new users will be obligated to pay for the cost of being attached to the collection system through connection fees, including the cost of any incremental burden that they may place on the entire system, and pay for their share of operational and maintenance costs in addition to any costs for extraordinary facilities, such as lift stations or capacity enhancement measures, as authorized by law.
PU-4-d Capacity Modeling. Continue development and utilization of citywide Capacity Modeling. city Modeling. sewer flow monitoring and computerized flow modeling to determine availability of sewer collection system capacity to serve planned urban development.
Commentary: Information about the availability of sewer collection Commentary:Commentary: Commentary:
system capacity will be a factor in evaluating proposed General Plan amendments, community plans, Specific Plans, neighborhood plans, and Concept Plans.
B3 Attach #1 of 3
DECEMBER 2014 6-21
Chapter 6: Public Utilities and Services
PU-4-e Evaluate and Maintain Infrastructure. Promote the health and safety Evaluate and Maintain Infrastructure. uate and Maintain Infrastructure. of the community, and preserve the longevity and sound condition of the sewer collection system through evaluation and maintenance of the sewer infrastructure.
• Continue assessments of existing infrastructure and facilitate necessary repair to damaged and worn-out pipelines.
• Continue routine sewer line maintenance and cleaning programs to prevent line blockages caused by root intrusion, grease buildup, and pipe failure.
• Continue a sewer line replacement program and funding to repair or replace sewer lines damaged or worn beyond useful life.
OBJECTIVE
PU-5 Preserve groundwater quality and ensure that the health and safety of the entire Fresno community is not impaired by use of private, on-site disposal systems.
IMPLEMENTING POLICIES
PU-5-a Mandatory Septic Conversion. Continue to evaluate and pursue where Mandatory Septic Conversion. atory Septic Conversion. determined appropriate the mandatory abatement of existing private wastewater disposal (septic) systems and mandatory connection to the public sewage collection and disposal system.
PU-5-b Non-Regional Treatment. ional Treatment. ional Treatment. Discourage, and when determined appropriate, oppose the use of private wastewater (septic) disposal systems, community wastewater disposal systems, or other nonregional sewage treatment and disposal systems within or adjacent to the Metropolitan Area if these types of wastewater treatment facilities would cause discharges that could result in groundwater degradation.
PU-5-c Satellite Facilities. Work with the Regional Water Quality Control Satellite Facilities. llite Facilities.
Board to ensure that approval of any satellite treatment and reclamation facility proposal is consistent with governing statutes and regulations.
OBJECTIVE
PU-6 Ensure the provision of adequate sewage treatment and disposal by utilizing the Fresno-Clovis Regional Wastewater Reclamation Facility as the primary facility, when economically feasible, for all existing and new development within the Metropolitan Area.
B3 Attach #1 of 3
6-22 FRESNO GENERAL PLAN
Commentary:Commentary: Commentary: Supplemental subregional facilities, such as the North Fresno Water Reclamation Facility, may also provide sewage treatment and disposal for new and existing development in the Metropolitan Area.
IMPLEMENTING POLICIES
PU-6-a Treatment Capacity and Cost Recovery. Prepare for and consider the Treatment Capacity and Cost Recovery. tment Capacity and Cost Recovery. implementation of increased wastewater treatment and reclamation facility capacity in a timely manner to facilitate planned urban development within the Metropolitan Area consistent with this General Plan. Accommodate increase in flows and loadings from the existing community with the capital costs and benefits allocated equitably and fairly between existing users and new users, as authorized by law.
Commentary: Consistent with the fiscal management policies and Commentary:Commentary: Commentary:
strategies in the Economic Development and Fiscal Sustainability Element, new users will be obligated to pay for the cost of being attached to the treatment facility through connection fees, including the cost of any incremental burden that they may place on the entire system, and pay for their share of operational costs of extraordinary facilities such as satellite or “package” treatment plants, as authorized by law.
PU-6-b Consider Capacity in Plan Amendments. Monitor wastewater Consider Capacity in Plan Amendments. ider Capacity in Plan Amendments. treatment plant flows and loadings to the extent feasible. Consider the effects on wastewater treatment capacity and availability of potable water when evaluating proposed General Plan amendment proposals, community plans, Specific Plans, neighborhood plans, and Concept Plans.
OBJECTIVE
PU-7 Promote reduction in wastewater flows and develop facilities for beneficial reuse of reclaimed water and biosolids for management and distribution of treated wastewater.
IMPLEMENTING POLICIES
PU-7-a Reduce Wastewater. Identify and consider implementing water Reduce Wastewater. ce Wastewater. conservation standards and other programs and policies, as determined appropriate, to reduce wastewater flows.
B3 Attach #1 of 3
DECEMBER 2014 6-23
Chapter 6: Public Utilities and Services
PU-7-b Reduce Stormwater Leakage. Reduce Stormwater Leakage. Stormwater Leakage. Reduce storm water infiltration into the sewer collection system, where feasible, through a program of replacing old and deteriorated sewer collection pipeline; eliminating existing stormwater sewer cut-ins to the sanitary sewer system; and avoiding any new sewer cut-ins except when required to protect health and safety.
PU-7-c Biosolid Bio solidDisposal. Disposal.Disposal. Disposal. Investigate and consider implementing economically effective and environmentally beneficial methods of biosolids handling and disposal.
PU-7-d Wastewater Recycling. Wastewater Re ewater Recycling.cycling. cycling. Pursue the development of a recycled water system and the expansion of beneficial wastewater recycling opportunities, including a timely technical, practicable, and institutional evaluation of treatment, facility siting, and water exchange elements.
Commentary: This policy corresponds with Policy RC-6-d in the Commentary:Commentary: Commentary:
Resource Conservation and Resilience Element.
PU-7-e Infiltration Basins. Continue to rehabilitate existing infiltration basins, Infiltration Basins. ltration Basins. and if determined appropriate, pursue acquiring additional sites for infiltration basins, as needed.
PU-7-f Food and Drink Industry. Ensure adequate provision of facilities for Food and Drink Industry. and Drink Industry. the appropriate management of wastewater from wineries and food processing and beverage facilities, including conformance with Waste Discharge Requirements issued by the Regional Water Quality Control Board.
6.4 WATER
The quality, treatment, and conveyance of potable water in Fresno are a critical responsibility of the DPU – Water Division, and objectives and policies in this section support this obligation. The Resource Conservation and Resilience Element addresses the long-term supply of water resources, and the Urban Form, Land Use, and Design Element includes policies restricting the extension of water supply only to planned development in Development Areas that are consistent with this Plan.
The Water Division provides potable water to the majority of the city and some users within the City’s SOI with the exception of the Bakman Water Company, Pinedale County Water District, Park Van Ness Mutual Water Company, and California State University, Fresno. Fresno’s primary source of potable water is groundwater stored in B3 Attach #1 of 3
6-24 FRESNO GENERAL PLAN
an aquifer. However, in 2004 the City’s first Surface Water Treatment Facility (SWTF) came on line and began delivering on average 27,000 acre feet/year to residents in northeast Fresno.
The City’s existing water distribution system is quite old and is shown in Figure PU-2:
Water Distribution System. Nearly 35 percent of the 1,780-mile distribution system is over 50 years old, with another 34 percent ranging between 25 and 50 years old. There is a marginal pipeline replacement plan and a limited budget to replace this aged infrastructure. Most of the aged infrastructure is in the older parts of the community, including the Downtown. When the pipes fail, there is usually extensive damage to adjacent roadway and wet and dry utilities. This can cause disruption of service and costly cleanup. Based on historic City cost data, catastrophic failure costs 3 to 5 times more than planned replacement.
Groundwater within the Kings Subbasin generally meets primary and secondary drinking water standards for municipal water use. However, the groundwater basin is threatened by chemical contaminants that affect the City’s ability to fully use the groundwater basin resources without some type of wellhead treatment in certain areas.
Many different types of chemical pollutants have contaminated portions of the Upper Kings Subbasin underlying the city’s water service area, as shown in Figure PU-3:
Existing Regional Groundwater Contamination. Some of the major contaminant plumes include 1,2-Dibromo-3-Chloropropane (DBCP); ethylene dibromide (EDB); 1-2-3 trichloropropane (TCP); and other volatile organic compounds (VOCs) including trichlorethylene (TCE), tetrachloroethylene (PCE), nitrate, manganese, radon, chloride, and iron.
There are also several major contaminate point sources. In fact, about half of the city’s water service area has some form of groundwater contamination; only areas in the northwest appear to be relatively unaffected by regional groundwater contamination.
Of the City’s 272 currently active wells, 96 wells are impacted by a single contaminant plume, 33 wells are impacted by a pair of contaminant plumes, and 5 wells are impacted by 3 contaminant plumes. Currently, 34 of the City’s wells have wellhead treatment systems. With this in mind, the General Plan includes specific policies to address groundwater contamination.
B3 Attach #1 of 3
Existing City Wells
Booster Pump Station
Closed or Partially Closed
Gate Valve Location
PSV1 Location
Existing 14-inch and Smaller Pipeline
Existing 16-inch and Larger Pipeline
Districts
Highway 41A
Highway 41B (CA State University, Fresno)
Highway 41C (Bakman Water Company)
Shepherd
Sierra A
Sierra B (Pinedale County Water District)
Westside
Fresno County
Fresno Irrigation District
1 PSV = Pressure Safety Valve
180
41 99
168
180
99 41
Planning Area Boundary
Sphere of Inuence
Figure PU-2:
Water Distribution System
0 2 4
MILES
1/2 1
Source: City of Fresno, DPU Dept., 2014
SHAW AVE SHAW AVE
HERNDON AVE HERNDON AVE
BLACKSTONE AVE
WILLOW AVE
ASHLAN AVE
SHIELDS AVE
MCKINLEY AVE
CEDAR AVE
SHIELDS AVE SHIELDS AVE
ASHLAN AVE
MCKINLEY AVE
KINGS CANYON RD
HIGHLAND AVE
KINGS CANYON RD
OLIVE AVE OLIVE AVE
BUTLER AVE
JENSEN AVE
NORTH AVE NORTH AVE
JENSEN AVE
KEARNEY BLVD
BELMONT AVE BELMONT AVE
BULLARD AVE
NEES AVE
SHEPHERD AVE
GRANTLAND AVE
GARFIELD AVE
BLYTHE AVE BLYTHE AVE
BRAWLEY AVE
MARKS AVE
CLINTON AVE
BRAWLEY AVE
POLK AVE
MARKS AVE
WEST AVE
PALM AVE
WEBER AVE
GOLDEN STATE BLVD
FRESNO ST WALNUT AVE FIG AVE
CENTRAL AVE
AMERICAN AVE CEDAR AVE
CHESTNUT AVE CHESTNUT AVE
CLOVIS AVE
FOWLER AVE
TEMPERANCE AVE
JENSEN AVE
TEMPERANCE AVE
FIRST ST FIRST ST
BLACKSTONE AVE
FRESNO ST
GOLDEN STATE BLVD
H ST
VAN NESS AVE
BARSTOW AVE
FRIANT RD
CALIFORNIA AVE
FRUIT AVE
DE WOLFE AVE
COPPER AVE
FT WASHINGTON RD FIRST ST
ASHLAN AVE
FOWLER AVE
MAROA AVE
CHURCH AVE
ANNADALE
ELM AVE
CHERRY AVE
EAST AVE
ORANGE AVE
MAPLE AVE
FRUIT AVE
HUGHES AVE
WEST AVE
CLINTON AVE CLINTON AVE
DAKOTA AVE
VAN NESS AVE
ALLUVIAL AVE
BEHYMER AVE
PERRIN AVE
TEAGUE AVE
GETTYSBURG AVE GETTYSBURG AVE
VETERANS
AUDUBON DR
BRYAN AVE
HAYES AVE
CORNELIA AVE
VALENTINE AVE
CHESTNUT AVE
TULARE AVE
MCKINLEY AVE
GATES AVE
BULLARD AVE
WHITESBRIDGE AVE
MAPLE AVE
LANE
Fresno Yosemite
International Airport
California
State University
Fresno
Sierra
Gate
Valves
Shepherd
Gate
Valves
Highway 41
Gate
Valves
Fresno-Clovis
Regional Wastewater
Reclamation Facility
S a n J o a q u i n R iv e r
WIILLOW AVE
PEACH AVE
MINNEWAWA AVE
CLOVIS AVE
B3 Attach #1 of 3
Active City Well
Well with Wellhead Treatment
and/or Blending Plan
Superfund Site (Old)
Gasoline Case (Old)
EDB Plume (Old)
Point Source Plume (Old)
DBCP Plume (Old)
TCP Plume (Old)
Nitrates greater than 20mg/L
Nitrates greater than 40mg/L
180
41 99
168
180
99 41
Planning Area Boundary
Sphere of Inuence
City Limits
Figure PU-3:
Existing Regional
Groundwater Contamination
0 2 4
MILES
1/2 1
Source: City of Fresno, DPU Dept., 2006,
Metropolitan Water Resources Management
Plan - Phase 1 Baseline System Characterization, December, 2007, West Yost Note: This map does notinclude all ofthe known
plumes in the Planning Area Boundary, but
represents the City of Fresno’s e
orts during
2006 to document the location of most of the
known plumes as part of an update to the City’s
Water Resource Management Plan.
SHAW AVE SHAW AVE
HERNDON AVE HERNDON AVE
BLACKSTONE AVE
WILLOW AVE
ASHLAN AVE
SHIELDS AVE
MCKINLEY AVE
CEDAR AVE
SHIELDS AVE SHIELDS AVE
ASHLAN AVE
MCKINLEY AVE
KINGS CANYON RD
HIGHLAND AVE
KINGS CANYON RD
OLIVE AVE OLIVE AVE
BUTLER AVE
NORTH AVE NORTH AVE
JENSEN AVE
KEARNEY BLVD
BELMONT AVE BELMONT AVE
BULLARD AVE
NEES AVE
SHEPHERD AVE
FIGARDEN DR
GRANTLAND AVE
GARFIELD AVE
BLYTHE AVE LB EHTY A EV
ARB YELW A EV
SKRAM A EV
CLINTON AVE
BRAWLEY AVE
KLOP A EV
SKRAM A EV
A TSEW VE
P MLA AVE
WEBER AVE
GOLDEN STATE BLVD
FRESNO ST W TUNLA A EV GIF A EV
CENTRAL AVE
AMERICAN AVE
HCAEP A EV
RADEC A EV
TUNTSEHC A EV TUNTSEHC A EV
LC SIVO A EV LC SIVO A EV
RELWOF A EV
ECNAREPMET A EV
JENSEN AVE
ECNAREPMET A EV
TSRIF TS TSRIF TS
BLACKSTONE AVE
FRESNO ST
GOLDEN STATE BLVD
H ST
EVA SSEN NAV
BARSTOW AVE
FRIANT RD
FRIANT RD
CALIFORNIA AVE
TIURF A EV
ED EFLOW A EV
COPPER AVE
FT WASHINGTON RD TSRIF TS
ASHLAN AVE
RELWOF A EV
AORAM AVE
CHURCH AVE
ANNADALE
MLE A EV
YRREHC A EV
TSAE A EV
EGNARO AVE
ELPAM A EV
LLIW WO A EV
TIURF A EV
TSEW A EV
SEHGUH AVE
CLINTON AVE CLINTON AVE
DAKOTA AVE EVA SSEN NAV
ALLUVIAL AVE
BEHYMER AVE
PERRIN AVE
TEAGUE AVE
GETTYSBURG AVE GETTYSBURG AVE
VETERANS
AUDUBON DR
YRB NA A EV
AH SEY A EV
AILENROC AVE
V ENITNELA AVE
TUNTSEHC AVE
TULARE AVE
MCKINLEY AVE
GATES
BULLARD AVE
WHITESBRIDGE AVE
ELPAM AVE
LANE
California
State University
Fresno
Fresno Yosemite
International
Airport
San Jo a q u i n R ive r
Fresno-Clovis
Regional Wastewater
Reclamation Facility (RWRF)
B3 Attach #1 of 3
DECEMBER 2014 6-27
Chapter 6: Public Utilities and Services
OBJECTIVE
PU-8 Manage and develop the City’s water facilities on a strategic timeline basis that recognizes the long life cycle of the assets and the duration of the resources, to ensure a safe, economical, and reliable water supply for existing customers and planned urban development and economic diversification.
IMPLEMENTING POLICIES
PU-8-a Forecast Need. Use available and innovative tools, such as Forecast Need. cast Need. computerized flow modeling to determine system capacity, as necessary to forecast demand on water production and distribution systems by urban development, and to determine appropriate facility needs.
PU-8-b Potable Water Supply and Cost Recovery. Prepare for provision of Potable Water Supply and Cost Recovery. ble Water Supply and Cost Recovery. increased potable water capacity (including surface water treatment capacity) in a timely manner to facilitate planned urban development consistent with the General Plan. Accommodate increase in water demand from the existing community with the capital costs and benefits allocated equitably and fairly between existing users and new users, as authorized by law, and recognizing the differences in terms of quantity, quality and reliability of the various types of water in the City’s portfolio.
Commentary: Consistent with fiscal management policies and Commentary:Commentary: Commentary:
strategies in the Economic Development and Fiscal Sustainability Element, new users will be obligated to pay for the cost of being attached to the potable water supply and distribution system and surface water treatment through connection fees, including the cost of any incremental burden that they may place on the entire system in terms of both infrastructure and water resources, and pay for the full operational costs of extraordinary facilities, as authorized by law.
PU-8-c Conditions of Approval. Set appropriate conditions of approval for Conditions of Approval. itions of Approval. each new development proposal to ensure that the necessary potable water production and supply facilities and water resources are in place prior to occupancy.
PU-8-d CIP Update. Continue to evaluate Capital Improvement Programs and CIP Update. Update.CIP Update. update them, as appropriate, to meet the demands of both existing and planned development consistent with the General Plan.
B3 Attach #1 of 3
6-28 FRESNO GENERAL PLAN
PU-8-e Repairs. Continue to evaluate existing water production and Repairs.Repairs. distribution systems and plan for necessary repair or enhancement of damaged or antiquated facilities.
PU-8-f Water Quality. Continue to evaluate and implement measures Water Quality. r Quality. determined to be appropriate and consistent with water system policies, including prioritizing the use of groundwater, installing wellhead treatment facilities, constructing above-ground storage and surface water treatment facilities, and enhancing transmission grid mains to promote adequate water quality and quantity.
PU-8-g Review Project Impact on Supply. Mitigate the effects of development Review Project Impact on Supply. ew Project Impact on Supply. and capital improvement projects on the long-range water budget to ensure an adequate water supply for current and future uses.
6.5 SOLID WASTE
This section addresses land use compatibility, public sanitation, and aesthetic impacts associated with the City’s solid waste management and community sanitation practices.
The following objectives and policies will ensure a consistent, citywide level of service for refuse collection, neighborhood cleanup, sanitation enforcement, and recycling programs.
Existing waste disposal facilities are adequate to maintain a sufficient level of service for future population growth in the city over the planning period for this Plan. The DPU - Solid Waste & Recycling Division develops performance measures yearly to determine the pounds of waste, recycling and composting generated by each household, business, and multi-family unit and updates estimates of future waste generation with the latest growth projections.
The City is currently excelling at solid waste diversion, which is the system of moving solid waste away from landfills and into recycling and composting programs. Diversion conserves limited landfill space, keeps toxic chemicals and materials from contaminating landfills, and enhances the re-use of materials. In 2009, Fresno was ranked highest in the State among larger cities by the California Integrated Waste Management Board for diverting 71 percent of its solid waste. A Fresno City Council resolution committed the City to the goal of a 75 percent Waste Diversion Rate by 2012 and a Zero Waste goal by 2025. The City is still on track for the 2025 Zero Waste goal while the Waste Diversion Rate by 2012 has been delayed. The City was on track to meet the 75 percent goal by 2012, but budget constraints in 2011 prevented the goal from being met in that year.
B3 Attach #1 of 3
DECEMBER 2014 6-29
Chapter 6: Public Utilities and Services
In 2005, the City adopted a Construction and Demolition Diversion ordinance to encourage and provide for the diversion of commercial materials and construction and demolition material from landfill disposal. Recycling of construction and demolition is required for any City-issued building, relocation or demolition permitted project that generates at least eight cubic yards of material by volume. All waste must be hauled to a City-approved facility.
The DPU - Solid Waste & Recycling Division provides residential waste collection service to the city of Fresno. In December 2011, exclusive franchises for commercial solid waste were approved (the system was privatized) and this service is no longer provided by the DPU - Solid Waste & Recycling Division.
OBJECTIVE
PU-9 Provide adequate solid waste facilities and services for the collection, transfer, recycling, and disposal of refuse.
IMPLEMENTING POLICIES
PU-9-a New Techniques. Continue to collaborate with affected stakeholders New Techniques. Techniques. and partners to identify and support programs and new techniques of B3 Attach #1 of 3
6-30 FRESNO GENERAL PLAN
solid waste disposal, such as recycling, composting, waste to energy technology, and waste separation, to reduce the volume and toxicity of solid wastes that must be sent to landfill facilities.
PU-9-b Compliance ComplianceCompliance with State Law with State Law with State Law. Continue to pursue programs to maintain conformance with the Solid Waste Management Act of 1989 or as otherwise required by law and mandated diversion goals.
PU-9-c Cleanup and Nuisance Abatement. Continue and enhance, where Cleanup and Nuisance Abatement. nup and Nuisance Abatement. feasible, community sanitation programs that provide services to neighborhoods for cleanup, illegal dumping, and nuisance abatement services.
PU-9-d Facility Siting. Locate private or public waste facilities and recycling Facility Siting. lity Siting. facilities in conformance with City zoning and State and federal regulations, so that the transportation, processing, and disposal of these materials are not detrimental to the public health, safety, welfare, and aesthetic well-being of the surrounding community.
Commentary: Following Council direction, facility siting provisions in Commentary:Commentary: Commentary:
Development Code will take into account proximity to residential development, access to transportation, density and separation requirements.
PU-9-e Tire Dumping. Adopt and implement, as determined appropriate, Tire Dumping Dumping measures to eliminate illegal tire dumping.
PU-9-f Household- HouseholdHousehold-Generated Hazardous Generated Hazardous Generated Hazardous Waste and Hazardous Waste and Hazardous Waste Facilities.Facilities. Facilities. Allow for household-generated hazardous waste and Facilities. hazardous waste facilities, which are planned and zoned for Heavy Industrial uses, only after CEQA review, environmental assessments, and approval of a Conditional Use Permit.
6.6 DISADVANTAGED UNINCORPORATED
COMMUNITIES
California State law requires that local municipalities identify any Disadvantaged Unincorporated Communities (DUCs) within their SOI, analyze the infrastructure needs (including water, wastewater, stormwater drainage, and structural fire protection) of the DUC, and evaluate potential funding mechanisms to make service extension feasible.
Disadvantaged Unincorporated Communities are defined as settled places not within B3 Attach #1 of 3
DECEMBER 2014 6-31
Chapter 6: Public Utilities and Services
city limits where the median household income is 80 percent or less than the statewide median household income.1, 2
In compliance with State law, the City will identify all DUCs within the SOI and perform the required infrastructure analysis to coincide with its next Housing Element Update.
1 State of California Office of Planning and Research. Technical Advisory to SB 244. 2 Flegal, C., Rice, S., Mann, J., & Tran, J. California Unincorporated: Mapping Disadvantaged Communities. PolicyLink, 2013
B3 Attach #1 of 3
6-32 FRESNO GENERAL PLAN
This page intentionally left blank.
B3 Attach #1 of 3
7 RESOURCE
CONSERVATION AND
RESILIENCE
The Resource Conservation and Resilience Element
establishes objectives and policies for the conservation of natural resources in Fresno. The Element addresses air
resources, including air quality and greenhouse gas
emissions; water resources, including groundwater and
waterways; energy resources; and land resources, including farmland and mineral resources. The overarching theme is “resiliency,” meaning the ability to withstand temporary and permanent disruptions in resources that will affect everyday ways of life.
B3 Attach #1 of 3
7-2 FRESNO GENERAL PLAN
7.1 CONTEXT
A conservation element for the conservation, development, and utilization of natural resources including water, forests, soils, rivers, wildlife, minerals, and other natural resources is required to be included in a general plan by State law (California Government Code Section 65302). The conservation element must consider the effect of development within the jurisdiction, as described in the land use element, on natural resources located on public lands.
Assembly Bill (AB) 32—the Global Warming Solutions Act of 2006 requires California to reduce statewide greenhouse gas emissions to 1990 levels by the year 2020 and Executive Order S-03-05 calls for a reduction of 80 percent below 1990 levels by 2050.
In support of these State goals the City has committed through the General Plan and Greenhouse Gas (GHG) Reduction Plan to reduce community-related and City operations-related greenhouse gas emissions to a degree that would not hinder or delay implementation of AB 32 and would lay the framework to help meet future goals.
The primary benefit to the City, and to the development community, of having a citywide GHG Reduction Plan is that it will assist development by streamlining the approval process. The CEQA streamlining provisions of the CEQA Guidelines (SB 97 updates) require local governments to define the extent of GHG production and identify ways to substantially reduce GHGs in the future in order to minimize a potentially significant environmental impact. If a GHG Reduction Plan reduces community-wide emissions to a level that is less than significant, then a later project that complies with the requirements in such a GHG Reduction Plan may be found to have a less than significant impact. This will allow the applicant to complete a GHG Reduction Plan consistency analysis for their project instead of a project specific analysis for greenhouse gases.
Potential improvements in air quality and water supply security are additional benefits to pursuing GHG reductions for Fresno. The factors that contribute to GHG increases also impact air quality and water supply in the San Joaquin Valley. As discussed in later sections of this element, the accelerating climate change could have adverse impacts in the Fresno region such as: increased temperature and extreme weather events, increased risk of large wildfires, exacerbation of air quality problems, reduction in the quality and supply of water from the Sierra snowpack, decreased electricity supply, reductions in the quality and quantity of certain agricultural products, decreased health and productivity of California’s forests, and increased flood risk.
B3 Attach #1 of 3
DECEMBER 2014 7-3
Chapter 7: Resource Conservation and Resilience
Resiliency in City Planning
Resiliency, in terms of city planning, refers to creating infrastructure and implementing policies and programs to ensure that the residents, businesses, and government of a city can withstand temporary and permanent disruptions in resources that affect daily activities. A resilient city is not dependent on certain sources of energy, is able to adapt to shifts in weather patterns, has a plan to respond to emergencies such as earthquakes and floods, and has secured a long-term source of food and water. These ideas are presented in this element in relation to resource conservation concepts; details on infrastructure planning are in the Public Utilities and Services Element and the Transportation and Mobility Element, while emergency preparedness is addressed in the Noise and Safety Element. Protection of biological resources such as native plant communities and wildlife habitats is addressed in the Parks, Open Space, and Schools Element.
Relationship to General Plan Goals
This Element provides objectives and policies that support a wide range of General Plan goals, in particular the following:
3. Emphasize conservation, successful adaptation to climate and changing resource conditions, and performance effectiveness in the use of energy, water, land, buildings, natural resources, and fiscal resources required for the longterm sustainability of Fresno.
4. Emphasize achieving healthy air quality and reduced greenhouse gas emissions.
5. Support agriculture and food production as an integral industry.
Emphasize the economic and cultural role of Fresno as a center of agriculture and food production systems by conserving farmland through a focus on developing vacant and underutilized land within the established Sphere of Influence of the City, limiting any further urban boundary expansion, and developing urban agriculture within the city and designated growth areas.
12. Resolve existing public infrastructure and service deficiencies, make full use of existing infrastructure, and invest in improvements to increase competitiveness and promote economic growth.
Emphasize the fair and necessary costs of maintaining sustainable water, sewer, streets, and other public infrastructure and service systems in rates, fees, financing and public investments to implement the General Plan.
Adequately address accumulated deferred maintenance, aging infrastructure, risks to service continuity, desired standards of service to meet quality-of-life B3 Attach #1 of 3
7-4 FRESNO GENERAL PLAN
goals, and required infrastructure to support growth, economic competitiveness and business development.
13. Emphasize the City as a role model for good growth management planning, efficient processing and permit streamlining, effective urban development policies, environmental quality, and a strong economy. Work collaboratively with other jurisdictions and institutions to further these values throughout the region.
Positively influence the same attributes in other jurisdictions of the San Joaquin Valley –and thus the potential for regional sustainability - and improve the standing and credibility of the City to pursue appropriate State, LAFCo, and other regional policies that would curb sprawl and prevent new unincorporated community development which compete with and threaten the success of sustainable policies and development practices in Fresno.
16. Protect and improve public health and safety.
17. Recognize, respect, and plan for Fresno's cultural, social, and ethnic diversity, and foster an informed and engaged citizenry.
Emphasize shared community values and genuine engagement with and across different neighborhoods, communities, institutions, businesses and sectors to solve difficult problems and achieve shared goals for the success of Fresno and all its residents.
Fresno Green – The City’s Strategy for Achieving Sustainability In 2008, the Fresno Green Strategies were presented to a previous mayor and City Council. They were accepted as the City’s first attempt to articulate a direction for achieving a sustainable future through green conservation efforts, including those that could be made by the City. These strategies addressed a wide range of issues organized around five “visions” for Fresno and its future growth areas: New City Beautiful, Sierra View 2025, Solar Valley, Green Enterprise and Economic Development, and City as Good Steward. The City won an award from the U.S. Environmental Protection Agency (EPA) for these strategies.
Most of the objectives and programs that support these strategies and ideas have been or are in the process of being implemented. The majority are incorporated into policies in this General Plan. Those that are not should not be considered objectives or policies of this Plan. Key ideas from the Fresno Green Strategies are described below.
B3 Attach #1 of 3
DECEMBER 2014 7-5
Chapter 7: Resource Conservation and Resilience
New City Beautiful
The New City Beautiful vision showcases good urban design, with priority given to public health, open spaces, public art, historic preservation, urban forests, and the protection of natural habitats. The main initiatives are:
• Develop and implement compact, transit- and pedestrian-oriented development principles and green building standards.
• Build municipal buildings to a green building rating system and adopt green technology for the retrofit of existing City buildings. • Plan new residential areas and retrofit established neighborhoods to be within one half mile of public parks, school playgrounds and/or recreational open space. • Plant and maintain trees in order to achieve shading of at least 50 percent of all hardscaped parking and pedestrian surfaces.
• Protect critical habitat corridors and key habitat characteristics from unsuitable development.
• Reduce the use of disposable toxic or non-renewable products through environmentally preferred purchasing policies.
Sierra View 2025
The Sierra View 2025 initiatives focus on making the Sierra Nevada mountain range clearly visible to all Valley residents by 2025. The aim of the initiatives is to improve public health with cleaner air, enhance public transportation, and increase opportunities for walking and cycling:
• Implement enhanced public transit and traffic light synchronization programs to reduce commute time.
• Reduce City fleets’ air pollutant emissions and City greenhouse gas emissions. • Reduce the number of commute trips by single occupancy vehicles. • Meet federal clean air standards.
Solar Valley
This initiative envisions Fresno as becoming a leader in renewable energy use by maximizing new renewable sources. With its abundant sunshine, the opportunity exists to improve air quality, reduce dependence on foreign energy, and provide attractive new jobs by harnessing solar power. Three initiatives work toward this vision:
• Increase use of renewable energy to meet 50 percent of annual electrical consumption for City operations.
B3 Attach #1 of 3
7-6 FRESNO GENERAL PLAN
• Reduce the city’s peak electrical load by 10 percent through energy efficiency and conservation measures and shifting the timing of energy demands. • Reduce citywide greenhouse gas emissions to meet requirements of State AB 32.
Green Enterprises and Economic Development
These initatives set the stage for Fresno to become the Valley center for innovative business enterprises with a focus on the “triple bottom line” of providing environmental, economic and social benefits:
• Position Fresno as a regional center for green enterprises. • Create environmentally beneficial jobs in low-income neighborhoods. • Promote and support locally grown and organic foods.
City as Good Steward
The City as Good Steward vision puts forth Fresno as a city that leads by example in greening up its facilities and practices, embracing a zero waste initiative, providing appropriate staff resources, and collaborating with other municipalities and agencies to develop regionally-based green programs. Seven initiatives comprise the program for this vision:
• Achieve 75 percent diversion of solid waste that otherwise would go to landfills by 2012 and zero waste to landfills by 2025.
• Develop and implement an Integrated Pest Management program. • Protect integrity of Fresno’s primary drinking water sources through an update of the General Plan.
• Develop and implement environmentally responsible policies and practices. • Market the Fresno Green Strategies (New City Beautiful, Sierra View 2025, Solar Valley, Green Enterprises and Economic Development, and City as a Good Steward) throughout the community.
• Incorporate sustainable policies into the General Plan. • Measure successes of Fresno Green Strategies and present a periodic report to the Council, which could be integrated into the General Plan annual report.
Relation between Urban Form and Resource Conservation
Making efficient use of public infrastructure and reducing the financial resources devoted to energy use will save money for residents, businesses, and the City government. By strategically regulating urban form elements through this Plan, such as B3 Attach #1 of 3
DECEMBER 2014 7-7
Chapter 7: Resource Conservation and Resilience
development types, intensity, building massing and orientation, landscaping size and type, and the mix of land uses, the city can produce significant energy and water savings.
The Plan also seeks to prevent an overextension of its developable area and manage land use impacts on municipal revenues more effectively. Low-density residential developments on the urban fringe in county areas that require annexation are expensive for the City to serve with both physical infrastructure (roads, water, and sewer) and public services (fire and police). In addition, because of tax sharing arrangements with the County of Fresno, these annexed areas contribute significantly less revenue to the City’s general fund than land developed within the city limits. Meanwhile, Fresno has vacant and undervalued parcels located in its urban core, particularly along key transit corridors. In established neighborhoods, infrastructure and services are already provided, and tax benefits are much greater for the City than those generated by newly annexed land. Ultimately, the amount of land available to the City for future growth is finite, as further expansion of the City’s SOI is blocked in certain directions by the Madera/Fresno county line and the city of Clovis, is contingent on County of Fresno plans, and may consume valuable farmland. Infill development is also important to other aims of the Plan, including ensuring that the cost of doing business goes down, revenues are maximized, and scarce financial resources are used efficiently.
7.2 USE OF INFRASTRUCTURE AND RESOURCES
Continued growth outwards creates transportation and air quality issues, as well. The continued siting of major retail and commercial uses, as well as jobs, at Fresno’s urban fringe is lengthening travel times and increasing traffic levels (and air pollution) disproportionately faster than the rate of population growth, due to inefficient location selection. Given the restrictions on and impacts of increasing Fresno’s land area, the Plan promotes the highest and best use of land within Fresno’s current city limits, phases growth into unincorporated areas of the SOI, and avoids de-investment in Downtown and established neighborhoods. Furthermore, certain patterns of land development can increase costs to the City in excess of related revenues and essentially reduce fiscal resources. The Plan seeks to discourage this type of development and, at the least, ensure that all development covers its fair share of public costs.
Communication and Broadband
Making efficient use of public infrastructure and reducing the financial resources devoted to energy use will save money for residents, businesses, and the City. This section addresses broadband and telecommunications infrastructure opportunities as they relate to the progression, redevelopment of the inner city and development of additional services to constituents. Broadband has become an important part of the lives of every citizen as it is used for social interaction, education, business, and B3 Attach #1 of 3
7-8 FRESNO GENERAL PLAN
healthcare, and has been a key factor in economic development for many cities. As technology evolves and content becomes more readily available, the need for higher communication speeds and access to the technology has also increased.
The City of Fresno Information Services Department (ISD) has used excess fiber of the Intelligent Transportation System, as well as its own implemented fiber, for data transport and connectivity. The City’s Intelligent Traffic System is designed and implemented by the Public Works Department with ISD as a partner from a technology aspect. Most of the fiber implemented was funded through grants in order to install conduit and fiber to synchronize traffic signals. To date, most of the construction has been in major thoroughfares where there is a need to control traffic for ease of congestion and improve air quality.
Utilizing the excess fiber, the City has been able to realize a cooperative effort between the region’s biggest agencies – the City of Fresno, the County of Fresno and the City of Clovis, as they share data services. In 2003, these three agencies entered into the Fresno Regional E-Government System agreement. Since the initiation of this agreement, ISD has been able to connect multiple agencies (including educational institutions) together to provide shared services such as GIS sharing, public safety data sharing, educational services, data services, as well as video broadcast services.
Through this process, the City has been a good steward of taxpayer funds in that they have been able to connect other agencies via this same fiber allowing higher connection speeds without monthly communication fees while realizing additional savings in construction costs. The fiber is also used for other regional services such as video policing and radio services for public safety. In essence, the concept of using excess and additional fiber is a cost savings to the City and its constituents because fiber was installed in trenches while streets were open, thereby only digging once.
Construction costs for installing a fiber network to allow high speed broadband for City operations, as well as to reach the City’s constituents is costly. While there are costs in purchasing and installing fiber, the most costly portion of installing a fiber optic network is the trenching and installation of conduit. For this reason, many agencies have considered or have adopted a “dig once” policy. While a trench is open for any reason, one or more conduits are placed in the trench either with fiber installed or it is left empty for future fiber installation. The fiber is then used for a multitude of purposes including connecting locations, video surveillance (video policing), wireless services, or it is opened up to the communication carriers who may lease the conduit space for their build outs, thereby offsetting construction costs. Not only will this cut costs of fiber implementation, it will pave the way to ensure that there is a pathway for higher speed broadband as the needs increase.
B3 Attach #1 of 3
DECEMBER 2014 7-9
Chapter 7: Resource Conservation and Resilience
In areas of development, where there is a need, fiber can be installed to connect facilities and agencies. This can include many City Fire Department and Police Department stations as many of these have been built near neighborhoods or in locations where City fiber does not exist. Additionally, as the Video Policing program evolves and the need arises for high-tech strategies for the City Fire and Police Departments, the foundation will be in place for a cost effective means of providing connections. If the City ever decides to provide Internet or other services to the public or expand services at City parks, the connectivity can either be installed while construction is commencing or the means will be there for a cost effective implementation at a later date.
In the case where the City will allow private communication companies to lease the conduit, the conduit will remain a City asset with the potential to receive lease revenues consistent with the requirements of the California Public Utilities Commission’s regulations and State laws. If other agencies or institutions would like to connect, they may do so under the current Fresno Regional E-Government System Agreement, which covers data sharing and not Internet transport where the City provides Internet connectivity in competition with other carriers.
OBJECTIVE
RC-1 Make efficient use of existing and future public infrastructure.
IMPLEMENTING POLICIES
RC-1-a Setting Service Standards. Set service delivery standards at existing levels or formulate and commit the City to an investment program that will meet an improved standard of service.
Commentary: Implementation of this policy will be coordinated with the policies and strategies for fiscal sustainability presented in the Economic Development and Fiscal Sustainability Element.
RC-1-b Capital Improvement Program. Prepare and adopt a long-term Capital Improvement Program (CIP) that describes City-sponsored capital projects related to General Plan implementation.
Commentary: The CIP will define what areas or projects it would enable and include funding sources covering the complete cost of the projects, as well as intended phasing. It will be updated annually and comprehensively reviewed every five years so that it accurately reflects the City’s priorities, community needs, fiscal realities, and State mandates. It also will include an analysis of how improvements B3 Attach #1 of 3
7-10 FRESNO GENERAL PLAN
implement the General Plan and how they reflect the City’s commitment to environmental justice and fair share issues relative to individual neighborhood needs. Implementation of this policy will be coordinated with the policies and strategies for fiscal sustainability presented in the Economic Development and Fiscal Sustainability Element and with technical work on service standards and infrastructure improvements mandated by policies in the Public Utilities and Services Element.
RC-1-c Prioritize Revenues. Prioritize revenues by supporting, streamlining, and providing incentives to projects that create the largest positive impacts on property values, the city’s retail base, and, to the extent feasible, Downtown and established neighborhoods.
Commentary: These incentives could include giving priority to supporting redevelopment of vacant and underutilized land, particularly in mixed use and higher density corridors and Downtown, over the conversion of active farmland to urban uses.
RC-1-d Coordinate Public Construction. Coordinate public construction with other public and private agencies, particularly with respect to streets, sewerage, water, gas, electric, irrigation improvements, flood control facilities, and communication to seek the greatest public benefit and efficiencies at the least public cost.
RC-1-e Dig Once. Whenever a suitable trench is dug, one or more telecommunication conduits shall be placed in the trench, either with fiber installed or with space available for future fiber installation, to expand or upgrade the fiber optic network as appropriate.
Commentary: Implementation of this policy will require identification of funding sources.
RC-1-f Telecommunications Strategy. Develop a process for communication carriers to use excess fiber optic conduit with the City in a manner that will allow for appropriate cost recovery and that is consistent with State and federal law.
RC-1-g Grant Funding. Seek grant funds for the construction or implementation of the fiber optic system to provide expanded public services (such as services for educational, economic, public safety, or underserved communities).
B3 Attach #1 of 3
DECEMBER 2014 7-11
Chapter 7: Resource Conservation and Resilience
RC-1-h Public-Private Partnerships. Foster opportunities for public-private partnerships that leverage infrastructure, encourage pooling of resources, and promote shared-use activities.
OBJECTIVE
RC-2 Promote land uses that conserve resources.
IMPLEMENTING POLICIES
RC-2-a Link Land Use to Transportation. Promote mixed-use, higher density infill development in multi-modal corridors. Support land use patterns that make more efficient use of the transportation system and plan future transportation investments in areas of higher-intensity development. Discourage investment in infrastructure that would not meet these criteria.
RC-2-b Provide Infrastructure for Mixed-Use and Infill. Promote investment in the public infrastructure needed to allow mixed-use and denser infill development to occur in targeted locations, such as expanded water and wastewater conveyance systems, complete streetscapes, parks and open space amenities, and trails. Discourage investment in infrastructure that would not meet these criteria.
OBJECTIVE
RC-3 Actively engage, listen to, educate, and enlist the support of the Fresno community on the need and strategies for resource conservation.
IMPLEMENTING POLICIES
RC-3-a Track Trends in Resource Consumption. Provide and periodically update written materials and information on the City’s website that tracks public and private rates of resource consumption in Fresno and related fiscal and environmental costs.
Commentary: The City of Fresno Department of Public Utilities will work with the San Joaquin Valley Air Pollution Control District and other resource agencies to determine and publish such information, with the frequency of updates dependent on budgetary resources.
B3 Attach #1 of 3
7-12 FRESNO GENERAL PLAN
RC-3-b Community Outreach and Joint Solution Making. Host an ongoing education and listening session series with the public to inform them of public and private rates of resource consumption, costs, impacts, and projected future constraints.
RC-3-c Multi-Jurisdictional Efforts. Work actively with the public to develop and champion realistic, effective solutions to conserve resources at the local, regional, and state levels.
Commentary: The City will forge partnerships with other resource agencies, time and resources permitting, to provide information, answer questions, and suggest solutions.
7.3 AIR QUALITY AND GREENHOUSE GAS EMISSIONS
Fresno is located in the center of the San Joaquin Valley Air (SJVA) Basin. The air quality in the SJVA Basin is among the worst in the nation, and routinely exceeds federal and State air quality health standards for ozone and particulates. The poor air quality contributes to high levels of asthma, sinus infections, and cardiovascular disease.
The SJVA Basin’s poor air quality is caused by natural geographic and climatic conditions, as well as local and regional development, transportation, and land use practices.
The federal Clean Air Act required the U.S. EPA to set standards, which state that certain pollutants should not exceed specified levels. California has adopted its own set of stricter standards under the California Clean Air Act. Transportation conformity is required under the federal Clean Air Act to ensure that federally supported highway and transportation project activities are consistent with State implementation programs. Conformity means that transportation activities should not cause new air quality violations, worsen existing violations, or delay timely attainment of federal air quality standards. Conformity requires demonstration that State and regional transportation control measures in ozone nonattainment areas are implemented in a timely fashion. These measures are expected to be given funding priority and to be implemented on schedule.
The California Clean Air Act requires nonattainment areas to achieve and maintain the State ambient air quality standards by the earliest practicable date and local air districts to develop plans for attaining the State ozone, carbon monoxide, sulfur dioxide, and nitrogen dioxide standards. In 2003, the Legislature enacted a bill to reduce public exposure to particulates and established a process for achieving near-term reductions in particulates throughout California ahead of federally required deadlines.
B3 Attach #1 of 3
DECEMBER 2014 7-13
Chapter 7: Resource Conservation and Resilience
Under the California Health and Safety Code, the Air Resources Board is authorized to adopt regulations to protect public health and the environment through the mobile and stationary source airborne toxic control measures. These measures focus on reducing public exposure to diesel particulates and other toxic air contaminants, particularly for children riding in and playing near school buses and other commercial motor vehicles, who are disproportionately exposed to pollutants from these sources.
Emissions from cars and trucks are being reduced by State and federal standards, which are based not only on air quality considerations but also on energy use. In California, the Pavley Clean Car Standard and the Low Carbon Fuel standard will have dramatic impacts on vehicle emissions in coming years, as will implementation of the newest national fuel standards for current and future model years.
Fresno’s air quality management programs are administered by the San Joaquin Valley Air Pollution Control District (SJVAPCD), which covers eight counties, from the San Joaquin County in the north to Kern County in the south. Within this region, the SJVAPCD is responsible for ensuring compliance with federal air quality standards, but it cannot regulate all the pollution sources. The SJVAPCD only has authority to regulate stationary sources for air pollution; its incentive programs to help reduce mobile source emissions are purely voluntary. This lack of authority to regulate mobile source emissions has restricted the SJVAPCD’s ability to reduce emissions in the Valley and to achieve compliance timelines for federal air quality standards. Its regulations include dust reduction during construction and stationary source requirements. Incentives, which are paid for by collected fees, include programs to replace or retrofit certain vehicle and engine types (trucks, lawn mowers, and school buses) and the Burn Cleaner Program (wood stove change out).
The City’s Role in Improving Air Quality
Given the SJVAPCD’s limited authority, any local efforts to directly and indirectly reduce mobile source emissions and thereby improve air quality fall to the City and its transportation and land use policies. Over 81 percent of the region’s summer ozone pollution comes from mobile vehicle sources. Reducing ozone pollution is therefore highly contingent on reducing the number of vehicles miles traveled in the city. Fresno residents, like the residents of other neighboring cities, are highly dependent on automobiles and trucks for day-to-day operations due to low-density development patterns. The City can reduce the vehicle miles traveled by planning for and providing feasible and convenient alternative travel facilities and modes that emit fewer pollutants per person. The City can also reduce vehicle miles traveled by striving to ensure that trip generators (such as homes) and destinations (shops and businesses) are located near one another to allow for shorter trips. The reduction in vehicle miles traveled can be realized through transit-oriented development (TOD) and higher density, mixed-use development.
B3 Attach #1 of 3
7-14 FRESNO GENERAL PLAN
The land use objectives and policies of this Plan are designed to decrease the generation of air pollution and greenhouse gases through the reduction of vehicle miles traveled by supporting infill development, encouraging Complete Neighborhoods, requiring more compact development in infill areas and growth areas, and tying mixedland uses and high-density development to existing and probable high-capacity urban corridor transit routes. This pattern of development will allow for a more resilient and sustainable community, preserving valued agricultural land.
Infill development relies on the pre-existing public road and utility infrastructure, but may require site cleanup and may burden the existing utility infrastructure to the point that it may need to be upgraded. Mixed-use development allows for a diversity of land uses and activities to be located on the same site or in the same building, including residential uses, retail, professional offices, and commercial uses. Ultimately, higherdensity infill and mixed-use development encourages people to drive less because destinations are closer together and easier to reach.
Another type of development that can improve the air quality is TOD, which locates residential and commercial districts around a public transit station or transit corridor.
It attempts to encourage walking through a compact pattern of development, mixed land uses, and a location near good transit options such as train lines or bus rapid transit (BRT) corridors. TOD is often characterized by frequent and high-quality transit service, good walkability, parking management, and other design features that facilitate transit use and maximize overall accessibility. It can reduce vehicle miles traveled by offering reliable access to other forms of transportation and mobility.
The availability and reliability of transit service to users is another critical method by which local infrastructure can affect regional air quality. Public transit can play an important role in reducing air pollution by offering an alternative mode of transportation around the city beyond the private vehicle. When individuals opt to use public transportation instead of private vehicles, fewer cars are on the road, which decreases congestion, results in less pollution, and improves air quality.
Street networks can also affect air quality based on the length of trips that they require, as more distance travelled and more time on the road is likely to coincide with more air pollution. With shorter trips needed around the city, the vehicle miles traveled are reduced and fewer pollutants are released into the air, thus improving the air quality.
The term Complete Streets means that streets are designed so all users—pedestrians, bicyclists, motorists and transit riders—of all ages and abilities may safely move along and across them. Since 2011, the Complete Streets Act has required California cities to B3 Attach #1 of 3
DECEMBER 2014 7-15
Chapter 7: Resource Conservation and Resilience
account for the needs of all roadway users when updating their General Plans. There is no single design for a Complete Street, but components include sidewalks, curb extensions, accessible pedestrian signals, roundabouts, bike lanes, accessible public transportation stops, and pedestrian-scaled lighting. Complete Street policies often have the effect of encouraging walking and use of public transit, thereby reducing automobile traffic congestion and improving air quality. The Mobility and Transportation Element further discusses street patterns and Complete Street systems.
The Plan also supports modes of travel beyond the private automobile through its circulation policies designed to expand and connect the city’s existing sidewalk and bike route network, consider multiple modes of transportation to reduce reliance on singledriver automobile transportation and level of service measurement, and consider context in roadway design. Other transportation measures that are part of the City’s effort, and that have been determined to reduce air pollution include:
• Investing in BRT, express bus, limited stop bus and high frequency bus routes on principal transit corridors, transit corridors, and transit routes as determined feasible by appropriate transportation infrastructure studies. • Support and promote employer implementation of staggered work hours and employee incentives to use carpools, public transit, and other measures to reduce vehicular use and traffic congestion.
Lastly, the use of hybrid, electric and alternative fuel vehicles can improve the air quality, as these vehicles emit fewer pollutants into the air. The Plan supports low emission vehicles through policies and infrastructure, such as providing electric and CNG (compressed natural gas) fueling stations, preferential parking spots for these vehicles, and using these vehicles for the City fleet.
Greenhouse Gas Emissions
Gases that trap heat in the earth’s atmosphere are called greenhouse gases (GHGs).
These gases play a critical role in determining the earth’s surface temperature. Part of the solar radiation that enters earth’s atmosphere from space is absorbed by the earth’s surface. The other part of it is reflected off the earth and radiated back toward space, but GHGs absorb some of this radiation. As a result, radiation that otherwise would have escaped back into space is retained, resulting in a warming of the atmosphere.
Without natural GHGs, the earth’s surface would be about 61°F cooler. This phenomenon is known as the greenhouse effect. However, many scientists have determined that emissions from human activities—such as electricity generation, vehicle emissions, and even farming and forestry practices—have elevated the concentration of GHGs in the atmosphere beyond naturally-occurring concentrations, contributing to the larger process of global climate change.
B3 Attach #1 of 3
7-16 FRESNO GENERAL PLAN
Global Climate Change
Global climate change (GCC) refers to a change in the average weather of the earth that may be measured by wind patterns, storms, precipitation, and temperature.
Historically, the rate of temperature change has typically been incremental, with warming and cooling occurring over the course of thousands of years. In the past 10,000 years the earth has experienced incremental warming as glaciers retreated across the globe. However, scientists have observed an unprecedented increase in the rate of warming over the past 150 years, roughly coinciding with the global industrial revolution.
Although GCC is now widely accepted as a concept, the extent and speed of change to be expected, and the exact contribution from human sources, remains in debate. In its 2013 report, the Intergovernmental Panel on Climate Change (IPCC) predicted that the increase in global mean temperature in 2100 relative to 1850 to 1900 is likely to exceed
2.7 degrees Fahrenheit. The same report projects a sea level rise of 10.3 to 21.7 inches by 2100, relative to 1986-2005, with greater rise possible depending on the rate of polar ice sheet melting. A 2012 report done by the National Research Council (NRC) assessed historic and projected sea level rise for specific locations along the open Pacific coasts of California, Oregon, and Washington. Along the California coast south of Cape Mendocino, the committee projected that sea level will rise 1.57 to 11.8 inches by 2030,
4.72 to 24 inches by 2050, and 16.5 to 65.7 inches by 2100.
Accelerating GCC has the potential to cause a number of adverse impacts in California, including but not limited to:
• A reduction in the quality and supply of water from the Sierra snowpack. If heattrapping emissions continue unabated, more precipitation will fall as rain instead of snow, and the snow that does fall will melt earlier, reducing the Sierra Nevada spring snowpack by as much as 70 to 90 percent. This can lead to challenges in securing adequate water supplies. It can also lead to a potential reduction in hydropower.
• Increased risk of large wildfires. If rain increases as temperatures rise, wildfires in the grasslands and chaparral ecosystems of southern California are estimated to increase by approximately 30 percent toward the end of the twenty-first century because more winter rain will stimulate the growth of more plant “fuel” available to burn in the fall. In contrast, a hotter, drier climate could promote up to 90 percent more northern California fires by the end of the century by drying out and increasing the flammability of forest vegetation.
• Reductions in the quality and quantity of certain agricultural products. The crops and products likely to be adversely affected include wine grapes, fruit, nuts, and milk.
B3 Attach #1 of 3
DECEMBER 2014 7-17
Chapter 7: Resource Conservation and Resilience
• Decreased electricity supply. Decreased water availability for hydropower generation (due to less Sierra snowpack and consequently lower reservoir levels) and decreased transmission efficiencies will increase the risk of brown-outs and black-outs and will affect agricultural and industrial productivity. • Increased flood risk. Climate change is anticipated to cause a 20 to 30 percent increase in precipitation in the spring and fall in California. More frequent and heavier precipitation events cause flooding and mudslides, which would incur considerable costs in damages to property, agricultural productivity, infrastructure and even human life.
• Exacerbation of air quality problems. If temperatures rise to the medium warming range, there could be 75 to 85 percent more days with weather conducive to ozone formation in Los Angeles and the San Joaquin Valley, relative to today’s conditions.
This is more than twice the increase expected if rising temperatures remain in the lower warming range. This increase in air quality problems could result in an increase in asthma and other health-related problems.
• An increase in temperature and extreme weather events. Climate change is expected to lead to increases in the frequency, intensity, and duration of extreme heat events and heat waves in California. More heat waves can exacerbate chronic disease or heat-related illness.
• A decrease in the health and productivity of California’s forests. Climate change can cause an increase in wildfires, an enhanced insect population, and establishment of non-native species.
By identifying and addressing underlying vulnerabilities due to climate change in this Plan, the City of Fresno will increase the resilience of the community and the resources it depends on.
Responding to Climate Change Legislation
The City will continue to comply with applicable State climate change legislation. It will also take into consideration settlements by the Governor’s Office of Planning and Research (OPR) Technical Advisories and Attorney General with other jurisdictions related to the California Environmental Quality Act (CEQA), GHG emissions, and General Plan updates. By proactively addressing climate change issues and requirements through the Plan, the City has the opportunity to create streamlined application processes for conforming local development.
The issue of climate change is closely related to other resource issues and opportunities, particularly air quality and water supply. The State’s GHG legislation (AB 32 – California Global Warming Solutions Act of 2006 and SB 375 – Sustainable Communities and Climate Protection Act of 2008) and the amended CEQA and CEQA B3 Attach #1 of 3
7-18 FRESNO GENERAL PLAN
Guidelines require local governments to define the extent of GHG production and identify ways to substantially reduce GHGs in the future in order to minimize a potentially significant environmental impact.
Of particular importance to the Plan is SB 375’s requirement that all regional transportation planning organizations (locally, the Fresno Council of Governments) develop a Sustainable Community Strategy (SCS) designed to coordinate regional transportation plans with land use intensities and densities in order to reduce future GHG emissions. Local adherence to SB 375 and the regional SCS is not mandatory; however, the aim is to motivate local governments to align their land use planning with the adopted SCS to capitalize on the new CEQA streamlining opportunities discussed below. For instance, the County of Fresno has a State-mandated target of reducing its GHG emissions from automobile and light trucks (primarily NOx – nitrogen oxides) by 5 percent by 2020 and 10 percent by 2035. SB 375 provides financial and regulatory incentives to achieve the target GHG reductions, including streamlined environmental review for projects that conform to an adopted SCS.
The Plan includes policies to reduce vehicle miles traveled by increasing land development densities so that more trips (such as to jobs, schools, and personal services) can be accommodated by shorter drives, transit, walking, or biking, and it is likely that such policies would be consistent with an adopted SCS. The Fresno Council of Governments adopted its SCS in 2014. This General Plan complies with the adopted SCS.
Senate Bill 97 (Chapter 185, Statutes of 2007) amended the California Environmental Quality Act statute to establish how GHG emissions and the effects of GHG emissions are appropriately analyzed under CEQA. The amendments stipulate that environmental documents for certain residential and mixed-use projects that are consistent with a General Plan designation, density, SCS, or alternative planning strategy need not analyze global warming impacts resulting from cars and light duty trucks. SB 97 also allows streamlined environmental review for projects in transit corridors that are consistent with an SCS and a City or County’s General Plan.
CEQA Tiering and Streamlining Analysis of Greenhouse Gas Emissions
A Climate Action Plan (CAP) to reduce GHG emissions is being prepared concurrently with this Plan. The CAP will allow the City to streamline environmental review for later projects. This is because CEQA and CEQA Guidelines will allow the City to determine that a project's incremental contribution to a cumulative effect is not cumulatively considerable if the project complies with the requirements in a previously adopted CAP or mitigation program under specified circumstances. An environmental document that B3 Attach #1 of 3
DECEMBER 2014 7-19
Chapter 7: Resource Conservation and Resilience
relies on a GHG reduction plan for a cumulative impacts analysis must identify those requirements specified in the CAP that apply to the project, and, if those requirements are not otherwise binding and enforceable, incorporate those requirements as mitigation measures applicable to the project. If there is substantial evidence that the effects of a particular project may be cumulatively considerable notwithstanding the project's compliance with the specified requirements in the CAP for the reduction of GHG emissions, an EIR must be prepared for the project.
OBJECTIVE
RC-4 In cooperation with other jurisdictions and agencies in the San Joaquin Valley Air Basin, take necessary actions to achieve and maintain compliance with State and federal air quality standards for criteria pollutants.
Commentary: This includes compliance with California Government Code Section 65302.1 for the San Joaquin Valley.
IMPLEMENTING POLICIES
RC-4-a Support Regional Efforts. Support and lead, where appropriate, regional, State and federal programs and actions for the improvement of air quality, especially the SJVAPCD’s efforts to monitor and control air pollutants from both stationary and mobile sources and implement Reasonably Available Control Measures in the Ozone Attainment Plan.
Commentary: A list of Reasonably Available Control Measures was submitted by the SJVAPCD to the U.S. Environmental Protection Agency as part of the Ozone Attainment Plan designed to reduce ozone-forming emissions. The City is responsible for implementing measures related to operations and/or services that the City controls.
RC-4-b Conditions of Approval. Develop and incorporate air quality maintenance requirements, compatible with Air Quality Attainment and Maintenance Plans, as conditions of approval for General Plan amendments, community plans, Specific Plans, neighborhood plans, Concept Plans, and development proposals.
RC-4-c Evaluate Impacts with Models. Continue to require the use of computer models used by SJVAPCD to evaluate the air quality impacts of plans and projects that require such environmental review by the City.
B3 Attach #1 of 3
7-20 FRESNO GENERAL PLAN
RC-4-d Forward Information. Forward information regarding proposed General Plan amendments, community plans, Specific Plans, neighborhood plans, Concept Plans, and development proposals that require air quality evaluation, and amendments to development regulations to the SJVAPCD for their review of potential air quality and health impacts.
RC-4-e Support Employer-Based Efforts. Support and promote employer implementation of staggered work hours and employee incentives to use carpools, public transit, and other measures to reduce vehicular use and traffic congestion.
RC-4-f Municipal Operations and Fleet Actions. Continue to control and reduce air pollution emissions from vehicles owned by the City and municipal operations and facilities by undertaking the following:
• Expand the use of alternative fuel, electric, and hybrid vehicles in City fleets.
• Create preventive maintenance schedules that will ensure efficient engine operation.
• Include air conditioning recycling and charging stations in the City vehicle maintenance facilities, to reduce Freon gases being released into the atmosphere and electrostatic filtering systems in City maintenance shops, when feasible or when required by health regulations.
• Use satellite corporation yards for decentralized storage and vehicle maintenance.
• Convert City-owned emergency backup generators to natural gas fuels whenever possible, and create an advanced energy storage system.
RC-4-g FAX Actions. Continue to improve Fresno Area Express (FAX) bus transit system technical performance, reduce emission levels, streamline system operations, and implement BRT where supportive land uses are proposed by Figure LU-1: Land Use Diagram.
RC-4-h Airport Actions. Support Airport efforts to develop and maintain programs and policies to support City, State and federal efforts to achieve and maintain air quality standards.
RC-4-i Methane Capture. Continue to pursue opportunities to reduce air pollution by using methane gas from the old City landfill and the City’s wastewater treatment process.
B3 Attach #1 of 3
DECEMBER 2014 7-21
Chapter 7: Resource Conservation and Resilience
RC-4-j All Departments. Continue to develop and implement in all City departments, operational policies to reduce air pollution.
RC-4-k Electric Vehicle Charging. Develop standards to facilitate electric vehicle charging infrastructure in both new and existing public and private buildings, in order to accommodate these vehicles as the technology becomes more widespread.
OBJECTIVE
RC-5 In cooperation with other jurisdictions and agencies in the San Joaquin Valley Air Basin, take timely, necessary, and the most costeffective actions to achieve and maintain reductions in greenhouse gas emissions and all strategies that reduce the causes of climate change in order to limit and prevent the related potential detrimental effects upon public health and welfare of present and future residents of the Fresno community.
IMPLEMENTING POLICIES
RC-5-a Support State Goal to Reduce Statewide GHG Emissions. As is consistent with State law, strive to meet AB 32 goal to reduce greenhouse gas emissions to 1990 levels by 2020 and strive to meet a reduction of 80 percent below 1990 levels by 2050 as stated in Executive Order S-03-05. As new statewide GHG reduction targets and dates are set by the State update the City’s Greenhouse Gas Reduction Plan to include a comprehensive strategy to achieve consistency with those targets by the dates established.
RC-5-b Greenhouse Gas Reduction Plan. As is consistent with State law, prepare and adopt a Greenhouse Gas Reduction Plan as part of the Master Environmental Impact Report to be concurrently approved with the Fresno General Plan in order to achieve compliance with State mandates, assist development by streamlining the approval process, and focus on feasible actions the City can take to minimize the adverse impacts of growth and development on global climate change. The Greenhouse Gas Reduction Plan shall include, but not be limited to:
• A baseline inventory of all known or reasonably discoverable sources of GHGs that currently exist in the city and sources that existed in 1990.
• A projected inventory of the GHGs that can reasonably be expected to be emitted from those sources in the year 2035 with B3 Attach #1 of 3
7-22 FRESNO GENERAL PLAN
implementation of this General Plan and foreseeable
communitywide and municipal operations.
• A target for the reduction of emissions from those identified sources.
• A list of feasible GHG reduction measures to meet the reduction target, including energy conservation and “green building” requirements in municipal buildings and private development. • Periodically update municipal and community-wide GHG
emissions inventories to determine the efficacy of adopted measures and to guide future policy formulation needed to achieve and maintain GHG emissions reduction targets.
RC-5-c GHG Reduction through Design and Operations. Increase efforts to incorporate requirements for GHG emission reductions in land use entitlement decisions, facility design, and operational measures subject to City regulation through the following measures and strategies:
• Promote the expansion of incentive-based programs that involve certification of projects for energy and water efficiency and resiliency. These certification programs and scoring systems may include public agency “Green” and conservation criteria, Energy Star™ certification, CALGreen Tier 1 or Tier 2, Leadership in Energy Efficient Design (LEED™) certification, etc.
• Promote appropriate energy and water conservation standards and facilitate mixed-use projects, new incentives for infill development, and the incorporation of mass transit, bicycle and pedestrian amenities into public and private projects.
• Require energy and water audits and upgrades for water conservation, energy efficiency, and mass transit, pedestrian, and bicycle amenities at the time of renovation, change in use, change in occupancy, and change in ownership for major projects meeting review thresholds specified in an implementing
ordinance.
• Incorporate the City’s “Guidelines for Ponding Basin/Pond Construction and Management to Control Mosquito Breeding” as conditions of approval for any project using an on-site stormwater basin to prevent possible increases in vector-borne illnesses associated with global climate change.
• Periodically evaluate the City’s facility maintenance practices to determine whether there are additional opportunities to reduce B3 Attach #1 of 3
DECEMBER 2014 7-23
Chapter 7: Resource Conservation and Resilience
GHGs through facility cleaning and painting, parks maintenance, road maintenance, and utility system maintenance.
• Periodically evaluate standards and mitigation strategies for highly vehicle-dependent land uses and facilities, such as drivethrough facilities and auto-oriented development.
RC-5-d SCS and CAP Conformity Analysis. Ensure that the City includes analysis of a project’s conformity to an adopted regional Sustainable Community Strategy or Alternative Planning Strategy (APS), an adopted Climate Action Plan (CAP), and any other applicable City and regional greenhouse gas reduction strategies in affect at the time of project review.
RC-5-e Ensure Compliance. Ensure ongoing compliance with GHG emissions reduction plans and programs by requiring that air quality measures are incorporated into projects’ design, conditions of approval, and mitigation measures.
RC-5-f Toolkit. Provide residents and project applicants with a “toolkit” of generally feasible measures that can be used to reduce GHG emissions, including educational materials on energy-efficient and “climate-friendly” products.
RC-5-g Evaluate Impacts with Models. Continue to use computer models such as those used by SJVAPCD to evaluate greenhouse gas impacts of plans and projects that require such review.
7.4 WATER RESOURCES
Population and economic growth of Fresno will be determined, in part, by the availability of water. Fresno’s water supply faces challenges and requires strategic decisions to secure its long-term availability and affordability, in light of several pressures:
• Fresno’s water supply currently depends on hundreds of deep wells, which draw on a declining aquifer (See the Public Utilities and Services Element for more information).
• The City has the opportunity to use substantial surface water resources, but these require funding and construction of costly new treatment and distribution infrastructure.
• Fresno has one of the highest per capita water consumption rates in California, more than twice that of Los Angeles. More than 50 percent of water consumption in Fresno is used for landscaping, rising to 70 percent in summer months.
B3 Attach #1 of 3
7-24 FRESNO GENERAL PLAN
• The costs of wastewater treatment, both for the City and industrial users, are relatively high.
• Running groundwater pumps and conveyance systems uses a tremendous amount of energy. Both the amount and cost of energy are rising in spite of technological innovation and efforts to reduce energy demands related to the City’s water supply.
Water Sources
Fresno relies on two sources for its water: groundwater and surface water. With its dry climate and low annual rainfall (11 inches), Fresno is dependent on the Sierra snowpack, two rivers, and a groundwater basin for its water needs.
Fresno’s primary source of water is groundwater that is located within the existing Kings Sub-basin groundwater aquifer and watershed area, as shown in Figure RC-2.
The DPU Water Division currently uses 270 wells to pump about 146 million gallons of water per day (mgd). Since the 1940s, Fresno has taken out more water from the aquifer than has naturally and intentionally seeped back in. This has created an overdraft on the system, resulting in a declining water table (approximately 100 feet in the past 80 years). This increase in the depth to the water table has contributed to water quality problems, deeper well construction, and additional energy costs (due to additional pumping required) and treatment costs. The City currently spends about $20 million on electricity annually, of which 56 percent, or $11.2 million, is for water and wastewater services. The vast majority of that expenditure, $9 million, is for electricity to run groundwater pumps and conveyance.
As the groundwater level decreases, the City will be forced to continue drilling deeper wells, which will result in increased power costs to lift the deeper water from the aquifer. The groundwater level will continue to decline, possibly increasing in its rate of decline as the population drawing water from the basin increases, as shown in Figure RC-1. Other jurisdictions access the Kings Sub-basin groundwater aquifer, and so the rate of drawdown is not solely under the control of the City. Fresno is the biggest user of the aquifer, however, and thus has a large degree of influence on its condition. As it is in a position to lead, the Plan supports efforts to improve regional standards of groundwater usage and recharge.
Fresno does have other sources of water available from the San Joaquin River to the north and the Kings River to the southeast, as shown in Figure RC-2. Snow melt from the Sierras makes its way to Millerton Lake, where it is stored behind Friant Dam and released to the San Joaquin River, and to Pine Flat Reservoir, where it is stored behind Pine Flat Dam and released to the Kings River. Fresno’s access to this natural surface water has been established through contracts with the United States Bureau of Reclamation (USBR) for the San Joaquin River and the Fresno Irrigation District (FID) B3 Attach #1 of 3
DECEMBER 2014 7-25
Chapter 7: Resource Conservation and Resilience
for the Kings River. The FID contract is renewed annually and the USBR contract is permanent.
Figure RC-1: Population Growth vs Depth to Groundwater
As the City’s population has grown, the demand on the City’s groundwater supplies has increased. In the 1930s, groundwater was accessible at a depth of 30 feet, while in the 2000s, groundwater was accessible at depths of more than 120 feet in the ground.
Between both sources, 156,100 acre feet1 (af) of surface water was available to Fresno in 2010. The City diverted 79,000 af for use within the city and allowed the remaining 77,100 af to be used by California State University, Fresno and local farmers for irrigation purposes. This practice is termed in-lieu recharge, whereby groundwater pumping is offset by the use of surplus surface water, thereby leaving groundwater in storage for later use. Another advantage to this practice is that the irrigated surface water seeps through the soil to replenish the aquifer.
1 An acre-foot is enough water to cover an acre of land with one foot of water. It equates to about 326,000 gallons of water.
B3 Attach #1 of 3
7-26 FRESNO GENERAL PLAN
The City’s Northeast Surface Water Treatment Facility (NESWTF) opened in 2004. By 2009, it helped to offset demand for groundwater by 12 percent. Because of the depth of the groundwater table in Fresno, it costs less to treat water at a surface water treatment facility than it does to pump water from the aquifer. The City of Fresno Urban Water Management Plan (UWMP) and the City of Fresno Metropolitan Water Resources Management Plan provide recommendations to increase surface water treatment capacity with phased infrastructure improvements that could shift the burden away from groundwater and allow water levels in the aquifer to balance and potentially recover over time. This will also allow the City to make use of available surface water that is not being used within the city.
If the city continues to use primarily groundwater and does not increase surface water treatment and recycled water supply capacity, the groundwater table will decrease at an increasingly higher rate as Fresno grows and the population increases. According to modeling done for Phase 2 of the City of Fresno Metro Plan, continuing to operate “status quo” will cause the groundwater table to decline an additional 85 feet below 2005 conditions by 2025. Under these conditions, 26 percent of the City’s wells (69 wells) would have groundwater levels below the current pump bowl intake elevations and would not be operational, and another 13 percent of the wells (36 wells) would have groundwater levels of 15 feet or less above the pump bowl elevations, which may result in inadequate water coverage over the top of the pump bowl.
As part of the Kings Sub-basin groundwater aquifer, the Kings River, pictured here, is an important natural resource for the City of Fresno. Photo: Fresno/Clovis Convention & Visitors Bureau.
B3 Attach #1 of 3
Sa n Joaq uin River
Kings
Rive r
FRIANT RD
F r esn o
Madera
Clovis
Kerman Sanger
Parlier
Selma
Fowler
Reedley
Kingsburg
Caruthers
Raisin
City
SHAW AVE
HERNDON AVE
ASHLAN AVE
SHIELDS AVE
CLINTON AVE
MCKINLEY AVE
KINGS CANYON RD
BULLARD AVE
BLACKSTONE AVE
1ST ST
CEDAR AVE
WILLOW AVE
MARKS AVE
CHESTNUT AVE
CLOVIS AVE
TEMPERANCE AVE
JENSEN AVE
AMERICAN AVE
ACADEMY AVE
COPPER AVE
MANNING AVE
MOUNTAIN VIEW AVE
MCCALL AVE
Mader a
Sub Basi n
K i ng s
S u b B asi n
Millerton
Reservoir
Friant
F ri a n t K e r n C a n a l
180
41 168
99 41
99 180
145
Figure RC-2: Kings Subasin Groundwater Aquifer and Watershed Area 0 2 4
MILES
1 8
Fresno Area Regional
Groundwater Management Plan Boundary
Kings Sub Basin
Madera Sub Basin
Planning Area Boundary
Fresno Sphere of Inuence
Fresno City Limits
Other Cities
Source: City of Fresno, 2014;
Provost & Pritchard Consulting Group;
California Department of Water Resources
B3 Attach #1 of 3
7-28 FRESNO GENERAL PLAN
Existing Plans and Initiatives
As noted previously, Fresno’s future relies on being able to provide a dependable supply of potable water to the community. The City has adopted long-range capital and strategic programs through its City of Fresno Metro Plan, City of Fresno Recycled Water Master Plan, and City of Fresno Wastewater Master Plan. The City has also adopted the State’s 2013 CalGreen Building Code, Model Water Efficient Landscape Ordinance, and Graywater Standards, which combine for a 10 to 20 percent reduction in water use in most new construction.
2010 City of Fresno Urban Water Management Plan (UWMP)
The City of Fresno UWMP sets water management goals and strategies to supply water to Fresno’s population through 2030. These goals and strategies include reducing the consumption of gallons per capita per day from 300 to 243 by 2020 as mandated by the State and balancing the City’s groundwater operations by 2025. To accomplish these targets will require ongoing and new conservation measures; the maximization of available surface water supplies for direct treatment and use, and intentional groundwater recharge; and the incorporation of tertiary-treated recycled water into the future water supply portfolio to meet non-potable demands in new growth areas and existing parts of the city. Implementation of the City’s future water supply plan will result in a significant shift and increase in diversity in the City’s water supply mix, which will enhance overall water supply reliability.
Water Conservation Efforts
The city depends on reduced consumption due to conservation as a part of its future water supply. Educating the public to reduce usage also directly affects water delivery costs. Power and treatment costs increase as the City pumps more water, so higher water use would mean higher water and sewer rates. Many of the City’s water conservation measures respond to requirements in the City’s United States Bureau of Reclamation (USBR) contract for 60,000 acre feet of surface water. In fact, one of the contract conditions is that the city follows USBR Best Management Practices, which were used to create the City’s Water Conservation Program.
This Program includes watering restrictions in the form of a required winter and summer watering schedule; customer education on the need to conserve water and how to do so; free residential plumbing retrofits such as low flow shower heads and aerators; free system water audits, leak detection and repair; metering for all new connections and retrofits of existing connections; rebate programs for high efficiency clothes washing machines, ultra-low flush or high efficiency toilets, and urinal replacement; public information outreach programs; and water waste prohibition through watering regulations and enforcement. Demonstration gardens and drip B3 Attach #1 of 3
DECEMBER 2014 7-29
Chapter 7: Resource Conservation and Resilience
irrigation demonstration plots have been installed as resources to provide examples to customers.
Groundwater Recharge
An important process in a viable groundwater management plan is groundwater recharge. One source is the natural subsurface inflow recharge, which occurs when water flows from areas where the water table is higher to areas where it is lower. The Water Division has estimated that the average rate of subsurface inflow to the aquifer is 22,500 acre feet/year (af/yr). The aquifer is also recharged naturally by rainfall, unlined canals and rivers, as well as irrigation water seeping through the soil at an average estimated rate of 24,400 af/yr. Natural recharge can be impeded somewhat by human activities including pavement and buildings, which can result in enhanced surface runoff and reduction in recharge.
The Kings Sub-basin groundwater aquifer is recharged naturally by rainfall, unlined canals and rivers, and irrigation water, but human activities can impede this natural process with pavement and buildings. Photo credit: Karana Hattersley-Drayton.
To capture surface water runoff, also known as stormwater, the Fresno Metropolitan Flood Control District (FMFCD) has developed an urban drainage design concept that collects, detains and retains surface water runoff for intentional groundwater recharge in ponding basins dispersed throughout the city. FMFCD estimates they collect more than 95 percent of Fresno’s urban runoff, though the percentage that actually gets B3 Attach #1 of 3
7-30 FRESNO GENERAL PLAN
recharged and the part that is discharged to FID canals and the San Joaquin River is unknown. The FMFCD also partners with the FID and the City in a cooperative groundwater recharge program. This program provides for dry season (generally March through October) delivery of City contract imported surface water from the San Joaquin and Kings Rivers into many of the FMFCD’s local ponding basins and the Cityowned Leaky Acres recharge basin. Intentional recharge can vary due to a number of factors, which could include pond availability, water delivery season, pond maintenance, or length of wet season.
Intentional recharge in Fresno has averaged 48,900 af/yr from 1990 to 2011. In 2010, intentional recharge was 53,100 af for a total groundwater recharge of 100,000 af.
Groundwater pumpage in 2010 was 128,578 af which created a 28,578 af overdraft on the aquifer that year alone. This overdraft is not maintainable.
The City also recharges treated wastewater into the ground at the Fresno-Clovis Regional Water Reclamation Facility (RWRF). Around 55,000 af is percolated for recharge into the aquifer, with 30,000 af subsequently pumped out by the FID in exchange for 13,800 af of fresh surface water from the Kings River.
Stormwater Best Management Practices
The FMFCD captures approximately 100 percent of the stormwater runoff from new development and approximately 95 percent of the stormwater runoff from existing development. Capturing the runoff allows for groundwater recharge and also protects surface water quality by not allowing urban runoff, which often contains contaminants from roadways and lawns, to flow into natural creeks, rivers, and irrigation ditches. The runoff is collected in retention basins (also known as ponding basins), allowing for filtration through the soil. On average, retention basins remove 50 to 80 percent of stormwater pollutants. Additional sediment and ground water studies show that the majority of stormwater pollutant are absorbed to the top 4cm of soil and do not exceed background levels beyond 16cm. The same studies did not detect any stormwater pollutants in ground water tested beneath a retention basin serving an industrial catchment.
The FMFCD’s stormwater quality management program includes specific pollution prevention and control practices for urban drainage system planning, design, construction, and maintenance. The program also includes public education to prevent stormwater pollution; commercial, industrial, and new development stormwater quality control practices; monitoring to assess stormwater impacts on receiving water and to evaluate the effectiveness of best management practices; and development and implementation of ordinances to effect and enforce stormwater quality controls.
B3 Attach #1 of 3
DECEMBER 2014 7-31
Chapter 7: Resource Conservation and Resilience
Water Conservation
Fresno’s average total per capita water consumption was 295 gallons per capita per day (gpcd) from 1991 to 2011, making Fresno one of the highest water consuming cities in California. The total per capita water production has varied between 1991 to 2011, from a low of 246 gpcd in 2011 to a high of 329 gpcd in 2001. By comparison, Clovis averages 247 gpcd, Los Angeles is 150, Phoenix is 184, and Tucson is 110.
The California Water Conservation Act of 2009 requires a statewide 20 percent reduction in urban water usage by 2020. The methodology chosen by a jurisdiction must be documented in their Urban Water Management Plan (UWMP). The City’s adopted target of 250 gpcd to meet State law is a 20 percent reduction from the 313 gpcd average annual gpcd water use for the 10-year period from 1996 to 2005. The City of Fresno Metro Plan recommends a further reduction to 243 gpcd to help balance the groundwater table by 2020. This General Plan incorporates a comprehensive conservation program that has a reduction target of per capita water usage in the city’s water service area of 243 gpcd by 2020 and 190 by 2035.
To meet a consumption reduction target of 243 gpcd by 2020 and 190 by 2035 will require a combination of conservation measures, including among other possible actions: incentives, appliance rebates, outreach programs and education, fixture swap, prioritized leak detection program, retrofit upon resale ordinance, as well as partnering with commercial, industrial, and institutional customers to reduce their water demand through operational improvements. The recent installation of residential water meters is anticipated to reduce water consumption, however additional water conservation measured should be explored. In the future, the City may develop a tiered water rate structure to further encourage water conservation. The biggest opportunities for water conservation are related to the reduction of outdoor water uses, particularly landscape and turf irrigation, by all customers. Measures related to outdoor water use reduction include rebates for xeriscape (drought-tolerant) landscaping for new homes, programmable irrigation, weather-based irrigation control, and turf replacement, and landscape water audit and budget program.
Recycled Water Use
Water recycling is using treated wastewater for beneficial purposes such as agricultural and landscape irrigation, industrial processes, toilet flushing, and replenishing a ground water basin (referred to as ground water recharge). Water recycling offers resource and financial savings, as potable water does not need to be used for non-drinking purposes.
Wastewater treatment can be tailored to meet the water quality requirements of a planned reuse. Recycled water for landscape irrigation requires less treatment than recycled water for drinking water.
B3 Attach #1 of 3
7-32 FRESNO GENERAL PLAN
Wastewater generated from homes, businesses, and industry in the city is conveyed to the Fresno-Clovis Regional Wastewater Reclamation Facility (RWRF). The RWRF is operated by the City of Fresno and has the capacity to treat 80 million gallons a day (mgd) of wastewater. On an average day, the RWRF receives 68 million gallons of wastewater. The RWRF recycles nearly every component of influent wastewater (water, solids, and natural gas). The City releases up to 65,100 af of recycled water per year. • 10,000 af/yr is sent directly to irrigate non-food agricultural land downstream. • 55,100 af/yr is directed to 1,660 acres of ponds for percolation into the aquifer. • 30,000 af/yr is then pumped from the aquifer into FID canals for reuse downstream from Fresno to nearby farmers for unrestricted irrigation use. In exchange for this recycled water, FID provides Fresno with 13,800 af of Kings River surface water.
The City does not presently have the infrastructure to route recycled water from the RWRF to existing or new development. The retrofit of existing residential uses is considered economically infeasible and impractical to implement. The use of recycled water should focus on new and existing large green spaces, industrial uses, and new development. However, the development of a gray water policy for the residential reuse of wastewater for household gardening and landscape irrigation on site may be feasible.
The City also operates a satellite facility in North Fresno called the Wastewater Reclamation Facilities (WRF) Satellite Plant. It was built to serve the Copper River development and golf course. In 2010, the plant was capable of irrigating the golf course at about 750 af/yr and future total capacity will ultimately reach about 1,000 af/yr when the surrounding development builds out.
Key Opportunities
With strategic planning and investments, Fresno will have a dependable water supply system that, in turn, will create a competitive economic advantage. Below are some considerations that are noted with regards to the City’s efforts to create a viable water supply system, and many are supported by General Plan policies. • The geologic structure of the aquifer underneath Fresno is capable of recharging to levels sufficient to support the city during drought periods if the proper infrastructure were in place.
• Conversion to conjunctive use of surface and ground water could reduce energy usage for water delivery purposes by 18 to 20 percent. The reduction in power demand for pumping water would be a reduction in both the total demand and, more significantly, during peak usage periods (a reduction in both production and B3 Attach #1 of 3
DECEMBER 2014 7-33
Chapter 7: Resource Conservation and Resilience
grid capacity demand). This reduction could also reduce the city’s carbon footprint, potentially eliminating the equivalent of 670,000 gallons of gasoline or one year of electricity for 745 homes.
• Fresno has developed a Property Assessed Clean Energy (PACE) district that can finance water efficiency and energy efficiency upgrades. • Fresno has the water resources available to balance the groundwater aquifer and create storage for dry years. This can be accomplished by implementing the UWMP and the City of Fresno Metro Plan. These plans call for increased surface water treatment facility capacity, increased intentional recharge, a local groundwater banking program, use of recycle water for non-potable water demands and aggressive water conservation measures.
• Available recycled water and untreated surface water can be used by industrial facilities for cooling systems and other uses without having to meet the drinking water standards for the rest of the city. This water supply could be distributed directly to future industrial facilities or parks to encourage new businesses to relocate to Fresno.
• Changing the practice of lining canals with concrete, or piping them through residential neighborhood developments, will allow for additional natural recharge. • Outdoor water demand can be significantly reduced through climate-appropriate landscape design and more efficient irrigation technology, while indoor water demand can be reduced by efficient fixtures and appliances. • Citywide, infrastructure costs and water demand can be minimized through efficient land use. Compact and infill development generally requires significantly less pipe and lower water per capita demand equating to significant per capita cost savings as compared to low density developments.
• Where infill development substantially increases density, or increases the building height, due to both the age and size of the distribution system, the distribution system may require upgrading to avoid negative impacts from suction created by booster pumps, or to provide adequate flows and pressures for increased demands.
In addition to those discussed below, the Public Utilities and Services Element contains additional objectives and policies on water supply, water quality, and reclaimed water.
OBJECTIVE
RC-6 Ensure that Fresno has a reliable, long-range source of drinkable water.
B3 Attach #1 of 3
7-34 FRESNO GENERAL PLAN
IMPLEMENTING POLICIES
RC-6-a Regional Efforts. Support cooperative, multi-agency regional water resource planning efforts and activities on developing and implementing the Upper Kings Basin Integrated Regional Water Management Plan.
RC-6-b Water Plans. Adopt and implement ordinances, standards, and policies to achieve the intent of the City of Fresno Urban Water Management Plan, Fresno-Area Regional Groundwater Management Plan, and City of Fresno Metropolitan Water Resources Management Plan to ensure a dependable supply of water.
RC-6-c Land Use and Development Compliance. Ensure that land use and development projects adhere to the objective of the Fresno Metropolitan Water Resources Management Plan to provide sustainable and reliable water supplies to meet the demand of existing and future customers through 2025.
RC-6-d Recycled Water. Prepare, Adopt, and implement a City of Fresno Recycled Water Master Plan.
Commentary: This plan will expand the City’s wastewater recycling program by developing treatment, delivery, and users.
RC-6-e Protect Aquifer. Oppose urban development in unincorporated areas that are not served by a wastewater treatment/management system capable of preventing the buildup of compounds that would degrade the aquifer.
RC-6-f Regulate Sewage Disposal Facilities. Oppose development of new sewage disposal facilities either within the Planning Area or upgradient (north and east) of the Planning Area, unless the treatment facilities produce effluent that:
• Will not degrade the aquifer in the long term;
• Will not introduce contaminants into surface water that would negatively affect its potential economic use for drinking water; • Will not deleteriously affect downstream agricultural and urban uses; and
• Will not degrade sensitive riparian habitat.
B3 Attach #1 of 3
DECEMBER 2014 7-35
Chapter 7: Resource Conservation and Resilience
RC-6-g Protect Recharge Areas. Continue to protect areas of beneficial natural groundwater recharge by preventing uses that can contaminate soil or groundwater.
RC-6-h Conditions of Approval. Include in the Development Code standards for imposing conditions of approval for development projects to ensure long-term maintenance of adequate clean water resources.
Require findings that adequate water supply must exist prior to any discretionary project approval for residential and commercial development requiring annexation, as required by law.
RC-6-i Natural Recharge. Support removal of concrete from existing canals and change the practice of lining new and existing canals with concrete to allow for natural recharge.
OBJECTIVE
RC-7 Promote water conservation through standards, incentives and capital investments.
IMPLEMENTING POLICIES
RC-7-a Water Conservation Program Target. Maintain a comprehensive conservation program to help reduce per capita water usage in the city’s water service area to 243 gallons per capita per day (gpcd) by 2020 and 190 gpcd by 2035, by adopting conservation standards and implementing a program of incentives, design and operation standards, and user fees.
• Support programs that result in decreased water demand, such as landscaping standards that require drought-tolerant plants, rebates for water conserving devices and systems, turf
replacement, xeriscape landscape for new homes, irrigation controllers, commercial/industrial/institutional water conserving programs, prioritized leak detection program, complete water system audit, landscape water audit and budget program, and retrofit upon resale ordinance.
• Implement the U.S. Bureau of Reclamation Best Management Practices for water conservation as necessary to maintain the City’s surface water entitlements.
• Adopt and implement policies in the event that an artificial lake is proposed for development.
B3 Attach #1 of 3
7-36 FRESNO GENERAL PLAN
• Work cooperatively toward effective uniform water conservation measures that would apply throughout the Planning Area. • Expand efforts to educate the public about water supply issues and water conservation techniques.
RC-7-b Water Pricing and Metering. Develop a tiered water cost structure for both residential and commercial users that will properly price water based on its true cost; require all new development to be metered for water use; and charge all customers the true, full cost of their water supply, including costs of acquisition, initial treatment, conveyance, wastewater treatment, operations, maintenance, and remediation.
RC-7-c Best Practices for Conservation. Require all City facilities and all new private development to follow U.S. Bureau of Reclamation Best Management Practices for water conservation, as warranted and appropriate.
RC-7-d Update Standards for New Development. Continue to refine water saving and conservation standards for new development.
RC-7-e Retrofit City Facilities, and Consider Incentives Programs to Encourage Retrofitting of Other Existing Public and Private Residential and Non-Residential Facilities and Sites. Reduce water use in municipal buildings and City operations by developing a schedule and budget for the retrofit of existing municipal buildings with water conservation features, such as auto shut-off faucets and water saving irrigation systems. Prepare a comprehensive incentive program for other existing public and private residential and non-residential buildings and irrigation systems.
RC-7-f Implementation and Update Conservation Program. Continue to implement the City of Fresno Water Conservation Program, as may be updated, and periodically update restrictions on water uses, such as lawn and landscape watering and the filling of fountains and swimming pools, and penalties for violations. Evaluate the feasibility of a 2035 conservation target of 190 gpcd in the next comprehensive update of the City of Fresno Water Conservation Program.
RC-7-g Educate on State Requirements. Educate the residents and businesses of Fresno on the requirements of the California Water Conservation Act of 2009.
B3 Attach #1 of 3
DECEMBER 2014 7-37
Chapter 7: Resource Conservation and Resilience
RC-7-h Landscape Water Conservation Standards. Refine landscape water conservation standards that will apply to new development installed landscapes, building on the State Model Water Efficient Landscape Ordinance and other State regulations.
• Evaluate and apply, as appropriate, augmented xeriscape, “waterwise,” and “green gardening” practices to be implemented in public and private landscaping design and maintenance.
• Facilitate implementation of the State’s Water Efficient Landscape Ordinance by developing alternative compliance measures that are easy to understand and observe.
RC-7-i PACE Financing. Develop a residential Property Assessed Clean Energy (PACE) program, if it is determined to be a feasible option, to help finance water efficiency and energy efficiency upgrades for property owners.
Commentary: The program would be administered by private parties.
7.5 ENERGY RESOURCES
Pacific Gas and Electric (PG&E) provides almost all the energy for the city of Fresno.
The cost of energy services provided by PG&E is among the highest in the State.
Meanwhile, the city has abundant solar resources that could be expanded to reduce dependence on costly purchased electricity, but this will take time and financial resources to implement. Green building practices can be one of the main energy savings strategies encouraged, or required, as Fresno continues to develop. How the City can develop an energy-efficient infrastructure and reduce dependence on the energy grid is a prominent issue for the Plan.
The PG&E electrical grid was established decades ago. It’s been at least 30 years since a large transmission line has been built in the Central Valley. Demand for electricity in Fresno has increased 5.4 percent since 2005, placing an increased load on a finite capacity grid system. In April of 2014, PG&E disclosed plans to build a 70-mile transmission line meant to meet the Valley’s growing demand for electricity. The route for this power line is proposed to the west of Fresno SOI and is expected to go into operation by 2020.
The PG&E natural gas pipeline system was established decades ago and has had limited upgrade. In 1993, a massive expansion of the natural gas pipeline that runs from Idaho’s border with British Columbia to the county of Fresno was completed. Natural gas usage in Fresno has increased 9.2 percent since 2005, adding increased load on the system.
B3 Attach #1 of 3
7-38 FRESNO GENERAL PLAN
Newer development in Fresno uses energy at higher rates than older land uses, despite having newer, more efficient technology available. Also, the average single-family home consumes 40 percent more electricity than a multi-family home. According to PG&E, the highest amount of residential energy usage in Fresno appears to be in the newer, more affluent areas on the north, west, and southeast edges of Fresno.
Cost data from the recent retrofits done in Fresno shows the average investment necessary to achieve a 28 to 30 percent reduction in energy usage on a typical Fresno home is about $25,000. Taking the 76,000 homeowners that have a need and multiplying that by the average cost per retrofit, equates to $1.9 billion in economic activity potential in Fresno, if fully developed. When combined with the estimated $103 million in annual energy savings through a fully deployed and subscribed existing-home retrofit program, the economic potential of comprehensively reducing energy consumption in Fresno is staggering.
The City has been active since the mid-1990s in taking steps to invest and deploy renewable energy technology and improve the energy efficiency of City-owned facilities and the community at large. Notable actions include:
• Adopting the 2013 California Energy Code;
• Developing a comprehensive free residential energy efficiency survey program (by April 2014, the City has conducted a little over 2,500 residential energy efficiency surveys to Fresno homes);
• Implementing the Fresno Energy Watch Program as part of the Fresno Small Business Energy Makeover;
• Using renewable biogas to produce electric power at the Fresno-Clovis Regional Wastewater Reclamation Facility;
• Installing solar panels at City-owned facilities (As of April 2014, the City had deployed over 4.85 megawatts of solar power on City-owned facilities, including the largest single solar farm at any airport in the nation while a 2 megawatt solar array is planned for the Fresno-Clovis Regional Wastewater Reclamation Facility); and
• Requiring installation of solar energy systems in construction of any new Cityowned buildings containing at least 7,500 square feet, and a mandate to use a green building rating system standard for all new municipal buildings over 10,000 square feet.
PG&E also has energy efficiency programs operating in the Fresno area. Many of these programs are geared towards on low-income families, such as the Energy Partners B3 Attach #1 of 3
DECEMBER 2014 7-39
Chapter 7: Resource Conservation and Resilience
program and Middle Income Direct Install (MIDI) program. Other programs are focused on local businesses, such as the Direct Install program of the Fresno Energy Watch, the Air-Care Plus program, and numerous others.
The Fresno County Equal Opportunities Commission (FCEOC) administers the federally-funded weatherization programs focused on low-income homeowners in Fresno. These programs are designed to work in collaboration with utility funded programs operated by PG&E. There are several areas of overlap with these programs.
Private organizations, businesses, and individuals are also taking important steps locally.
Fresno has the third highest deployment level for solar power among cities in California with 1,056 sites that total 12 MW of power generation capacity. The level of investment in solar power in Fresno has seen a rapid increase since 2006 with over 532 systems installed in 2010 compared with only two systems installed in 2006. In July 2009, Environment California ranked Fresno third in the State for number of kilowatts its solar projects produce and fifth for projects on roofs, with Clovis close behind at seventh.
California State University, Fresno, developed sheltered parking canopies on campus, protecting nearly 700 vehicles from the elements and supporting 3,872 photovoltaic cell panels, which generate 20 percent of the campuses electricity demand. The $11.9 million project—the largest of its kind on a university campus—was completed in fall 2007.
Key Opportunities
Under this Plan, the City will promote household conservation of electricity, and strive to change current trends of higher energy use in newer development in order to conserve resources for future growth. Fresno also has enormous potential for solar power and will continue investing in solar energy for public facilities. Some of the key opportunities include:
ALTERNATIVE ENERGY
Current viable alternative energy sources for buildings and transportation in Fresno include solar photovoltaic electricity, solar thermal electricity, solar thermal heating, low-speed wind generated electricity, hydroelectricity, natural gas for vehicles, electricity for vehicles, and bio-methane generated electricity.
ENERGY STAR
To earn the ENERGY STAR, a home must meet strict guidelines for energy efficiency set by the U.S. Environmental Protection Agency (EPA), making them 20 to 30 percent B3 Attach #1 of 3
7-40 FRESNO GENERAL PLAN
more efficient than standard homes. Homes achieve this level of performance through a combination of energy-efficient improvements including insulation systems, high– performance windows, efficient heating and cooling equipment, and qualified lighting and appliances. In Fresno, 4,441 Energy Star qualified homes have been built, which is equivalent to eliminating 124 vehicles from the roadway, planting 205 acres of trees, or saving the environment from 1.5 million pounds of CO2.
OBJECTIVE
RC-8 Reduce the consumption of non-renewable energy resources by requiring and encouraging conservation measures and the use of alternative energy sources.
IMPLEMENTING POLICIES
RC-8-a Existing Standards and Programs. Continue existing beneficial energy conservation programs, including adhering to the California Energy Code in new construction and major renovations.
RC-8-b Energy Reduction Targets. Strive to reduce per capita residential electricity use to 1,800 kWh per year and non-residential electricity use to 2,700 kWh per year per capita by developing and
implementing incentives, design and operation standards, promoting alternative energy sources, and cost-effective savings.
Commentary: These targets represent 28 and 30 percent reductions respectively, from the 2010 rate of consumption.
RC-8-c Energy Conservation in New Development. Consider providing an incentive program for new buildings that exceed California Energy Code requirements by fifteen percent.
RC-8-d Incentives. Establish an incentive program for residential developers who commit to building all of their homes to ENERGY STAR performance guidelines.
Commentary: See also Policy RC-7-j on PACE financing for energy efficient retrofits.
RC-8-e Energy Use Disclosure. Promote compliance with State law mandating disclosure of a building’s energy data and rating of the previous year to prospective buyers and lessees of the entire building or lenders financing the entire building.
B3 Attach #1 of 3
DECEMBER 2014 7-41
Chapter 7: Resource Conservation and Resilience
RC-8-f City Heating and Cooling. Reduce energy use at City facilities by updating heating and cooling equipment and installing “smart lighting” where feasible and economically viable.
RC-8-g Revolving Energy Fund. Create a City Energy Fund which uses first year savings and rebates from completed City-owned energy efficiency projects to provide resources for additional energy projects. Dedicate this revolving fund to the sole use of energy efficiency projects that will pay back into the fund.
RC-8-h Solar Assistance. Identify and publicize information about financial mechanisms for private solar installations and provide over-thecounter permitting for solar installations meeting specified standards, which may include maximum size (in kV) of units that can be so approved.
RC-8-i Renewable Target. Adopt and implement a program to increase the use of renewable energy to meet a given percentage of the city’s peak electrical load within a given time frame.
RC-8-j Alternative Fuel Network. Support the development of a network of integrated charging and alternate fuel station for both public and private vehicles, and if feasible, open up municipal stations to the public as part of network development.
RC-8-k Energy Efficiency Education. Provide long-term and on-going education of homeowners and businesses as to the value of energy efficiency and the need to upgrade existing structures on the regular basis as technology improves and structures age.
7.6 FARMLAND
Central California is one of the world’s premier growing regions, with Fresno at its heart. The San Joaquin Valley is a mature agricultural area, with a well-defined pattern of farming activities. Much of the arable land is devoted to relatively stable crops, such as orchards, vineyards, and other commercial crops.
The conversion of farmland to urban uses is not the only threat to agriculture. When “leapfrog” development (development that is not contiguous to the existing urbanized area) occurs in the midst of agriculture uses, optimal crop production is precluded due to urban/agriculture conflicts. It is common for farmland to suffer disruptions and economic losses, while urban uses also suffer negative effects, such as farm-generated dust, noise and odors. Another problem exists with premature disinvestment of B3 Attach #1 of 3
7-42 FRESNO GENERAL PLAN
farmland where future growth is anticipated but development may not occur for several years. Farmland may be purchased or held for its possible urban development value, rather than continue in agriculture production.
Policies in the Plan will help preserve farmland by incentivizing new development within and adjacent to already-urbanized land, only extending public utilities to new development that adheres to the Plan, and not expanding the City’s SOI. Additional objectives and policies in this element address the broader planning issues of farmland preservation. The Healthy Communities Element also has more information on urban agriculture and expanding access to fresh, healthy foods.
Fresno is at the heart of one the premier agricultural areas in the world, and the General Plan policies will help preserve farmland.
OBJECTIVE
RC-9 Preserve agricultural land outside of the area planned for urbanization under this General Plan.
B3 Attach #1 of 3
DECEMBER 2014 7-43
Chapter 7: Resource Conservation and Resilience
IMPLEMENTING POLICIES
RC-9-a Regional Cooperation. Work to establish a cooperative research and planning program with the Counties of Fresno and Madera, City of Clovis, and other public agencies to conserve agricultural land resources.
RC-9-b Unincorporated Land in the Planning Area. Express opposition to residential and commercial development proposals in unincorporated areas within or adjacent to the Planning Area when these proposals would do any of the following:
• Make it difficult or infeasible to implement the General Plan; • Contribute to the premature conversion of agricultural, open space, or grazing lands; or
• Constitute a detriment to the management of resources and/or facilities important to the region (such as air quality, water quantity and quality, traffic circulation, and riparian habitat).
RC-9-c Farmland Preservation Program. In coordination with regional partners or independently, establish a Farmland Preservation Program.
When Prime Farmland, Unique Farmland, or Farmland of Statewide Importance is converted to urban uses outside City limits, this program would require that the developer of such a project mitigate the loss of such farmland consistent with the requirements of CEQA.
The Farmland Preservation Program shall provide several mitigation options that may include, but are not limited to the following:
Restrictive Covenants or Deeds, In Lieu Fees, Mitigation Banks, Fee Title Acquisition, Conservation Easements, Land Use Regulations, or any other mitigation method that is in compliance with the requirements of CEQA. The Farmland Preservation Program may be modeled after some of all of the programs described by the California Council of Land Trusts.
7.7 MINERAL RESOURCES
This section of the Resource Conservation and Resilience Element is intended to assure that cost-effective locally available mineral resources (such as rock, gravel, and sand for concrete aggregate) are protected for future use by the construction industry, and that extraction of these resources is done in a responsible manner that provides for beneficial end uses of surface mining sites, as required by the California’s Surface Mining and Reclamation Act.
B3 Attach #1 of 3
7-44 FRESNO GENERAL PLAN
Aggregate mineral resources are critical to supporting urban development, as all public and private projects utilize this material for roadway paving, structural elements (foundations), and hardscape (sidewalks, curbing, gutters). Because of the demands that will be made on these mineral resources due to Fresno’s projected growth, and because the City has land use authority over designated mineral resource areas, the Plan contains policies relating to mineral resource land and direction for managing mining and post-mining rehabilitation of the land.
Naturally occurring deposits of aggregate minerals must be of sufficient quality to meet engineering material specifications and must be sufficiently concentrated to justify the investment in an extraction and processing site. High-quality aggregate minerals are required for proper formulation of concrete to attain sufficient strength through the curing process. Existing and ancient riverbeds and streambeds are prime areas to look for such high-quality concrete aggregate materials, which consist of sand, gravel, and certain types of rock.
Lower-quality aggregate materials, used for base rock and asphaltic mixtures, also can be recovered from riparian corridors, but may be available in other areas as well. For instance, surface mining for base rock is common on the alluvial fans of the Coast Range along the western edge of the San Joaquin Valley.
Recycling (re-crushing) of concrete extends the available supply of mineral resources but cannot replace mining as a source of these materials. The primary reason for this is that virgin minerals are needed for formulation of concrete. Once minerals undergo the curing reaction once, they are only suited for lower-quality uses such as base rock or asphalt mixtures. Another reason that recycling cannot replace mining is that in a growing area such as Fresno, more new durable structures are created each year than are demolished.
Surface mining operations need to locate in areas where these minerals are sufficiently concentrated–where most of the material excavated consists of the desired materials, and where the mineral deposits can be easily accessed (i.e., there is relatively little “overburden” covering the deposits).
The California Surface Mining and Reclamation Act of 1975 mandates that a “classification/designation” analysis be done to provide information on the availability of mineral resource for construction and growth. The objective is to ensure that raw material will be available when needed—that this raw material will not become inaccessible for mining as the result of inappropriate land use decisions involving mineral resource areas.
B3 Attach #1 of 3
DECEMBER 2014 7-45
Chapter 7: Resource Conservation and Resilience
The California Department of Conservation Division of Mines and Geology periodically maps high-quality concrete aggregate deposits and compiles statistics on the amount of aggregate minerals available, and consumed, within designated ProductionConsumption (P-C) Regions of the State. The Department uses an “MRZ-2” designation for regionally significant deposits of high-grade sand and gravel aggregate (i.e., material suitable for making Portland Cement Concrete). Potential, but presently unproven, mineral resource areas are mapped as MRZ-3. Most of the area outside of the San Joaquin and Kings River Resource Areas has an MRZ-3 designation, and may contain economically recoverable mineral resources. However, those resources may not be of the high quality needed to formulate concrete. The City keeps these maps on file for use in development review and decision-making.
OBJECTIVE
RC-10 Conserve aggregate mineral resources within the Planning Area, as identified by the Division of Mines and Geology, and allow for responsible extraction to meet Fresno’s needs.
IMPLEMENTING POLICIES
RC-10-a Meet Future Needs. Adopt land use and resource protection regulations that support mining of the high-quality, close-to-market aggregate resources to meet the needs of the Fresno ProductionConsumption Region.
RC-10-b Zoning in San Joaquin Riverbottom. Maintain zoning consistent with on-going mineral extraction in the San Joaquin Riverbottom that also allows multiple open space uses in conformance with State law and the City’s Surface Mining Ordinance.
RC-10-c Processing-Mining Link. Accommodate only those mineral processing activities in the San Joaquin Riverbottom that are associated and colocated with mining operations when such industrial activities will sunset with the mining operation and do not stimulate unplanned growth or conversion of multi-use open space to urban uses.
RC-10-d Manage MRZ-2 Areas. Prohibit land uses and development projects that preclude mineral extraction in potential high-quality mineral resource areas designated MRZ-2 by the California Department of Conservation Division of Mines and Geology.
B3 Attach #1 of 3
7-46 FRESNO GENERAL PLAN
RC-10-e Existing Permits. Honor surface mining permits approved by the County of Fresno upon annexation, provided that the mining operation is in compliance with the terms of its current permit(s) and State law. Require new permit applications in the event of noncompliance, permit expiration, or permit revocation, and ensure compliance with law or regulations.
RC-10-f Cooperate on Uniform Criteria. Work with the County of Fresno, the County of Madera, and the City of Clovis to develop uniform criteria applicable to existing, new, and altered mineral extraction sites in the San Joaquin Riverbottom.
7.8 WASTE REDUCTION
The Public Utilities and Services Element has background information on solid waste collection and disposal and policies related to these systems. This section of the Resource Conservation and Resilience Element contains policies addressing waste reduction.
OBJECTIVE
RC-11 Strive to reduce the solid waste going to landfills to zero by 2035.
IMPLEMENTING POLICIES
RC-11-a Waste Reduction Strategies. Maintain current targets for recycling and re-use of all types of waste material in the city and enhance waste and wastewater management practices to reduce natural resource consumption, including the following measures:
• Continue to require recyclable material collection and storage areas in all residential development.
• Establish recycling collection and storage area standards for commercial and industrial facilities to size the recycling areas according to the anticipated types and amounts of recyclable material generated.
• Provide educational materials to residents on how and what to recycle and how to dispose of hazardous waste.
• Provide recycling canisters and collection in public areas where trash cans are also provided.
• Institute a program to evaluate major waste generators and identify recycling opportunities for their facilities and operations.
B3 Attach #1 of 3
DECEMBER 2014 7-47
Chapter 7: Resource Conservation and Resilience
• Continue to partner with the California Integrated Waste Management Board on waste diversion and recycling programs and the CalMax (California Materials Exchange) program. • Evaluate the feasibility of a residential, restaurant, and institutional food waste segregation and recycling program, to reduce the amount of organic material sent to landfill and minimize the emissions generated by decomposing organic material.
• Evaluate the feasibility of “carbon footprinting” for the City’s wastewater treatment facilities, biomass and composting operations, solid waste collection and recycling programs. • Expand yard waste collection to divert compostable waste from landfills.
• Study the feasibility and cost-benefit analysis of a municipal composting program to collect and compost food and yard waste, including institutional food and yard waste, using the resulting compost matter for City park and median maintenance.
RC-11-b Zero Waste Strategy. Create a strategic and operations plan for fulfilling the City Council resolution committing the City to a Zero Waste goal.
RC-11-c Industry Efforts. Support industry efforts to collect and recycle electronics, mattresses, carpets and any other recyclable products to help the region meet goals consistent with the statewide goal of at least 75 percent of all solid waste recycled by January 2020.
B3 Attach #1 of 3
7-48 FRESNO GENERAL PLAN
This page intentionally left blank.
B3 Attach #1 of 3
8 HISTORIC AND TORIC AND
CULTURAL RESOURCES
ELEMENT ELEMENT ELEMENT
The Historic and Cultural Resources Element of the
General Plan recognizes that an aesthetic environment and connections to culture and history are essential
characteristics of a community that values its quality of life. The purpose of the Historic and Cultural Resources Element is to provide policy guidance to protect, preserve, and enhance the city’s cultural and historic resources.
B3 Attach #1 of 3
8-2 FRESNO GENERAL PLAN
8.1 CONTEXT
Cultural resources are defined as the collective evidence of the past activities and accomplishments of people. Buildings, objects, features, sites, and structures with scientific, historic, and cultural value are all examples of cultural resources. Cultural resources are finite and non-renewable resources that once destroyed cannot be returned to their original state.
Archaeological resources are places where human activity has measurably altered the earth or left deposits of physical remains. Archaeological resources may be either prehistoric (before the introduction of writing in a particular area) or historic (after the introduction of writing). The majority of such places in this region are associated with either Native American or Euroamerican occupation of the area.
Historic resources are those buildings, structures, objects or sites that are generally 50 years of age and which have significance due to their association with key events, individuals or ethnic groups, or which possess high artistic values. A nineteenth century railroad station, a mid-century modern office building, an early vernacular farmhouse or an ethnic neighborhood, all have the potential to be historic resources.
Contemporary Native American resources, also called ethnographic resources, can include archaeological resources, rock art, and the prominent topographical areas, features, habitats, plants, animals, and minerals that contemporary Native Americans value and consider essential for the preservation of their traditional values.
Relationship to General Plan Goals
Historic preservation is important in economic revitalization and heritage tourism. The adaptive reuse of older buildings is also “green” and contributes to the City’s commitment to become fully sustainable. The Historic and Cultural Resources Element’s historic resource objectives and policies provide a philosophical context and road map for the City’s historic preservation program and are implemented through the City’s Historic Preservation Ordinance.
B3 Attach #1 of 3
DECEMBER 2014 8-3
Chapter 8: Historic and Cultural Resources Element
This Element provides objectives and policies that support the following General Plan goals:
6. Protect, preserve, and enhance natural, historic, and cultural resources.
Emphasize the continued protection of important natural, historic and cultural resources in the future development of Fresno. This includes both designated historic structures and neighborhoods, but also “urban artifacts” and neighborhoods that create the character of Fresno.
15. Improve Fresno's visual image and enhance its form and function through urban design strategies and effective maintenance.
17. Recognize, respect, and plan for Fresno's cultural, social, and ethnic diversity, and foster an informed and engaged citizenry.
Emphasize shared community values and genuine engagement with and across different neighborhoods, communities, institutions, businesses and sectors to solve difficult problems and achieve shared goals for the success of Fresno and all its residents.
B3 Attach #1 of 3
8-4 FRESNO GENERAL PLAN
Historic Context
The Yokuts were the first residents of the Fresno area, with small tribes occupying the floodplains of the Big Dry Creek and the Little Dry Creek. There were no missions in the San Joaquin Valley but there were small Mexican era settlements such as Pueblo de las Junta, located at the confluence of the San Joaquin River and the Fresno Slough. The Spanish and Mexican influence is indicated through place names such as “Fresno,” which means “ash tree” and which was first applied to the Fresno River. Following the Gold Rush of 1849, miners were drawn to the southern gold fields, and cattle ranchers and dryland farmers moved into the area.
In 1870, the Central Pacific Railroad began its diagonal push down the San Joaquin Valley. The railroad reached what is now Fresno in late April 1872. The location was uninviting at best, with barren sand plains in all directions. The nearest substantial supply of water was the San Joaquin River, 10 miles to the north. In 1872, the Contract and Finance Company, a subsidiary of the railroad, laid out the town in a rigid “gridiron” plan. The town grew slowly but in 1874 wrestled the county seat away from the former mining town of Millerton.
In 1875, the first of many agricultural colonies was developed in Fresno, drawing farming families from around the United States and from Europe. These colonies were constructed with miles of tree-lined boulevards and with water delivered to the individual farms through a lacework of canals, laterals and irrigation ditches.
Fresno was incorporated as a city in 1885, and with incorporation came improvements to the infrastructure. The 1887 boom in agriculture and land values brought prosperity to the community. In 1889 alone, buildings with an estimated value of one million dollars were erected along Mariposa Street in the heart of Downtown. By 1890, the population of Fresno was over 10,000, and land outside the original town site was subdivided into streets and lots. The depression of 1893 had little effect on the city, probably due to its agricultural base.
B3 Attach #1 of 3
DECEMBER 2014 8-5
Chapter 8: Historic and Cultural Resources Element
Fresno Panoramic (c1886)
Photo: Courtesy of Fresno Historical Society Archives
The first horse drawn streetcars were introduced in 1892, and this greater mobility allowed for the construction of a variety of streetcar suburbs. Although the original “parent grid” of Fresno was parallel to the diagonal rail corridor these new subdivisions were surveyed to line up with the agricultural sections. As a consequence odd-shaped triangular lots still exist where the new grids meet the old.
By 1900, Fresno was the market center of what is now the richest farming region in the United States. Emigrants from Scandinavia, China, Japan, Armenia, Russia (Volga Germans), Mexico, and most recently Southeast Asia have contributed to the character and cultural heritage of the area.
Beginning in the early twentieth century, the Downtown was completely transformed, as elegant Victorian-style blocks and hotels were demolished and smaller buildings were eventually refaced with a modern storefront. What emerged was a more rational Classic Revival city, influenced by the latest trends in architectural design emanating from American cities such as New York, Chicago, and San Francisco, as well as international cities such as Paris.
Fresno continued to grow following World War I, and in 1930, the city had a population of 52,513. While the Great Depression brought hardship to the city, it also resulted in the construction of a series of major civic buildings in the city through Franklin Roosevelt’s “alphabet soup” of agencies. For example, the complex of buildings at Fresno’s Chandler Airfield/Fresno Municipal Airport was constructed in 1936-7 with funding from the Works Progress Administration.
During and after World War II, there was a severe housing shortage as thousands of homeless transients arrived in the city, looking for agricultural work. In addition, returning servicemen and their families also needed housing. The first major post-war B3 Attach #1 of 3
8-6 FRESNO GENERAL PLAN
subdivision completed was Mayfair, which included the first suburban shopping center.
Manchester Center followed in 1955, with Fig Garden Village in 1956. Six blocks of the Downtown were converted to a pedestrian mall in 1964, with a design by landscape architect Garrett Eckbo. However, the suburban flight of the 1960s and the construction of the Fashion Fair shopping complex in 1969 helped lead to the decline of the Fulton Mall and the Downtown area.
Today, Fresno is home to a diverse population, which includes descendants from the city’s earliest pioneers and recently arrived immigrants. For many residents, the city still functions as a small town, despite its large size. Residents value the agricultural green belt that surrounds the city, with its geometric fields of grapevines and row crops; the Classic Revival high rise buildings along the Fulton Mall; the city’s ethnic diversity; and the opportunities available for improving one’s quality of life.
Fresno’s Historic and Cultural Resources
HISTORIC AND ARCHITECTURALLY SIGNIFICANT BUILDINGS
As with many California towns of the nineteenth century, Fresno has a wealth of residential architectural styles. Due to fires and redevelopment in Downtown, the earliest building stock is gone, with a few notable exceptions. Examples of the late Queen Anne style survive, while the “Victorian” city has largely disappeared. Other residential building styles that are well represented in Fresno include Craftsman bungalows, Neoclassical cottages, American Foursquare, and Period Revival buildings, such as Tudors and Spanish Eclectic.
B3 Attach #1 of 3
DECEMBER 2014 8-7
Chapter 8: Historic and Cultural Resources Element
Listed on the National Register of Historic Places, the Fresno Memorial Auditorium (HP# 058) was built in 1935 in Downtown Fresno with partial funding from the PWA. For many years during the twentieth century, it was Fresno’s most significant cultural facility.
Photo: Karana Hattersley-Drayton
In addition, Fresno has a vernacular tradition of building in adobe and hardpan, including mid-century modern garden office complexes constructed of stabilized adobe brick. Additional important local property types are the extant summer kitchens (backhaus) constructed by the Volga Germans, the “bungalow courts” scattered through the city’s older neighborhoods and tankhouses tucked behind or adjacent to a farmhouse. The city’s rail, agricultural, and ethnic history is imprinted on the landscape and in the resources, both above and below ground, which link residents to their past and provide a design aesthetic for new construction.
HISTORIC PRESERVATION PROGRAMS
In 1979, the City adopted a Historic Preservation Ordinance, which was amended and updated in 1999, 2009, and 2012. The Ordinance established both a citizens’ Historic Preservation Commission and a Local Register of Historic Resources, modeled on the U.S. Secretary of the Interior’s National Register of Historic Places. The Local Register includes three separate landmark programs: individual designation on the Local Register of Historic Resources, inclusion within a Local Register District, and inclusion in the Heritage Property program. In 2004, Fresno was the first city in California to be designated a “Preserve America Community” by former First Lady Laura Bush. This program recognizes communities that protect and celebrate their heritage, use their B3 Attach #1 of 3
8-8 FRESNO GENERAL PLAN
historic assets for economic development and revitalization, and encourage people to experience and appreciate local historic resources through education and heritage tourism programs.
Garden office, 5151 N. Palm Ave. (Stevens and Zellmer)
Photo: Karana Hattersley-Drayton
The City maintains a Local Register of Historic Resources that includes buildings, structures, objects, sites and districts that have sufficient integrity and are significant in Fresno’s history. As of January 2014, there were 271 individual properties on the Local Register (over the years several resources have been removed from listing). Local Register properties include the Fresno Buddhist Temple (1920), the Fresno Memorial Auditorium (1935) and the Helm Building (1914).
Twenty-eight buildings and sites on the Local Register are also listed on the National Register of Historic Places. These “crown jewels” of the community include local landmarks such as the Old Fresno Water Tower (1894), the Thomas R. Meux Home (1889) and the streamline modern Tower Theatre (1939). Fourteen properties are also listed as Heritage Properties, such as the 1962 Calwa Rocket.
In addition to individual listings, Fresno has three designated historic districts: the Porter Tract (near Fresno City College), Wilson Island (near the Tower District), and B3 Attach #1 of 3
DECEMBER 2014 8-9
Chapter 8: Historic and Cultural Resources Element
the Chandler Airfield/Fresno Municipal Airport. At least twelve other districts have been recommended through surveys, community or Specific Plans.
NATIVE AMERICAN HERITAGE SITES
There have been sixteen Native American archeological sites recorded within the Planning Area by the Southern San Joaquin Valley Information Center (SSJVIC), a depository for information on cultural resources. According to the SSJVIC the probability of finding subsurface cultural resources is considered low to moderate in most areas, with the exception of the waterways. Current and past waterways and their surrounding regions are considered especially sensitive for cultural resources, as indigenous people utilized these areas as permanent villages, temporary camps, and task specific sites.
As part of the General Plan update process, the Native American Heritage Commission (NAHC) conducted a record search of the sacred lands file. The NAHC response listed 11 local Native American tribes that may have historic ties to the Planning Area, and letters of inquiry were sent, along with follow up phone calls, to the 11 tribal representatives; however, no responses were received. Nonetheless, the NAHC has characterized the City of Fresno as being “very sensitive” for potential impacts to Native American sacred sites and prehistoric deposits.
8.2 CITYWIDE HISTORIC AND CULTURAL
PRESERVATION
The following policies are intended to maintain and enhance a citywide program for historic and cultural preservation, consistent with the State and Federal Certified Local Government program and State laws and regulations related to historic and cultural resources.
Old Fresno Water Tower (1894) HP #001/National Register Photo: Khaled Alkotob
Detail, Tower Theater (1939) HP #190/National Register
Photo: Karana Hattersley-Drayton
B3 Attach #1 of 3
8-10 FRESNO GENERAL PLAN
Nothing in the General Plan is intended to identify or designate any significant resources, potential significant resources, significant districts or potential significant districts. Identification and designation of resources and districts shall be done consistent with the City’s Historic Preservation Ordinance and State and federal law.
Citywide Program
OBJECTIVE
HCR-1 Maintain a comprehensive, citywide preservation program to identify, protect and assist in the preservation of Fresno’s historic and cultural resources.
IMPLEMENTING POLICIES
HCR-1-a Certified Local Government. Maintain the City’s status as a Certified Certified Local Government. ified Local Government.
Local Government (CLG), and use CLG practices as the key components of the City’s preservation program.
HCR-1-b Preservation Office, Commission and Program. Maintain the Preservation Office, Commission and Program. ervation Office, Commission and Program.
Preservation Office, Historic Preservation Commission, and preservation program to administer the City’s preservation functions and programs.
HCR-1-c Historic Preservation Ordinance. Historic Preservation Ordinance oric Preservation Ordinance. Maintain the provisions of the City’s Historic Preservation Ordinance, as may be amended, and enforce the provisions as appropriate.
Identification and Preservation
OBJECTIVE
HCR-2 Identify and preserve Fresno’s historic and cultural resources that reflect important cultural, social, economic, and architectural features so that residents will have a foundation upon which to measure and direct physical change.
IMPLEMENTING POLICIES
HCR-2-a Identification and Designation of Historic Properties. Work to identify Identification and Designation of Historic Properties. entification and Designation of Historic Properties. and evaluate potential historic resources and districts and prepare nomination forms for Fresno’s Local Register of Historic Resources and California and National registries, as appropriate.
B3 Attach #1 of 3
DECEMBER 2014 8-11
Chapter 8: Historic and Cultural Resources Element
Commentary: Historic resources include buildings, structures, objects, Commentary:Commentary: Commentary:
and sites, as well as cultural and historic landscapes and traditional cultural properties (as defined by State and federal law). Examples of the latter categories include farm complexes, canal systems, signage, gardens, landscaped boulevards, and infrastructure, such as lighting and street furniture. As appropriate, nominations may be forwarded to the State Historic Resources Commission for consideration for the California Register of Historical Resources and/or the National Register of Historic Places. The Historic Preservation Commission is anticipated to play a key role in this process, including the evaluation of historic resources and districts.
HCR-2-b Historic Surveys. Historic Surveys oric Surveys. Prepare historic surveys according to California Office of Historic Preservation protocols and City priorities as funding is available.
Commentary: Early actions would be to survey historic resources Commentary:Commentary: Commentary:
located within the Bus Rapid Transit corridors slated for development and intensification and within the South Industrial District just south of Downtown. The results of these surveys would be posted on the City’s website for use by the public and others interested in the City’s historic resources.
HCR-2-c Project ProjectDevelopment DevelopmentDevelopment Development. Prior to project approval, continue to require a project site and its Area of Potential Effects (APE), without benefit of a prior historic survey, to be evaluated and reviewed for the potential for historic and/or cultural resources by a professional who meets the Secretary of Interior’s Qualifications. Survey costs shall be the responsibility of the project developer. Council may, but is not required, to adopt an ordinance to implement this policy.
HCR-2-d Native American Sites. Work with local Native American tribes to Native American Sites. ve American Sites. protect recorded and unrecorded cultural and sacred sites, as required by State law, and educate developers and the community-at-large about the connections between Native American history and the environmental features that characterize the local landscape.
Commentary:Commentary: Commentary: Development on archaeologically sensitive sites requires on-site monitoring by appropriate Native American consultant(s) and a qualified archaeologist for all grading, excavation, and site preparation activities that involve earth-moving operations.
HCR-2-e Alternate Public Improvement Standards. Develop and adopt Alternate Public Improvement Standards rnate Public Improvement Standards Alternate Public Improvement Standards for historic landscapes to B3 Attach #1 of 3
8-12 FRESNO GENERAL PLAN
ensure that new infrastructure is compatible with the landscape; meets the needs of diverse users, including motorists, cyclists, and pedestrians; and provides for proper traffic safety and drainage.
Commentary:Commentary: Commentary: City of Fresno Historic Preservation Commissioners and staff will work collaboratively to develop Alternate Public Improvement Standards for historic landscapes, such as Kearney Boulevard.
HCR-2-f Archaeological Resources. Archaeological Resources aeological Resources. Consider State Office of Historic Preservation guidelines when establishing CEQA mitigation measures for archaeological resources.
HCR-2-g Demolition Review. Review all demolition permits to determine if the Demolition Review. lition Review. resource scheduled for demolition is potentially eligible for listing on the Local Register of Historic Resources. Consistent with the Historic Preservation Ordinance, refer potentially eligible resources to the Historic Preservation Commission and as appropriate to the City Council.
HCR-2-h Minimum Maintenance Standards. Minimum Maintenance Standards mum Maintenance Standards. Continue to support enforcement of the minimum maintenance provisions of the Historic Preservation Ordinance, as may be amended, and enforce the provisions as appropriate.
Commentary:Commentary: Commentary: The City of Fresno’s Preservation staff and Commission will coordinate with the Code Enforcement division on enforcement.
HCR-2-i Preservation Mitigation Fund. Consider creating a preservation Preservation Mitigation Fund. ervation Mitigation Fund. mitigation fund to help support efforts to preserve and maintain historic and cultural resources.
Commentary: Preservation mitigation funds are intended to be used Commentary:Commentary: Commentary:
for the restoration of historic properties or cultural heritage programming, and may be generated through a plan or program or other qualifying mechanism to allow for payment of fees to reduce impacts from loss of historic resources.
HCR-2-j Window Replacement. Window Replacement ow Replacement. City staff will evaluate potential opportunities for identification of window replacements to ensure historic integrity is maintained while encouraging sustainability. In addition, city staff will evaluate window replacements in federally funded housing projects on a project-by-project basis with consideration for health, safety, historic values, sustainability, and financial feasibility.
B3 Attach #1 of 3
DECEMBER 2014 8-13
Chapter 8: Historic and Cultural Resources Element
HCR-2-k City-Owned Resources wned Resources wned Resources. Maintain all City-owned historic and cultural resources in a manner that is consistent with the U.S. Secretary of the Interior’s Standards for the Treatment of Historic Properties, as appropriate.
HCR-2-l City Historic Preservation Team. Establish an inter-departmental City Historic Preservation Team. Historic Preservation Team.
Historic Preservation team to coordinate on matters of importance to history and preservation.
HCR-2-m Local Register Listing. Recommend that property owners, who receive Local Register Listing. l Register Listing. funds from the City of Fresno for rehabilitation of a property, consent to listing it on the Local Register of Historic Resources if the property meets the criteria for age, significance, and integrity. Publicly funded rehabilitation properties which may meet Local Register criteria will be presented to the City’s Historic Preservation Commission for review.
HCR-2-n Property Database and Informational Property Database and erty Database and InformationalInformational Informational System. Identify all historic resources within the city designated on the Local, State, or National register, and potential significant resources (building, structure, object or site) in existence for at least 45 years, and provide this information on the City’s website.
Commentary: This information will help notify City staff, applicants Commentary:Commentary: Commentary:
and the public regarding historic resources and potential historic resources, allowing it to be incorporated into development and other projects at an early stage. Due to the passage of time and the increasing number of sites involved, it is anticipated a significant number of additional potential historic resources may be continually added to the website, and the City will strive to keep the website up to date. Inclusion of potential historic resources on the website does not make them historic resources until formally designated as required by law, and the fact that a potential historic resource is listed or not identified on the website does not preclude the City from subsequently determining it may or may not be a historical resource for the purposes of CEQA.
8.3 THE NEW CITY BEAUTIFUL
A great city is a mix of older buildings and new buildings, where the past is respected, but change is also considered vital for a healthy community. Historic preservation can play an important role in economic revitalization and heritage tourism. The adaptive reuse of older buildings is prudent and contributes to the City’s commitment to B3 Attach #1 of 3
8-14 FRESNO GENERAL PLAN
resiliency. In the Fresno Green program, described in the Context section 7.1 of Chapter 7, “New City Beautiful” policies recognize the importance of these philosophical connections by referencing the urban planning principles of the late nineteenth and early twentieth centuries, which linked art, architecture, urban planning, and health.
Fresno’s history is rooted in agriculture, which still forms the basis for much of its heritage, industry, and wealth. The preservation of cultural and historic landscapes in general—and the conservation of agricultural lands in particular—is a critical component of protecting and promoting Fresno’s identity. A major component of this General Plan is the preservation of nearby agricultural landscapes through the promotion of infill and compact development and the decision not to pursue expansion of the City’s Sphere of Influence. The Urban Form, Land Use, and Design Element contains objectives and policies regarding the preservation of agriculture; objectives and policies presented below expand on the specific idea of supporting a New City Beautiful concept.
OBJECTIVE
HCR-3 Promote a “New City Beautiful” ethos by linking historic preservation, public art, and planning principles for Complete Neighborhoods with green building and technology.
IMPLEMENTING POLICIES
HCR-3-a Adaptive Reuse. Adaptive Reuse tive Reuse. Promote the adaptive reuse and integration of older buildings into new projects as part of the City’s commitment to nurturing a sustainable Fresno.
HCR-3-b Public Art. Collaborate with the arts community to promote the Public Art. ic Art. Public Art. integration of public art into historic buildings and established neighborhoods. Link arts activities (such as Art Hop) with preservation activities.
HCR-3-c Context Sensitive Design. Work with architects, developers, business Context Sensitive Design. ext Sensitive Design. owners, local residents and the historic preservation community to ensure that infill development is context-sensitive in its design, massing, setbacks, color, and architectural detailing.
Outreach and Education
OBJECTIVE
HCR-4 Foster an appreciation of Fresno’s history and cultural resources.
B3 Attach #1 of 3
DECEMBER 2014 8-15
Chapter 8: Historic and Cultural Resources Element
IMPLEMENTING POLICIES
HCR-4-a Inter-Agency Collaboration. gency Collaboration. gency Collaboration. Foster cooperation with public agencies and non-profit groups to provide activities and educational opportunities that celebrate and promote Fresno’s history and heritage.
HCR-4-b Heritage Tourism and Public Education. Promote heritage tourism Heritage Tourism and Public Education. tage Tourism and Public Education. and the public’s involvement in preservation through conferences, walking tours, publications, special events, and involvement with the local media.
HCR-4-c Training and Consultation. Training and Consultation. ning and Consultation.Provide training, consultation, and support in collaboration with Historic Preservation Commissioners to community members regarding Fresno’s history, use of the U.S.
Secretary of the Interior’s Standards, and the California Historical Building Code, as time and resources allow.
HCR-4-d Public Archives. Public Archives ic Archives.Maintain public archives that include information on all designated historic properties, as well as historic surveys, preservation bulletins, and general local history reference materials.
Post survey reports, Historic Preservation Commission minutes and agendas, and other information of public interest on the historic preservation page of the City’s website.
HCR-4-e Preservation Awards. Preservation Awards ervation Awards. Continue to recognize the best work in preservation and neighborhood revitalization as may be appropriate through programs such as the biennial Mayoral Preservation Awards program.
HCR-4-f Economic Incentives. Economic Incentives omic Incentives. Investigate the potential for developing a Mills Act program and possible sources of funding for the Historic Rehabilitation Financing Program.
B3 Attach #1 of 3
8-16 FRESNO GENERAL PLAN
The H.H. Brix Mansion (1919) HP #089
Photo: Karana Hattersley-Drayton
B3 Attach #1 of 3
9 NOISE AND
SAFETY
The purpose of the Noise and Safety Element is to
identify the natural and man-made public health
and safety hazards that exist within the Planning
Area, and to establish preventative and responsive
objectives and policies and programs to mitigate
their potential impacts. Specifically included are
strategies to mitigate noise impacts from new
development and direction for noise mitigation.
Hazards that are addressed include geologic and
seismic hazards, flooding, wildland fires, hazardous
materials, and airport safety.
B3 Attach #1 of 3
9-2 FRESNO GENERAL PLAN
9.1 CONTEXT
The noise section of this element identifies existing noise sources within the Planning Area and establishes policies, standards and programs to mitigate potential impacts through design and performance measures. This element contains policies that guide the location of industrial land uses and transportation facilities, since they are common sources of excessive noise levels, as well as the location of noise sensitive uses, such as residences, schools, churches, and hospitals.
This element also addresses safety issues, including seismic and geologic hazards, flood hazards, wildfire hazards, hazardous materials, airport safety, emergency response, and safety services. It includes policies on natural hazards mitigation planning, which respond to the Federal Disaster Mitigation Act of 2000 and the Federal Emergency Management Agency’s implementing regulations and support the County’s Multi-Jurisdictional Local Hazard Mitigation Plan, which the City has adopted.
Relationship to General Plan Goals
The objectives and policies of this element support the following General Plan goals:
9. Promote a city of healthy communities and improve quality of life in established neighborhoods.
Emphasize supporting established neighborhoods in Fresno with safe, well maintained, and accessible streets, public utilities, education and job training, proximity to jobs, retail services, health care, affordable housing, youth development opportunities, open space and parks, transportation options, and opportunities for home grown businesses.
16. Protect and improve public health and safety.
9.2 NOISE
California Government Code Section 65302(f) requires that general plans contain a Noise Element to identify and quantify potential noise problems and to provide effective policies for noise control and mitigation.
B3 Attach #1 of 3
DECEMBER 2014 9-3
Chapter 9: Noise and Safety
Noise Characteristics and Measurement
Noise is commonly defined as undesirable or unwanted sound. Noises vary widely in their scope, source, and volume, ranging from individual occurrences such as leaf blowers, to the intermittent disturbances of overhead aircraft, to the fairly constant noise generated by traffic on freeways. Three aspects of community noise are used in assessing the noise environment:
• Level (e.g., magnitude or loudness). Sound levels are measured and expressed in decibels (dB) with 10 dB roughly equal to the threshold of hearing. Figure NS-1 shows the decibel levels associated with different common sounds. Transient noise events may be described by their maximum A-weighted noise level (dBA).
• Frequency composition or spectrum. Frequency is a measure of the pressure fluctuations per second, measured in units of hertz (Hz). The characterization of sound level magnitude with respect to frequency is the sound spectrum, often described in octave bands, which divide the audible human frequency range (e.g., from 20 to 20,000 Hz) into ten segments.
• Variation in sound level with time, measured as noise exposure. Most community noise is produced by many noise sources that change gradually throughout the day and produce a relatively steady background noise having no identifiable source. People may become habituated to moderate continuous transportation-generated noise, such as that generated by roadways. Identifiable events of brief duration, such as aircraft flyovers and the passage of freight trains, are more noticeable because they cause the community noise level to vary episodically instead of gradually. A single number called the equivalent sound level or “Leq” describes the average noise exposure level over a period of time. Analysis of noise for planning purposes uses descriptors which emphasize the effect of night time noise, because during that time noise is perceived as more disruptive because background noise levels are generally lower than in the daytime, making outside noise intrusions more noticeable.
These weighted noise descriptors include:
• Community Noise Equivalent Level (CNEL) which reflects a 24-hour average of ambient sound but adds a five percent weighting factor for both evening (7 to 10 p.m.) and night-time (10 p.m. to 7 a.m.) sound; and
B3 Attach #1 of 3
9-4 FRESNO GENERAL PLAN
• Day-Night Average Level ( Ldn) which reflects a 24-hour average of ambient sound but adds a 10 percent weighting factor for sound occurring during night-time hours (10 p.m. to 7 a.m.).
Both CNEL and Ldn reflect noise exposure over an average day with weighting to reflect the increased sensitivity to noise during the evening and night. The two descriptors are roughly equivalent. The CNEL descriptor is used in relation to major continuous noise sources, such as aircraft or traffic, and is the reference level for the Noise Element under State planning law. The general practice is to identify noise contours around transportation facilities such as airports, rail lines, highways, and major streets, and to identify noise levels at property lines from stationary sources such as industrial equipment.
Knowledge of the following relationships is helpful in understanding how changes in noise and noise exposure are perceived:
• Except under special conditions, a change in sound level of 1 dB cannot be perceived;
• A 3 dB change is considered a just-noticeable difference; • A 5 dB change is required before any noticeable change in community response would be expected. A 5 dB increase is often considered a significant impact; and
• A 10 dB increase is subjectively heard as an approximate doubling in loudness and almost always causes an adverse community response.
Forty-five dBA is usually set as the limit on indoor noise detectable from outdoor sound sources. Sixty dBA is considered to be the sound level of normal conversation and levels within this range are often used as a limit on outdoor ambient noise levels for suburban residential areas. Outdoor ambient noise levels are permitted to be higher for urban areas and commercial sites, and higher still for industrial areas.
Noise Generation in Fresno
In the urban environment, noise generators, such as transportation corridors and industrial uses, occur in close proximity to sensitive noise receivers, such as residential uses. Some land uses potentially constitute both a noise generator and a simultaneous noise receiver, e.g., recreational sites. Fresno has special noise considerations because it has grown up around two major rail corridors, and many freight trains run through the heart of the city daily. Fresno contains three airports and has four State highways that traverse it, as well as major streets at half-mile and one-mile grid intervals, carrying large volumes of passenger vehicle B3 Attach #1 of 3
DECEMBER 2014 9-5
Chapter 9: Noise and Safety
and truck traffic. Industrial and public facilities in and around the city also generate noise from processing materials and from the operation of equipment such as large pumps and backup generators. Residential and commercial uses also contribute noise from smaller equipment, such as swimming pool pumps, air conditioning units, and compressors for refrigeration.
Industrial and public facilities in and around Fresno can generate noise, and the City requires enclosure, muffling, and/or extra setbacks for stationary noise sources so that nearby properties are not exposed to excessive noise levels.
Longstanding City policy for stationary sources has been to require enclosure, muffling, and/or greater setbacks so that adjacent properties are not exposed to excessive noise levels. Nuisance noise abatement has been accomplished through the City’s Noise Ordinance. Noise from transportation facilities has been controlled primarily by State and federal standards but also by distancing sensitive uses from these facilities, and by use of sound-proofing construction measures, such as masonry walls and sealed buildings.
Title 24 of the California Building Code sets out energy conservation requirements, which have also greatly helped mitigate indoor noise levels by requiring dual-pane windows and additional insulation in buildings.
Federal Aviation Administration regulations for airports have supported planning and zoning designations, which have kept sensitive uses away from the noise attendant upon flight paths. Each of the three airports in B3 Attach #1 of 3
9-6 FRESNO GENERAL PLAN
Fresno has its own noise policies and land use compatibility criteria, all of which are incorporated into this Plan.
B3 Attach #1 of 3
Figure NS-1 :Typical Sound Levels
Outdoor Sound Levels
Threshold of Pain
Military Jet Takeoff with Afterburner at 50 feet
�
Ambulance Siren at 10 feet
Pile Driver at 50 feet
Gas Lawnmower at 3 feet
Sports Boat at 100 feet
Diesel Truck at 50 feet
Concrete Mixer at 50 feet
Leaf Blower at 50 feet
Commercial I Urban Area, Daytime
Urban Expressway at 300 feet
Suburban Area, Daytime
Quiet Urban Area, Nighttime
Quiet Suburban Area, Nighttime
Quiet Rural Area, Nighttime
Leaves Rustling
Quiet Wilderness Area, No Wind
Threshold of Human Hearing
: I
I I
Indoor Sound Levels
Threshold of Pain
Rock Band Cance
Night Club with Live Music
Food Blender at 3 feet q :;;;>. /)4 Noisy Restaurant / ;/ Garbage Disposal at 3 feet d},yj/
Vaccuum Cleaner at 10 feet '�.'PNormal Conversation at 3 feet Active Office Environment
Quiet Office Environment
Dishwasher, Next Room
Library
Quiet Bedroom, Nightime
Concert Hall, Background
Recording Studio
Threshold of Human Hearing
Source: URS, 2010.
B3 Attach #1 of 3
9-8 FRESNO GENERAL PLAN
Existing Noise Levels
The existing noise conditions in the City were measured at nine locations from May 30 to June 1, 2012. Noise monitoring sites were selected to be representative of typical residential, commercial, and industrial sites within the Planning Area, as well as arterial roadways, elevated and below-grade freeways, and railroad crossings with and without train horn soundings. At each of the nine long-term 24-hour noise monitoring sites, day-night statistical noise level trends were recorded to develop Ldn values.
Descriptions of each location and the measured noise levels are listed in Table 9-1.
TABLE 9-1: MEASURED EXISTING NOISE LEVELS1
Noise Level
(dBA Ldn)
Railroad crossing at Shields Ave. 84
Along Railroad near W. Barstow Ave. 74
SR 41 between W. Barstow & W. Shaw Ave. 76
SR 180 near N. Peach Ave. 76
E. Shaw Ave. near N. Cedar Ave. 72
N. Blackstone Ave. near E. Ashlan Ave. 70
S. Elm Ave. near E. Jensen Ave. 68
N. Valentine Ave. between W. Ashlan & W. Holland Ave. 67 S .Fruit Ave. north of Church Ave. 65
1. Values provided have been normalized to the reference distance of 100 feet.
Existing noise levels in the city are principally generated by transportation noise sources (refer to Figure NS-2: Existing Noise Contours). Vehicular traffic noise is the dominant source in most areas, but aircraft and rail activity are also significant sources of environmental noise in the local areas surrounding these operations. In several locations, industrial noise was clearly audible. However, overall average daily noise levels at existing nearby noise-sensitive receptors (e.g., residential areas) typically consist of traffic noise primarily and industrial noise secondarily. New noisesensitive developments in close proximity to industrial land uses could be exposed to greater industrial noise levels.
Traffic Noise
The level of highway traffic noise depends on three factors: (1) the volume of the traffic, (2) the speed of the traffic, and (3) the number of trucks in the flow of traffic. Vehicle noise is a combination of the noises produced by the engine, exhaust, tires, and wind generated by taller vehicles. Other factors that affect the perception of traffic noise include: distance from the highway, terrain, vegetation, pavement type and condition, and natural and structural B3 Attach #1 of 3
DECEMBER 2014 9-9
Chapter 9: Noise and Safety
obstacles. While tire noise from autos is generally located at ground level, truck noise sources can be located as high as 10 to 15 feet above the roadbed due to tall exhaust stacks and higher engines.
Future noise exposure contours for Fresno’s major roadways were modeled by applying the Federal Highway Administration’s noise modeling procedure, using roadway, speed, and traffic mix data from the City and projected traffic volumes based on anticipated development under the General Plan.
In establishing noise contours for land use planning, it is customary to ignore noise attenuation afforded by buildings, roadway elevations, and depressions, and the barrier effect of natural terrain features. The result is a worst-case estimate of the existing and future (projected) noise environment. The assumption is that it is more desirable to overestimate the potential noise at a future noise-sensitive development site than to underestimate the noise environment and allow for potentially incompatible land-use development. The developed noise contours for the City are conservative, meaning that the contours are modeled with minimal noise attenuation by natural barriers, buildings, with the exception of significantly depressed sections of highways.
Future development within the Planning Area will result in increased traffic volumes, thus increasing noise levels in some areas (refer to Figure NS-3:
Future Noise Contours). For example, future noise levels along highways are projected to increase by two to five decibels, while noise levels along most existing roadways are projected to increase by one to five decibels.
New roadways, significantly expanded roadways, or sparsely populated areas where significant new development may also experience an increase in noise levels by more than five decibels. While there will be increases in some noise levels, efforts can be taken to help minimize such instances.
For example, siting noise sensitive uses away from high-noise areas (e.g., major transportation routes) and buffering noise through design will help minimize future noise-related land use conflicts.
B3 Attach #1 of 3
9-10 FRESNO GENERAL PLAN
Railroad Operations Noise
Railroad activity in Fresno primarily occurs along two rail corridors, however there are also several spur lines. Warning horns generally are signaled within one-quarter mile of a grade crossing, although the area around the Community Regional Medical Center in downtown is designated as a quiet zone. Where grade crossings exist, and warning horns and crossing alarms are signaled, individual single event noise levels associated with a train generally reach 105 dBA to 110 dBA at a distance of 100 feet from the track centerline. Away from grade crossings, train pass-by noise levels are lower, typically 85 dBA to 90 dBA at a distance of 100 feet.
Airport Noise
There are two public airports in the Planning Area, Fresno-Yosemite International Airport and Fresno Chandler Executive Airport, and one private airport open to public use, Sierra Sky Park. In conjunction with Fresno-Yosemite International Airport, the Air National Guard maintains an airbase for military flight and training operations.
Each airport has its own City of Fresno airport land use plan designed to provide for public safety. In addition, the Fresno County Airport Land Use Commission (ALUC) must prepare an Airport Land Use Compatibility Plan (ALUCP) as required by the Caltrans Division of Aeronautics for each airport. ALUC and the Federal Aviation Administration (FAA) provide guidance to local jurisdictions on determining appropriate and compatible adjacent land uses through the detailed findings and policies of ALUCPs.
Among other objectives, these airport plans strive to minimize the effects of aircraft noise on communities adjacent to airports and prevent uses incompatible with airport operations from locating near the airport. This General Plan and all other City land use plans must either be compatible with the adopted ALUCP or make a statement of overriding consideration justifying its incompatibility.
Figures NS-4 through 6 depict each airport’s noise and safety zones that have been established to identify the compatibility criteria to apply to any given project proposed within the airport’s compatibility zones. The noise contours shown on the maps are developed following Federal Aviation Regulation (FAR) Part 150 Airport Noise Compatibility Planning. The Part 150 program is designed to lessen the effect of airport noise on the surrounding community as development is proposed around an airport or B3 Attach #1 of 3
DECEMBER 2014 9-11
Chapter 9: Noise and Safety
the airport is modified or expanded. The specific criteria applied for each contour can be found in each airport’s ALUCP, both the City’s and the one prepared by the ALUC.
Major Stationary Noise Sources
Noise can result from many industrial processes, even when the best available noise control technology is applied. Noise exposures within industrial facilities are controlled by federal and State employee health and safety regulations set by the Occupational Safety and Health Administration (OSHA) and Cal-OSHA, but exterior noise levels may exceed locally acceptable standards. Commercial, recreational, and public service facility activities can also produce noise that affects adjacent sensitive land uses. These noise sources can be continuous and may contain tonal components that may be annoying to individuals who live nearby. In addition, noise generation from fixed noise sources may vary based upon climatic conditions, time of day and existing ambient noise levels.
Industrial uses in Fresno are typically located in industrial districts near freeways and commercial uses, away from residences and other sensitive noise receptors. Noise sources associated with service commercial uses such as automotive repair facilities, wrecking yards, tire installation centers, car washes, loading docks, etc., are found at various locations within the city. The noise emissions of these types of uses are dependent on many factors and are therefore difficult to quantify precisely. Nonetheless, noise generated by the these uses contributes to the ambient noise environment in immediate vicinity of these uses and should be considered where either new noise-sensitive uses are proposed nearby or where similar uses are proposed in existing residential areas.
B3 Attach #1 of 3
BLYTHE AVE
BRAWLEY AVE
MARKS AVE
BRAWLEY AVE
POLK AVE
MARKS AVE
VE
PALM AVE WALNUT AVE
FIG AVE
PEACH AVE
CEDAR AVE
CHESTNUT AVE CHESTNUT AVE
CLOVIS AVE CLOVIS AVE
FOWLER AVE
TEMPERANCE AVE TEMPERANCE AVE
FIRST ST FIRST ST
FRUIT AVE
DE WOLFE AVE
FIRST ST
FOWLER AVE
MAROA AVE
ELM AVE
CHERRY AVE
EAST AVE
ORANGE AVE
MAPLE AVE
WILLOW AVE
FRUIT AVE
HUGHES AVE
WEST AVE
BRYAN AVE
HAYES AVE
CORNELIA AVE
VALENTINE AVE
CHESTNUT AVE
MAPLE AVE
I
I I ] 7 cl .__ r-__. I I
I r• I I ·~
u-
;11- r + --+- -l---I:::!--···
-
-
-
-
-
-
E9 -====--====
ANS
BULLARD
VETER
GOLDEN S
AVE
VE A
TATE B
TES GA
LVD AVE BLYTHE
RD TNA FRI
TON RD
i v e r
u i n R
SHING A W FT
J o a q S a n
BON
U
DR
AUD
VAN NESS AVE
WEBER AVE
VAN NESS AVE
H ST
KINGS CANYON RD
ST FRESNO
GOLDEN STATE B
JENSEN AVE
LVD
SHAW AVE
GARFIELD AVE
GRANTLAND AVE
SHIELDS AVE
CLINTON AVE
MCKINLEY AVE
OLIVE AVE
Sierra ALLUVIAL AVE Sky Park WEST A
Figure NS-2:
Existing Noise Contours
(Vehicle)
60 to 65 dB
65 to 70 dB
70 to 75 dB
75 to 80 dB
over 80 dB
Railroad
41 99
168
180 180
41 99
COPPER AVE
BEHYMER AVE
PERRIN AVE
SHEPHERD AVE
TEAGUE AVE
NEES AVE
WILLOW AVE
Fresno-Clovis
Regional Wastewater
Reclamation Facility (RWRF)
Planning Area Boundary
Sphere of In˜uence
City Limits
0 1/2 1 2
MILES
Note: The Fresno Air National Guard Base, a military airport, and the Source: City of Fresno, 2011; Salter Associates, 2012 Fresno Yosemite International Airport are located in the area Dyett & Bhatia, 2012. represented as Fresno Yosemite International Airport.
Airport HERNDON AVE HERNDON AVE
SHAW AVE
DAKOTA AVE
SHIELDS AVE
CLINTON AVE
BLACKSTONE AVE BLACKSTONE AVE
FRESNO ST BULLARD AVE
CEDAR AVE
BARSTOW AVE
California State University
Fresno
GETTYSBURG AVE GETTYSBURG AVE
ASHLAN AVE ASHLAN AVE ASHLAN AVE
SHIELDS AVE
Fresno Yosemite
International
Airport CLINTON AVE
MCKINLEY AVE MCKINLEY AVE
OLIVE AVE
BELMONT AVE BELMONT AVE
TULARE AVE
KINGS CANYON RD
WHITESBRIDGE AVE Chandler
Executive LANE
HIGHLAND AVE
KEARNEY BLVD Airport
CALIFORNIA AVE
BUTLER AVE
CHURCH AVE
JENSEN AVE JENSEN AVE
ANNADALE
NORTH AVE NORTH AVE
CENTRAL AVE
AMERICAN AVE
4 B3 Attach #1 of 3
-
-
-
-
-
-
E9 -===--==
A A A E
VE
A
ST ST FIRST FIRST
AVE
CLOVIS AVE
FOWLER AVE
ANCE AVE TEMPER
RD T N IA FR
99 SHINGTON RD
ve r
A W
u i n R i
FT
FRIANT RD
Jo a q San
ON DR BU UD A
GA I F
DR
VAN NESS AVE
BULLARD AVE GOLDEN ST
ANS
VE
VETER
TES A
ATE BL
GA
VD
WEBER AVE
VAN NESS AVE
H ST
BLYTHE AVE
KINGS CANYON RD
FRESNO ST
GOLDEN STATE BLVD
JENSEN AVE
Figure NS-3 :
Future Noise Contours
(Vehicle)
60 to 65 dB
65 to 70 dB
AVE BRYAN
HAYES AVE
AVE
C
POLK
ORNELIA AVE
BLYTHE AVE
BR VE WLEY BR WL Y AVE
V AVE
MARKS
ALENTINE
VE
MARKS A AVE
HUGHES AVE
Planning Area Boundary Sierra ALLUVIAL AVE Sky Park WEST AVE WEST A VE FRUIT A FRUIT AVE ALNUT AVE FIG
W VE PALM A
AVE
MARO AVE
ELM AVE
CHERRY AVE
EAST AVE ST
OR
FIRST
ANGE AVE
DAKOTA
CEDAR AVE
MAPLE AVE MAPLE AVE
CHESTNUT AVE CHESTNUT AVE
WILL
CHESTNUT
VE
PEA
OW A
CH AVE
CLOVIS AVE
FOWLER AVE
CHURCH AVE
ANCE AVE TEMPER
DE WOLFE AVE
COPPER AVE
70 to 75 dB
41 75 to 80 dB WILLOW AVE
BEHYMER AVE
over 80 dB PERRIN AVE
SHEPHERD AVE
Railroad TEAGUE AVE
NEES AVE
Airport Sphere of Influence BLACKSTONE AVE BLACKSTONE AVE FRESNO ST
HERNDON AVE HERNDON AVE
CEDAR AVE
RDEN CityLimits
BULLARD AVE
California
State University 168 BARSTOW AVE Fresno
SHAW AVE SHAW AVE
GARFIELD AVE
GRANTLAND AVE
GETTYSBURG AVE GETTYSBURG AVE
ASHLAN AVE ASHLAN AVE ASHLAN AVE
AVE
SHIELDS AVE SHIELDS AVE SHIELDS AVE
Fresno Yosemite
International CLINTON AVE CLINTON AVE Airport CLINTON AVE
MCKINLEY AVE MCKINLEY AVE MCKINLEY AVE
OLIVE AVE OLIVE AVE
HIGHLAND AVE
BELMONT AVE BELMONT AVE
TULARE AVE
KINGS CANYON RD 180 WHITESBRIDGE AVE Chandler
Executive LANE
KEARNEY BLVD Airport BUTLER AVE
CALIFORNIA AVE
JENSEN AVE JENSEN AVE
Fresno-Clovis Regional Wastewater ANNADALE
Reclamation Facility (RWRF)
NORTH AVE NORTH AVE
CENTRAL AVE
41 0 1/2 1 2
99 MILES
AMERICAN AVE
Note: The Fresno Air National Guard Base, a military airport, and the Source: City of Fresno, 2011; Salter Associates, 2012 Fresno Yosemite International Airport are located in the area Dyett & Bhatia, 2012. represented as Fresno Yosemite International Airport.
180
4 B3 Attach #1 of 3
E9
T T S S ST ST R R I I F F
SHAW AVE
168 GETTYSBURG AVE RDEC A AVE
ASHLAN AVE Fresno Yosemite ELPA AVE M
Airport
UN TTS A E EV HC
OLLI WW A EV
SIOLC A E V V
RLWOF A E EV
CNRPMT A A EEE EV
DE EFLOW AVE
MILLBROOK AVE
International
DAKOTA AVE DAKOTA AVE
SHIELDS AVE SHIELDS AVE
CLINTON AVE
CLINTON AVE
MCKINLEY AVE MCKINLEY AVE
OLIVE AVE
180 BELMONT AVE
BELMONT AVE
TULARE AVE
HUNTINGTON BLVD
VENTURA AVE KINGS CANYON RD
60 dB
70 dB
75 dB
65 dB
41 KINGS CANYON RD
Figure NS-4:
TS ST RI F
Existing Fresno Yosemite International Airport Noise and Safety Zones
SHAW AVE
168 GETTYSBURG AVE
R DEC AVE
ASHLAN AVE Fresno Yosemite
ELP AVE M
Airport
UNTS A EV HC
O LI W A EV
SI OLC A EV
R L WOF A EV
CN R P M T A EV
DE EFL O W AVE
MILLBROOK AVE
International
DAKOTA AVE DAKOTA AVE
SHIELDS AVE SHIELDS AVE
CLINTON AVE
CLINTON AVE
MCKINLEY AVE MCKINLEY AVE
OLIVE AVE
180 BELMONT AVE
BELMONT AVE
TULARE AVE
HUNTINGTON BLVD
VENTURA AVE KINGS CANYON RD
0 1/2 1 2 Safety Zones
MILES Zone 1 RPZ
Zone 2 Inner Approach/Departure
Zone 3 Inner Turning
Zone 4 Outer Approach/Departure
Zone 5 Sideline
Zone 6 Tra˜c Pattern
Noise Contours
75 dB
Planning Area
Sphere of In°uence
City Limits
Source: City of Fresno, 2014.
B3 Attach #1 of 3
E9
S AVE EGU HH
CALIFORNIA AVE
E. CHURCH AVETIURF AVE
ENROHT AVE
BELMONT AVE
BLACKSTONE AVE
DIVISADERO ST NEILSEN AVE
60 CNEL
65 CNEL
WHITES BRIDGE AVE
KEARNEY BLVD
FULT
V
G
AN
ST
ON ST
NESS AVE
M
H
ST
B ST
ST
TULARE
S AVE E GUH
CALIFORNIA AVE
E. CHURCH AVE
TI URF AVE
0 1/2 1 2
ENROHT AVE
MILES
Safety Zones
Primary Surface
Runway Proction Zone
Inner Approach Zone
Inner Turning Zone
Outer Approach Zone
Sideline Zone
Tra˜c Pattern Zone
Noise Contours
Planning Area
Sphere of In°uence
City Limits
Downtown Planning Area
Source: City of Fresno, 2014.
Figure NS-5:
Existing Fresno Chandler Executive Airport Noise And Safety Zones
BELMONT AVE
BLACKSTONE AVE
DIVISADERO ST NEILSEN AVE
60 CNEL
65 CNEL
WHITES BRIDGE AVE
KEARNEY BLVD
B3 Attach #1 of 3
ezzza
KLOP EVA
HERNDON AVE
PALO ALTO AVE
SPRUCE AVE
SIERRA AVE DEN AVE
SSEN N
D
V
VLB
A
60 dB
65 dB
70 dB
ALLUVIAL AVE
HERNDON AVE SKRM EV
A
A
SAN JOSE AVE
MILBURN
AVE
GOLDEN STATE
BLVD
SANTA FE AVE
G GAR
I F
KL OP EVA
HERNDON AVE
PALO ALTO AVE
SPRUCE AVE
SIERRA AVE
Figure NS-6:
Existing Sierra Skypark Airport Noise and Safety Zones
DEN AVE
SEN D
VLB A
60 dB
65 dB
70 dB
ALLUVIAL AVE
HERNDON AVE
SKR M EVA
SAN JOSE AVE
Safety Zones
0 1/2 1 2
Primary Surface
MILES
Clear Zone
Inner Approach Zone
Outer Approach
Horizontal Surface
Conical Surface
Tra˜c Pattern
Primary Review Area Boundary
Noise Contours
Planning Area
Sphere of In°uence
City Limits
Source: City of Fresno, 2014.
B3 Attach #1 of 3
DECEMBER 2014 9-17
Chapter 9: Noise and Safety
There are numerous park and school uses within the city. Noise generated by these uses depends on the age and number of people utilizing the respective facility at a given time and the types of activities they are engaged in. School playing field activities tend to generate more noise than those of neighborhood parks, as the intensity of school playground usage tends to be higher. At a distance of 100 feet from an elementary school playground being used by 100 students, average and maximum noise levels of 60 and 75 dB, respectively, can be expected. At organized events such as high-school football games with large crowds and public address systems, the noise generation is often significantly higher. As with service commercial uses, the noise generation of parks and school playing fields is variable.
Noise Control – Maximum Noise Level Standards
With the proposed intensification of land uses in the city, noise control will be an increasing consideration for infrastructure and new development, particularly for infill residential projects. Major cities in California commonly consider maximum noise levels of 65 dB to be considered “normally acceptable” for unshielded residential development including outdoor space in an urban environment. Suburban and rural jurisdictions tend to prefer a 60 dB or lower threshold for residential areas. Noise levels from 65 dB to 70 dB fall within the “conditionally unacceptable” range, and those in the 70 to 75 dB range are considered “normally unacceptable.” The General Plan is consistent with noise control practice in urban areas, employing 60 dB as being a desirable level, but accepting 65 dB as being in the “normally acceptable” range for noise due to the number of transportation sources located in proximity to urban residential areas. This policy supports the development of infill residential projects, as well as nonresidential infill projects by setting a realistic, achievable threshold of impact for new development.
Section 10-101 of the City’s Municipal Code contains the City’s Noise Ordinance, which establishes excessive noise guidelines and exemptions.
Standards are set for ambient noise based on district type (residential, commercial, and industrial) and time of day. Upon adoption of the new noise limits and policies proposed in this General Plan Update, the City will commence an update of its Noise Ordinance to provide regulatory consistency with adopted policies.
B3 Attach #1 of 3
9-18 FRESNO GENERAL PLAN
Acceptable ranges for exterior noise levels in the Noise Ordinance will be updated to be consistent with this General Plan. This update will need to increase the threshold in residential districts to 65 decibels and adjust noise limits for other planned uses. The updated Noise Ordinance will also specify maximum hourly noise levels for outdoor activity areas and indoor spaces measurement standards; uniform guidelines for acoustical studies based on current professional standards; required noise mitigation standards and enforcement procedures for stationary noise sources which cause the allowable noise limits to be exceeded. Finally, the Noise Ordinance will establish performance standards for noise reduction for new developed property that may be exposed to community noise levels exceeding target acceptable noise levels for outdoor activity levels and interior spaces.
TABLE 9-2: TRANSPORTATION (NON-AIRCRAFT) NOISE
SOURCES
Noise-Sensitive Land Use1
Outdoor Activity
Areas2 Interior Spaces
Ldn/CNEL, dB Ldn/CNEL, dB Leq dB2
Residential 65 45 -
Transient Lodging 65 45 -
Hospitals, Nursing Homes 65 45 -
Theaters, Auditoriums, Music
Halls - - 35
Churches, Meeting Halls 65 - 45
Office Buildings - - 45
Schools, Libraries, Museums - - 45
1. Where the location of outdoor activity areas is unknown or is not applicable, the exterior noise level standard shall be applied to the property line of the receiving land use.
2. As determined for a typical worst-case hour during periods of use.
TABLE 9-3: STATIONARY NOISE SOURCES1
Daytime
(7:00 a.m. – 10:00 p.m.)
Nighttime
(10:00 p.m. – 7:00 a.m.)
Hourly Equivalent Sound
Level (Leq), dBA 50 45
Maximum Sound Level
(Lmax), dBA 70 60
1. The Department of Development and Resource Management Director, on a case-by-case basis, may designate land uses other than those shown in this table to be noise-sensitive, and may require appropriate noise mitigation measures.
2. As determined at outdoor activity areas. Where the location of outdoor activity areas is unknown or not applicable, the noise exposure standard shall be applied at the property line of the receiving land use. When ambient noise levels exceed or equal the levels in this table, mitigation shall only be required to limit noise to the ambient plus five dB.
B3 Attach #1 of 3
DECEMBER 2014 9-19
Chapter 9: Noise and Safety
OBJECTIVE
NS-1 Protect the citizens of the City from the harmful and annoying effects of exposure to excessive noise.
IMPLEMENTING POLICIES
NS-1-a Desirable and Generally Acceptable Exterior Noise Environment. Establish 65 dBA Ldn or CNEL as the standard for the desirable maximum average exterior noise levels for defined usable exterior areas of residential and noisesensitive uses for noise, but designate 60 dBA Ldn or CNEL (measured at the property line) for noise generated by
stationary sources impinging upon residential and noisesensitive uses. Maintain 65 dBA Ldn or CNEL as the maximum average exterior noise levels for non-sensitive commercial land uses, and maintain 70 dBA Ldn or CNEL as maximum average exterior noise level for industrial land uses, both to be measured at the property line of parcels where noise is generated which may impinge on
neighboring properties.
Commentary: The Noise Ordinance will define usable
exterior areas for single family and multiple family residential and noise sensitive uses to include rear yards and other outdoor areas intended to accommodate leisure or active use, excluding front or side yard areas, and front or side porches. Balconies or roof decks facing front and side yards shall be included in designated areas to be protected from noise where these spaces are used to calculate compliance with required outdoor living area as required by adopted development standards.
NS-1-b Conditionally Acceptable Exterior Noise Exposure Range. Establish the conditionally acceptable noise
exposure level range for residential and other noise
sensitive uses to be 65 dB Ldn or require appropriate noise reducing mitigation measures as determined by a site
specific acoustical analysis to comply with the desirable and conditionally acceptable exterior noise level and the
required interior noise level standards set in Table 9-2.
NS-1-c Generally Unacceptable Exterior Noise Exposure
Range. Establish the exterior noise exposure of greater B3 Attach #1 of 3
9-20 FRESNO GENERAL PLAN
than 65 dB Ldn or CNEL to be generally unacceptable for residential and other noise sensitive uses for noise
generated by sources in Policy NS-1-a, and study
alternative less noise-sensitive uses for these areas if otherwise appropriate. Require appropriate noise reducing mitigation measures as determined by a site specific
acoustical analysis to comply with the generally desirable or generally acceptable exterior noise level and the required 45 dB interior noise level standards set in Table 9-2 as conditions of permit approval.
NS-1-d Allowable Exterior Noise Environment for BRT and Activity Centers. Exclude residential and noise sensitive uses located along Bus Rapid Transit corridors or within Activity Centers identified by this General Plan, from exterior noise standards in Policies NS-1-a through NS-1-c where it is determined application of noise mitigation measures will be detrimental to the realization of the General Plan's mixed use policies.
Commentary: Interior noise level standards of Table 9-2 will still apply.
NS-1-e Update Noise Ordinance. Update the Noise Ordinance to ensure that noise exposure information and specific
standards for both exterior and interior noise and
measurement criteria are consistent with this General Plan and changing conditions within the city and with noise
control regulations or policies enacted after the adoption of this element.
NS-1-f Performance Standards. Implement performance
standards for noise reduction for new residential and noise sensitive uses exposed to exterior community noise levels from transportation sources above 65 dB Ldn or CNEL, as shown on Figure NS-3: Future Noise Contours, or as
identified by a project-specific acoustical analysis based on the target acceptable noise levels set in Tables 9-2 and Policies NS-1-a through NS-1-c.
NS-1-g Noise mitigation measures which help achieve the noise level targets of this plan include, but are not limited to, the following:
B3 Attach #1 of 3
DECEMBER 2014 9-21
Chapter 9: Noise and Safety
• Façades with substantial weight and insulation;
• Installation of sound-rated windows for primary sleeping and activity areas;
• Installation of sound-rated doors for all exterior entries at primary sleeping and activity areas;
• Greater building setbacks and exterior barriers;
• Acoustic baffling of vents for chimneys, attic and gable ends;
• Installation of mechanical ventilation systems that
provide fresh air under closed window conditions.
The aforementioned measures are not exhaustive and
alternative designs may be approved by the City, provided that a qualified Acoustical Consultant submits information demonstrating that the alternative design(s) will achieve and maintain the specific targets for outdoor activity areas and interior spaces.
NS-1-h Interior Noise Level Requirement. Comply with the State Code requirement that any new multifamily residential,
hotel, or dorm buildings must be designed to incorporate noise reduction measures to meet the 45 dB Ldn interior noise criterion, and apply this standard as well to all new single-family residential and noise sensitive uses.
NS-1-i Mitigation by New Development. Require an acoustical analysis where new development of industrial, commercial or other noise generating land uses (including transportation facilities such as roadways, railroads, and airports) may result in noise levels that exceed the noise level exposure criteria established by Tables 9-2 and 9-3 to determine impacts, and require developers to mitigate these impacts in conformance with Tables 9-2 and 9-3 as a condition of permit approval through appropriate means.
Noise mitigation measures may include:
• The screening of noise sources such as parking and
loading facilities, outdoor activities, and mechanical
equipment;
B3 Attach #1 of 3
9-22 FRESNO GENERAL PLAN
• Providing increased setbacks for noise sources from
adjacent dwellings;
• Installation of walls and landscaping that serve as noise buffers;
• Installation of soundproofing materials and doubleglazed windows; and • Regulating operations, such as hours of operation,
including deliveries and trash pickup.
Alternative acoustical designs that achieve the prescribed noise level reduction may be approved by the City, provided a qualified Acoustical Consultant submits information
demonstrating that the alternative designs will achieve and maintain the specific targets for outdoor activity areas and interior spaces. As a last resort, developers may propose to construct noise walls along roadways when compatible with aesthetic concerns and neighborhood character. This would be a developer responsibility, with no City funding.
NS-1-j Significance Threshold. Establish, as a threshold of significance for the City's environmental review process, that a significant increase in ambient noise levels is
assumed if the project would increase noise levels in the immediate vicinity by 3 dB Ldn or CNEL or more above the ambient noise limits established in this General Plan
Update.
Commentary: When an increase in noise would result in a “significant” impact (increase of three dBA or more) to residents or businesses, then noise mitigation would be required to reduce noise exposure. If the increase in noise is less than three dBA, then the noise impact is considered insignificant and no noise mitigation is needed.
By setting a specific threshold of significance in the General Plan, this policy facilitates making a determination of environmental impact, as required by the California
Environmental Quality Act. It helps the City determine
whether (1) the potential impact of a development project on the noise environment warrants mitigation, or (2) a
statement of overriding considerations will be required.
B3 Attach #1 of 3
DECEMBER 2014 9-23
Chapter 9: Noise and Safety
NS-1-k Proposal Review. Review all new public and private development proposals that may potentially be affected by or cause a significant increase in noise levels, per Policy NS-1-i, to determine conformance with the policies of this Noise Element. Require developers to reduce the noise
impacts of new development on adjacent properties through appropriate means.
NS-1-l Enforcement. Continue to enforce applicable State Noise Insulation Standards and Uniform Building Code noise
requirements, as adopted by the City.
NS-1-m Transportation Related Noise Impacts. For projects subject to City approval, require that the project sponsor mitigate noise created by new transportation and
transportation-related stationary noise sources, including roadway improvement projects, so that resulting noise
levels do not exceed the City’s adopted standards for noisesensitive land uses.
NS-1-n Best Available Technology. Require new noise sources to use best available control technology to minimize noise emissions.
Commentary: Noise from mechanical equipment can be
reduced by soundproofing materials and sound-deadening
installation; controlling hours of operation will also reduce noise impacts during the morning or evening.
NS-1-o Sound Wall Guidelines. Acoustical studies and noise mitigation measures for projects shall specify the heights, materials, and design for sound walls and other noise
barriers. Aesthetic considerations shall also be addressed in these studies and mitigation measures such as variable noise barrier heights, a combination of a landscaped berm with wall, and reduced barrier height in combination with increased distance or elevation differences between noise source and noise receptor, with a maximum allowable
height of 15 feet. The City will develop guidelines for aesthetic design measures of sound walls, and may
commission area wide noise mitigation studies that can
serve as templates for acoustical treatment that can be applied to similar situations in the urban area.
B3 Attach #1 of 3
9-24 FRESNO GENERAL PLAN
Commentary: While acoustical studies need to be sitespecific in order to appropriately assess particular settings, having prototypical design measures and noise control
templates that can be applied for similar situations and contexts can facilitate infill and other development.
NS-1-p Airport Noise Compatibility. Implement the land use and noise exposure compatibility provisions of the adopted
Fresno Yosemite International Airport Land Use
Compatibility Plan, the Fresno-Chandler Executive Airport Master and Environs Specific Plan, and the Sierra Sky Park Land Use Policy Plan to assess noise compatibility of
proposed uses and improvements within airport influence and environs areas.
9.3 SEISMIC AND GEOLOGIC HAZARDS
Seismicity
Fresno is in one of the more geologically stable areas of California and does not lie within a known active earthquake fault zone. Although a number of faults are located within the Sierra Nevada Mountain Range, none are considered active. The nearest active fault is located by Independence, CA, approximately 100 miles to the east along the Fresno County-Inyo County boundary. Overall, seismic-related concerns (including liquefaction and subsidence) are considered fairly minor for the Planning Area. The city is not located in an Alquist-Priolo Special Fault Study Zone, that is, it has not been identified as a zone of special study around active faults. Hidden faulting in Western Fresno County did manifest itself in the Coalinga Earthquake of 1983, causing ground shaking in Fresno, but minimal damage. In the future, Fresno could be affected by major seismic events from the following active fault systems in other regions of California:
• The San Andreas Fault paralleling the Coast Ranges in western Fresno County;
• The Owens Valley Fault system in the Eastern Sierra Region of California;
• The White Wolf Fault paralleling the Tehachapi range southeast of Bakersfield
• Hidden thrust fault(s) in the west side of the San Joaquin Valley; and B3 Attach #1 of 3
DECEMBER 2014 9-25
Chapter 9: Noise and Safety
• The Long Valley Caldera, a seismic and volcanic area in the Eastern Sierra that lies between Mono Lake and Crowley Lake.
The principal potential earthquake hazard for Fresno is ground shaking, which could cause damage to buildings and infrastructure elements such as bridges and pipes. The distance between Fresno and major faults minimizes this potential hazard.
Soil Hazards
Expansive soils, soil erosion, and water infiltration are issues that can cause safety concerns in Fresno.
Expansive soils are largely comprised of clays, which expand in volume when water is absorbed and shrink as the soil dries. Expansion is measured by shrink-swell potential, which is the volume change in soil with a gain in moisture. If the shrink-swell potential is rated moderate to high, then damage to buildings, roads, structural foundations, and pipes can occur. In the northern portion of Fresno’s SOI, there are some areas of expansive clay soil that require special construction standards for foundations and infrastructure. Expansive clay problems can be surmounted by appropriate engineering design and construction techniques.
Highly erodible soils are those that are easily carried by water and, to a lesser extent, by wind. Surface erosion is more commonly visible, but subsurface erosion can lead to damage to pipes, roads, foundations, and other structural elements. Soil erosion potential is identified by a specific soil’s “K Factor,” which provides an indication of a soil’s inherent susceptibility to erosion, absent of slope and groundcover factors. Values of K range from 0.05 to 0.43, and the higher the value, the more susceptible the soil is to sheet erosion by water. The addition of weight, such as pools and decks, onto susceptible soil, as well as private irrigation systems and the action of burrowing rodents, are factors that may aggravate land slippage. Fresno is not susceptible to soil erosion with the exception of land within 300 feet of the toe of the San Joaquin River bluffs, where the steep slopes and soil composition predispose it to instability and erosion.
Soils are also defined by their rainfall runoff potential, which is the degree to which soil allows or disallows rainfall water to infiltrate and transmit down to the groundwater table. Groups of soils having similar runoff potential under similar storm and cover conditions, absent of slope, are placed into B3 Attach #1 of 3
9-26 FRESNO GENERAL PLAN
one of four hydrologic group classifications: A, B, C or D. Definitions of the classes are as follows:
• Soil Group A. High Infiltration (Low runoff potential)—Soils having high infiltration rates, even when thoroughly wetted and consisting chiefly of deep, well drained sands or gravels. These soils have a high rate of water transmission.
• Soil Group B. Moderate Infiltration—Soils having moderate infiltration rates, even when thoroughly wetted and consisting chiefly of moderately deep to deep, moderately fine to moderately course textures. These soils have a moderate rate of transmission. • Soil Group C. Slow Infiltration—Soils having slow infiltration rates, even when thoroughly wetted and consisting chiefly of soils with a layer that impedes downward movement of water, or soils with moderately fine to fine textures. These soils have a slow rate of transmission. • Soil Group D. Very Slow Infiltration (High runoff potential)—Soils having very slow infiltration rates, even when thoroughly wetted and consisting chiefly of clay soils with a high swelling potential, soils with a permanent high water table, soils with a clay pan or clay layer at or near the surface, and shallow soils over nearly impervious material.
These soils have a very slow rate of water transmission.
Hydrological groups are used in equations that estimate runoff from rainfall.
These estimates are needed for solving hydrologic problems that arise in planning watershed protection and flood prevention projects and for designing structures for the use, control, and disposal of water.
OBJECTIVE
NS-2 Minimize risks of property damage and personal injury posed by geologic and seismic risks.
IMPLEMENTING POLICIES
NS-2-a Seismic Protection. Ensure seismic protection is incorporated into new and existing construction, consistent with the Fresno Municipal Code.
NS-2-b Soil Analysis Requirement. Identify areas with potential geologic and/or soils hazards, and require development in these areas to conduct a soil analysis and mitigation plan by a registered civil engineer (or engineering geologist
B3 Attach #1 of 3
DECEMBER 2014 9-27
Chapter 9: Noise and Safety
specializing in soil geology) prior to allowing on-site drainage or disposal for wastewater, stormwater runoff, or swimming pool/spa water.
NS-2-c Landfill Areas. Require proposed land uses on or near landfill areas to be designed and maintained to comply with California Code of Regulations, Title 27, Section 21190, Post Closure Land Use.
NS-2-d Bluff Preservation Overlay Zone. Per the requirements of the Bluff Preservation Overlay Zone District and Policy POSS-7-f (Chapter 5, Parks and Open Space), the following standards shall be applicable for property located within the Bluff Preservation zone:
• Require proposed development within 300 feet of the
toe of the San Joaquin River bluffs to undertake an
engineering soils investigation and evaluation report that demonstrates that the site is sufficiently stable to
support the proposed development, or provide
mitigations to provide sufficient stability; and
• Establish a minimum setback of 30 feet from the San
Joaquin River bluff edge for all buildings, structures, decks, pools and spas (which may be above or below
grade), fencing, lighting, steps, etc.
o An applicant may request to reduce the
minimum setback to 20 feet from the bluff
edge if it can be demonstrated, to the
satisfaction of the City’s Building Official and
the Planning Director, that the proposed
building, structure, deck, pool and/or spas
(which may be above or below grade),
fencing, steps, etc., will meet the objectives of
the Bluff Preservation Overlay Ordinance. In
no case shall the setback be reduced to less
than 20 feet.
9.4 STORM DRAINAGE AND FLOOD CONTROL
Fresno’s precipitation comes in episodic storm events, which may be severe and may cause localized flooding. The Fresno area receives inflows B3 Attach #1 of 3
9-28 FRESNO GENERAL PLAN
of regional runoff from a large watershed to the east, and is in the path of natural drainage from the valley floor, foothills and Sierra Nevada range.
The San Joaquin River, confined between bluffs, comprises the northern boundary of Fresno. Figure NS-7: Flood Plains shows the locations of the existing 100-year floodplains in the Planning Area, as mapped by FEMA’s National Flood Insurance Maps.
The Fresno Metropolitan Flood Control District (FMFCD) is responsible for flood control and storm water planning and management. It was authorized as a “special act” district and established by voter approval in 1956 to serve a 54-square mile area. Since its creation the district boundaries have been expanded several times and now include approximately 400 square miles—almost the entire portion of the Fresno-Clovis Metropolitan Area, with the exception of 6.5 square miles of SEDA which has yet to be annexed to the District. Once all of SEDA is annexed, FMFCD will develop and adopt Storm Water Master Plans for SEDA based on this General Plan.
The District was formed for the purpose of acquiring and constructing flood control and drainage facilities to safely convey, discharge, store and conserve storm water received on land within the District boundaries or which flows through the District. Eight flood control reservoirs and major basin facilities have been constructed along the Big Dry Creek, Redbank Creek, Dog Creek, Pup Creek, and Fancher Creek, comprising the Fresno Stream Group. The District also serves as the local sponsor of the U.S.
Army Corps of Engineers for five the flood control facilities within the Redbank-Fancher Creeks Flood Control Project.
B3 Attach #1 of 3
~---
ET~J ---------
1 [:
:·-·:.._
<--,:
:;
I
I
I
I--, I ]
I I r- .__ I I r-__. I I I r·
,...J
-
-
I I
E9 -===--=====----'
A
A
BR WL YA A A E E
NEA
A A
H
TSEW AVE
A A
AA
R
T T T S S S A R R I I F F ST ST
A
A
A A
T T AVE T SEHC
L W
A
SIV AVE OLC
RELWO AVE F
A A A VE CNRPM EEE EE T
99 RD T N IA FR
ve r
u i n R i
ASHINGTON RD
W FT
San Jo a q
NT RD
U ON DR B
FRIA
UD A
GA I F
DR
ANS
BULLARD AVE
VETER
VE
GOLDEN
ATES
VAN NESS AVE
GA
STATE BLVD
WEBER AVE
VAN NESS AVE
H
AVE
ST
BLYTHE
KINGS CANYON RD
ST FRESNO
GOLDEN STATE
JENSEN AVE
BLVD
YRB N AVE
HA AVE SEY
KL OP A
180
VE
I LE AVE
L
NROC
E AVE
VE
B HTY
BR WL Y AVE
V VE
S
I TNEL A
KR M AVE SKR M AVE
NEES AVE
SE GUH AVE
Sphere of In˜uence ALLUVIAL AVE
TSE W AVE
TI URF AVE TI URF AVE
TU AVE
G
W NL P ML AVE
I F AVE
O
41 VE
M
R M A
LE AVE
Y RE AVE
T
HC
S E AVE RI F ST
E AVE GN RO
R DEC AVE
ELP M AVE E AVE
U
LP M
NTSE AVE HC U UNT AVE
O
NTSEHC
LI W A
168
VE
HC EP AVE
SI V AVE OLC
REL WO AVE F
AVE CN R P MET
EFL O AVE DE W
Figure NS-7:
Existing Floodplains
100 Year Flood Zones
COPPER AVE
BEHYMER AVE
PERRIN AVE
WILLOW AVE
SHEPHERD AVE
TEAGUE AVE Planning Area Boundary
HERNDON AVE HERNDON AVE
City Limits
RDEN
SHAW AVE SHAW AVE
GARFIELD AVE
GRANTLAND AVE
GETTYSBURG AVE
SHIELDS AVE
DAKOTA AVE
SHIELDS AVE
CLINTON AVE CLINTON AVE
MCKINLEY AVE
OLIVE AVE
BLACKSTONE AVE BLACKSTONE AVE
FRESNO ST BULLARD AVE
CEDAR AVE
BARSTOW AVE
GETTYSBURG AVE
ASHLAN AVE ASHLAN AVE ASHLAN AVE
SHIELDS AVE
CLINTON AVE
MCKINLEY AVE MCKINLEY AVE
OLIVE AVE
BELMONT AVE BELMONT AVE
TULARE AVE
KINGS CANYON RD WHITESBRIDGE AVE
LANE
HIGHLAND AVE
KEARNEY BLVD
CALIFORNIA AVE
BUTLER AVE
CHURCH AVE
JENSEN AVE JENSEN AVE
Fresno-Clovis ANNADALE Regional Wastewater
Reclamation Facility (RWRF) NORTH AVE NORTH AVE
CENTRAL AVE
41 99 0 1/2 1 2
AMERICAN AVE MILES
Source: FEMA, 2014.
180
4 B3 Attach #1 of 3
9-30 FRESNO GENERAL PLAN
The urban storm water drainage program provides a system comprised of storm drainage collection, conveyance, detention and retention serving planned urban and rural areas within the Fresno-Clovis environs. The adopted Storm Drainage and Flood Control Master Plan divides the service area into 163 local drainage areas. Collectively, the system has in excess of 600 miles of storm drainage pipeline and 154 local stormwater management basins together with ancillary facilities, such as storm water lift pump stations.
This system expands as the area of urbanization expands. Facilities are funded and constructed by owners/developers of properties pursuant to the City's drainage fee requirements in Fresno Municipal Code section 12- 1901 et. seq., or constructed by FMFCD under publicly awarded contracts.
The City also requires drainage to be directed to public streets, so that storm water travels along paved surface areas to inlets per the Fresno Municipal Code. The inlets accept the water into the storm drainage pipelines which convey water to stormwater management basins. The pipeline system is designed with a peak flow capacity to accommodate a two-year intensity storm event (50 percent probability of occurring in any given year). The basin capacity utilizes the percentage of runoff from the two-year pipeline data, but with a volume from six inches of rainfall. All basins are designed with relief systems so that additional capacity can be created by dewatering between rainfall events. The District’s drainage services program includes topographic mapping; master plan engineering and facility design; system construction; and operation and maintenance.
Any infill project that increases the amount of impervious surfacing, changes the existing drainage pattern(s), and/or generates storm flows faster or greater than the existing condition could result in the existing pipeline collection system being overburdened. Typically, infill projects are required to mitigate any increase in runoff by either increasing the capacity of the existing system (i.e., build more infrastructure) or holding storm runoff on site to ensure offsite runoff does not increase.
As the owner and operator of the storm water drainage system, the District has primary responsibility for implementing the U.S. Clean Water Act requirements through a National Pollutant Discharge Elimination System discharge permit issued by the Regional Water Quality Control Board (RWQCB). This program is comprised of pollutant removal in the stormwater basins and education to avoid storm water pollution; best management practices for commercial, industrial and new development storm water quality control; monitoring to assess storm water impacts upon B3 Attach #1 of 3
DECEMBER 2014 9-31
Chapter 9: Noise and Safety
the quality of receiving water; and the preparation of ordinances for adoption by local governments to enforce storm water quality control measures.
The District’s programs include water conservation efforts through its design and operation of storm water drainage facilities to detain and retain water from storm events as well as receive dry season surface water supplies for groundwater recharge. Approximately 90 basins are intertied with Fresno Irrigation District (FID) canals and receive surface water through contracts with the irrigation district and the cities of Fresno and Clovis. Storm water drainage basins serving primarily residential areas are also designed to accommodate passive and active recreational activities.
Recreational use of 27 basins has been accommodated by improvements including baseball and playground areas, and two basins have been specifically designed to accommodate use by individuals with disabilities, while a third accommodates a high quality little league baseball facility.
District flood control and drainage facilities also provide important open space in the urban area and areas for wildlife habitat. Through a memorandum of understanding, which serves as a Section 1601 Master Streambed Alteration Agreement with the California Department of Fish and Wildlife, restoration and protection of rural streams for flood control purposes also brings long-term net benefits for fish, wildlife, water quality, native plants, and stream habitats.
To address the risks of damaging floods, the City of Fresno adopted and recently updated a Flood Plain Ordinance that meets the standards imposed by California Government Code Section 65302(g)(2). The Government Code specifies that cities should include either directly, or through adoption by reference to a flood plain ordinance (65302(g)(6)), flood hazards zones and maps on flooding in the area (65302(g)(2)(A)), goals to protect new development against flooding (65302(g)(2)(B)), and implementation measures to achieve the stated goals (65302(g)(2)(C)).
The City of Fresno Flood Plain Ordinance incorporates by reference flood hazard zones established by the Federal Emergency Management Agency (FEMA), Federal Insurance Rate Maps completed for Fresno County, and other maps as are needed to review flood risk (FMC 11-607). The Flood Plain Ordinance protects against risk to new and existing development by requiring any building proposed within a special flood hazard area to obtain a building permit and provide information specifically related to flood risk (11-613). The permit is reviewed by the Building Official, who has been designated as the Flood Plain Administrator, to ensure that the project will B3 Attach #1 of 3
9-32 FRESNO GENERAL PLAN
be reasonably safe from flooding and will not adversely increase flood risk elsewhere (11-614, 11-616). The Ordinance also includes specific development and construction standards to minimize flood risk (11-623 to 11-636). This permit review process and the applicable standards help to implement the goals found within the Flood Plain Ordinance Statement of Purpose (11=603) and also serve to both implement and complement the Goals, Objectives, and Implementing Policies found within this General Plan.
OBJECTIVE
NS-3 Minimize the risks to property, life, and the environment due to flooding and stormwater runoff hazards.
IMPLEMENTING POLICIES
NS-3-a Stormwater Drainage and Flood Control Master Plan.
Support the full implementation of the FMFCD Storm
Drainage and Flood Control Master Plan, the completion of planned flood control and drainage system facilities, and the continued maintenance of stormwater and flood water
retention and conveyance facilities and capacities. Work with the FMFCD to make sure that its Storm Drainage and Flood Control Master Plan is consistent with the General Plan.
NS-3-b Curb and Gutter Installation. Coordinate with Fresno Metropolitan Flood Control District (FMFCD) to install
curbing, gutters, and other drainage facilities with priority to existing neighborhoods with the greatest deficiencies and consistent with the Storm Drainage and Flood Control
Master Plan.
NS-3-c Dual Use Facilities. Support multiple uses of flood control and drainage facilities as follows:
• Use, wherever practical, FMFCD facilities for
groundwater management and recharge; and
• Promote recreational development of ponding basin
facilities located within or near residential areas,
compatible with the stormwater and groundwater
recharge functions.
B3 Attach #1 of 3
DECEMBER 2014 9-33
Chapter 9: Noise and Safety
NS-3-d Landscaped Buffer. City will support the development of FMFCD ponding basins including the landscaping and
irrigation for the top one third of the side sloped areas consistent with the FMFCD Basin Design Criteria.
NS-3-e Pollutants. Work with FMFCD to prevent and reduce the existence of urban stormwater pollutants pursuant to the requirements of the National Pollution Discharge
Elimination Systems Act.
NS-3-f Flooding Emergency Response Plans. Work with
responsible agencies to update emergency dam failure
inundation plans, evacuation plans and other emergency
response plans for designated flood-prone areas, including the San Joaquin riverbottom.
NS-3-g Essential Facilities Siting Outside of Floodplains. Avoid siting emergency response and essential public facilities, such as fire and police stations, within a 100-year floodplain, unless it can be demonstrated that the facility can be safely operated and accessed during flood events.
NS-3-h Runoff Controls. Implement grading regulations and related development policies that protect area residents from flooding caused by urban runoff produced from events that exceed the capacity of the Storm Drainage and Flood Control Master Plan system of facilities. Place all structures and/or flood-proofing in a manner that does not cause
floodwaters to be diverted onto adjacent property, increase flood hazards to other property, or otherwise adversely affect other property.
NS-3-i New Development Must Mitigate Impact. Require new development to not significantly impact the existing storm drainage and flood control system by imposing conditions of approval as project mitigation, as authorized by law. As part of this process, closely coordinate and consult with the FMFCD to identify appropriate conditions that will result in mitigation acceptable and preferred by FMFCD for each
project.
Commentary: The City recognizes the expertise and
significant role of the FMFCD, and will give the highest B3 Attach #1 of 3
9-34 FRESNO GENERAL PLAN
deference to its recommendations for mitigation measures, consistent with applicable law.
NS-3-j National Flood Insurance Program. Continue to
participate in the National Flood Insurance Program (NFIP) by ensuring compliance with applicable requirements.
Review NFIP maps periodically to determine if areas subject to flooding have been added or removed and make
adjustments to the Land Use Diagram Figure LU-1.
NS-3-k 100-Year Floodplain Policy. Require developers of residential subdivisions to preserve those portions of
development sites as open space that may be subject to
100-year flood events, unless the flood hazard can be
substantially mitigated by development project design.
NS-3-l 200-Year Floodplain Protection. Promote flood control measures that maintain natural conditions within the 200- year floodplain of rivers and streams and, to the extent possible, combine flood control, recreation, water quality, and open space functions. Discourage construction of
permanent improvements that would be adversely affected by periodic floods within the 200-year floodplain, particularly in the San Joaquin riverbottom.
NS-3-m Flood Risk Public Awareness. Continue public awareness programs to inform the general public and potentially
affected property owners of flood hazards and potential dam failure inundation. Remind households and businesses
located in flood-prone areas of opportunities to purchase flood insurance.
NS-3-n Precipitation Changes. Work with FMFCD to evaluate the planned and existing stormwater conveyance system in light of possible changes to precipitation patterns in the future.
9.5 WILDLAND FIRE HAZARDS
Fresno’s high summer temperatures, intense sunlight, and low rainfall could encourage wildland fires by drying and pre-heating combustible material and fostering spontaneous combustion of flammable material.
Fresno’s estimated maximum wind speed is 70 mph, which could fan blazes to a high intensity. Fire hazards are typically highest in heavily B3 Attach #1 of 3
DECEMBER 2014 9-35
Chapter 9: Noise and Safety
wooded areas, as trees are a great source of fuel, as are grasslands. Given that the Planning Area is largely urbanized or working agricultural land and lacks steep topographies, wildfire threats are minimal. Although Fresno is proximate to high and very high fire hazard designated areas, the city is largely categorized as little or no threat or moderate fire hazard, which is largely attributed to paved areas. Small areas along the San Joaquin River Bluff area in northern Fresno are prone to wildfire due to relatively steep terrain and vegetation and therefore classified as high fire hazard.
Policies related to fire protection and response are located in the Public Utilities and Services Element.
9.6 HAZARDOUS MATERIALS
A material is considered hazardous if it appears on a list of hazardous materials prepared by a federal, State, or local agency, or if it has characteristics defined as hazardous by such an agency. The California Code of Regulation defines a hazardous material as a substance that, because of physical or chemical properties, quantity, concentration, or other characteristics, may either (1) cause an increase in mortality or an increase in serious, irreversible, or incapacitating illness, or (2) pose a substantial present or potential hazard to human health or environment when improperly treated, stored, transported or disposed of, or otherwise managed. Hazardous materials have been and are commonly used in commercial, agricultural, and industrial applications and, to a limited extent, in residential areas.
Hazardous wastes are defined in the same manner. Hazardous wastes are hazardous materials that no longer have practical use, such as substances that have been discarded, discharged, spilled, contaminated, or are being stored prior to proper disposal. Hazardous materials and hazardous wastes are classified according to four properties: toxic (causes human health effects), ignitable (has the ability to burn), corrosive (causes severe burns or damage to materials), and reactive (causes explosions or generates toxic gases).
Sites previously contaminated by hazardous materials are required to be identified and cleaned up. The contaminated sites in Fresno are largely associated with leaking underground storage tanks and are predominately clustered south of Downtown, near Fresno Yosemite International Airport and Palm Bluffs Corporate Center (northwest Fresno), and along the Union B3 Attach #1 of 3
9-36 FRESNO GENERAL PLAN
Pacific Railroad Tracks as shown on Figure PU-3: Regional Groundwater Contamination shows the locations of known leaking underground storage tanks and known hazardous waste sites requiring cleanup under federal or State direction.
Releases, leaks, or disposal of chemical compounds, such as petroleum hydrocarbons, on or below the ground surface can lead to contamination of underlying soil and groundwater. Depending of the conditions and intensity of the release, groundwater contamination can migrate beyond the property boundary of the original release site. Disturbance of a previously contaminated area through grading or excavation operations could expose the public to health hazards from physical contact with contaminated materials or hazardous vapors. Improper handling or storage of contaminated soil and groundwater can further expose the public to these hazards, or potentially spread contamination through surface water runoff or air-borne dust.
In addition, contaminated groundwater can spread down gradient, potentially contaminating subsurface areas of surrounding properties. This also poses a threat due to the high number of private water wells and the City’s reliance on groundwater as the principal potable water source.
Groundwater quality is discussed in the Public Utilities and Services Element.
OBJECTIVE
NS-4 Minimize the risk of loss of life, injury, serious illness, and damage to property resulting from the use, transport,
treatment, and disposal of hazardous materials and
hazardous wastes.
IMPLEMENTING POLICIES
NS-4-a Processing and Storage. Require safe processing and storage of hazardous materials, consistent with the
California Building Code and the Uniform Fire Code, as
adopted by the City.
NS-4-b Coordination. Maintain a close liaison with the Fresno County Environmental Health Department, Cal-EPA
Division of Toxics, and the State Office of Emergency
Services to assist in developing and maintaining hazardous material business plans, inventory statements, risk
B3 Attach #1 of 3
DECEMBER 2014 9-37
Chapter 9: Noise and Safety
management prevention plans, and
contingency/emergency response action plans.
NS-4-c Soil and Groundwater Contamination Reports. Require an investigation of potential soil or groundwater
contamination whenever justified by past site uses. Require appropriate mitigation as a condition of project approval in the event soil or groundwater contamination is identified or could be encountered during site development.
NS-4-d Site Identification. Continue to aid federal, State, and County agencies in the identification and mapping of waste disposal sites (including abandoned waste sites), and to assist in the survey of the kinds, amounts, and locations of hazardous wastes.
NS-4-e Compliance with County Program. Require that the production, use, storage, disposal, and transport of
hazardous materials conform to the standards and
procedures established by the County Division of
Environmental Health. Require compliance with the
County’s Hazardous Waste Generator Program, including
the submittal and implementation of a Hazardous Materials Business Plan, when applicable.
NS-4-f Hazardous Materials Facilities. Require facilities that handle hazardous materials or hazardous wastes to be
designed, constructed, and operated in accordance with
applicable hazardous materials and waste management
laws and regulations.
NS-4-g Hazmat Response. Include policies and procedures appropriate to hazardous materials in the City’s disaster and emergency response preparedness and planning,
coordinating with implementation of Fresno County’s
Hazardous Materials Incident Response Plan.
NS-4-h Household Collection. Continue to support and assist with Fresno County’s special household hazardous waste
collection activities, to reduce the amount of this material being improperly discarded.
NS-4-i Public Information. Continue to assist in providing information to the public on hazardous materials.
B3 Attach #1 of 3
9-38 FRESNO GENERAL PLAN
9.7 AIRPORT SAFETY
There are two public airports in the Planning Area, Fresno-Yosemite International Airport (FYI) and Chandler Executive Airport (FCH), and one private airport open to public use, Sierra Sky Park. In conjunction with Fresno-Yosemite International Airport, the Air National Guard maintains an airbase for military flight and training operations. Each airport has its own airport land use plan designed to provide for public safety. The Fresno County Airport Land Use Commission (ALUC) provides guidance to local jurisdictions on adjacent land uses through Airport Land Use Compatibility Plans (ALUCPs). This General Plan and all other City land use plans must be compatible with the ALUCPs.
Airports may impact public safety due to the potential for aircraft crashes.
Policies in this section are designed to minimize public exposure to risks associated with airport operations and to minimize the siting of land uses near airports that might interfere with airport operations. As shown earlier in this chapter, Figures NS-4 through NS-6 show each airport’s safety zones, which are established to identify the land or water area surrounding the airport runways that could be impacted by an airport hazard.
Fresno Yosemite International Airport is one of two public airports in Fresno, and it has its own land use plan.
B3 Attach #1 of 3
DECEMBER 2014 9-39
Chapter 9: Noise and Safety
OBJECTIVE
NS-5 Protect the safety, health, and welfare of persons and property on the ground and in aircraft by minimizing
exposure to airport-related hazards.
IMPLEMENTING POLICIES
NS-5-a Land Use and Height. Incorporate and enforce all applicable Airport Land Use Compatibility Plans (ALUCPs) through land use designations, zoning, and development
standards to support the continued viability and flight operations of Fresno’s airports and to protect public safety, health, and general welfare.
• Limit land uses in airport safety zones to those uses listed in the applicable ALUCPs as compatible uses, and regulate compatibility in terms of location, height, and noise.
• Ensure that development, including public infrastructure projects, within the airport approach and departure
zones complies with Part 77 of the Federal Aviation
Administration Regulations (Objects Affecting Navigable Airspace), particularly in terms of height.
NS-5-b Airport Safety Hazards. Ensure that new development, including public infrastructure projects, does not create safety hazards such as glare from direct or reflective
sources, smoke, electrical interference, hazardous
chemicals, fuel storage, or from wildlife, in violation of adopted safety standards.
NS-5-c Avigation Easements. Employ avigation easements in order to secure and protect airspace required for unimpeded operation of publicly owned airports.
Commentary: Avigation easements are established in the
form of land use covenants and are binding upon present and subsequent property owners.
NS-5-d Disclosure. As a condition of approval for residential development projects, require sellers to prepare and
provide State Department of Real Estate Disclosure
B3 Attach #1 of 3
9-40 FRESNO GENERAL PLAN
statements to property buyers notifying of noise and safety issues related to airport operations.
NS-5-e Planned Expansion. Allow for the orderly expansion and improvement of publicly-owned airports, while minimizing adverse environmental impacts associated with these
facilities.
• Periodically update airport facility master plans in
accordance with FAA regulations.
• Require land use within the boundaries of the FresnoYosemite International Airport and Chandler Downtown Airport to conform to designations and policies specified in adopted City of Fresno compatible land use plans.
• Provide local jurisdictions surrounding the City's publicly owned airports with specific guidelines for effectively dealing with the presence and operation of these
airports.
9.8 EMERGENCY RESPONSE
Police and fire protection services are addressed in the Public Utilities and Services Element.
Emergency Planning
The California Emergency Services Act requires cities to prepare and maintain an Emergency Plan for natural, manmade, or war-caused emergencies that result in conditions of disaster or in extreme peril to life.
The City does have an adopted Emergency Operations Plan (EOP). The EOP does not designate evacuation routes, which may not be necessary since Fresno does not face any expected natural hazards from likely sources or locations.
Local Hazard Mitigation Planning
The purpose of a Local Hazard Mitigation Plan is to reduce or eliminate long term risk to human life and property resulting from hazards, by identifying risks before they occur and putting together resources, information, and strategies for emergency response. Fresno County is the lead agency on the Multi-Jurisdictional Local Hazard Mitigation Plan (MHMP) for the county. The Fresno County Board of Supervisors has B3 Attach #1 of 3
DECEMBER 2014 9-41
Chapter 9: Noise and Safety
adopted the Fresno County MHMP. It includes a City of Fresno annex which lists information most relevant to Fresno in the areas of health, infrastructure, housing, government, environment, and land use.
The MHMP meets the requirements of the Disaster Mitigation Act of 2000 (DMA). A federally-approved hazard mitigation plan enables Fresno County to apply for federal pre-disaster hazard mitigation grant funds to support mitigation projects. The DMA establishes a national hazard mitigation program to reduce the loss of life and property, human suffering, economic disruption and disaster assistance costs resulting from natural disasters. The DMA also provides a source of pre-disaster hazard mitigation funding to assist local governments in implementing effective hazard mitigation measures to ensure the continued functionality of critical services and facilities after a natural disaster.
OBJECTIVE
NS-6 Foster an efficient and coordinated response to
emergencies and natural disasters.
IMPLEMENTING POLICIES
NS-6-a County Multi-Jurisdiction Hazard Mitigation Plan. Adopt and implement the Fresno County Multi-Jurisdiction Hazard Mitigation Plan and City of Fresno Local Hazard Mitigation Plan Annex.
Commentary: The federal Disaster Mitigation Act of 2000 requires that cities, counties, and special districts have a Local Hazard Mitigation Plan to be eligible to receive FEMA hazard mitigation funds. Cities and counties can adopt and use all or part of a regional multi-jurisdictional plan, such as the one prepared by Fresno County, in lieu of preparing all or part of a Local Hazard Mitigation Plan.
NS-6-b Disaster Response Coordination. Maintain coordination with other local, State, and Federal agencies to provide coordinated disaster response.
NS-6-c Emergency Operations Plan. Update the City’s
Emergency Operations Plan periodically, using a whole
community approach which integrates considerations for
B3 Attach #1 of 3
9-42 FRESNO GENERAL PLAN
People with access and functional needs in all aspects of planning.
NS-6-d Evacuation Planning. Maintain an emergency evacuation plan in consultation with the Police and Fire Departments and other emergency service providers, which shows
potential evacuation routes and a list of emergency shelters to be used in case of catastrophic emergencies.
Commentary: The evacuation plan will be flexible in order to consider many scenarios and multiple modes of
transportation beyond private automobiles. It will provide special provisions for disadvantaged populations, such as those with physical disabilities or those with low or very low incomes, and for areas with fewer resources through
neighborhood emergency preparedness programs.
NS-6-e Critical Use Facilities. Ensure critical use facilities (e.g.
City Hall, police and fire stations, schools, hospitals, public assembly facilities, transportation services) and other structures that are important to protecting health and safety in the community remain operational during an emergency. • Site and design these facilities to minimize their
exposure and susceptibility to flooding, seismic and
geological effects, fire, and explosions.
• Work with the owners and operators of critical use
facilities to ensure they can provide alternate sources of electricity, water, and sewerage in the event that regular utilities are interrupted in a disaster.
NS-6-f Emergency Vehicle Access. Require adequate access for emergency vehicles in all new development, including
adequate widths, turning radii, hard standing areas, and vertical clearance.
NS-6-g Emergency Preparedness Public Awareness Programs.
Continue to conduct programs to inform the general public, including people with access and functional needs, of the City’s emergency preparedness and disaster response
procedures.
B3 Attach #1 of 3
10 HEALTHY
COMMUNITIES
The Healthy Communities Element presents a broad and
comprehensive initiative to improve community health. The concept of a “healthy community” also includes household income, addressed in the Economic Development and Fiscal Sustainability Element, and environmental health issues, such as air quality, addressed in the Resource Conservation and Resilience Element. This element focuses specifically on subjects not fully discussed in other elements, in particular the relationships between the built, natural, and social environments and community health and wellness
outcomes, such as death, chronic disease, and the effects of drug abuse and crime. Many community partners will help the City achieve improvements in individual, family, and community health, and their roles are explained at the end of this element.
B3 Attach #1 of 3
10-2 FRESNO GENERAL PLAN
10.1 PLANNING FOR COMMUNITY HEALTH
The World Health Organization defines health as the following:
“A state of complete physical, social and mental well-being, and not merely the absence of disease or infirmity. Within the context of health promotion, health has been considered less as an abstract state and more as a means to an end which can be expressed in functional terms as a resource which permits people to lead an individually, socially and economically productive life. Health is a resource for everyday life, not the object of living. It is a positive concept emphasizing social and personal resources as well as physical capabilities.”1 With this context in mind, this element first assesses the conditions that affect community health in Fresno, followed by a discussion of local opportunities and strategies for improving public health in the city, as well as detailed objectives and policies towards that goal.
There are four key components that directly affect the health of the Fresno community:
1. Physical health, or the medical well-being of individuals, as seen in rates of disease and death, with special consideration given to disparities in health across populations;
2. Environmental conditions, notably air quality, which can enhance or impede health;
3. Household income, which can affect the financial ability to afford medical care and healthy food, as well as mental and social well-being, and can directly relate to other factors such as safety and access to parks; and
4. Safety, particularly exposure to violent crime, which has direct and indirect impacts on individuals and governments alike, reducing productiveness, opportunities, and quality of life and contributing to poor physical and mental health.
This element also discusses some of the indirect contributing factors that the City can influence, including educational attainment, access to parks and recreation, the availability of healthy food, and transportation options.
The health of the Fresno community can be directly measured in the physical health of its residents. It can also be measured in quantitative factors that contribute directly to 1 Ottawa Charter for Health Promotion. WHO, Geneva, 1986 B3 Attach #1 of 3
December 2014 10-3
Chapter 10: Healthy Communities
health: environmental conditions, income, and safety. Several social and physical factors can also influence community health, including educational attainment; access to social services, parks, recreation, and healthy food; affordable housing and transportation options; and youth engagement.
An analysis of these direct and indirect factors will contribute to the evaluation of Fresno’s current public health conditions, with community health broadly defined as physical, emotional, and social well-being. Some of these issues, such as the location and programming of public parks, are within the City’s ability to plan and improve.
Other issues, however, may require broad-based or indirect efforts in consultation with other public agencies and the private sector. All the issues discussed in the Healthy Communities Element are important to consider in the context of the Fresno General Plan as a comprehensive plan that reflects the interdependence of health outcomes with land use, transportation, and other public policies and practices.
A Healthy California Community2
There are many components considered when planning for healthy communities, including:
• Basic Needs for All
o Affordable, accessible and nutritious foods and safe drinking water o Affordable, accessible, high quality health care
o Affordable, safe, integrated, and location efficient housing o Safe, sustainable, accessible and affordable transportation options o Safe, clean environment
o Access to quality schools
o Access to affordable, safe opportunities and spaces for physical exercise and fun activities
o Safe communities, free of crime and violence
• Safe, Sustainable Environment
o Clean air, soil, and water
o Green and open spaces
o Reduced greenhouse gas emissions and other pollutants 2 Defining a Healthy Community – CA Planners Roundtable.
B3 Attach #1 of 3
10-4 FRESNO GENERAL PLAN
o Reduced waste
o Affordable and renewable energy resources
o Nourishes the interrelationship between people, nature and the built environment
• Economic and Social Vitality
o Living wage, safe and equitable job opportunities to support individuals and families
o Strong, resilient economy supportive of innovation and entrepreneurial spirit o Healthy development of children and adolescents
o Access to high quality, affordable education from preschool through college and including vocational opportunities
o Community empowerment through robust social and civic engagement that takes into account diversity and cultural competency
o Access to opportunities to thrive regardless of income, race, ethnicity, nationality, gender, age, sexual orientation, identity, creed or disability o An understanding of the social determinants of health and health equity as strategies to reduce health disparities affecting the most vulnerable populations
o Opportunities for exercising creativity, artistic expression and fostering imagination
• Efficient Development Patterns
o Sufficient affordable housing development in appropriate locations o Mix of land uses and a built environment that support walking and biking o Multimodal, affordable transportation choices
o Safe public spaces for social interaction
o Conservation and restoration of open space and preservation of agricultural lands
Relationship to General Plan Goals
This Element provides objectives and policies that support the following General Plan goals:
9. Promote a city of healthy communities and improve quality of life in established neighborhoods.
B3 Attach #1 of 3
December 2014 10-5
Chapter 10: Healthy Communities
Emphasize supporting established neighborhoods in Fresno with safe, well maintained, and accessible streets, public utilities, education and job training, proximity to jobs, retail services, and health care, affordable housing, youth development opportunities, open space and parks, transportation options, and opportunities for home grown businesses.
14. Provide a network of well-maintained parks, open spaces, athletic facilities, and walking and biking trails connecting the city’s districts and neighborhoods to attract and retain a broad range of individuals, benefit the health of residents, and provide the level of public amenities required to encourage and support development of higher density urban living and transit use.
16. Protect and improve public health and safety.
10.2 HEALTH
Tracking the age and cause of death of local residents against State and national statistics is one simple way of measuring the physical health of the Fresno community.
The prevalence of chronic illnesses and health disparities across demographic lines are other important components of evaluating the state of the city’s public health. Many health statistics are collected at the county level, so this element relies on that level of data to assess the state of physical health for the city’s residents. With 495,000 out of the county of Fresno’s 940,000 residents, the city of Fresno makes up 53 percent of the population in the data discussed in this section.
Age and Cause of Death
The median age of death in the county of Fresno, 77.7 years old, is close to that of California (77.9) and the nation (78.2). However, another measure of age of death is years of potential life lost (YPLL) per 1,000 people. This metric computes the estimated number of years of life lost due to premature deaths against a person’s theoretical life expectancy. The County of Fresno Department of Public Health performed an assessment in 2009 in partnership with the Central Valley Health Partnership Institute.
In an unpublished report, they found the rate of YPLL in the county to be 28.7 years, compared to a statewide rate of 23.1 years. In other words, living in the county results in an average of 5.6 more years of lost potential lifespan per 1,000 residents, compared to the statewide rate, or 24 percent more lost years. Another study in 2011 by the Robert Wood Johnson Foundation used publicly available data for 2005-07 to find a similar disparity between county and the statewide YPLL.
The county’s rate of death from cancer is comparable to the State but lower than the national average. Diabetes is a major cause of death for county residents, both B3 Attach #1 of 3
10-6 FRESNO GENERAL PLAN
absolutely (fourth highest cause of death) and relatively, resulting in death at a rate 52 percent higher than the statewide average and 43 percent higher than the national average. Indeed, the county’s diabetes death rate is one of the worst in California, ranking 56th out of 58 counties, and because diabetes is often created by a lack of exercise and poor diet, these may be major public health issues in Fresno. In addition, county residents die significantly more (a rate greater than 15 percent higher per 100,000 residents) from Alzheimer’s disease, stroke, influenza/pneumonia, chronic liver disease and cirrhosis, accidents, motor vehicle accidents, and homicide, compared to the statewide and national average death rates. Overall, the county ranks in the bottom half (29 through 58) for most causes of death.
Chronic Disease-Related Risk Factors
The county ranks quite low in terms of overall health (51 out of 58 California counties) for overall health outcomes.3 The high rates of death in the county from diabetes, influenza/pneumonia, and chronic liver disease and cirrhosis suggest that notable proportions of local residents may be in chronically poor health, as those causes of death tend to be the result of longer term unhealthy living.
Health Disparities4
Health disparities between different racial and ethnic groups can be striking and create radically different qualities of life. Nearly 50 percent of Fresno’s population is Latino/of Hispanic origin. Latinos are a population that, as a whole, often has poor health indicators in relation to other ethnicities, as Latinos experience disproportionately high prevalence of and risk factors for asthma, obesity, HIV/AIDS, teenage pregnancy, suicide, and mental health disorders. Factors contributing to poorer health outcomes among the Hispanic population include language and cultural barriers, limited access to preventative care, and lack of insurance.5
Obesity
The U.S. Department of Health and Human Services, through its Healthy People Initiative, set national objectives for 2010 for the proportion of the population that is overweight or obese. The target rate was set to 15 percent or less of the adult population to be overweight or obese, but that rate is far exceeded in the county. In 2005, in the county, overweight and obese adults comprised 57 percent of the adult population aged 18 to 64 years, and 65 percent for adults aged 65 and older. 3 Robert Wood Johnson Foundation. 2011 County Health Rankings, Fresno, CA. 4 U.S. Centers for Disease Control and Prevention, Office of Minority Health and Health Disparities, 2012. 5 In 2012, over 30 percent of Latinos nationwide lacked health insurance (U.S. Census).
B3 Attach #1 of 3
December 2014 10-7
Chapter 10: Healthy Communities
Between 2004 and 2009, the rate of students who were overweight in grades 5, 7, and 9, rose from 30.6 percent, 32.0 percent and 27.4 percent to 36.0 percent, 38.5 percent, and 33.7 percent, respectively.6 There is a growing body of evidence relating obesity to the consumption of sugar-sweetened beverages. Over 30 years, the average daily caloric intake has increased by nearly 300 calories. In fact, in the county, 53 percent of 2- to 11- year-olds and 69 percent of 12- to 17-year-olds consume at least one soda a day, compared to 24 percent children nationwide.7
Smoking
In the county, 14.4 percent of adults report being a smoker, higher than the Healthy People 2020 (HP2020) goal of 12 percent.8 Smoking prevalence among county youth ages 12 to 17 is 7.2 percent. When looking at the availability of tobacco products, 17 percent, 35 percent, and 49 percent of students in grades 7, 9, and 11 respectively feel that it is easy to obtain cigarettes.9 Undercover tobacco youth purchase surveys found that 33 percent tobacco retailers in the city attempted to illegally sell cigarettes to minors.10 This rate of illegal tobacco sales to minors is higher than the HP2020 target of less than 5 percent. Also, no cities in the county meet the HP2020 target of having adopted local ordinances that prohibit smoking in multi-unit housing.
Local Health Disparities
The impact of health disparities is critical to justifying the role of planning in improving public health and creating healthy communities. Health disparities are differences in health outcomes (injury, illness, and death) between different groups of people. There is broad agreement in the literature that people who live in more socially and economically disadvantaged areas are in worse health than those living in more prosperous areas.11
A 2011 Community Needs Assessment of Fresno, Madera, Tulare, and Kings counties, undertaken by the Hospital Council of Northern and Central California, found several health disparities by race and ethnic group across the region. In Fresno, Latinos make up almost 47 percent of the city population; yet compared to white residents, Fresno’s 6 California Department of Education. California Physical Fitness Report Summary of Results. 2009-2010; 2004-2005 7 California Health Interview Survey, 2005 8 California Health Interview Survey, 2009. Current Smoking Status-Adults and Teens. 9 California Healthy Kids Survey, 2007-09, County Results: Main Report San Francisco: WestEd Health and Human Development Program for the California Department of Education. 10 Krenz, V.D. Brief Evaluation Report: Tobacco Retailer Licensing Policy in Fresno County. American Lung Association. 2010.
Krenz, V.D. & Allen, Fresno County Tobacco Prevention Program Final Evaluation Report. California: Fresno County Tobacco Prevention Program. 2007 11 Reducing Health Disparities through a Focus on Communities. PolicyLink, 2002.
B3 Attach #1 of 3
10-8 FRESNO GENERAL PLAN
Latino population experiences higher rates of diabetes, hospitalizations, and mortality, and higher rates of death from motor vehicle accidents. Similarly, African-American residents, who make up eight percent of the city population, experience higher hospital use and/or death rates for asthma, cancer, cardiovascular issues, diabetes, homicides, hypertension, and motor vehicle accidents compared to white residents.12
In the county, rates of obesity vary greatly by race, with 38 percent of Latinos obese compared to 23 percent of Whites, 22 percent of African-Americans, and just 8 percent of Asians. Only 6 percent of African-Americans in the county undertake vigorous physical exercise at least three times per week, compared to 21 percent of Whites, 24 percent of Asians, and 19 percent of Latinos.13
The county has a higher percentage of disabled residents (21.3 percent) than in California as a whole (19.2 percent).14 This population inherently has greater physical health needs than the rest of the population in the county.
Access to Medical and Health-Related Services
The medical dimension of health encompasses a range of services including primary care, specialty care, home health care, emergency services, mental health services, longterm care, dental care, and alternative care. Access to health care services is an important determinant of community health, since medical monitoring, advice, and care is often essential to preventing disease and improving poor health. In this context, access refers to physical proximity, as well as socioeconomic access.
Physical access to medical services is intertwined with transportation planning, because community members rely on the network of roadways, public transportation services, and walking and biking facilities to get to and from health-related facilities. The location of hospitals, medical clinics, and doctors’ and dentists’ offices in Fresno are such that parts of the city are underserved for residents in those areas. There are only a few medical facilities west of State Route 99, and a small number of health services in the southeastern section of the city. Northern and central Fresno has the bulk of the city’s medical facilities; these are easily accessible from State Route 41, but located far from the poorest populations south of State Route 180.
12 Hospital Council of Northern and Central California. Community Needs Assessment. 2011. 13 California Health Interview Survey. CHIS 2007. Adult, Teen, Child Public Use Files. <http://www.chis.ucla.edu>. Updated January 2007. As cited in Fresno Downtown Neighborhoods Health Impact Assessment. 14 Fresno Council of Governments. “Coordinated Human Services Transportation Plan.” 2008.
B3 Attach #1 of 3
December 2014 10-9
Chapter 10: Healthy Communities
For those families and individuals with the least resources or with physical disabilities that restrict function, public transportation systems are particularly important. To the extent that the Plan can improve the frequency and reliability of public transportation services to medical and health-related facilities within the city, this would support the wider goal of increasing access. The City does have good transit options for reaching medical care, with FAX service provided to all the hospitals in Fresno and to Children’s Hospital Central California in Madera; a paratransit service, Handy Ride, also services the hospitals and other medical facilities in Fresno.
Other closely related issues are language barriers and overall health literacy. The current operational definition of health literacy used in Healthy People 2010 is, “the degree(s) to which individuals have the capacity to obtain, process and understand basic health information and services for appropriate health decisions.” According to the U.S. Department of Health and Human Services, more than 90 million Americans struggle to understand basic health information. In one study in a public hospital, onethird of English-speaking patients could not read basic health materials, more than a quarter could not read appointment slips, and 42 percent did not understand labels on prescription bottles. The 2000 Census counted 20 million people who speak English poorly and 10 million who speak no English at all. In a 2002 report, the White House Office of Management and Budget estimated the number of patient encounters across language barriers each year at 66 million.15
15 U.S. National Library of Medicine National Institutes of Health. Understanding Health Literacy and its Barriers. CBM, 2004-1.
B3 Attach #1 of 3
10-10 FRESNO GENERAL PLAN
Physical and socioeconomic access to health care services is an important determinant of community health.
A related issue is that the county, along with the entire San Joaquin Valley, experiences a relative lack of medical physicians. The county had 2.0 physicians and surgeons per 1,000 residents in 2005, compared to a rate of 2.6 across California, or 23 percent fewer than the statewide average.16
OPPORTUNITIES FOR IMPROVEMENT
Many of the physical health issues in this section are being addressed by the County of Fresno Public Health Department and local health care providers. However, this Plan puts in place new policies to help provide better access to physical exercise and fresh food, and to invest in efforts to lower the crime rate, in order to reduce the prevalence and impact of preventable disease. This section supports initiatives of the California Endowment in partnering with the communities of central, southeast, and southwest Fresno as part of its Building Healthy Communities campaign.
Environmental Conditions
Fresno and the San Joaquin Valley as a whole have poor air quality when measured against federal and State guidelines. The area is in nonattainment (fails to meet 16 Bengiamin, Marlene, and John Amson Capitman and Xi Change. Healthy People 2010: A 2007 Profile of Health Status in the San Joaquin Valley. Central Valley Health Policy Institute, 2008.
B3 Attach #1 of 3
December 2014 10-11
Chapter 10: Healthy Communities
standards) for federal standards for PM 2.5 (particulate matter less than 2.5 micrometers in diameter) and State standards for 8-hour ozone, PM 10 (less than 10 micrometers in diameter), and PM 2.5. Fresno also is in extreme nonattainment for federal 8-hour ozone standards and severe nonattainment for State 1-hour ozone standards. Ozone is a highly reactive form of oxygen that attacks lung tissue and is particularly damaging to young children and older adults. Reducing the very high levels of ozone and significant concentrations of particulate matter from Fresno’s air would be a major step to improving the health of the community.
Local actions and opportunities for improvement in air quality are addressed in the Resource Conservation and Resilience Element.
Income and Poverty
The San Joaquin Valley is one of the least affluent areas of California. Per-capita income is well below the national average, and poverty, in both urban and rural areas, is a significant problem. Valley residents have among the lowest per capita personal incomes, higher rates of unemployment, and more residents living below the Federal Poverty Level than the average for California as a whole.
According to the American Community Survey, 27.5 percent of individuals in the city were living in poverty, significantly higher than the state average of 15.3 percent.
Thirty-eight percent of related children under 18 were below the poverty level.17
The 2006 Brookings Institution Study listed Fresno as the largest city in the United States with the most concentrated poverty, meaning the degree to which its poor are clustered in high-poverty neighborhoods. High poverty neighborhoods, generally defined as areas where more than 40 percent of people live below the poverty line, are in the central and southwestern part of the city including the Edison, Roosevelt and Lowell communities. Some areas within these communities had between 60 and 70 percent of people living below the poverty line in 2000. For example, the Lowell community, located in Downtown, has a population of nearly 14,000 with approximately 70 percent of individuals living below the poverty line of $15,219 (the federal poverty threshold for a three-person family in 2004) for a family of three in 2000.
Neighborhood poverty increased dramatically on the south and west sides of Fresno between 1980 and 2000, and this disparity has not changed in the past decade. Many factors have contributed to this increase in poverty. Immigrants, for example, are more likely to be poor than native-born residents. Growth patterns have also exacerbated the 17 2008 – 2012 American Community Survey 5 – Year Estimates.
B3 Attach #1 of 3
10-12 FRESNO GENERAL PLAN
concentration of poverty. Housing in the northern part of the city caters to upperincome families, while affordable housing investment has occurred in more distressed neighborhoods.
OPPORTUNITIES FOR IMPROVEMENT
Creating more and better paying jobs in Fresno would help address household poverty; these policy opportunities are addressed in the Economic Development and Fiscal Sustainability Element. Improving the rate of education attainment, a major factor in improving income, is addressed later in this element.
The concentrations of poverty in the central, western, and southern portions of Fresno suggest several opportunities for the City, such as targeting the development of jobs that pay a living wage in and near these neighborhoods, and dispersing low-income households to more mixed income neighborhoods. It is anticipated a subsequent community plan, such as the proposed Downtown Neighborhoods Community Plan, may further refine strategies to improve household income in these areas.
Crime and Safety
The cause-and-effect relationships between community design, crime, and public health are difficult to understand, but some general relationships have been found. Notably, both the reality and the perception of safety are indicators of a neighborhood’s overall economic and social health. Safety is necessary in neighborhoods in order to foster common values and to improve quality of life. In contrast, crime in neighborhoods creates fear and distrust among residents. Finally, while chronic disease is a major health challenge, many chronic disease prevention strategies—such as urban design that encourages walking and biking, provision of parks and recreation areas, and attracting grocery stores to neighborhoods—are less effective when fear and violence pervade the environment.18 Findings about this relationship include:
• Violence and fear of violence cause people to be less physically active and spend less time outdoors, and also alter people’s purchasing patterns, limiting access to healthy food;
• Experiencing and witnessing violence decrease motivation and capability of eating healthfully and being active;
• Violence reduces social interactions that would otherwise contribute to community cohesion; and
18 Cohen, L., et al. “Addressing the Intersection: Preventing Violence and Promoting Healthy Eating and Active Living.” Prevention Institute, May 2010 p 1.
B3 Attach #1 of 3
December 2014 10-13
Chapter 10: Healthy Communities
• Violence acts as a barrier to investment in community resources and opportunities, including those that support healthy eating and active living.
OPPORTUNITIES FOR IMPROVEMENT
The Plan continues support of the City of Fresno Police Department’s efforts to prevent and investigate crime, as covered in the Public Utilities and Services Element. Target ratios of officers per 1,000 residents will be set as part of the budgetary process. A viable local approach to crime reduction and increasing perceptions of safety in Fresno communities requires attention to the physical and social environments that either support or deter crime. The physical features, layout, and design of many aspects of neighborhoods can influence crime prevention and other crime-related outcomes, such as neighborhood deterioration and residents’ fear of crime.19 In addition, the physical design of buildings and streetscapes can help to deter crime, a concept known as Crime Prevention Through Environmental Design, or CPTED, is an approach that suggests design policies for new development and opportunities to reinvest in better design for established neighborhoods.
Educational Attainment
In the United States, the poorest communities are usually also those with the highest proportions of people without a high school diploma. This is because low-income communities often have poorer quality educational systems and lack access to basic resources that would improve student performance. Poverty also places greater pressure on students to leave school early in order to earn money; and, low quality and incomplete education makes it harder to find well-paying employment, increasing the likelihood that these students grow up and continue to live in poverty. A high poverty rate may also relate to the fact that many residents are foreign-born and may have limited English-language skills, precluding them from higher paying jobs.
Not having a high school diploma is associated with several negative health outcomes.
In 2002, 28 percent of adult Americans without a high school diploma lacked health insurance, in comparison to 8 percent of people with at least a Bachelor’s degree. More to the point, in 2005, 22 percent of adults in the county aged 18 to 64 had no health insurance, compared to a statewide average of 14 percent.20 The rate of educational attainment is not distributed equally across the city. The areas of the city with the lowest rates of high school graduates are in central and 19 Taylor, R. and A. Harrell. “Physical environment and crime.” As presented to the National Justice Institute, 1996. 20 Bengiamin, et. seq. 2008.
B3 Attach #1 of 3
10-14 FRESNO GENERAL PLAN
southwestern Fresno, at times exceeding 53 percent of the adult population. In contrast, northern Fresno has the highest rates of high school diplomas, with more than 88 percent of the population with diplomas in many areas. This distribution is almost identical to the poverty rate, with higher rates of poverty and lower proportions of high school diplomas appearing to correlate. About 20 percent of the adult population in the county has a college degree, compared to 27 percent statewide, and the city and county lag behind the rest of the state in residents with graduate degrees (6 percent vs. 11 percent). Moreover, about 26 percent of adult residents of Fresno have not graduated from high school, compared with less than 20 percent across the state.
Raising educational attainment is not only critical for health outcomes, but it is also essential to increasing opportunities for jobs and employment, as discussed in the Economic Development and Fiscal Sustainability Element.
OPPORTUNITIES FOR IMPROVEMENT
The City has no control over the local public schools or institutes of high education. It can, however, work with these agencies and with private educational institutions on their location and mission. Opportunities may also exist to partner with neighborhood schools as locations for public services and outreach, which may then encourage greater interest in school and opportunities for adult education and pursuit of a General Education Diploma (GED). Joint use agreements for open space and recreation facilities are discussed elsewhere in this element.
A factor in the city’s low rate of educational attainment may also be its lack of appeal to people with a college degree, especially recent graduates in their twenties. Fresno has a shortage of large private employers that offer career development and high salaries and lacks the walkable mixed-use neighborhoods that appeal to this population. The City has the potential to develop these assets, however, particularly by leveraging the presence of a major California State University in the city. Possible strategies are discussed in the Economic Development and Fiscal Sustainability Element.
10.3 ACCESS TO PARKS AND RECREATION
Exercise is critical to achieving positive health outcomes. Lack of physical activity is a primary risk factor in five of the top ten causes of death in California: heart disease, cancer, stroke, diabetes, and Alzheimer’s disease. It is also a primary risk factor for obesity, which itself contributes to the same prevalent causes of death. Recent statistics indicate that almost half of adult Californians (ages 18 and older) fail to meet the B3 Attach #1 of 3
December 2014 10-15
Chapter 10: Healthy Communities
national recommended guidelines for physical activity.21 Planners and public health practitioners recognize that community, neighborhood, and transportation system design often influences the extent to which physical activity fits into daily life, with the biggest barriers being long distances, lack of facilities, and safety concerns. When compared with people who were continually sedentary, those who increased their leisure time physical activity had 34 percent lower mortality, and those who were continually active had 45 percent lower mortality. These results did not vary in analyses stratified by obesity and functional limitations.22
Lack of physical activity is also a significant problem in the county. Only 64 percent of children ages 5 to 17 engaged in vigorous physical activity at least three days per week.23 County students, in grades 5, 7, and 9, lack cardio-respiratory endurance as evidenced by poor results for aerobic capacity. In 2010, two-thirds of students in grades 5, 7, and 9 did not achieve the standards in all six areas of the physical fitness test.
Access to and motivation to use physical recreation resources improves rates of physical activity, and the associated health benefits. Studies suggest people who live within walking distance (one-fourth mile) of a park are 25 percent more likely to meet their minimum recommended weekly amount of exercise.24 Public parks also serve as places for physical recreation as well as community anchors that can bolster emotional well-being.
Fresno has about 3.28 acres of parkland per 1,000 residents, compared to 5.0 in Visalia and 13.0 in Sacramento (which has 2.5 acres for neighborhood parks; 2.5 acres for community parks; and 8 acres for citywide parks, greenways and open space). In 2012 and 2013, Fresno was ranked last out of the 40 and then 50 largest U.S. cities, respectively, for ParkScore, a measure that takes into account public open space acreage, services, investment, and access.25 The City’s parks are also not distributed proportionate to the population. Overall, only 40 percent of residential lots in the city are within walking distance of a public park. The northern, generally less dense, areas of the city are well served by parks, open space, and bike routes. In contrast, the central areas of Fresno south of Shaw Avenue and west of State Route 41 have fewer and smaller parks, despite being some of the denser populated portions of the city. 21 Centers for Disease Control and Prevention. Behavioral Risk Factor Surveillance System, Chronic Disease Indicators, Physical Activity Trends for California, 2009.
22 Balboa-Castillo, T. “Physical activity and mortality related to obesity and functional status in older adults in Spain.” American Journal of Preventive Medicine Vol. 40, Issue 1, 2011. 23 California Health Interview Survey, 2009. Vigorous Physical Activity At Least 3 Days Per Week. 24 Frank, L., et al. “Linking objectively measured physical activity with objectively measured urban form: findings from SMARTRAQ.” American Journal of Preventative Medicine Vol. 28, Issue 2, 2005. 25 Trust for Public Land: http://parkscore.tpl.org/rankings.php B3 Attach #1 of 3
10-16 FRESNO GENERAL PLAN
Some schools allow unrestricted access to their grounds outside of school hours, which helps provide recreational access in areas with few parks, especially west of State Route
99. Few of the school grounds east of State Route 99 and south of Herndon Avenue are unrestricted.
OPPORTUNITIES FOR IMPROVEMENT
Priorities for this Plan include (1) to increase the amount of parks and open space available to its residents, and (2) to enhance access to parks and public recreation facilities within the central area of Fresno for those living in established neighborhoods.
While the creation of large parks in the older, denser portions of the city would be difficult, there are vacant parcels in key locations to create Pocket Parks with a children’s playground and a running path. The Parks, Open Space, and Schools Element addresses the amount and location of future parks and partnerships with neighborhoods needed to secure new parks and maintenance resources.
Another approach that leverages existing assets is to enter into joint use agreements with public schools in underserved areas, as these schools often have outdoor playfields and space and sometimes indoor resources. Many of the areas underserved by parks have schools located in the neighborhood. However, joint use agreements can be obstructed by the need to establish who ensures and pays for security, cleanup, and liability.
10.4 ACCESS TO HEALTHY FOOD
In addition to lack of exercise, poor diet is another major risk factor contributing to chronic disease prevalence. In the U.S., obesity and diet-related chronic disease rates are escalating; people are experiencing rising antibiotic resistance as a result of the treatment of farm animals; food, air, soil, and water are being contaminated from chemicals and pathogens related to agriculture; and natural resources such as fresh water and prime farmland are being depleted. These threats have environmental, social, and economic costs that are growing, cumulative, and unequally distributed. These issues all relate to the food system—what we eat and how it is produced.
Obesity is a particularly important concern for the healthy development of children.
Childhood obesity has more than tripled in the past 30 years. The prevalence of obesity among children aged 6 to 11 years increased from 6.5 percent in 1980 to 19.6 percent in 2008. The prevalence of obesity among adolescents aged 12 to 19 years increased from B3 Attach #1 of 3
December 2014 10-17
Chapter 10: Healthy Communities
5 percent to 18.1 percent.26 Obese youth are more likely to have risk factors for cardiovascular disease, such as high cholesterol or high blood pressure. Children and adolescents who are obese are also at greater risk for bone and joint problems, sleep apnea, and social and psychological problems such as stigmatization and poor selfesteem.27,28 Finally, obese youth are more likely than youth of normal weight to become overweight or obese adults, and therefore more at risk for associated adult health problems, including heart disease, Type 2 diabetes, stroke, several types of cancer, and osteoarthritis.
County children and adults are more overweight, suffer from diabetes and heart disease, are less physically active and have less access to healthy food and recreational resources than their statewide counterparts. According to the 2009 California Health Interview Survey, the percentage of overweight and obese adults in the county was 34.4 percent and 30.2 percent, compared to 33.6 percent and 22.7 percent statewide, respectively.29
In some communities, healthy food access is a big factor in obesity rates, particularly where there are challenges to both physical proximity and affordability. Residents in communities with a more “imbalanced food environment” (where fast food restaurants and corner stores are more convenient than grocery stores) have more health problems and higher mortality than residents of areas with a higher proportion of grocery stores, other factors held constant.30 Likewise, the presence of a supermarket in a neighborhood is linked to higher fruit and vegetable consumption and a reduced prevalence of obesity.31,32 In low-income neighborhoods, the addition of a supermarket has been found to increase residents’ likelihood of meeting nutritional guidelines by one-third.33
“Food deserts,” defined as large and isolated geographic areas where mainstream grocery stores are absent or distant, are linked to poor food habits and associated 26 Ogden, C.L., et al. “Prevalence of high body mass index in US children and adolescents, 2007–2008.” Journal of the American Medical Association, 303(3):242–9, 2010. 27 Daniels, S.R., et al. “Overweight in children and adolescents: pathophysiology, consequences, prevention, and treatment.” Circulation, 111;1999–2002, 2005. 28 U.S. Surgeon General. Overweight and Obesity: Health Consequences. Rockville: MD, 2001. 29 California Health Interview Survey, 2009. <http://www.chis.ucla.edu/main/DQ3/output.asp?_rn=0.7438928>. 30 Mari Gallagher Research and Consulting Group. “Examining the Impact of Food Deserts on Public Health in Chicago.” 2006.
31 Inagami, S., et al. “You are where you shop: grocery store locations, weight, and neighborhoods.” American Journal of Preventative Medicine Vol. 31, Issue 1, 2006. 32 Sturm, R., and A. Datar. “Body mass index in elementary school children, metropolitan area food prices, and food outlet density.” Public Health Vol. 119, 2005. 33 Morland, K., et al. “The contextual effect of the local food environment on residents’ diet.” American Journal of Public Health Vol. 92, Issue 11, November 2002.
B3 Attach #1 of 3
10-18 FRESNO GENERAL PLAN
negative diet-related health outcomes. The 2007 report “Searching for Healthy Food:
The Food Landscape in California Cities and Counties” report found that fast food restaurants and convenience stores were five times more prevalent in the county than supermarkets and produce vendors.34 According to the USDA Food Desert Locator, there are 12 census tracts in the county that are classified as food deserts. The distribution of retail food outlets in the county is: 50 percent fast-food restaurants, 34 percent convenience stores, 12 percent supermarkets, 3 percent produce stores, and 1 percent farmer’s markets.35
Furthermore, 21.6 percent of the population in the county is categorized as “food insecure” compared to 16.6 percent nationwide.
36 The county, one of the world’s top
producers of fruits and vegetables, exports much of its bounty out of the county. It is not uncommon for produce from the county to be sold to a distributor who ships it out of the county, out of California or out of the U.S. for processing or packaging. The product then finds its way back to Fresno via national supermarket chains at a higher cost.
Full service grocery stores and produce markets are inconsistently distributed around Fresno, with fewer on the city’s edges. The areas west of State Route 99 are largely devoid of grocery options.
34 CA Center for Public Health Advocacy. Searching for Healthy Food, The Food Landscape in Fresno County. 2007. 35 United States Department of Agriculture. Food Dessert Locator, Fresno County. 2011. 36 Feeding America. Food Insecurity & Food Cost In the US, Fresno County. 2011 B3 Attach #1 of 3
December 2014 10-19
Chapter 10: Healthy Communities
While Fresno is surrounded by some of the most productive agricultural land in the world, one in five residents in the county of Fresno is “food insecure,” and less than 10 percent of residential land in the city is within walking distance to a grocery store.
Most city residents would be unable to easily walk to a grocery store, since their locations are spread out. Only 10 percent of residential land in the city is within walking distance of a grocery store or fresh produce market. Farmers markets are also unevenly distributed.
The central areas of Fresno south of Shaw Avenue and west of State Route 41—on both sides of State Route 99—are underserved by grocery stores as well as parks, with fewer and smaller parks than other parts of the city. This quadrant could be considered to be the part of Fresno with the least access to healthy living options. Smaller areas lacking healthy lifestyle access include the neighborhood between McKinley and State Routes 41, 168, and 180; the neighborhood immediately west of the fairgrounds; and the area east of State Route 41 between Herndon, Bullard, and Cedar Avenues.
Urban Agriculture
Urban agriculture is the practice of cultivating, processing, and distributing food in or around a city or town for local consumption. Urban agriculture includes farmers’ markets, farm stands, community gardens, on-site garden produce market stands, and urban farms. Direct access to fresh fruits and vegetables through urban agriculture can improve food security and food safety.
B3 Attach #1 of 3
10-20 FRESNO GENERAL PLAN
The City became involved in healthy food access issues in 2007 when it was approached by several entities seeking to establish farmer’s markets. One of these applicants had received grant funding, only to discover that in order to allow a farmers’ market on its property, a rezoning was necessary to comply with land use regulations.
As a consequence, the City has made the zoning regulations for farmers’ markets more flexible. Additional initiatives for farmers’ markets and other types of urban agriculture are presented in this element, and the concurrent Development Code update will offer regulations for integrating healthy community concepts into the City’s regulations, consistent with General Plan policies and programs.
Another facet of urban agriculture is community gardens, which are on the rise in Fresno and in cities around the country. A community garden is a piece of land gardened by a group of people, utilizing either individual or shared plots on private or public land for the purpose of providing fresh produce and plants for the cultivators personal use as well as satisfying labor, neighborhood improvement, sense of community and connection to the environment. The land may produce fruit, vegetables, and/or ornamentals. They typically occur on a small-scale in urban and suburban areas and may be found in neighborhoods, schools, connected to institutions such as hospitals and churches, and on residential housing grounds. The benefits include:
• Recreational and community-building opportunities for residents; • Inexpensive access to fresh, healthy produce – which can serve as part of the solution to food deserts and other public health issues related to diet, including obesity;
• Business opportunities for residents to sell goods that they may grow, e.g. at farmers’ markets; and
• Productive use for vacant or underutilized land.
B3 Attach #1 of 3
December 2014 10-21
Chapter 10: Healthy Communities
Farmers markets provide residents with access to fresh, local produce.
OPPORTUNITIES FOR IMPROVEMENT
This Plan reflects the City's recent efforts to commit to several broad approaches to address these issues, including:
• The 2007 Fresno Green Strategy includes a policy to “encourage all city facilities (including schools) to serve at least 20 percent locally grown and organic foods beginning in 2009.” While this policy was intended mostly as an economic development strategy, it has the possibility to improve healthy food access. • As part of a multi-jurisdictional working group dedicated to improving health by improving the built environment, the City adopted a “Resolution Supporting the Collaborative Efforts of the City of Fresno Development and Resource Management Department and the County of Fresno in their efforts to Incorporate Public Health Strategies into Local Land Use, Transportation and Community Design Planning.” • Additional partnerships with the County of Fresno include Walkability Workshops in underserved neighborhoods, participation in Farmers Market and Community Garden conferences, and now, work on healthy communities in the General Plan and Development Code updates.
• The City also has been working with The California Endowment in partnership with the communities of central, southeast, and southwest Fresno as part of its Building Healthy Communities campaign.
B3 Attach #1 of 3
10-22 FRESNO GENERAL PLAN
Transportation Options
Transportation system design is related to health outcomes in a number of ways. For instance, while streets are designed to meet safety standards, negligent use by drivers, bicyclists and pedestrians can result in increased collisions or injuries. Statistics have shown traffic collisions and fatalities are substantially higher when vehicles are traveling faster, which naturally occurs on unobstructed and wide multi-lane roads. However, pedestrian injuries can be reduced more than seven-fold by slowing traffic down from 30 to 20 miles per hour miles per hour, and slowing traffic from 40 to 20 miles per hour can reduce a pedestrian’s chance of being killed, if hit by a vehicle, from 85 percent to just five percent. Reasonable road widths can naturally support efforts to reduce vehicle speed. Additionally, there is also a correlation between vehicle miles traveled (VMT) and traffic collision rates. Regardless of speed, the lower the VMT, the less likely there will be a traffic collision. A design emphasis of this Plan and the Complete Neighborhoods concept is to reduce VMT. Decreasing the VMT also has the added benefit of reducing air pollution, which has a major impact on local health conditions in Fresno.
By exchanging some of those vehicle trips for non-motorized trips, a community can realize health benefits. For instance, there is evidence that for each half-mile walked per day, people are about five percent less likely to be obese (controlling for age, education, gender, and ethnicity). Almost one-third of Americans who commute to work via public transit meet their daily requirements for physical activity by walking as a part of their daily life, including to and from the transit stop.37 This kind of access to routine physical activity is critical for individuals and families who lack the funds to support gym memberships or access to other private facilities.
Transit
Public transit provides travels options for people who cannot or choose not to drive, and can be a crucial means of accessing health services as well as jobs and education.
The Fresno Area Express (FAX) serves about 17.5 million annual passenger trips. Figure HC-1: Public Transit shows the location of bus stops in the city and a quarter-mile radius from each, representing a normal walking distance. FAX’s service area is fairly extensive, with 60 percent of residential and 94 percent of commercial land in Fresno within walking distance of a bus stop.
37 Besser, L. and A. Dannenberg, “Walking to public transit: steps to help meet physical activity recommendations.” American Journal of Preventive Medicine, Vol. 32, Issue 4. November 2005.
B3 Attach #1 of 3
December 2014 10-23
Chapter 10: Healthy Communities
Bicycling
The City of Fresno has a long-standing policy that biking is an important activity for many reasons including exercise and health. The City Council adopted the Active Transportation Plan (ATP), which serves as an administrative and implementing guide, to increase the miles of bike lane (along roadways) and bike paths (separate rights-of way) available to bike riders. Bicycle safety is a significant concern addressed in the ATP, which will be addressed by continuing to build safe bike routes and through education.
Walking
Walking delivers myriad physical and social benefits. Being able to walk to a job, the store, a park, or simply for recreation provides physical exercise, eliminates travel expenses, and can provide social cohesion and sense of place. While walking is almost always an option, as a practical matter an unpleasant environment or a perception of risk can discourage this activity. For example, walking can be discouraged by the unavailability of sidewalks in certain locations, negligent use of roadways by high-speed automobile traffic, visually uninteresting or unpleasant surroundings, the presence or threat of crime, and long distances between destinations. The City has options for addressing some of these negative factors including through land use designations, development standards, streetscape design, and police services as funding becomes available.
Creating additional safe walking and biking routes to schools for children is an important part of the city’s circulation system and a priority for this Plan. Providing these features will allow for physical activity opportunities, help with school attendance, and bolster the role of schools as community resources.
OPPORTUNITIES FOR IMPROVEMENT
This Plan’s transportation and mobility policies are intended to further improve the safety and efficiency of the system for all users; this will promote a better environment for walking, biking and the use of transit. This Plan also supports opportunities to increase the number of persons who bicycle to work—or bicycle mode split—from just less than one percent of total commuters to work, to a much greater proportion.
Completion of the city’s planned bicycle lane and path network will make travel around Fresno by bicycle more feasible. The Mobility and Transportation Element addresses many of these issues.
B3 Attach #1 of 3
SHAW AVE SHAW AVE
HERNDON AVE HERNDON AVE
BLACKSTONE AVE
WILLOW AVE
ASHLAN AVE
SHIELDS AVE
MCKINLEY AVE
CEDAR AVE
SHIELDS AVE SHIELDS AVE
ASHLAN AVE
MCKINLEY AVE
KINGS CANYON RD
HIGHLAND AVE
KINGS CANYON RD
OLIVE AVE OLIVE AVE
BUTLER AVE
JENSEN AVE
NORTH AVE NORTH AVE
JENSEN AVE
KEARNEY BLVD
BELMONT AVE BELMONT AVE
BULLARD AVE
NEES AVE
SHEPHERD AVE
FIGARDEN DR
GRANTLAND AVE
GARFIELD AVE
BLYTHE AVE
LB EHTY AVE
ARB YELW AVE
SKRAM AVE
CLINTON AVE
BRAWLEY AVE
KLOP AVE
SKRAM AVE
A TSEW VE
P MLA AVE
WEBER AVE
GOLDEN STATE BLVD
FRESNO ST W TUNLA AVE GIF AVE
CENTRAL AVE
AMERICAN AVE
HCAEP AVE
RADEC AVE
TUNTSEHC AVE TUNTSEHC AVE
SIVOLC AVE SIVOLC AVE
RELWOF AVE
ECNAREPMET AVE
JENSEN AVE
ECNAREPMET AVE
TSRIF ST TSRIF ST
BLACKSTONE AVE
FRESNO ST
GOLDEN STATE BLVD
H ST
EVA SSEN NAV
BARSTOW AVE
FRIANT RD
FRIANT RD
CALIFORNIA AVE
TIURF AVE
DE EFLOW AVE
COPPER AVE
FT WASHINGTON RD TSRIF ST
ASHLAN AVE
RELWOF AVE
AORAM AVE
CHURCH AVE
ANNADALE
MLE AVE
YRREHC AVE
TSAE AVE
EGNARO AVE
ELPAM AVE
LLIW WO AVE
TIURF AVE
TSEW AVE
SEHGUH AVE
CLINTON AVE CLINTON AVE
DAKOTA AVE VAN NESS AVE
ALLUVIAL AVE
BEHYMER AVE
PERRIN AVE
TEAGUE AVE
GETTYSBURG AVE GETTYSBURG AVE
VETERANS
AUDUBON DR
YRB NA AVE
HA SEY AVE
AILENROC AVE
V ENITNELA AVE
TUNTSEHC AVE
TULARE AVE
MCKINLEY AVE
GATES
BULLARD AVE
WHITESBRIDGE AVE
ELPAM AVE
Fresno Yosemite
International
Airport
San Jo a q u i n R ive r
Fresno-Clovis
Regional Wastewater
Reclamation Facility (RWRF)
FAX Bus Stops
Bus Stop 1/4 Mile Service Area
Figure HC-1:
Public Transit
0 2 4
MILES
1/2 1
Planning Area
Sphere of Inuence
City Limits
Source: City of Fresno Public Transportation (FAX), 2014. 180
41 99
168
180
99 41
B3 Attach #1 of 3
December 2014 10-25
Chapter 10: Healthy Communities
Safe and Affordable Housing38
Housing can have direct and indirect effects on community health. Physical housing characteristics have been linked directly to several adverse health outcomes. For example, the presence of dampness and mold leads to increased risk of respiratory and other illnesses, while dilapidated and abandoned housing increases the risk of accidental injury among residents and is associated with increased emotional stress. Lead exposure from lead-based paint is one of the largest environmental health hazards facing children throughout the nation, and yet about three-quarters of the nation's housing stock built before 1978 contains some lead-based paint. Population density and overcrowding have also been associated with increased chances of contracting infections and sustaining injury. Based on findings such as these, it follows that well-constructed and managed housing can avoid health problems associated with allergens, neurotoxins, other indoor air quality issues, disease exposure and stress due to overcrowding, and neighborhood safety issues as well.
Not only is there evidence that poor quality housing directly causes negative health effects, but affordable and higher quality housing may have indirect health benefits, too.
Affordable housing may improve health outcomes by freeing up resources for nutritious food and health care, and may reduce stress by providing families with greater residential stability, self-esteem, and sense of security and control over their environments.39 Home ownership in general has been associated with reduced morbidity and mortality risk.40
To really get at solutions for ensuring housing affordability beyond those already identified in the Housing Element, Fresno may also need to think about factors addressed by other General Plan elements that contribute to the lack of affordability.
For example, family budgets must also factor in the cost of transportation when considering where to live. Compact, mixed-use communities with a balance of housing, jobs, and stores and easy access to transit have lower transportation costs because they enable residents to meet daily needs with fewer cars, the single biggest transportation cost factor for most households. So, efforts to increase walkability of neighborhoods, a key theme in this Plan, may also result in overall increases in affordability for Fresno residents.
38 The Housing Element adopted in 2016 is in a companion volume of this General Plan. 39 Center for Housing Policy. “The positive impacts of affordable housing on health; a research summary.” 2007. 40 Filakti, H., and J. Fox. “Differences in mortality by housing tenure and by car access from the opcs longitudinal study.” Population Trends. 81:27-30, 1995.
B3 Attach #1 of 3
10-26 FRESNO GENERAL PLAN
OPPORTUNITIES FOR IMPROVEMENT
One of the City’s primary planning considerations is to address the need for increasing the affordable housing opportunities for low- and moderate-income households, with special emphasis on persons with disabilities, people experiencing homelessness, large families, persons living in substandard housing, and persons paying rent that exceeds 50 percent of their monthly income. As part of the implementation of the Housing Element, programs are identified each year to improve both the quantity and quality of the affordable housing stock in the city. Other considerations include upgrading the city’s infrastructure needs in low- and moderate-income neighborhoods, initiating programs to reduce crime, undertaking a code enforcement program and reducing homelessness.
Given its limited budget and fiscal capabilities, the City is working in close partnership with agencies such as the Fresno Housing Authority to contribute to the creation and rehabilitation of safe, affordable housing. The relatively low cost of land and ample supply of housing in the area also means that the market generally provides a supply of affordable housing on its own, although Fresno’s incomes are well below the state average and what is considered affordable in some parts of the state may not be in Fresno. This General Plan designates areas for higher densities and calls for by-right zoning to implement higher densities in the Development Code update consistent with the City of Fresno Housing Element. New policies to improve housing overlap with other issues, such as supporting housing that better serves an aging population and implementing the State’s newest building code, the CALGreen Code.
Youth Engagement and Empowerment
Engaging the younger members of our community is important to shaping the city’s direction. They offer a valuable voice and direction as the future stewards of our community. Soliciting youth feedback and input in designing public programming or infrastructure (parks, schools, etc.) that directly serve youth can provide significant benefits to institutions and neighborhoods. Youth are an important constituency when it comes to long-term care of investments (brick and mortar and time); if they help design and build something, they have proven they will take care of it.41
OPPORTUNITIES FOR IMPROVEMENT
Fresno has a Youth Engagement Team (YET) that is a collaborative network of 14 youth serving organizations. The idea is that young people should have a voice in their communities, with the chance to be advocates for change and to participate in the 41 Comments from leaders at the Fresno Youth Leadership Institute – September 30, 2011.
B3 Attach #1 of 3
December 2014 10-27
Chapter 10: Healthy Communities
decision-making process on issues that affect them. Tasks undertaken include researching and documenting local issues, creating campaigns to shift community attitudes, drafting suggestions for and working with local governments to enact policy change, and learning leadership skills necessary to inspire others to get involved.
Through the YET work in collaboration with the Building Healthy Communities campaign, youth and adult partnerships are currently working to engage youth in policies surrounding transportation, education equity and urban land use. Some of these initiatives and partnerships include:
• Students United to Create a Climate of Engagement, Support and Safety (SUCCESS) led by Youth Leadership Institute. The goal of SUCCESS project is to ensure equal learning opportunities for all students in the Fresno Unified School District (FUSD) through creating healthy school climates that support positive youth development. Currently, the SUCCESS team is working on recommendations to improve FUSD discipline policies and procedures to ensure behavior is addressed fairly and effectively. The goal of the program is to measure school attendance and reduce the number of school days missed due to suspension and expulsion.
• Summer Night Lights (SNL), led by the City of Fresno Parks, After School, Recreation and Community Services (PARCS). The SNL program aims to address youth violence prevention in key neighborhoods in Fresno where youth violence is most prevalent, by offering support services and measuring local violent crime data. SNL currently operates at Romain Park and Holmes Park. The underlying goal is to reduce the violence in the areas of these two parks, as measured by Fresno Police Department crime data, particularly violent crimes involving youth. • Fresno Youth Council for Sustainable Communities, led by the Center for Multicultural Cooperation. The California Center for Civic Participation, Center for Multicultural Cooperation and the Wangari Maathai Center, have established Youth Councils for Sustainable Communities in Fresno, Sacramento and the Bay Area.
The purpose is to ensure that youth are engaged in important decisions that will help transform communities into thriving, healthy places that preserve the environment and provide economic opportunities for all people. • Fresno Boys and Young Men of Color, led by Stone Soup Fresno. Stone Soup Fresno is working to ensure boys and young men of South East Asian heritage are included in local research and policy efforts to improve local health, education and economic outcomes for boys and young men of color.
Furthering the engagement of the Fresno’s youth in these civic activities is a cost effective way for the City to reduce crime, increase educational attainment, and improve a number of health indicators across all populations. This Plan includes specific policies to support the YET program and also provides clear opportunities with B3 Attach #1 of 3
10-28 FRESNO GENERAL PLAN
its own departments, such as PARCS, and expand collaborative efforts with local schools.
Building Healthy Communities Initiative
The City has been coordinating with community groups to address priorities of residents in south Fresno – generally those neighborhoods south of State Route 180.
One such group, The California Endowment, has launched a “Building Healthy Communities Initiative.” The Building Healthy Communities Initiative addresses a broad range of land use and social issues, which include:
• Ensure that the built environment is clean, well maintained and conducive to health in all city neighborhoods and includes adequate and equitable provision of sewer and water within a reasonably priced homeownership market. • Establish effective education and job training for area youth that is both academic and trade oriented.
• Ensure that underserved neighborhoods are included in strategies for job creation, including opportunities for home grown business development. • Actively seek opportunities to create and maintain safe parks of all sizes in every city neighborhood to provide families with spaces to interact with their neighbors and promote physical activity.
• Create opportunities both public and private for the Downtown neighborhoods that include entertainment, stores (retail, food, clothing etc.), parks, recreation centers and after school programs, especially for youth. • Acknowledge and address attitudes within the government institutions, economic systems and law enforcement culture toward immigrant and ethnic minority communities that perpetuate inequality.
• Develop a system of transportation that responds to the needs of the most vulnerable sectors of the community, including focused bus routes for specific geographic areas of need and/or particularly vulnerable subgroups (e.g. the elderly, disabled and farm workers).
• Provide accessible healthcare services beyond emergency care. • Establish an equitable system of public safety that supports community while also reducing crime.
Although these matters are not identified policies of this Plan, it is a stated policy of this Plan to coordinate with community groups such as those engaged in The California Endowment Building Healthy Communities Initiative to address community land use priorities.
B3 Attach #1 of 3
December 2014 10-29
Chapter 10: Healthy Communities
10.5 OBJECTIVES AND POLICIES
The vision for this element strives to:
• Increase access to medical and health services for underserved areas and populations at greater risk for poor physical health.
• Design new development and redevelopment to promote physical activity, access to fresh and healthy food, and deter crime.
• Continue programs to improve regional air quality.
• Expand access to infrastructure and community programs that facilitate healthy living, such as parks, recreation facilities, bike paths, and community gardens. • Support transportation and housing options that are affordable, reliable, effective, and safe.
OBJECTIVE
HC-1 Work with neighborhood associations of local residents, businesses, and institutions on neighborhood and community health initiatives.
IMPLEMENTING POLICIES
HC-1-a Neighborhood Associations. Promote the establishment of formal and self-sufficient "neighborhood associations" of local residents, businesses and institutions who are committed to working together and with others in Fresno to achieve the health, safety, recreation, employment, business development, property maintenance and other goals of their neighborhoods.
Commentary: Neighborhood associations can help coordinate with the City on setting priorities and obtaining feedback on programs and projects that are implemented.
HC-1-b Local Health Workshops. Work with health providers, schools, religious institutions, neighborhood associations and others to develop and maintain a program of regular health workshops (and mobile health clinics) operated by medical service providers and hosted in local neighborhood facilities such as schools, parks, religious institutions, businesses, and parking lots.
HC-1-c Neighborhood Care Facilities. Support public agencies and private sector groups who provide care facilities in neighborhoods and job centers through new partnerships and incentives, and create B3 Attach #1 of 3
10-30 FRESNO GENERAL PLAN
opportunities to provide healthy, secure environments for Pre-K children, older adults, and people with disabilities.
HC-1-d Cultural Sensitivity. Work with providers to ensure that additional health care services are offered in a way that is culturally sensitive and linguistically appropriate for the diverse communities in Fresno.
Commentary: The City will encourage collaborative partnerships between the County of Fresno Health Department; California State University, Fresno; medical professionals; community-based agencies; service providers; schools; and local agencies.
OBJECTIVE
HC-2 Create complete, well-structured, and healthy neighborhoods and transportation systems.
IMPLEMENTING POLICIES
HC-2-a Healthy Neighborhoods. Promote the design of Complete Neighborhoods whose physical layout and land use mix allow for walking to local stores and services, biking, and transit use; foster community pride; enhance neighborhood identity; encourage public safety; are family-friendly; and address the needs of residents of all ages and abilities.
Commentary: Related policies are in the Urban Form, Land Use and Design Element.
HC-2-b Supportive Housing. Continue to promote the availability of group housing facilities, emergency residential shelters, and similar housing arrangements throughout the city consistent with State and federal law.
HC-2-c Prevent Crime through Design. Incorporate Crime Prevention Through Environmental Design (CPTED) principles and best practices into project review procedures for new development and major renovations.
HC-2-d Mobility for Carless Population. Improve multi-modal mobility for populations that do not have access to a car by connecting neighborhoods to major destinations, including parks; civic facilities; educational institutions; medical facilities; employment centers; shopping destinations; and recreation areas.
B3 Attach #1 of 3
December 2014 10-31
Chapter 10: Healthy Communities
Commentary: Details and related policies in the Transportation and Mobility Element describe how this will accomplished with a variety of modes.
HC-2-e Bike and Pedestrian Network. Continue to promote alternative modes of transportation through development and maintenance of a citywide pedestrian and bicycle network.
OBJECTIVE
HC-3 Create healthy, safe, and affordable housing.
IMPLEMENTING POLICIES
HC-3-a Universal Design. Work with residential developers to update the City of Fresno Universal Design Standard to facilitate incorporation of lifecycle design principles in new residential development and make these options available to purchasers, to help community members stay in their homes and neighborhoods as they age.
Commentary: This idea is valuable to the concept of creating Complete Neighborhoods. Another common term is “visitability,” referring to the desire for friends or family of any age or physical ability to be able to visit the home. A life cycle or “visitable” house includes fixed accessible features (wider doors and halls, open floor spaces, clear traffic patterns, etc.), what many people understand to be “universal design” principles. Lifecycle housing also provides for adaptable features, such as wall reinforcement for later installation of grab bars, or removable base cabinets for future knee space, to accommodate wheelchairs.
HC-3-b Housing-Related Illness Assessment and Testing. Support efforts to provide community assessment and testing programs for housingrelated illnesses (i.e. blood lead levels, respiratory health, and skin conditions).
Commentary: Work collaboratively with the American Lung Association to support assessment and testing of housing related illnesses through best practice program, such as the Master Home Environmentalist Program.
HC-3-c Housing Services. Publicize housing programs and help residents make the connection between federal, State, County, City, private, and community-based housing services and local government resources related to rehabilitation and affordable housing improvements.
B3 Attach #1 of 3
10-32 FRESNO GENERAL PLAN
Commentary: Recommendations from the National Center for Healthy Housing’s “Housing and Health: New Opportunities for Dialogue and Action” will help the City implement this policy.
HC-3-d Green Standards for Affordable Housing. Provide appropriate incentives for affordable housing providers, agencies, non-profit, and market rate developers to use LEED and CALGreen Tier 1 or Tier 2 standards or third-party equivalents.
Commentary: The City will publicize the health, environmental, and long term economic and maintenance benefits of applying LEED, CALGreen for third-party equivalents to projects in Fresno.
HC-3-e Health Services and Medical Facilities in Underserved Neighborhoods.
Publicize existing health programs and help residents make the connection between County and community-based health services and medical facilities. Work with hospitals and the County of Fresno Health Department to increase siting and development of medical clinics and medical facilities.
HC-3-f New Drive-Through Facilities. Incorporate design review measures in the Development Code to reduce vehicle emissions resulting from queued idling vehicles at drive-through facilities proximate to residences.
Commentary: This action will help the City achieve the health benefits associated with improved neighborhood air quality through reduced auto-related emissions.
HC-3-g Residential Compatibility. Consider developing a program with community stakeholders to address compatibility of industrial and heavy commercial uses and zoning with established neighborhoods.
OBJECTIVE
HC-4 Improve property maintenance.
IMPLEMENTING POLICIES
HC-4-a Business Maintenance Standards. Update property maintenance standards, codes, and enforcement provisions to include businesses.
Commentary: Updated maintenance standards will provide additional enforcement options related to certain types of businesses, such as B3 Attach #1 of 3
December 2014 10-33
Chapter 10: Healthy Communities
"corner stores," which due to their nature and location have significant impacts on a healthy environment.
HC-4-b Local Business Assistance. Assist local store owners in established neighborhoods in identifying low-cost solutions to comply with physical accessibility requirements under the Americans with Disability Act. Provide financial assistance to qualifying businesses.
Commentary: The City will use multi-lingual outreach to include and support small business owners not fluent in English.
HC-4-c Residential Maintenance Standards. Consider the development of a residential housing inspection program to provide a structured review, evaluation and correction process to prevent substandard housing.
Commentary: This improvement program will be initiated in targeted neighborhood areas with high concentrations of substandard and poorly maintained residential properties.
HC-4-d Cooperative Compliance Monitoring. Work with "neighborhood resident associations" to monitor and enforce basic property maintenance standards to ensure neighborhood cleanliness and safety, and prevent blight-causing conditions.
HC-4-e Code enforcement. Conduct resident outreach, including to diverse populations, to assess the accessibility and adequacy of the City’s code enforcement procedures and modify them as needed.
HC-4-f Chronic Violators. Design and implement procedures to address chronic code violations at single properties.
OBJECTIVE
HC-5 Promote access to healthy and affordable food.
IMPLEMENTING POLICIES
HC-5-a Healthy Grocery Incentives. Adopt regulations and incentives in the Development Code for locating healthy food grocery stores to increase communitywide healthy food access, with an emphasis on the attraction of grocery stores to established neighborhoods deficient in grocery stores and access to healthy and fresh food.
B3 Attach #1 of 3
10-34 FRESNO GENERAL PLAN
• Establish definitions and standards for “healthy food grocery stores” in order to ensure that businesses meeting that description have access to incentives developed with them in mind.
Commentary: Criteria is to be established and should consider including in the store: (1) dedicate at least 50 percent of retail space for a general line of food and non-food grocery products intended for home preparation, consumption, and use; (2) dedicate at least 30 percent of retail space for perishable goods that include dairy, fresh produce, fresh meats-poultry-fish, and frozen foods; and/or (3) dedicate at least 500 square feet of retail space for fresh produce.
• Provide flexibility for established neighborhoods with corner stores and markets to meet the intent of a healthy grocery store, but with a lower square footage of produce area;
• Offer incentives for suitable sites that could be developed as healthy food grocery stores (with a focus on neighborhood areas with little or no access);
• Expedite permit processing as resources are available for healthy food grocery store development;
• Enable potential new healthy food grocers to consolidate parcels and/or make necessary improvements; and
• Allow for grocery stores that use less space, require less parking, and focus on the day-to-day needs of nearby residents.
HC-5-b Food Assistance Awareness. Support local agencies and community groups in increasing community awareness of and participation in existing federal food assistance programs, such as the Women, Infants, and Children (WIC) nutrition program and the Supplemental Nutrition Assistance Program (SNAP, formerly food stamps).
HC-5-c Refrigeration Assistance for Local Stores. Work with philanthropic and community institutions to create a revolving fund granting zerointerest loans to neighborhood convenience stores for the purchase of refrigeration and other fixtures necessary to allow for the sale of fresh produce.
HC-5-d Work with Farmers Markets. Promote comprehensive listing of all farmers markets in Fresno and support local agencies and community groups in working with farmers’ markets to accept WIC and EBT by B3 Attach #1 of 3
December 2014 10-35
Chapter 10: Healthy Communities
providing technical assistance, such as providing an exchange or voucher system.
HC-5-e Food Policy Council. Participate in the creation of a Fresno Food Policy Council with community-based groups to study the food system as a whole and recommend changes to appropriate agencies regarding food policy that increase access.
Commentary: The Fresno Food Policy Council will include stakeholders from many sectors of the food system, e.g., anti-hunger and food justice advocates, educators, employees of non-profits involved in food system reform, government officials, farmers, grocers, chefs, business people, food processors, and food distributors.
Opportunities for youth involvement in the work of the Fresno Food Policy Council will also be provided, as well as the County of Fresno Health Department’s Transformation Project and the Central California Obesity Prevention Program.
HC-5-f Urban Agriculture. Promote a full range of urban agriculture activities, including farmers’ markets, farm stands, community gardens, on-site garden produce market stands, and urban farms.
Support associations involved in these activities, which can be accomplished by a combination of the following:
• Amend the FMC to provide clear and concise permitting procedures regarding Community Gardens, On-site Garden
Produce Market Stands, and Urban Farms that allow sale of foods grown locally.
• Create a policy for reduced planning entitlements and plan check fees.
• Make publically available an inventory of City-owned surplus land that could be used for urban agriculture.
• Continue to allow and promote community gardens in Cityowned parks. • Support the planning of community gardens within walking distance of high-density residential areas to compensate for the reduced amount of open space in these areas.
• Emphasize opportunities for urban agriculture in all areas of the city, schools, parks, residential food deserts, and especially in areas of the city with a relatively high proportion of “food insecure” individuals.