FISCAL IMPACT STATEMENT

PROGRAM: Friant Road Adaptive ITS Washington to Copper River Road. 209900282 PW00955 Bid No. 12400307

TOTAL OR ANNUALIZED

RECOMMENDATION CURRENT COST

Direct Cost $1,963,964

Indirect Cost $ 612,034

TOTAL COST $2,576,000

Additional
Revenue or Savings
Generated $0

Net City Cost $2,576,000

Amount Budgeted
(If none budgeted,
identify source) $2,136,000

Indirect cost consists of the following:

Preliminary Engineering $249,000
Construction Engineering $216,300
Construction Materials $ 70,000
Contingency $ 76,736
Total $612,036

The Friant Road Adaptive Intelligent Transportation System (ITS) from Ft.

Washington to Copper River Road project is federally funded by Congested Mitigation and Air Quality Program (CMAQ). Required local match is funded by local Measure “C” Flexible funding.