CPD-B FHWA Eng. On-Call T&M - Multiple (06-2024) Page 1 of 2 Exhibit A
EXHIBIT A
SCOPE OF SERVICES
Consultant Service Agreement between City of Fresno (City) and Kleinfelder, Inc. (Consultant)
Services will be on an on-call basis and will include but are not limited to geotechnical investigation and design services will be provided for a wide variety of City capital improvement projects including new site developments, renovation and/or remodel of existing facilities, roadways, bridges, utility alignments, trails, and other municipal infrastructure.
In general, the Consultant shall be qualified and able to provide the following services:
• Desktop evaluation of pertinent records and maps
• Site reconnaissance and characterization
• Field investigation and drilling
• Sampling and logging of soil and rock
• Geotechnical laboratory testing
• Evaluation of site conditions, laboratory test results and engineering • calculations
• Establishment of engineering design parameters and
• recommendations for design
• Preparation of design level geotechnical reports
• Review of design plans and calculations for verification of • conformance to recommendations of geotechnical design • Performance of positive underground utility identification via passive • and active methods (i.e. GPR scanning, potholing, hydro-vac, etc.) • Preparation and submission of Traffic Control plans
• Coordination with other design disciplines or parties • Attendance at project meetings, as requested
• Construction-related geotechnical consultation
• Other related services as required
All services provided shall comply with generally accepted engineering standards, practices, and applicable codes and regulations.
Firm(s) must have substantial experience in providing geotechnical engineering design services, pavement evaluations, utility locating, and related assessments. Personnel shall be knowledgeable in the areas of expertise required for their work assigned work. Firm(s) shall be licensed as a C-57 well driller or use the services of a licensed C-57 well driller for all field investigation activities. Any services (i.e. field drilling, laboratory testing, etc.) that will be performed for the prime consultant by a sub-consultant shall be indicated and presented as specified in Section IV (SOQ Requirements).
CPD-B FHWA Eng. On-Call T&M - Multiple (06-2024) Page 2 of 2 Exhibit A
In general, the Consultant shall be qualified and able to provide the following:
• Perform geotechnical investigations and create an initial, followed by a final project Geotechnical Report, as needed for submission to the relevant reviewing agency/agencies having jurisdiction and adequately provide the technical data needs of the Architectural/Structural design team to support the development of Construction Drawings and Specifications.
• Perform geotechnical feasibility assessment that shall include but not be limited to a desk study (review of existing geotechnical data, public documentation, geologic maps, aerial photographs, historic groundwater level, FEMA flood maps, etc.), preliminary geotechnical exploration and report preparation (summary of findings with preliminary assessment of site conditions and initial recommendation to support building design). When needed and depending upon site conditions, limited exploration shall be performed using Cone Penetration Test (CPT) equipment to identify site hazards, such as liquefaction and soft soil settlement potentials, and provide preliminary soil information for project planning and budgeting purposes. • Prepare design level geotechnical reports based on the findings from the feasibility assessment that shall include but not be limited to soil borings (locations, type and depth), detailed geotechnical exploration (drilling, laboratory testing of select soil samples for moisture-density, Atterberg Limits, gradation, strength, corrosivity, consolidation tests, expansion index, and R-value, etc.), detailed report on the site conditions, constraints, mitigation measures (if applicable), load-induced ground settlement, foundation design recommendation, etc.
• Conduct pavement evaluations and pavement design including alternative pavement design recommendations (i.e. cold-in-place recycling, Full Depth Reclamation, geotextiles, etc.)
• Participate in the constructability review of project documents respective design teams during design and pre-construction phases.
• Attend Meetings and other general project coordination duties: The firm(s) may be requested to attend various pre-construction/design meetings to perform necessary coordination, provide project oversight and/or project closeout assistance as necessary, and be available for on-site geotechnical consultation throughout the duration of the project(s), as required.
• Firms shall provide all necessary field drilling and testing equipment, and other instrumentation/devices, as needed, to assure all work is done in a timely and professional manner to deliver the required deliverables. • All work shall be performed, signed and sealed under the direction and supervision of a California Registered Geotechnical Engineer (“GE”).
Firm(s) are advised that standard field construction observations, materials testing, compaction testing, and supporting site inspections may potentially be performed by firms other than the on-call geotechnical consultants. As such, firms will be expected to work in harmony and in cooperation with the City of Fresno approved Quality Assurance Program testing agencies, when necessary.
Local Assistance Procedures Manual EXHIBIT 10-H2
Cost Proposal
Note: Mark-ups are Not Allowed
Consultant Kleinfelder, Inc. Prime Consultant Subconsultant 2nd Tier Subconsultant Project No. TBD Contract No. TBD Participation Amount $ TBD Date 10/15/2024 + *GENERAL & ADMINISTRATIVE % = COMBINED ICR%
For Combined Rate + =
*includes FCCM %
Fee =
Actual or Avg % or $
Straight OT(1.5x) OT(2x) From To Hourly Rate increase
Stephen Plauson, PE, GE* 268.44$ N/A N/A 11/1/2024 10/31/2025 93.75 $ - Principal-in-Charge / Project Manager 281.87 $ N/A N/A 11/1/2025 10/31/2026 98.44 $ 5.00% Not Applicable Exempt 295.96$ N/A N/A 11/1/2026 10/31/2027 103.36 $ 5.00% Joseph Zilles, PG* 245.33$ N/A N/A 11/1/2024 10/31/2025 85.68 $ - Water Quality and Supply / Hydrogeology Lead 257.59$ N/A N/A 11/1/2025 10/31/2026 89.96 $ 5.00% Not Applicable Exempt 270.48$ N/A N/A 11/1/2026 10/31/2027 94.46 $ 5.00% James Helge, CEM* 224.09$ N/A N/A 11/1/2024 10/31/2025 78.26 $ - Environmental Lead 235.28 $ N/A N/A 11/1/2025 10/31/2026 82.17 $ 5.00% Not Applicable Exempt 247.05$ N/A N/A 11/1/2026 10/31/2027 86.28 $ 5.00% Steven Wiesner, PE, GE 291.86$ N/A N/A 11/1/2024 10/31/2025 101.93 $ - Independent Technical Reviewer - Geotechnical 306.47$ N/A N/A 11/1/2025 10/31/2026 107.03 $ 5.00% Not Applicable Exempt 321.79$ N/A N/A 11/1/2026 10/31/2027 112.38 $ 5.00% Elizabeth Simmons, PG 269.36$ N/A N/A 11/1/2024 10/31/2025 94.07 $ - Independent Technical Reviewer - Environmental 282.82$ N/A N/A 11/1/2025 10/31/2026 98.77 $ 5.00% Not Applicable Exempt 296.96$ N/A N/A 11/1/2026 10/31/2027 103.71 $ 5.00% James Finegan, CHG 246.71$ N/A N/A 11/1/2024 10/31/2025 86.16 $ - Independent Technical Reviewer - Hydrology 259.05 $ N/A N/A 11/1/2025 10/31/2026 90.47 $ 5.00% Not Applicable Exempt 271.99$ N/A N/A 11/1/2026 10/31/2027 94.99 $ 5.00% James Wetenkamp, CEG, PG 206.54$ N/A N/A 11/1/2024 10/31/2025 72.13 $ - Engineering Geology 216.87 $ N/A N/A 11/1/2025 10/31/2026 75.74 $ 5.00% Not Applicable Exempt 227.73$ N/A N/A 11/1/2026 10/31/2027 79.53 $ 5.00% Jose Asyn Tejeira, PE 209.51$ N/A N/A 11/1/2024 10/31/2025 73.17 $ - Geotechnical Engineer 219.99 $ N/A N/A 11/1/2025 10/31/2026 76.83 $ 5.00% Not Applicable Exempt 230.99$ N/A N/A 11/1/2026 10/31/2027 80.67 $ 5.00% Victoria Tinoco 137.67$ N/A N/A 11/1/2024 10/31/2025 48.08 $ - Geotechnical Engineer 144.54 $ N/A N/A 11/1/2025 10/31/2026 50.48 $ 5.00% Not Applicable Exempt 151.76$ N/A N/A 11/1/2026 10/31/2027 53.00 $ 5.00%
BILLING INFORMATION
Hourly Range -
for Classifications Only
CALCULATION INFORMATION
Name/Job Title/Classification Hourly Billing Rates Effective date of hourly rate 148.99%
15.00%
EXHIBIT 10-H2 COST PROPOSAL Page 1 of 3
SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)
FRINGE BENEFIT %
57.07% 91.92%
X
Local Assistance Procedures Manual EXHIBIT 10-H2
Cost Proposal
Note: Mark-ups are Not Allowed
Consultant Kleinfelder, Inc. Prime Consultant Subconsultant 2nd Tier Subconsultant Project No. TBD Contract No. TBD Participation Amount $ TBD Date 10/15/2024 + *GENERAL & ADMINISTRATIVE % = COMBINED ICR%
For Combined Rate + =
*includes FCCM %
Fee =
Actual or Avg % or $
Straight OT(1.5x) OT(2x) From To Hourly Rate increase
BILLING INFORMATION
Hourly Range -
for Classifications Only
CALCULATION INFORMATION
Name/Job Title/Classification Hourly Billing Rates Effective date of hourly rate 148.99%
15.00%
EXHIBIT 10-H2 COST PROPOSAL Page 1 of 3
SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)
FRINGE BENEFIT %
57.07% 91.92%
X
Exequiel “Zeke” Sinco, PE,GE* 220.60$ N/A N/A 11/1/2024 10/31/2025 77.04 $ - Geotechnical Engineer 231.62 $ N/A N/A 11/1/2025 10/31/2026 80.89 $ 5.00% Not Applicable Exempt 243.19$ N/A N/A 11/1/2026 10/31/2027 84.93 $ 5.00% Nathan Strid, PE* 159.12$ N/A N/A 11/1/2024 10/31/2025 55.57 $ - Geotechnical Engineer 167.08 $ N/A N/A 11/1/2025 10/31/2026 58.35 $ 5.00% Not Applicable Exempt 175.44$ N/A N/A 11/1/2026 10/31/2027 61.27 $ 5.00% Justin Crose, PG* 193.97$ N/A N/A 11/1/2024 10/31/2025 67.74 $ - Hydrogeology 203.67 $ N/A N/A 11/1/2025 10/31/2026 71.13 $ 5.00% Not Applicable Exempt 213.87$ N/A N/A 11/1/2026 10/31/2027 74.69 $ 5.00% Robert Horwath, PG 231.48$ N/A N/A 11/1/2024 10/31/2025 80.84 $ - Site Characterization 243.04 $ N/A N/A 11/1/2025 10/31/2026 84.88 $ 5.00% Not Applicable Exempt 255.18$ N/A N/A 11/1/2026 10/31/2027 89.12 $ 5.00% Jesus Reyes 123.13$ N/A N/A 11/1/2024 10/31/2025 43.00 $ - Geotechnical Engineer 129.28 $ N/A N/A 11/1/2025 10/31/2026 45.15 $ 5.00% Not Applicable Exempt 135.75$ N/A N/A 11/1/2026 10/31/2027 47.41 $ 5.00% Jesus Reyes** 269.85$ 404.77$ 539.69$ 11/1/2024 10/31/2025 94.24 $ - Inspection and Materials Testing 283.33 $ 425.00$ 566.66$ 11/1/2025 10/31/2026 98.95 $ 5.00% Not Applicable 297.51$ 446.26$ 595.01$ 11/1/2026 10/31/2027 103.90 $ 5.00% Jesus Reyes** 264.12$ 396.18$ 528.24$ 11/1/2024 10/31/2025 92.24 $ - Inspection and Materials Testing 277.32 $ 415.98$ 554.64$ 11/1/2025 10/31/2026 96.85 $ 5.00% Not Applicable 291.18$ 436.77$ 582.36$ 11/1/2026 10/31/2027 101.69 $ 5.00% Jesus Reyes** 243.47$ 365.21$ 486.95$ 11/1/2024 10/31/2025 85.03 $ - Inspection and Materials Testing 255.64 $ 383.46$ 511.29$ 11/1/2025 10/31/2026 89.28 $ 5.00% Not Applicable 268.41$ 402.62$ 536.83$ 11/1/2026 10/31/2027 93.74 $ 5.00% Jesus Reyes** 226.38$ 339.57$ 452.76$ 11/1/2024 10/31/2025 79.06 $ - Inspection and Materials Testing 237.69 $ 356.53$ 475.38$ 11/1/2025 10/31/2026 83.01 $ 5.00% Not Applicable 249.57$ 374.36$ 499.15$ 11/1/2026 10/31/2027 87.16 $ 5.00% Non-Exempt (Prevailing Wage - Group 3)
Non-Exempt (Prevailing Wage - Group 2)
Non-Exempt (Prevailing Wage - Group 4)
Non-Exempt (Prevailing Wage - Group 1)
Local Assistance Procedures Manual EXHIBIT 10-H2
Cost Proposal
Note: Mark-ups are Not Allowed
Consultant Kleinfelder, Inc. Prime Consultant Subconsultant 2nd Tier Subconsultant Project No. TBD Contract No. TBD Participation Amount $ TBD Date 10/15/2024 + *GENERAL & ADMINISTRATIVE % = COMBINED ICR%
For Combined Rate + =
*includes FCCM %
Fee =
Actual or Avg % or $
Straight OT(1.5x) OT(2x) From To Hourly Rate increase
BILLING INFORMATION
Hourly Range -
for Classifications Only
CALCULATION INFORMATION
Name/Job Title/Classification Hourly Billing Rates Effective date of hourly rate 148.99%
15.00%
EXHIBIT 10-H2 COST PROPOSAL Page 1 of 3
SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)
FRINGE BENEFIT %
57.07% 91.92%
X
Jamal Osumanu 105.95$ N/A N/A 11/1/2024 10/31/2025 37.00 $ - Geotechnical Engineer 111.24 $ N/A N/A 11/1/2025 10/31/2026 38.85 $ 5.00% Not Applicable Exempt 116.80$ N/A N/A 11/1/2026 10/31/2027 40.79 $ 5.00% Jamal Osumanu** 269.85$ 404.77$ 539.69$ 11/1/2024 10/31/2025 94.24 $ - Inspection and Materials Testing 283.33 $ 425.00$ 566.66$ 11/1/2025 10/31/2026 98.95 $ 5.00% Not Applicable 297.51$ 446.26$ 595.01$ 11/1/2026 10/31/2027 103.90 $ 5.00% Jamal Osumanu** 264.12$ 396.18$ 528.24$ 11/1/2024 10/31/2025 92.24 $ - Inspection and Materials Testing 277.32 $ 415.98$ 554.64$ 11/1/2025 10/31/2026 96.85 $ 5.00% Not Applicable 291.18$ 436.77$ 582.36$ 11/1/2026 10/31/2027 101.69 $ 5.00% Jamal Osumanu** 243.47$ 365.21$ 486.95$ 11/1/2024 10/31/2025 85.03 $ - Inspection and Materials Testing 255.64 $ 383.46$ 511.29$ 11/1/2025 10/31/2026 89.28 $ 5.00% Not Applicable 268.41$ 402.62$ 536.83$ 11/1/2026 10/31/2027 93.74 $ 5.00% Jamal Osumanu** 226.38$ 339.57$ 452.76$ 11/1/2024 10/31/2025 79.06 $ - Inspection and Materials Testing 237.69 $ 356.53$ 475.38$ 11/1/2025 10/31/2026 83.01 $ 5.00% Not Applicable 249.57$ 374.36$ 499.15$ 11/1/2026 10/31/2027 87.16 $ 5.00% Lab Supervisor 135.52$ N/A N/A 11/1/2024 10/31/2025 47.33 $ - Lab Supervisor 135.52 $ N/A N/A 11/1/2025 10/31/2026 47.33 $ 5.00% Not Applicable Exempt 135.52$ N/A N/A 11/1/2026 10/31/2027 47.33 $ 5.00% Special Inspector II 108.98$ 163.47$ 217.96$ 11/1/2024 10/31/2025 38.06 $ - Special Inspector II 108.98 $ 163.47$ 217.96$ 11/1/2025 10/31/2026 38.06 $ 5.00% $38 / $39 Non-Exempt 108.98$ 163.47$ 217.96$ 11/1/2026 10/31/2027 38.06 $ 5.00% Technician IV 104.51$ 156.77$ 209.03$ 11/1/2024 10/31/2025 36.50 $ - Technician IV 109.75 $ 164.63$ 219.51$ 11/1/2025 10/31/2026 38.33 $ 5.00% Not Applicable Non-Exempt 115.25$ 172.88$ 230.50$ 11/1/2026 10/31/2027 40.25 $ 5.00% Technician III 97.36$ 146.03$ 194.71$ 11/1/2024 10/31/2025 34.00 $ - Technician III 102.22 $ 153.33$ 204.45$ 11/1/2025 10/31/2026 35.70 $ 5.00% $27 - $34 Non-Exempt 107.35$ 161.02$ 214.70$ 11/1/2026 10/31/2027 37.49 $ 5.00% Non-Exempt (Prevailing Wage - Group 2)
Non-Exempt (Prevailing Wage - Group 3)
Non-Exempt (Prevailing Wage - Group 4)
Non-Exempt (Prevailing Wage - Group 1)
Local Assistance Procedures Manual EXHIBIT 10-H2
Cost Proposal
Note: Mark-ups are Not Allowed
Consultant Kleinfelder, Inc. Prime Consultant Subconsultant 2nd Tier Subconsultant Project No. TBD Contract No. TBD Participation Amount $ TBD Date 10/15/2024 + *GENERAL & ADMINISTRATIVE % = COMBINED ICR%
For Combined Rate + =
*includes FCCM %
Fee =
Actual or Avg % or $
Straight OT(1.5x) OT(2x) From To Hourly Rate increase
BILLING INFORMATION
Hourly Range -
for Classifications Only
CALCULATION INFORMATION
Name/Job Title/Classification Hourly Billing Rates Effective date of hourly rate 148.99%
15.00%
EXHIBIT 10-H2 COST PROPOSAL Page 1 of 3
SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)
FRINGE BENEFIT %
57.07% 91.92%
X
Alma Jimenez 115.74$ N/A N/A 11/1/2024 10/31/2025 40.42 $ - Project Controls Professional 121.52 $ N/A N/A 11/1/2025 10/31/2026 42.44 $ 5.00% Not Applicable Exempt 127.59$ N/A N/A 11/1/2026 10/31/2027 44.56 $ 5.00% Margarita "Maggie" Medina 82.58$ 123.87$ 165.16$ 11/1/2024 10/31/2025 28.84 $ - Project Administrator 86.70 $ 130.05$ 173.41$ 11/1/2025 10/31/2026 30.28 $ 5.00% Not Applicable Non-Exempt 91.03$ 136.54$ 182.05$ 11/1/2026 10/31/2027 31.79 $ 5.00% NOTES:
1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles.
Subconsultants will provide their own cost proposals.
2. The cost proposal format shall not be amended.
3. Billing rate = actual hourly rate * (1+ ICR) * (1+ Fee). Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans. All costs must comply with the Federal cost principles for reimbursement.
4. For named employees and key personnel enter the actual hourly rate. For classifications only, enter the Average Hourly Rate for that classification.
Local Assistance Procedures Manual EXHIBIT 10-H2
Cost Proposal
Consultant Kleinfelder, Inc. Prime Consultant Subconsultant Project No. TBD Contract No. N/A Date 10/15/2024
Quantity Unit Unit Cost
per IRS rate
per attached Fee Schedule
at cost
at cost
at cost
per attached Fee Schedule
Note: Add additional pages if necessary.
NOTES:
1. List other direct cost items with estimated costs. These costs should be competitive in their respective industries and supported with appropriate documentation.
2. Proposed ODC items should be consistently billed regardless of client and contract type.
3. Items when incurred for the same purpose, in like circumstance, should not be included in any indirect cost pool or in the overhead rate.
4. Items such as special tooling, will be reimbursed at actual cost with supporting documentation (invoice).
5. Items listed above that would be considered "tools of the trade" are not reimbursable as other direct cost
6. Travel related costs should be pre-approved by the contracting agency and shall not exceed current State Department of Personnel Administration rules
7. If mileage is claimed, the rate should be properly supported by the consultant's calculation of their actual costs for company vehicles. In addition, the miles claimed should be supported by mileage logs.
8. If a consultant proposes rental costs for a vehicle, the company must demonstrate that this is its standard procedure for all of their contracts and that they do not own any vehicles that could be used for the same purpose.
9. The cost proposal format shall not be amended. All costs must comply with the Federal cost principles.
10. Add additional pages if necessary.
11. Subconsultants must provide their own cost proposals Subconsultant 5: Technicon Engineering Services Reimbursed at cost Subconsultant 2: Associated Traffic Safety Reimbursed at cost Subconsultant 3: Sunland Analytical Lab Inc Reimbursed at cost Subconsultant 4: Metiri Group Reimbursed at cost
Laboratory Testing
Reimbursed at cost
Vehicle Rental
Subconsultant 1: Avila Traffic Control
EXHIBIT 10-H2 COST PROPOSAL Page 2 of 3
SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)
SCHEDULE OF OTHER DIRECT COST ITEMS
Plan Sheets
TotalDescription of Item
Mileage Costs
Equipment Rental and Supplies
Permit Fees
Subconsultant 6: Bess Testlab, Inc Reimbursed at cost
Subconsultant 7: GPRS Reimbursed at cost
Subconsultant 8: Salem Engineering Group Inc Reimbursed at cost Subconsultant 13: Enthalpy Analytical, LLC Reimbursed at cost Subconsultant 14: Forensic Analytical Consulting Services, Inc Reimbursed at cost Subconsultant 9: Taber Drilling Reimbursed at cost
Subconsultant 11: Dillard Environmental Services Reimbursed at cost Subconsultant 12:California Laboratory Services Reimbursed at cost Subconsultant 10: Gregg Drilling Reimbursed at cost
X
2024 KLEINFELDER FEE SCHEDULE FOR
GEOTECHNICAL and MATERIALS LABORATORY TESTING SERVICES
†Common ASTM, AASHTO and DOT test methods.
• Those beginning with A, B, C, D, E, F, or G are ASTM methods. • Those beginning with T are AASHTO methods.
Revised 4/2024
SOIL TESTS
SOIL DENSITY TESTS
Test Standard Test Method† Fee
Standard Proctor D698, T99 $ 305 each
Modified Proctor D1557, T180 $ 305 each
Rapid Determination of Compaction* D5080 $ 250 each
1-Point Proctor, Check Point T272 $ 180 each
Proctor Oversize Correction D4718 $ 95 each
Treated Soil Proctor D558 $ 400 each
Minimum and Maximum Relative Density D4254, D4253 $ 535 each Maximum Density by Vibratory Hammer D7382 $ 695 each
Moisture/Density, TEX 113-E TEX113-E $ 345 each
Moisture/Density, TEX 114-E TEX114-E $ 345 each
California Impact, CT 216 CT216 $ 285 each
*Field Test
SOIL CLASSIFICATION AND INDEX TESTS
Test Standard Test Method† Fee
Visual Classification D2488 $ 37 each
Sieve Analysis, % Finer than No. 200 Sieve D1140 $ 115 each Sieve Analysis, Fine D422, D6913, T88 $ 165 each
Sieve Analysis, Coarse D422, D6913, T88 $ 165 each
Sieve Analysis, Coarse and Fine D422, D6913, T88 $ 210 each Hydrometer Analysis (Requires a Sieve Analysis, not included) D422, D7928 $ 230 each Water Content D2216, D4363, T265 $ 32 each
Water Content and Dry Unit Weight D2216, D2937, D7263 $ 58 each Atterberg Limits, Single Point D4318-B, T89, T90 $ 150 each Atterberg Limits, Multiple Point D4318-A, T89, T90 $ 230 each Soil Specific Gravity D854, T100 $ 285 each
Soil Organic Content D2974-C $ 160 each
Fiber Content of Peat Soils D1997 $ 335 each
Pinhole Dispersion Classification D4647 $ 660 each
Soil pH D4972, G51 $ 74 each
Double Hydrometer for Dispersive Soils D4221 $ 345 each Crumb Test for Dispersive Soils D6572 $ 110 each
Soil Resistivity G187 $ 200 each
Chloride Content $ 89 each
Sulfate Content $ 74 each
Thermal Resistivity, Per Point D5334, IEEE 422 $ 410 each Thermal Resistivity, Dry-Out Curve D5334, IEEE 422 $ 1,195 each Methylene Blue C837 $ 290 each
2024 KLEINFELDER FEE SCHEDULE FOR
GEOTECHNICAL and MATERIALS LABORATORY TESTING SERVICES
†Common ASTM, AASHTO and DOT test methods.
• Those beginning with A, B, C, D, E, F, or G are ASTM methods. • Those beginning with T are AASHTO methods.
Revised 4/2024
SOIL TESTS (continued)
SOIL BEARING PRESSURE TESTS
Test Standard Test Method† Fee
California Bearing Ratio, Single Point (proctor not included) D1883, T193 $ 440 each California Bearing Ratio, 3 Points (proctor not included) D1883, T193 $ 820 each Resistance R-Value D2844 $ 410 each
Resistance R-Value of Treated Material D2844 $ 475 each Rock Correction for R-Value D2844 $ 105 each
Stabilized Soil UC Strength, 1 Point (proctor not included) D1633, D5102 $ 220 each Stabilized Soil UC Strength, Set of 3 D1633, D5102 $ 1,195 each CT373, 1 Lime Content, w/o Opt. Moist. CT373 $ 210 each CT373, 1 Lime Content CT373 $ 460 each
CT373, 3 Lime Contents CT373 $ 1,385 each
Eades and Grim Test (Opt. Lime Content) C977 $ 245 each Resilient Modulus T307 $ 600 each
CTB Strength, Individual Specimen $ 230 each
CTB Strength, Set of 3, Without Design $ 525 each
CTB Complete Mix Design $ Inquire each
SOIL STRENGTH AND PERMEABILITY TESTS
Test Standard Test Method† Fee
Pocket Penetration Value $ 37 each
Unconfined Compressive Strength D2166, T208 $ 180 each
Direct Shear, 1 Point D3080, T236 $ 190 each
Direct Shear, 3 Points D3080, T236 $ 495 each
Direct Shear, Residual Strength, Each Point D3080-Modified $ 315 each Consolidation without Time Rate Plots D2435-Modified $ 430 each Consolidation with 2 Time Rate Plots D2435-A, T216-A $ 565 each Consolidation, All Loads with Time Rates D2435-B, T216-B $ 800 each Collapse Potential D5333 $ 315 each
One Dimensional Swell – Wetting After Loading, Series D4546-A $ 380 each One Dimensional Swell – Wetting After Loading D4546-B $ 220 each One Dimensional Swell – Loading After Wetting D4546-C $ 600 each Expansion Index D4829 $ 245 each
Denver Swell Test $ 220 each
Permeability, Rigid Wall D2434 $ 565 each
Permeability, Flexible Wall D5084-C $ 495 each
Triaxial Compression, CU, 1 Point D4767, T297 $ 630 each Triaxial Compression, CU, 3 Points D4767, T297 $ 1,560 each Triaxial Compression, UU, 1 Point D2850, T296 $ 265 each Triaxial Compression, UU, 3 Points D2850, T296 $ 800 each Triaxial Compression, UU Saturated, 1 Point D2850-Modified $ 380 each Triaxial Test, TEX117E, Part I TEX117E $ 2,250 each
Triaxial Test, TEX117E, Part II TEX117E $ 2,250 each
Vane Shear – Motorized D4648 $ 100 each
2024 KLEINFELDER FEE SCHEDULE FOR
GEOTECHNICAL and MATERIALS LABORATORY TESTING SERVICES
†Common ASTM, AASHTO and DOT test methods.
• Those beginning with A, B, C, D, E, F, or G are ASTM methods. • Those beginning with T are AASHTO methods.
Revised 4/2024
ROCK TESTS
Test Standard Test Method† Fee
Rock Sample Preparation D4543 $ 150 each
Rock Mohs Hardness IRSM $ 100 each
Rock Point Load Index, per Point* D5731 $ 68 each
Rock Slake Durability D4644 $ 250 each
Rock Splitting Tensile/Brazilian, per Point* D3967 $ 125 each Rock Direct Tensile D2936 $ 250 each
Rock Unconfined Compression D7012-C $ 315 each
Above testing fees include routine sample preparation (end grinding) and sample photographs. *Point load and splitting tensile test fees are per break, not per set of ten.
AGGREGATE TESTS
Test Standard Test Method† Fee
ASR Reactivity, Long Method C227, C1293 $ 2,135 each
ASR Reactivity, Short Method C1260, C1567 $ 1,195 each
Cleanness Value CT227 $ 210 each
Clay Lumps and Friable Particles, per size *(see note below) C142, T112 $ 130 each Coarse Specific Gravity & Absorption C127, T85 $ 125 each Fine Specific Gravity & Absorption C128, T84 $ 185 each Coarse Durability D3744, T210 $ 190 each
Fine Durability D3744, T210 $ 190 each
Flat and Elongated Particles, per size *(see note below) D4791 $ 120 each Fractured Faces, per size *(see note below) D5821, T335 $ 130 each Lightweight Pieces (Per specific gravity of heavy liquid) C123, T113 $ 370 each Los Angeles Abrasion, Large Aggregate C535 $ 250 each
Los Angeles Abrasion, Small Aggregate C131, T96 $ 250 each Mortar Sand Strength C87, CT515 $ 820 each
Organic Impurities C40, T21 $ 125 each
Sand Equivalent D2419, T176 $ 190 each
Sieve Analysis, % Finer than No. 200 Sieve C117, T11 $ 115 each Sieve Analysis, Fine C136, T27 $ 165 each
Sieve Analysis, Coarse C136, T27 $ 165 each
Sieve Analysis, Coarse and Fine C136, T27 $ 210 each
Soundness of Aggregate, per size *(see note below) C88, T104 $ 190 each Unit Weight C29, T19 $ 84 each
Water Content D2216, C566, T255 $ 32 each
Texas Wet Ball Mill TEX116E $ 380 each
Decantation Wash TEX406A $ 115 each
Uncompacted Void Content of Fine Aggregate C1252, T304 $ 180 each *Tests are billed by each size fraction tested. The quantity of fractions tested is dependent on the sample gradation and test method.
2024 KLEINFELDER FEE SCHEDULE FOR
GEOTECHNICAL and MATERIALS LABORATORY TESTING SERVICES
†Common ASTM, AASHTO and DOT test methods.
• Those beginning with A, B, C, D, E, F, or G are ASTM methods. • Those beginning with T are AASHTO methods.
Revised 4/2024
FILTER MEDIA TESTS
Test Standard Test Method† Fee
Filter Media, Sieve Analysis (includes d10, d60, es, cu) AWWA B100 $ 230 each Filter Media, Mohs Hardness AWWA B100 $ 230 each
Acid Solubility AWWA B100 $ 230 each
CONCRETE TESTS
Test Standard Test Method† Fee
Concrete Compression C39 $ 42 each
Concrete Core Compression C42 $ 105 each
Concrete Flexural Strength C78 $ 130 each
Hydraulic Cement Mortar Compression C109 (field cast) $ 42 each Concrete Drying Shrinkage, set of 3* C157 $ 640 Each
Concrete Core Thickness C174 $ 58 each
Concrete Laboratory Trial Batch** C192 $ 1,750 each
Concrete Time of Set by Penetration Resistance C403, C191 $ 2,400 each Concrete Modulus of Elasticity C469 $ 600 each
Concrete Splitting Tensile Strength C496 $ 175 each
Concrete Absorption C497, C642 $ 200 each
Concrete Cylinder Unit Weight C567 $ 200 each
Non-Shrink Grout Compression C1107, C579 $ 42 each
Shotcrete Compression C1140, C1604 $ 89 each
Shotcrete Core Grading ACI 506.3 $ 150 each
Concrete Paving Slab Modulus of Rupture C1782 $ 945 each Concrete Direct Tensile D2936, CRD C164 $ 525 each
CLSM Compression D4832 $ 58 each
*For sets greater than 3, add $100 per prism
**Includes up to 9 cylinders or 9 flex beams, additional cylinders, beams, or shrinkage prisms charged at individual unit rates
ROLLER COMPACTED CONCRETE TESTS
Test Standard Test Method† Fee
RCC Compression C1435/C39 $ 68 each
RCC Air Content C1849 $ 125 each
RCC Unit Weight C1849 $ 125 each
RCC Consistency and Density (VeBe) C1170 $ 1,680 each
RCC Accelerated Cure C1768 - modified $ 790 each
RCC Trial Batch ACI 211.1 $ inquire each
2024 KLEINFELDER FEE SCHEDULE FOR
GEOTECHNICAL and MATERIALS LABORATORY TESTING SERVICES
†Common ASTM, AASHTO and DOT test methods.
• Those beginning with A, B, C, D, E, F, or G are ASTM methods. • Those beginning with T are AASHTO methods.
Revised 4/2024
MASONRY TESTS
Test Standard Test Method† Fee
Masonry Grout Compression C1019, C942 $ 42 each
Masonry Mortar Compression C270, C780 $ 42 each
Masonry Core Compression and Shear CA DSA $ 210 each
Masonry Prism Compression C1314 $ 160 each
CMU Absorption and Received Moisture C140 $ 125 each
CMU Compression C140 $ 130 each
CMU Dimension Verification C140 $ 60 each
CMU Lineal Shrinkage C426 $ 350 each
ASPHALT TESTS
MIX PROPERTY TESTS
Test Standard Test Method† Fee
Air Voids Determination (calculation only) D3203, AI-MS-2 $ 68 each VMA Determination (calculation only) AI-MS-2, CT-LP-2 $ 68 each VFA Determination (calculation only) AI-MS-2, CT-LP-2 $ 68 each Volumetric Properties (calculation only) AI-MS-2, CT-LP-2 $ 68 each AC Moisture Content T329 $ 85 each
Gradation of Extracted Aggregate D5444 $ 160 each
AC Content by Extraction D2172 $ 375 each
AC Content by Ignition Oven D6307, T308 $ 200 each
AC Ignition Oven Calibration (determination of mix correction) D6307 $ 440 each Hveem Stability D1560 $ 440 each
Hveem Stability without Compaction D1560 $ 230 each
Marshall Stability and Flow (does not include compaction) D6927 $ 220 each
DESIGN AND DENSITY TESTS
Test Standard Test Method† Fee
AC Core Thickness D3549 $ 45 each
AC Core Unit Weight & Thickness D1188, D2726, D3549 $ 68 each Unit Weight, Gyratory Method D6925, T312 $ 400 each
Unit Weight, Hveem Method D1561 $ 390 each
Unit Weight, Marshall Method D6926 $ 285 each
Maximum Theoretical Specific Gravity D2041 $ 210 each
Moisture Induced Damage T283 $ 1,695 each
Hamburg Wheel Track, Set of 2 T324 $ 1,270 each
Index of Retained Strength D1075 $ 1,445 each
Indirect Tensile Strength (does not include compaction) D6931 $ 1,050 set/3 Indirect Tensile Strength of Cored Specimen D6931 $ 440 each Caltrans Tensile Strength Ratio CT371 $ 2,310 each
Caltrans Optimum Bitumen Content OGFC CT368 $ 2,135 each Film Stripping CT302 $ 190 each
Mix Design, Hveem Method CT367 $ Inquire each
2024 KLEINFELDER FEE SCHEDULE FOR
GEOTECHNICAL and MATERIALS LABORATORY TESTING SERVICES
†Common ASTM, AASHTO and DOT test methods.
• Those beginning with A, B, C, D, E, F, or G are ASTM methods. • Those beginning with T are AASHTO methods.
Revised 4/2024
Mix Design, Marshall Method AI-MS-2 $ Inquire each
Mix Design, Superpave Method AI-MS-2 $ Inquire each
EMULSION TESTS
EMULSION TESTS
Test Standard Test Method† Fee
Emulsion Settlement D6930, T59 $ 295 each
Emulsion Sieve Test D6933, T59 $ 130 each
Emulsion Storage Stability D6930, T59 $ 230 each
Emulsion Torsional Recovery CT332 $ 200 each
Particle Charge D7402, T59 $ 130 each
Residue by Evaporation D6934, T59 $ 145 each
Saybolt Viscosity D7946, T59 $ 200 each
Slurry Seal Wet Track Abrasion D3910, ISSA TB100 $ 440 each
METAL TESTS
BOLT TESTS
Test Standard Test Method† Fee
Bolt Assembly Suite (Bolt, Nut, Washer) * F606 $ 300 each Bolt Hardness E18 $ 40 each
Bolt Proof Load F606 $ 60 each
Bolt Wedge Tensile F606 $ 65 each
Nut Hardness E18 $ 40 each
Nut Proof Load F606 $ 60 each
Washer Hardness E18 $ 40 each
*An 'assembly' is one bolt, one nut and one washer. The suite consists of a bolt wedge tensile test, bolt and nut proof load tests, and hardness tests on all three pieces.
REINFORCING BAR TESTS
Test Standard Test Method† Fee
Bend A370, E290 $ 60 each
Rebar Tensile, up to No. 11 A370, E8 $ 120 each
Rebar Tensile, No. 14 and No. 18 A370, E8 $ 300 each
Rebar Coupler Slip A370, A1034, CT670 $ 225 each
Rebar Coupler Tensile, up to No. 11 A370, A1034, CT670 $ 150 each Rebar Coupler Tensile, No. 14 and No. 18 A370, A1034, CT670 $ 350 each Headed Rebar Tensile, up to No. 11 A370, A970 $ 150 each Headed Rebar Tensile, No. 14 and No. 18 A370, A970 $ 350 each Modulus of Elasticity* A370 $ 300 Each
Epoxy Coating Thickness A775, A934 $ 130 each
Epoxy Coating Continuity – Holiday Test A775, A934 $ 130 each Epoxy Flexibility - Bending A775, A934 $ 130 each
*Machined specimens only, in addition to the tensile fee.
2024 KLEINFELDER FEE SCHEDULE FOR
GEOTECHNICAL and MATERIALS LABORATORY TESTING SERVICES
†Common ASTM, AASHTO and DOT test methods.
• Those beginning with A, B, C, D, E, F, or G are ASTM methods. • Those beginning with T are AASHTO methods.
Revised 4/2024
METAL TESTS
Test Standard Test Method† Fee
PT Strand Tensile A370, A1061 $ 255 each
Anchor Bolt Tensile, up to 1.5” dia. F1554 $ 190 each
Anchor Bolt Tensile, greater than 1.5” dia. F1554 $ 350 each Reduced Section Tensile* A370 $ 250 each
Rockwell Hardness E18 $ 40 each
Macroetch E381 $ 500 each
Charpy Impact, Set of 3 ** A370, A673 $ 1,000 each
Galvanization Thickness B499, E376 $ 35 each
Fireproofing Density E605 $ 115 each
*Machining test specimens is not included. Additional fees for stress-strain diagram. **Machining test specimens is not included. Additional fees will be assessed for testing at temperatures other than 40°F.
MISCELLANEOUS TESTS
MISCELLANEOUS TESTS
Test Standard Test Method† Fee
Tensile and Elastic Modulus Polymer Composite Materials D3039 $ 805 set/5
SAMPLE PREPARATION
SAMPLE PREPARATION
Test Standard Test Method† Fee
Sample Cutting and Trimming $ 42 each
Sample Preparation $ 75 each
Sample Remolding $ 100 each
Contamination Fee $ varies each
Sample Disposal Fee $ 10 each
KLEINFELDER FEE SCHEDULE FOR
GEOTECHNICAL / MATERIALS TESTING EQUIPMENT
†Examples of common test methods. Other methods may exist.
Revised 8/2018
EQUIPMENT CHARGES
MATERIALS TESTING EQUIPMENT
Equipment Invoice Name Test Method† Price
Anchor Bolt Testing Device ANCHOR BOLT TST/DAY $150.00 / day Brinell Hardness Tester BRINELL HARDNESS/DAY E10 $20.00 /day Concrete Rebound (Schmidt) Hammer SCHMIDT HAMMER/DAY C805 $55.00 / day Concrete Vapor Emission Test Kit MOIST FLOOR/SLAB TST F1869 $30.00 / kit Coring Machine CORING MACHINE /DAY $85.00 /day
Coring Machine with Generator CORING MCH W/GEN DAY $165.00 / day Cylinder Mold CYLINDER MOLDS $3.00 each
Diamond Bit Core Barrel Charge
3" Diameter CORING, 3” DIAM./IN $3.30 / inch
4" Diameter CORING, 4” DIAM./IN $4.40 / inch
6" Diameter CORING, 6” DIAM./IN $6.60 / inch
Digital Thickness Gauge THICKNESS GAUGE /DAY $50.00 /day FerroScan Equipment FERROSCAN EQUIPMENT $275.00 /day
Floor Flatness Testing Device (Per Sq Ft) FLOOR FLATNESS /SF E1155 $0.10 /sq ft Floor Flatness Testing Device (Per Test) FLOOR FLATNESS TST E1155 $150.00 / day Hand Auger and Soil Sampler HAND AUGER/DAY $75.00 /day Magnetic Particle Testing Device MAGNETIC PARTICLE ASNT, AWS B1.1 $45.00 /day Nuclear Soil Density/Moisture Gauge NUCLEAR DENS GAUGE D6938 $75.00 / day Skidmore Bolt Tension Calibrator SKID WILH BOLT/DAY A325, A490 $55.00 / day Torque Wrench, up to 1,000 foot-pounds TORQUE WRENCH/DAY A325, A490 $50.00 / day Ultrasonic Testing Device UT TESTING EQUIP/DAY ASNT, AWS B1.1 $75.00 /day
VEHICLES
Description Invoice Name Price
Mileage, 2 Wheel Drive (Per Mile) MILEAGE, 2 WH/MILE $0.80 / mile Mileage, 4 Wheel Drive (Per Mile) MILEAGE, 4 WH/MILE $1.60 / mile Vehicle, 2 Wheel Drive (Per Hour) VEHICLE, 2 WHEEL/HR $10.00 / hour Vehicle w/Std Testing Equip (Per Hour) VEH W/STD EQUIP/HR $19.00 / hour
OFFICE EQUIPMENT
Description Invoice Name Price
Reproduction (Per Page) REPRODUCTION/PAGE $0.65 / page
Report Surcharge (Per Copy) REPORT (PER COPY) $44.00 / each Bond Cost for CADD (Per Square Foot) CADD – BOND $0.60 / sq ft CADD Workstation (Per Hour) CADD WORKSTATION /HR $15.75 / hour