Attachment A
ADDITIONAL SCOPE OF SERVICES
Consultant Service First Amendment to Agreement between City of Fresno and Electrical Power Systems, Inc.
Additional engineering services for design of Emergency Backup Generators at the 8-Side Switchgear and Headworks Build!ngs at the Regional Wastewater Reclamation FaciHty include the following:
TASK I- Project Management
A. Project Management and Administration - Electrical Power Systems, Inc. (Consultant)
1. Due to additional scope of services described in Task II below, continue with scope of services from the Original Contract, dated March 2, 2022, as described in Exhibit A, Section A.
TASK II- Construction Documents
A. Mechanical Gas Piping Desrgn Servrces - Lawrence Engineering Group (Subconsultant)
1. Preparation of plans and technical specifications.
2. Plan check submittal and backcheck approval.
3. Bid consultation and review of material submittals.
4. Project closeout and record drawings review.
5. Construction site visits.
8. Grading Plan - YCG Civil Engineering (Subconsultant) 420475v1
1. Topographic Survey
a. Provrde field work and office calculations to produce a topographic survey on City of Fresno datum.
b. Provide a topographic map of the area within the subject property identified as "Limits of Survey" on attached Attachment B.
c. This survey will show the location and sizes of exrsting trees 6 inches and larger, structures, walkways, hardscape, fences, adjacent roadways, visible USA markings and visible above ground utilities within the project area. Field measurement of inverts of accessible and unobstructed visible catch basins, area drains, storm drain manholes and sanitary sewer manholes will be shown. d. Contours will be shown at one (1) foot intervals or as appropriate to clearly define the slopes. Spot elevations collected by ground surveys, including finish floor elevations, if accessible, will be shown to an accuracy of 0.01' (one hundredth) of a foot. Heavily brushed areas will be defined at the perimeter.
2. Initial Site Meeting
a. Meeting: Prior to the commencement of work, Subconsultant will discuss concepts, ideas, land use, and design to obtain a full understanding of the scope of work. b. Site Visit and Existing Conditions Review: Along with the provided topographic survey drawings, the Subconsultant will visit the site to identify site constraints and 3 CROSS OVER 12 KV
TIE BUS DUCT
** % DRAFT PLANSET **
NOT TO BE USED FOR CONSTRUCTION
30 EPS IS RESPONSIBLE FOR ELECTRICAL SYSTEMS DESIGN ONLY. EPS IS
NOT RESPONSIBLE FOR ELECTRICAL SAFETY WORK PROCEDURES
AND/OR USE OF REQUIRED PERSONAL PROTECTIVE EQUIPMENT, SEE NFPA 70E "STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE'' AND OSHA 29 CFR. CONTRACTOR MUST READ SPECIFICATIONS AND
INSTALL MATERIAL AS PER SPECIFICATIONS AND/OR PLANS OR AS PER E.P.S. APPROVAL. PLANS AND SPECIFICATIONS ONLY APPLY TO THE PROJECT FOR WHICH THEY WERE CREATED.
JOE PREVENDAR P.E. CA EE 16581
[email protected]
JOB:
FILE:
PLOT:
DSGN:DRWN:
DATE:
PROFESSIONAL AND CONSULTING
ELECTRICAL ENGINEERING
2187 SUITE 102 HERNDON AVE
CLOVIS, CA 93611
P: (559) 221-7230
UPDATED:
FCP23044
ABDUR REHMAN P.E. CA EE 22090
[email protected]
E02-Site Plan-
JPPWCHWCH
MAR 2024
4/18/2024 5:08 PM / 0.001:1
FOR REVIEW & COMMENTS ONLY -
EQUIPMENT PURCHASED FROM THIS
DRAWING MUST BE ACCOMPANIED BY
ELECTRICAL POWER SYSTEMS, INC.
APPROVED SHOP DRAWINGS FOR
THAT EQUIPMENT
PRELIMINARY
DRAFT
NOT FOR
CONSTRUCTION
PLANT 12KV BUILDING
HV-MS2-A
HV-MS2-B
(N) 2.5MW EGEN-1
(N) 2.5MW EGEN-2
12KV PLANT SITE PLAN
SCALE: 1/8" = 1'-0"
04'-0" 8'-0"16'-0"
(E) SPARE CONDUIT IN EMH-7C1 SIDE 7C
(N) 12KV BREAKER 29-BKR-109
(N) 12KV BREAKER 29-BKR-211
69''
34'-3"
12''
53'-10 1/2"
(E) ELECTRICAL DUCT
(E) SPARE CONDUIT IN EMH-7C1 SIDE 7D
'EMH-7C1'
S
S
S
S
SS
S S
S
S FROM
7D
FROM
7C
(E) EMH-7C2
(E) EMH-7C1
SEE THIS SHEET
(N) 12KV BREAKER 29-BKR-212
(N) 2.5MW EGEN-3
24''
69''
Attachment B