Cities Index.
25-780 Notice of Exemption

Fresno City Council
June 12, 2025

Document
25-780 Notice of Exemption
Meeting
June 12, 2025
Body
Fresno City Council
Pages
2
Original file
136 KB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.

502055v1
NOTICE OF EXEMPTION PLEASE POST FOR 30 DAYS

FROM: City of Fresno Department of Public Utilities—Utilities Engineering & Planning 1626 E. Street
Fresno, California 93721-3604

TO: X Fresno County Clerk
2220 Tulare Street – First Floor Lobby
Fresno, California 93721

Office of Planning & Research SCH NO.:

P.O. Box 3044, Room 212
Sacramento, California 95812-3044
Project Title: Wellhead Treatment Improvements at Pump Station 345-1 Project Location: 185 S BURGAN AVE, Fresno, CA 93727; Located on S. Burgan Avenue between S. Fowler Avenue and S. Armstrong Avenue (APN: 313-121-17)

Project Location – city: City of Fresno Project Location- county: County of Fresno

Description of Nature, Purpose and Beneficiaries of Project:

Installation of a wellhead treatment system to remove naturally occurring contaminants from an existing municipal potable water supply well and bring the well system back online. The wellhead treatment system will include two static mixers with associated sodium hypochlorite and sodium permanganate storage and injection processes to remove hydrogen sulfide and balance chlorine levels, and a six - vessel manganese dioxide filtration system to remove elevated levels of manganese. Prior to installation, a concrete pad will be installed to support the treatment system components. Additionally, electrical improvements for equipment and instrumentation power will be installed . The treatment system will also be equipped with instrumentation to provide an automated system that can be controlled and monitored both locally and from the City's existing Supervisory Control and Data Acquisition (SCADA) system. Process and service piping will be installed to convey spent backwash water resulting from system operations and connected to an existing City sewer line located in Burgan Avenue.

Beneficiaries of the project would be: City of Fresno Department of Public Utilities
1626 E. Street
Fresno, CA 93706

Name of Public Agency Approving Project: City of Fresno Name of Person or Agency Carrying Out Project: City of Fresno Department of Public Utilities
1626 E. Street
Fresno, CA 93706
Notice of Exemption
Date: 3/20/2025

Page 2 ends

502055v1
Exempt Status: (check one)
Ministerial - PRC § 21080(b)(1); CEQA Guidelines §15268 Declared Emergency - PRC § 21080(b)(3); CEQA Guidelines §15269(a) Emergency Project - PRC § 21080(b)(4); CEQA Guidelines §15269(b) and (c) Categorical Exemption –CEQA Guidelines §15301/Class 1(b) Statutory Exemption – PRC §______________________
Other _____________________
Reasons why project is exempt:

The Project described herein represents the minor alteration of the already existing Pump Station 345- 1 (PS 345-1). PS 345-1 has been inactive since 2020 due to exceeding standard limits for manganese.

The Project consists of the following work:

1. Installation of a manganese filtration package which includes two static mixers with associated sodium hypochlorite and sodium permanganate storage and injection processes to remove hydrogen sulfide and balance chlorine levels, and a six -vessel manganese dioxide filtration system to remove elevated levels of manganese

2. Replacing above-ground well discharge pipe and fittings.

3. Installation of miscellaneous yard pipes and fittings to convey spent backwash water resulting from system operations and connected to an existing City sewer line located in Burgan Avenue.

4. Installation of additional analyzers and instruments f or an automated system that can be controlled and monitored by the City’s SCADA system.

5. Installation of concrete pad to support the treatment system components:
a) Length: 8 ft x 20 ft x 12 in
b) Depth: 1 ft

Construction of a wellhead treatment system will occur within the existing publicly-owned drinking water well site.

The Project will not expand the use of the existing facility, nor will it relocate any existing facilities or structures. As noted above, PS 345-1 has not been in use since 2020 due to manganese contamination.

The Project is merely to add a water filtration package and install additional piping and appurtenances, which involves negligible or no expansion of existing or former use. Once the wellhead treatment system is complete, the City will be able to use the well as originally intended.

Further, staff has determined that none of the exceptions to Categorical Exemptions set for in the CEQA Guidelines Section 15300.2 apply to this Project.

Lead Agency Contact Person: Debbie Khounsavath Full telephone no. (559) 621-1624

Signature: _____________________________________ Date: ______________________

Printed Name and Title: Debbie Khounsavath, Planner II
Department of Public Utilities—Utilities Engineering & Planning Notice of Exemption
Date: 3/20/2025

Page 2 ends

502055v1
Signed by Lead Agency Signed by applicant

If filed/signed by applicant:

Attach certified document of exemption finding (check if attached)

← All documents from this meeting