AMENDMENT NO. 1 TO COOPERATIVE PROJECT AGREEMENT
Short-Term Regional Transportation program (STRTP)
Project N-1 Urban, Veterans Blvd/SR99 Interchange and Grade Separation
1. PARTIES. The Authority and the City of Fresno are collectively referred to herein as "the Parties".
2. RECITAT-S.
WHEREAS, the Parties entered into the Cooperative Project Agreement for Project N- I Urban, Veterans Blvd/SR99 Interchange and Grade Separation, ("Agreement"), dated June I't, 2009, for funding of a transportation improvement project ("Project") in Fresno County pursuant to the Measure "C" Short-Term Regional Transportation Program Handbook ("Handbook"), and the Fresno County Measure "C" Expenditure Plan ("Expenditure Plan"), which was approved by the voters of Fresno County in November, 2006; and,
WI{EREAS, Authority is authorizedto approve and revise Project funding for payment to Responsible Agency in accordance with the Agreement, the Handbook and the Expenditure Plan regarding the Project, identified as N-l Urban, Veterans Blvd/SR99 Interchange and Grade Separation; and,
WHEREAS, at the time of approval of the original Agreement, it was co.ntemplated by the Parties that Authority ultimately shall provide funding ro Responsible Agency for eligible Project costs "not to exceed', $8,836,000 of Measure ,,C', funding, and that mutual intent will remain unchanged by this Amendment No. 1.
The Parties now desire to amend the statements defining and delineating the project Scope, Project Schedule and Project Funding Program, as set forth in the original Agreement, based on the following:
o Responsible Agency desires to draw down the balance of the funds set aside for the Veterans Blvd. Project. Said funds will allow for the Project to proceed to the next Phase of PS&E of the approved Measure "C" Regional Transportation Program ("Measure "C") funding for the transportation improvement project N- 1 Urban, Veterans Blvd/SR99 Interchange and Grade Separation Project, per the revised Exhibits as more thoroughly described in Section 3.1 of this Amendment No. 1.
This Amendment No. 1 to STRTP projecr N_l
Grade Separation Project is made and entered into the
Fresno County Transportation Authority (',Authority")
Veterans Blvd/SR99 Interchange and
of December,20lI by and between the
City of Fresno ("Responsible Agency").
Urban,
rtht say
and the
2.1 2.2
K Nzu {,nô &o.þtt - o,,JfÀ.aoR,5oou\
t\*' y t,"å
TERMS.
3.1 Exhibit "4" (Project Scope), Exhibit ,.8,, @rpject Schedule) and Exhibit,,C,, (project Funding Program), which hereinafter shall be referenced collectively as the',Original Exhibits" as set forth in Section 1.1 of the original Agreement, and fully incorporated therein by the provisions of Section 3.23 thereot shaú be and are hereby replaced by:
Exhibit "A-1" (Project Scope), Exhibit "B-1" (Project Schedule) and Exhibit ,,C-I,, (Project Funding Program), which are attached to this AmendmentNo. 1 and incotporated herein by this reference, commencing upon the Effective Date of this AmendmentNo. I to the Agreement.
3.2 All work performed by the Responsible Agency under the Agreement prior to the Effective Date of this Amendment shall be governed by and .o-p.nrui.d pwsuant to the Original Exhibits and the Agreement. All work performed commencing upon the Effective Date of this Amendment shall be performed and compensated pursuant to the Agreement as amended herein and the Exhibits attached to this Amendment No. 1 .
3.3 Effective Date. The Effective Date of this Amendment No.l to the Agreement shall be 72:01 a.m' of the day following the date upon which it is signed by the parties. In the event this Amendment No, 1 to the Agreement is signed by the Parties on different dates, the Effective Date shall be 12:01 a.m. of the day foliowing that date upon which it is signed by the second of the parties.
3'4 Excepting only those provisions modified herein, all other terms and conditions contained in the original Cooperative Project Agreement are unaffected by this Amendment No. 1 and shall remain in full force and effect.
Page2
IN \ryrrNEss wHEREox', the undersigned parties have executed year first written above.
this Agreement on the day and
F'RESNO COT]NTY TRANSPORTATION AUTHORITY
By
Name
Title Chair of the Authoriqv
APPROVED AS TO LEGAL
KEVIN B
COLINSEL
By
Name RonQ¡rcmn
(Typed)
Title Executive Director
APPROVED AS TO ACCOLINTING
FORM:
By
ATTEST
By
(sie )-
Name MICHAEL E. ROWE
Title Senior Deputy County Counsel
AGENCYNAME
ATTEST
Name PATRICK N. TWIEMILLER
Name VICKI CROW
Title Auditor-Controller/Treasurer-Tax Collector
Name Crndu /3rr+cr
By By
(Signature)
(Signature)
Title Public Works Director Titte e"^rrtn C*r" A-r*-
APPROVED AS TO FORM
J
Transportation Benefit
EXHIBIT A.1 - PROJECT SCOPE
urban Project N-1 - veterans Blvd/sR.gg lnterchange and GradeSeparation Responsible Agency
City of Fresno
Project Limits
The project limits for urban project N-1 are from shaw Avenue to Hemdon Avenue.
Project Phase
El Phase 1* ' Preliminary Engineering fnctudes Prcliminary Designt?ngineeing lpseq and Envircnmental (pNED)] tr Phase 2 - Rightof-Way Acquisition
E Phase 3 - construction flncludes prcject condruetion & construction Managenent] llltJt 1 - Pians, Specifications, and Eslimates (PS&E) only. Rightof-way and conskuction phases are to be scheduled in the Measure cMid-Term and Long.Term programs.
Project Phase(s) Scope
This FS&E phàs
Measure C funds
State Route 99 in
address logical termini requirements of the NEpA process, loæl prepare acquisition and construction documents fdr a 4lane Ve between Shaw Avenue and Barstow Avenue, and also from Bullard Avenue to Hemdon Avenue for the pS&E phase of the project Gomplete Project Scope
hy. the City
funded .the
Caltrans En
ord öf Decis
Ïhe next phase (PS&E) has been induded lheFY 201012011 in the Measure "c" Extension 2010 short rerm RegionalTransportation reloætion, concluding with construction and associated conitruction Project Purpose
tlg pl.Jgrt is to provide_improved t æess to tands adjaænt to andrelief to improve haffic flo¡r on the ional tnanspoiláfion ,yrt.r; tnng increases in lraffic volumes; and existing and planned iocal and The project willprovide an east-west connection from west Fresno to norlh Fresno and a greaily improved freeway interchange aæess for4qd¡ryq,!!Eql9J*" ""-r"" ^,,"",
rfltllalso,-^
^^,F^.vl* 1^g.111t.:_.l3l.leûcrossing'oËÜ*u1rn"eäiíir'Ëä¡iråãor.riritatingaæesrto sR.gsfors tq9[trqliltY qwcgÐ tu ùn.the Hemdon Avenue conidor. The proiect will re-lieve cong-estion at tne äãþcent sR-99 intéicrrãngei at Hemdon Avenue and shawAvenue which are inadequate to serve existing and future kaftc der¡ands. ' Page I of2
Urban Project N-l - veterans Blvd/SR-99 lnterchange and Grade Separation Exhibit A1Page Two city of Fræno 2025 General plan and the regional road network. The traffic Project Report and Envíronmental lmpact Repõrt shows level of serviæ -F" at Community Engagement
Ïhe p A Notiæ of Preparation meeting was held in February 2010inform pubrc T:ii"JËäiflt'ffi:iJ;i'iiXtËllil:i$ii:'iåfiñ:ii
a web
Gonstruction Staging
construction will be continuory- 1d during construction adjacent resídences and businesses will be provided aæess at all times.Falsework wiltbe erected over SR-gg to maiñtain freeway kaffiô.
Detours
short-term limited detours will be necessary for Golden state Boulevard and a very short night-time freeway detour will be required forfalsework plaæment' Otheruise exísting transportalion facílities will be unaffected by the project.
Current Status
The PA/ED phase is near comflelion and the DPR and DEf R are close to signature. The project is ready to proceed with the ps&E phase.
Contact
For inquiries, you may æntact scott Mozier, P.E., city Engineer wífrr the city of Fresno public works Dept. at (55g) 621-gs1 1.
Measure'C'Short'Range Regional Transplrtat¡ln Program I Project Schedule - Exhibit Bl EXHIBIT B-1 - PROJECT SCHEDULE
urban Project N1 - veterans Blvd/sR-g9 rnterchange and Grade Separation
Responsible Agency
City of Fresno
Project Limits
The project limits for urban Project N-1 are from shaw Avenue to Herndon Avenue.
Project Phase
X Phase 1* - Preliminary Engineering ftncludes Preliminary Design/Engineering (pS&E) and Env¡onnental(pA/ED)] ! Phase 2 - RightoÊWay Acquisition
E Phase 3 - construction (lncludes project constructiln & construction Management) lPhrye 1 - Plans, Specifìcations, and Estimate (PS&E) only. Rightof-way and conStruction phases are to be scheduled in the Measure C Mid-Term and Long-Term Programs
Gontact
For inquiries, you may contact scott Mozier, P.E., city Engineer, with the city of Fresno Public works Dept. at (55g) 621-gs11.
Project Schedule
SHORT.TERM PROGRAM FV 2OOBIO9 . 2O1OI13
Ri€ht-ot-Way ?
Conltud¡on 3
i PÞFt Cõôsiue¡b n ¿ cø ß¡ilcr¡on M.nqØ.nt
Measure "C" Shoft'Range RegionalTranspoftation Program I Project Funding program - Exhibit Cl (Continued) Measure "C" Sho¡t'Range RegionalTransportation Program I Project Funding program - Exhibit Ct EXHIBIT Cl . PROJECT FUNDING
urban Project N1 - veterans Brvd/sR-gg lnterchange and GradeSeparation *, , ' ' t ' ' ' t ' , , , , , , , * ,., , , , , , , , , , , , , , , , , , , _Responsible Agency City of Fresno
Project Limits
The project limits for urban project N-'l are from shaw Avenue to l-lerndon Avenue.
Project Phase
EI Phase 1- -f reliminary Engineering [tnctudes Pretiminary Design/Engineering eseq and Environmentat] D Phase 2 - Right-of-Way Acquisition
D Phase 3 - construction (llclydes project construction & construction Management)*Phase 1 - Ptoject Approval / Environmental Document (PA/ED) only. Right-ðf-way áno construction phases are to be scheduled in theMeasure C Mid-Term and Long-Term programs Contact
For inquiries, you may contact scott Mozier, P.E., city Engineer, with the city of Fresno public works Department at (55g) 621-g650.
Funding Program ($ in miltions- See Attached)
Page I of 2
' Mòasure "C" Shorl-Range RegionalTransporlation P.rogram I Project Funding Program - Exhibit Cl (Continued) pBoJEc,pHAsE
l,* l,* l;**
SH0RT-lttilrì PROGnftfsl f Y
roratruttoltlcernser;l I lso.ooolso.ooo lsr.ooo lrtlr ¡soooo¡u*--¡roloo--oo¡soo*¡-soor¡ãooo-j loTÄtFUi¡DlnGPHÄsE2,l | | s0000 | $0.000 t so.ooo ¡ soooo ¡-soroo ¡ro-ñ-¡ãi-oo ¡ffi¡ffi¡ffi¡-ffiä ?orzrs I z0nl4 | eorvro I zcrotrz I ruHorruo
Tolrtl-turlDlrJcPtlASE3:l | | so.ooo I soioo I so,oon I suoor ¡su* ¡6'-¡oo-lîil1-rro-no* lTilr, I s0.000 rorAlFUruD*GAr-r-pHAsEsl I lsoooo I so.ooo I sr.ooo I sr.oao j*,0* j s8836 i i**ri i**oi uo.uu
Short-Term Regional Transportation Program
Planned lmprovement;
lnflated Cost:
Year of Completion:
Priority Number:
Responsible Agency:
99 Revision Date: December 8,2010
Project Sched ule/Cost Estimates/Funding Prog ram :
't#qæeìa#q
Freeway lnterchange & Grade Separation at Union Pacific Rail Road & Golden State Blvd.
531.7 12 million (Shortterm Program)
2022 (Additional $121.008 million in the Long-term Program) I
City of Fresno
URBAN PROJECT Nf
VËTERANS ELVD"
INTERCHANGE & GRAÐË SEPARATION
FROJEC-I PIlASE TOTAL COST
8 FUI.IDITJG
STAFTI EHÞ IPRIORCOSTI_.
veeC I vån | * r¡rrórirã lão-ñIã*,,"- ?0l0,fr I 20ili12 l20r2ii¡l e0lJ,l4l z0l4fr5l 20r6í61 2016n A-38