47 Energy and Environmental Economics. 2015. Pathways to Deep Decarbonization in the United States. Website:
http://ww2.arb.ca.gov/sites/default/files/2020-07/williams.pdf. Accessed June 24, 2022.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Greenhouse Gas Emissions
FirstCarbon Solutions 3.8-53
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-08 GHG.docx - Maximize air quality benefits using the best available control technologies for stationary sources in communities most in need.
- Implement SB 905.
- Develop a net-zero cement strategy to meet SB 956 targets for the GHG intensity of cement use.
- Leverage energy-efficient and low carbon hydrogen programs. - Prioritize most vulnerable residents with the majority of funds in the new $922 million Equitable Building Decarbonization program.
- Achieve 3 million all-electric and electric-ready homes by 2030 and 7 million by 2035 with 6 million heat pumps installed by 2030.
- Adopt a zero-emission standard for new space and water heaters sold in California beginning in 2030.
- Implement biomethane procurement targets for investor-owned utilities as specified in SB 1440.
• Carbon Dioxide Removal and Capture
- Implement SB 905.
- Achieve the 85 percent reduction in anthropogenic sources below 1990 levels per AB 1279 by incorporating CCS into sectors and programs beyond transportation. - Evaluate and propose the role for CCS in cement decarbonization and as part of hydrogen peroxide pathways.
- Explore carbon capture application for zero-carbon power for reliability needs per SB 100. • Short-Lived Climate Pollutants (Non-Combustion Gases) - Install anaerobic digesters to maximize air and water quality protection, maximize biomethane capture, and direct biomethane to specific sectors. - Increase alternative manure management projects.
- Expand markets for products made from organic waste.
- Pursuant to SB 1137, develop leak detection and repair plans for facilities in health protection zones, implement emission detection system standards, and provide public access to emissions data.
- Convert large HFC emitters to the lowest practical GWP technologies. • Natural and Working Lands
- Implement AB 1757 and SB 27.
- Implement the Climate Smart Strategy.
- Accelerate the pace and scale of climate smart forest management to at least 2.3 million acres annually by 2025.
- Accelerate the pace and scale of healthy soils practices to 80,000 acres annually by 2025, conserve at least 8,000 acres of annual crops annually, and increase organic agriculture to 20 percent of all cultivated acres by 2045.
- Restore 60,000 acres of Delta wetlands annually by 2045. - Increase urban forestry investment annually by 200 percent, relative to business as usual.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Greenhouse Gas Emissions Recirculated Draft Program EIR
3.8-54 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-08 GHG.docx Consistency with City of Fresno General Plan
The General Plan includes objectives and policies designed to reduce GHG emissions throughout the City. As discussed above, the City also adopted a GHG Plan in 2014 that provides the City’s primary strategy for reducing GHG emissions through GHG reduction target years 2020 and 2035. The intent of the GHG Plan is to achieve compliance with State GHG reduction mandates by focusing on feasible actions the City can take to minimize the adverse impacts of growth and development on climate change. The GHG Plan does not create an entirely new, separate strategy; rather, it builds on the policies and implementation measures contained in the City’s General Plan. Where needed, the GHG Plan provides more details to clarify and focus action and to ensure implementation. The 2014 GHG Plan has not been the subject of a legal challenge and has not been invalidated by the court. The General Plan contains the following policies related to GHG emissions reduction that are applicable to the proposed project.
48 Objective
RC-5 In cooperation with other jurisdictions and agencies in the San Joaquin Valley Air Basin, take timely, necessary, and the most cost-effective actions to achieve and maintain reductions in greenhouse gas emissions and all strategies that reduce the causes of climate change in order to limit and prevent the related potential detrimental effects upon public health and welfare of present and future residents of the Fresno community.
Implementing Policies
RC-5-a Support State Goal to Reduce Statewide GHG Emissions. As is consistent with State law, strive to meet AB 32 goal to reduce greenhouse gas emissions to 1990 levels by 2020 and strive to meet a reduction of 80 percent below 1990 levels by 2050 as stated in Executive Order S-03-05. As new Statewide GHG reduction targets and dates are set by the State update the City’s Greenhouse Gas Reduction Plan to include a comprehensive strategy to achieve consistency with those targets by the dates established.
RC-5-b Greenhouse Gas Reduction Plan. As is consistent with State law, prepare and adopt a Greenhouse Gas Reduction Plan as part of the Master Environmental Impact Report to be concurrently approved with the Fresno General Plan in order to achieve compliance with State mandates, assist development by streamlining the approval process, and focus on feasible actions the City can take to minimize the adverse impacts of growth and development on global climate change. The Greenhouse Gas Reduction Plan shall include, but not be limited to:
• A baseline inventory of all known or reasonably discoverable sources of GHGs that currently exist in the City and sources that existed in 1990. • A projected inventory of the GHGs that can reasonably be expected to be emitted from those sources in the year 2035 with implementation of this General Plan and foreseeable community-wide and municipal operations.
48 City of Fresno (City). 2014. Fresno General Plan. December.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Greenhouse Gas Emissions
FirstCarbon Solutions 3.8-55
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-08 GHG.docx • A target for the reduction of emissions from those identified sources. • A list of feasible GHG reduction measures to meet the reduction target, including energy conservation and “green building” requirements in municipal buildings and private development.
• Periodically update municipal and community-wide GHG emissions inventories to determine the efficacy of adopted measures and to guide future policy formulation needed to achieve and maintain GHG emissions reduction targets.
RC-5-c GHG Reduction through Design and Operations. Increase efforts to incorporate requirements for GHG emission reductions in land use entitlement decisions, facility design, and operational measures subject to City regulation through the following measures and strategies:
a) Promote the expansion of incentive-based programs that involve certification of projects for energy and water efficiency and resiliency. These certification programs and scoring systems may include public agency “Green” and conservation criteria, Energy Star™ certification, CALGreen Tier 1 or Tier 2, Leadership in Energy-Efficient Design (LEED®) certification, etc. b) Promote appropriate energy and water conservation standards and facilitate mixed-use projects, new incentives for infill development, and the incorporation of mass transit, bicycle and pedestrian amenities into public and private projects.
c) Require energy and water audits and upgrades for water conservation, energy efficiency, and mass transit, pedestrian, and bicycle amenities at the time of renovation, change in use, change in occupancy, and change in ownership for major projects meeting review thresholds specified in an implementing ordinance.
d) Incorporate the City’s “Guidelines for Ponding Basin/Pond Construction and Management to Control Mosquito Breeding” as conditions of approval for any project using an on-site stormwater basin to prevent possible increases in vector-borne illnesses associated with global climate change. e) Periodically evaluate the City’s facility maintenance practices to determine whether there are additional opportunities to reduce GHGs through facility cleaning and painting, parks maintenance, road maintenance, and utility system maintenance.
f) Periodically evaluate standards and mitigation strategies for highly vehicle- dependent land uses and facilities, such as drive-through facilities and auto- oriented development.
RC-5-d SCS and CAP Conformity Analysis. Ensure that the City includes analysis of a project’s conformity to an adopted regional Sustainable Community Strategy or Alternative Planning Strategy (APS), an adopted Climate Action Plan (CAP), and any other applicable City and regional greenhouse gas reduction strategies in effect at the time of project review.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Greenhouse Gas Emissions Recirculated Draft Program EIR
3.8-56 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-08 GHG.docx RC-5-e Ensure Compliance. Ensure ongoing compliance with GHG emissions reduction plans and programs by requiring that air quality measures are incorporated into projects’ design, conditions of approval, and mitigation measures.
RC-5-f Toolkit. Provide residents and project applicants with a “toolkit” of generally feasible measures that can be used to reduce GHG emissions, including educational materials on energy-efficient and “climate friendly” products.
RC-5-g Evaluate Impacts with Models. Continue to use computer models such as those used by SJVAPCD [Valley Air District] to evaluate greenhouse gas impacts of plans and projects that require such review.
As detailed in the Regulatory Framework section, the proposed Specific Plan includes numerous policies related to reducing GHG emissions associated with development in the Plan Area. Policy RC-
1.1, Land Use Strategies, would support compact, mixed-use development that is pedestrian- oriented and located in high-quality transit corridors. Policy RC-1.2 and Policy RC-1.3 further outline the Fresno SEDA Specific Plan focus on transit oriented development, as well as TDM strategies.
Several policies promote exceeding Title 24 requirements through encouraging compliance with voluntary energy conservation certification programs, such as LEED® and EnergyStar, and Policy RC-
1.6 states that City buildings in the Plan Area will exceed Title 24 Energy Efficiency Standards, along with purchasing green vehicles for City fleets, and supporting water conservation and waste reduction efforts throughout the Plan Area. These proposed Specific Plan policies are consistent with, and support the goals and objectives of, the City’s General Plan and GHG Plan related to GHG emissions reductions. Therefore, the proposed project is consistent with the goals and objectives of the General Plan.
Conclusion
In conclusion, the proposed project would be consistent with relevant plans, policies, and regulations associated with GHGs, notably the most recent version of the ARB’s Scoping Plan (the 2022 Scoping Plan), and the Fresno 2022 RTP/SCS. This would ensure that the proposed project would be consistent with, and would not impair, the State’s carbon neutrality standard by year 2045 as established under AB 1279. The State is making progress toward reducing GHG emissions in key sectors such as transportation, industry, and electricity. Since the proposed project would be consistent with State GHG Plans, it would not impede the State’s goals of reducing GHG emissions 40 percent below 1990 levels by 2030 and of achieving carbon neutrality by 2045. The proposed project would make a reasonable fair share contribution to the State’s GHG reduction goals by implementing a wide array of project features that would substantially reduce GHG emissions, and, therefore, the proposed project’s GHG emissions would be considered to have a less than significant impact with respect to Impacts GHG-1 and GHG-2.
Level of Significance Before Mitigation
Less than significant impact.
Mitigation Measures
None required.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Greenhouse Gas Emissions
FirstCarbon Solutions 3.8-57
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-08 GHG.docx
3.8.6 - Cumulative Impacts
The geographic scope of the cumulative impact analysis for energy use is the Plan Area and portions of the City of Fresno, City of Clovis, and unincorporated Fresno County adjacent to the Plan Area.
This analysis evaluates whether impacts of the proposed project, together with impacts of cumulative development, would result in a cumulatively significant impact with respect to GHG emissions. This analysis then considers whether incremental contribution of the impacts associated with implementation of the proposed project would be significant. Both conditions must apply for cumulative effects to rise to the level of significance. Based on this analysis, there is a potentially significant cumulative effect resulting from the proposed project.
As previously discussed, no single land use project could generate enough GHG emissions to noticeably change the global average temperature. Cumulative GHG emissions, however, contribute to global climate change and its significant adverse environmental impacts.
The proposed project would be consistent with relevant plans, policies, and regulations associated with GHGs, notably the most recent version 2022 version of ARB’s Scoping Plan, as well as the SJCOG’s 2022 RTP/SCS and the City’s General Plan. The proposed project would not impede upon the State’s ability to reach mandated GHG reduction targets in the future and will support State-level efforts to reduce GHG emissions. Therefore, development of the proposed project would have a less than significant cumulative impact relative to this environmental topic. In addition, the implementation of MM AIR-1b, MM AIR-1c, and MM AIR-1d would serve to further reduce GHG emissions along with criteria air pollutants and toxic air contaminants. Accordingly, impacts related to GHG emissions would result in a less than cumulatively considerable contribution.
Level of Cumulative Significance Before Mitigation
Less than significant impact.
Cumulative Mitigation Measures
None required.
THIS PAGE INTENTIONALLY LEFT BLANK
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-1
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx
3.9 - Hazards and Hazardous Materials
3.9.1 - Introduction
This section describes the existing hazards and hazardous materials setting and potential effects from project implementation on the site and its surrounding area. Descriptions and analysis in this section are based, in part, on the Fresno General Plan (General Plan) and the Fresno Southeast Development Area (SEDA) Specific Plan, as well as research on various hazardous materials websites.
As further discussed in Chapter 1, Introduction, nine comments were received during the Draft Program Environmental Impact Report (Draft PEIR) scoping period related to hazards and hazardous materials were received:
• Requests that the Draft PEIR acknowledge the potential for historic or future activities to result in the release of hazardous waste/substances.
• Recommends that all future development under the proposed project collect soil samples for lead analysis prior to performing any intrusive activities. • Recommends that all future development under the proposed project conduct surveys for the presence of lead-based paints (LBP), mercury, asbestos-containing materials (ACMs), and polychlorinated biphenyl caulk before demolishing any buildings. • Requests that Draft PEIR require any future development under the proposed project that requires the importation of soil to backfill any excavated areas to conduct the proper sampling to ensure that the imported soil is free of contamination. • Requests that the Draft PEIR require any future development under the proposed project that is developed on land containing agricultural uses, weed abatement activities, or related activities to conduct a proper investigation for organochlorinated pesticides. • Recommends that the current and former agricultural lands in the Plan Area be evaluated in accordance with the California Department of Toxic Substances Control (DTSC) 2008 Interim Guidance for Sampling Agricultural Properties, Third Addition. • States that any future development under the SEDA Specific Plan that would use or handle hazardous materials would be required to meet the requirements set forth in the California Health and Safety Code, Division 20, Chapter 6.95, and the California Code of Regulations Title 22, Division 4.5. Any businesses handling hazardous waste must submit a Hazardous Materials Business Plan pursuant to the Health and Safety Code, Division 20, Chapter 6.95, Section 25507.
• States that an underground storage tank (UST) Removal Permit from the Fresno County Department of Public Health, Environmental Health Division must be obtained if any petroleum USTs are discovered during construction.
• States that all water wells and septic systems identified at a future development site that are not intended to be used should be properly removed with a licensed contractor.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-2 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx
3.9.2 - Environmental Setting
Hazards
This description of existing conditions focuses on hazards from fire and overhead power lines, as well as hazardous materials and wastes. A hazard is a situation that poses a level of threat to life, health, property, or the environment. Hazards can be dormant or potential, with only a theoretical risk of harm. However, once a hazard becomes active, it can create an emergency. A hazardous situation that has already occurred is called an incident. Emergency response is action taken in response to an unexpected and dangerous occurrence in an attempt to mitigate its impact on people, structures, or the environment. Emergency situations can range from natural disasters to hazardous materials problems and transportation incidents.
Hazards Materials and Wastes
Hazardous materials include but are not limited to hazardous materials, hazardous substances, and hazardous wastes, as defined in Section 25501 and Section 25117, respectively, of the California Health and Safety Code. A hazardous material is any material that, because of its quantity, concentration, or physical or chemical characteristics, poses a significant present or potential hazard to human health and safety or to the environment if released; and any material that a handler or an administering regulatory agency under Section 25501 has a reasonable basis for believing would be injurious to the health and safety of persons or harmful to the environment. Various properties may cause a substance to be considered hazardous, including:
• Toxicity—causes human health effects;
• Ignitability—has the ability to burn;
• Corrosivity—causes severe burns or damage to materials; and • Reactivity—causes explosions or generates toxic gases.
Hazardous Building Materials
Many older buildings contain building materials consisting of hazardous materials. These materials include LBP , ACM, and polychlorinated biphenyls (PCBs).
Prior to the United States Environmental Protection Agency (EPA) ban in 1978, LBP was commonly used on interior and exterior surfaces of buildings. Disturbances such as sanding and scraping activities, renovation work, gradual wear and tear, old peeling paint, and paint dust particulates have been found to contaminate surface soils or cause lead dust to migrate and affect indoor air quality.
Exposure to residual lead can cause severe health effects, especially in children.
Asbestos is a naturally occurring fibrous material that was extensively used as a fireproofing and insulating agent in building construction materials before such uses were banned by the EPA in the 1970s. In addition, many types of electrical equipment contained PCBs as an insulator, including transformers and capacitors. After PCBs were determined to be a carcinogen in the mid to late 1970s, the EPA banned PCB use in new equipment and began a program to phase out certain existing PCB-containing equipment. For example, fluorescent lighting ballasts manufactured after City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-3
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx January 1, 1978, do not contain PCBs, and are required to have a label clearly stating that PCBs are not present in the unit.
Hazardous Substances
A hazardous substance can be any biological, natural, or chemical substance, whether solid, liquid, or gas, which may cause harm to human health. Hazardous substances are classified based on their potential health effects, whether acute (immediate) or chronic (long-term). Dangerous goods are classified based on immediate physical or chemical effects, such as fire, explosion, corrosion, and poisoning. An accident involving dangerous goods could seriously harm human health or damage property or the environment. Harm to human health may happen suddenly (acute), such as dizziness, nausea, and itchy eyes or skin; or it may happen gradually over years (chronic), such as dermatitis or cancer. Some people can be more susceptible than others. Hazardous substances and dangerous goods can include antiseptic used for a cut, paint for walls, a cleaning product for the bathroom, chlorine in a pool, carbon monoxide from a motor vehicle, fumes from welding, vapors from adhesives, or dust from cement, stone, or rubber operations. Such hazardous substances can make humans very sick if they are not used properly.
Hazardous Wastes
Hazardous waste is any hazardous material that is to be discarded, abandoned, or recycled. The criteria that define a material as hazardous also define a waste as hazardous. Specifically, materials and waste may be considered hazardous if they are poisonous (toxic); can be ignited by open flame (ignitable); corrode other materials (corrosive); or react violently, explode, or generate vapors when mixed with water (reactive). Soil or groundwater contaminated with hazardous materials above specified regulatory State or federal thresholds is considered hazardous waste if it is removed from a site for disposal. If handled, disposed, or otherwise handled improperly, hazardous materials and hazardous waste can result in public health hazards if released into the soil or groundwater or through airborne releases in vapors, fumes, or dust. Soil and groundwater having concentrations of hazardous constituents higher than specific regulatory levels must be handled and disposed of as hazardous waste when excavated or pumped from an aquifer. The California Code of Regulations, Title 22, Sections 66261.20–24 contains technical descriptions of toxic characteristics that could cause soil or groundwater to be classified as hazardous waste.
Hazardous Materials Sites
The Cortese List is a list of known hazardous materials or hazardous waste facilities that meet one or more of the provisions of Government Code Section 65962.5, including:
• The list of hazardous waste and substances sites from the DTSC EnviroStor database.1 • The list of Leaking Underground Storage Tank (LUST) sites by county and fiscal year from the California State Water Resources Control Board (State Water Board) GeoTracker database.2
1 California Department of Toxic Substances Control (DTSC). “Cortese” list of DTSC’s EnviroStor database list of Hazardous Waste and Substances sites. DTSC’s Hazardous Waste and Substances Site List—Site Cleanup (Cortese List). Website:
https://www.envirostor.dtsc.ca.gov/public/. Accessed May 17, 2022. 2 California State Water Resources Control Board (State Water Board). “Cortese” List of Leaking Underground Storage Tank Sites by County (San Francisco County). Website: https://geotracker.waterboards.ca.gov/sites_by_county. Accessed May 17, 2022 City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-4 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx • The list of solid waste disposal sites identified by the State Water Board with waste constituents exceeding hazardous waste levels outside the waste management unit.3 • The list of active cease-and-desist orders and cleanup and abatement orders from the State Water Board.4
• The list of hazardous waste facilities subject to corrective action pursuant to Section 25187.5 of the Health and Safety Code, as identified by the DTSC. 5 Envirostor
The EnviroStor database, maintained by the DTSC, tracks cleanup, permitting, enforcement and investigation efforts at hazardous waste facilities, sites with known contamination, and sites where there may be reasons to investigate further. The database includes federal Superfund sites (from the National Priorities List); State response sites, voluntary cleanup sites; school investigation and cleanup sites; corrective action sites; and tiered California permit sites. It also includes sites that are being investigated for contamination where contamination has not been confirmed. According to an EnviroStor search performed on May 17, 2022, a total of three sites are located within the Plan Area.
See Table 3.9-1 for more information.
Table 3.9-1: Facilities Listed on the DTSC EnviroStor Database Site
No. Site Name; Address Site Description; Size
Contaminants of
Concern Cleanup Status
1 Fourth Educational
Center Site; 2660
Leonard Avenue
Former agricultural site
with residences and
aboveground storage
tank; 160.5 acres.
Arsenic, pesticides Inactive–Action Required as
of 5/18/09.
2 Clovis USD–Proposed K-
6 School; SE Intersection
of Temperance and
Clinton Avenues
Former agricultural site
that is currently fallow.
Formerly contained
farm
residence/buildings that
have been removed; 20
acres.
Metals, pesticides,
PCBs
No further action as of
4/17/2014.
3 T H Agriculture and
Nutrition, LLC; 7183
East McKinley Avenue
Formerly a plant and
warehouse for
agricultural chemicals.
Pesticides; VOCs Certified by DTSC/in
Operation and Maintenance
Agreement as of 1/12/2006.
Removed from the National
Priorities List of Superfund
and hazardous waste sites
but subject to continued
monitoring. Land use
restrictions apply.
3 California Environmental Protection Agency (Cal/EPA). 2020. Site Portal. Website:
https://siteportal.calepa.ca.gov/nsite/map/results. Accessed May 17, 2022. 4 Ibid.
5 California Environmental Protection Agency (Cal/EPA). “Cortese” list of sites subject to Corrective Action pursuant to Health and Safety Code 25187.5. Website: https://www.calepa.ca.gov/sitecleanup/corteselist/section-65962-5a/. Accessed May 17, 2022.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-5
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx Site
No. Site Name; Address Site Description; Size
Contaminants of
Concern Cleanup Status
Notes:
DTSC = California Department of Toxic Substances Control PCB = polychlorinated biphenyl
VOC = volatile organic compound
Source: California Department of Toxic Substances Control (DTSC) EnviroStor. 2022.
Geotracker
GeoTracker is the State Water Board data management system for sites that impact, or have potential to impact, water quality in California, with emphasis on groundwater. GeoTracker contains records for sites that require cleanup, such as LUST Sites, Cleanup Program Sites, and Department of Defense Sites. GeoTracker also contains records for various unregulated projects, as well as permitted facilities including operating Permitted USTs, Irrigated Lands, Oil and Gas production, and Land Disposal Sites (landfills). According to a GeoTracker search performed on May 17, 2022, a total of two open sites are located within the Plan Area. See Table 3.9-2 for more information.
Table 3.9-2: Geotracker Sites in the Plan Area
Site
No. Site Name; Address Site Description; Size
Contaminants of
Concern Cleanup Status
1 Pipco Ranch; 5414
North East Fresno
LUST Cleanup Site Gasoline Completed–Case Closed as of
7/1/07.
2 Baggie Farms; 6731
North Avenue East
LUST Cleanup Site Diesel Completed–Case Closed as of
10/15/1991.
3 Tri-Boro Fruit Co. Inc.;
2500 South Fowler
Avenue
LUST Cleanup Site Gasoline Completed–Case Closed as of
8/29/1996.
4 Tri-Boro Fruit Co. Inc. LUST Cleanup Site Diesel Completed–Case Closed as of 1/18/1995.
5 Demirjian, Mike; 5408
East Jensen Avenue
Cleanup Program
Site
Petroleum, fuels,
oils
Open–Site Assessment as of
11/1/1990.
6 Sunnyside Sierra; 5895
East Jensen Avenue
LUST Cleanup Site Gasoline Completed–Cased Closed as of 1/7/1997.
7 Bonner Packing; 568
South Temperance
Avenue
LUST Cleanup Site Gasoline Completed–Case Closed as of
9/13/1988.
8 Narlian Residence;
7910 Kings Canyon East
LUST Cleanup Site Gasoline Completed–Case Closed as of
9/15/1995.
9 Than; 7183 East
McKinley Avenue
Cleanup Program
Site
Pesticides,
Herbicides, VOCs
Completed–Case Closed as of
5/12/2010. DTSC continues to
provide regulatory oversite for
maintenance of site cap and for
submittal of annual groundwater
monitoring reports.
I I I I
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-6 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx Site
No. Site Name; Address Site Description; Size
Contaminants of
Concern Cleanup Status
10 Private Residence LUST Cleanup Site Gasoline Open–Site Assessment as of 11/15/2011.
11 Private Residence; 9337
McKinley Avenue
LUST Cleanup Site Gasoline Completed–Case Closed as of
9/18/1996.
Notes:
VOC = volatile organic compound
DTSC = California Department of Toxic Substances Control LUST = Leaking Underground Storage Tank
Source: California State Water Resources Control Board (State Water Board). Geotracker. 2022.
Summary
As outlined above, the Plan Area contains various contaminated sites that have released hazardous materials and required remediation and involvement from local, State, and federal agencies. A search of the EnviroStor and GeoTracker databases conducted on May 17, 2022, in the Plan Area found the sites listed in Tables 3.9-1 and 3.9-2. The Plan Area has several cases of leaking underground stork tanks, but cleanup is complete for nearly all of these sites.
Hazardous Materials Incidents Emergency Response
The unauthorized releases of hazardous materials into the environment could create many environmental impacts including impacts to properties, natural environment, and human health. The significance of these impacts could vary according to the location and quantity of the substance released. Hazardous releases can occur in areas that treat, store, transport and use hazardous materials. In the event of an unauthorized release of hazardous materials/substances, emergency response measures must be implemented to ensure the protection of human and natural environmental health from risk.
The Plan Area contains agricultural, rural residential, as well as institutional and public facilities uses.
Agriculture is the primary land use in the Plan Area and is a major industry in the City. The potential for hazardous materials incidents are heightened. Accidental releases of pesticides, fertilizers, and other agricultural chemical may be harmful to the public’s health, safety, and the environment. In addition, the Plan Area contains State Route (SR) 180, which is a major State transportation route.
This transportation route as well as the agricultural uses listed above, transports large quantities of hazardous materials through and into the Plan Area each year. Because of the rural nature of the Plan Area and its location along a route that regularly transports hazardous materials through and around the Plan Area, the area faces risks associated with the potential for hazardous materials emergencies (accidental releases). The City of Fresno Fire Department recognizes the potential for a large chemical release to occur which could expose thousands of people to hazardous or toxic vapors.
In addition, prior to the banning of lead additives in vehicle fuel in 1992, tailpipe emissions from automobiles using leaded gasoline contained lead and resulted in aerially deposited lead (ADL) being deposited in and along roadways throughout the State. ADL-contaminated soils still exist along City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-7
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx roadsides and medians and can also be found underneath some existing road surfaces due to past construction activities.
The City of Fresno Fire Department Hazardous Materials Response Team (HMRT) has embraced an all-hazards approach to emergency response to ensure that the Planning Area receives effective protection from the risk of hazardous materials releases.
Emergency Response
In addition to emergency response to hazardous materials incidents, both the City of Fresno and the County of Fresno implement programs to facilitate emergency preparedness for other types of incidents within the Plan Area. Specifically, the City of Fresno has an Emergency Operations Plan that describes what the City’s actions will be during a response to an emergency. This plan also describes the role of the Emergency Operations Center (EOC) and the coordination that occurs between the EOC, City Departments, and other response agencies. The plan establishes a requirement for the emergency management organization to mitigate any significant emergency disaster affecting the City. The plan also identifies the policies, responsibilities, and procedures required to protect the health and safety of City communities, public and private property, and the environmental effects of natural or technological disasters. In addition, the plan establishes the operation concepts and procedures associated within initial response operations (field response) to emergencies, the extended response operations (City of Fresno EOC Activities), and the recovery process.
Furthermore, the plan complies with the State of California Emergency Operations Plan “Cross Walk” checklist for determining whether an emergency plan has addressed critical elements of California’s Standardized Emergency Management System (SEMS) and the National Incident Management System (NIMS).
The County of Fresno has a Multi-Jurisdictional Hazard Mitigation Plan, which is a plan that aims to reduce or eliminate long-term risk to people or property natural from hazards. The plan, which covers all territory within Fresno County’s jurisdictional boundaries, was adopted by the City of Fresno in 2009, and an update was adopted by the City of Fresno in 2020. The plan was prepared pursuant to the requirements of the Disaster Mitigation Act of 2000 so that Fresno County and the jurisdictions within it would be eligible for the Federal Emergency Management Agency’s (FEMA) Hazard Mitigation Assistance Grants.
Existing Schools
Presently, the Lone Star Elementary School, located in the southern portion of the Plan Area, is the only school in the Plan Area. However, Clovis Unified School District is constructing an educational center for middle and high school students in the northern portion of the Plan Area on a site along the Clinton Avenue alignment between Leonard and Highland Avenues, with phased opening expected in 2025.
Airport Hazards
There are three airports located within the City of Fresno: Fresno Yosemite International Airport, Fresno Chandler Executive Airport, and Sierra Sky Park. None of the airports are located in the Plan Area.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-8 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx Fresno Yosemite International Airport is located approximately 2 miles from the Plan Area, along East Clinton Way. The airport is a joint use civilian/military airport. It is used by commercial air carriers, air cargo operators, charter operators, the State of California, general aviation, and the United States Military. The California Air National Guard occupies a 58-acre area adjacent to East McKinley Avenue in the southeast portion of the airport. A helicopter repair and maintenance unit of the Army National Guard, the California Department of Forestry and Fire Protection (CAL FIRE), and a number of corporate aviation businesses occupy facilities north of the runways. About 250 general aviation aircraft are based at Fresno Yosemite International Airport and two Fixed Base Operators (FBOs) offer a wide range of aeronautical services.
According to the Fresno Yosemite International Airport Safety Compatibility Zones Map, 6 a small
portion of the Plan Area is located within the 60 decibel (dB) Community Noise Equivalent Level (CNEL) co ntour.7 A larger portion of the Plan Area is located within the Traffic Pattern Zone.8 Wildland Fire Hazard
CAL FIRE designates the Plan Area as a Local Responsibility Area (LRA).9 There are no wildlands located within or adjacent to the Plan Area.10
The Plan Area is located within the Central Valley and is relatively flat. The majority of the Plan Area is located within agricultural lands. The Plan Area is surrounded by mostly agricultural properties and rural residential uses to the north, west, and south. The Sierra Nevada foothills to the north and east of the City provide the nearest areas where large expanses of undeveloped properties occur.
Because of the topography and the distance between the developed portions of the City and undeveloped areas, the primary fire hazard concern within the City consists of the potential for structure fires in developed areas.
3.9.3 - Regulatory Framework
Federal
Toxic Substances Control Act
Established in 1976 and amended on December 31, 2002, the Toxic Substances Control Act (TSCA) (15 United States Code [USC] Section 2601-2692) grants the EPA power to require proper reporting, recordkeeping, and testing requirements related to chemical substances and/or mixtures.
Specifically, the TSCA addresses the production, importation, use, and disposal of specific chemicals, including PCBs, asbestos, radon, and LBP . The TSCA establishes the EPA’s authority to require the
6 Fresno Council of Government (COG). 2018. Fresno County Airport Land Use Compatibility Plan. Website:
https://ceqanet.opr.ca.gov/2018081025/2. Accessed November 29, 2022. 7 Fresno Council of Governments (COG). Airport Land Use Compatibility Plan. Exhibit D2 Future Noise Contours. Fresno Yosemite International Airport. Website: https://www.fresno.gov/darm/wp-content/uploads/sites/10/2020/04/ALUCP-Fresno-Yosemite- International-Airport.pdf. Accessed May 17, 2022.
8 Fresno Council of Governments (COG). Airport Land Use Compatibility Plan. Exhibit D1- Fresno Yosemite Intl. – Airport Influence Area and Safety Zones. Website: https://www.fresno.gov/darm/wp-content/uploads/sites/10/2020/04/ALUCP-Fresno-Yosemite- International-Airport.pdf. Accessed May 17, 2022.
9 California Department of Forestry and Fire Protection (CAL FIRE). 2007. Draft Fire Hazard Severity Zones in LRA. Fresno County.
Website: https://osfm.fire.ca.gov/media/6673/fhszl06_1_map10.pdf. Accessed May 17, 2022. 10 City of Fresno. 2018. Fresno County Multi-Hazard Mitigation Plan. Figure 4.52 Fresno County’s Wildfire Severity Zones. Website:
https://www.fresno.gov/darm/wp-content/uploads/sites/10/2020/12/FresnoCountyHMPFinal.pdf. Accessed March 21, 2023.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-9
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx notification of the use of chemicals, require testing, maintain a TSCA inventory, and require those importing chemicals under Sections 12(b) and 13 to comply with certification and/or other reporting requirements. This federal legislation also phased out the use of ACMs in new building materials and sets requirements for the use, handling, and disposal of ACMs. Disposal standards for LBP wastes are also detailed in the TSCA.
Occupational Health and Safety Act
The Occupational Safety and Health Administration (OSHA) of the United States Department of Labor is responsible for implementing and enforcing federal laws and regulations that address worker health and safety. OSHA requires specific training for hazardous materials users and handlers, provision of information (procedures for personal safety, hazardous materials storage and handling, and emergency response) to employees who may be exposed to hazardous materials, and acquisition of material safety data sheets from materials manufacturers. Material safety data sheets describe the risks, as well as proper handling and procedures, related to particular hazardous materials. Employee training must include response and remediation procedures for hazardous materials releases and exposures. Construction workers and operational employees at the project site would be subject to these requirements.
Code of Federal Regulations, Titles 29 and 40
Regulations in Code of Federal Regulations Title 29 include requirements to manage and control exposure to LBP and ACMs. In California, these requirements are implemented by the California Division of Occupational Safety and Health (Cal/OSHA) under California Code of Regulations Title 8 (see further discussion of California Code of Regulations Title 8 below). The removal and handling of ACMs is governed primarily by EPA regulations under Code of Federal Regulations Title 40. The regulations require that the appropriate State agency be notified before any demolition, or before any renovations, of buildings that could contain asbestos or ACMs above a specified threshold.
Resource Conservation and Recovery Act and Comprehensive Environmental Response, Compensation, and Liability Act
The EPA is responsible for implementing and enforcing federal laws and regulations pertaining to hazardous materials. The primary legislation includes the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act (SARA) and the Emergency Planning and Community Right-to-Know Act (known as SARA Title III). RCRA and the 1984 RCRA Amendments regulate the treatment, storage, and disposal of hazardous and nonhazardous wastes and mandate that hazardous wastes be tracked from the point of generation to their ultimate fate in the environment, including detailed tracking of hazardous materials during transport and permitting of hazardous material handling facilities. As permitted by RCRA, in 1992, the EPA approved California’s program called the Hazardous Waste Control Law (HWCL), administered by DTSC, to regulate hazardous wastes in California, as discussed further below. The purpose of CERCLA is to identify and clean up chemically contaminated sites that pose a significant environmental health threat, and the Hazard Ranking System is used to determine whether a site should be placed on the National Priorities List for cleanup activities. SARA relates primarily to emergency management of accidental releases and requires annual reporting of continuous emissions and City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-10 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx accidental releases of specified compounds that are compiled into a nationwide Toxics Release Inventory. Finally, SARA Title III requires formation of State and local emergency planning committees that are responsible for collecting material handling and transportation data for use as a basis for planning and provision of chemical inventory data to the community at large under the “right-to-know” provision of the law.
Hazardous Materials Transportation Act
Under the Hazardous Materials Transportation Act of 1975, the United States Department of Transportation (USDOT), Office of Hazardous Materials Safety regulates the transportation of hazardous materials on water, rail, highways, through air, or in pipelines, and enforces guidelines created to protect human health and the environment and reduce potential impacts by creating hazardous material packaging and transportation requirements. It also includes provisions for material classification, packaging, marking, labeling, place-carding, and shipping documentation. The USDOT provides hazardous materials safety training programs and supervises activities involving hazardous materials. In addition, the USDOT develops and recommends regulations governing the multimodal transportation of hazardous materials.
Aboveground Petroleum Storage Act, and Spill Prevention, Control, and Countermeasure Rule The Aboveground Petroleum Storage Act of 1990, and the Spill Prevention, Control, and Countermeasure (SPCC) Rule (amended 2010) of the Oil Pollution Prevention regulation (40 Code of Federal Regulations [CFR] 112) require the owner or operator of a tank facility with an aggregate storage capacity greater than 1,320 gallons to notify the local Certified Unified Program Agency (CUPA) and prepare an SPCC plan. The SPCC plan must identify appropriate spill containment measures and equipment for diverting spills from sensitive areas and must discuss facility-specific requirements for the storage system, inspections, recordkeeping, security, and training.
Clean Water Act
The Clean Water Act (CWA) (Title 33 § 1251 et seq. of the United States Code [33 USC 1251, et seq.]) is the major federal legislation governing water quality. The CWA established the basic structure for regulating discharges of pollutants into waters of the United States (not including groundwater). The objective of the act is “to restore and maintain the chemical, physical, and biological integrity of the nation’s waters.” The CWA establishes the basic structure for regulating the discharge of pollutants into waters of the United States. Responsibility for administering the CWA resides with the State Water Board and nine Regional Water Quality Control Boards (RWQCBs); the Central Valley RWQCB administers the CWA for Fresno County. Section 404 of the CWA regulates temporary and permanent fill and disturbance of waters of the United States, including wetlands. The United States Army Corps of Engineers (USACE) requires that a permit be obtained if a project proposes to place fill in navigable waters and/or to alter waters of the United States below the ordinary high-water mark in non-tidal waters. Section 401 of the CWA requires compliance with State water quality standards for actions within State waters. Compliance with the water quality standards required under Section 401 is a condition for issuance of a Section 404 permit. Under Section 401 of the CWA, every applicant for a permit or license for any activity that may result in a discharge to a water body must obtain a State water quality certification from the RWQCB to demonstrate that the proposed activity would comply with State water quality standards.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-11
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx Federal Air Regulations, Part 77
The Federal Aviation Administration (FAA) is charged with the review of construction activities that occur in the vicinity of airports. Its role in reviewing these activities is to ensure that new structures do not result in a hazard to navigation. The regulations in the Federal Air Regulations (14 CFR, Part 77) are designed to ensure that no obstructions in navigable air space are allowed to exist that would endanger the public. Proposed structures are also evaluated against Terminal En Route Procedures, which ensure that a structure does not adversely impact flight procedures. Tall structures, including buildings, construction cranes, and cell towers in the vicinity of an airport can be hazardous to the navigation of airplanes. Federal Air Regulations Part 77 identifies the maximum height at which a structure would be considered an obstacle at any given point around an airport.
The extent of the off-airport coverage that needs to be evaluated for tall structure impacts can extend miles from an airport facility. In addition, Federal Air Regulations Part 77 establishes standards for determining whether objects constructed near airports will be considered obstructions in navigable airspace, sets forth notice requirements of certain types of proposed construction or alterations, and provides for aeronautical studies to determine the potential impacts of a structure on the flight of aircraft through navigable airspace.
Federal Insecticide, Fungicide, and Rodenticide Act
The Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) (7 USC 136 et seq.) was originally passed in 1947. It has been amended several times, most extensively in 1972 and in 1996 by the Food Quality Protection Act of 1996, and in 2012 by the Pesticide Registration Improvement Extension Act. The purpose of FIFRA is to establish federal jurisdiction over the distribution, sale, and use of pesticides. It also gives EPA the authority to study the effects of pesticide use. Other key provisions of FIFRA require pesticide applicators to pass a licensing examination for status as “qualified applicators,” create a review and registration process for new pesticide products and ensure thorough and understandable labeling that includes instructions for use.
State
California Hazardous Waste Control Law
The HWCL is the primary hazardous waste statute in the State of California and implements RCRA as a “cradle-to-grave” waste management system for handling hazardous wastes in a manner that protects human health and the environment and would reduce potential resulting impacts. The law specifies that generators have the primary duty to determine whether their waste is hazardous and to ensure proper management. The HWCL also establishes criteria for the reuse and recycling of hazardous waste used or reused as raw materials. The law exceeds federal requirements by mandating source reduction planning, and a much broader requirement for permitting facilities that treat hazardous waste. It also regulates a number of types of waste and waste management activities that are not covered by federal law.
California Health and Safety Code
The California Health and Safety Code (HSC § 25141) defines hazardous waste as a waste or combination of waste that may:
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-12 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx . . . because of its quantity, concentration, or physical, chemical, or infection characteristics:
(1) Cause or significantly contribute to an increase in mortality or an increase in serious irreversible or incapacitation-reversible illness. (2) Pose a substantial present or potential hazard to human health or the environment, due to factors including, but not limited to, carcinogenicity, acute toxicity, chronic toxicity, bioaccumulative properties, or persistence in the environment, when improperly treated, stored, transported, or disposed of or otherwise managed.
These regulations establish criteria for identifying, packaging, and labeling hazardous wastes; prescribe management practices for hazardous wastes; establish permit requirements for hazardous waste treatment, storage, disposal, and transportation; and identify hazardous waste that commonly would be disposed of in landfills.
Under both the RCRA and the HWCL, hazardous waste manifests must be retained by the generator for a minimum of 3 years. The generator must match copies of the manifests with copies of manifest receipts from the treatment, disposal, or recycling facility.
In accordance with Chapter 6.11 of the California Health and Safety Code (HSC § 25404, et seq.), local regulatory agencies enforce many federal and State regulatory programs through the CUPA program, including:
• Hazardous materials business plans (HMBPs) (HSC § 25501, et seq.). • State Uniform Fire Code (UFC) requirements (UFC § 80.103, as adopted by the State Fire Marshal pursuant to HSC § 13143.9).
• Underground storage tanks (HSC § 25280, et seq.)
• Aboveground storage tanks (HSC § 25270.5(c)).
• Hazardous waste generator requirements (HSC § 25100, et seq.).
The Fresno County Health Department’s CUPA is responsible for implementing a unified hazardous materials and hazardous waste management regulatory program. The agency provides oversight of businesses that:
• Require Hazardous Materials Business Plans;
• Require California Accidental Release Prevention plans or Federal Risk Management Plans; • Operate Underground Storage Tanks;
• Operate Aboveground Storage Tanks;
• Generate Hazardous Waste(s);
• Have On-site Treatment of Hazardous Waste(s)/Tiered Permits.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-13
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx Compliance is achieved through routine inspections of all regulated facilities, and investigation of citizen-based complaints and inquiries regarding improper handling and/or disposal of hazardous materials and/or hazardous wastes. Hazardous waste source reduction is a primary goal of the CUPA.
Additionally, the agency provides oversight for the remediation of contaminated sites.
California Code of Regulations, Title 8
Cal/OSHA assumes primary responsibility for developing and enforcing workplace safety regulations.
These regulations concern the use of hazardous materials in the workplace, including requirements for employee safety training; availability of safety equipment; accident and illness prevention programs; hazardous substance exposure warnings; and preparation of emergency action and fire prevention plans.
Cal/OSHA also enforces hazard communication program regulations, including procedures for identifying and labeling hazardous substances, and requires that safety data sheets (formerly known as material safety data sheets) be available for employee information and training programs.
Cal/OSHA standards are generally more stringent than federal regulations. Construction workers and operational employees at the project site would be subject to these requirements.
California Code of Regulations, Title 8, Section 1529 authorizes Cal/OSHA to implement the survey requirements of Code of Federal Regulations Title 29 relating to asbestos. These federal and State regulations require facilities to take all necessary precautions to protect employees and the public from exposure to asbestos. Workers who conduct asbestos abatement must be trained in accordance with federal and State OSHA requirements. The Bay Area Air Quality Management District (BAAQMD) oversees the removal of regulated ACMs (see “Asbestos Demolition, Renovation, and Manufacturing Rule” below).
California Code of Regulations, Title 8, Section 1532.1 includes requirements to manage and control exposure to LBP. These regulations cover the demolition, removal, cleanup, transportation, storage, and disposal of lead-containing material. The regulations outline the permissible exposure limit, protective measures, monitoring, and compliance to ensure the safety of construction workers exposed to lead-based material. Loose and peeling LBP must be disposed of as a State and/or federal hazardous waste if the concentration of lead equals or exceeds applicable hazardous waste thresholds. Federal and State OSHA regulations require a supervisor who is certified with respect to identifying existing and predictable lead hazards to oversee air monitoring and other protective measures during demolition activities in areas where LBP may be present. Special protective measures and notification of Cal/OSHA are required for highly hazardous construction tasks related to lead, such as manual demolition, abrasive blasting, welding, cutting, or torch burning of structures, where LBP is present.
California Code of Regulations Title 22, Division 4.5
California Code of Regulations, Title 22, Division 4.5, contains the Environmental Health Standards for the Management of Hazardous Waste, which includes California waste identification and classification regulations. California Code of Regulations, Title 22, Chapter 11, Article 3, “Soluble Threshold Limits Concentrations/Total Threshold Limits Concentration Regulatory Limits,” identifies the concentrations at which soil is determined to be a California hazardous waste. California’s City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-14 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx Universal Waste Rule (22 California Code of Regulations [CCR] § 66273) provides an alternative set of management standards in lieu of regulation as hazardous wastes for certain common hazardous wastes, as defined in California Code of Regulations, Title 22, Section 66261.9. Universal wastes include fluorescent lamps, mercury thermostats, and other mercury-containing equipment. Existing structures may contain fluorescent light ballasts that could contain mercury or lead. The Alternative Management Standards for Treated Wood Waste (22 CCR § 67386) were developed by the DTSC to allow for disposal of treated wood as a nonhazardous waste, to simplify and facilitate the safe and economical disposal of such waste. Chemically treated wood can contain elevated levels of hazardous chemicals (e.g., arsenic, chromium, copper, pentachlorophenol, or creosote) that equal or exceed applicable hazardous waste thresholds. The Alternative Management Standards provide for less stringent storage requirements and extended accumulation periods, allow shipments without a hazardous waste manifest and a hazardous waste hauler, and allow disposal at specific nonhazardous waste landfills.
Porter-Cologne Act
The Porter-Cologne Water Quality Control Act of 1969 (Porter-Cologne Act) is California’s statutory authority for the protection of water quality. Under the Porter-Cologne Act, the State must adopt water quality policies, plans, and objectives that protect the State’s waters for the use and enjoyment of the people. Regional authority for planning, permitting, and enforcement is delegated to the nine RWQCBs. The RWQCBs are required to formulate and adopt water quality control plans (also known as Basin Plans) for all areas of the region and establish water quality objectives in the plans. The Porter-Cologne Act sets forth the obligations of State Water Board and RWQCBs to adopt and periodically update water quality control plans that recognize and reflect the differences in existing water quality, the beneficial uses of the region’s groundwater and surface water, and local water quality conditions and problems. It also authorizes the State Water Board and RWQCBs to issue and enforce waste discharge requirements and to implement programs for controlling pollution in State waters. Finally, the Porter-Cologne Act also authorizes the State Water Board and RWQCBs to oversee site investigation and cleanup for unauthorized releases of pollutants to soils and groundwater and in some cases to surface waters or sediments.
California Emergency Response Plan
California has developed an emergency response plan to coordinate emergency services provided by federal, State, and local governments and private agencies. Responding to hazardous materials incidents is one part of this plan. The plan is administered by the California Governor’s Office of Emergency Services, which coordinates the responses of other agencies. Emergency response team members respond and work with local fire and police agencies, emergency medical providers, the California Highway Patrol (CHP), CAL FIRE, California Department of Fish and Wildlife (CDFW), and California Department of Transportation (Caltrans).
California Department of Forestry and Fire Protection
CAL FIRE has mapped fire threat potential throughout California. CAL FIRE maps fire threat based on the availability of fuel and the likelihood of an area burning (based on topography, fire history, and climate). The threat levels include no fire threat, moderate, high, and very high fire threat.
Additionally, CAL FIRE produced a 2010 Strategic Fire Plan for California, which contains goals, City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-15
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx objectives, and policies to prepare for and mitigate the effects of fire on California’s natural and built environments. CAL FIRE’s Office of the State Fire Marshal provides oversight of enforcement of the California Fire Code as well as overseeing hazardous liquid pipeline safety.
California Building Code
The State of California provided a minimum standard for building design through the 2016 California Building Standards Code (CBC), which is located in Part 2 of Title 24 of the California Code of Regulations. The 2016 CBC is based on the 2015 International Building Code but has been modified for California conditions. It is generally adopted on a jurisdiction by-jurisdiction basis, subject to further modification based on local conditions. Commercial and residential buildings are plan- checked by local City and County building officials for compliance with the CBC. Typical fire safety requirements of the CBC include the installation of sprinklers in all new high-rise buildings and residential buildings; the establishment of fire resistance standards for fire doors, building material; and particular types of construction.
California Public Resources Code
The California Public Resources Code includes fire safety regulations that restrict the use of equipment that may produce a spark, flame, or fire; require the use of spark arrestors11 on construction equipment that use an internal combustion engine; specify requirements for the safe use of gasoline-powered tools in fire hazard areas; and specify fire suppression equipment that must be provided on-site for various types of work in fire-prone areas.
These regulations include the following:
• Earthmoving and portable equipment with internal combustion engines would be equipped with a spark arrestor to reduce the potential for igniting a wildland fire (Public Resources Code [PRC] § 4442);
• Appropriate fire suppression equipment would be maintained during the highest fire danger period—from April 1 to December 1 (PRC § 4428);
• On days when a burning permit is required, flammable materials would be removed to a distance of 10 feet from any equipment that could produce a spark, fire, or flame, and the construction contractor would maintain the appropriate fire suppression equipment (PRC § 4427); and
• On days when a burning permit is required, portable tools powered by gasoline-fueled internal combustion engines would not be used within 25 feet of any flammable materials (PRC § 4431).
11 A spark arrestor is a device that prohibits exhaust gases from an internal combustion engine from passing through the impeller blades where they could cause a spark. A carbon trap is commonly used to retain carbon particles from the exhaust.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-16 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx Local
Fresno General Plan
The General Plan outlines a long-range vision for the physical development of the City that reflects the community’s vision to preserve the desirable qualities of the existing community while encouraging the aspirations of the community. The General Plan includes the following objectives and policies related to hazards and hazardous materials:
Public Utilities and Services Element
Objective PU-2 Ensure that the Fire Department’s staffing and equipment resources are sufficient to meet all fire and emergency service level objectives and are provided in an efficient and cost effective manner.
Policy PU-2-a Unify Fire Protection. Pursue long-range transfer of fire protection service agreements with adjacent fire districts that, in concert with existing automatic aid agreements, will lead to the eventual unification of fire protection services in the greater Fresno area.
Policy PU-2-b Maintain Ability. Strive to continually maintain the Fire Department’s ability to provide staffing and equipment resources to effectively prevent and mitigate emergencies in existing and new high-rise buildings and in other high-density residential and commercial development throughout the City.
Policy PU-2-c Rescue Standards. Develop appropriate standards, as necessary, for rescue operations, including, but not limited to, confined space, high angle, swift water rescues, and the unique challenges of a high speed train corridor.
Policy PU-2-d Station Siting. Use the General Plan, community plans, Specific Plans, neighborhood plans, and Concept Plans, the City’s Geographic Information Systems (GIS) database, and a fire station location program to achieve optimum siting of future fire stations.
Policy PU-2-e Service Standards. Strive to achieve a community wide risk management plan that include the following service level objectives 90 percent of the time:
• First Unit on Scene–First fire unit arriving with minimum of three firefighters within 5 minutes and 20 seconds from the time the unit was alerted to the emergency incident.
• Effective Response Force–Provide sufficient number of firefighters on the scene of an emergency within 9 minutes and 20 seconds from the time of unit alert to arrival. The effective response force is measured as 15 firefighters for low risk fire incidents and 21 firefighters for high risk fire incidents and is the number of personnel necessary to complete specific tasks required to contain and control fire minimizing loss of life and property.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-17
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx Objective PU-3 Enhance the level of fire protection to meet the increasing demand for services from an increasing population.
Policy PU-3-a Fire Prevention Inspections. Develop strategies to enable the performance of annual fire and life safety inspection of all industrial, commercial, institutional, and multi- family residential buildings, in accordance with nationally recognized standards for the level of service necessary for a large Metropolitan Area, including a self-certification program.
Policy PU-3-b Reduction Strategies. Develop community risk reduction strategies that target high service demand areas, vulnerable populations (e.g., young children, older adults, non-English speaking residents, persons with disabilities, etc.), and high life hazard occupancies.
Policy PU-3-d Review All Development Applications. Continue Fire Department review of development applications, provide comments and recommend conditions of approval that will ensure adequate on-site and off-site fire protection systems and features are provided.
Policy PU-3-e Building Codes. Adopt and enforce amendments to construction and fire codes, as determined appropriate, to systematically reduce the level of risk to life and property from fire, commensurate with the City’s fire suppression capabilities.
Policy PU-3-f Adequate Infrastructure. Continue to pursue the provision of adequate water supplies, hydrants, and appropriate property access to allow for adequate fire suppression throughout the City.
Policy PU-3-g Cost Recovery. Continue to evaluate appropriate codes, policies, and methods to generate fees or other sources of revenue to offset the ongoing personnel and maintenance costs of providing fire prevention and response services.
Noise and Safety Element
Objective NS-4 Minimize the risk of loss of life, injury, serious illness, and damage to property resulting from the use, transport, treatment, and disposal of hazardous materials and hazardous wastes.
Policy NS-4-a Processing and Storage. Require safe processing and storage of hazardous materials, consistent with the California Building Standards Code and the Uniform Fire Code, as adopted by the City.
Policy NS-4-b Coordination. Maintain a close liaison with the Fresno County Environmental Health Department, Cal/EPA Division of Toxics, and the State Office of Emergency Services to assist in developing and maintaining hazardous material business plans, inventory statements, risk management prevention plans, and contingency/emergency response action plans.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-18 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx Policy NS-4-c Soil and Groundwater Contamination Reports. Require an investigation of potential soil or groundwater contamination whenever justified by past site uses.
Require appropriate mitigation as a condition of project approval in the event soil or groundwater contamination is identified or could be encountered during site development.
Policy NS-4-d Site Identification. Continue to aid federal, State, and County agencies in the identification and mapping of waste disposal sites (including abandoned waste sites), and to assist in the survey of the kinds, amounts, and locations of hazardous wastes.
Policy NS-4-e Compliance with County Program. Require that the production, use, storage, disposal, and transport of hazardous materials conform to the standards and procedures established by the County Division of Environmental Health. Require compliance with the County’s Hazardous Waste Generator Program, including the submittal and implementation of a Hazardous Materials Business Plan, when applicable.
Policy NS-4-f Hazardous Materials Facilities. Require facilities that handle hazardous materials or hazardous wastes to be designed, constructed, and operated in accordance with applicable hazardous materials and waste management laws and regulations.
Policy NS-4-g Hazmat Response. Include policies and procedures appropriate to hazardous materials in the City’s disaster and emergency response preparedness and planning, coordinating with implementation of Fresno County’s Hazardous Materials Incident Response Plan.
Policy NS-4-h Household Collection. Continue to support and assist with Fresno County’s special household hazardous waste collection activities, to reduce the amount of this material being improperly discarded.
Policy NS-4-I Public Information. Continue to assist in providing information to the public on hazardous materials.
Objective NS-5 Protect the safety, health, and welfare of persons and property on the ground and in aircraft by minimizing exposure to airport-related hazards.
Policy NS-5-a Land Use and Height. Incorporate and enforce all applicable Airport Land Use Compatibility Plans (ALUCPs) through land use designations, zoning, and development standards to support the continued viability and flight operations of Fresno’s airports and to protect public safety, health, and general welfare. • Limit land uses in airport safety zones to those uses listed in the applicable ALUCPs as compatible uses, and regulate compatibility in terms of location, height, and noise.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-19
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx • Ensure that development, including public infrastructure projects, within the airport approach and departure zones complies with Part 77 of the Federal Aviation Administration Regulations (Objects Affecting Navigable Airspace), particularly in terms of height.
Policy NS-5-b Airport Safety Hazards. Ensure that new development, including public infrastructure projects, does not create safety hazards such as glare from direct or reflective sources, smoke, electrical interference, hazardous chemicals, fuel storage, or from wildlife, in violation of adopted safety standards.
Policy NS-5-c Aviation Easements. Employ aviation easements in order to secure and protect airspace required for unimpeded operation of publicly owned airports.
Policy NS-5-d Disclosure. As a condition of approval for residential development projects, require sellers to prepare and provide State Department of Real Estate Disclosure statements to property buyers notifying of noise and safety issues related to airport operations.
Policy NS-5-e Planned Expansion. Allow for the orderly expansion and improvement of publicly owned airports, while minimizing adverse environmental impacts associated with these facilities.
• Periodically update airport facility master plans in accordance with FAA regulations.
• Require land use within the boundaries of the Fresno-Yosemite International Airport and Chandler Downtown Airport to conform to designations and policies specified in adopted City of Fresno compatible land use plans. • Provide local jurisdictions surrounding the City's publicly owned airports with specific guidelines for effectively dealing with the presence and operation of these airports.
Objective NS-6 Foster an efficient and coordinated response to emergencies and natural disasters.
Policy NS-6-a County Multi-Jurisdiction Hazard Mitigation Plan. Adopt and implement the Fresno County Multi-Jurisdiction Hazard Mitigation Plan and City of Fresno Local Hazard Mitigation Plan Annex.
Policy NS-6-b Disaster Response Coordination. Maintain coordination with other local, State, and federal agencies to provide coordinated disaster response.
Policy NS-6-c Emergency Operations Plan. Update the City’s Emergency Operations Plan periodically, using a whole community approach which integrates considerations for People with access and functional needs in all aspects of planning.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-20 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx Policy NS-6-d Evacuation Planning. Maintain an emergency evacuation plan in consultation with the Police and Fire Departments and other emergency service providers, which shows potential evacuation routes and a list of emergency shelters to be used in case of catastrophic emergencies.
Policy NS-6-e Critical Use Facilities. Ensure critical use facilities (e.g., City Hall, police and fire stations, schools, hospitals, public assembly facilities, transportation services) and other structures that are important to protecting health and safety in the community remain operational during an emergency.
• Site and design these facilities to minimize their exposure and susceptibility to flooding, seismic and geological effects, fire, and explosions. • Work with the owners and operators of critical use facilities to ensure they can provide alternate sources of electricity, water, and sewerage in the event that regular utilities are interrupted in a disaster.
Policy NS-6-f Emergency Vehicle Access. Require adequate access for emergency vehicles in all new development, including adequate widths, turning radii, hard standing areas, and vertical clearance.
Policy NS-6-g Emergency Preparedness Public Awareness Programs. Continue to conduct programs to inform the general public, including people with access and functional needs, of the City’s emergency preparedness and disaster response procedures.
Fresno Southeast Development Area Specific Plan
The Fresno SEDA Specific Plan is framed within three significant and interrelated goals: fiscal responsibility, social equity, and environmental sustainability. The proposed Plan and policies that form its implementation framework are formulated and coordinated to meet the criteria of these overlapping goals. The proposed Specific Plan contains the following objectives and policies related to hazards and hazardous materials:
Urban Form
Objective UF-5 Provide a well-balanced transportation network accessible to all users.
Policy UF-5.1 Circulation Plan and Street Standards. Implement a circulation plan which provides a variety of transportation options necessary to meet the needs of residents and employees within the SEDA.
In order to promote connectivity throughout the Plan Area, all SEDA street rights- of-way shall be publicly accessible and shall not include gates or access controls, except where permitted through special review by the City of Fresno.
Policy UF-5.6 Performance Standards and Evaluation. The following criteria shall guide the evaluation of facilities within the SEDA.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-21
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx • Transit: Transit will be provided as demand warrants. Upon Plan buildout or when warranted, 10-minute peak-period headways will be provided along the BRT [Bus Rapid Transit] corridor (e.g., Kings Canyon), and 15-minute peak- period headways shall be provided for high-priority transit routes (e.g., De Wolf, Clovis).
In addition, all other transit routes in the planning area shall be operated at 30-minute headways upon Plan completion. Extended hour or late-night service shall be provided at 60-minute headways.
- Bus stop locations are generally placed at ¼ mile spacing. Bus stop placement will be prioritized at:
1. Schools and medical facilities.
2. Libraries, parks, senior centers, and recreation facilities.
3. Concentrated commercial areas.
4. Concentrated residential and employment areas.
• Bicycles: A user-friendly bicycle network will be provided to welcome all riders throughout the entire Plan Area. Bicycle lanes including Class II and Class IV facilities should be provided on all Super Arterials, Arterials, and Local Streets.
A Bicycled network should be designated on Neighborhood or Local Streets.
Ensuring the safety of vulnerable users will be an important priority, as the Plan will seek to create a network of easy to use, lower stress amenities that provide the ability to connect riders to key designations throughout the City, as described in the Fresno Active Transportation Plan (2017). • Pedestrians: A first-class pedestrian system shall be provided, including sidewalks on all streets, bicycle/pedestrian trails, and other design elements that prioritize safety and convenience for pedestrians, as described in the Fresno Active Transportation Plan (2017).
• Vehicles: A highly connected, grid-based roadway system shall be provided for efficient vehicular travel. Please see the Streets and Circulation Standards in the Development Code and the City of Fresno's Department of Public Works Standard Drawings.
Policy UF-5.7 Level of Service (LOS). To promote complete streets and provide safe mobility for all users throughout the entire SEDA, streets will be designed with no more than four through lanes and a continuous two-way left-turn land (portions of Jensen and Temperance Avenues may have more than four lanes). In addition, these LOS standards are complemented by several other transportation related policies to reduce overall vehicle miles traveled (such as complete streets and transportation demand management). The following LOS standards apply to SEDA roadways:
• LOS ‘E’ for Arterials, Collectors, and Local (both intersection and segment operations) during peak traffic hours.
• LOS ‘F’ Exception. LOS ‘F’ in areas with ample transit, pedestrian, and/or bicycle options, including in and around the Mixed-Use Districts of the SEDA, City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-22 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx particularly if achieving a LOS with less delay would violate the four-lane maximum as described above.
Open Space, Schools, and Public Facilities
Objective OS-11 Provide the necessary levels of police and fire services in accordance with the City of Fresno General Plan.
Policy OS-11.1 Provision of Police Services. Provide police services in the SEDA in accordance with the policies of the City of Fresno General Plan. If deemed necessary, the City of Fresno Planning and Development Department, through coordination with public safety agencies, can make adjustments to these policies.
Policy OS-11.2 Provision of Fire Services. Provide fire services in the SEDA in accordance with the policies of the City of Fresno General Plan. If deemed necessary, the City of Fresno Planning and Development Department, through coordination with public safety agencies, can make adjustments to these policies.
Policy OS-11.3 Coordination with Police and Fire Departments. The City of Fresno Planning and Development Department shall work with the Police and Fire departments as appropriate to promote safe environments throughout the SEDA and ensure that services can be provided in a manner that is sensitive and responsive to the needs of the community. Coordination may address:
• Evaluation of design features for safety and crime prevention • Siting of police and fire substations
• Facilitation of citizen involvement processes
Greenhouse Gas Reduction and Conservation
Objective RC-1 Meet statewide targets set for greenhouse gas emissions reductions as set forth in the City’s updated GHG [greenhouse gas] Reduction Plan, adopted in 2021.
Policy RC-1.5 Waste Diversion, Recycling, and Energy Recovery. Establishing programs and actions that promote recycling and diversion of waste from landfills can reduce energy consumed in the transport and handling of waste material and can reduce the greenhouse gases that are emitted during the decomposition of organic waste.
The State of California has adopted increasingly stringent mandates for the percentage of solid waste that can be disposed in landfills. In addition, certain landfills have been mandated to install methane capture systems to result in greenhouse gas reductions from these sources. The effects of methane are powerful—as it is 21 times more effective than carbon dioxide in retaining heat in the atmosphere. Methane can be flared, producing mainly carbon dioxide or used in combustion devices to generate heat or power that can be used for productive City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-23
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx purposes displacing the use of fossil fuels. The following policies are recommended in the SEDA to reduce GHGs and conserve energy:
1. Maintain current targets for recycling and re-use of all types of waste material in the City and enhance waste and wastewater management practices to reduce natural resource consumption, including the following measures:
a) Continue to require recyclable material collection and storage areas in all residential development.
b) Establish recycling collection and storage area standards for commercial and industrial facilities to size the recycling areas according to the anticipated types and amounts of recyclable material generated. c) Provide educational materials to residents on how and what to recycle and how to dispose of hazardous waste.
d) Provide recycling canisters and collection in public areas where trash cans are also provided.
e) Institute a program to evaluate major waste generators and identify recycling opportunities for their facilities and operations. f) Continue to partner with the California Integrated Waste Management Board on waste diversion and recycling programs and the CalMax (California Materials Exchange) program.
g) Evaluate the feasibility of a residential, restaurant and institutional food waste segregation and recycling program, to reduce the amount of organic material sent to landfill and minimize the emissions generated by decomposing organic material.
h) Evaluate the feasibility of “carbon footprinting” for the City’s wastewater treatment facilities, biomass and composting operations, solid waste collection and recycling programs.
i) Expand yard waste collection to divert compostable waste from landfills. j) Study the feasibility and cost-benefit analysis of a municipal composting program to collect and compost food and yard waste, including institutional food and yard waste, using the resulting compost matter for City park and median maintenance.
2. Create a strategic and operations plan for fulfilling the City Council resolution committing the City of Fresno to a Zero Waste goal.
3. Continue to pursue opportunities to reduce air pollution by using methane gas from the old City landfill and the City’s wastewater treatment process.
Objective RC-5 Protect surface and groundwater supplies from major sources of pollution.
Policy RC-5.2 Hazardous Materials. Prevent contamination of the groundwater table and surface water resources and discourage all pesticide use for agricultural and landscaping uses within the SEDA.
• Signage: Install appropriate signage to deter the discharge of hazardous materials into storm drains.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-24 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx • Pollution Prevention: Provide information to SEDA residents on appropriate ways to dispose of hazardous materials and chemicals.
• Pesticide Reduction: Discourage all pesticide use for agricultural and landscaping uses within the SEDA.
• Remediation: Encourage rapid cleanup of contaminated groundwater consistent with applicable laws and regulations.
City of Fresno Municipal Code
Chapter 15 Article 25 of the Municipal Code outlines performance standards related to site and facility maintenance, noise, air contaminants, waste, and fire hazards to provide control measures to protect the community form nuisances, hazards, and objectionable conditions.
Chapter 15 Article 27 of the Municipal Code establishes standards for specific uses and activities. It provides regulations for the use and storage of pesticides, fertilizers, and hazardous materials, and for hazardous waste management facilities, and for use of hazardous materials in residences. It requires the preparation of a Hazardous Materials Plans for some uses.
3.9.4 - Methodology
Impacts related to hazards and hazardous materials resulting from implementation of the Specific Plan are discussed below. The following impact analysis is based on an assessment of baseline conditions for the Plan Area, including locations of hazardous materials use and storage through a review of various databases identifying existing contaminated sites and City emergency response and evacuation plan requirements. This analysis identifies potential impacts based on the interaction between the affected environment and construction, operation, and maintenance activities related to future development that could occur under the proposed project.
3.9.5 - Thresholds of Significance
The Lead Agency utilizes the criteria in the California Environmental Quality Act (CEQA) Guidelines Appendix G Environmental Checklist as thresholds to determine whether impacts hazards and hazardous materials are significant environmental effects.
Appendix G to the CEQA Guidelines is a sample Initial Study Checklist that includes questions for determining whether impacts to resources are significant. These questions reflect the input of planning and environmental professionals at the Governor’s Office of Planning and Research and the California Natural Resources Agency, based on input from stakeholder groups and experts in various other governmental agencies, nonprofits, and leading environmental consulting firms. Accordingly, the City has derived its significance criteria, based in part on the questions posed in Appendix G.
These significance criteria are as follows:
The proposed project would be considered significant if the project would:
a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-25
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment.
c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school. d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment.
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working the project area. f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan.
g) Expose people or structures, either directly or indirectly to a significant risk of loss, injury, or death involving wildland fires.
3.9.6 - Project Impacts and Mitigation Measures
This section discusses potential impacts associated with the development of the project and provides mitigation measures where appropriate.
Routine Transport, Use, or Disposal of Hazardous Materials Impact HAZ-1: The proposed project would not create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials.
Impact Analysis
Buildout under the proposed project would include new development, infill development, and intensification of land uses within the Plan Area. Therefore, existing structures within the Plan Area may need to be demolished and new buildings will be constructed. Identification of hazardous materials or conditions would occur during subsequent CEQA review of any future discretionary projects.
Construction
Construction activities, including demolition and grading, could expose persons working or living in the Plan Area to potentially hazardous materials including but not limited to asbestos and lead from LBP as well as known or potentially unknown hazardous substances present in the soil or groundwater. Various federal, State, and local regulations and guidelines pertaining to the abatement of, and protection from, exposure to hazardous materials during construction activity.
These requirements include San Joaquin Valley Air Pollution Control District (Valley Air District) requirements for demolitions and renovations; Construction Safety Orders 1529 (pertaining to asbestos) and 1532.1 (pertaining to lead) from Title 8 of the California Code of Regulations, Part 61, Subpart M of the Code of Federal Regulations (pertaining to asbestos); and lead exposure guidelines City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-26 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx provided by the Department of Housing and Urban Development (HUD). Asbestos and lead abatement must be performed and monitored by contractors with appropriate certifications from the State Department of Health Services. In addition, Cal/OSHA has regulations concerning the use of hazardous materials, including requirements for safety training, availability of safety equipment, hazardous materials exposure warnings, and emergency action and fire prevention plan preparation.
Cal/OSHA enforces the hazard communication program regulations, which include provisions for identifying and labeling hazardous materials, describing the hazards of chemicals, and documenting employee training programs. All demolition that could result in the release of lead and/or asbestos must be conducted according to Cal/OSHA standards.
As described above in Section 3.9.2, there are sites containing hazardous materials located throughout the Plan Area, which pose potential health hazards. However, new development on contaminated areas that would occur as a result of the proposed project would be required to be remediated (i.e., cleaned up) prior to the commencement of construction activities. These activities would be under the supervision of DTSC, the City and County of Fresno, and/or RWQCB, depending on the site characteristics. Potential soil contamination in these areas must be properly identified and cleaned up prior to any development activities on any of these sites to prevent exposure of people and the environment to these hazards. Similarly, if groundwater contamination has been identified, remediation activities would be required by the RWQCB, DTSC, or other appropriate regulatory agency prior to the start of any new construction activities.
Operation
As described above, hazardous materials related to the agriculture industry and agriculture related businesses are routinely transported and used within the Plan Area. Residential and public facilities use small quantities of hazardous materials, such as paints or cleaning supplies. Federal, State, and local agencies maintain records of facilities that use large quantities of hazardous materials or generate hazardous waste. The use of certain hazardous materials necessitates a risk management plan to prevent hazardous materials from impacting the surrounding area.
Implementation of the proposed project would result in the continued use and storage of hazardous materials, including common cleaning products, building maintenance products, paints and solvents, and other similar items. However, these items would not be used in large enough quantities to pose a significant risk to the public or the environment. Furthermore, the quantity of large agricultural operations and associated hazardous materials would be reduced as a result of the proposed project.
Additionally, pursuant to Health and Safety Code, Division 20, Chapter 6.95, Section 25507, a hazardous materials business plan would be required for facilities that store, use, or handle high quantities of hazardous materials. In general, hazardous materials business plans provide guidance to firefighters, health officials, planners, public safety officers, and health care providers in the event of an emergency. Implementation of a hazardous materials business plan would prevent hazards from impacting the public or the environment in the event that a hazardous material is released. The Fresno County Health Department’s CUPA is responsible for monitoring compliance with hazardous materials business plans, as well as other regulatory programs such as the operation of USTs and hazardous waste treatment and disposal.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-27
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx All future development under the Specific Plan must also adhere to applicable General Plan policies intended to reduce potential project-specific impacts regarding routine transport, use, or disposal of hazardous materials, including Objective NS-4, Policies NS-4-a through NS-4-g, and Policy NS-4-I, as described in Section 3.9.3, Regulatory Framework, above.
Additionally, the Specific Plan contains proposed policies that would further minimize risk to the public or environment resulting from the transportation, use, or disposal of hazardous materials. For example, Policy RC-5.2 aims to prevent contamination of the groundwater table and surface water resources and discourage all pesticide use for agricultural and landscaping uses within SEDA through the use of signage, provision of pollution prevention information to SEDA residents and remediation actions.
Any future individual development projects that involve the transport, use, or disposal of hazardous materials would be subject to existing federal, State, and local regulations outlined in Section 3.9.3 Regulatory Framework. Regulatory programs overseen/administered by the local CUPA, as well as compliance with applicable laws, regulations, and policies, would ensure hazardous impacts associated with the routine transport, use, or disposal of hazardous materials are less than significant. Thus, at the programmatic level, impacts would be less than significant. Consistent with the General Plan and the proposed Specific Plan policies, individual development projects would be required to undergo project-specific environmental review, which may require additional site-specific measures to reduce any potential impacts and ensure that impacts remain less than significant.
Level of Significance Before Mitigation
Less than significant impact.
Mitigation Measures
None required.
Risk of Upset
Impact HAZ-2: The proposed project would not create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the likely release of hazardous materials into the environment.
Impact Analysis
Implementation of the Specific Plan would result in continued use and storage of hazardous materials, including household cleaning products, paints, solvents, building maintenance products, etc. Furthermore, as illustrated in Table 3.9-1 and Table 3.9-2, some sites within the Plan Area have residual contamination that may require remediation. In addition, if existing structures are demolished to accommodate new development, hazardous building materials such as ACM or LBP could be encountered. Transport of hazardous materials is likely to continue to occur on SR-180.
Therefore, there is a potential for accidental release of hazardous materials within the Plan Area.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-28 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx The Fresno Fire Department (FFD) has a Hazardous Materials Response Team (HMRT) that handles hazardous materials incidents within the City and consists of 60 personnel.12 The FFD HMRT ensure that the community receives a robust, competent Level of Service (LOS) provided in the event of an accidental hazardous material release. Furthermore, all new development resulting from the proposed project that would handle, store, produce, or dispose of hazardous materials would be subject to federal, State, and local regulations outlined in Section 3.9.3, Regulatory Framework.
Furthermore, the SEDA Specific Plan proposes primarily residential and mixed-use land uses that are not expected to use and store large quantities of hazardous materials.
Additionally, future development under the Specific Plan would be required to adhere to applicable General Plan policies intended to reduce potential project-specific impacts, including Objective NS-4, Policies NS-4-a through NS-4-g, and Policy NS-4-I, as described in Section 3.9.3, Regulatory Framework, above.
However, the sites identified in Table 3.9-1 and Table 3.9-2 includes contaminated properties owned by multiple property owners. Contaminated properties within the Plan Area would be remediated and developed in accordance with regulatory requirements. However, the cleanup process also would be subject to case-by-case considerations, with regulatory actions and oversight subject to agency-owner interactions and negotiations. While compliance with applicable federal, State, and local standards (including the hazardous materials policies under General Plan Objective NS-4) requires sites contaminated with hazardous materials to be cleaned up, the redevelopment of these or other future sites where hazardous materials are unknown could create a significant impact to future occupants of the Plan Area and/or construction workers. Therefore, the following project- specific mitigation measures regarding hazardous materials would reduce potential impacts regarding the creation of a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving release of hazardous materials into the environment: Mitigation Measure (MM) HAZ-2a through MM HAZ-2h.
MM HAZ-2a requires new development to prepare a Phase I Environmental Site Assessment (Phase I ESA), which would identify Recognized Environmental Conditions (RECs) and become the basis for potential recommendations for follow-up investigation. MM HAZ-2b requires a Phase II ESA to be prepared to further evaluate RECs determined in the Phase I ESA. MM HAZ-2c requires additional Phase II ESAs to be prepared in the event that the initial Phase II ESA describes site characteristics that require further investigation. MM HAZ-2d requires site remediation in the event that the Phase II ESA(s) find concentrations of hazardous materials exceeding regulatory thresholds. MM HAZ-2e requires the use of an Environmental Site Management Plan (ESMP), when applicable. MM HAZ-2f provides requirements for sites with potential residual volatile organic compounds (VOCs) in soil, soil gas, or groundwater that are planned for redevelopment with an overlying occupied building. MM HAZ-2g provides requirements for demolitions when ACM and LBP may be present. Finally, MM HAZ- 2h provides requirements that must be followed in the event that soils with toxic or hazardous materials concentrations that exceed applicable Environmental Screening Levels are found.
12 City of Fresno. Fire Suppression. Website: https://www.fresno.gov/fire/fire-suppression/. Accessed May 19, 2022.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-29
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx In addition to the above referenced MM HAZ-2a through MM HAZ-2h, any future individual development projects that involve the transport, use, or disposal of hazardous materials would be subject to existing federal, State, and local regulations outlined in Section 3.9.3 Regulatory Framework as well as regulatory programs overseen/administered by the local CUPA. Compliance with the laws and regulations referenced above under Impact HAZ-1, would ensure hazardous impacts from development of the proposed Plan related to the creation of a possible hazard to the public or environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment are anticipated to be less than significant.
Consistent with the General Plan and proposed Specific Plan policies, individual development projects would be required to undergo project-specific environmental review, which may require additional site-specific measures to reduce any potential impacts and ensure that impacts remain less than significant.
Level of Significance Before Mitigation
Potentially significant.
Mitigation Measures
MM HAZ-2a Prior to the issuance of a grading permit, the property owners and/or developers of properties shall ensure that a Phase I Environmental Site Assessment (Phase I ESA) (performed in accordance with the current Airborne Toxic Control Measures [ATCM] Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process [E 1527]) shall be conducted for each individual property prior to development or redevelopment to ascertain the presence or absence of Recognized Environmental Conditions (RECs), Historical Recognized Environmental Conditions (HRECs), and Potential Environmental Concerns (PECs) relevant to the property under consideration. The findings and conclusions of the Phase I ESA shall become the basis for potential recommendations for follow-up investigation, if found to be warranted.
MM HAZ-2b In the event that the findings and conclusions of the Phase I Environmental Site Assessment (Phase I ESA) for a property result in evidence of Recognized Environmental Conditions (RECs), Historical Recognized Environmental Conditions (HRECs) and/or Potential Environmental Concerns (PECs) warranting further investigation, the property owners and/or developers of properties shall ensure that a Phase II ESA shall be conducted to determine the presence or absence of a significant impact to the subject site from hazardous materials. The Phase II ESA may include but may not be limited to the following: (1) Collection and laboratory analysis of soils and/or groundwater samples to ascertain the presence or absence of significant concentrations of constituents of concern; (2) Collection and laboratory analysis of soil vapors and/or indoor air to ascertain the presence or absence of significant concentrations of volatile constituents of concern; and/or (3) Geophysical surveys to ascertain the presence or absence of subsurface features of concern such as underground storage tanks (USTs), drywells, drains, plumbing, and septic systems. The findings and conclusions of the Phase II ESA shall become the City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-30 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx basis for potential recommendations for follow-up investigation, site characterization, and/or remedial activities, if found to be warranted.
MM HAZ-2c In the event the findings and conclusions of the Phase II Environmental Site Assessment (Phase II ESA) reveal the presence of significant concentrations of hazardous materials warranting further investigation, the property owners and/or developers of properties shall ensure that site characterization shall be conducted in the form of additional Phase II ESAs in order to characterize the source and maximum extent of impacts from constituents of concern. The findings and conclusions of the site characterization shall become the basis for formation of a remedial action plan and/or risk assessment.
MM HAZ-2d If the findings and conclusions of the Phase II Environmental Site Assessment (Phase II ESA), site characterization and/or risk assessment demonstrate the presence of concentrations of hazardous materials exceeding regulatory threshold levels, prior to the issuance of a grading permit, property owners and/or developers of properties shall complete site remediation and potential risk assessment with oversight from the applicable regulatory agency including, but not limited to, the California Environmental Protection Agency (Cal/EPA) Department of Toxic Substances Control (DTSC) or Regional Water Quality Control Board (RWQCB), and Fresno County Environmental Health Division (FCEHD). Potential remediation could include the removal or treatment of water and/or soil. If removal occurs, hazardous materials shall be transported and disposed at a hazardous materials permitted facility.
MM HAZ-2e Prior to the issuance of a building permit for an individual property within the Plan Area with residual environmental contamination, the agency with primary regulatory oversight of environmental conditions at such property ("Oversight Agency") shall have determined that the proposed land use for that property, including proposed development features and design, does not present an unacceptable risk to human health, if applicable, through the use of an Environmental Site Management Plan (ESMP) that could include institutional controls, site-specific mitigation measures, a risk management plan, and deed restrictions based upon applicable risk-based cleanup standards. Remedial action plans, risk management plans and health and safety plans shall be required as determined by the Oversight Agency for a given property under applicable environmental laws, if not already completed, to prevent an unacceptable risk to human health, including workers during and after construction, from exposure to residual contamination in soil and groundwater in connection with remediation and site development activities and the proposed land use.
MM HAZ-2f For those sites with potential residual volatile organic compounds (VOCs) in soil, soil gas, or groundwater that are planned for redevelopment with an overlying occupied building, a vapor intrusion assessment shall be performed by a licensed environmental professional. If the results of the vapor intrusion assessment indicate the potential for significant vapor intrusion into the proposed building, the project City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-31
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx design shall include vapor controls or source removal, as appropriate, in accordance with Regional Water Quality Control Board (RWQCB), the California Department of Toxic Substances Control (DTSC) or the Fresno County Environmental Health Division (FCEHD) requirements. Soil vapor mitigations or controls could include passive venting and/or active venting. The vapor intrusion assessment as associated vapor controls or source removal can be incorporated into the Environmental Site Management Plan (ESMP) (Mitigation Measure HAZ4-4e).
MM HAZ-2g In the event of planned renovation or demolition of residential and/or commercial structures on the subject site, prior to the issuance of demolition permits, asbestos and lead-based paint (LBP) surveys shall be conducted in order to determine the presence or absence of asbestos-containing materials (ACM) and/or LBP . Removal of friable ACM, and non-friable ACMs that have the potential to become friable, during demolition and/or renovation shall conform to the standards set forth by the National Emissions Standards for Hazardous Air Pollutants (NESHAPs).
The San Joaquin Valley Air Pollution Control District (Valley Air District) is the responsible agency on the local level to enforce the NESHAPs and shall be notified by the property owners and/or developers of properties (or their designee(s)) prior to any demolition and/or renovation activities. If asbestos-containing materials are left in place, an Operations and Maintenance Program (O&M Program) shall be developed for the management of asbestos-containing materials (ACM).
MM HAZ-2h Prior to the import of a soil to a particular property within the Plan Area as part of that property’s site development, such soils shall be sampled for toxic or hazardous materials to determine whether concentrations exceed applicable Environmental Screening Levels for the proposed land use at such a property, in accordance with Regional Water Quality Control Board (RWQCB), the Fresno County Environmental Health Division (FCEHD), and the California Department of Toxic Substances Control (DTSC), including but not limited to the DTSC 2001 Information Advisory Clean Imported Fill Material Fact Sheet, which identifies land use activities appropriate for a fill material source area and provides guidelines for types of analyses to be performed, prior to importing to such a property.
Level of Significance After Mitigation
Less than significant impact with mitigation incorporated.
Hazardous Emissions Proximate to a School
Impact HAZ-3: The proposed project could emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school.
Impact Analysis
Presently, the Lone Star Elementary School, located in the southern portion of the Plan Area, is the only school in the Plan Area. However, Clovis Unified School District is constructing an educational City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-32 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx center for middle and high school students in the northern portion of the Plan Area on a site along the Clinton Avenue alignment between Leonard and Highland Avenues, with phased opening expected in 2025.
The SEDA Specific Plan proposes to build schools within Neighborhood Town Centers, which are shown in Chapter 2, Project Description, Exhibit 2-2. The proposed project aims to provide nearly all homes to be within walking distance of an elementary school. However, the exact location of future school developments is not known at this time.
As illustrated in Table 3.9-1 and Table 3.9-2, some sites within the Plan Area have residual contamination that may require remediation. Therefore, development under the proposed project could include land uses, or could include disturbance of existing hazardous cleanup sites, which have the potential to emit hazardous emissions or handle hazardous materials and substances. It is anticipated that future development under the proposed project could occur within 0.25 mile of an existing or future school.
However, any future individual development projects that involve the transport, use, or disposal of hazardous materials would be subject to existing federal, State, and local regulations outlined in Section 3.9.3, Regulatory Framework. Future individual projects would be subject to City review and an environmental site assessment would be required for proposed projects sited near schools.13 Additionally, future development under the Specific Plan would be required to adhere to applicable General Plan policies intended to reduce potential project-specific impacts, including Objective NS-4, Policies NS-4-a through NS-4-g, and Policy NS-4-I, as described in Section 3.9.3, Regulatory Framework, above. The Specific Plan contains proposed policies that would further minimize risk of emissions of hazardous materials near schools. For example, Policy RC-5.2 aims to prevent contamination of the groundwater table and surface water resources and discourage all pesticide use for agricultural and landscaping uses within SEDA through the use of signage, provision of pollution prevention information to SEDA residents and remediation actions.
Moreover, implementation of the project-specific mitigation measures discussed under Impact HAZ- 2, MM HAZ-2a through MM HAZ-2h, would further reduce impacts to schools. As stated in the discussions of Impacts HAZ-1 and HAZ-2, all future development under the proposed project would be required to achieve compliance with existing federal, State, and local regulations, procedures, and policies would avoid potential impacts associated with hazardous materials handling, use, and storage in the Plan Area. Compliance with these regulations, procedures, and policies would ensure that hazardous materials are properly handled, thereby reducing potential risks to nearby schools. At the programmatic level, impacts related to the handling of hazardous materials near a school would be reduced to a less than significant level with the implementation of MM HAZ-2a through MM HAZ- 2h.
13 California Department of Education. School Site Selection and Approval Guide. Website:
https://www.cde.ca.gov/ls/fa/sf/schoolsiteguide.asp#emissions. Accessed May 19, 2022.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-33
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx Level of Significance Before Mitigation
Potentially significant impact.
Mitigation Measures
Implementation of MM HAZ-2a through MM HAZ-2h.
Level of Significance After Mitigation
Less than significant impact with mitigation incorporated.
Government Code Section 65962.5 Sites
Impact HAZ-4: The proposed project could be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, could create a significant hazard to the public or the environment.
Impact Analysis
As illustrated in Table 3.9-1 and Table 3.9-2, some sites within the Plan Area have residual contamination, including contamination from VOCs, diesel, gasoline, various metals, pesticides, herbicides, PCBs, and other chemicals. For a majority of these properties, remediation to mitigate potential impacts is complete and the cases are marked as closed. However, some of the sites have open cases and additional action is recommended. Remediation is meant to clean up contaminated sites and reduce concentrations of chemicals to a level to a certain human health risk threshold. For a site to be developed, a regulatory agency must confirm that the site has been remediated properly and the contamination has been reduced to a safe level.
Contaminated sites are regulated on an individual basis in accordance with applicable federal, State, and local procedures and standards. However, regulatory actions are subject to agency-owner negotiations. Additionally, future development resulting from the Specific Plan could occur on sites where hazardous materials are unknown. This would create a potentially significant impact.
However, as further discussed under Impact HAZ-2, implementation of the project-specific mitigation measures discussed under Impact HAZ-2, MM HAZ-2a through MM HAZ-2h, would reduce impacts related to these sites to a less than significant level. Consistent with the General Plan and proposed Specific Plan policies, individual development projects would be required to undergo project-specific environmental review, which may require additional site-specific measures to reduce any potential impacts and ensure that impacts remain less than significant.
Level of Significance Before Mitigation
Potentially significant impact.
Mitigation Measures
Implementation of MM HAZ-2a through MM HAZ-2h.
Level of Significance After Mitigation
Less than significant impact with mitigation incorporated.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-34 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx Proximity to Public Airport Safety Hazard
Impact HAZ-5: For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, the proposed project would not result in a safety hazard or excessive noise for people residing or working the project area.
Impact Analysis
As described above, Fresno Yosemite International Airport is located approximately 2 miles from the Plan Area, along East Clinton Way. According to the Fresno Yosemite International Airport Safety Compatibility Zones Map, a small portion of the Plan Area is located within the 60 dB CNEL contour.
14 A Larger portion of the Plan Area is located within the Traffic Pattern Zone.15 The 2018 Fresno County Airport Land Use Compatibility Plan (ALUCP) is the plan that governs land use compatibility around Fresno Yosemite Airport. State law establishes that the Fresno County Airport Land Use Commission (ALUC) is one of the review authorities for new land use plans in the Airport Influence Area (AIA). Therefore, ALUC review of the Specific Plan is required. The ALUC advises the City on land use designations in terms of noise, safety, and airspace hazards. The ALUC found the proposed project to be consistent with the ALUCP on August 7, 2023. Therefore, at the programmatic level, impacts to the Plan Area would be less than significant. Consistent with the General Plan and SEDA Specific Plan policies, individual development projects would be required to undergo project-specific environmental review, which may require additional site-specific or project- specific airport land use compatibility measures to reduce any potential impacts and ensure that impacts remain less than significant.
Level of Significance Before Mitigation
Less than significant impact.
Mitigation Measures
None required.
Emergency Response and Evacuation
Impact HAZ-6: The proposed project would not impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan.
Impact Analysis
The Fresno Police Department (FPD) and FFD are the lead agencies for all local emergency response efforts. In addition, the City’s full-time Emergency Preparedness Officer (EPO) is responsible for ensuring that Fresno’s emergency response plans are up-to-date and implemented properly. The
14 Fresno Council of Governments (COG). Airport Land Use Compatibility Plan. Exhibit D2 Future Noise Contours. Fresno Yosemite International Airport. Website: https://www.fresno.gov/darm/wp-content/uploads/sites/10/2020/04/ALUCP-Fresno-Yosemite- International-Airport.pdf. Accessed May 17, 2022.
15 Fresno Council of Governments (COG). Airport Land Use Compatibility Plan. Exhibit D1- Fresno Yosemite Intl. – Airport Influence Area and Safety Zones. Website: https://www.fresno.gov/darm/wp-content/uploads/sites/10/2020/04/ALUCP-Fresno-Yosemite- International-Airport.pdf. Accessed May 17, 2022.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-35
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx EPO also facilitates cooperation between City departments and other local, State, and federal agencies that would be involved in emergency response operations.16 Development of the Plan Area would increase the development of residential, mixed use, research and development, institutional, and office land uses. These types of land uses are not expected to impair implementation of or physically interfere with adopted emergency response plans or emergency evacuations plans in the City.
Furthermore, the Specific Plan includes various proposed policies that would reduce impacts in case of an emergency. Policy UF-5.1 requires implementation of the Major Circulation Plan, which would improve traffic circulation within the Plan Area in case of an emergency. Policy UF-5.6 sets criteria for vehicle travel facilities. Policy UF-5.7 sets LOS standards. Policy OS-11.1, and Policy OS-11.2, and Policy OS-11.3 require the provision of adequate police and fire services in the SEDA in accordance with the policies of the General Plan and require that the Planning Department work with police and fire departments during buildout of the SEDA Specific Pan to ensure services are responsive to community needs.
At the programmatic level, impacts to the Plan Area would be less than significant. Consistent with the General Plan and SEDA Specific Plan policies, individual development projects would be required to undergo project-specific environmental review, which may require additional site-specific or project-specific measures to reduce any potential impacts and ensure that impacts remain less than significant.
Level of Significance Before Mitigation
Less than significant impact.
Mitigation Measures
None required.
Wildland Fires
Impact HAZ-7: The proposed project would not expose people or structures, either directly or indirectly to a significant risk of loss, injury or death involving wildland fires.
Impact Analysis
CAL FIRE designates the Plan Area as an LRA.17,18 The San Joaquin River Bluffs area is identifies as having a high fire risk because it is steep terrain. However, the Plan Area is located approximately 9 miles southeast of this area.
Although portions of the City or nearby areas are designated as having high fire hazard severity, the primarily agricultural land in the Plan Area is actively managed and cultivated and therefore does not
16 City of Fresno. Mayor’s Office. Emergency Preparedness. Website: https://www.fresno.gov/mayor/emergency-preparedness/.
Accessed May 19, 2022.
17 California Department of Forestry and Fire Protection (CAL FIRE). 2007. Draft Fire Hazard Severity Zones in LRA. Fresno County.
Website: https://osfm.fire.ca.gov/media/6673/fhszl06_1_map10.pdf. Accessed May 17, 2022. 18 City of Fresno. 2018. Fresno County Multi-Hazard Mitigation Plan. Figure 4.52 Fresno County’s Wildfire Severity Zones. Website:
https://www.fresno.gov/darm/wp-content/uploads/sites/10/2020/12/FresnoCountyHMPFinal.pdf. Accessed March 21, 2023.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-36 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx pose a high fire risk. Development of the Plan Area would result in more paved areas, thereby reducing wildfire risks. Therefore, impacts would be less than significant.
Level of Significance Before Mitigation
Less than significant impact.
Mitigation Measures
None required.
3.9.7 - Cumulative Impacts
The geographic context for an analysis of cumulative impacts related to hazards and hazardous materials is the Plan Area as well as the rest of the City and adjacent communities in the City of Clovis and unincorporated Fresno County. This analysis evaluates whether the impacts of the proposed project, together with the impacts of cumulative development, would result in a cumulatively significant impact related to hazards and hazardous materials. This analysis then considers whether incremental contribution to cumulative impacts associated with the implementation of the proposed project would be significant. Both conditions must apply for a project’s cumulative effects to rise to a level of significance. If both conditions apply, this analysis will then evaluate feasible cumulative mitigation that would reduce cumulative effects. If one or both conditions do not apply, cumulative impacts would be less than significant, and no cumulative mitigation is necessary.
Hazards and Hazardous Materials
Cumulative projects would be subject to the requirements and regulations set forth by the EPA, OSHA, USDOT, DTSC, Caltrans, CHP , and the San Joaquin Valley Air Pollution Control District (Valley Air District) related to transport, use, and disposal of hazardous materials. Accordingly, cumulative development would not result in physical changes that would result in a significant environmental effect. Cumulative projects will also be required to comply with the California Code of Regulations during construction, site grading, excavation operations, and building demolition. For these reasons, cumulative projects would have a less than significant cumulative effect.
Moreover, the Specific Plan’s incremental contribution to the less than significant cumulative impacts would not be significant. As previously discussed, development under the Specific Plan would result in additional residential and nonresidential development, as well as other private and public improvements throughout the Plan Area, which could result in an increase in the routine transportation, use, and disposal of hazardous materials. Potential impacts would be reduced to below a level of significance, as discussed above, because construction must comply with the California Code of Regulations and implement a Storm Water Pollution Prevention Plan (SWPPP) to prevent hazardous materials spills and protect public safety, and all future development would implement
MM HAZ-2a through MM HAZ-2h.
To ensure that development consistent with the Specific Plan results in a less than significant contribution to cumulative impacts, applications for development would be reviewed by the City for compliance with existing General Plan policies and actions and the proposed Specific Plan policies to City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.9-37
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx further reduce potential impacts related to sites with known hazardous materials to less than significant.
Accordingly, development under the Specific Plan would not result in physical changes that would incrementally contribute to a significant environmental effect. For these reasons, the proposed project’s contribution to cumulative impacts would be considered less than significant.
Airport Safety Hazards
Cumulative projects would be subject to the requirements and regulations set forth by the Fresno Yosemite International Airport ALUCP and FAA related to the exposure of people residing or working in the area to a safety hazard or excessive noise. Cumulative projects would also be required to comply with the existing General Plan policies, proposed Specific Plan policies, and Municipal Code regulations related to interior noise standards and maximum building heights. For these reasons, cumulative projects would have a less than significant effect.
Moreover, the Specific Plan’s incremental contribution to cumulative impacts would not be significant. As previously discussed, development under the Specific Plan would result in additional residential and nonresidential development, as well as other private and public improvements throughout the Plan Area, which could result in an increase in the exposure of people residing or working in the area to a safety hazard or excessive noise. Potential impacts would be reduced to below a level of significance, as discussed above, because future projects would be required to comply with the policies and actions within the General Plan and the Municipal Code regarding interior noise standards and maximum building heights permitted under Federal Aviation regulations. To ensure a less than significant contribution to cumulative impacts, development consistent with the Specific Plan will be required to implement all applicable policies during the design review process. As the City receives development applications for subsequent development under the Specific Plan, those applications would be reviewed by the City for compliance with General Plan policies and actions as well as the Municipal Code to further reduce potential impacts related to the exposure of people residing or working in the area to a safety hazard or excessive noise.
Emergency Response and Evacuation Plan
Cumulative impacts related to emergency response and evacuation plans would be less than significant. The City’s Police and Fire Departments manage and maintain emergency plans and training of City staff and community members and focuses on activities that will prepare the community to take care of itself in the period immediately following a local disaster. Adjacent jurisdictions also have emergency response plans and emergency evacuation plans. Furthermore, larger regional and statewide resource areas are regulated by State agencies to address larger-scale statewide issues. For these reasons, cumulative impacts associated with emergency response and evacuation plans are less than significant.
Moreover, the Specific Plan’s incremental contribution to these less than significant cumulative impacts would not be significant. To ensure a less than significant contribution to cumulative impacts, development consistent with the Specific Plan would be required to implement all City of Fresno—Fresno Southeast Development Area Specific Plan Project Hazards and Hazardous Materials Recirculated Draft Program EIR
3.9-38 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-09 Hazards.docx applicable policies and actions during the design review process. As the City receives development applications for subsequent development under the Specific Plan, those applications would be reviewed by the City for compliance with the policies and actions of the General Plan related to emergency response plans and emergency evacuation plans. Therefore, the proposed project’s contribution to cumulative impacts would be considered less than significant.
Level of Cumulative Significance Before Mitigation
Less than significant impact.
Cumulative Mitigation Measures
None required.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hydrology and Water Quality
FirstCarbon Solutions 3.10-1
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-10 Hydrology.docx
3.10 - Hydrology and Water Quality
3.10.1 - Introduction
This section describes the existing hydrology and water quality setting and potential effects of project implementation on the Plan Area and its vicinity. Descriptions and analysis in this section are based, in part, on the 2020 Urban Water Management Plan (UWMP), the Fresno Metropolitan Flood Control District (FMFCD) 2016 District Services Plan, and the 2019 North Kings Groundwater Sustainability Plan (North Kings GSP).
As further discussed in Chapter 1, Introduction, 36 public comments were received during the Draft Program Environmental Impact Report (Draft PEIR) scoping period related to the project’s potential hydrologic impacts:
• Identifies locations within the Plan Area that are within Special Flood Hazard Areas, which would be subject to Fresno County Ordinance Code Title 15, Chapter 15.48 as well as Federal Emergency Management Agency (FEMA) flood elevation requirements as applicable. • States that any construction within or near a stream will require a clearance from the California Department of Fish and Wildlife (CDFW) and Streambed Alternation Agreement if buildout would result in alteration or degradation.
• Recommends that any improvements constructed within or near a canal should be coordinated with the owners of the canal/appropriate agency. • Recommends that the FMFCD be consulted regarding future development near flood drainage basins.
• Identifies that any future development under the Southeast Development Area (SEDA) Specific Plan that would be greater than 1 acre would be required to obtain a National Pollutant Discharge Elimination System (NPDES) permit and produce a Storm Water Pollution Prevention Plan (SWPPP).
• States that any grading will require either an engineered grading and drainage plan, road improvement plan, permit, or voucher and must comply with the City of Fresno (City) standards/requirements.
• States that Fresno County (County) has a water- providing Community Service Area (CSA) (CSA 14) which is interested in connecting to the City’s water system and that the County has several road CSAs within the Plan Area.
• Identifies the Fresno Irrigation District (FID) canals in the Plan Area. • States that many of the existing facilities will need to be upgraded to meet the current urban standards or relocated by the developer to accommodate new urban developments, which will require new pipelines and new exclusive easements. • Requires that all open channels and existing pipelines impacted by the project area development be upgraded to meet FID’s current standards for urban, rural, and industrial areas.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hydrology and Water Quality Recirculated Draft Program EIR
3.10-2 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-10 Hydrology.docx • Requires that development impacts to large canal crossings be designed to protect the canal’s integrity for an urban setting, including the need for access and full right-of-way widths for FID’s operations and maintenance needs.
• Identifies that the FID facilities within the Plan Area carry irrigation water for FID users, recharge water for the City, and flood waters during winter months. • Requires that development within the Plan Area will not result in an increase in the City’s surface water allocation from FID.
• Requests that the Draft PEIR evaluate whether the City’s Water Master Plan needs to be updated and how the Cooperative Agreement between the City and FID may impact development within the Plan Area.
• Requests that the Draft PEIR evaluate whether previous projects proposed under the City’s Water Master Plan resulted in the benefits anticipated. • Requests that the Draft PEIR require that any future development minimize water demand and/or reduce impacts to groundwater.
• Requires that if any future development under SEDA that uses treated surface water during a period where the City has a deficit water supply or groundwater levels continue to drop, then the City must acquire additional water from a water purveyor as to not impact water supplies or exacerbate the deficit.
• Identifies that groundwater overdraft is an issue in the City and requires that the Draft PEIR evaluates the SEDA Specific Plan’s impact on groundwater resources. • States that approximately 4,200 acres of the Plan Area is outside the current FMFCD boundary and thus the FMFCD’s Sphere of Influence (SOI) will be adjusted to include the Plan Area. • Requires that all impacts to stormwater runoff created by increasing densities in developed area that affect the capacity of the existing Master Planned storm drainage system must be fully mitigated.
• States that FMFCD has studied the areas not currently located within a Master Planned Area and has located the tentative basin facilities in an attached Exhibit that must be incorporated in the SEDA Proposed Land Use Plan.
• States that the City, FMFCD, and the County are all currently covered as co-permittees for the Municipal Separate Storm Sewer System (MS4) discharges through the NPDES Permit and discusses procedure for future projects under SEDA for permitting. • Requests that all future California Environmental Quality Act (CEQA) review within the City, including the SEDA area, utilize the Guidance for Addressing Stormwater Quality for CEQA Review document.
• States that existing FMFCD policy requires post-development requirements for areas not served by stormwater basins or areas that discharge to sensitive waterbodies. Should future development under SEDA include sustainable infrastructure, coordination between the City and FMFCD must take place to ensure plans are suited to meet stormwater quality regulatory objectives and are compatible with drainage standards in the Fresno area.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hydrology and Water Quality
FirstCarbon Solutions 3.10-3
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-10 Hydrology.docx • Recommends that the Draft PEIR evaluate impacts related to the construction of Master Planned storm drainage facilities to the extent feasible to prevent duplicate CEQA processing. • States that future development under SEDA would be subject to drainage fees pursuant to the Drainage Fee Ordinance prior to approval of any final maps and/or issuance of building permits at the rates in effect at the time of such approval. • Requires that the grading of proposed development within the Plan Area shall be designed such that there are not adverse impacts to the passage of major storm flow through that development.
• Requires that future development provide any surface flowage easements or covenants for any portions of the developing area that cannot convey stormwater to public right-of-way without crossing private property.
• Requires that FMFCD review and approve the final improvement plans for all development (i.e., grading, street improvement, and storm drain facilities) within the boundaries of the proposed project to ensure consistency with the future Storm Drainage Master Plan. • Requires that a storm drain easement is obtained whenever storm drain facilities are located on private property. No encroachments into the easement will be permitted, including, but not limited to, foundations, roof overhangs, swimming pools, and trees. • Requires that all future development verify that permanent drainage service is available with FMFCD to ensure that runoff can be safely conveyed to existing Master Plan facilities. • Encourages but does not require that roof drains from nonresidential development be constructed such that they are directed onto and through a landscaped grassy swale area to filter out pollutants from roof runoff.
• Requires that runoff from areas where industrial activities, product, or merchandise come into contact with and thus contaminate stormwater must be directed through landscaped areas or otherwise treated before discharging it off-site or into a storm drain. • Requests that the Draft PEIR accurately captures and analyzes baseline conditions and potentially significant project-specific and cumulative impacts within and adjacent to the planning area.
• Requests that the Draft PEIR identifies and adopts all feasible and enforceable mitigation measures that avoid and reduce negative impact.
• Requests that the Draft PEIR analyzes and creates mitigation measures consistent with all applicable laws, including State and federal fair housing, civil rights, and climate laws such as Senate Bill (SB) 743.
3.10.2 - Environmental Setting
Surface Hydrology
The City of Fresno is located in the Upper Dry Subbasin of the Tulare-Buena Vista Lakes Watershed.
The Tulare-Buena Vista Lakes Watershed generally consists of the drainage area of the San Joaquin Valley south of the San Joaquin River. This includes major population centers such as Fresno, City of Fresno—Fresno Southeast Development Area Specific Plan Project Hydrology and Water Quality Recirculated Draft Program EIR
3.10-4 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-10 Hydrology.docx Bakersfield, Porterville, Hanford, Tulare, and Visalia. Encompassing approximately 10.5 million acres, water primarily flows through the watershed from the northeast to the southwest, from the Sierra Nevada to the San Joaquin Valley. Rivers in the basin typically end at the Tulare Lake and Buena Vista Lake in the western San Joaquin Valley, but some surface water can drain north to the San Joaquin River during years of extreme rainfall. The main rivers that produce surface waters within the basin include the Kings, Kaweah, Tule, and Kern Rivers. Additional suppliers of surface water in the basin area include the San Luis Canal/California Aqueduct System, Friant-Kern Canal, and the Delta- Mendota Canal, which contribute imported surface waters to the basin. 1 The Upper Dry Subbasin is approximately 2,126 square miles in area and encompasses much of western Fresno County and small portions of Kings and San Benito Counties.2 There are several streams that run throughout both the basin and subbasin, of which the major ones include Dry Creek, Dog Creek, and Fancher Creek.3 Drainage in much of the subbasin area has been utilized as agricultural irrigation supply through the engineering and construction of numerous canal and conveyance systems.
The San Joaquin River and the Kings River are the principal rivers that influence the hydrology in Fresno. The Kings River is connected to the San Joaquin River by the James Bypass, a manmade canal. Floodwater from the Kings River is diverted to the San Joaquin River; three dams control the flows on the two rivers. The Friant and Mendota Dams are located on the San Joaquin River. While these two dams provide some flood control, that was not their designed purpose; they were designed as reservoirs for municipal and agricultural irrigation supply. The Pine Flat Dam on the Kings River, however, was designed for flood control. There are also multiple reservoirs and detention basins that have been constructed to prevent flooding. These facilities include the Redbank Dam, Big Dry Creek Dam, Fancher Creek Dam, Redbank Creek, Pup Creek, and the Alluvial Drain Detention Basins. These facilities, along with the numerous canals, convey discharges throughout the City. These facilities were designed to protect developed areas from a 200-year storm event.
4 Surface Water Uses
Municipal Use
The City began using surface water as a source of potable water in 2004 with the activation of the Northeast Surface Water Treatment Facility (NESWTF). The facility, located at Chestnut and Behymer Avenues, is designed for a 30 million gallons per day (mgd) capacity and is planned to be expanded to a total of 60 mgd as development in the City continues. Surface water starts as snow melt in the Sierra Nevada before traveling down the San Joaquin and Kings Rivers via Millerton Lake and Pine Flat Reservoir. These serve as temporary storage locations before the surface water is delivered via the Enterprise Canal to the NESWTF, where the water is treated to drinking water standards. In 2017, the Friant-Kern Pipeline was completed, which allows water from the San Joaquin River to be
1 Central Valley Regional Water Quality Control Board (Central Valley RWQCB) Water Quality Control Plan for the Tulare Lake Basin.
Third Edition, May 2018.
2 California Department of Fish and Wildlife (CDFW). 2020. Biogeographic Information and Observation System (BIOS). Website:
https://wildlife.ca.gov/Data/BIOS. Accessed July 5, 2022. 3 United States Geological Survey (USGS). 2020. The National Map Advanced Viewer. Website: https://viewer.nationalmap.gov/ advanced-viewer/. Accessed July 5, 2022.
4 Fresno Metropolitan Flood Control District (FMFCD). 2016. 2016 District Services Plan.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hydrology and Water Quality
FirstCarbon Solutions 3.10-5
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-10 Hydrology.docx delivered directly to the NESWTF. This allows improved water quality, increased reliability, and greater flexibility in operating the facility. The City also completed construction of the Southeast Surface Water Treatment Facility (SESWTF), which is a 54 mgd facility with an ultimate capacity of 80 mgd.5 This included a 72-inch raw water transmission main to convey surface water from the FID’s Fresno Canal to the SESWTF.
Agricultural Use
FID serves a 383-square-mile area in the County, centered on metropolitan Fresno, with surface water from the Kings and San Joaquin Rivers for agricultural irrigation use.6 FID has historically diverted an average of 453,800 acre-feet per year (AFY) from 1964 to 2019 depending on type of hydrologic year.7
Project Site
As the Plan Area is located within the City’s SOI, it experiences similar surface hydrology. The Friant Dam is approximately 14 miles north and upstream from the Plan Area; the Mendota Dam is approximately 37 miles west and downstream from the Plan Area; and the Pine Flat Dam is approximately 16 miles east and upstream from the Plan Area.
There are a number of existing FID facilities that cross the Plan Area, including canals and pipelines; these include, from northeast to southwest: Redbank Creek, the Gould Canal, the Gray Colony Canal, Dog Creek, the Mill Canal, the Temperance Canal, the Fancher Creek Canal, the Briggs Canal, the East Branch West Branch Canal, the Hansen Canal, and the Armstrong Canal.
Some portions of the Plan Area are encompassed within FMFCD’s service area; however, a majority of the area is outside of the service boundary.
Surface Water Quality
San Joaquin River
The primary surface water feature in the City is the San Joaquin River, which generally serves as the City’s northern boundary. The San Joaquin River is 366 miles long, making it the largest river in Central California. Much of the water that flows through the San Joaquin River is used for irrigation.
The San Joaquin River has been identified by the Central Valley Regional Water Quality Control Board (Central Valley RWQCB) as having numerous beneficial uses, including municipal and domestic water supply, agricultural, industrial, recreational, freshwater and wildlife habitats, and migration and spawning grounds. Water quality in the San Joaquin River is affected by both natural and anthropogenic sources, including soil erosion, stormwater runoff, wastewater discharges, industrial, residential, and agricultural runoff, recreational activity, and flora and fauna. While the segment of the San Joaquin River in the City is not considered substantially impaired, downstream portions of the River throughout the Central Valley and near the Sacramento-San Joaquin Delta are affected by various constituents and pollutants, usually as a result of agricultural runoff; however, the portion of
5 Water Systems Consulting, Inc. 2021. City of Fresno 2020 Urban Water Management Plan. 6 Fresno Irrigation District (FID). 2022. From 850 to Now. Website: https://www.fresnoirrigation.com/history. Accessed July 5, 2017. 7 Water Systems Consulting, Inc. 2021. 2020 Urban Water Management Plan. Website: https://www.fresno.gov/publicutilities/wp- content/uploads/sites/16/2021/06/Fresno-2020-UWMP_Public-Draft_2021-06-29.pdf. Accessed July 5. 2022. .
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hydrology and Water Quality Recirculated Draft Program EIR
3.10-6 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-10 Hydrology.docx the San Joaquin River in Fresno does appear on the California State Water Resources Control Board (State Water Board) 2022 Impaired Water Bodies/303(d) List for invasive species (non-native fish species) and pH levels.8
Kings River
The Kings River is also a significant source of surface water for the Central Valley. It is located approximately 25 miles south of the City on the southern border of Fresno County. The Kings River drains from the Sierra Nevada westward toward the City. The river is approximately 126 miles long and mainly supports agriculture and groundwater recharge operations in the Central Valley. Pine Flat Dam/Reservoir supports the regulation of flows from the river. The Kings River provides water to the City and its vicinity via FID infrastructure, including a system of weirs, canals, and channels. The water quality in the Kings River is generally of high quality in its upper reaches due to its origin within the Sierra Nevada mountains. The lower reaches, however, have elevated levels of salinity, molybdenum, toxaphene, chlorpyrifos, and additional unknown toxicities, as listed in the Clean Water Act 303(d) List maintained by the State Water Board. 9 The likely sources of the contaminants,
according to the Water Quality Control Plan for the Tulare Lake Basin, are either surface or subsurface agricultural drainage. The Basin Plan recommends several Best Management Practices (BMPs) to address the water quality issues.
Millerton Lake
Another prominent surface water feature in the Fresno area is Millerton Lake, which is located upstream and to the northeast of Fresno. Millerton Lake was created by the construction of Friant Dam on the San Joaquin River by the United States Bureau of Reclamation (USBR) in 1942. While Millerton’s secondary uses include recreation, hydroelectric power generation, and flood control, the primary purpose is the storage of irrigation water for the San Joaquin Valley. Millerton Lake is also included on the 2018 Impaired Water Bodies/303(d) List for mercury. 10 Other Surface Waters
A network of agricultural canals and flood control channels traverse through the City and the Plan Area. Numerous agricultural ponds, recharge basins, and other similar features are also located throughout the City.
Project Site
The Plan Area will be supplied by the same surface water sources from the City’s water supply system and, therefore, would be subject to the same surface water quality conditions for potable water supplies.
8 California State Water Resources Control Board (State Water Board). 2022 California Integrated Report (Clean Water Act Section 303(d) List and 305(b) Report). Website:
https://www.waterboards.ca.gov/water_issues/programs/water_quality_assessment/2020_2022_integrated_report.html. Accessed December 9, 2024.
9 Kings Basin Water Authority. 2018. Kings Basin Integrated Regional Water Management Plan. 10 California State Water Resources Control Board (State Water Board). 2018 California Integrated Report (Clean Water Act Section 303(d) List and 305(b) Report). Website:
https://www.waterboards.ca.gov/water_issues/programs/water_quality_assessment/2018_integrated_report.html. Accessed December 9, 2024.
.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hydrology and Water Quality
FirstCarbon Solutions 3.10-7
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-10 Hydrology.docx There are a number of FID and other canals and bodies of water located throughout the Plan Area, including Redbank Creek, the Gould Canal, the Gray Colony Canal, Dog Creek, the Mill Canal, the Temperance Canal, the Fancher Creek Canal, the Briggs Canal, the East Branch West Branch Canal, the Hansen Canal, and the Armstrong Canal. A portion of the Redbank Basin is located in the northwestern portion of the Plan Area, and the Fancher Creek Basin is located just outside the northeastern boundary of the Plan Area. No surface water bodies in or near the Plan Area are listed on the 303(d) List.
11 Groundwater Basin Hydrology
The City is within the Kings River Subbasin, which, along with six other subbasins, form the San Joaquin Valley Groundwater Basin. The San Joaquin Valley Groundwater Basin is located within the Tulare Lake Hydrologic Region, which spans approximately 10.9 million acres and includes most of Fresno County. The region encompasses the southern one-third of the Central Valley RWQCB. The Kings River Subbasin is generally bounded to the north by the San Joaquin River, to the east by the Sierra Nevada foothills, to the south by the southern fork of the Kings River, and to the west by the Delta-Mendota and Westside Subbasins.
12 Historically, the City has relied heavily on groundwater pumped from the underground basin and aquifers to meet its water demands. The City has a network of over 270 municipal water wells and operates approximately 202 active municipal supply wells that access groundwater from said basin.13 The production capacity from the active wells is approximately 403 mgd, and the total capacity including inactive wells is approximately 487 mgd.
14 The wells are located around the City, and most
are directly connected into the water distribution system. The City’s water system depended completely on groundwater as a water source until 2004, when the first Surface Water Treatment Facility (SWTF) was commissioned. Today, groundwater is still heavily relied upon as a primary water source for the City; however, the City is working to maximize the use of its surface water supplies to reduce future dependance on groundwater.
15 The City is located within the North Kings Groundwater Sustainability Agency (North Kings GSA), which is working to reach groundwater sustainability in accordance with the Sustainable Groundwater Management Act (SGMA). SGMA requires governments and water agencies of “critically overdrafted” basins to reach sustainability by 2040; the Kings River Subbasin was identified as a critically overdrafted basin. As a result, the City has placed a higher priority on developing its surface water supply and decreasing its reliability on groundwater to allow the basin to recharge.
The City actively works to recharge the groundwater basin. As a result of the City’s investment in other water supplies, groundwater levels in the City have begun to stabilize.16
11 California State Water Resources Control Board (State Water Board). 2022 California Integrated Report (Clean Water Act Section 303(d) List and 305(b) Report). Website:
https://www.waterboards.ca.gov/water_issues/programs/water_quality_assessment/2020_2022_integrated_report.html. Accessed December 9, 2024.
12 Water Systems Consulting, Inc. 2021. City of Fresno 2020 Urban Water Management Plan. 13 Ibid.
14 Ibid.
15 Ibid.
16 Ibid.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hydrology and Water Quality Recirculated Draft Program EIR
3.10-8 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-10 Hydrology.docx The City replenishes groundwater by three methods: natural recharge, subsurface inflow, and intentional recharge.
Natural recharge occurs as precipitation, irrigation, canal, and/or stream flows infiltrate the soils and seep down to the water table to replenish the aquifer. Per the 2020 UWMP , the Kings Basin Integrated Groundwater and Surface Water Model (IGSM), completed in 2007, provides the best available information on the City’s groundwater yield. As such, the annual natural recharge from 1964 to 2004 was determined to be 42,700 AFY; however, this was projected to decline steadily from 2005 to General Plan buildout within the City’s SOI due to increased urbanization and development and a reduction in pervious surfaces. It can be noted though that, as future growth areas are annexed, the amount of natural recharge may increase. The UWMP estimated a total of 24,970 acre- feet (AF) of natural recharge for 2020, and projects that natural recharge will total 26,280 AF in the General Plan buildout year of 2035 and 26,790 AF by 2045, assuming groundwater characteristics are not altered due to climatic events or regulatory influences from SGMA.17 Subsurface recharge occurs from the movement of groundwater from external sources moving into the local aquifer. Subsurface water tends to flow from surrounding areas with a higher groundwater table than the City’s into the aquifer within the City’s SOI, including the Plan Area. It is likely that the subsurface inflow would increase with future annexation and development as the SOI is built out.
Per the 2020 UWMP , net subsurface inflow into the City’s SOI was determined to be 64,800 AFY annually for the period of 1964–2004. The UWMP estimated a total subsurface inflow for 2020 of 47,510 AF and projects that the total would reach 54,720 AF in 2035 and 59,530 AF in 2045, assuming groundwater characteristics are not altered due to climatic events or regulatory influences from SGMA.
18 Intentional recharge occurs by directing surface water into the underground aquifer with the use of groundwater recharge basins or wells. Fresno mainly uses recharge basins, which are located throughout the City, in an effort to offset declining groundwater levels and overdraft conditions. The City’s primary recharge facility is Leaky Acres, located northwest of the Fresno-Yosemite International Airport. It consists of 26 basins covering approximately 225 acres. Additionally, the City has agreements with the FMFCD and the FID to utilize their facilities (basins, canals, etc.) for additional groundwater recharge activities. According to the 2020 UWMP , the City recharged an average of approximately 60,000 AFY from 2000 to 2019. However, the amount has not historically been consistent and can fluctuate based on available surface water. This amount dropped to 34,700 AF in 2014 and to 19,800 AF in 2015. In 2019 though, the City recharged 82,993 AF, the highest amount within this measurement period. Per the City’s 2020 UWMP , the City will plan on increasing the amount of groundwater to be recharged gradually by 540 AFY each year moving forward when possible. During wet years, the City will recharge more water when it is available to help offset potential increased reliance on groundwater during dry years. The UWMP projects a total recharge volume of 60,000 AF starting in 2020, increasing to 68,100 AF in 2035 and 73,500 AF in 2045 during normal water years.
17 Water Systems Consulting, Inc. 2021. City of Fresno 2020 Urban Water Management Plan, Table 6-1, Components to Groundwater Yield for Normal Years.
18 Water Systems Consulting, Inc. 2021. City of Fresno 2020 Urban Water Management Plan.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hydrology and Water Quality
FirstCarbon Solutions 3.10-9
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-10 Hydrology.docx The total groundwater recharge amount for 2020 was 132,480 AF (24,970 AF of natural recharge, 47,510 AF of subsurface inflow, and 60,000 AF of intentional recharge); the total projected groundwater recharge amount for 2035 is 149,100 AF (26,280 AF of natural recharge, 54,720 AF of subsurface inflow, and 68,100 AF of intentional recharge) and for 2045 is 159,820 AF (26,790 AF of natural recharge, 59,530 AF of subsurface inflow, and 73,500 AF of intentional recharge) during normal water years and assuming groundwater characteristics are not altered due to climatic events or regulatory influences from SGMA.19 Groundwater pumping has been greatly reduced since the activation of the first SWTF in 2004 and has only further declined as a result of a second SWTF; per the 2020 UWMP , groundwater pumping has decreased from 165,200 AFY in 2003 to 55,000 AF in 2020.20 Surface water has allowed the City to reduce its dependance on groundwater as a water supply. Prior to 2004, 100 percent of Fresno’s water demand was met with groundwater. In 2004, the City’s first SWTF, the NESWTF, was constructed and activated; it provided 10–15 percent of the City’s potable water demand from 2005–2014, and 15 percent from 2016–2020. With the addition of the T-3 Water Storage and modular Surface Water Treatment Facility (T-3 SWTF) in 2015 and the SESWTF in 2018, the City was able to provide greater than 50 percent of its potable water supply with surface water in 2019 and 2020.21 The City plans on expanding surface water treatment capacities and groundwater recharge activities to maintain the reduction in groundwater reliance.
Plan Area
The City Metropolitan Water Resources Management Plan (Metro Plan) and UWMP include several objectives, goals, and policies to improve and develop water infrastructure as development progresses in the City.
22 The critical focal points of the water system development are the implementation of further water conservation measures, installation of new municipal groundwater wells, increased groundwater recharge efforts to bring the City’s groundwater pumpage into balance with its recharge rate, maximized use of available surface water, increased use of recycled water for landscape irrigation and other nonpotable uses, and the acquisition of future water supplies when available.
At the time of preparation of this Recirculated Draft PEIR, the City is updating the Metro Plan to include revised and updated recommendations for water supply facilities for the Plan Area. Among these proposed improvements are new municipal groundwater wells to be drilled in the Plan Area, recharge inter-ties to FMFCD basins to facilitate groundwater recharge in the Plan Area, expansion of SWTFs, new water storage and booster pump sites, and new water mains.
Groundwater Quality
Groundwater quality throughout the Tulare Lake Hydrologic Region is generally suitable for most urban and agricultural uses and meets primary and secondary drinking water standards for municipal use. However, local impairments are found in the groundwater supply with high total dissolved solids (TDS), nitrate, arsenic, and organic compounds acting as the primary constituents of
19 Water Systems Consulting, Inc. 2021. City of Fresno 2020 Urban Water Management Plan, Table 6-1, Components to Groundwater Yield for Normal Years.
20 Water Systems Consulting, Inc. 2021. City of Fresno 2020 Urban Water Management Plan, Figure 6-7, Historic Groundwater Production.
21 Water Systems Consulting, Inc. 2021. City of Fresno 2020 Urban Water Management Plan. 22 City of Fresno. 2014. Fresno Metropolitan Water Resources Management Plan Update.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hydrology and Water Quality Recirculated Draft Program EIR
3.10-10 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-10 Hydrology.docx concern within the region. As a single, unconfined aquifer, the groundwater basin within the City has been designated as a Sole Source Aquifer as authorized by Section 14246 of the Federal Safe Drinking Water Act of 1974.23 This designation means that Fresno is dependent on a single source of groundwater and that this sole source must be protected from contamination.
While the groundwater supply within the Kings River Subbasin generally meets drinking water standards, extensive contamination occurs throughout the City with eight major contaminant plumes present. Of the City’s 270 groundwater wells, 60 of the active wells currently have wellhead treatment systems.24 Several different types of pollutants have contaminated the groundwater in portions of the City. Major contaminant plumes include dibromochloropropane (DBCP), ethylene dibromide (EDB), trichloropropane (TCP), other volatile organic compounds (VOCs) like trichlorethylene (TCE), tetrachloroethylene (PCE), nitrate manganese, radon, chloride, and iron.
Nitrate, pesticides, and nutrients in agricultural drainage are currently found within much of the City’s groundwater supply, and their levels exceed some drinking water standards established by the State. While nitrates may occur naturally, their presence is often attributed to anthropogenic reasons. Common sources of nitrate contamination include runoff and leaching from fertilizer use, leaching from septic tanks and sewage, and erosion of natural deposits. 25 Another major problem facing the City’s groundwater supply is the presence of DBCP in groundwater wells. This fumigant was widely used in the 1960s to control nematodes in vineyards and is now present in down gradient groundwater wells. TCP, a manmade chemical associated with pesticide products, has also been detected in several of the City’s municipal wells. As of 2020, the City has received settlements in a number of lawsuits related to these contaminants and has constructed wellhead treatment systems and implemented blending plans for a number of affected wells.26 Plan Area
While there are no wells currently in operation within the Plan Area, several wells adjacent to the Plan Area have active wellhead treatment systems for DBCP and TCP contaminants. There are also portions of TCP (5 parts per trillion [ppt]), DBCP (0.2 parts per billion [ppb]) and nitrate (5 milligrams per liter [mg/L]) contaminant plumes within the Plan Area on the western border near State Route (SR) 180. It is expected that some portion of any new groundwater wells to be installed in the Plan Area will require wellhead treatment systems for various contaminants.
Stormwater Runoff
Stormwater Collection System
Stormwater drainage facilities within the Fresno-Clovis Metropolitan area are planned, implemented, operated, and maintained by the FMFCD. The storm drain facilities are documented in the Storm Drainage and Flood Control Master Plan (Storm Drain Master Plan), which is developed and updated by FMFCD. FMFCD’s Storm Drain Master Plan divides the service area into many local drainage areas of 1–2 square miles throughout Fresno. Drainage area boundaries are determined by
23 United States Environmental Protection Agency (EPA). 2021. Summary of the Safe Drinking Water Act 42 USC Section 300f et seq. (1974). Website: https://www.epa.gov/laws-regulations/summary-safe-drinking-water-act. Accessed June 10, 2022. 24 Water Systems Consulting, Inc. 2021. City of Fresno 2020 Urban Water Management Plan. 25 City of Fresno. 2023. Water Quality Annual Report 2023. 26 Water Systems Consulting, Inc. 2021. City of Fresno 2020 Urban Water Management Plan .
City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hydrology and Water Quality
FirstCarbon Solutions 3.10-11
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-10 Hydrology.docx geographic and topographic features and the economics of providing storm drainage service to the watershed. Storm drainage facilities within a drainage area typically consist of storm drain inlets, pipelines, retention basins, urban detention (water quality) basins, and stormwater pump stations.
Surface grading improvements such as streets, curbs, gutters, and valley gutters are part of the City of Fresno infrastructure, but the general grading of these features is governed by the Storm Drain Master Plan to provide a coherent implementation of drainage within Fresno.
All inlets, pipes, and pump stations within each drainage area are maintained by the FMFCD. The gutters, along with public streets and sidewalks, are maintained by the City’s Street Maintenance Division. It is assumed that this maintenance agreement will remain in place for the foreseeable future. The FMFCD’s Storm Drain Master Plan includes 165 adopted or proposed drainage areas, most served by a retention or detention facility.
27 FMFCD basins have been sized for capacities not
less than 60 percent of average annual runoff;28 FMFCD allows a 20 percent change in volume before basins need to be resized.
Stormwater collection in the City begins with street gutters that collect and convey stormwater runoff to storm drain inlets. The runoff is collected in these inlets and delivered to FMFCD’s pipe networks, pump stations, and infiltration basins for groundwater recharge. Most runoff is discharged into recharge basins, but during heavy rainfall events, excess runoff overflows into a system of relief channels and canals that discharge to the San Joaquin River, its tributary streams, local agricultural canals, and FID facilities.
Storm drain inlets are located at low points in the topography as determined by the Storm Drain Master Plan. Pipeline alignments and sizes are also shown on the Storm Drain Master Plan. Pipeline alignments are subject to change as development proposals are put forward by development projects. Retention basin and urban detention basin locations and sizes are part of the Storm Drain Master Plan as well. Basins are sited in the topographic low point of the drainage area. All of the storm drainage pipelines within the drainage area are directed to the basin for that area. Retention basins store and percolate stormwater from the drainage area if time between storms permits; otherwise, the water is pumped to designated irrigation canals. Urban detention basins provide quiescent (still) conditions for the removal or settling out of suspended solids prior to discharge of the stormwater to the San Joaquin River.
The Fresno-Clovis Metropolitan area consists of drainage areas that are completed (e.g., all Master Planned facilities are constructed and functional) or in the process of being completed (e.g., portions of the retention basin, pipelines, and inlets are constructed and other portions are not). For the drainage areas that are in the planning stage, the planning area may be planned and documented and the retention basin land may be purchased, but no construction has occurred; other areas may not have the land purchased for the basins yet. Implementation of the Storm Drain Master Plan occurs in response to development activity in newly developing areas and through Capital Improvement Projects (CIPs) in previously developed areas.
27 Fresno Metropolitan Flood Control District (FMFCD). 2016. 2016 District Services Plan. 28 Ibid.
City of Fresno—Fresno Southeast Development Area Specific Plan Project Hydrology and Water Quality Recirculated Draft Program EIR
3.10-12 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-10 Hydrology.docx Plan Area
In accordance with the Storm Drain Master Plan and other planning documents, the FMFCD is developing improvements for the Plan Area for storm drain facilities. The Plan Area encompasses all or part of the following existing drainage areas: BG, BL, BM, BS, CS, DS and, DV. Proposed drainage areas for SEDA include DT, DU, DW, DX, DY , and DZ. Most of the existing drainage areas include existing storm drain collection facilities, but the proposed drainage areas generally have no existing storm drain facilities. Areas DS and DV are the exceptions in that they are existing drainage areas with basins but have not been built out to Master Plan conditions. FMFCD improvements include storm drain inlets and piping, which are being analyzed and developed in conjunction with the proposed land uses for the Plan Area. Those portions of the Plan Area encompassed in existing drainage areas include Master Planned utilities designed by FMFCD.
There are seven existing basins contributing to stormwater collection for the Plan Area and six proposed basins within the Plan Area. There are also two existing basins outside of the Plan Area that are not part of existing drainage areas, including the Redbank Basin and the Fancher Creek Basin, which may contribute to additional drainage capacity; however, these two basins were not considered in the analyses completed as part of the Storm Drain Technical Study prepared for this Recirculated Draft PEIR (Appendix I). FMFCD basins are designed for a capacity not less than 60 percent of average annual runoff. Per the FMFCD, the proposed drainage areas for SEDA have not been adopted yet, and the basin locations have not been finalized. Table 3.10-1 shows the capacities of both existing basins that serve the Plan Area and proposed basins that will serve the Plan Area.
Table 3.10-1: Drainage Areas and Basin Capacities
Drainage Area
Designation
Drainage Area Size A
(acres)
Basin Volume B
(AF)
Basin Design Use Basin Type Relief Line to FID
Facility
Existing Drainage Areas/Basins
BG 753.61 232.1 Nonresidential Recharge Yes; Washington Colony Canal
BL 783.63 301.1 Residential Recharge No; relief line to Basin BH
BM 1,519 390.4 Residential Dual Use No; relief line to
Basin BH
BS 1,190.39 401.3 Nonresidential Recharge Yes; Mill Ditch CS 860.99 346.5 Nonresidential Recharge Yes; Washington Canal
DS C 1,958.14 1,383.3 Residential Undetermined D Yes; Mill Ditch and Redbank Basin
DV C 505 230.0 Nonresidential Undetermined D Yes; Briggs Canal and Fancher Creek
Proposed Drainage Area/Basins
DT 975.46 232.4 Residential Undetermined D Yes; Fancher Creek City of Fresno—Fresno Southeast Development Area Specific Plan Project Recirculated Draft Program EIR Hydrology and Water Quality
FirstCarbon Solutions 3.10-13
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN -JN)/3168/31680037/EIR/1 - Recirculated Draft PEIR/31680037 Sec03-10 Hydrology.docx Drainage Area
Designation
Drainage Area Size A
(acres)
Basin Volume B
(AF)
Basin Design Use Basin Type Relief Line to FID
Facility
DU 1,268.94 323.8 Residential Undetermined D No; relief line to Basin DV
DW 749.99 233.9 Residential Undetermined D Undetermined DX 877.9 304.5 Residential Undetermined D Yes; Briggs Canal DY 771 295.2 Nonresidential Undetermined D No; relief line to Basin DZ
DZ 694.5 263.6 Nonresidential Undetermined D No; relief line to Basin BG
Notes:
AF = acre-feet
FID = Fresno Irrigation District
FMFCD = Fresno Metropolitan Flood Control District
GIS = Geographic Information System
A Drainage area sizes obtained from GIS Shape Files provided by FMFCD.
B Basin volumes obtained from H&H calculation sheets provided by FMFCD.
C Existing drainage area and basin but not yet built out.
D Approved use of proposed basins will be determined via coordination between FMFCD and City.
Source: Blair, Church & Flynn Consulting Engineers. SEDA Specific Plan Storm Drain Technical Study. June 10, 2022.
Flooding and Inundation
The City of Fresno is located in the alluvial fans of numerous foothill stream sand creeks that drain the western slope of the Sierra Nevada foothills. These streams include Big Dry Creek, Alluvial Drain, Pup Creek, Dog Creek, Redbank Creek, Mud Creek, and Fancher Creek. Numerous smaller, unnamed drainage courses also drain into the City from the rural areas east of Fresno.
Based on a review of the FEMA Flood Insurance Rate Maps (FIRMs) for the City of Fresno, 29 there are
areas that are subject to the 100-year flood frequency flood zone as shown in Exhibit 3.10-1. The primary area that is subject to the 100-year flood zone is along the San Joaquin River below the bluffs. There are additional areas in the vicinity of the Fresno International Airport, the SEDA Specific Plan Area in the vicinity of the Redbank Creek Dam, adjacent to SR-180 east of Clovis Avenue, and within an industrial area east of SR-99, south of California Avenue and north of Jensen Avenue. In addition, various detention basins are subject to the 100-year flood zone.
Project Site
According to the FIRMs that include SEDA, a majority of the SEDA Specific Plan Area is outside the 100-year flood zones; most areas are located within Zone X (unshaded) (outside the 500-year floodplain with minimal risk of flooding) as shown in Exhibit 3.10-1.
29 Federal Emergency Management Agency (FEMA). 2021. National Flood Hazard Layer. Website: https://www.fema.gov/flood- maps/national-flood-hazard-layer. Accessed June 13, 2022.
THIS PAGE INTENTIONALLY LEFT BLANK