Cities Index.
Exhibit G - VMT Analysis

Fresno City Council
February 26, 2026

Document
Exhibit G - VMT Analysis
Meeting
February 26, 2026
Body
Fresno City Council
Original file
960 KB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.

Exhibit G

862 Pollasky Avenue ♦ Clovis, California 93612 ♦ (559) 299-1544 ♦ www.peters-engineering.com

Ms. April Gonzalez April 17, 2024
Central Valley Engineering & Surveying, Inc.
2511 Logan Street
Selma, California 93662

Subject: Vehicle Miles Traveled Analysis
Proposed Truck Parking Lot and Repair Shop
121 West North Avenue
Fresno, California

Dear Ms. Gonzalez:

Introduction
This report presents the results of vehicle miles traveled (VMT) analyses for the subject project.

Project Description
The proposed project site covers approximately 2.22 acres located on the south side of West North Avenue in Fresno, California (APN 329-020-33). The Project includes construction of a 4,900 -square-foot shop building and approximately 35 truck parking stalls. Hours of operation are expected to be 8:00 a.m. to 6:00 p.m. There will be four employees. Site access will be via a gated driveway connecting to North Avenue approximately 880 feet west of Elm Avenue. A site plan is attached.

Trip Generation
City staff have indicated the City’s methodology for trip generation for truck parking and ancillary services, such as maintenance and office facilities, shall be calculated using the rates provided in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 9th Edition, for Land Use 110 (General Light Industrial) . Table 1 presents trip generation characteristics of the proposed project.

Table 1
Project Trip Generation
ITE Land Use Area Daily A.M. Peak Hour P.M. Peak Hour
Rate Total Rate In:Out In Out Total Rate In:Out In Out Total General Light
Industrial (110)

2.22 acres 51.80 115 7.51 83:17 14 3 17 7.26 22:78 4 13 17 Reference: Trip Generation Manual, 9th Edition, Institute of Transportation Engineers 2012 Rates are reported in trips per acre.

Vehicle Miles Traveled Analysis – Proposed Truck Parking Lot and Repair Shop April 17, 2024 121 West North Avenue, Fresno, California Page 2

Vehicle Miles Traveled (VMT)
Senate Bill (SB) 743 requires that relevant CEQA analysis of transportation impacts be conducted using a metric known as vehicle miles traveled (VMT) instead of Level of Service (LOS). VMT measures how much actual auto travel (additional miles driven) a proposed project would create on California roads. If the project adds excessive car travel onto roads, the project may cause a significant transportation impact.

The State CEQA Guidelines were amended to implement SB 743 by adding Section 15064.3. Among its provisions, Section 15064.3 confirms that, except with respect to transportation projects, a project’s effect on automobile delay shall not constitute a significant environmental impact. Therefore, LOS as a measure of impacts on traffic facilities is no longer a relevant CEQA criteria for transportation impacts.

CEQA Guidelines Section 15064.3(b)(4) states that “[a] lead agency has discretion to evaluate a project’s vehicle miles traveled, including whether to express the change in absolute terms, per capita, per household or in any other measure. A lead agency may use models to estimate a project’s vehicle miles traveled, and may revise those estimates to reflect professional judgment based on substantial evidence. Any assumptions used to estimate vehicle miles traveled and any revision to model outputs should be documented and explained in the environmental document prepared for the project. The standard of adequacy in Section 15151 shall apply to the analysis described in this section.” The City of Fresno adopted CEQA Guidelines for Vehicle Miles Traveled Thresholds , dated June 25, 2020, pursuant to SB 743 to be effective as of July 1, 2020. The thresholds described therein are referred to herein as the City of Fresno VMT Thresholds. The City of Fresno VMT Thresholds document was prepared and adopted consistent with the requirements of CEQA Guidelines Sections 15064.3 and 15064.7. The December 2018 Technical Advisory on Evaluating Transportation Impacts in CEQA (Technical Advisory) published by the Governor’s Office of Planning and Research (OPR) was utilized as a reference and guidance document in the preparation of the City of Fresno VMT Thresholds.

The City of Fresno VMT Thresholds adopted a screening standard and criteria that can be used to screen out qualified projects that meet the adopted criteria from a requirement to prepare a detailed VMT analysis.

The City of Fresno VMT Thresholds Section 3.0 regarding Project Screening discusses a variety of projects that may be screened out of a VMT analysis including specific development and transportation projects. For development projects, conditions may exist that would allow the presumption that a development project will have a less-than-significant impact. These conditions may be size, location, proximity to transit, or trip ‐making potential. For transportation projects, the primary attribute to consider with transportation projects is the potential to increase vehicle travel, sometimes referred to as “induced travel.” Specifically, t he City of Fresno VMT Thres holds states: “Therefore, the City will allow screening out projects if the project would generate less than 500 ADT.” Based on the calculations presented in Table 1, t he proposed Project is expected to generate less than 500 trips per day. Therefore, no additional analyses are required and the lead agency may presume that the Project will create a less-than-significant transportation impact.

Vehicle Miles Traveled Analysis – Proposed Truck Parking Lot and Repair Shop April 17, 2024 121 West North Avenue, Fresno, California Page 3

Thank you for the opportunity to perform this VMT analysis. Please feel free to contact our office if you have any questions.

PETERS ENGINEERING GROUP

John Rowland, PE, TE

Attachment: Site Plan

SC
B
B
B
B
B
MGM
B
B
B
B
B
B

VANACCESSIBLE
WM
WM
SC
SC

CENTRAL VALLEY
DATE SIGNED:10/4/2023
N
PROPERTY LINE -417'-0"
X123456789101112131415
1617181920212223242526

XABCDEF
PROPERTY LINE -417'-0"
PROPERTY LINE -233'-0"
PROPERTY LINE -233'-0"

AA BBB BCD E
F
F
F
1 2
45 6
7 8
9 1010
10 10
10 1010
11 11
11 11
11 12
13 1415
16 16
16 17
17 17
18 19 20
212223
24 16
25 26

← All documents from this meeting