Costco Commercial Center Project
Conditional Use Permit Application No. P21-01959
Plan Amendment and Rezone Application No. P21-01960
Conditional Use Permit Application No. P21-03251
Planned Development Permit Application No. P21-03252
7120 North Riverside Drive Fresno, CA 93722
APN: 503-020-12
Exhibit C-1 – Project Site Plan Rendering
D
10'-10"9'-2"4'-0"9'-2"11'-8"9'-2"4'-0"9'-2"11'-8"9'-2"4'-0"9'-2"11'-8"9'-2"4'-0"9'-2"10'-10" 121424257
19 51916
30 10
15132123292715
13 27292517252816
612151414151514141515141414
V8
21 CLEANAIR / VANPOOL / EV
CLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EV
CLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EV
CLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EVCLEANAIR / VANPOOL / EV
NOPARKINGNOPARKINGNOPARKING
NOPARKING
EV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLY
EV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLY
EV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLY
EV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLY
EV CHARGINGONLYEV CHARGINGONLY
EV CHARGINGONLY
EV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLY
EV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLY
EV CHARGINGONLYEV CHARGINGONLY
1 16181618294NOPARKING
NOPARKINGEV CHARGINGONLYEV CHARGINGONLYvNOPARKINGEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLY7 11 NOPARKINGv
NOPARKINGNOPARKING
12 12
2NOPARKING84
NOPARKING
NOPARKINGvv v432
EV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLY US - COSTCO - RCVNG - REMODELWEST SPRUCE AVENORTH RIVERSIDE DRW. HERNDON AVE
ARTHUR AVE
68'
40'
40'35'18'24'20'64'64'64'31'-8"
41'-4"1237'-3"
805'
57'-8"
261'-2"
566'-4"
41'-3"1128'-4"30'
30'30'
75'-7"
64'64'64'
60'5'
64'64'
10'-6"
5'64'
164'-8"
40'
5'11'11'11'11'10' 33'-7"151'-6"54'-11"30'
12'
CARWASHEXIT DRIVE
RIGHT IN - RIGHT OUTINTERSECTIONFULL ACCESSINTERSECTION
NEW LEFT TURNPOCKET
5'-0" WIDE ACCESSIBLEPATH TO ROWCART CORRALTREE WELL
FUEL CANOPYCONTROLLERENCLOSURETRANSFORMER50'-0" OVERHEADELECTRICAL EASEMENTFUEL TANKS
PROPOSED ROWTRAIL EASEMENT
EXISTING PUBLICSTREET EASEMENT(2007 - 0148120 OR)
12' WIDE TRAIL
ACCESSIBLE RAMP W/4'-0" MIN. LANDING - TYP.
EXISTING PUBLICSTREET EASEMENT(2O18-0152181 OR)TIRE CENTERCOMPACTORTREE WELLRECEIVING(15) SHIPPING(3) FUTURESHIPPING LOADINGDOCKLOADINGDOCKCOMPACTORPROPOSED ROWTRAIL EASEMENTEXISTING PUBLICSTREET EASEMENT(95-067734 OR)EXISTING PUBLICSTREET EASEMENT(204-0028936 OR)12' WIDE TRAILNEW CURB - TYP.STREET WIDENINGAND NEW LANESTRIPING NEW DOUBLE LEFTHAND TURN LANERIGHT IN - RIGHTOUT INTERSECTIONVICINITY MAP025'50'100'1" = 50'-0" CLIENT:JURISDICTION:COSTCO SITE AREA:EXISTING ZONING:PROJECT ADDRESS:PROJECT DATACOSTCO WHOLESALE999 LAKE DRIVEISSAQUAH, WA 98027SITE DATA:SETBACKS:REQUIREDACTUALFRONT:TBDFRONT:TBDSIDE:TBDSIDE:TBDREAR:TBDREAR:TBDNEC OF I-35 & NE 36TH STFRESNO, CA21.20 ACRES (923,869 SF)CITY OF FRESNOCC/EA/czTBDTBDTBDTBDTBDTBD NOTES:EXISTING CONDITIONS TO BE FIELDVERIFIED.ANY SURVEY MONUMENTS WITHIN THEAREA OF CONSTRUCTION SHALL BEPRESERVED OR RESET BY A PERSONLICENSED TO PRACTICE LANDSURVEYING IN THE STATE OFCALIFORNIAREPAIR ALL DAMAGED AND/OROFF-GRADE CONCRETE STREETIMPROVEMENTS, AS DETERMINED BYTHE CONSTRUCTION MANAGEMENTENGINEER, PRIOR TO OCCUPANCY2 WORKING DAYS BEFORECOMMENCING EXCAVATIONOPERATIONS WITHIN THE STREETRIGHT-OF WAY AND/OR UTILITYEASEMENTS, ALL EXISTINGUNDERGROUND FACILITIES SHALL HAVEBEEN LOCATED BY UNDERGROUNDSERVICES ALERT (USA). CALL1-800-642-2444 © MG2. All rights reserved. No part of this document may be reproduced inany form or by any means without permission in writing from MG2. CONCEPT SITE PLANF R E S N O , C A L I F O R N I AN O V E M B E R 1 4 , 2 0 2 3NOVEMBER 14, 2023CONCEPT SITE PLAND11-34FRESNO, CA TOTAL SITE AREA22.53 ACRES (981,622 SF)FUEL PARCEL AREA:1.33 ACRES (57,753 SF) W. HERNDON AVE.N. RIVERSIDE DR.SAN JOAQUINRIVERCOSTCOSITE99N. GOLDEN STATE BLVD.
ACESSOR'S PARCELNUMBER:503-020-12
PARKING DATA:10' WIDE STALLSACCESSIBLE STALLSBUILDING DATA:
NUMBER OF STALLS PER 1000 SFOF BUILDING AREA:TOTAL SITE PARKING:##INCLUDES:873 STALLS808 STALLS25 STALLS3.98 STALLS GROSS WAREHOUSETOTAL BUILDING FOOTPRINT AREA:INCLUDES NET MECHANICAL / FIREINCLUDES:219,216 SF1,188 SFINCLUDES OPEN CANOPY3,233 SF167,960 SF10' WIDE STALLS#40 STALLS12' WIDE TRAILER PARKING33 STALLSTOTAL RECEIVING PARKING:INCLUDES:40 STALLSGROSS MDO46,834 SFPROPOSED ZONING:CG/cz EV STALL PARKING92 STALLS