CITY OF FRESNO
MASTER FEE SCHEDULE
WATER DIVISION
Fee Actual Cost M FS Page #
330.00 478.00 157
455.00 641.00 157
530.00 773.00 157
2,241.00 7,782.00 157
2,508.00 7,991.00 157
2,671.00 8,718.00 157
Size 1.5"
Fee Description
Service & Meter Installations
Meter Installation
(when installed on existing service)
Size 1"
Size 2"
Service Installation (without meter)
Size 1"
Size 1.5"
Size 2"
Sample from MFS Amendment
Detailed Itemization for Meter Installations by Size
Meter Installation - 1"
Description of Cost Salary/Fringe Total Hours/Each Total Cost Water Distribution/Production Specialist 54.04 2.0 108.07 Labor Subtotal 108.07
Admin OH Subtotal 118.83
Total Labor 226.90
Equipment
½ Ton Pick-Up 10.00 2.0 20.00 Equipment Sub-Total 20.00
Materials
1" AMR METER 231.07 1.0 231.07 Materials SubTotal 231.07
TOTAL 477.97
Recommended Fee 478.00
Meter Installation - 1.5"
Description of Cost Salary/Fringe Total Hours/Each Total Cost Water Distribution/Production Specialist 54.04 2.0 108.07 Labor Subtotal 108.07
Admin OH Subtotal 118.83
Total Labor 226.90
Equipment
½ Ton Pick-Up 10.00 2.0 20.00 Equipment Sub-Total 20.00
Materials
1.5" AMR METER 393.89 1.0 393.89 Materials SubTotal 393.89
TOTAL 640.79
Recommended Fee 641.00
Meter Installation - 2"
Description of Cost
Salary/Fringe Total Hours/Each Total Cost
Water Distribution/Production Specialist 54.04 2.0 108.07 Labor Subtotal 108.07
Admin OH Subtotal 118.83
Total Labor 226.90
Equipment
½ Ton Pick-Up 10.00 2.0 20.00 Equipment Sub-Total 20.00
Materials
2" AMR METER 525.50 1.0 525.50 Materials SubTotal 525.50
TOTAL 772.40
Recommended Fee 773.00
Detailed Itemization of Service Installation - 1"
Description of Cost Salary/Fringe Total Hours/Each Total Cost Water Distribution/Production Technician 49.14 6.0 294.86 Water Distribution/Production Specialist 54.04 6.0 324.22 Senior Water Distribution/Production Operator 66.12 6.0 396.72 Labor Subtotal 1,015.80
Admin OH Subtotal 1,116.97
Total Labor 2,132.77
Equipment
Pipefitter Truck 30.00 6.0 180.00 Compressor 40.00 3.0 120.00 Backhoe 40.00 3.0 120.00 Equipment Sub-Total 420.00
Materials
ANGLE METER STOP (1") 87.69 1.0 87.69 CORP STOP (1") 79.62 1.0 79.62 SADDLE (8"X1") 55.92 1.0 55.92 TUBING (1") [CU] 10.82 60.0 649.49 PIPE (1") [PVC] [SCH 40] 0.59 2.0 1.18 METER BOX #1 B16 FOR 0.75" OR 1" METER 35.61 1.0 35.61 B-16 LID ARMORCAST 30.81 1.0 30.81 TAILPIECE, METER (1") 23.16 1.0 23.16 M-55 METER AMR - 1" (55GPM) 274.53 1.0 274.53 CAP SxS (1") [PVC] 0.50 1.0 0.50 ADAPTOR SXT MALE (1") [SCH 80] 6.32 1.0 6.32 1" METER SPOOL 4.01 1.0 4.01 Paving - 63 sq ft 3,980.27 1.0 3,980.27 Materials SubTotal 5,229.11
TOTAL 7,781.88
Recommended Fee 7,782.00
Detailed Itemization of Service Installation - 1.5"
Description of Cost Salary/Fringe Total Hours/Each Total Cost Water Distribution/Production Technician 49.14 6.0 294.86 Water Distribution/Production Specialist 54.04 6.0 324.22 Senior Water Distribution/Production Operator 66.12 6.0 396.72 Labor Subtotal 1,015.80
Admin OH Subtotal 1,116.97
Total Labor 2,132.77
Equipment
Pipefitter Truck 30.00 6.0 180.00 Compressor 40.00 3.0 120.00 Backhoe 40.00 3.0 120.00 Equipment Sub-Total 420.00
Materials
ANGLE METER STOP (1.5") 260.56 1.0 260.56 CORP STOP (1.5") 233.07 1.0 233.07 ELBOW (1.5") COMP X COMP{90} 172.92 1.0 172.92 SADDLE (12"X1.5") 82.85 1.0 82.85 PIPE (1.5") [PVC] [SCH 40] 0.80 3.0 2.40 PIPE (1.5") POLYETHYLENE BLACK PLASTIC 1.33 60.0 79.67 BOLTS/NUTS HH PLATED (5/8"X3") 0.88 4.0 3.53 B-30 LID ARMORCAST 67.32 1.0 67.32 METER BOX B30 #1 1/2 FOR 1.5" METER 40.68 1.0 40.68 GASKET, METER FLANGE (1.5") 3.21 2.0 6.43 M-120 METER AMR - 1.5" 467.98 1.0 467.98 CAP SxS (1.5") [PVC] 0.82 1.0 0.82 ADAPTOR SXT MALE (1.5")(SCH 80) 13.05 3.0 39.16 Paving - 63 sq ft 3,980.27 1.0 3,980.27 Materials SubTotal 5,437.67
TOTAL 7,990.44
Recommended Fee 7,991.00
Detailed Itemization of Service Installation - 2"
Description of Cost Salary/Fringe Total Hours/Each Total Cost Water Distribution/Production Technician 49.14 6.0 294.86 Water Distribution/Production Specialist 54.04 6.0 324.22 Senior Water Distribution/Production Ope 66.12 6.0 396.72 Labor Subtotal 1,015.80
Admin OH Subtotal 1,116.97
Total Labor 2,132.77
Equipment
Pipefitter Truck 30.00 6.0 180.00
Compressor 40.00 3.0 120.00
Backhoe 40.00 3.0 120.00
Equipment Sub-Total 420.00
Materials
ANGLE METER STOP (2") 378.16 1.0 378.16
CORP STOP (2") 378.11 1.0 378.11
ELBOW (2") COMP X COMP{90} 306.01 1.0 306.01 SADDLE (12"X2") 88.63 1.0 88.63
PIPE (2") [PVC] [SCH 40] 1.25 2.0 2.51
PIPE (2") POLYETHYLENE BLACK PL 2.89 60.0 173.19
BOLTS/NUTS HH PLATED (5/8"X3") 0.88 4.0 3.53
B-36 LID ARMORCAST 110.07 1.0 110.07
METER BOX #2 B36 54.23 1.0 54.23
GASKET, METER FLANGE (2") 3.85 2.0 7.70
M-170 METER AMR - 2" 624.35 1.0 624.35
CAP SxS (2") [PVC] 0.99 1.0 0.99
ADAPTOR SXT MALE (2")(SCH 80) 18.89 3.0 56.66 Paving - 63 sq ft 3,980.27 1.0 3,980.27
Materials SubTotal 6,164.39
TOTAL 8,717.16
Recommended Fee 8,718.00