FORMAL BID SPECIFICATIONS CONSTRUCTION FOR:

FAX MAINTENANCE BUILDING STEAM BAY RENOVATION
BID FILE NO. 12600496
SCHEDULED BID OPENING:

TUESDAY, JUNE 2, 2026
PROCUREMENT SPECIALIST: TAMRA TORRENCE
[email protected]
(559) 621-1153

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

TABLE OF CONTENTS

PAGE

INTRODUCTION

Notice Inviting Bids.................................................................................................... i Instructions to Bidders .............................................................................................. iv

DIVISION I BIDDING AND CONTRACT DOCUMENTS

Bidder's Checklist ....................................................................................................... 2 Bid Proposal Form ...................................................................................................... 4 Time of Completion and Liquidated Damages........................................................... 6 Time Period to Award Bid........................................................................................... 7 Bid Deposit............................................................................................................... 8 Contractor’s License……………………………………………………………………... 9
List of Subcontractors ................................................................................................. 10 Certification from Comptroller..................................................................................... 11 Non-Collusion Affidavit…………………………………………………………………... 12
Update of Statement of Qualifications…………………………………………………. 13 Non-Discrimination Clause…………………………………………………………….. 14
National Targeted Hiring………………………………………………………………… 15
Certification for Local Preference………………………………………………………. 16 Signature Page for Bid Proposal ......… ……………….....................……………….. 17 Sample Certification ………………........................................……………………….. 19 Subcontractor Information Detail ………………............................………………….. 20

DIVISION II GENERAL CONDITIONS
Definitions………………………..………………………………………………………… 32
Bonds........................................................................................................................ 37 FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

TABLE OF CONTENTS
(Continued)
Precedence of Contract Documents…………………………………………………… 38 Nonfederal Labor Standards Provisions………………………………………………… 41 Payrolls and Basic Records……………………………………………………………… 44 Fair Employment Practices and Nondiscrimination…………………………………… 46 Claims for Additional Time………………………………………………………………. 50 Claims and Disputes……………………………………………………………………… 51
Progress Payment and Retention………………………………………………………... 56 Final Application and Final Payment……………………………………………………… 58 Payment Withheld…………………………………………………………………………… 58
Waiver and Release Form………………………………………………………………… 59 Escrow Agreement for Security Deposit in Lieu of Retention……………………………. 67

DIVISION III FEDERAL REQUIREMENTS

DIVISION IV SPECIAL CONDITIONS

DIVISION V STANDARD SPECIFICATIONS

DIVISION VI TECHNICAL SPECIFICATIONS
Construction Plans

EXHIBITS Exhibit A – Geotechnical Engineering Investigation Report

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496 i
670645v1

NOTICE INVITING BIDS
Sealed or electronic bids will be received at the office of the Purchasing Manager of the City of Fresno for the following:

FAX MAINTENANCE BUILDING STEAM BAY RENOVATION
BID FILE NUMBER: 12600496
The scope of work for the FAX Steam Bay Renovation project will update a partially operable maintenance lift replacing it with a surface mounted lift as well as backfilling the existing lift and pit to make the bay working area a continuous surface, removing existing steps in the work area.

The key items are as follows:
• R
emove existing in-ground lift and upgrade to a surface mounted lift • Remove unnecessary maintenance bay conduits and equipment • Clean and repaint steam bay walls
• Re-route existing electrical and/or plumbing on the wall T
he Engineer’s Estimate of Cost for this project is $299,137.00.

B
ids will be taken on complete work, in accordance with Plans and Specifications on file in the office of the Purchasing Manager, 2101 G Street, Building A, Fresno, CA 93706, phone number (559) 621-1332 or via Planet Bids.

Specifications and bid proposal forms for these items can be downloaded at the City’s online website at: http://www.fresno.gov. Click “Business” (at the top of the screen), under the “Doing Business” section, click “Bid Opportunities”.

Bids will be submitted electronically via Planet Bids or by paper only.

Bid proposals must be filed electronically or with the Purchasing Manager prior to the bid opening at 3 p.m. on Tuesday, June 2 , 2026, w hen the bids will be publicly opened and recorded.

Electronically filed is defined as by means of electronic equipment or devices. Join the bid opening meeting at https://fresno.zoomgov.com/j/1619517892 or call 1 (669) 254- 5252, meeting ID 161 951 7892.

Th
e work hereunder constitutes a “public work” as defined in Chapter 1, Part 7, Division 2 of the California Labor Code, and Contractor shall cause the work to be performed as a “public work” in accordance with such Chapter of the California Labor Code. The Council of the City of Fresno has adopted Resolution No. 82-297 ascertaining the general prevailing rate of per diem wages and per diem wages for holidays and overtime in the Fresno area for each craft, classification, or type of worker needed in the execution of contracts for the City. A copy of the resolution is on file at the Office of the City Clerk. Actual wage schedules are available at Construction Management Office, 747 R Street, 2nd Floor, Fresno, California 93721, (559) 621-8880.

Contractors and Subcontractors must meet any and all requirements of Labor Code sections 1771.1 and 1771.5 prior to submitting bids.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

ii

670645v1
All proposals must be made on the Bid Proposal Form provided by the Purchasing Manager. A Bid Deposit, which can be provided separately, in the amount of TEN PERCENT (10%) of the Total Net Bid Amount (or, in bids with Add Alternates, the highest possible combination of the Base Bid plus Add Alternates) in the form of a certified or cashier’s check, an irrevocable letter of credit, or a certificate of deposit or a bidder’s bond executed by a corporate surety, admitted by the California Insurance Commissioner to do business in California, payable and acceptable to the Ci ty of Fresno; or the Bidder shall have registered with the Purchasing Manager of the City an annual bid bond sufficient to provide coverage in such amount. All Bid Deposits will be held until a Contract has been executed with the successful Bidder or all bids have been rejected. Copies of Bid Deposits may be submitted electronically, with the exception of a certified or cashier’s check, which must be brought to the Purchasing Manager’s office and labeled accordingly with bid number prior to the bid opening.

The City of Fresno hereby notifies all Bidders that no person shall be excluded from participation in, denied any benefits of, or otherwise discriminated against in connection with the award and performance of any contract on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era or on any other basis prohibited by law.

Furthermore, the City of Fresno hereby notifies all Bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, national origin, religion, age, or disability in consideration for an award.

The City of Fresno encourages all prime Contractors to utilize qualified SBE (Small Business Enterprise) sub-Contractors on the City of Fresno projects and promotes the direct purchase of goods from qualified SBEs by utilizing SBE vendors when such vendors are available, and the price of the goods or services sought is reasonable.

A pre-bid conference will be held at 2223 G Street, Fresno, CA 93706 on May 13, 2026 at 10:00 a.m. This meeting will start in the FAX Administrative Building’s Lower Conference Room.

Prospective bidders are encouraged to attend. City staff will be present to answer any questions regarding the specifications and provide a tour of the job site. Attendees will be permitted to inspect the job site and its equipment under the supervision of FAX staff.

Services of an interpreter and additional accommodations can be made available. Requests for accommodations should be made at least five working days but no later than 48 hours prior to the scheduled meeting/event. Please contact the Procurement Specialist on the cover at 559- 621- 1332 or through the Questions and Answers field on Planet Bids.

In accordance with provisions of section 22300 of the California Public Contract Code, Contractor may substitute securities for any monies withheld by City to ensure performance under the Contract.

A 100 percent Payment Bond and 100 percent Performance Bond for all public works contracts must be filed with the Contract Documents and approved by the City before the Contractor enters upon performance of the Work.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

iii

670645v1

Bidders are advised that as required by the Fresno Municipal Code, the City of Fresno is implementing new National Targeted Worker requirements for public work of improvement contracts over $200,000. The mandatory participation level for National Targeted Workers is 15%.

No bid will be considered for award unless the Bidder at the time of bid opening, is licensed with a valid Class “B” Contractor’s License issued by the State of California.

The City reserves the right to reject any and all bids at is sole discretion.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

iv

670645v1

INSTRUCTIONS TO BIDDERS

FAX MAINTENANCE BUILDING STEAM BAY RENOVATION
BID FILE NUMBER: 12600496

BID PROPOSALS WILL BE CONSIDERED FOR AWARD ONLY IF THE BIDDER HAS COMPLIED WITH THE FOLLOWING:

1. Bid Proposals shall be submitted on the forms furnished by the Purchasing Manager, with all documents listed on the Bidder’s Checklist, completely filled out, properly signed by the Bidder and delivered, under sealed cover, plainly marked or electronically to the Office of the Purchasing Manager, 2101 G Street, Bldg. A, Fresno, CA 93706, or electronically filed utilizing Planet Bids prior to the date and time specified in the Notice Inviting Bids, when all bids will be publicly opened and recorded. Bids received at 3:00 p.m. or after will not be accepted. The time stamp in the Purchasing Division will be the official clock for documenting the time of filing. Electronically filed is defined as by means of electronic equipment or devices. Failure to submit all forms required herein may deem the bidder non-responsive at City’s sole discretion.

In the event that both a paper and electronic bid for the same project is submitted, the City will use and accept the electronic version as the authorized submittal.

2. A Bid Deposit has been made in accordance with either paragraph (a) or paragraph (b), below. A bid without a proper Bid Deposit will be automatically rejected. (a) BID DEPOSIT. Bidders must submit a Bid Deposit, which may be provided separately, in the amount of TEN PERCENT (10%) of the Total Net Bid Amount (or, in bids with Add Alternates, the highest possible combination of the Base Bid plus Add Alternates) with their Bid Proposal. Such Bid Deposit shall be in the form of a certified or cashier’s check, an irrevocable letter of credit or a certificate of deposit payable to the City of Fresno, or a bidder’s bond executed by a corporate surety, admitted by the California Insurance Commissioner to do business in California, payable and acceptable to the City of Fresno. Such Deposit shall be retained by the City of Fresno as a guarantee that the Bidder, if awarded all or part of the Contract, will within 15 calendar days from the date the Notice of Award is mailed to the Bidder, execute and return a Contract furnished by the City. No Bid Deposits will be returned to Bidders until either a Contract has been executed for all items awarded, or all bids have been rejected. Bid bonds will not be returned, except upon bidder’s written request. Copies of Bid Deposits may be submitted electronically, with the exception of a certified or cashier’s check, which must be brought to the Purchasing Manager’s office and labeled accordingly with bid number prior to the bid opening. (b) ANNUAL BIDDERS BOND. If the Bidder contemplates submitting bids from time to time during a period of one (1) year for the furnishing of certain materials, supplies or services to the City of Fresno, the Bidder may cover all such bids by a single Annual Bidder’s Bond instead of a separate bond for each bid. If such an Annual Bidder’s Bond is registered with the Purchasing Manager of the City of Fresno, and is currently valid, it shall be deemed to accompany each and every bid submitted, provided such bond is in a sufficient amount to provide the required Deposit for all FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

v

670645v1
of the Bidder’s proposals then outstanding. It shall be stated upon the Bid Proposal that such an Annual Bidder’s bond is registered with the Purchasing Manager of the City of Fresno.

3. NOTARIAL ACKNOWLDGEMENT. Each bid must be accompanied by a Bid Bond executed by a surety authorized to do business in the State of California. The bond must be originally signed by both the Principal and the Surety. Notary acknowledgments for both the Principal and the Surety must be attached if corporate seal is not visible on the bid bond. If signed by an Attorney -in-Fact, a certified and effectively dated Power of Attorney must be included with the bond. Failure to provide properly notarized signatures or visible corporate seal will render the bid non-responsive.

CONTRACT DEFINITIONS
Attention of Bidders is especially directed to all provisions of the Contract Documents, as defined in the GENERAL CONDITIONS.

PREVAILING WAGE
The work hereunder constitutes a “public work” as defined in Chapter 1, Part 7, Division 2 of the California Labor Code, and Contractor shall cause the work to be performed as a “public work” in accordance with such Chapter of the California Labor Code. The Council of the City of Fresno has adopted Resolution No. 82-297 ascertaining the general prevailing rate of per diem wages and per diem wages for holidays and overtime in the Fresno area for each craft, classification, or type of worker needed in the execution of Contracts for the City. Information specific to the Work to be done under this Contract can be obtained by contacting the Contract Compliance Officer at the City of Fresno office of Construction Management, (559) 621-8880.

FEDERAL IMMIGRATION REFORM AND CONTROL ACT

As a material part of any Contract for a City of Fresno project, every Contractor who has employees who will work on a City of Fresno project, is required to comply with all of the provisions of the Federal Immigration Reform and Control Act of 1986 (P.L. 99-603, 100 Stat. 3359). This requirement includes compliance with all of the employee documentation provisions. Furthermore, the Contractor will make any employee documentation required to comply with the Act immediately available to the City upon its request for each individual employee working on a City of Fresno project.

VERIFICATION OF WORK

All dimensions and quantities noted on the Plans, exhibits, etc., are approximate. Before submitting a Bid Proposal, Bidders should inspect the Work site to verify the Work and the conditions under which the Work will be performed. The submittal of a Bid Proposal shall be considered prima facie evidence that the Bidder has reviewed the Specifications, job site and conditions; is fully aware of the required Work and Work conditions and has included within the Bid Proposal the appropriate amounts covering the cost of execution of the Work in accordance with such Specifications, job site and conditions.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

vi

670645v1

SUBCONTRACTORS

The Prime Contractor shall include with the Bid Proposal the name, location and license number of the place of business of each Subcontractor who will perform work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one- half of 1 percent of the prime contractor’s total bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one -half of 1 percent of the prime contractor’s total bid or ten thousand dollars ($10,000), whichever is greater.

Subcontractor Information – Detail concerning any subcontractor who the prime contractor is required to list under this subdivision, other than the subcontractor’s name and location of business, shall be submitted by the prime contractor within 1 working day after the time of bid opening.

The Prime Contractor shall list only one subcontractor for each portion of work as defined by the prime contractor in his or her bid.

PROMPT PAYMENT TO SUBCONTRACTORS

All Contracts and Subcontracts (all tiers), shall contain the following provisions:

a. Prompt Progress Payment to Subcontractors. A prime contractor or subcontractor shall pay a subcontractor not later than 7 days of receipt of each progress payment in accordance with Section 7108.5 of the California Business and Professions Code concerning prompt payment to subcontractors. Any viol ation of Section 7108.5 shall subject the violating contractor or subcontractor to the penalties, sanction and other remedies of that section. These requirements shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise, available to the prime contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the prime contractor, deficient subcontractor performance, or noncompliance by a subcontractor. This provision applies to both DBE and non- DBE subcontractors.

b. Prompt Payment of Withheld Funds to Subcontractors. The City shall hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the City of the contract work and pay retainage to the prime contractor based on these acceptances. The prime contractor or subcontractor shall return all monies withheld in retention from a subcontractor within 30 days after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the contract work by the City. Any delay or postponement of payment may take place only for good cause and with the City’s prior written approval.

Any violation of these provisions shall subject the violating prime contractor or subcontractor to the penalties, sanctions, and other remedies specified in Section 7108.5 of the California Business and Professions Code. These requirements shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise, available to the prime contractor or subcontractor in the event of a dispute involving late payment, or nonpayment by the prime contractor, deficient subcontractor performance, FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

vii

670645v1
and/or noncompliance by a subcontractor. This provision applies to both DBE and non- DBE subcontractors.

ASSURANCE

The Contractor shall comply with the following assurance and require that each subcontract include the same assurance by each of its subcontractors: The Contractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this Contract. The Contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of contracts hereunder. Failure by the Contractor to carry out these requirements is a material breach of this Contract, which may result in the termination of this Contract, or such other remedy or sanction as may be available. Contractor will contain this paragraph in each of its subcontracts and require the same of its subcontractors.

PRE-BID CONFERENCE

A pre -bid conference may be held at the time and place listed in the Notice Inviting Bids.

Prospective bidders are encouraged to attend. City Staff will be present to answer any questions regarding the Specifications, and there may be an inspection tour of the job site(s).

QUESTIONS, CLARIFICATIONS AND CONCERNS

The Specifications describing this project have been carefully prepared. Any questions or concerns relating to these Specifications shall be directed in writing to the designated Procurement Specialist of the Purchasing Division (see cover page) facsimile to the fax number on the cover page or emailed to [email protected]. A Bid Question form for this purpose has been included as page xii.

Questions will be accepted only up to 5 working days prior to the bid opening date to allow the City, if necessary, to issue an addendum to all bidders stating revisions, deletions, or additions to be made to the Specifications as a result of any questions. If questions arise after the deadline, please contact the designated Procurement Specialist of the Purchasing Division, but the City will not guarantee a response.

The City will not be responsible for verbal responses made by parties other than the Purchasing Manager or her/his designee.

CONTACTS WITH CITY STAFF

Before an award is made, any contact with City staff, other than the Purchasing Manager or designee(s), without prior written authorization is strictly prohibited and may render the Bidder non-responsible.

ENGINEER’S ESTIMATE OF COST

The Engineer’s Estimate of Cost listed in the Notice Inviting Bids is given for informational purposes only. This amount does not include other Project costs such as design, inspection, contingency and Contract compliance and is not warranted to represent the City’s estimated cost of construction for this Project.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

viii

670645v1

LOCAL PREFERENCE

Fresno Municipal Code Section 4- 108 LOCAL PREFERENCE IN CONTRACTS REQUIRING COMPETITIVE BIDDING provides for a local preference. That applicable to public work of improvement contracts are paraphrased as follows:

Except for those contracts funded by the federal or state government when such funding would be jeopardized because of this preference, the Council authorizes the Purchasing Manager to extend a preference to a local business as expressly set forth herein. For purposes of this section, “local business” shall mean a business with a fixed primary or branch office either (i) within a twenty-five-mile radius of Fresno City Hall, located at 2600 Fresno Street in the City of Fresno, or (ii) within the County of Fresno; and which fixed primary, or branch office was established prior to the City inviting bids for the respective purchase.

The Purchasing Manager, in the evaluation of any and all sealed bids for any public works construction pursuant to this section, shall extend a five percent (5%) preference to a local business in award of the Contract whenever the amount of the preference, as determined in subdivision (i) below, is less than or equal to seventy-five thousand dollars ($75,000).

The preference shall be extended consistent with each of the following:
(i) The amount of the preference shall be equal to the amount of the percentage applied to the lowest responsive and responsible bid.
(ii) If the Bidder submitting the lowest responsive and responsible bid is not a local business, and if a local business has also submitted a responsive and responsible bid, and, with the benefit of the preference, the local business’ bid is equal to or less than the original lowest responsive and responsible bid, the City shall award the Contract to the local business at its submitted bid price.
(iii) The Bidder shall certify, under penalty of perjury, that the Bidder qualifies as a local business. The preference is waived if the certification does not appear on the bid. (iv) The bidder shall certify, under penalty of perjury, that it will self -perform at least 30% of the contract amount with individuals who reside in Fresno County. (v) The Bidder shall certify, under penalty of perjury, that at least 50% of the contract value would be performed by either the bidder or subcontractor meeting the local preference criteria.

For (iv) and (v), in determining compliance with the minimum percentages, work performed by residents of states other than California will be excluded from the calculation.

Bidders shall submit the CERTIFICATION FOR LOCAL PREFERENCE form with their bid if they seek the benefit of local preference.

SUBSTITUTION OF MATERIALS

Where specific names are used in conjunction with materials, they are mentioned as standards, but this implies no right upon the part of the Contractor to substitute other materials or methods without permission of the Engineer.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

ix

670645v1

If manufacturers or brands are used or listed in conjunction with products, equipment or materials in these Specifications without the words “or equal,” equals are allowed. Except in those instances where the product is designated as “No Substitution Allowed,” the Specifications will list at least two brands or trade names of comparable quality or utility followed by the words “or equal.” Where “or equal(s)” are allowed for any product, equipment or materials, they must meet all the requirements of the Specifications to the satisfaction of the City and must be in current production.

For all “or equal(s),” Contractor shall make submittals after Notice to Proceed for evaluation. If approval as an equal is denied by the City, Contractor shall provide one of the manufacturers/brands listed in the Specifications without change in the Contract Price.

STATEMENT OF QUALIFICATIONS

Bidders who desire to participate in the formal bidding process of the City of Fresno for public works projects must, (a) have on file with the Office of the Purchasing Manager of the City of Fresno; or (b) must submit with the Bid Proposal, a "Statement of Qualifications," including Schedules "A 1" and "A 2." The Statement must be filed annually. Statements that are older than one year are no longer valid which may render a bid nonresponsive.

EXCEPTIONS

Any exceptions taken at the time of or after bid submittal may render the bid nonresponsive.

Attachments by Bidders which include legal terms and conditions that conflict with the GENERAL CONDITIONS may be considered an exception, and Bidder may, therefore, be considered nonresponsive.

ERRORS AND OMISSIONS

Errors and omissions by the Bidder will be dealt with in accordance with the California Public Contract Code including, but not limited to sections 4107.5 and 5103.

BID APPEAL PROCEDURE

The City has an appeal procedure in place as adopted by the City Council on April 29, 2003 in Resolution No. 2003-129. Any Bidder wishing to file an appeal should refer to that Resolution. A copy of the Resolution may be obtained from the City Clerk’s Office, 2600 Fresno Street, Fresno, California 93721.

Once City staff has reviewed and evaluated the bid proposals received and has determined the lowest responsive and responsible Bidder for award, that determination will be posted on a public bulletin board outside the Purchasing Division's Office and on the City’s website www.fresno.gov, Departments, General Services, Purchasing, Anticipated Formal Bid Award, a minimum of 5 working days prior to Council action to award a Contract for the project/purchase.

The bulletin board and website will generally be updated by Monday of each week, no later than 5 p.m. It is the sole responsibility of interested bidders to seek this information from either of these sources.

Should bidders wish to appeal the staff determination, appeals must be received in writing within 5 working days from the time the determination is posted and conform to the requirements under FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

x

670645v1
Resolution No. 2003-129. “Working day” means a City of Fresno regular business day. In no event will appeals be accepted later than 5 p.m. on the day before Council is scheduled to take action on the Contract award. Appeals must be submitted to the following:

City of Fresno- Purchasing Division
2101 G Street, Bldg. A
Fresno, California 93706
FAX Number (559) 457-1564

Letters of appeal must clearly state why it is felt the staff’s determination of bid award is to someone other than the lowest responsive and responsible Bidder, or outside the procedural requirements for the submission and opening of bids.

Appeals not submitted within the stated time will not be honored and the City will proceed to award the Contract.

REGULATED COMMUNICATIONS IN CITY PROCUREMENT PROCESS ORDINANCE

The Regulated Communications in City Procurement Process Ordinance (Article 6, Chapter 4 of the Fresno Municipal Code) became effective May 7, 2004. With certain specified exceptions, the Ordinance provides that no Respondent, Bidder, Proposer (as the case may be) shall initiate, engage in, or continue any communication to or with any City elected official concerning or touching upon any matter which is the subject of this competitive procurement process.

Any Respondent, Bidder, Proposer or elected official (as the case may be) who initiates, engages in, continues in, or receives any regulated communication shall file the written disclosure required by the Regulated Communications in City Procurement Process Ordinance.

Any Respondent, Bidder, or Proposer violating the Regulated Communications in City Procurement Process Ordinance may be disqualified from participating in this procurement process and/or determined to be non- responsible. Additionally, the City may set aside the award of a contract, prior to its execution, to a party found to have violated the Ordinance.

Note: The full text of Fresno Municipal Code, Chapter 4, Article 6 may be viewed on the City’s website at, http://www.fresno.gov. under “Government” on the top left portion of the home page click on “City Clerk”, then click on “Fresno Municipal Code and City Charter” located to the right of the page. Or view the Fresno Municipal Code directly at https://library.municode.com/ca/fresno/codes/code_of_ordinances?nodeId=MUCOFR_CH4CIPU COSA

DEBARMENT

A Bidder may be debarred from bidding or proposing upon or being awarded any contract with the City, or from being a subcontractor or supplier at any tier upon such contract, in accordance with the procedures in Fresno Municipal Code Section 4-104 adopted by Council on May 17, 2018.

The initial period of any such debarment shall not be less than one year and may be permanent depending on the violation. A Bidder may request a hearing, in accordance with Fresno Municipal Code Section 4-104, upon receipt of a notice of proposed debarment from the City Manager or designee. A copy of the Resolution may be obtained from the City Clerk’s Office, FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

xi

670645v1
2600 Fresno Street, Fresno, California 93721.

OUTREACH TO SMALL BUSINESS ENTERPRISES IN SUBCONTRACTING

The City of Fresno hereby notifies all Bidders that it is the City’s policy to provide all small business enterprises, including minority, women, and disabled veteran business enterprises, equal access and opportunity for participation in the performance of all construction contracts, professional service contracts, and procurement of supplies, equipment and other services. Therefore, the City requests that a Bidder who intends to subcontract a portion of the work seek out small business enterprises that are potential subcontractors, suppliers, or consultants, and actively solicit their interest, capability and prices.

NATIONAL TARGETED HIRING (NTH)

This project is subject to Fresno Municipal Code section 4-117:

The Contractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The Contractor shall carry out applicable requirements of Fresno Municipal Code section 4- 117 in the award and administration of this Contract. Failure by the Contractor to carry out these requirements is a material breach of this Contract, which may result in the termination of this Contract or such other remedy as the City deems appropriate. The Contractor shall include these requirements in all subcontracts issued pursuant to this contract.

Contractor shall take necessary and reasonable steps to ensure that NTH have opportunity to participate in the Contract.

VIOLATIONS OF NTH REQUIREMENTS. Contractor shall diligently carry out and adhere to NTH requirements as set forth in the NTH Program and in the Contract. The failure of Contractor to comply with the requirements shall be deemed a material breach of Contract and, after due notice and opportunity to cure the breach is afforded the Contractor; such breach may result in, among other remedies and sanctions, a cancellation of the Contract.

MONETARY SANCTION FOR VIOLATIONS. Upon a final determination by the City that Contractor has materially violated the NTH terms of the Contract, and after due notice of this determination is given to the Contractor, a substantial monetary penalty, on account of the NTH violation, may be withheld and set off by the Finance Department from progress payments, or the final payment, due to the Contractor for work performed under the Contract. Depending upon the seriousness or willfulness of the NTH violation, the amount of money which may be withheld may be up to, but not more than, the full amount of the liquidated damages as allowed under the Contract.

MINIMUM NTH SUBMISSION REQUIREMENTS. Submission of information required under this section shall be on a form provided by the City, or as otherwise directed.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

xii

670645v1

PURCHASING DIVISION
TELEPHONE # (559) 621-1332
FAX # as shown on front page
BID QUESTIONS FOR:

FAX MAINTENANCE BUILDING STEAM BAY

RENOVATION

BID FILE NO. 12600496

ATTENTION: Tamra Torrence,
Senior Procurement Specialist
Email :[email protected]
(FOR CITY OF FRESNO USE ONLY)
QUESTION NO:

DATE: REVIEWED BY:

RESPONSIBLE FOR RESPONSE:
[ ] CITY STAFF
[ ] CONSULTANT
FROM:

COMPANY:

CONTACT PERSON:

DATE:

PHONE No:

FAX No:

QUESTION (One question per sheet.)
ANSWER:

RESPONSE BY:

INCLUDED IN ADDENDUM NO.

DATE:

DATE:

One question per page – Duplicate this form as necessary.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

1 670645v1

DIVISION I

BIDDING AND CONTRACT DOCUMENTS
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

2 670645v1
BIDDER’S NAME:
(Submit with Bid Proposal)
BIDDER’S CHECKLIST

FAX MAINTENANCE BUILDING STEAM BAY RENOVATION
BID FILE NUMBER: 12600496

SUBMIT THIS BIDDER’S CHECKLIST WITH YOUR BID DOCUMENTS. Bidders shall complete and submit all documents marked with an “X” in the “REQUIRED” column. Documents required on the checklist but not included may render your bid nonresponsive and ineligible for award. Bids received by the City by the scheduled bid opening time will be opened and publicly read but are subject to verification that all the required documents have been submitted. Copies of bid deposits may be submitted electronically and separately , with the exception of a certified or cashier’s check, which must be brought to the Purchasing Manager’s office and labeled accordingly with bid number prior to bid opening.

REQUIRED

[X] 1. BID PROPOSAL pages 4 through 5
[X] 2. BID DEPOSIT attached to front of Proposal or submitted electronically in the form of:
[ ] Certified Check [ ] Bidder’s Bond
[ ] Cashier’s Check [ ] Irrevocable Ltr of Credit
[ ] Certificate of Deposit [ ] Annual Bidder’s Bond

[X] 3. CONTRACTOR’S LICENSE information, page 9
[X] 4. LIST OF SUBCONTRACTORS page 10
[X] 5. CERTIFICATION (Comptroller General’s List), page 11 [X] 6. NON-COLLUSION DECLARATION page 12
[X] 7. UPDATE OF STATEMENT OF QUALIFICATIONS page 13
[X] 8. NON-DISCRIMINATION CLAUSE page 14
[X] 9. NATIONAL TARGETED HIRING page 15
[X] 10. CERTIFICATION FOR LOCAL PREFERENCE page 16
[X] 12. SIGNATURE PAGES page 17-18
[X] 13. SAMPLE CERTIFICATION page 19
[X] 14. ADDENDA – Signature page of all Addenda issued, Addenda No. to . (Enter numbers)
[_] 15. PRE-BID CONFERENCE – A company representative attended the pre-bid conference held on X

(Continued)

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

3 670645v1

BIDDER’S NAME:
(Submit with Bid Proposal)

If one of the (3) lowest bidders, submit within one (1) working day from the date of the bid opening:

[X] 16. SUBCONTRACTOR INFORMATION – DETAIL, page 20. If bidder lists subcontractors on page 10, this form is to be submitted to the Purchasing Division within one working day from the date of the bid opening.

SUBMITTED BY:

Name of Company Contact Name
Address City State Zip
Phone No. Fax No.

E-Mail Address:

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496 4 670645v1
BIDDER’S NAME:

BID PROPOSAL

FAX MAINTENANCE BUILDING STEAM BAY RENOVATION
BID FILE NUMBER: 12600496
TO: THE PURCHASING MANAGER OF THE CITY OF FRESNO:

The undersigned Bidder, having carefully examined the location of the hereinafter described work, plans and/or specifications therefor, hereby proposes to furnish, all, in strict accordance with said plans and/or specifications, the materials, labor, and equipment necessary to complete the project for the prices set forth in the following bid items:

(Continued)

ITEM QUANTITY DESCRIPTION OF WORK UNIT TOTAL

1. Lump Sum Mediator (Owner’s 50% share, see
page 55 of General Conditions) Lump Sum $25,000*

2. Lump Sum Traffic Control Lump Sum $1,500**

3. Lump Sum Mobilization Lump Sum $12,000***

4. Lump Sum Clearing and Grubbing (Non-
Structural Demolition and Removal) Lump Sum $

5. Lump Sum
Storm Water Pollution Prevention
Plan (SWPPP) and Fugitive Dust
Control Plan (FDCP) Preparation
Lump Sum $

6. Lump Sum
Storm Water Pollution Prevention
Plan (SWPPP) and Best
Management Practices (BMP’s)
Implementation
Lump Sum $

7. 110 LF Sawcut Linear Foot $

8. 28 TON Aggregate Base (Class II) Ton $

9. 820 SF Concrete Surface and Footings Square Foot $

10. 2 EA Trench Drain Connection Each $

11. Lump Sum Re-Route Existing
Electrical/Plumbing on Wall Lump Sum $

12. Lump Sum Surface Mounted Maintenance Lift Lump Sum $

13. Lump Sum Wall Cleaning and Painting Lump Sum $
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

5 670645v1

TOTAL NET BID AMOUNT $
The Total Net Bid Amount is

____________________________________________Dollars and ___________________ Cents.

Completion of Bid Proposal Form to be Eligible for Award. Bidders must bid all bid items (including any Alternates). The Bidder may be deemed non-responsive and ineligible for award in the event Bidder fails to initial this paragraph on the line provided and completely fill in this Bid Proposal Form including, without limitation, all dollar amounts and information called for on this Bid Proposal Form. By his or her initials to the right hereof, Bidder represents he or she has read and understands the consequences of not completely filling in this Bid Proposal Form.

Initial

*This item has been determined to be $25,000 as noted in the “Explanation of Bid Items,” page 90 and in the General Conditions, page 56.

**This item has been determined to be $1,500 as noted in the “Explanation of Bid Items”, page 90.

***This item has been determined to be $12,000 as noted in the “Explanation of Bid Items”, page 91.

The Bid Prices set forth herein shall include any and all applicable taxes.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

6 670645v1
BIDDER’S NAME:
(Submit with Bid Proposal)

TIME OF COMPLETION/LIQUIDATED DAMAGES

The Contractor shall diligently prosecute the work to completion for all bid items before the expiration of TWO HUNDRED FORTY (240) calendar days from the date of the Notice to Proceed.

It is agreed that the Contractor shall be liable for and shall pay to the City, as fixed, and agreed, liquidated damages, and not as a penalty, the sum of FIVE HUNDRED DOLLARS ($500) per day for each calendar day of delay in completion of the work from the date for completion as specified herein or in any written extension of time granted by the City.

NOTE: The following shall apply to all bid items:

TIME OF COMPLETION AS SPECIFIED WILL BE ENFORCED.

LIQUIDATED DAMAGES WILL BE DEDUCTED FROM PAYMENTS.

ADDENDA

The City makes a concentrated effort to ensure any addenda issued relating to these Specifications are distributed to all interested parties. It shall be the Bidder’s responsibility to inquire as to whether any addenda to the Specifications have been issued. Upon issuance by the City, all Addenda are part of the Bid Proposal. Signing the Bid Proposal on the signature page thereof shall also constitute signature on all Addenda.

PRECEDENCE OF BID PRICES

In the event of discrepancies between the bid total, summaries of totals and unit price extensions, the unit price correctly extended will control over the summaries of totals, and the summaries of totals correctly added will control over the total, whether the summaries of totals are extended unit prices or lump sums.

RIGHT TO REJECT ANY AND/OR ALL BIDS

The City reserves the right to reject any and all bids.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

7 670645v1
BIDDER’S NAME:
(Submit with Bid Proposal)

TIME PERIOD TO AWARD/REJECT BIDS

The undersigned Bidder agrees that the City may have SIXTY -FOUR (64) DAYS from the date bids are opened to accept or reject this Bid Proposal. It is further understood that if the Bidder to whom any award is made fails to enter into a Contract as provided in the Specifications, award may be made to the next lowest responsive and responsible Bidder, who shall be bound to perform as if he/she had received the award in the first instance. No Bid Proposal may be withdrawn prior to award within that time.

AWARD OF CONTRACT

When bids are submitted to the Council, the award will be made to the lowest responsive and responsible Bidder, as determined at City’s sole discretion, subject to the right to reject any and all bids.

MINOR IRREGULARITIES

The City reserves the right to waive any informality or minor irregularity that does not have a monetary consideration when it is in the best interest of the public and of the City to do so. A discrepancy that offers a Bidder an unfair advantage may cause the bid to be nonresponsive.

CITY ENGINEER’S QUANTITY ESTIMATE

All bids will be compared with the City Engineer’s Estimate of the quantities of work to be done.

TIEBREAKER

In the event a tiebreaker is needed to establish the lowest responsive and responsible Bidder, the City shall, unless otherwise agreed upon by all participating parties, utilize a coin toss as a tiebreaker to be administered by a third party chosen by mutual consent of the participants.

Such coin toss shall take place within 7 working days from the date of bid opening. If the City determines that a tiebreaker is necessary, each applicable Bidder agrees to participate or to indemnify the City in any litigation resulting from the utilization of the tiebreaker.

If a Bidder
refuses to timely participate, the City shall conduct the coin toss in a manner determined by the City to be fair to all and the results of such coin toss shall be final.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

8 670645v1

BIDDER’S NAME:
(Submit with Bid Proposal)

BID DEPOSIT

Accompanying this bid proposal, if paper copy, is a Bid Deposit in the amount of TEN PERCENT (10%) OF THE TOTAL NET BID AMOUNT (or, in bids with Add Alternates, the highest possible combination of the Base Bid plus Add Alternates) in the following form:

[ ] Certified Check [ ] Bidder’s Bond
[ ] Cashier’s Check [ ] Irrevocable Letter of
Credit
[ ] Certificate of Deposit [ ] Annual Bidder’s Bond

Note: Company Checks are NOT acceptable

Copies of Bid Deposits may be submitted electronically, with the exception of a certified or cashier’s check, which must be brought to the Purchasing Manager’s office and labeled accordingly with bid number prior to the bid opening.

Bid Deposit is deposited by the undersigned Bidder with the City of Fresno as a guarantee that the Bidder, if awarded all or part of the Contract, will, within 15 calendar days from the date the Notice of Award is mailed to the Bidder, execute and return a Contract furnished by the City. If the Deposit is in the form of an Annual Bidder’s Bond, the bond must be heretofore registered with the Purchasing Manager and must be in the amount of not less than the greater of TEN PERCENT (10%) of the Total Net Bid Amount or TEN PERCENT (10%) of the highest possible combination of the Base Bid plus Add Alternates.

Such Deposit is made with the understanding that failure to execute such Contract will result in damage to the City, that the amount of such damage would be difficult to determine and that in the event of such default said Deposit shall become the property of the City; or, if a Bidder’s Bond is deposited, the amount of the obligation thereof, but not more than the above stated amount, shall thereupon be due and payable to the City of Fresno as liquidated damages for such default, payment of said amount to be the joint and several obligation of the Bidder and the corporate surety.

A bid without a proper Bid Deposit will be automatically rejected.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

9 670645v1

BIDDER’S NAME:
(Submit with Bid Proposal)

CONTRACTOR’S LICENSE

The undersigned Bidder holds a valid Class State of California Contractor’s License. The License Number is and was issued on .

Expiration date: .

BUSINESS LICENSE

( ) The undersigned bidder has a current City of Fresno Business License Number: .

If the successful bidder does not have a City of Fresno Business license, he/she shall obtain such a license prior to the issuance of a Notice to Proceed for the Work and maintain in effect throughout the term of this Contract.

DEPARTMENT OF INDUSTRIAL RELATIONS (DIR)

Registration Number: and Expiration Date:

CALIFORNIA LABOR CODE SECTION 1777.5

PLEASE ANSWER YES OR NO: Was the undersigned Bidder in the last six months determined to have willfully failed to comply with the provisions of California Labor Code Section 1777.5 relating to apprentices on Public Works?

YES NO

SUBLETTING OR ASSIGNING THE CONTRACT

Pursuant to Required Contract Provisions Federal -Aid Construction Contracts, Appendix C, the Contractor shall perform with its own organization Contract work amounting to not less than 30 percent of the original total Contract Price (i.e., the total net bid amount) and not less than 30 percent of each possible combination of the Base Bid plus Add Alternate(s), if applicable, excluding specialty items designated by the City on the bid proposal.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

10 670645v1

BIDDER’S NAME:
(Submit with Bid Proposal)

LIST OF SUBCONTRACTORS

Pursuant to the provisions of California Public Contract Code sections 4100 to 4113 inclusive, the undersigned hereby designates below, for the Project, opposite various portions of work, the names, locations and license number of the places of business of each Subcontractor who will perform work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor’s total bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one- half of 1 percent of the prime contractor’s total bid or ten thousand dollars ($10,000), whichever is greater. All work not listed below shall be performed by the undersigned Bidder. It is understood that the Bidder, if awarded the Contract, shall not substitute any Subcontractor in place of the Subcontractors herein designated, or sublet or subcontract any of the work as to which a Subcontractor is not herein designated, without the written consent of the City. The subletting or subcontracting of any work for which there was no Subcontractor designated in the original bid may be permitted only in case of public emergency or necessity, and only after the City Council makes findings in a Resolution setting forth facts constituting the emergency or necessity.

List one firm only for each portion of work.

DIR
NAME AND LICENSE NUMBER LOCATION WORK TO BE SUBLET REGISTRATION #

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

11 670645v1
BIDDER’S NAME:
(Submit with Bid Proposal)

CERTIFICATE FROM COMPTROLLER

The Bidder certifies under penalty of perjury under the laws of the State of California that his or her business or the corporation is not listed on the Comptroller General's list of ineligible bidders/contractors.

– State of , County of
I, , being first duly sworn, do hereby state that
(Name of Affiant)
I am of
(Capacity) (Name of Firm, Partnership or Corporation)
whose business is
and who resides at
and that
(Give names of all persons, firms, or corporations interested in the bid) is/are the only person(s) with me in the profits of the herein contained Contract; that the Contract is made without any connection or interest in the profits thereof with any persons making any bid or Bid for said Work; that the said Contract is on my part, in all respects, fair and without collusion or fraud, and also that no members of the Board of Trustees, head of any department or bureau, or employee therein, or any employee of the City, is directly or indirectly interested therein.

Signature of Affiant Date
Sworn to before me this day of , 20 .

Notary public My commission expires – Seal

The above Certification is part of the Bid Proposal. Signing this Bid Proposal on the signature page thereof shall also constitute signature of this Certification. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

12 670645v1
BIDDER’S NAME:
(Submit with Bid Proposal)

NON-COLLUSION AFFIDAVIT
In accordance with Title 23 United States Code, Section 112 and Public Contract Code, Section 7106, the Bidder declares under penalty of perjury under the laws of the State of California that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other Bidder, or to secure any advantage against the City of anyone interested in the proposed Contract; that all statements contained in the Bid Proposal are true; and, further, that the Bidder has not, directly or indirectly, submitted his/her bid price or any breakdown thereof, or the contents thereof, or divulged information or date relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

The above Noncollusion Affidavit is part of the Bid Proposal. Signing this Bid Proposal on the signature page thereof shall also constitute signature of this Noncollusion Affidavit.

Bidders are cautioned that making a false declaration may subject the certifier to criminal prosecution.

This affidavit is to be filled out and executed by the Bidder; if a corporation makes the bid, then by its properly executed agent. The name of the individual swearing to the affidavit should appear on the line marked “Name of Affiant.” The affiant’s capacity, when a partner or officer of a corporation, should be inserted on the line marked “Capacity.” The representative of the Bidder should sign his or her individual name at the end, not a partnership or corporation name, and swear to this affidavit before a notary public, who must attach his or her seal. - State of , County of I, , being first duly sworn, do hereby state that (Name of Affiant)
I am of
(Capacity) (Name of Firm, Partnership or Corporation) whose business is
and who resides at
and that
(Give names of all persons, firms, or corporations interested in the bid) is/are the only person(s) with me in the profits of the herein contained Contract; that the Contract is made without any connection or interest in the profits thereof with any persons making any bid or Bid for said Work; that the said Contract is on my part, in all respects, fair and without collusion or fraud, and also that no members of the Board of Trustees, head of any department or bureau, or employee therein, or any employee of the City, is directly or indirectly interested therein.

Signature of Affiant Date

Sworn to before me this day of , 20 .

Notary public My commission expires Seal

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

13 670645v1

BIDDER’S NAME:
(Submit with Bid Proposal)

UPDATE OF STATEMENT OF QUALIFICATIONS

TO: Purchasing Manager, City of Fresno

The undersigned Bidder filed with the Purchasing Manager of the City of Fresno a STATEMENT OF QUALIFICATIONS on , 20 . The Statement is valid for one year and must be refiled after that time.

In connection with the submission of a bid for this project, it is desired to advise the City regarding any changes in the information contained in the STATEMENT and its schedules or attachments.

The Contractor hereby declares under penalty of perjury under the laws of the State of California that the information contained in the STATEMENT OF QUALIFICATIONS (and its schedules and attachments) currently on file with the City of Fresno is correct and complete, except as stated below:

(If the information is all correct and complete, state “No Change.” Otherwise, indicate the portion of the STATEMENT involved and the nature of the change or correction.

Attach additional sheets if necessary.)

The above Statement is part of the Bid Proposal. Signing this Bid Proposal on the signature page thereof shall also constitute signature of this Statement.

Bidders are cautioned that making a false declaration may subject the certifier to criminal prosecution.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

14 670645v1

BIDDER’S NAME:
(Submit with Bid Proposal)

NON-DISCRIMINATION CLAUSE

1. During the performance of this contract, contractor and its subcontractors shall not unlawfully discriminate against any employee or applicant for employment because of sex, race, religion, color, national origin, ancestry, physical disability (including HIV and AIDS), mental disability, medical condition (cancer), marital status, age (over 40) or denial of family care leave. Contractors and subcontractors shall insure that the evaluation and treatment of their employees and applicants for employment are free of such discrimination and harassment.

Contractors and subcontractors shall comply with the provisions of the Fair Employment and Housing Act (Government Code Section 12900 (a-f) et seq.) and the applicable regulations promulgated thereunder (California Administrative Code, Title 2, Section 7285.0 et seq.).

The applicable regulations of the Fair Employment and Housing Commission implementing Government Code, Section 12900 (a-f), set forth in Chapter 5 of Division 4 of Title 2 or the California Administrative Code are incorporated into this contract by reference and made a part hereof as if set forth in full. Contractor and its subcontractor shall give written notice of their obligations under this clause to labor organizations with which they have a c ollective bargaining or other agreement.

2. This contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the contract.

THE UNDERSIGNED CERTIFIES THAT THE CONTRACTOR WILL COMPLY WITH THE ABOVE REQUIREMENTS.

CONTRACTOR OR
SUBCONTRACTOR NAME:

CERTIFIED BY:

NAME: TITLE:

SIGNATURE: DATE:

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

15 670645v1

BIDDER’S NAME:
(Submit with Bid Proposal)

NATIONAL TARGETED HIRING

Fresno Municipal Code Section 4-117 NATIONAL TARGETED HIRING IN CONTRACTS FOR PUBLIC WORKS CONSTRUCTION provides for targeted hiring for journeymen and apprentices residing in economically disadvantaged areas. That applicable public work of improvement contracts are paraphrased as follows:

Except for those contracts funded by the federal or state government when such funding would be jeopardized because of targeted hiring, the Council obligates any Contractor on any public work of improvement in excess of $200,000 to hire journeymen and apprentices residing in economically disadvantaged areas as set forth herein. For the purposes of this section, “National Targeted Worker” shall mean a person residing in a zip code that includes a census tract or portion thereof in which the median annual household income is less than $35,000 per year, as measured and reported by the U.S. Census Bureau in the most recent U.S. Census.

The selected Contractor shall diligently adhere to the National Targeted Worker participation level for the duration of Agreement.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

16 670645v1
BIDDER’S NAME:
(Submit with Bid Proposal)

CERTIFICATION FOR LOCAL PREFERENCE

We certify that we qualify as a local business pursuant to Fresno Municipal Code Section 4- 108(d), as revised.

Location of Business: Primary Office [ ]
Please provide street address Branch Office [ ] (No PO Box) (Please mark as applicable)

Address:

Phone:

And:

The undersigned Bidder hereby declares under penalty of perjury under the laws of the State of California that the information contained on this CERTIFICATION FOR LOCAL PREFERENCE is correct and complete.

The above Certification is part of the Bid Proposal. Signing this Bid Proposal on the signature page thereof shall also constitute signature of this Certification.

Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution
.

Bidder will self-perform at least 30% of the contract amount with residents of Fresno County

Not
applicable.

And:

Bidder affirms at least 50% of the total value of the contract will be performed by either the Bidder or subcontractors meeting the local preference criteria.

Not applicable.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

17 670645v1
BIDDER’S NAME:
(Submit with Bid Proposal)

SIGNATURE PAGE

By my signature on this Bid Proposal I certify, under penalty of perjury under the laws of the State of California, that the foregoing statements, pages 2 through 16, and those contained herein are true and correct.

BID SUBMITTED BY:
(Please follow the instructions for each line, as explained below.)

(1) ( ) ( )
Bidding Firm Phone Fax

(2) [ ] Corp: State of Incorporation:
[ ]
Individual
[ ] Partner
[ ] Other: _______________________

(3)
Business Address

City State Zip Code

(4) By:

Signature of Authorized Person

Type or Print Name of Authorized Person and Title

Federal Tax I.D. No.: Date:

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

18 670645v1
BIDDER’S NAME:
(Submit with Bid Proposal)

INSTRUCTIONS FOR SIGNATURE PAGE
LINE 1: The name of the Bidder must be the same as that under which a license is issued, if a license is required. If the Bidder is a corporation, enter the exact name of the corporation under which it is incorporated; if Bidder is an individual, enter name; if Bidder is an individual operating under a trade name, enter name and dba (trade name in full); if a partnership, enter the correct trade style of the partnership; if a joint venture, enter exact names of entities joining in the venture.

LINE 2: Identify here the character of the name shown under (1), i.e., corporation (including state of incorporation), individual, partnership, or joint venture.

LINE 3: Enter the address to which all communications and notices regarding the Bid Proposal and any Contract awarded thereunder are to be addressed.

LINE 4: (a) If the Bidder is a corporation, the Bid Proposal must be signed by an officer or employee authorized to sign Contracts on behalf of the corporation evidenced by inclusion of one of the following certified by the secretary of the corporation, authorizing the officer or employee to sign contracts (sample certification attached): a copy of the Articles of Incorporation, a copy of the Bylaws, a copy of the Board Resolution or Minutes.
(b) If Bidder is an individual, he/she must sign the Bid Proposal, or if the Bid Proposal is signed by an employee or agent on behalf of the Bidder, a copy of a power of attorney must be on file with the City of Fresno prior to the time set for the opening of the bids or must be submitted with the Bid Proposal.
(c) If the Bidder is a partnership, the Bid Proposal must be signed by all general partners; or by a general partner(s) authorized to sign Contracts on behalf of the partnership evidenced by inclusion of either a copy of the Partnership Agreement or a recorded Statement of Partnership.
(d) If the Bidder is a joint venture, the Bid Proposal must be signed by all joint venturers; or by a joint venture(s) authorized to sign Contracts on behalf of the joint venture evidenced by inclusion of either a copy of the Joint Venture Agreement or a recorded Statement of Joint Venture; and if the joint venture(s) is a corporation or a partnership signing on behalf of the Joint Venture, then Paragraphs (a) and (c) above apply respectively.

Where Bidder is a partnership or a corporation, the names of all other general partners, or the names of the president and secretary of the corporation, and their business addresses must be typewritten below:

NAME ADDRESS

NOTE: All addresses must be complete with street number, City, State and Zip Code.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

19 670645v1

SAMPLE CERTIFICATION

I,_______________________________________________________, certify that I am the secretary Name

of the corporation named herein; that ______________________ who signed this Name

Bid Proposal on behalf of the corporation, was then ____ of Title

said corporation; that said Bid Proposal is within the scope of its corporate powers and was duly signed for and on behalf of said corporation by authority of its governing body, as evidenced by the attached true and correct copy of the _________________________________ Name of Corporate Document

By:

Name:

Title: Secretary

Date:

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

20 670645v1

SUBCONTRACTOR INFORMATION - DETAIL
(To be submitted by the three lowest Bidders within
one working day from the date of the bid opening.)
Complete and attach as many sheets as necessary.

Name of Project:

Date bids were submitted:

Subcontractor's Name: City
Work to be performed on Project:

California State License No: Class:

Expiration Date:

Name of License Bonding Company:

Bond Number:

Subcontractor's Name: City
Work to be performed on Project:

California State License No: Class:

Expiration Date:

Name of License Bonding Company:

Bond Number:

Subcontractor's Name: City
Work to be performed on Project:

California State License No: Class:

Expiration Date:

Name of License Bonding Company:

Bond Number:

Subcontractor's Name: City
Work to be performed on Project:

California State License No: Class:

Expiration Date:

Name of License Bonding Company:

Bond Number:

Signed: , 20
Name of Bidder:

Contractor's License Number:

SIGNED UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE STATE OF CALIFORNIA BY:

Name of Authorized Official:

Signature:

Date: _____
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

21 670645v1

ATTACHMENTS
(To be filed after award by successful bidder)

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

22 670645v1

SAMPLE CONTRACT

CITY OF FRESNO, CALIFORNIA

PUBLIC WORK OF IMPROVEMENT

THIS CONTRACT (Contract) is made and entered into by and between CITY OF FRESNO, a California municipal corporation (City), and [Contractor Name], [Legal Identity] (Contractor) as follows:

1. Contract Documents. The “Notice Inviting Bids,” “Instructions to Bidders,” “Bid Proposal,” and the “Specifications” including “General Conditions,” “Special Conditions,” and “Technical Specifications” for the following: [Title] (Bid File No. [Bid File No.]) [Alternates (if any)] copies of which are annexed hereto, together with all the drawings, plans, and documents specifically referred to in said annexed documents, including Performance and Payment Bonds, if required, and are hereby incorporated into and made a part of this Contract, and shall be known as the Contract Documents.

2. Price and Work . For the monetary consideration of [Written Dollar Amount] dollars and [Written Cents Amount] cents ($[Amount]), as set forth in the Bid Proposal, Contractor promises and agrees to perform or cause to be performed, in a good and workmanlike manner, under the direction and to the satisfaction of the City’s “Engineer,” and in strict accordance with the Specifications, all of the work as set forth in the Contract Documents.

3. Payment. City accepts Contractor’s Bid Proposal as stated and agrees to pay the consideration stated, at the times, in the amounts, and under the conditions specified in the Contract Documents. The Contractor agrees to accept electronic payment from the City

4. Indemnification. To the furthest extent allowed by law, including California Civil Code section 2782, CONTRACTOR shall indemnify, defend and hold harmless CITY and each of its officers, officials, employees, agents, and volunteers from any and all claims, demands, actions in law or equity, loss, liability, fines, penalties, forfeitures, interest, costs including legal fees, and damages (whether in contract, tort, or strict liability, including but not limited to personal injury, death at any time, property damage, or loss of any type) arising or alleged to have arisen directly or indirectly out of (1) any voluntary or involuntary act or omission, (2) error, omission or negligence, or (3) the performance or non - performance of this Contract . CONTRACTOR'S obligations as set forth in this section shall apply regardless of whether CITY or any of its officers, officials, employees, agents, or volunteers are passively negligent, but shall not apply to any loss, liability, fines, penalties, forfeitures, costs or damages caused by the active or sole negligence, or the willful misconduct, of CITY or any of its officers, officials, employees, agents or volunteers.

To the fullest extent allowed by law, and in addition to the express duty to indemnify, CONTRACTOR, whenever there is any causal connection between the CONTRACTOR’s performance or non-performance of the work or services required under this Contract and any claim or loss, injury or damage of any type, CONTRACTOR expressly agrees to undertake a duty to defend CITY and any of its officers, officials, employees, agents, or volunteers, as a separate duty, independent of and broader that the duty to indemnify. The duty to defend as herein agreed to by CONTRACTOR expressly includes all costs of litigation, attorneys fees, settlement costs and expenses in connection with claims or litigation, whether or not the claims are valid, false or groundless, as long as the claims could be in any manner be causally connected to CONTRACTOR as reasonably determined by CITY.

Upon the tender by CITY to CONTRACTOR, CONTRACTOR shall be bound and obligated to assume the defense of CITY and any of its officers, officials, employees, agents, or volunteers, including the a duty to settle and otherwise pursue settlement negotiations, and shall pay, liquidate, discharge and satisfy any and all settlements, judgments, awards, or expenses resulting from or arising out of the claims without reimbursement from CITY or any of its officers, officials, employees, agents, or volunteers.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

23 670645v1
It is further understood and agreed by CONTRACTOR that if CITY tenders a defense of a claim on behalf of CITY or any of its officers, officials, employees, agents, or volunteers and CONTRACTOR fails, refuses or neglects to assume the defense thereof, CITY and its officers, officials, employees, agents, or volunteers may agree to compromise and settle or defend any such claim or action and CONTRACTOR shall be bound and obligated to reimburse CITY and its officers, officials, employees, agents, or volunteers for the amounts expended by each in defending or settling such claim, or in the amount required to pay any judgment rendered therein.

The defense and indemnity obligations set forth above shall be direct obligations and shall be separate from and shall not be limited in any manner by any insurance procured in accordance with the insurance requirements set forth in this Contract. In addition, such obligations remain in force regardless of whether CITY provided approval for, or did not review or object to, any insurance CONTRACTOR may have procured in accordance with the insurance requirements set forth in this Contract. The defense and indemnity obligations shall arise at such time that any claim is made, or loss, injury or damage of any type has been incurred by CITY, and the entry of judgment, arbitration, or litigation of any claim shall not be a condition precedent to these obligations.

The defense and indemnity obligations set forth in this section shall survive termination or expiration of this Contract.

If CONTRACTOR should subcontract all or any portion of the work to be performed under this Contract, CONTRACTOR shall require each subcontractor to Indemnify, hold harmless and defend CITY and each of its officers, officials, employees, agents and volunteers in accordance with the terms as set forth above.

5. Trench Shoring Detailed Plan. Contractor acknowledges the provisions of Section 6705 of the California Labor Code and, if said provisions are applicable to this Contract, agrees to comply therewith.

6. Worker’s Compensation Certification. In compliance with the provisions of Section 1861 of the California Labor Code, Contractor hereby certifies as follows:

I am aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for worker’s compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of work of this Contract and will make my subcontractors aware of this provision.

[Signatures follow on the next page.]

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

24 670645v1
IN WITNESS WHEREOF, the parties have executed this Contract on the day and year here below written, of which the date of execution by City shall be subsequent to that of Contractor’s, and this Contract shall be binding and effective upon execution by both parties.

[Contractor Name],
[Legal Identity]

By:

Name:
(Type or print written signature.)

Title:
(If corporation or LLC, Board Chair,
Pres. or Vice Pres.)

Dated:

By:

Name:
(Type or print written signature.)

Title:
(If corporation or LLC, CFO, Treasurer,
Secretary or Assistant Secretary)

Dated:

CITY OF FRESNO,
a California municipal corporation

By:
[Name], [Title]
[Department]

Dated:

ATTEST:

AMY K. ALLER
Interim City Clerk

By:

Deputy

No signature of City Attorney required. Standard
Document #DPW 23.0 has been used without
modification as certified by the undersigned.

By:
[City Certifier Name]
[City Certifier Title]
[Department] City address:

City of Fresno
Attention: [Name], [Title]
[Street Address]
Fresno, CA [Zip]

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

25 670645v1
Job of File No.

Name or Title of Job.

Department No.

FAIR EMPLOYMENT PRACTICES COMPLIANCE REPORT

1. Name and Address of Contractor PRIME [ ] SUB [ ]
Yes No

2. Have you established a company-wide employment policy to assure that equal employment opportunity is given to all persons without regard to race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation or on any other basis prohibited by law?

3. Have you notified all supervisors, foreman and other personnel officers in writing of the contents of the anti-discrimination clause and their responsibilities under it?

4. Have notices setting forth the provisions of the Fair Employment Practice Section used in City of Fresno Contracts been posted in conspicuous places available to employees and applicants for employment on this Project?

5. Have each of the Company’s employee referrals including unions, employment agencies, advertisements, Department of Employment, etc., been notified of the contents of the anti-discrimination clause?

5a. Has this been done in writing?

6. Has each employee referral advised the Company that it will refer all qualified applicants for employment to the Company without regard to race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation or on any other basis prohibited by law?

7. Has a collective bargaining agreement or other contract or understanding been made with a labor union (or unions) which covers the performance of any work or supplying of any materials under this Contract?

7a. Do you operate under an Association Master Labor Agreement? If your answer is “yes”, state the name of the Association.

Are copies of those agreements on file with the City? [ ] Yes [ ] No With whom?

7b. If you do not operate under an Association Master Labor Agreement then indicate what steps you have taken to attempt to develop an agreement which will:

(1) Spell out responsibilities for nondiscrimination in hiring, referral, upgrading and training. (2) Otherwise implement an affirmative anti-discrimination program in terms of the unions’ specific area of skill and geography, to the end that qualified minority workers will be available and given an equal opportunity for employment.

In addition, if you have reached such an agreement, attach a copy of the provisions thereof which bear on (1) and (2) above.

8. Have you encountered any opposition to the anti-discrimination clause by individuals, firms or organizations? If your answer to No. 8 is “Yes”, identify the individual, firm or organization and briefly describe the nature of the opposition.

9. Check principal sources DEPT OF EMP. EMP. AGENCIES DIRECT HIRING UNION OTHER for employee referrals.

15. Const. Workers

b. Other Workers

10. The following person or persons are responsible for determining whom to hire or whether or not to hire workers on this particular Project:

QUESTIONS 11 THROUGH 13 TO BE FILLED OUT BY PRIME CONTRACTOR ONLY:

11. Have you awarded any subcontracts for work covered by your Contract?

12. Have the anti-discrimination provisions been included in each of said subcontracts?

13. Have all such Subcontractors been instructed to file compliance reports and have they been furnished with report forms?

14. Dated this day of , 20_ ,
at
(City and State)

15. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.
(Contractor)

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

26 670645v1

FAIR EMPLOYMENT PRACTICES COMPLIANCE REPORT
(continued)

INSTRUCTIONS TO CONTRACTORS
This Compliance Report is required by the Fair Employment Practices provisions of City of Fresno Contracts for the supplying of work, materials, or both.

This report is to be completed in its entirety for each prime Contract and all first tier subcontracts. The reports shall be submitted to the City after award of the Contract and prior to Notice to Proceed.

Additional sheets of paper may be attached if necessary to submit explanations or further information.

If the answers to any of the questions indicate non- compliance with the anti -discrimination provision of the Contract, a brief explanation of such answer must accompany the report.

It shall be the further responsibility of the Contractor to keep the information contained in the compliance report current and should there be changes in the Contractor’s agreements with employee referrals, including unions or in the individuals responsible for hiring, etc., which would change the answers submitted by the Contractor in his or her original questionnaire, the Contractor should file a supplementary report containing revised answers to the applicable questions. Such changes from the original report are to be submitted in duplicate.

Upon completion of the Contract the Contractor must submit a final statement of compliance including statements that the original compliance report was submitted, that any changes in the original report were reported, and that the requirements of the Fair Employment Practices section were complied with during the Contract. If such a statement cannot be submitted in its entirety, a statement along the same lines with the exceptions noted must be submitted.

The City may require submission of additional information or reports on compliance at any time.

FINAL STATEMENT OF FAIR EMPLOYMENT PRACTICES COMPLIANCE

Name of Job or Contract

The undersigned is responsible to see that the Contractor has complied with the Fair Employment Practices section of the City of Fresno Contract indicated above. The original compliance report was submitted and no changes or additions to the original report became known to the Contractor or the undersigned except as noted below. The Contractor, in performance of the Contract, to the best of my knowledge, complied with said section of the Contract, except as noted below.

Dated this day of , 20 , at
City and State

Changes or additions to the original compliance report
City

By

Title
Deviations from compliance

Contractor

By

Title
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

27 670645v1 1 of 2 Payment Bond 06-2025

PAYMENT BOND

PUBLIC WORK

KNOW ALL PERSONS BY THESE PRESENTS: That [NAME OF CONTRACTOR] as Principal (the Principal) and

as Surety (the Surety) are held and firmly bound onto the City of Fresno and the State of California Department of Housing and Community Development (the Obligee) in the just and full sum of $[DOLLAR AMOUNT] lawful money of the United States of America (said sum being equal to [Select - 100% under $10M; 110% $10M and over] of the estimated amount payable by the terms of the hereinafter described contract), for the payment of which, well and truly to be made, we hereby bind ourselves and ours, and each of our, heirs, executors, administrators, successors, and assigns, jointly and severally firmly by these presents.

THE CONDITION OF THE ABOVE OBLIGATION IS SUCH, That
WHEREAS, the Principal has been awarded a contract for the following described work of improvement and is required by the Obligee to give this bond in connection with the execution of the written contract therefor (insert brief description of work of improvement):
[TITLE AND WORK]
(Bid File No. [BID FILE NO.]) [ALTERNATES (if any)]
NOW, THEREFORE, if the Principal or subcontractors of the Principal shall fail to pay any of the persons named in the Section 9100 of the Civil Code, or amounts due under the Unemployment Insurance Code with respect to work or labor performed by any such claimant, or prevailing wages due and penalties incurred pursuant to Sections 1774, 1775, 1813, or 1815 of the Labor Code, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Principal and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code, with respect to the work and labor, the Surety will pay for the same, in an amount not exceeding the sum specified above, and also, in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs, and reasonable expenses and fees, including reasonable attorney’s fees, incurred by the Obligee in successfully enforcing this obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered. The benefit of this bond shall inure to any of the persons named in Section 9100 of the Civil Code so as to give the right of action to those persons or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

No extension of time granted to the Principal and no change, alteration or addition in any of the terms of the contract or any of the contract documents or the work to be performed thereunder, whether made after notice or not, shall release or otherwise affect the obligations of the Surety hereunder, and the Surety waives notice of any such extension, change, alteration or addition. The Surety, by the execution of this bond, represents and warrants that this bond has also been duly executed by the Principal and proper authority, and the Surety hereby waives any defense which it might have by reas on of any failure of the Principal to execute or properly execute this bond.
[Signatures follow on the next page.]

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

28 670645v1

In witness whereof, this instrument has been duly executed by the Principal and the Surety above named, on the day of 20 .

[NAME OF CONTRACTOR]

PRINCIPAL SURETY

No signature of City Attorney required.

Standard Document #GSD-S 06-2025 has been
used without modification, as certified by the
undersigned.

By:

Name, Title

APPROVED
City Manager or designee

By:

Title:

Date:

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

29 670645v1

1 of 2 Performance Bond 06-2025

PERFORMANCE BOND

PUBLIC WORK

KNOW ALL PERSONS BY THESE PRESENTS: That [NAME OF CONTRACTOR] as Principal (the Principal) and _
_
as Surety (the Surety) are held and firmly bound onto the City of Fresno and the State of California Department of Housing and Community Development (the Obligee) in the just and full sum of $[DOLLAR AMOUNT] lawful money of the United States of America (said sum being equal to [Select - 100% under $10M; 110% $10M and over] of the estimated amount payable by the terms of the hereinafter described contract), for the payment of which, well and truly to be made, we hereby bind ourselves and ours, and each of our, heirs, executors, administrators, successors, and assigns, jointly and severally firmly by these presents.

THE CONDITION OF THE ABOVE OBLIGATION IS SUCH, That
WHEREAS, the Principal has been awarded a contract for the following described work of improvement and is required by the Obligee to give this bond in connection with the execution of the written contract therefor (insert brief description of work of improvement):
[TITLE AND WORK]
(Bid File No. [BID FILE NO.]) [ALTERNATES (if any)]
NOW, THEREFORE, if the Principal shall well and truly do and perform each and all of the covenants, conditions, and agreements of said contract on the Principal’s part to be done and performed, and any and all alterations thereof made as therein provided, at the time and in the manner therein specified, and shall indemnify and save harmless the Obligee, its officers, officials, agents, employees and volunteers, as therein stipulated, then this obligation shall be null and void; otherwise, it shall remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney’s fees, incurred by the Obligee in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

No extension of time granted to the Principal and no change, alteration or addition in any of the terms of the contract or any of the contract documents or the work to be performed thereunder, whether made after notice or not, shall release or otherwise affect the obligations of the Surety hereunder, and the Surety waives notice of any such extension, change, alteration or addition. The Surety, by the execution of this bond, represents and warrants that this bond has also been duly executed by the Principal and proper authority, and the Surety hereby waives any defense which it might have by reason of any failure of the Principal to execute or properly execute this bond.
[Signatures follow on the next page.]

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

30 670645v1

In witness whereof, this instrument has been duly executed by the Principal and the Surety above named, on the day of 20 .

[NAME OF CONTRACTOR]

PRINCIPAL SURETY

No signature of City Attorney required.

Standard Document #GSD-S 06-2025 has
been used without modification, as
certified by the undersigned.

By:

Name, Title

APPROVED
City Manager or designee

By:

Title:

Date:

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

31 670645v1

DIVISION II

GENERAL CONDITIONS

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

32 670645v1

DIVISION II

GENERAL CONDITIONS

DEFINITIONS (NONFEDERAL)

Wherever used in the Specifications, including the Instructions to Bidders and the Bid Proposal, or any of the Contract documents, the following words shall have the meaning herein given, unless the context requires a different meaning.

1. "Bidder" shall mean and refer to each person or other entity submitting a bid proposal, whether or not such person or entity shall become a Seller by virtue of award of a Contract by the Buyer.

2. California Building Code (CBC), Latest Edition; California Plumbing Code (CPC), Latest Edition; California Mechanical Code (CMC), Latest Edition; National Electrical Code (NEC), Latest Edition; California Fire Code (CFC), Latest Edition; California Health and Safety Code (as applicable). For purposes of this definition, “Latest Edition” shall mean the edition, and to the extent, adopted by the City through the City of Fresno Municipal Code.

3. “City,” "Buyer," “Procurement Specialist,” "Owner," "Vendee," "City of Fresno" shall each mean and refer to the City of Fresno, California.

4. "City Standard Specifications" - City of Fresno, Standard Specifications, Department of Public Works, dated May 2024, (a) https://www.fresno.gov/publicworks/developer-doorway/#tab-8

5. “Construction Manager” shall mean and refer to the Owner’s authorized representative at the Job Site, in responsible charge of administering the Contract. The Construction Manager has hired a construction management firm (“Project Manager”) which shall be the single point of contract for all correspondence, submittals, progress payment requests, and contacts (“Communications”) to and from the Contractor.

The Project Manager shall report any and all Communications with the Contract to the Construction Manager “Contract," "Contract Documents" shall mean and refer to these Specifications, including the Instructions to Bidders, the Bid Proposal, and any addenda thereto, the Agreement and all other standard Specifications, Buyer's Specifications and other papers and documents incorporated by reference into or otherwise referred to in any of the foregoing documents, whether or not attached thereto.

6. "Contract," "Contract Documents" shall mean and refer to these Specifications, including the Instructions to Bidders, the Bid Proposal and any addenda thereto, the Agreement and all other standard Specifications, Procurement Specialist's Specifications and other papers and documents incorporated by reference into or otherwise referred to in any of the foregoing documents, whether or not attached thereto.

7. “Contractor,” "Seller," "Vendor," "Supplier" shall each mean and refer to each person or other entity awarded a Contract hereunder and named or to be named in the Agreement with the Procurement Specialist to furnish the goods or services, or both, to be furnished under the Contract

8. "Council," "City Council" shall each mean and refer to the Council of the Buyer.

9. "Engineer," "City Engineer," shall mean and refer to the City Engineer and any duly authorized representative.

10. "Goods," "Merchandise" shall each mean and refer to the equipment, material, article, supply, or thing to be furnished by the Seller under the Contract.

11. "Purchasing Manager" shall mean and refer to the Purchasing Manager of the Buyer or Procurement Specialist.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

33 670645v1

12. "Specifications" shall mean and refer to all of the Contract Documents.

13. "State Standard Specifications" - State of California, Department of Transportation, Standard Specifications, Latest Edition.

14. “Working day” shall mean and refer to City regular business day.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

34 670645v1

INSURANCE REQUIREMENTS

(a) Throughout the life of this Agreement, CONTRACTOR shall pay for and maintain in full force and effect all insurance as required herein with an insurance company(ies) either (i) admitted by the California Insurance Commissioner to do business in the State of California and rated no less than “A- VII” in the Best’s Insurance Rating Guide, or (ii) as may be authorized in writing by CITY'S Risk Manager or his/her designee at any time and in his/her sole discretion. The required policies of insurance as stated herein shall maintain limits of liability of not less than those amounts stated therein. However, the insurance limits available to CITY, its officers, officials, employees, agents and volunteers as additional insureds, shall be the greater of the minimum limits specified therein or the full limit of any insurance proceeds to the named insured.
(b) If at any time during the life of the Agreement or any extension, CONTRACTOR or any of its subcontractors fail to maintain any required insurance in full force and effect, all services and work under this Agreement shall be discontinued immediately, and all payments due or that become due to CONTRACTOR shall be withheld until notice is received by CITY that the required insurance has been restored to full force and effect and that the premiums therefore have been paid for a period satisfactory to CITY. Any failure to maintain the required insurance shall be sufficient cause for CITY to terminate this Agreement. No action taken by CITY pursuant to this section shall in any way relieve CONTRACTOR of its responsibilities under this Agreement. The phrase “fail to maintain any required insurance” shall include, without limitation, notification received by CITY that an insurer has commenced proceedings, or has had proceedings commenced against it, indicating that the insurer is insolvent.
(c) The fact that insurance is obtained by CONTRACTOR shall not be deemed to release or diminish the liability of CONTRACTOR, including, without limitation, liability under the indemnity provisions of this Agreement. The duty to indemnify CITY shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by CONTRACTOR. Approval or purchase of any insurance contracts or poli cies shall in no way relieve from liability nor limit the liability of CONTRACTOR, vendors, suppliers, invitees, contractors, sub- contractors, subcontractors, or anyone employed directly or indirectly by any of them.

Coverage shall be at least as broad as:

1. The most current version of Insurance Services Office (ISO) Commercial General Liability Coverage Form CG 00 01, providing liability coverage arising out of your business operations. The Commercial General Liability policy shall be written on an occurrence form and shall provide coverage for “bodily injury,” “property damage” and “personal and advertising injury” with coverage for premises and operations (including the use of owned and non- owned equipment), products and completed operations, and contract ual liability (including, without limitation, indemnity obligations under the Agreement) with limits of liability not less than those set forth under “Minimum Limits of Insurance.”

2. The most current version of ISO *Commercial Auto Coverage Form CA 00 01, providing liability coverage arising out of the ownership, maintenance or use of automobiles in the course of your business operations. The Automobile Policy shall be written on an occurrence form and shall provide coverage for all owned, hired, and non-owned automobiles or other licensed vehicles (Code 1- Any Auto).

3. Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

35 670645v1

MINIMUM LIMITS OF INSURANCE

CONTRACTOR shall procure and maintain for the duration of the contract insurance with limits of liability not less than those set forth below. However, insurance limits available to CITY, its officers, officials, employees, agents and volunteers as additional insureds, shall be the greater of the minimum limits specified herein or the full limit of any insurance proceeds available to the named insured:

1. COMMERCIAL GENERAL LIABILITY
(i) $2,000,000 per occurrence for bodily injury and property damage; (ii) $2,000,000 per occurrence for personal and advertising injury; (iii) $4,000,000 aggregate for products and completed operations; and, (iv) $4,000,000 general aggregate applying separately to the work performed under the Agreement.

2. COMMERCIAL AUTOMOBILE LIABILITY
$1,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation Insurance as required by the State of California with statutory limits and EMPLOYER’S LIABILITY with limits of liability not less than:
(i) $1,000,000 each accident for bodily injury;
(ii) $1,000,000 disease each employee; and,
(iii) $1,000,000 disease policy limit.

4. BUILDERS RISK (Course of Construction) insurance in an amount equal to the completed value of the project with no coinsurance penalty provisions. (Only required if the project includes new construction of a building, or renovation of, or addition to, an existing building.)

5. CONTRACTORS’ POLLUTION LEGAL LIABILITY with coverage for bodily injury, property damage or pollution clean- up costs that could result from of pollution condition, both sudden and gradual. Including a discharge of pollutants brought to the work site, a release of pre-existing pollutants at the site, or other pollution conditions with limits of liability of not less than the following:

(i) $1,000,000 per occurrence; and,
(ii) $2,000,000 general aggregate per annual policy period.

(a) In the event this Agreement involves the transportation of hazardous material, either the Commercial Automobile policy or other appropriate insurance policy shall be endorsed to include Transportation Pollution Liability insurance covering materials to be transported by CONTRACTOR pursuant to the Agreement.

UMBRELLA OR EXCESS INSURANCE
In the event CONTRACTOR purchases an Umbrella or Excess insurance policy(ies) to meet the “Minimum Limits of Insurance,” this insurance policy(ies) shall “follow form” and afford no less coverage than the primary insurance policy(ies). In addition, such Umbrella or Excess insurance policy(ies) shall also apply on a primary and non- contributory basis for the benefit of the CITY, its officers, officials, employees, agents and volunteers.

DEDUCTIBLES AND SELF-INSURED RETENTIONS
CONTRACTOR shall be responsible for payment of any deductibles contained in any insurance FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

36 670645v1
policy(ies) required herein and CONTRACTOR shall also be responsible for payment of any self-insured retentions.

OTHER INSURANCE PROVISIONS/ENDORSEMENTS
(i) All policies of insurance required herein shall be endorsed to provide that the coverage shall not be cancelled, non-renewed, reduced in coverage or in limits except after thirty (30) calendar days written notice has been given to CITY, except ten (10) da ys for nonpayment of premium.

CONTRACTOR is also responsible for providing written notice to the CITY under the same terms and conditions. Upon issuance by the insurer, broker, or agent of a notice of cancellation, non -renewal, or reduction in coverag e or in limits, CONTRACTOR shall furnish CITY with a new certificate and applicable endorsements for such policy(ies). In the event any policy is due to expire during the work to be performed for CITY, CONTRACTOR shall provide a new certificate, and applicable endorsements, evidencing renewal of such policy not less than seven (7) calendar days following to the expiration date of the expiring policy.
(ii) The Commercial General, Pollution and Automobile Liability insurance policies shall be written on an occurrence form.
(iii) The Commercial General, Pollution and Automobile Liability insurance policies shall be endorsed to name City, its officers, officials, agents, employees and volunteers as an additional insured for all ongoing and completed operations. The Commercial Gener al endorsements must be as broad as that contained in ISO Forms: GC 20 10 11 85 or both CG 20 10 & CG 20 37. (iv) The Commercial General, Pollution and Automobile Liability insurance shall contain, or be endorsed to contain, that the CONTRACTORS’ insurance shall be primary to and require no contribution from the City. These coverages shall contain no special limitati ons on the scope of protection afforded to City, its officers, officials, employees, agents and volunteers. (v) If CONTRACTOR maintains higher limits of liability than the minimums shown above, City requires and shall be entitled to coverage for the higher limits of liability maintained by CONTRACTOR. (vi) Should any of these policies provide that the defense costs are paid within the Limits of Liability, thereby reducing the available limits by defense costs, then the requirement for the Limits of Liability of these policies will be twice the above stated limits.
(vii) All policies of insurance shall contain, or be endorsed to contain, a waiver of subrogation as to CITY, its officers, officials, agents, employees and volunteers. (viii) The Builder’s Risk Insurance shall have the policy endorsed to provide the City of Fresno to be named as a Loss Payee.

PROVIDING OF DOCUMENTS
CONTRACTOR shall furnish CITY with all certificate(s) and applicable endorsements effecting coverage required herein All certificates and applicable endorsements are to be received and approved by the CITY’S Risk Manager or his/her designee prior to CITY’S execution of the Agreement and before work commences. All non- ISO endorsements amending policy coverage shall be executed by a licensed and authorized agent or broker. Upon request of CITY, CONTRACTOR shall immediately furnish CITY with a complete copy of any insurance policy required under this Agreement, including all endorsements, with said copy certified by the underwriter to be a true and correct copy of the original policy. This requirement shall survive expiration or termination of this Agreement. All subcontractors working under the direction of CONTRACTOR shall also be required to provide all documents noted herein.

SUBCONTRACTORS
If CONTRACTOR subcontracts any or all of the services to be performed under this Agreement, CONTRACTOR shall require, at the discretion of the CITY Risk Manager or designee, subcontractor(s) FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

37 670645v1
to enter into a separate Side Agreement with the City to provide required indemnification and insurance protection. Any required Side Agreement(s) and associated insurance documents for the subcontractor must be reviewed and preapproved by CITY Risk Manager or designee. If no Side Agreement is required, CONTRACTOR will be solely responsible for ensuring that its subcontractors maintain insurance coverage at levels no less than those required by applicable law and is customary in the relevant industry.

PERFORMANCE AND PAYMENT BONDS
The Contractor shall provide two good and sufficient surety bonds from a corporate surety admitted by the California Insurance Commissioner to do business in the State of California, on forms as those provided by the City in these Specifications and approved by the City. (a) The “Payment Bond” shall be for not less than 100% under $10M; 110% $10M and over of the Contract price, to satisfy claims of material suppliers and of mechanics and laborers employed by Contractor on the work. The bond shall be maintained by the Contractor in full force and effect until the work is completed and accepted by the City, and until all claims for materials and labor are paid, and shall otherwise comply with Chapter 5, Title 3, Part 6, Division 4 of the California Civil Code. (b) The "Faithful Performance Bond" shall be for 100% under $10M; 110% $10M and over of the Contract price to guarantee faithful performance of all work, within the time prescribed, in a manner satisfactory to the City, and that all materials and workmanship will be free from original or developed defects.

INDEMNIFICATION
To the furthest extent allowed by law, including California Civil Code section 2782, CONTRACTOR shall indemnify, defend and hold harmless CITY and each of its officers, officials, employees, agents, and volunteers from any and all claims, demands, actions in law or equity, loss, liability, fines, penalties, forfeitures, interest, costs including legal fees, and damages (whether in contract, tort, or strict liability, including but not limited to personal injury, death at any time, property damage, or loss of any type) arising or alleged to have arisen directly or indirectly out of (1) any voluntary or involuntary act or omission, (2) error, omission or negligence, or (3) the performance or non- performance of this Contract. CONTRACTOR'S obligations as set forth in this section shall apply regardless of whether CITY or any of its officers, officials, employees, agents, or volunteers are passively negligent, but shall not apply to any loss, liability, fines, penalties, forfeitures, costs or damages caused by the active or sole negligence, or the willful misconduct, of CITY or any of its officers, officials, employees, agents or volunteers.

To the fullest extent allowed by law, and in addition to the express duty to indemnify, CONTRACTOR, whenever there is any causal connection between the CONTRACTOR’s performance or non-performance of the work or services required under this Contract and any claim or loss, injury or damage of any type, CONTRACTOR expressly agrees to undertake a duty to defend CITY and any of its officers, officials, employees, agents, or volunteers, as a separate duty, independent of and broader that the duty to indemnify. T he duty to defend as herein agreed to by CONTRACTOR expressly includes all costs of litigation, attorneys fees, settlement costs and expenses in connection with claims or litigation, whether or not the claims are valid, false or groundless, as long as the claims could be in any manner be causally connected to CONTRACTOR as reasonably determined by CITY.

Upon the tender by CITY to CONTRACTOR, CONTRACTOR shall be bound and obligated to assume the defense of CITY and any of its officers, officials, employees, agents, or volunteers, FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

38 670645v1
including the a duty to settle and otherwise pursue settlement negotiations, and shall pay, liquidate, discharge and satisfy any and all settlements, judgments, awards, or expenses resulting from or arising out of the claims without reimbursement from CITY or any of its officers, officials, employees, agents, or volunteers.

It is further understood and agreed by CONTRACTOR that if CITY tenders a defense of a claim on behalf of CITY or any of its officers, officials, employees, agents, or volunteers and CONTRACTOR fails, refuses or neglects to assume the defense thereof, CITY and its officers, officials, employees, agents, or volunteers may agree to compromise and settle or defend any such claim or action and CONTRACTOR shall be bound and obligated to reimburse CITY and its officers, officials, employees, agents, or volunteers for the amounts expended by each in defending or settling such claim, or in the amount required to pay any judgment rendered therein.

The defense and indemnity obligations set forth above shall be direct obligations and shall be separate from and shall not be limited in any manner by any insurance procured in accordance with the insurance requirements set forth in this Contract. In addit ion, such obligations remain in force regardless of whether CITY provided approval for, or did not review or object to, any insurance CONTRACTOR may have procured in accordance with the insurance requirements set forth in this Contract. The defense and indemnity obligations shall arise at such time that any claim is made, or loss, injury or damage of any type has been incurred by CITY, and the entry of judgment, arbitration, or litigation of any claim shall not be a condition precedent to these obligations.

The defense and indemnity obligations set forth in this section shall survive termination or expiration of this Contract.

If CONTRACTOR should subcontract all or any portion of the work to be performed under this Contract, CONTRACTOR shall require each subcontractor to Indemnify, hold harmless and defend CITY and each of its officers, officials, employees, agents and volunteers in accordance with the terms as set forth above.

GENERAL GUARANTY
Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire occupancy of the premises by the City shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects in the work and pay for any damage to other work resulting therefrom, which shall appear within a period of 1 year from the date of final acceptance of work unless a longer period is specified. The Engineer will give notice of observed defects with reasonable promptness.

PRECEDENCE OF CONTRACT DOCUMENTS
The order of precedence of documents shall be: (1) Rules and Regulations of Federal Agencies relating to the source of funds for this project; (2) Permits from other agencies as may be required by law;(3) Supplemental Agreements, Change Orders, or Contract the one dated later having precedence over another dated earlier; (4) Special Conditions; (5) General Conditions; (6) Technical Specifications; (7) Plans;(8) Standard Specifications; (9) Standard Plans.

Detailed Plans shall have precedence over general Plans.

Whenever any conflict appears in any portion of the Contract, it shall be resolved by application of the order of precedence.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

39 670645v1

CONTRACT DOCUMENTS
The Contractor shall submit the required contract documents in a form acceptable to the Public Works Department (Construction Management Division, 747 R Street, 2nd Floor, Fresno, California 93721) within 15 calendar days (except in the event federal funding is applicable to this Contract, then 10 working days) from the Notice of Award of Bids. Failure to provide said documents within the designated period shall be sufficient cause to forfeit the Contractor's Bid Deposit and initiate a departmental recommendation to the Council to award project to the next lowest responsive and responsible Bidder.

NOTE: Contract Documents consist of the following: Contract, Labor and Materials and Faithful Performance Bonds, Insurance Certificates, Workers' Compensation Insurance Certificate, Fair Employment Form, and any other information which may be required by these Specifications.

PRE-CONSTRUCTION MEETING AND SCHEDULE OF WORK
Prior to the start of construction, the Construction Management Division will call a meeting with all affected City Departments, governmental agencies, or utility companies to coordinate the construction with the Contractor so that no delays will be encountered due to conflicts of operations.

The Contractor will be called upon to indicate, at this meeting, the proposed operations to accomplish the work. The Contractor's attention is called to Section 6- 1, City Standard Specifications, and the following requirements:
• The Contractor shall submit a written tentative schedule of work to the Engineer at the pre-construction meeting.
• The final schedule of work shall be submitted no later than 5 working days after the pre- construction meeting.
• If the Project does not require a Stormwater Pollution Prevention Plan (SWPPP), per the specification outlined in Division IV, the awarded Contractor shall begin job site activities 15 calendar days after receiving notice that the contract has been executed by the City. • If the Project requires a Stormwater Pollution Prevention Plan (SWPPP), per the specification outlined in Division IV, the awarded Contractor shall begin job site activities within 55 calendar days after receiving notice that the contract has been executed by the City.
• Modifications to the start of job site activities shall be approved in writing by the Engineer.

If the Contractor delays the submittal of the final work schedule, the City may deduct the number of calendar days beyond the 5 working days allowed for submittal from the number of working days allowed for completion of the project.

Contractor’s proposed schedule shall be in the form of a tabulation, chart, or graph and shall be in sufficient detail to show the chronological relationship of all activities of the project including, but not limited to, estimated starting and completion dates of various activities, procurement of materials, and scheduling of equipment. The construction schedule shall reflect completion of all work under the Contract within the specified time and in accordance with these Specifications. Once submitted to the Engineer for review and approval, the Engineer shall either approve or reject said Project Schedule. If rejected, it shall be revised to incorporate the necessary changes, deletions or additions and resubmitted to the Engineer. If the Project Schedule is approved by the Engineer, the Project Schedule shall become the baseline schedule for the Project. The Project Schedule is subject to FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

40 670645v1
change during construction and will be continually updated and adjusted throughout the Project by Contractor on at least a monthly basis.

The City will use the Project Schedule for planning, executing and monitoring Project progress.

The Contractor will prepare a monthly schedule update. The Contractor, at each weekly Project meeting shall provide City with two week look-ahead schedules identifying its planned prosecution of the Work.

Contractor will exchange scheduling information with subcontractors and suppliers. Contractor will order work, equipment, and materials with sufficient lead-time to avoid interruption of the Work.

The City may issue a Notice to Proceed and start contract time upon the required start of job site activities, as specified herein, unless otherwise approved in writing by the Engineer. It is the Contractors responsibility to ensure that all necessary pre- construction coordination is completed, submittals are approved, and permits issued in order for the work to commence.

OVERTIME INSPECTION FEES
The Contractor shall promptly pay the City for all overtime inspection in accordance with existing resolutions or fee schedule of the City unless the charges for such inspection have been specifically waived elsewhere within this Contract. Overtime inspection charges will be made for all inspections on Saturdays, Sundays, and City Holidays, and hours worked by the inspector other than those of the normal City working days. If charges are not paid within 15 days of invoice, City may elect in its sole discretion to withhold unpaid charges from any progress payments.

SUBSTITUTION OF MATERIALS
(After Award)
See City of Fresno Standard Specifications, Section 4-1.5 entitled "Trade Names or Equals," which shall prevail.

Where the Contractor has good and sufficient reason to suggest a substitution after bidding, he/she will within 14 days after the signing of the Contract, submit his or her request for substitution in writing and shall indicate all information required thereof including reasons for substitution, difference in price or cost, difference in size, difference in color, etc., and it will be approved or disallowed within 30 days.

No consideration shall be given to request for substitution not in accordance with the above conditions. The Engineer will be the sole judge in matters concerning equality of proposed substitutions and the decision shall be final. The burden of proof as to the quality of any proposed substitutions shall be upon the Contractor.

Supplier must submit a letter to guarantee the replacement of any material that appears defective on the job for a period of 1 year after acceptance of the project.

ASSIGNMENT OF PAYMENT
Contractor hereby agrees he/she will not assign the payment of any monies due it (him/her) from the City under the terms of this Contract to any other individual(s), corporation(s), or entity(s). The City retains the right to pay any and all monies due Contractor directly to Contractor.

PATENTS
For the purchase of equipment and material, the Vendor shall hold the City of Fresno, its officers FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

41 670645v1
and employees, harmless from any and all liability for damages arising out of the use of any patented material, equipment, device or process incorporated into or made a part of or required by the manufacturer's Specifications to be used on or in connection with the material, equipment or supplies purchased by the Buyer pursuant to these Specificat ions, and Vendor agrees, by submission of a proposal hereunder, to defend the Buyer, at Vendor's sole expense, in any action or suit for damages or injunctive relief on account of any allegedly unauthorized use of or infringement of patent rights on any patented material, equipment, device or process, if the Buyer is named as a defendant in any such action or suit.

CODES AND ORDINANCES
Nothing in these Specifications is to be construed to permit work not conforming to applicable codes.

MAINTENANCE OF RECORDS
Contractor and its subcontractors are required to maintain books, records, and other documents pertinent to the work of this Contract in accordance with Generally Accepted Accounting Principles.

All such books, records, and other documents pertaining to the Contract shall be available to City or its authorized representatives upon request during regular business hours throughout the life of the Contract and for a period of 5 years after final payment or, if longer, for any period required by law or any State or Federal funding agreement applicable to this Contract. In addition, all books, documents, papers and records of Contractor and its subcontractors pertaining to the Contract shall be available for the purpose of making audits, examinations, excerpts, and transcriptions for the same period of time by City or its authorized representatives, (and, in the event State or Federal funding is applicable to this Contract, then the respective State of California, State of California Department of Transportation (Caltrans), the State of California State Auditor, the United States, the Federal Highway Administration (FHWA), or any authorized representatives of the aforementioned), and shall allow interviews during normal business hours of any employees who might reasonably have information related to such records. If any litigation, claim, negotiations, audit, or other action is commenced before the expiration of said time period, all records must be retained until such action is resolved, or until the end of said time period whichever shall later occur. Failure or refusal by Contractor or its subcontractors to comply with this provision shall be considered a substantial failure to comply with this Contract, and City may declare Contractor in default as set forth in these Specifications, withhold payment to Contractor, or take any other action it deems necessary to protect its interests. This provision shall survive expiration or termination of this Contract.

Contractor and its subcontractors shall establish and maintain an accounting system and records that properly accumulate and segregate incurred Project costs by line item for the Project. The accounting system shall enable the determination of incurred costs at interim points of completion and provide support for reimbursement payment vouchers or invoices sent to or paid by the City.

Contractor and its subcontractors shall make the Contract and any State or Federal funding agreement materials applicable to this Contract available at their respective offices at all reasonable times during the entire Project period and 5 years from the date of final payment to Contractor. This provision shall survive expiration or termination of this Contract.

NONFEDERAL LABOR STANDARD PROVISIONS
GENERAL PROVISIONS: The following Nonfederal Labor Standards Provisions, including the following provisions concerning: maximum hours of work, minimum rates of pay, and overtime compensation, with respect to the categories and classifications of employees hereinafter mentioned FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

42 670645v1
are included in the Contract pursuant to the requirements of applicable State or local laws, but the inclusion of such provisions shall not be construed to relieve the Contractor or any subcontractor from the pertinent requirements of any corresponding Federal Labor -Standard Provisions of this Contract. In cases the minimum rates of pay set forth below shall be higher than the minimum rates of pay required by or set forth in the Federal Labor-Standards Provisions of this Contract for corresponding classifications, the minimum rates of pay set forth below shall be deemed, for the purpose of this Contract, to be the applicable minimum rates of pay for such classifications. The limitations, if any, in these Nonfederal Labor Standards Provisions upon the hours per day, per week or month which employees engaged on the work covered by this Contract may be required or permitted to work thereon shall not be exceeded.

SCHEDULE OF WAGES AND SALARIES: In accordance with the provisions of sections 1770 to 1781, inclusive of the Labor Code of the State of California and/or section (1)(b) of the United States Labor Code, the Director of Industrial Relations and/or the United States Secretary of Labor shall ascertain the general prevailing rate of wages applicable to the work to be done under this Contract to be included in these Specifications by reference. (For any questions regarding wage rates or specific wage rate determinations, contact the Contract Compliance Officer at City of Fresno Public Works Department, Construction Management Division, 747 R Street, 2 nd Floor, Fresno, California
93721, (559) 621-8880.)
LABOR CODE SECTION 1775: PENALTIES FOR UNDER-PAYMENT OF WAGES: The Contractor and each subcontractor shall comply with California Labor Code section 1775 and pay not less than the wages established by the Director of the Department of Industrial Relations and/or the Federal government. In accordance with such section 1775, Contractor or such subcontractor shall, as a penalty to the City, forfeit up to $200.00, as determined by the Labor Commissioner, for each calendar day or portion thereof for each worker under this Contract paid less than the established wage rates.

These penalties shall be withheld from progress payments then due. The Contractor shall contain in each subcontract the requirements hereunder.

PENALTIES FOR VIOLATION OF EIGHT HOUR DAY: Eight hours labor constitutes a regular day's work under this Contract. Contractor or any subcontractor under him/her shall forfeit as a penalty to the City $25.00 for each worker employed in the execution of this Contract by contractor or such subcontractor for each calendar day during which any such worker is required or permitted to labor more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of sections 1810 to 1815, inclusive, of the California Labor Code. Notwithstanding the provisions of Sections 1810 to 1814, inclusive, of the California Labor Code, and notwithstanding the foregoing, work performed by employees of contractors and subcontractors in excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon public work upon compensation for all hours in excess of 8 hours per day at not less than one and one-half (1.5) times the basic rate of pay.

LABOR CODE SECTION 1777.5; EMPLOYMENT OF APPRENTICES:

If this Contract involves
$30,000 or more, the Contractor and each subcontractor shall comply with California Labor Code section 1777.5, as it may be amended from time to time, the entire provisions of which are incorporated by this reference as if fully set forth herein, and Article 10, Subchapter 1, Chapter 2, Title 8 of the California Code of Regulations for all apprenticeable occupations applicable to the work as defined in such laws and regulations. Contractor shall be responsible for the compliance with such Labor Code section for all apprenticeable occupations and shall contain in each subcontract the requirements hereunder. In accordance with section 1777.5 of the California Labor Code and the rules and regulations of the California Apprenticeship Council, properly indentured apprentices shall be employed in the execution of this Contract in at least the ratio of not less than 1 hour of apprentice work for every 5 hours of journeyman work (unless the respective contractor or subcontractor has FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

43 670645v1
been exempted from such ratio) and paid the prevailing rate of per diem wages for apprentices in the trade to which he/she is registered. The employment and training of each apprentice shall be in accordance with either the apprenticeship standards and apprentice agreements under which he/she is training, or the rules and regulations of the California Apprenticeship Council. Prior to commencing work on the Contract, Contractor and each subcontractor shall submit contract award information to the City, if requested, and to an applicable apprenticeship program that can supply apprentices to the job site. The information shall include an estimate of journeyman hours to be performed under the Contract, the number of apprentices proposed to be employed, and the approximate dates the apprentices would be employed. Within 60 days after concluding work on the Contract, the Contractor and each subcontractor shall submit to the City, if requested, and to the apprenticeship program a verified statement of the journeyman and apprentice hours performed on the Contract. Contractor shall employ apprentices for the number of hours computed before the end of the Contract or, in the case of the subcontractor, before the end of the subcontract and endeavor, to the greatest extent possible, to employ apprentices during the same time period that the journeymen in the same craft or trade are employed at the job site.

FRESNO MUNICIPAL CODE SECTION 4-113; LABOR CODE SECTION 1777.5; EMPLOYMENT OF APPRENTICES: If this Contract involves $500,000 or more, the Contractor shall contain in each subcontract the requirements hereunder and be responsible for providing all documentation required hereunder from subcontractor to the City. The Contractor and each subcontractor shall provide documentation to City demonstrating compliance with the requirements of California Labor Code section 1777.5 and Article 10, Subchapter 1, Chapter 2, Title 8 of the California Code of Regulations by providing City copies of each of the following:
(i) All contract award information (e.g., completed form DAS 140) sent by Contractor and by subcontractors to the State Division of Apprenticeship Standards and each applicable apprenticeship program in accordance with California Labor Code section 1777.5, as may be amended from time to time, including identification of addressee. (ii) All requests by Contractor and by subcontractors for approval, and all responses and certificates from any applicable apprenticeship program disapproving or approving Contractor or subcontractor(s), to train apprentices; if any. (iii) All requests by Contractor and by subcontractors for dispatch of apprentices from any applicable apprenticeship program (e.g., completed form DAS 142); and all responses thereto, if any.
(iv) All certifications, if any, of Contractor and of subcontractor(s) as an individual employer apprenticeship program by the State Division of Apprenticeship Standards or the California Apprenticeship Council.
(v) All apprenticeship agreements of apprentices employed by Contractor and by subcontractor(s) and performing work under the Contract. (vi) A verified statement by the Contractor and by the subcontractor within 60 days after concluding the work of the respective journeyperson and apprentice hours performed on the Contract or subcontract.
(vii) All certificates of any exemption by the State Division of Apprenticeship Standards, California Apprenticeship Council or any apprenticeship program of Contractor or subcontractor from any requirements of California Labor Code section 1777.5, as may be amended from time to time.
(viii) Other documentation as may be requested by City.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

44 670645v1
LABOR CODE SECTION 6705: If this Contract involves an estimated expenditure in excess of $25,000.00 and excavation of any trench or trenches five feet or more in depth, then your attention is directed to California Labor Code section 6705 relating to a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches, the entire provisions of which are incorporated by this reference as if fully set forth hereinafter.

Before execution of the Contract by the City, the Contractor shall submit to the City and the Engineer shall accept, if satisfactory to him/her, said detailed plan.

If, in the Engineer's opinion, there is any noncompliance with said detailed plan, then the Contractor shall stop forthwith all trench work until, either in the Engineer's or the State Division of Industrial Safety's opinion, there is compliance. The City shall not be liable for costs incurred by the Contractor due to the work stoppage and the Contractor will not be given nor is entitled to an extension of time to complete the work within the time set forth in this Contract due to the work stoppage.

WAGE AND PRICE CONTROL: Notwithstanding any provisions of the Contract to the contrary, the Contractor shall be bound by the orders issued and rules and regulations adopted pursuant to the Economic Stabilization Act of 1970 (Public Law 91- 379, 84 Statutes 799), as amended, or any subsequent Act of Congress.

COMPLIANCE WITH OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970: This Contract is subject to all terms and conditions of the OCCUPATIONAL SAFETY AND HEALTH ACT of 1970, the California Occupational Safety and Health Act and their present and future amendments.

Contractor expressly assumes responsibility for compliance therewith and warrants that all materials, supplies, and equipment provided or installed pursuant to this Contract, whether provided by the Contractor, subcontractor, or a supplier, fully satisfy the requirements of said Acts. Contractor shall, upon insertion in each Contract with a subcontractor or supplier of a clause by which the subcontractor or supplier warrants such compliance, be relieved of responsibility by the subcontractor or supplier.

LABOR
CODE SECTION 1776; PAYROLLS AND BASIC RECORDS: The Contractor and each subcontractor shall comply with California Labor Code section 1776, the entire provisions of which are incorporated by this reference as if fully set forth herein, and Contractor shall contain in each subcontract the requirements hereunder.
(a) Accurate payroll records and basic records relating thereto shall be maintained by the Contractor and each subcontractor during the course of the work and preserved for a period as required by law for all journeymen, apprentices, workers, and other employees employed in connection with the work.

Such records shall contain information as on the payroll record forms provided by the Division of Labor Standards of the Department of Industrial Relations, the name, address, social security number, work classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents), daily and weekly number of hours worked, deductions made and actual per diem wages paid. The Contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially
responsible, and that the plan or program has been communicated in writing to all employees affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits.

Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

45 670645v1
(b) (1) The Contractor shall submit weekly (7 days after each week ending pay period) for each week in which any Contract work is performed a certified copy of all payrolls to the Engineer.

The payrolls submitted shall set out accurately and completely all of the information required to be maintained under paragraph (a) of this clause. The Contractor is responsible for the submission of certified copies of payrolls by all subcontractors. (2) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the Contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the Contract and shall certify under penalty of perjury under the laws of the State of California each of the following:
(i) That the payroll for the payroll period contains the information required to be maintained under paragraph (a) of this clause entitled "LABOR CODE SECTION 1776; PAYROLLS AND BASIC" and that such information is true, correct and complete; (ii) That each employee employed on the Contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions;
(iii) That each employee has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the Contract; (iv) Contractor has complied with the requirements of California Labor Code sections 1771, 1811, and 1815 for any work performed hereunder by his or her employees. (3) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the "Statement of Compliance" required by paragraph (b) (2) of this clause. (4) The falsification of any of the above certifications may subject the Contractor or Subcontractor to civil or criminal prosecution.
(c) The Contractor or subcontractor shall make certified copies of all the records required under paragraph (a) of this clause available for inspection at all reasonable hours at the principal office of the Contractor by, and furnished upon request to, the Engineer, the Division of Labor Standards Enforcement of the Department of Industrial Relations, the Division of Apprenticeship Standards of the Department of Industrial Relations, and each of their authorized representatives. A certified copy of the employee’s record shall likewise be made available for inspection or furnished upon request by the employee or his or her authorized representative. The Contractor shall provide hereunder the street address, city, and county of the location of the payroll records maintained by Contractor and shall provide a notice of any change of location and address within 5 working days of such change.

The Contractor and subcontractors shall permit such representatives to interview employees during working hours on the job. If the Contractor or subcontractor fails to submit the required records within 10 days after each week ending pay period, or to furnish or make them available for inspection within 10 days of request, (Contractor has 10 days to comply) after written notice, the Contractor shall forfeit $100.00 for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated, pursuant to California Labor Code section 1776. These penalties shall be withheld from progress payments then due.

LABOR CODE SECTION 1771.1: CONSTRUCTION REGISTRATION WITH CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS: A Contractor or Subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

46 670645v1
Code or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered Contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the Contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The prime Contractor is required to post job site notices prescribed by California Code of Regulations. All Contractors and Subcontractors must furnish electronic certified payroll records directly to the Division of Labor Standards Enforcement.

FAIR EMPLOYMENT PRACTICES AND NONDISCRIMINATION
In connection with the performance of work under this Contract, the Contractor agrees as follows:

1. The Contractor shall not unlawfully discriminate, harass, or allow harassment against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability (including HIV and AIDS), mental disability, medical condition (cancer), marital status, political affiliation, sex, age (over 40), sexual orientation, and denial of family care leave or on any other basis prohibited by law. The Contractor shall ensure that the treatment of employees and evaluation of applicants for employment are free of such discrimination and harassment. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer, recruitment, or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the State of California setting forth the provisions of this Fair Employment Practices section.

2. Contractor and all subcontractors shall comply with the provisions of the Fair Employment and Housing Act (Government Code, Section 12900 et seq.), and the applicable regulations promulgated thereunder (California Code of Regulations, Title 2, Section 7285.0 et seq.). The applicable regulations of the Fair Employment and Housing Commission implementing Government Code Section 12990 (a- f), set forth in Chapter 5 of Division 4 of Title 2 of the California Code of Regulations, are incorporated into this Agreement by reference and made a part hereof as if set forth in full.

3. Contractor assures City that it shall comply with the requirements of the Americans with Disabilities Act (ADA) of 1990, (42 U.S.C. 12101 et seq.), which prohibits discrimination on the basis of disability, as well as all applicable regulations and guidelines issued pursuant to the ADA; the Civil Rights Act of 1964, as amended, 42 U.S.C. 2000d (1988) et seq.; Section 504 of the Rehabilitation Act of 1973, as amended, 29 U.S.C. 794 (1989) and the Age Discrimination Act of 1975, as amended, 42 U.S.C. 6102 (1994); together with all applicable regulations and guidelines adopted to implement same. Said group of laws and requirements are collectively referred to in this Contract as the “anti-discrimination laws”.

4. The Contractor will send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a written notice advising the said labor union or workers' representative of the Contractor's commitments under this section and shall post copies of the notice in conspicuous places available to employees and applicants for employment.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

47 670645v1

5. The Contractor will permit access to his or her records of employment, employment advertisements, application forms, and other pertinent data and records by the City, State of California, the State Fair Employment and Housing Commission, or any other appropriate agency designated by the City or the State of California, for the purposes of investigation to ascertain compliance with the Fair Employment Practices and Nondiscrimination section of this Contract.

6. Contractor agrees to collect and maintain information to show compliance with the “anti- discrimination laws” including a list of discrimination complaints, reports of any compliance reviews conducted by other agencies descriptions of any pending discrimination- based lawsuits and data on the racial, ethnic, national origin, sex, and handicap characteristics of the population it serves.

7. Contractor agrees to cooperate with City, and any other appropriate agency designated by the City, in all manner necessary to permit City and any such agency to adequately report to the United States Environmental Protection Agency on Contractor’s compliance with the “anti - discrimination laws”.

8. A finding of willful violation of the Fair Employment Practices section of this Contract or of the California Fair Employment and Housing Act shall be regarded by the City as a basis for determining the Contractor to be not a responsible bidder as to future contracts for which such Contractor may submit bids, for revoking the Contractor's prequalification rating, if any, and for refusing to establish, reestablish, or renew a prequalification rating for the Contractor.

The City will deem a finding of willful violation of the California Fair Employment and Housing Act to have occurred upon receipt of written notice from the Fair Employment and Housing Commission that it has investigated and determined that the Contractor has violated the California Fair Employment and Housing Act and has issued an order under California Government Code section 12973, section 12970, or obtained an injunction under California Government Code section 12973.

Upon receipt of such written notice from the Fair Employment and Housing Commission, the City shall notify the Contractor that unless he/she demonstrated to the satisfaction of the City within a stated period that the violation has been corrected, that he/she will be reported to the City Council as not a responsible bidder on any future Contract.

9. The Contractor agrees, that should the City determine that the Contractor has not complied with the Fair Employment Practices section of this Contract, then pursuant to Labor Code sections 1735 and 1775, the Contractor shall forfeit, as a penalty to the City, for each calendar day, or portion thereof, for each person who was denied employment as a result of such noncompliance, the penalties provided in the Labor Code for violation of prevailing wage rates. Such monies may be recovered from the Contractor. The City may deduct any such damages from any monies due the Contractor from the City. Furthermore, Contractor agrees that the City shall have the right to terminate this Contract either in whole or in part, and any loss or damage sustained by City in securing the goods or services ther eunder shall be borne and paid for by Contractor and by the surety under the performance bond, if any, and City may deduct from any moneys due or thereafter may become due to Contractor, the difference between the price named in the Contract and the actual cost thereof to City to cure Contractor’s breach of the Contract.

10. Nothing contained in this Fair Employment Practices section shall be construed in any manner or fashion so as to prevent the City from pursuing any other remedies that may be available at law.

11. After award of the Contract, the Contractor shall certify to the City that he/she has or will meet the following standards for affirmative compliance, which shall be evaluated in each case by the City:

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

48 670645v1
(a) The Contractor shall provide evidence, as required by the City, that he/she has notified all supervisors, foremen, and other personnel officers in writing of the content of the antidiscrimination clause and their responsibilities under it. (b) The Contractor shall provide evidence, as required by the City, that he/she has notified all sources of employee referrals (including unions, employment agencies, advertisement, Department of Employment) of the content of the antidiscrimination clause.
(c) The Contractor shall file a Fair Employment Practices compliance report, as required by the City. Willfully false statements made in such reports shall be punishable as provided by law. The compliance report shall also spell out the sources of the work force and who has the responsibility for determining whom to hire, or whether or not to hire. The compliance report shall be kept current throughout the Contract in that the Contractor shall report any changes in or additions to the answers therein, including changes in agreements with others. After the work or supplying materials is complete, and before final payment, the Contractor shall submit a final statement of compliance. (d) Personally, or through his or her representatives, the Contractor shall, through negotiations with the unions with whom he/she has agreements, attempt to develop an agreement which will:
(1) Spell out responsibilities for nondiscrimination in hiring, referral, upgrading and training.
(2) Otherwise implement an affirmative antidiscrimination program in terms of the unions; specific areas of skill and geography, to the end that qualified disadvantaged workers will be available and given an equal opportunity for employment.

12. Contractor’s signature on this Contract shall constitute a certification under the penalty of perjury under the laws of the State of California that Contractor has, unless exempted, complied with the nondiscrimination program requirements of Government Code, Section 12990, and Title 2, California Code of Regulations, Section 8103.

13. The Contractor will include the provisions of the foregoing paragraphs 1 through 12 in every first-tier subcontract so that such provisions will be binding upon each such subcontractor.

GENERAL MISCELLANEOUS
Independent Contractor. In the furnishing of the work provided for herein, the Contractor is acting as an independent contractor. Neither the Contractor, nor any of its officers, associates, agents, or employees shall be deemed an employee, joint venturer, partner, or agent of the City for any purpose. However, the City shall retain the right to verify that the Contractor is performing its respective obligations in accordance with the terms of the Contract.

Because of its status as an independent contractor, Contractor and its officers, agents and employees shall have absolutely no right to employment rights and benefits available to City employees. Contractor shall be solely liable and responsible for all payroll and tax withholding and for providing to, or on behalf of, its employees all employee benefits including, without limitation, health, welfare, and retirement benefits. In addition, together with its other obligations under this Contract, Contractor shall be solely responsible, indemnify, defend and save City harmless from all matters relating to employment and tax withholding for and payment of Contractor’s employees, including, without limitation, (i) compliance with Social Security and unemployment insurance withholding, FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

49 670645v1
payment of workers compensation benefits, and all other laws and regulations governing matters of employee withholding, taxes and payment; and (ii) any claim of right or interest in City employment benefits, entitlements, programs and/or funds offered employees of City whether arising by reason of any common law, de facto, leased, or co- employee rights or other theory . It is acknowledged that during the term of this Contract, Contractor may be providing services to others unrelated to City or to this Contract.

Notices. Any notice required or intended to be given to either party under the terms of this Contract shall be in writing and shall be deemed to be duly given if delivered personally or sent by United States registered or certified mail, with postage prepaid, return receipt requested, addressed to the party to which notice is to be given at the party's address set forth on the signature page of the Bid Proposal in the case of the Contractor and at the address set forth on the signature page of the Contract in the case of the City, or at such other address as the parties may from time to time designate by written notice. Notices served by United States mail in the manner above described shall be deemed sufficiently served or given at the time of the mailing thereof.

Binding. Subject to the following section, once this Contract is signed by all parties, it shall be binding upon, and shall inure to the benefit of, all parties, and each parties' respective heirs, successors, assigns, transferees, agents, servants, employees, and representatives.

Assignment. The Contract is personal to the Contractor and there shall be no assignment, transfer, sale, or subcontracting by the Contractor of its rights or obligations under the Contract without the prior written approval of the City. Any attempted assignment, transfer, sale or subcontracting by the Contractor, its successors, or assigns, shall be null and void unless approved in writing by the City.

Compliance with Law. In providing the services required under this Contract, Contractor and its subcontractors shall at all times comply with all applicable laws of the United States, the State of California and City, and with all applicable regulations promulgated by federal, state, regional, or local administrative and regulatory agencies, now in force and as they may be enacted, issued, or amended during the term of this Contract.

Waiver. The waiver by either party of a breach by the other of any provision of this Contract shall not constitute a continuing waiver or a waiver of any subsequent breach of either the same or a different provision of this Contract. No provisions of this Contract may be waived unless in writing and signed by all parties to this Contract. Waiver of any one provision herein shall not be deemed to be a waiver of any other provision herein.

Headings. The section headings in this Contract are for convenience and reference only and shall not be construed or held in any way to explain, modify, or add to the interpretation or meaning of the provisions of this Contract.

Severability. The provisions of this Contract are severable. The invalidity, or unenforceability of any one provision in this Contract shall not affect the other provisions.

Interpretation. The parties acknowledge that this Contract in its final form is the result of the combined efforts of the parties and that, should any provision of this Contract be found to be ambiguous in any way, such ambiguity shall not be resolved by construing this Contract in favor of or against either party, but rather by construing the terms in accordance with their generally accepted meaning.

Exhibits. Each exhibit and attachment referenced in this Contract is, by the reference, incorporated into and made a part of this Contract.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

50 670645v1
Cumulative Remedies . No remedy or election hereunder shall be deemed exclusive but shall, wherever possible, be cumulative with all other remedies at law or in equity.

No Third-Party Beneficiaries. The rights, interests, duties, and obligations defined within this Contract are intended for the specific parties hereto as identified in the preamble of this Contract.

Notwithstanding anything stated to the contrary in this Contract, it is not intended that any rights or interests in this Contract benefit or flow to the interest of any third parties other than expressly identified within this section. The parties do intend that in the event that the State of California is funding the Project being constructed hereunder, that the State of California be a third party beneficiary under this Contract and all rights, interest and benefits of this Contract accrue to the State.

Funding. This Contract is contingent on the appropriation of funds by City. Should funds not be appropriated, this Contract may be terminated by City upon prior written notice to Contractor.

Termination for Convenience: The City reserves the right to terminate this Contract upon 60 calendar days prior written notice to the Contractor. In the event of such termination, the Contractor shall be paid for satisfactory service performed to the date of termination.

Termination for Non- Performance: If Contractor shall (i) materially breach any of its obligations under this Contract (including, without limitation, the failure to meet quality standards or to complete delivery, within the time specified herein, of all or any part of the materials, equipment, supplies or services to be provided under the Contract), and (iii) fail to commence and diligently pursue reasonable efforts to cure such breach within 5 calendar days after written notice by the City specifically describing the breach; the City Manager or his/her designee, acting for and on behalf of the City, may at any time after the expiration of the time for delivery, terminate the Contract as to the whole thereof, or in the event partial delivery has been made and accepted, as to such items or service to be furnished which have not been delivered or accepted prior to such termination. Such termination shall be effective upon receipt by Contractor of written notice of termination from said City Manager or his/her designee, which notice shall be deemed to have been received by Contractor, if mailed, within forty -eight hours to Contractor’s address as contained in the Contractor’s Bid Proposal or, if personally delivered, upon the delivery thereof to Contractor, the authorized representative of Contractor, or to the Contractor’s said address.

Governing Law and Venue. This Contract shall be governed by, and construed and enforced in accordance with, the laws of the State of California, excluding, however, any conflict of laws rule which would apply the law of another jurisdiction. Venue for purposes of the filing of any action regarding the enforcement or interpretation of this Contract and any rights and duties hereunder shall be Fresno County, California.

Extent of Agreement. Each party acknowledges that they have read and fully understand the contents of this Contract. This Contract represents the entire and integrated agreement between the parties with respect to the subject matter hereof and supersedes all prior negotiations, representations, or agreements, either written or oral. This Contract may be modified only by written instrument duly authorized and executed by both City and Contractor in accordance with City’s current contract change order resolution for public works of improvement as may be revised.

CLAIMS FOR ADDITIONAL TIME
Extension of time, when granted, will be based upon the effect of delays to the project as a whole and will not be granted for noncontrolling delays to minor included portions of the Work unless it can be shown that such delays did, in fact, delay the progress of the project as a whole. The Contractor shall not be entitled to damages or additional payment due to these delays except to the extent the FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

51 670645v1
delay exceeds the original Contract duration for Substantial Completion, and any extension hereunder other than any extension granted due to Owner caused delay, when Owner is responsible for the delay, the delay is unreasonable under the circumstances involved, not within the contemplation of the parties, and such delay causes actual damage to the Contractor. The Owner shall not be entitled to liquidated damages for Contractor delays unless the delay by Contractor exceeds the original Contract duration for Substantial Completion and any extension of time to which the Contractor is entitled to under the Specifications.

If delays are caused by unforeseen events beyond the control of the Contractor, such delays will entitle the Contractor to an extension of time as provided herein. War, governmental regulations, priorities, labor disputes, strikes, fires, floods, adverse weather necessitating cessation of Work, other similar action of the elements, inability to obtain materials, equipment or labor because of Federal Government restrictions arising out of the National Defense or War Program, required Extra Work, action or inaction by the Owner, or other specific reasons as may be further described in the Specifications may constitute such a delay.

If the Contractor is delayed by the failure of the Owner to furnish necessary rights of way or materials agreed to be furnished by it, or by failure to supply necessary plans or instructions concerning the Work, after written request therefore, the Contractor shall be entitled to an extension of time as provided herein.

CLAIMS AND DISPUTES
(a) General
The Contractor and Owner shall make good faith efforts to resolve any and all Claims and disputes in a timely manner that may from time to time arise during Contractor's performance of the Work.

Claims, including those alleging an error or omission shall be directed to the Owner's Construction Manager for action as provided in the “Resolution of Claims and Disputes,” below.

It shall be a condition precedent to Claims review by the Capital Projects Director or his or her designated representative and to mediation or litigation between the Contractor and Owner as to all such matters arising prior to the date final payment is due, that a formal decision on all Contractor Claims be made by the Construction Manager. It shall be a condition precedent that the Contractor appeal any disputed Claim to the Capital Projects Director prior to initiating mediation or litigation. It shall be a condition precedent that the Contractor mediate any disputed Claim through non-binding mediation as provided herein, prior to initiating litigation. Unless mutually waived in writing by both parties, these provisions apply regardless of 1) whether such matters relate to execution and progress of the Work, or 2) the extent to which the Work has been completed.

Notice of Intent to Claim by Contractor must be made within 72 hours after occurrence of the event giving rise to such Claim, or within 72 hours after the claimant first discovers or should have reasonably discovered the condition giving rise to the Claim, whichever is later. Notice of Intent to Claim and Claims must be made by written notice.

At all times during the course of the dispute resolution process pursuant to the “Resolution of Claims and Disputes,” the Contractor shall continue with the Work as directed, in a diligent manner and without delay, or shall conform to the Owner's decision or order, and shall be governed by all applicable provisions of the Contract. Records of the Work shall be kept in sufficient detail to enable payment in accordance with applicable provisions in the Contract if this should become necessary.

The making of final payment shall not constitute a waiver of Claims by the Owner including, but not limited to, the following:
(i) liens, Claims, security interests or encumbrances arising out of the Contract and FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

52 670645v1
unsettled;
(ii) failure of the Work to comply with the requirements of the Contract Documents; or (iii) terms of special warranties required by the Contract Documents.

Contractor shall promptly provide an unconditional waiver and release upon final payment in accordance with California Civil Code section 3262 and these Contract Documents. Except to the extent of any Claim arising from City’s sole or active negligence, and except to the extent Contractor expressly describes any other disputed Claims for which prior written notice has been given the City and lists the respective dollar amounts in an unconditional waiver and release, the making of final payment shall constitute a waiver of Claims by the Contractor pertaining to any and all costs, expenses, changes or other Claims related to Contract Price or Contract Time, including any synergistic effects attributed to multiple Change Orders. In the event of any disputed Claims between the City and Contractor, the City may withhold from the final payment an amount not to exceed 150% of the disputed amount.
(b) Resolution of Claims and Disputes
(1) Decision of Construction Manager:
a. If the Contractor believes any Work or demand to be outside the requirements of the Contract or believes that omissions, conflicts, errors, or discrepancies will cause or have caused the Contractor additional costs or delays in the performance of the Work, he/she shall file a written Notice of Intent to Claim with the Construction Manager within 72 hours after occurrence of the event giving rise to the Claim, or within 72 hours after the Contractor or its subcontractor first discovers or should have reasonably discovered the condition giving rise to the Claim, whichever is later. If a written Notice of Intent to Claim is not submitted within this time period, the Contractor shall waive his or her right to further Claims on the issue and any synergistic effects related to such Claim.

1. Within 10 working days following the Notice of Intent to Claim, the Contractor shall provide a Notice of Claim with complete supporting data for the Claim of the cost and delay related to such omissions, conflicts, errors, discrepancies, or Work alleged to be outside the requirements of the Contract. Notwithstanding the foregoing, if all supporting data cannot reasonably be made available within said 10 working days, then Contractor shall provide all then available supporting data along with a request for additional time, stating a time certain, to obtain the remainder of supporting data along with both an explanation of the nature of such supporting data and the reason why additional time is necessary to provide same to the Construction Manager.

2. If a written Notice of Claim, along with complete supporting data or all then available supporting data and reasonable request for additional time with explanation as required above, is not submitted within 10 working days following the Notice of Intent to Claim, the Contractor shall waive his or her right to make further Claims on the issue and any synergistic effects related to such Claim.

3. The Contractor’s request for additional time to provide the remainder of its supporting data shall be deemed acceptable to Owner unless the Construction Manager rejects in writing Contractor’s request within 5 working days from receipt of Contractor’s request. If the Construction Manager rejects Contractor’s request for additional time, then Contractor shall either provide complete supporting data FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

53 670645v1
immediately upon receipt of such rejection or within any time acceptable to the Construction Manager as stated in his or her written rejection, whichever is later (unless otherwise mutually agreed upon in writing by Contractor and Construction Manager).
b. The Construction Manager will review any and all Claims and take one or more of the following preliminary actions in writing within 10 working days of receipt of written Notice of Claim and complete supporting data: 1) request additional supporting data from the Contractor; 2) reject the Claim in whole, or in part, stating reasons for rejection; or, 3) recommend approval of the Claim. In the event the Construction Manager has not taken any preliminary action within 10 working days, then the Claim is deemed rejected unless the Contractor and the Construction Manager mutually agree in writing to extend the time period for taking preliminary action. The Construction Manager will make his or her decision on the basis of the pertinent Contract provisions, together with the facts and circumstances involved in the dispute. The Construction Manager may also, but is not obligated to, notify the surety on Contractor's performance bond of the nature and amount of the Claim. c. If the Construction Manager requests additional supporting data from the Contractor, the Contractor shall supply the additional information to the Construction Manager within 10 working days unless the Contractor and the Construction Manager mutually agree in writing to extend the time period for supplying such information. The Construction Manager will have 10 working days from the receipt of additional supporting data to provide a written decision unless the Contractor and the Construction Manager mutually agree in writing to extend the time period for providing such decision. In the event the Construction Manager has not provided a written decision within 10 working days, or any extended time period agreed to in writing by Construction Manager and Contractor, then the Claim is deemed rejected and this shall constitute Contractor’s automatic request for an appeal meeting with the Capital Projects Director unless the Contractor submits a written withdrawal of its Claim. d. If the Claim is rejected in whole or in part by a written decision of the Construction Manager, the Contractor shall notify the Construction Manager in writing within 10 working days after receiving the written decision that either: 1) the decision is accepted, and the Claim is amended accordingly; or 2) the Contractor requests an appeal meeting with the Capital Projects Director. Failure to timely request an appeal meeting with the Capital Projects Director following receipt of the written decision constitutes acceptance by the Contractor of the Construction Manager's decision.

If the Owner and Contractor are able to resolve their dispute, the Owner will promptly process any required Contract changes.
(2) Decision of Capital Projects Director
a. The Capital Projects Director , or his or her designee, shall meet with the Contractor and the Construction Manager within 15 working days (unless necessary to accommodate the Capital Projects Director’s schedule, or that of his or her designee, but in no event longer than 20 working days; or unless otherwise mutually agreed upon in writing by Contractor and Construction Manager) from the Contractor's timely submittal of his or her request, or any automatic request hereunder, for a meeting. The Contractor may make a presentation in support of his or her Claim. No attorney may take part in the presentation or defense of the Claim in the meeting with the Capital FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

54 670645v1
Projects Director, or his or her designee. Nothing herein shall prevent an attorney from providing advice to a party either before or after the meeting. In the event the meeting with the Capital Projects Director , or his or her designee, has not been conducted within the time provided herein or as agreed upon in writing by Contractor and Construction Manager, then the Claim is deemed rejected and, unless the Contractor submits a written withdrawal of its Claim, the parties shall proceed to mediation as provided herein.
b. Within 10 working days (unless otherwise mutually agreed upon in writing by Contractor and Construction Manager) from the meeting with the Contractor and the Construction Manager, the Capital Projects Director, or his or her designee, shall render a written decision and a copy thereof shall be personally delivered, or mailed return receipt requested, to the Contractor. In the event the Capital Projects Director , or his or her designee, has not provided a written decision within 10 working days, or any extended time period agreed to in writing by Construction Manager and Contractor, then the Claim is deemed rejected and, unless the Contractor submits a written withdrawal of its Claim, the parties shall proceed to mediation as provided herein. c. If the Claim is rejected in whole or in part by a written decision of the Capital Projects Director, or his or her designee, the Contractor shall notify the Construction Manager in writing within 10 working days after receiving the written decision that either: 1) the decision is accepted and the Claim is amended accordingly; or 2) the Contractor rejects the decision of the Capital Projects Director, or his or her designee. Failure to timely notify the Construction Manager of either following receipt of the Capital Projects Director’s written decision, or that of his or her designee, shall constitute acceptance by the Contractor of the Capital Projects Director ’s decision, or that of his or her designee. If the Owner and Contractor are able to resolve their dispute, the Owner will promptly process any required Contract changes. If the Contractor rejects the written decision of the Capital Projects Director or his or her designee, the parties shall proceed to mediation as provided herein.
(3) Mediation
a. In the event that the Claim is not resolved after exhausting all aforementioned administrative measures, then the Contractor must participate in non- binding mediation with City before the Contractor may initiate litigation. b. The parties shall mutually select, in writing, a mediator with at least 5 years’ experience in the construction industry. In the event that the parties are unable to agree on a mediator within 15 working days of Contractor’s rejection of the decision of the Capital Projects Director or his or her designee, the City may select the mediator. Mediation, including at least one session requiring physical attendance by all parties, shall begin within 15 working days of selection of the mediator, unless necessary to accommodate the mediator’s schedule. The parties shall share the mediator’s fees and any administrative costs of mediation equally. The mediation shall be held in Fresno, California, unless another location is mutually agreed upon by the parties in writing.

In the event the parties are unable to reach a mutually acceptable resolution of the Claim within 20 working days of the start of mediation, unless extended or otherwise terminated by written mutual agreement of the parties, mediation shall terminate.
c. If the Owner and Contractor are able to resolve their dispute the Owner will promptly FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

55 670645v1
process any required Contract changes. Any settlement reached in principal must be in writing and is subject to approval by the City Manager or City Council consistent with City laws and policies. Should the dispute remain unresolved, the parties may resort to other dispute resolution procedures.
d. All statements made during the mediation shall be confidential and subject to sections 703.5, 1119 and 1152 of the California Evidence Code.
(4) Government Claims Act. Nothing herein is intended by the parties to waive any requirements of the Contractor to comply with the Government Claims Act including, without limitation, California Government Code section 905; and Contractor agrees that it shall remain responsible for complying with said section regarding any Claim. The parties agree, however, that the timeline for the Contractor to file a claim under the Government Claims Act is tolled until exhaustion of the Contractor of its administrative remedies hereunder (i.e., either upon termination of mediation, or upon written mutual waiver of mediation by the parties, whichever first occurs). (5) Litigation
a. If the Contractor continues to dispute the Work demanded of him/her after exhausting all aforementioned administrative measures, the Contractor may institute legal proceedings, but only after final acceptance of the project by the Owner.

Unless specifically waived by the Owner, in writing, the submission of a dispute for mediation in accordance with the above provisions shall be a condition precedent to the Contractor's right to initiate a suit, action or other proceeding against the Owner for damages.
b. In the event Owner initiates suit, action, or other proceeding against the Contractor for damages, the prevailing party in such suit or action shall be entitled to recover reasonable attorney's fees and costs of suit.
c. In the event Contractor initiates suit, action, or other proceeding against the Owner, the Owner shall be entitled to recover reasonable attorneys' fees and engineering defense costs if the Contractor is not awarded, by the arbitrator or court, a dollar amount greater than 50 percent of the Contractor's original Claim for damages. d. The Contractor shall include, or cause to be included, a requirement in all subcontracts of all tiers of Subcontractors for this project that whenever the Subcontractor disputes the Work demanded of him/her, he/she shall cooperate and comply with the Claims and Dispute procedures contained herein including, without limitation, exhausting all administrative measures prior to instituting legal proceedings, and instituting legal proceedings only after final acceptance of the project by the Owner.

MEDIATOR
The bid proposal includes a bid item “Mediator” which is provided to account for compensation by Owner for Owner’s share of costs of the Mediator as provided in these Specifications. The dollar amount listed in the bid item is an estimate only and will be included in each Bidder’s Proposal.

Invoices of the Mediator shall be paid by Contractor only upon direct written authorization from the Owner.

Final payment to Contractor will be based on fifty percent (50%) of the total amount of Owner approved invoices of the Mediator actually billed to Owner by Contractor. The Contractor shall include the specified lump sum bid item on the Bid Proposal for payment of Owner’s share of costs for FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

56 670645v1
the Mediator. Payment will be made under this bid item by issuance of a Change Order approved by the Owner and charged against this lump sum allocation.

This bid item may be increased, decreased, or deleted in its entirety and is not to be construed as additional money owed the Contractor. If no Change Order is issued against this bid item, the Contract Price shall be reduced by the full amount of the bid item included in the Bid Proposal for the Mediator.

The Contractor shall have no claim for anticipated overhead or profit should the Owner fail to issue any Change Orders against this bid item.

PROGRESS PAYMENTS AND RETENTION
The Construction Manager will, after award of a Contract, establish a monthly payment date. This date will be the date during the life of the Contract, which will terminate each working month. Each month, the Construction Manager will make an approximate measurement of the Work performed to that date and estimate its value based on the Contract Unit Prices. When the Work has been satisfactorily completed, the Construction Manager will determine the quantity of Work performed and prepare the final estimate of its value.

Progress payments for lump- sum items or amounts will be in accordance with a well -balanced, detailed program of payment -apportioning in the Schedule of Values, prepared by the Contractor and submitted to the City for approval. Such payment-apportioning may require modifications during the Contract term, as determined by the City.

The Schedule of Values for each lump- sum item shall show fixed definable and measurable quantities where possible and unit prices developed and assigned by the Contractor to the different features of the Work and major subdivisions thereof. The summation of extensions of quantities and unit prices and related costs shall equal the amount of the lump-sum price in the Contract Schedule of Quantities and Prices. The Schedule of Values shall also provide the Indirect Markup Rates for Overhead and Profit associated with each bid item.

Applications for progress payments will be based on the approved Schedule of Values and from the approved progress schedule, reflecting the progress which occurred during the payment period as approved by the City.

Unless a greater percentage of retention is otherwise specified in the Contract Documents to be withheld from progress payments, 5% will be deducted from each progress estimate and retained by the City; and the remainder, less the amount of any previous payment for the Work performed, will be paid to the Contractor subject to other provisions of this section. The City retains the option, at its discretion, to reduce any retained amount by payment to the Contractor upon conditions or otherwise.

Under no circumstance shall any provision of this section be construed to limit the ability of the City to withhold 150 percent of the value of any disputed amount of Work from the final payment. In the event of a good faith dispute, nothing in this section shall be construed to require the City pay for Work that is not approved or accepted in accordance with the Plans and Specifications.

The payment of progress payments by the City shall not be construed as an absolute acceptance of the Work done up to the time of such payments.

If within the time fixed by law, a properly executed stop notice is filed with the City due to Contractor's failure to pay for labor or materials used in the work, all money due for such labor or materials will be withheld from payment to the Contractor in accordance with applicable laws.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

57 670645v1
Notwithstanding any other provision of the Contract, the City reserves the right to off -set any payment due the Contractor against any debt due from the Contractor to the City, pursuant to this Contract.

COMPLETION
When Contractor considers the Work ready for its intended use, the Contractor shall notify the City in writing that the Work is substantially complete. The Contractor shall attach to this request a list of all work items that remain to be completed and a request that the City prepare a Certificate of Substantial Completion. Within a reasonable time thereafter, the City and Contractor shall inspect the Work to determine the status of completion and to the extent that City agrees the Project is substantially complete. If the City does not consider the Work substantially complete, the City will notify Contractor in writing of the reasons therefore and Contractor shall promptly correct all items identified by the City.

The City and Contractor shall repeat the above-referenced procedure until all items are completed to the City’s satisfaction, whereupon City shall issue a Certificate of Substantial Completion.

On the date that the City issues the Certificate of Substantial Completion, the City shall provide Contractor with the final punch list identifying the remaining minor corrective items to be completed for final completion of the Project.

When the Contractor considers the final punch list work to be complete, it shall request City to perform a final walk through of the Project to determine if said punch list work is complete and whether Contractor has otherwise completed all of its obligations under the Contract Documents.

The City shall record the Notice of Completion when the entire Work including, but not limited to Contractor’s closeout document obligations are fully satisfied, Contractor’s punch list(s) and work shall have been completed to the satisfaction of the City.

However, the City, at its sole option, may accept completion of the Contract and have the Notice of Completion recorded when the entire Work including individual portions of the Work shall have been completed to the satisfaction of the City, except for minor corrective items, as distinguished from incomplete items.

Regardless of the cause therefore, the Contractor may not maintain any claim or cause of action against the City for damages incurred as a result of its failure or inability to complete its Work on the Project in a shorter period than established in the Contract Documents, the parties stipulating that the period set forth in the Contract Documents is a reasonable time within which to perform the work on the Project.

EXTENSION OF TIME - LIQUIDATED DAMAGES
The Contractor and City hereby agree that the exact amount of damages for failure to complete the work within the time specified is extremely difficult or impossible to determine. Contractor shall be assessed the sum as set forth in the Contract, as liquidated damages for each and every day the work required under the Contract Documents remains unfinished past the time for completion, as set forth in the Contract Documents, and any extensions of time granted by the City to the Contractor under the terms of the Contract Documents. The Contractor will pay to the City or City may retain from amounts otherwise payable to the Contractor, said amount for each day after failure to meet the requirements of the contract completion as scheduled in the Contract. For purposes of this Item, section Work shall be considered complete in accordance with the provisions of the foregoing section entitled “COMPLETION” and issuance of a Certificate of Substantial Completion.

Contractor shall not be charged for liquidated damages, as set forth above, because of any delays in completion of Work which are not the fault or negligence of Contractor, or its subcontractors, or persons or entities for which it is responsible, including, but not restricted to acts of God, as set forth FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

58 670645v1
herein.

FINAL APPLICATION FOR PAYMENT AND FINAL PAYMENT
After Contractor has completed all of the remaining Work items, and delivered all maintenance and operating instructions, schedules guarantees, bonds, certificates of inspection, and As -Built drawings, marked up Record documents, and any other close out documents required by the Contract Documents, and after the City has indicated that Contractor has achieved Final Completion (including, without limitation, all final punch list work), Contractor may make application for final payment following the City’s procedure for progress payments. The final application for payment shall be accompanied by all documentation called for in the Contract Documents for making of progress payments together with complete and legally effective releases and waivers of all encumbrances arising out of or related to the Work.

After Contractor has satisfied all of the conditions of the preceding paragraph, Contractor shall submit its application for final payment and release of retention. Said application shall set forth the following information, at a minimum:
(1) Cost of the Work in permanent place as of the end of the immediately preceding month as shown on the updated Project Schedule and Schedule of Values submitted with the Contractor’s application;
(2) Less amounts previously paid and previously withheld as retention; (3) The amount currently due; and
(4) An itemized list of disputed amounts, if any.

Contractor’s application for final payment shall also be accompanied by Conditional Waivers and Releases Upon Final Payment executed by Contractor and by all subcontractors for whom payment is requested.

If the Contractor fails to complete the punch list work or corrective items prior to the expiration of 35 calendar days immediately following issuance of a Certificate of Substantial Completion, the City shall withhold from the final payment an amount equal to 150% of the estimated cost, as determined by the City, of each item until such time as the item is completed. Alternatively, at the end of such 35-day period, if there are items remaining to be corrected, the City may elect to proceed to withhold a sufficient amount, which in City’s judgment may be necessary to cover the cost of incomplete and defective work. In the event of a dispute between the City and Contractor over the amount due, the City may withhold from the final payment an amount not to exceed 150% of the disputed amount.

Subject to the provisions of the Contract Documents, City shall make final payment of undisputed amounts to Contractor no later than 45 calendar days after City’s receipt of Contractor’s properly submitted application for final payment.

PAYMENTS WITHHELD
In addition to any amount which City may retain under the Contract Documents, City may withhold a sufficient amount of the Contract price otherwise due to Contractor, which in City’s judgment may be necessary to cover:
(1) Payments which may be past due and payable for just claims against Contractor or any subcontractors, or against and about the performance of work on the Project. (2) The cost of defective work, which Contractor has not remedied.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

59 670645v1
(3) Liquidated damages assessed against Contractor.
(4) Penalties for violation of any labor laws or deficient certified payroll. (5) The cost of materials or equipment ordered by the City as it may deem advisable (this right is reserved by City in the event of any neglect by Contractor in furnishing materials in ample quantities and at such times as to ensure uninterrupted progress of the Work) in order that the Work may be completed by the date specified in the Contract documents.
(6) The cost of completion of this Contract if there exists a reasonable doubt that this Contract can be completed for the balance then unpaid to Contractor. (7) Damage caused by Contractor or its subcontractors and the parties for whom they are responsible.
(8) Site clean-up including, but not limited to, removal from site and disposal of debris if Contractor fails to provide such final cleaning after construction has been completed. (9) Payments to indemnify, defend, or hold harmless the City. (10) Any payments due to the City including but not limited to payments for failed tests, utilities or imperfections.
(11) Extra services for the Construction Manager or any City agents, including but not limited to, services rendered in the evaluation of Contractor substitution requests, Requests for Information (RFI’s), Change Order Requests and Claims.
(12) Extra services for any inspector including, but not limited to, re-inspection required due to Contractor’s failed tests or installation of unapproved or defective materials and Contractor’s requests for inspection and Contractor’s failure to attend the inspection. (13) Costs to complete or submit to City Project Record Documents and other closeout documents required under the Contract Documents.
(14) Submission of daily reports and completeness thereof. (15) Breach of any provision of the Contract Documents.

If the above grounds are in the opinion of the City removed by or at the expense of Contractor, payment shall be made for amounts withheld because of them.

City may apply, but is not obligated to apply, such withheld amount or amounts to payment of such claims or obligations at its sole discretion. In so doing, City shall make such payments on behalf of Contractor. If any payment is so made by City, then such amount shall be considered as a payment made under contract by City to Contractor and City shall not be liable to Contractor for such payments made in good faith. Such payments may be made without prior judicial determination of claim or obligations. City will render Contractor an accounting of such funds disbursed on behalf of Contractor.

As an alternative to payment of such claims or obligations, City, in its sole discretion, may reduce the total Contract price or set-off the amount against payments due.

WAIVER AND RELEASE FORMS
Consistent with the provisions of California Civil Code Chapter 3 – Waiver and Release [8120 – 8138], the Contractor and its subcontractors shall promptly furnish the City with a release of all claims against the City arising by virtue of the Contract Documents related to amounts to be paid or which have been paid. This section shall survive expiration or termination of the Contract. Contractor shall FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

60 670645v1
include these requirements in all subcontracts for this project. The Contractor and subcontractors from the operation of the release may specifically exclude disputed contract claims in stated amounts.

Neither the City nor the Contractor by any term of this Contract, or otherwise, shall waive, affect, or impair the claims and liens of other persons whether with or without notice except by their written consent, and any term of the Contract to that effect shall be null and void. Any written consent given by any claimant pursuant to this section shall be null, void, and unenforceable unless and until the claimant executes and delivers a waiver and release. Such a waiver and release shall be binding and effective to release the City, construction lender, and surety on a payment bond from claims and liens only if the waiver and release follows substantially one of the forms set forth in California Civil Code Chapter 3 – Waiver and Release [8120 – 8138] and this section and is signed by the claimant or his or her authorized agent, and, in the case of a conditional release, there is evidence of payment to the claimant. Evidence of payment may be by the claimant's endorsement on a single or joint payee check that has been paid by the bank upon which it was drawn or by written acknowledgment of payment given by the claimant.

No oral or written statement purporting to waive, release, impair or otherwise adversely affect a claim is enforceable or creates any estoppel or impairment of a claim unless:
(1) It is pursuant to a waiver and release prescribed herein, or (2) The claimant had actually received payment in full for the claim.

This section does not affect the enforceability of either an accord and satisfaction regarding a bona fide dispute or any agreement made in settlement of an action pending in any court provided the accord and satisfaction or agreement and settlement make specific reference to the stop notice or bond claims.

The waiver and release given by any claimant hereunder shall be null, void, and unenforceable unless it follows substantially the following forms in the following circumstances. Each waiver in this provision shall contain the following language, in at least as large a type as the largest type otherwise on the document:

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

61 670645v1
(Example 1.) Where the claimant is required to execute a waiver and release in exchange for, or in order to induce the payment of, a progress payment and the claimant is not, in fact, paid in exchange for the waiver and release or a single payee check or joint payee check is given in exchange for the waiver and release, the waiver and release shall follow substantially the following form:

CONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT
NOTICE: THIS DOCUMENT WAIVES THE CLAIMANT'S LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS EFFECTIVE ON RECEIPT OF PAYMENT. A PERSON SHOULD NOT RELY ON THIS DOCUMENT UNLESS SATISFIED THAT THE CLAIMANT HAS RECEIVED PAYMENT.

Identifying Information
Name of Claimant:

Name of Customer:

Job Location:

Owner:

Through Date:

Conditional Waiver and Release
This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and service provided, and equipment and material delivered, to the customer on this job through the Through Date of this document. Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the parties prior to the date that this document is signed by the claimant, are waived, and released by this document, unless listed as an Exception below. This document is effective only on the claimant's receipt of payment from the financial institution on which the following check is drawn:

Maker of Check:

Amount of Check: $
Check Payable to:

Exceptions
This document does not affect any of the following:
(1) Retentions.
(2) Extras for which the claimant has not received payment. (3) The following progress payments for which the claimant has previously given a conditional waiver and release but has not received payment:

Date(s) of waiver and release:

Amount(s) of unpaid progress payment(s): $
(4) Contract rights, including (A) a right based on rescission, abandonment, or breach of contract, and (B) the right to recover compensation for work not compensated by the payment.

Signature
Claimant's Signature:

Claimant's Title:

Date of Signature:

Exclusions: Listing of Claims, of which prior written Notice has been given to the City of Fresno:

1. Claim for: In the amount of: $

2. Claim for: In the amount of: $

3. Claim for: In the amount of: $
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

62 670645v1
(Example 2.) Where the claimant is required to execute a waiver and release in exchange for, or in order to induce payment of, a progress payment and the claimant asserts in the waiver it has, in fact, been paid the progress payment, the waiver and release shall follow substantially the following form with the text of the "Notice to Claimant" in at least as large a type as the largest type otherwise in the form:

UNCONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT
NOTICE TO CLAIMANT: THIS DOCUMENT WAIVES AND RELEASES LIEN, STOP PAYMENT

NOTICE, AND PAYMENT BOND RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL WAIVER AND RELEASE FORM.

Identifying Information
Name of Claimant:

Name of Customer:

Job Location:

Owner:

Through Date:

Unconditional Waiver and Release
This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and service provided, and equipment and material delivered, to the customer on this job through the Through Date of this document. Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the parties prior to the date that this document is signed by the claimant, are waived, and released by this document, unless listed as an Exception below. The claimant has received the following progress payment: $ .

Exceptions
This document does not affect any of the following:
(1) Retentions.
(2) Extras for which the claimant has not received payment. (3) Contract rights, including (A) a right based on rescission, abandonment, or breach of contract, and (B) the right to recover compensation for work not compensated by the payment.

Signature
Claimant's Signature:

Claimant's Title:

Date of Signature:

Exclusions: Listing of Claims, of which prior written Notice has been given to the City of Fresno:

1. Claim for: In the amount of: $

2. Claim for: In the amount of: $

3. Claim for: In the amount of: $
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

63 670645v1
(Example 3.) Where the claimant is required to execute a waiver and release in exchange for, or in order to induce the payment of, a final payment and the claimant is not, in fact, paid in exchange for the waiver and release or a single payee check or joint payee check is given in exchange for the waiver and release, the waiver and release shall follow substantially the following form:

CONDITIONAL WAIVER AND RELEASE ON FINAL PAYMENT
NOTICE: THIS DOCUMENT WAIVES THE CLAIMANT'S LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS EFFECTIVE ON RECEIPT OF PAYMENT. A PERSON SHOULD NOT RELY ON THIS DOCUMENT UNLESS SATISFIED THAT THE CLAIMANT HAS RECEIVED PAYMENT.

Identifying Information
Name of Claimant:

Name of Customer:

Job Location:

Owner:

Conditional Waiver and Release
This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and service provided, and equipment and material delivered, to the customer on this job. Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the parties prior to the date that this document is signed by the claimant, are waived, and released by this document, unless listed as an Exception below. This document is effective only on the claimant's receipt of payment from the financial institution on which the following check is drawn:

Maker of Check:

Amount of Check: $
Check Payable to:
*Exceptions
This document does not affect any of the following:

Disputed claims for extras in the amount of: $
Signature
Claimant's Signature:

Claimant's Title:

Date of Signature:
*Listing of Claims, of which prior written Notice has been given to the City of Fresno:

1. Claim for: In the amount of: $

2. Claim for: In the amount of: $

3. Claim for: In the amount of: $
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

64 670645v1
(Example 4.) Where the claimant is required to execute a waiver and release in exchange for, or in order to induce payment of, a final payment and the claimant asserts in the waiver it has, in fact, been paid the final payment, the waiver and release shall follow substantially the following form with the text of the "Notice to Claimant" in at least as large a type as the largest type otherwise in the form:

UNCONDITIONAL WAIVER AND RELEASE ON FINAL PAYMENT
NOTICE TO CLAIMANT: THIS DOCUMENT WAIVES AND RELEASES LIEN, STOP PAYMENT

NOTICE, AND PAYMENT BOND RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL WAIVER AND RELEASE FORM.

Identifying Information
Name of Claimant:

Name of Customer:

Job Location:

Owner:

Unconditional Waiver and Release
This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for all labor and service provided, and equipment and material delivered, to the customer on this job.

Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the parties prior to the date that this document is signed by the claimant, are waived, and released by this document, unless listed as an Exception below. The claimant has been paid in full.
*Exceptions
This document does not affect the following:

Disputed claims for extras in the amount of: $
Signature
Claimant's Signature:

Claimant's Title:

Date of Signature:
*Listing of Claims, of which prior written Notice has been given to the City of Fresno:

1. Claim for: In the amount of: $

2. Claim for: In the amount of: $

3. Claim for: In the amount of: $
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

65 670645v1

SECURITIES IN LIEU OF RETENTION PERMITTED AND ESCROW
AGREEMENT (PUBLIC CONTRACT CODE SECTION 22300)
Pursuant to provisions of section 22300 of the California Public Contract Code, Contractor may substitute securities for any monies withheld by Owner. Procedures shall be as provided in section 22300 of the California Public Contract Code.
(a) Provisions shall be included in any invitation for bid and in any contract documents to permit the substitution of securities for any moneys withheld by a public agency to ensure performance under a contract, provided that substitution of securities provisions shall not be required in contracts in which there will be financing provided by the Farmers Home Administration of the United States Department of Agriculture pursuant to the Consolidated Farm and Rural Development Act (7 U.S.C. Sec. 1921 et seq.), and where federal regulations or policies, or both, do not allow the substitution of securities. At the request and expense of the contractor, securities equivalent to the amount withheld shall be deposited with the public agency, or with a state or federally chartered bank in this state as the escrow agent, who shall then pay those moneys to the contractor. Upon satisfactory completion of the contract, the securities shall be returned to the contractor. (b) Alternatively, the contractor may request, and the owner shall make payment of retentions earned directly to the escrow agent at the expense of the contractor. At the expense of the contractor, the contractor may direct the investment of the payments into securities and the contractor shall receive the interest earned on the investments upon the same terms provided for in this section for securities deposited by the contractor. Upon satisfactory completion of the contract, the contractor shall receive from the escrow agent all securities, interest, and payments received by the escrow agent from the owner, pursuant to the terms of this section. (c) Securities eligible for investment under this section shall include those listed in Section 16430 of the Government Code, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the contractor and the public agency. The contractor shall be the beneficial owner of any securities substituted for moneys withheld and shall receive any interest thereon. Failure to include these provisions in bid and contract documents shall void any provisions for performance retentions in a public agency contract. For purposes of this section, the term “public agency” shall include, but shall not be limited to, chartered cities.
(d) (1) Any contractor who elects to receive interest on moneys withheld in retention by a public agency shall, at the request of any subcontractor, make that option available to the subcontractor regarding any moneys withheld in retention by the contractor fr om the subcontractor. If the contractor elects to receive interest on any moneys withheld in retention by a public agency, then the subcontractor shall receive the identical rate of interest received by the contractor on any retention moneys withheld from the subcontractor by the contractor, less any actual pro rata costs associated with administering and calculating that interest. In the event that the interest rate is a fluctuating rate, the rate for the subcontractor shall be determined by calculating the interest rate paid during the time that retentions were withheld from the subcontractor. If the contractor elects to substitute securities in lieu of retention, then, by mutual consent of the contractor and subcontractor, the subcontractor may substitute securities in exchange for the release of moneys held in retention by the contractor. (2) This subdivision shall apply only to those subcontractors performing more than five percent of the contractor’s total bid. (3) No contractor shall require any subcontractor to waive any provision of this section.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

66 670645v1
(e) The Legislature hereby declares that the provisions of this section are of statewide concern and are necessary to encourage full participation by contractors and subcontractors in public contract procedures.
(f) The escrow agreement used hereunder shall be null, void, and unenforceable unless it is substantially similar to the following form:

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

67 670645v1

ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION

This Escrow Agreement is made and entered into by and between whose address is hereinafter called
“Owner,” whose address is hereinafter
called “Contractor” and whose address is
hereinafter called “Escrow Agent.” For the consideration hereinafter set forth, the Owner, Contractor, and Escrow Agent agree as follows:
(1) Pursuant to Section 22300 of the Public Contract Code of the State of California, Contractor has the option to deposit securities with Escrow Agent as a substitute for retention earnings required to be withheld by Owner pursuant to the Construction Contract entered into between the Owner and Contractor for in the amount of
dated (hereinafter referred to as the
“Contract”). Alternatively, on written request of the Contractor, the Owner shall make payments of the retention earnings directly to the Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent shall notify the Owner within 10 days of the deposit. The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract between the Owner and Contractor. Securities shall be held in the name of and shall designate the Contractor as the beneficial owner. (2) The Owner shall make progress payments to the Contractor for those funds which otherwise would be withheld from progress payments pursuant to the Contract provisions, provided that the Escrow Agent holds securities in the form and amount specified above. (3) When the Owner makes payment of retentions earned directly to the Escrow Agent, the Escrow Agent shall hold them for the benefit of the Contractor until the time that the escrow created under this contract is terminated. The Contractor may direct the investment of the payments into securities.

All terms and conditions of this agreement and the rights and responsibilities of the parties shall be equally applicable and binding when the Owner pays the Escrow Agent directly. (4) Contractor shall be responsible for paying all fees for the expenses incurred by Escrow Agent in administering the Escrow Account and all expenses of the Owner. These expenses and payment terms shall be determined by the Owner, Contractor, and Escrow Agent. (5) The interest earned on the securities, or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to the Owner. (6) Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from the Owner to the Escrow Agent that Owner consents to the withdrawal of the amount sought to be withdrawn by Contractor.
(7) The Owner shall have a right to draw upon the securities in the event of default by the Contractor. Upon seven days’ written notice to the Escrow Agent from the owner of the default, the Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by the Owner.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

68 670645v1
(8) Upon receipt of written notification from the Owner certifying that the Contract is final and complete, and that the Contractor has complied with all requirements and procedures applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of the Escrow Account. The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges. (9) Escrow Agent shall rely on the written notifications from the Owner and the Contractor pursuant to Sections (5) to (8), inclusive, of this agreement and the Owner and Contractor shall hold Escrow Agent harmless from Escrow Agent’s release and disbursement of the securities and interest as set forth above.
(10) The names of the persons who are authorized to give written notice or to receive written notice on behalf of the Owner and on behalf of Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows:

On behalf of Owner: On behalf of Contractor: On behalf of Escrow Agent:

Title Title Title
Name Name Name
Signature Signature Signature
Address Address Address

At the time the Escrow Account is opened, the Owner and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Agreement.

IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers on the date first set forth above.

Owner Contractor

Title Title

Name Name

Signature Signature
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

69 670645v1

DIVISION III

FEDERAL REQUIREMENTS

(This is not a federally funded project and, as such, those provisions would otherwise apply to a federally funded project are not applicable to this project.)

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

70 670645v1

DIVISION IV

SPECIAL CONDITIONS
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

71 670645v1

DIVISION IV

SPECIAL CONDITIONS
The work embraced herein shall be done in accordance with applicable provisions of the Standard Specifications of the City of Fresno, Department of Public Works and with the special conditions contained herein.

Inspection and other construction review shall be provided by the City of Fresno, except where specified otherwise in Specifications or required permits.

1. PERMITS AND FEES

The Contractor shall secure all permits required to complete the items of this Contract. No fees will be charged for any City permits, other than for a water meter, if required. Water meter permit and fee shall be obtained and paid for at the Fresno City Water Division Office at 1910 East University Avenue. Caltrans encroachment permits are required for work at or near a State highway.

2. NOTIFICATION OF PROPERTY OWNERS

The Contractor shall notify all property owners in writing along the public right-of-way 96 hours (7 days notification prior to any street closure) in advance of construction as to when, how, and how long they will be affected. The Letter of Notification shall also give the name of the person representing the Contractor and his or her telephone number. The letter shall be prepared and delivered by the Contractor.

3. CONTRACTOR'S RESPONSIBILITIES

Contractor agrees that he or she shall assume sole and complete responsibility for job site conditions during the course of construction of this project, including safety of all persons and property; that this requirement shall apply continuously and not be limited to normal working hours.

4. TEMPORARY SUSPENSION OF WORK

The Engineer shall have the authority to suspend the work wholly or in part, for such period as deemed necessary, due to unsuitable weather, or to such other conditions as are considered unfavorable for the suitable prosecution of the work, or for such tim e as he or she may deem necessary due to the failure on the part of the Contractor to carry out orders given, or to perform any provision of the Contract.

If the Engineer orders a suspension of all of the work or a portion of the work which is the current controlling operation or operations, due to unsuitable weather or to such other conditions as are considered unfavorable to the suitable prosecution of the work, the days on which the suspension is in effect shall not be considered working days as defined in Section 8- 1.06, "Time of Completion, State Standard Specifications." If a portion of the work at the time of such suspension is not a current controlling operation or operations, the determination of working days will be made on the basis of the then current controlling operation or operations. If a suspension of work is FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

72 670645v1
ordered by the Engineer, due to the failure on the part of the Contractor to carry out orders given or to perform any provision of the Contract, the days on which the suspension order is in effect shall be considered working days if such days are working days within the meaning of the definition set forth in Section 8-1.06, " Time of Completion, State Standard Specifications."

5. TESTING

All first compaction tests shall be performed at no expense to the Contractor. The cost of each subsequent retest shall be paid for by the Contractor if the first tests fail to meet the required relative compaction.

6. DISPOSAL OF CONCRETE AND A.C. SURFACING

All concrete, A.C. and pavement removed from the project site shall be disposed of at a site obtained by the Contractor and approved by the Engineer. No recyclable material shall be disposed of at any landfill. All disposable recyclable materials shall be disposed in a manner that facilitates recycling. Payment for disposal, including all costs of hauling, shall be as specified in the Technical Specifications or Explanation of Bid Items. The Contractor shall report quantities of disposed material in a manner that enables the City to utilize diverted quantities as diversion credits pursuant to California Integrated Waste Management Act of 1989 (Public Resources Code Sections 40000 et seq.)

7. DISPOSAL OF OIL CAKE, VEGETATION, WOOD DEBRIS, STRUCTURE DEMOLITION

AND OTHER DEBRIS

All oil cake, wood debris, structure demolition, vegetation and any other debris removed from the project site shall be legally disposed of at a site(s) obtained by the Contractor (“Disposal Site(s)”) with prior written permission of the Engineer. Contract or shall identify the proposed Disposal Site(s) at the pre-construction conference. Such Disposal Site(s) shall be a properly licensed and permitted facility pursuant to state and local regulations for purposes of accepting delivery of the respective materials. No recyclable material shall be disposed of at any landfill. All disposable recyclable materials shall be disposed in a manner that facilitates recycling. In addition to the following, a certificate of compliance stating disposal location and manner of disposal of recyclable materials shall be submitted to the Engineer.

Contractor shall make arrangements for disposing of the materials at the Disposal Site(s) and pay all costs involved. Arrangements shall include, but not be limited to, obtaining written authorization from the property owner of the Disposal Site(s) and before disposing of any material off the project site, Contractor shall furnish to the Engineer the authorization or a certified copy thereof together with a written release from the property owner absolving the City of Fresno from any and all responsibility in connection with the disposal of material on the property of the Disposal Site(s).

Before any material is disposed of on the Disposal Site(s), the Contractor shall obtain written permission from the Engineer to dispose of the material at the location des ignated in the authorization.

It is expressly understood and agreed that the City of Fresno assumes no responsibility to the Contractor whatsoever by the granting of such permission and Contractor shall assume all risks in connection with the use of the Disposal Site(s). The Contractor is cautioned to make such independent investigation and examination as the Contractor deems necessary to be satisfied as FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

73 670645v1
to the quantity and types of materials which may be disposed of on the Disposal Site(s) and the status of any permits or licenses in connection therewith.

Within 24 hours of removing the respective material from the project site for disposal, Contractor shall provide Engineer with a certified copy of the weight slip from the Disposal Site obtained by Contractor upon delivery of such debris, and a certified statement from Contractor identifying the material constituting the debris and that it was disposed of at the Disposal Site (identifying the facility and name of the owner) in accordance with all laws and applicable regulations promulgated by Federal, State, regional, or local administrative and regulatory agencies.

Payment for disposal, including all costs of hauling, shall be as specified in the Technical Specifications or Explanation of Bid Items. The Contractor shall report quantities of disposed material in a manner that enables the City to utilize diverted quant ities as diversion credits pursuant to the California Integrated Waste Management Act of 1989 (Public Resources Code Sections 40000 et seq.)

8. PARKING PERMITS

All Contractors using vehicles, necessary for the performance of work for the City of Fresno, that require parking off the job site in an area subject to a parking violation shall obtain special meter provisions issued by the City Parking Division. Meter r eservations may be made on the City website by going to Departments, Planning & Development, Parking, and clicking Construction and Event Support at the bottom of the page, To Apply for Meter Reservation Online. Contractors not coordinating such provisions shall be required to otherwise comply with the parking requirements of Chapter 14 of the Fresno Municipal Code and will be subject to fines for violation of the Code.

9. TRAFFIC CONTROL

Any additional project specific requirements are outlined in Div. VI Technical Specifications.

Access to all local streets, businesses and residences shall be maintained at all times, except as noted. Turn lanes are not to be considered as travel lanes. A minimum of one 12- foot travel lane in each direction must be provided at all times.

Intersections:

Intersections may not be closed. A detour and barricading plan must be submitted to the City of Fresno Traffic Engineering Division at least 5 working days in advance of any work being done.

Written approval shall be obtained from the Traffic Engineering D ivision prior to the beginning of work.

Construction of sidewalks and curb ramps must be prosecuted in a manner that allows for the continued use of ADA-compliant routes by pedestrians at the intersection being worked on.

Public Notification:

The Contractor will ensure the public is given at least 7 days notification prior to street closure, and 96 hours notification prior to trail and lane closure. Method of notification must be approved in writing by the Engineer.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

74 670645v1
Any deviation from these requirements must have prior written approval of the Engineer and the Traffic Engineering Division.

Traffic Control Systems:

The California Manual on Uniform Traffic Control Devices (MUTCD) is hereby referred to and incorporated herein as though set forth in full. Special attention is directed to Section 7- 10 of the City Standard Specifications.

The Contractor shall be responsible for removal of any traffic markings and/or signing that may conflict with detour channelization and the placement and removal of any temporary traffic markings and/or signing as may be required by the City Traffic Engineer or his or her designee, or desired by the Contractor. Any removal of traffic markings shall be accomplished by burning off or sandblasting of the existing markings.

It is the responsibility of the Contractor to prepare a traffic control, traffic detour and temporary lane delineation plan for use during construction.

It is also the responsibility of the Contractor to obtain the City Traffic Engineering Division’s written approval of the Traffic Control plan prior to the beginning of any work.

Approval of the Traffic Control Plan may be rescinded at any time if all necessary signing and barricading is not placed and maintained as required.

Should it become necessary to rescind approval of the Traffic Control Plan, the City shall place and maintain all necessary signing and barricading. Payment for this work shall be deducted from the Contractor's final payment. Furthermore, non-compliance with any of the stated conditions in this section by Contractor will result in public inconvenience and/or exposure of the public to a dangerous condition, and such inconvenience and exposure is difficult to determine. Therefore, the Contractor agrees that liquidated damages of $1,000.00 per calendar day for each and every calendar day not in compliance with the stated conditions in this section shall be applied during the period whereby approval for the plan has been rescinded. Such liquidated damages shall be in addition to any other liquidated damages withheld from payments under these Specifications due to any delay by Contractor. In the event that the total liquidated damages exceed the final payment due the Contractor, the excess amount shall be due and payable immediately by the Contractor to City.

Construction Management with the assistance of the Traffic Engineering Division will be observing and directing the Contractor on proper traffic signing and barricading through the construction zone. The Contractor shall provide safe access for the City in spection staff to make their observation.

The Contractor shall strictly comply with, and will be solely responsible for, all required traffic control and devices as per City approved plan and any revisions thereof. The Contractor shall inspect the traffic control setup at two hour intervals at the least and correct all problems immediately.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

75 670645v1
The Contractor shall be responsible for providing all necessary flagging and maintaining traffic control facilities, 24 hours per day, 7 days per week for the entire duration of the project.

10. REMOVAL OF TRAFFIC CONTROL PAVEMENT MARKERS

Existing pavement markers, when no longer required for traffic lane delineation, shall be removed, and disposed of as directed by the Engineer.

Full compensation for removing and disposing of pavement markers shall be included in the various bid items and no separate payment will be made.

11. SURVEY MONUMENTS AND CONSTRUCTION STAKING

The Engineer shall provide horizontal and vertical controls which consist of control stakes at 50- foot intervals, angle points, and beginning and ending of curves only for proposed concrete improvements, edge of pavement, proposed underground facilities to be constructed under this Contract, and areas as required by Engineer.

All requests for staking shall be in writing and signed by the Contractor. All requests for staking shall be submitted to the Engineer at least two working days prior to the need for such staking.

The Project Inspector or Chief Surveyor will accept verbal requests for staking provided the Contractor signs a written request prior to commencement of the staking. Any stakes disturbed or removed prior to completion and inspection of the work controlled by said stakes shall be replaced by the Engineer at the expense of the Contractor. The cost of restaking or replacement of stakes so disturbed shall be charged to the Contractor at the rate as shown in the Master Fee Schedule in effect at the time the Contract is awarded. Said cost will be deducted from monies owed the Contractor under progress payments or fixed payment. Execution of the request for staking shall be prima facie evidence that the Contractor is responsible for all stakes set pursuant to the request.

The Contractor shall pay overtime rates when staking is required and performed at other than normal working hours. The hourly overtime rate for staking, as shown in the Master Fee Schedule in effect at the time the Contract is awarded, shall be paid when s uch overtime services are required on City observed holidays, Saturdays, Sundays, or before or after the normal 8 hours of a normal working day.

12. LOCATION OF THE WORK FOR INSTALLATIONS

The exact location for installation purposes will be indicated by the Engineer with location stakes and the Contractor will not commence any work hereunder without such stakes in place.

Full compensation for all costs involved in the above shall be included in the amount bid for the various items of work and no separate payment shall be made therefore.

13. PROJECT SITE MAINTENANCE

Reference is made to Section 7.8 of the City Standard Specifications, which is referred to in full and contained herein as part of these Specifications together with the following addition:

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

76 670645v1
The Contractor shall furnish and operate a self-loading motor sweeper with spray nozzles at least once each working day to keep paved areas acceptably clean as directed by the Engineer.

Full compensation of clean up during construction and for final clean up shall be included in the prices bid for the various items of work, and no separate payment will be made.

Reference is made to Section 5 of the City Standard Specifications contained herein as part of these Specifications with the following additions:

As directed by the Engineer, and as set forth in these Specifications, the Contractor shall expose, prior to construction staking, all existing utilities which may control proposed facility grades, so that the Engineer may verify the grades prior to staking. Two working days’ notice shall be given the Engineer.

The Contractor is responsible for protection of all utility services and facilities within the limits of work. Responsible diligence has been exercised in locating all lines, but the Contractor is responsible for checking in the field the locations as shown and is further responsible for any and all utilities whose presence or location is unknown.

All existing utility mains and service lines shall be kept in constant service during the construction of this project. Hand excavating shall be employed where necessary to safely expose existing utilities.

All utility services and facilities damaged or broken by the Contractor shall be repaired or replaced in accordance with the requirements of the owner of said utility. The Contractor will be permitted to sever a sanitary sewer house branch, provided an approved temporary conduit for the missing portion is installed immediately.

The cost of verifying the locations of said utility facilities indicated on the Plans, including exposing them prior to construction, and the full cost of protection, repair, or replacement of utilities shall be included in the various bid items of work with no separate payment thereof.

The Contractor should be aware that, because of the depth of certain facilities and their close proximity to existing utilities, it may be necessary for the Contractor to protect and support adjacent or crossing utilities and improvements. If utility poles require bracing during storm drain construction, the Contractor shall contact the effected utility companies and have their forces

brace the pole. The Contractor shall reimburse the utility company for all costs associated with bracing utility poles. The Engineer has made a diligent attempt to show on the Construction Drawings all pertinent intersec ting utilities which may affect the work. Utilities shown in profile view are shown at their most probable location, based upon available as-built drawings and known construction customs. The Contractor shall exercise extreme caution in excavating for this project and shall protect existing utilities from damage, in as much as their exact location is unknown until exposed by the excavation.

14. UTILITIES
Reference is made to Section 5 of the City Standard Specifications contained herein as part of these Specifications with the following additions:

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

77 670645v1
As directed by the Engineer, and as set forth in these Specifications, the Contractor shall expose, prior to construction staking, all existing utilities which may control proposed facility grades, so that the Engineer may verify the grades prior to staking. Two working days’ notice shall be given the Engineer.

The Contractor is responsible for protection of all utility services and facilities within the limits of work. Responsible diligence has been exercised in locating all lines, but the Contractor is responsible for checking in the field the locations as shown and is further responsible for any and all utilities whose presence or location is unknown.

All existing utility mains and service lines shall be kept in constant service during the construction of this project. Hand excavating shall be employed where necessary to safely expose existing utilities.

All utility services and facilities damaged or broken by the Contractor shall be repaired or replaced in accordance with the requirements of the owner of said utility. The Contractor will be permitted to sever a sanitary sewer house branch, provided an approved temporary conduit for the missing portion is installed immediately.

The cost of verifying the locations of said utility facilities indicated on the Plans, including exposing them prior to construction, and the full cost of protection, repair, or replacement of utilities shall be included in the various bid items of work with no separate payment thereof.

The Contractor should be aware that, because of the depth of certain facilities and their close proximity to existing utilities, it may be necessary for the Contractor to protect and support adjacent or crossing utilities and improvements. If utility poles require bracing during storm drain construction, the Contractor shall contact the effected utility companies and have their forces brace the pole. The Contractor shall reimburse the utility company for all costs associated with bracing utility poles. The Engineer has made a diligent attempt to show on the Construction Drawings all pertinent intersecting utilities which may affect the work. Utilities shown in profile view are shown at their most probable location, based upon available as -built drawings and known construction custom. The Contractor shall exercise extreme caution in excavating for this project and shall protect existing utilities from damage, inasmuch as their exact location is unknown until exposed by the excavation.

15. HAZARDOUS MATERIAL AND UNFORESEEN CONDITIONS

In the event any Work hereunder involves digging trenches or other excavations that extend deeper than four feet below the surface, the Contractor shall promptly, and before the following conditions are disturbed, notify the Engineer, in writing, of any: (i) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; (ii) subsurface or latent physical conditions at the site differing from those indicated; and (iii) unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in these Specifications.

The Buyer will promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the Contractor's cost of, or the time required for, performance of any part of the Work, it will issue a FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

78 670645v1
change order under the procedures described in these Specifications. In the event that a dispute arises between the Buyer and the Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor's cost of, or time required for, performance of any part of the Work, the Contractor shall not be excused from any scheduled completion date provided for by the Contract, but shall proceed with all Work to be performed under the Contract. The Buyer and Contractor shall retain any rights provided by Contract or law which pertain to the resolution of disputes and protests between the parties.

16. ACCESS TO PROPERTY

Pedestrian and vehicular access to properties shall be provided and maintained at all times, unless arrangements are made with the property owners, their tenants, renters, or lease holders along the streets and alleys, to deviate from this requirement. Exceptions include during the actual placing of concrete or for very short periods during paving operations. Access shall be safe and reasonable for pedestrians and motor vehicles used by the property owners and emergency vehicles (fire, police, and ambulance). The Engineer will make the sole determination of what is safe and reasonable.

The Contractor's failure to provide safe and reasonable pedestrian and vehicular access shall provide just reason to issue a stop work order to the Contractor with no additional working days added to the Contract.

17. AMERICANS WITH DISABILITIES ACT ACCESSIBILITY

If the previous pedestrian facility was accessible to pedestrians with disabilities, the path provided during construction and/or temporary traffic control shall also be accessible.

This will consist of a continuous, unobstructed 48” wide pedestrian path of travel adjacent to the work site, preferably parallel to the same sidewalk that has been obstructed. There shall not be any abrupt changes in grade or terrain that could cause a tripping hazard or could be a barrier to wheelchair use. The Contractor shall install and maintain temporary concrete, asphalt or wood ramps to provide a safe path of travel for mobility-impaired pedestrians at locations where ramps have been temporarily rem oved or are needed to route pedestrians. Barriers and channelizing devices shall be detectable to pedestrians who have visual disabilities. These considerations include, but are not limited to, the following:

• The path of travel shall not have abrupt changes in grade, elevation, or terrain. The path of travel shall have a cross slope of 2% or less; running slope may be equal to that of the topography of the adjacent street.

• Any changes in level in a path of travel that is over ¼” – ½” height shall be beveled at a 45- degree angle to provide a smooth transition.

• Temporary ramps shall be a minimum of 48” wide, with a running slope ratio not to exceed 1:12 (one foot run for every inch of the curb). Sides of a ramp shall be protected where there is a drop off. For all ramps not meeting the definition of a curb ramp , handrails will be provided in conformance with Title 24 and the Americans with Disabilities Act Design Standards.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

79 670645v1

• For walkways in the pedestrian path that have less than 5’ of clear width, there shall be provided passing spaces 5’ wide every 200 ft. to provide adequate space for two pedestrians in wheelchairs to pass each other.

• Signposts, scaffolding and fencing and other supports shall be placed to provide an unobstructed path of travel that is 48” wide and 80” high.

• Closed trenches, temporary paving surfaces, walking surfaces, steel plates, etc. shall have a smoothly finished, firm walking surface made even with surrounding walkways. If plywood is used as a temporary walking surface, it will be a minimum of ¾” in thickness and it will be anchored using either a mechanical fastener, cold mix or asphalt so that it is stable and level with surrounding surfaces.

• When a sidewalk is closed and pedestrian traffic detoured, sidewalk signs indicating that the sidewalk, curb ramp, or both the sidewalk and curb ramp are closed are required. These signs shall be placed so as to provide ample warning of the detour to people with mobility impairments and minimize backtracking. Signs shall be placed so that they are visible from the sidewalk before the detour begins.

• When a sidewalk is completely closed, a barrier that is detectable by a person with a visual disability traveling with the aid of a long cane shall be placed across the full width of the closed sidewalk.

• During detours, access shall be provided by directing all pedestrian traffic to the unaltered side of the street where marked crossings and usable curb ramps exist; if such elements do not exist, temporary marked crosswalks and temporary ramps shall be provided. Any plan proposing temporary marked crosswalks and ramps shall be approved in writing by the City Traffic Engineer or his or her designee.

• To protect pedestrians with visual disabilities using a mobility cane and to serve as a wheelchair stop, barriers shall have brightly contrasting colors marking each end and a ground rail running the length of each side of the barrier that is attached to the base.

• A-frames and other devices used for defining path of travel shall be connected and maintained to provide a stable guide to help a pedestrian with a visual disability negotiate a safe path while using a cane. These devices shall provide a continuous detectable edge at least 6” above the surface of the sidewalk or pathway, with the bottom of the edge a maximum of 2” above the ground or walkway surface. This edge should be firmly attached to the ground or to other devices.

• The bottom 3” of fencing material (e.g. chain link, plastic, etc.) shall be solid to provide a guide for pedestrians with visual disabilities and limit the likelihood that a long cane will be caught in the fence. This may be achieved by attaching a solid material to the bottom portion of the fence.

• During working hours, open excavations will not be allowed to adjoin or interrupt the pedestrian path. No open excavations will be permitted in pedestrian access areas FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

80 670645v1
overnight.

• Caution tape or its equivalent shall NOT be used by itself to delineate the path of travel or create a barricade.

• The Contractor shall provide notice to Fresno Area Express (FAX) at (559) 621-1424 twenty- four hours before engaging in work that will impede access to a FAX bus stop to allow the relocation of the bus stop to a temporary, accessible location.

Each project is unique and the Contractor is responsible for and will conduct a thorough review to ensure complete, safe, usable and accessible paths of travel.

Full compensation for all costs involved shall be included in the amount bid for the various items of work and no separate payment will be made.

18. COORDINATION BETWEEN CONTRACTORS

The Contractor shall coordinate his or her work at the site with work which may be done concurrently by other Contractors as required by Section 5- 1.20 of the State Standard Specifications.

Full compensation for all costs involved shall be included in the amount bid for the various items of work and no separate payment will be made.

19. ADJUSTMENT OF EXISTING UTILITY FACILITIES

The following are for estimating purposes only, and the Contractor should field verify the exact number of facilities to be adjusted to finish pavement elevation.

The following facilities shall be adjusted to grade by the Contractor unless otherwise directed by the Engineer:

(a) Sanitary Sewer Manhole
(b) Storm Drain Manhole
(c) Water Valve Casings and Lids

All other utilities shown on the Plans which may need adjustment to grade shall be done by their respective owners. All adjustments will be done after the paving operations. Contractor shall be responsible to identify the location with a physical marker and notifying the respective utility companies concerned; for PG&E, contact Mr. Chris Woods at (559) 263-5215, for AT&T, contact Ms. Dawn Sibley at (559) 454- 3367, and for FMFC D, contact Ms. Debbie Campbell at [email protected].

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

81 670645v1

20. HANDLING OF WATER MAIN

For projects that include installation of a water main, all pipe, fittings, valves and accessories shall be loaded and unloaded with hoists or skidding in order to avoid shock or damage. Under no circumstances shall such material be dropped. Pipe handled on skidways shall not be rolled or skidding against pipe on the ground.

Gaskets for push on joints to be stored shall be placed in a cool location out of direct sunlight.

21. UNDERGROUND UTILITY SEQUENCING

If included in the project, the first order of work shall be the installation of the water main.

Contractor shall trench through existing pavement and no additional pavement areas beyond the normal trench width shall be removed. The contractor may commence remaining work after obtaining satisfactory results for the pressure test(s) on the water main.

22. CONSTRUCTION SCHEDULE CONSTRAINTS

The Contractor shall submit a Tentative Construction Schedule and Final Construction Schedule in accordance with Division II – Pre-Construction Meeting and Schedule of Work. The contractor shall identify any schedule constraints that they foresee regarding material procurement, community impacts, utility work or adjacent construction projects.

23. ASPHALT CONCRETE MIX DESIGN APPROVAL

The Contractor shall submit to the Engineer a proposed mix design for each asphalt concrete mixture to be used at least two weeks prior to production of that asphalt concrete mixture. The proposed mix designs shall conform to the asphalt concrete mixture quality requirements specified in Section 39-2 of the State Standard Specifications.

The Contractor shall furnish test data in support of each proposed mix design including asphalt concrete quality requirements for California Test 305, Swell; California Test 307, Moisture Vapor Susceptibility; and, California Test 366, Stabilometer Value. The test data furnished shall be for an asphalt concrete mixture that conforms to the proposed target values for the asphalt binder content.

The Contractor shall submit the following for each asphalt concrete mixture proposed for use under the contract:

A. Aggregate and mineral filler:

1. Target values for percent passing each sieve size for the aggregate blend. The proposed target values, for the specified type and aggregate size, shall conform to the aggregate gradation limits specified in Section 39-2.02, Aggregate, of the State Standard Specifications.

2. Results of tests for aggregate quality requirements specified in Section 39-2.02, Aggregate, of the State Standard Specifications.

3. Source of each aggregate to be used.

4. Percentage of each aggregate stockpile or hot bin to be used.

5. Gradation of each aggregate stockpile or hot bin to be used.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

82 670645v1
B. Asphalt binder:

1. Target value for asphalt binder content for each proposed asphalt concrete mixture.

2. Results of the asphalt binder quality tests as specified in Section 92, Asphalts, of the State Standard Specifications.

Asphalt concrete production for this project shall not begin until the Contractor has received written notification that the proposed mix design has been accepted by the Engineer.

Adjustments from one mix design to another shall not be made during the progress of the work, unless permitted in writing by the Engineer. The Contractor shall submit to the Engineer a proposed mix design for each new asphalt concrete mixture to be used at least two weeks prior to production of that mixture. Changes in stockpile or hot bin proportions to conform to aggregate grading requirements will not be considered changes in the approved mix design.

24. ARCHEOLOGICAL AND HISTORICAL FINDINGS

Unless otherwise specified in this subsection, the Contractor is advised that the site of the work is not within any property, district, or site, and does not contain any building, structure, or object listed in the current National Register of Historic Places published by the United States Department of Interior.

Should the Contractor encounter, during his or her operations, any building, part of a building, structure, or object which is incongruous with its surroundings, he or she shall immediately cease operations in that location and notify the Construction Mana ger. The Construction Manager will immediately investigate the Contractor’s finding and will direct the Contractor to either resume his or her operations or to suspend operations as directed.

Should the Construction Manager order suspension of the Contractor’s operations in order to protect an archaeological or historical finding, or order the Contractor to perform extra work, such shall be covered by an appropriate contract modification (change order or supplemental agreement) as provided in the General Conditions.

25. PERFORMANCE AND ASSURANCES

Contractor agrees to faithfully and expeditiously perform or cause to be performed all work as described in the plans and specifications, or as later amended and approved by City under this Contract, and to perform in accordance with applicable provisions of the law.

26. CHANGE ORDERS

Approval of any change order by the City is subject to Resolution No. 2017- 158 as adopted by the City Council. Notwithstanding the inclusion of the City Standard Specifications, Section 3 entitled, “Changes in Work”, if this project is federally funded, the change order markup rates shall be based on the contractor’s overhead rates as negotiated in the base agreem ent or as agreed to in the Contractor’s Schedule of Values. If no agreement has been reached between the Contractor and the City, Overhead and Pro fit shall be negotiated with each change order. The FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

83 670645v1
City’s evaluation of profit shall be based on technical, cost, schedule and/or performance risk.

Profit may be based on the base agreement if the nature of the work poses similar risks to those in the base agreement. However, in no case shall the value of the total mark -up exceed the markup rates in the base agreement.

27. DUST CONTROL AND STORM WATER POLLUTION PREVENTION

It shall be the responsibility of the Contractor to prepare, obtain approval, and implement all of the requirements of the latest Fugitive Dust Control Plan (FDCP) in accordance with the San Joaquin Valley Air Pollution Control District (District) Regulation VIII. Also, it shall be the responsibility of the Contractor to prepare, obtain approval, and implement all of the requirements of the latest State National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities Order No. 2009-0009- DWQ and industry standards according to the State Water Quality Control Board (SWQCB).

Dust Control

The FDCP and maps must be prepared utilizing the latest requirements of the District. Once the FDCP and maps have been prepared, it shall be the responsibility of the Contractor to submit and obtain written approval by the District. Until a written approval has been obtained by the District, no construction activity shall commence on the project site. Once a written approval has been obtained, the Contractor shall submit to Construction Management a copy of the approved FDCP with all maps. The Contractor shall keep the FDCP current as required by the District. The Contractor shall keep a copy of the approved FDCP, and amendments thereto, at the job site and in the general business office of the Contractor.

In addition, the Contractor shall make available to Construction Management copies of all amendments to the FDCP as prepared by the Contractor. The FDCP shall be made available upon request of a representative of the District or U.S. Environmental Protecti on Agency.

Requests by the public shall be directed to the Engineer.

Contractor must provide written notification to the District at least 48 hours in advance of any earthmoving activity. Record keeping is required by the District and must be kept for each day any dust control measure is used. Copies of record keeping forms and the Construction Notification form are available on the District’s website at www.valleyair.org under Compliance Assistance/Dust Control. The Contractor shall be familiar with and shall have a copy of the District’s Regulation VIII – Fugitive Dust Control at Construction Sites . Copies of the regulation may be obtained online at the above-mentioned website.

The Contractor shall be responsible throughout the duration of the project for street sweeping, soil stabilization, watering operations, establishing a water source and associated costs, carryout and track out prevention, notification, installing, inspecti ng, maintaining, required record keeping and removing control measures to reduce Visible Dust Emissions (VDE) and eliminate nuisances from or within the construction site.

Dust control shall conform to Section 7-8 of the Standard Specifications and the cost of labor and equipment required for the work shall be included in the various bid items and no separate payment will be allowed. The cost of water will be paid by the Contractor.

Reference to and incorporation of the provisions of Sections 23113, 23114, 23115 and 40,000.16 of the California Vehicle Code regarding containment and transportation of any aggregate material FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

84 670645v1
upon public roadways is made to these Specifications.

Storm Water

It shall be the responsibility of the Contractor to comply with all of the requirements of the latest NPDES General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities Order No. 2009- 0009-DWQ according to SWQCB and standard industry practice. This includes, but is not limited to preparing plans and application, maps as well as all necessary reporting on the SWQCB’s Storm Water Multiple Application and Report Tracking System (SMARTS System). The Contractor, working with their certified Qualified Storm Water Pollution Prevention Plan (SWPPP) Developer (QSD), will determine what would be the best course of action to comply with the latest State NPDES General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities Order No. 2009- 0009- DWQ. If the Contractor’s QSD determines a SWPPP is the best course of action, it shall be the responsibility of the Contractor and their QSD to submit to Construction Management a completed SWPPP for review. Upon acceptance of the SWPPP document by Construction Management, the QSD shall prepare a Notice of Intention (NOI) application in the SWQCB’s SMARTS System and upload all necessary documents and maps to be approved by the Legally Responsible Person (LRP). Until a written approval of the SWPPP has been obtained from the SWQCB, no construction activity shall commence on the project site. Upon obtaining written approval of the SWPPP, it shall be the responsibility of the Contractor to implement the SWPPP. Throughout the course of the project, the Contractor’s certified Quality SWPPP Practitioner (QSP) shall conduct periodic inspections, testing, any reporting on the SMARTS System as well as coordinate with the QSD to update the SWPPP as necessary. At the conclusion of construction, it shall be the responsibility of the Contractor and his or her QSD/QSP to ensure the annual report has been updated on the SMARTS System as well as prepare the Notice of Termination (NOT) for City’s approval. The Contractor shall keep a copy of the approved SWPPP, and amendments thereto, at the job site and in the general business office of the Contractor. In addition, the Contractor shall make available to Construction Management copies of all amendments to the SWPPP as prepared by the Contractor. The SWPPP shall be made available upon request of a representative of the Fresno Metropolitan Flood Control District, Regional Water Quality Control Board, State Water Resources Control Board or U.S. Environmental Protection Agency. Requests by the public shall be directed to the Engineer.

SWPPP preparation will also include any preparation of Storm Water Annual Reports or Rain Event Action Plan (REAP). If specified for the risk level, REAP preparation includes preparing and submitting REAP forms and monitoring weather forecasts. Storm Water Annual Report preparation includes certifications, training, monitoring and inspection results, and obtaining Storm Water Annual Report acceptance.

If the Contractor and/or his/her QSD determines that a SWPPP is not necessary, then it shall be the responsibility of the Contractor to provide a list of Best Management Practices (BMP) that are to be implemented during the Work to Construction Management. The Contractor shall implement the BMP in a timely manner and maintain throughout the duration of the project. The Contractor shall keep a copy of the BMP list and any modification to the list at the job site and in the general business office of the Contractor. In addition, the Contractor shall make available to the City copies of all modifications to the BMP list. The BMP list shall be made available upon request of a representative of the Fresno Metropolitan Flood Control District, Regional Water Qualit y Control Board, State Water Resources Control Board or U.S. Environmental Protection Agency. Requests FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

85 670645v1
by the public shall be directed to Construction Management.

The Contractor shall be responsible throughout the duration of the project for installing, inspecting and maintaining the control measures (Best Management Practices – BMP’s) and for properly removing and disposing of temporary control measures. The Contra ctor shall be responsible for all permit fees and other fees associated with the SWPPP including any renewal fees. The Contractor will also be responsible for producing annual reports, as necessary. The Contractor shall also be responsible for other items associated with SWPPP implementation including Job Site Management, Storm Water Sampling and Analysis, and Street Sweeping.

Notice of violation and/or fines for any non-compliance will be the responsibility of the Contractor.

28. SALVAGED ITEMS

See Plans for locations of specific items to be salvaged. All salvaged material shall be delivered by the Contractor to the Fax Bus Yard, located at 2223 G Street or to a location directed by the Engineer. Contractor to coordinate delivery with FAX project manager.

Full compensation for all costs involved in salvage shall be included in the amount bid for the various items of work and no separate payment will be made therefore.

FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

86 670645v1

DIVISION V

STANDARD SPECIFICATIONS
Please refer to City of Fresno Standard Specifications and Drawings Updated January 2023 and as Amended thereafter
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

87 670645v1

STANDARD SPECIFICATIONS

The City of Fresno Standard Specifications and Drawings, Department of Public Works, dated January 2023 and as amended from time- to-time, are hereby referred to and incorporated herein as though set forth in full. It is recommended that bidders obtain the most current issue of these Specifications.

The Standard Specifications are available on the City of Fresno’s website (www.fresno.gov) by clicking on Public Works Department and checking Department Technical Library.

If you do not have access to the Internet, copies of the Standard Specifications with Standard Drawings may be obtained for $40 at City Hall, Public Works Counter, Room 4064N, 2600 Fresno Street, Fresno CA 93721- 3623, Telephone (559) 621- 8800. (If mailed, a mailing charge of $6.00 per book will be required.)
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

88 670645v1

DIVISION VI

TECHNICAL SPECIFICATIONS
89 FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

TECHNICAL SPECIFICATIONS

EXPLANATION OF BID ITEMS

Explanation of Bid Items

The unit price bid per unit measure of work shall include all costs of labor, equipment, and materials necessary for the furnishing and constructing complete in place and operating in accordance with the Plans and Specifications for the City of Fresno for all work listed in the bid items.

Bid Item No. 1 – Mediator (Owner’s 50% share, see page 56 of General Conditions)

This item shall be bid a lump sum for Mediator. Reference is made to “Mediator” on page 56 of the General Conditions.

This work shall consist of paying the City’s share of the costs of the Mediator, in conformance with the provisions in the Specifications, and as directed by the Engineer.

The dollar amount listed on the Bid Proposal form is an estimate only and will be included in each bidder’s Bid Proposal.

The bid item may be increased, decreased, or deleted in its entirety and is not to be construed as additional money owed to the Contractor. If no change order is issued against this bid item, the contract price shall be reduced by the full amount of the bid item included in the Bid Proposal for the Mediator

All costs associated with this bid item shall be included in the lump sum price and based on actual costs incurred.

Bid Item No. 2 – Traffic Control

This item shall be bid lump sum and shall conform to the provisions of the latest edition(s) of:

Section 12 (Temporary Traffic Control) of the Caltrans Standard Specifications, Chapter 5 of Caltrans Traffic Manual (Traffic Controls for Construction and Mai ntenance Work Zones), the 2014 California Manual on Uniform Traffic Control Devices (2014 CALIFORNIA MUTCD), Section 7- 10 (Public Convenience and Safety) of the City Standard Specifications, these Specifications, Public Works Policies 210.01 and 210.10 and as directed by the Engineer.

This item shall consist of the Contractor’s responsibility to provide safety and convenience to authorized vehicles and City of Fresno personnel in connection with the Contractor’s operations.

The Contractor shall be responsible for providing and maintaining a 25’ wide accessible traffic area as specified on the plans, including all signs, barricades, and delineation necessary to maintain traffic flow around the project.

Access for emergency vehicles shall be available within the construction area at all times.

Full compensation for furnishing , when needed, all labor (including flagging), materials, tools, equipment and incidentals, and for doing all work involved for the sole convenience, direction 90 FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
and safety of authorized vehicles and City of Fresno personnel shall be included in the pre- determined price for this bid item and no additional payment will be made. Payments shall be prorated over the term of the contract.

Bid Item No. 3 – Mobilization

This item shall be bid a lump sum and shall conform to the provisions of Section 9-1.16D of the City adopted Edition of the Caltrans Standard Specifications and these Specifications.

This item shall consist of covering the Contractor’s cost for contract documents and for the moving of personnel, equipment, supplies and incidentals to the project site.

The lump sum price for this item has been determined to be $1 2,000.00 and shall not exceed that amount. No additional payment will be made for this item.

Bid Item No. 4 – Clearing and Grubbing (Non-Structural Demolition and Removal)

This item shall be bid a lump sum and shall be in accordance with the provisions of Section 10 of the City of Fresno Standard Specifications, be in accordance with the provisions of Sections 17 of the State Standard Specifications, the applicable provisions of Division IV of these Specifications, as shown on the Plans, and as directed by the Engineer.

This work shall include but is not limited to the removal and disposal of the concrete flooring including the rebar if any, aggregate base, hydraulic lift and appurtenances or other existing facilities as needed for reconstruction of new improvements as shown on the Plans and Section 10 of the City of Fresno Specifications. Salvaged items shall include the existing trench drain grates and fixtures as noted on the plans.

Full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in clearing and grubbing, complete in place, including subgrade preparation, as shown on the Plans, and as directed by the Engineer shall be included in the unit price of this bid item.

All costs associated with this bid item shall be included in the lump sum price and no additional payment will be made.

Bid Item No.5 – Storm Water Pollution Prevention Plan (SWPPP) and Fugitive Dust Control Plan (FDCP) Preparation

This item shall be bid lump sum and shall conform to the provisions of Item 27 of Division IV Special Conditions for plan preparation if required for Storm Water Pollution Prevention Plan (SWPPP) and Fugitive Dust Control Plan (FDCP).

Full compensation for all costs involved in preparing, obtaining approval, maintenance of, revising, and amending the SWPPP and the FDCP shall be included in the lump sum bid amount for this bid item, and no additional payment will be made.

Bid Item No. 6 – Storm Water Pollution Prevention Plan (SWPPP) and Best Management Practices (BMP’s) Implementation
91 FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

This item shall be bid lump sum and shall conform to the provisions of Item 27 of Division IV Special Conditions.

This item shall consist of implementation and maintenance of the control measures (Best Management Practices – BMP’s) as stipulated in Item 27 of the Special Conditions to reduce or eliminate pollutants and sediment in storm water discharges from or within the construction site.

The Contractor shall be responsible throughout the duration of the project for installing, inspecting and maintaining the control measures (Best Management Practices – BMP’s) and for properly removing and disposing of temporary control measures.

Full compensation for complying with and implementing the SWPPP-BMP’s, including all labor, materials, tools, equipment, and incidentals, and all work necessary to place, maintain, and remove BMP’s as required, and to carry out all training, inspection, mo nitoring programs, and to perform any other work necessary to comply with the requirements in Item 27 of Division IV Special Conditions, shall be included in the lump sum amount bid for this Bid Item and no additional payment will be made.

Bid Item No. 7 – Sawcut

This item shall be bid per linear foot and shall consist of saw cutting existing Concrete as specified on the plans, and as directed by the Engineer.

Full compensation for all costs involved in furnishing all labor, materials, tools, equipment, and incidentals for doing all work involved in saw cutting concrete shall be included in the unit price per linear foot of this item.

Final pay quantity will be based on the actual saw cutting done as determined by the Engineer.

Bid Item No. 8 – Aggregate Base (Class II)

This item shall be bid per ton and shall conform with the provisions of Section 12 of the City of Fresno Standard Specifications, these Specifications, and as shown on the Plans.

This item shall consist of mineral aggregate, spread, and compacted on a prepared subgrade or subbase in conformance with the lines, grades and dimensions shown on the Plans, standard details and as specified herein.

Full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in the spreading and compaction of Class II Aggregate base, complete in place, including subgrade preparation, as shown on the Plans, and as directed by the Engineer shall be included in the unit price of this bid item.

The final pay quantity will be the actual authorized tonnage installed based upon certified weight receipts.

Bid Item No. 9 – Concrete Surface and Footings

This item shall be bid per square foot and shall conform to the provisions of Section 14 of the 92 FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
City of Fresno Standard Specifications, these Specifications and as shown on the Plans.

This item shall consist of constructing Concrete Surface and Footings at the locations shown on the Plans.

Full compensation for furnishing all items listed below, as shown on the Plans, and as directed by the Engineer shall be included in the unit price of the item.

This bid item shall include the following: furnishing all labor, materials, tools, equipment, incidentals, Concrete Surface and Footings complete in place, including subgrade preparation, all bar reinforcing steel dowels, construction of trench drains, adjustment of appurtenances to grade, placing or replacing, working in and around, duct work, wall appurtenances, wall/floor lighting facilities and other appurtenances, and/or incorporating into existing flooring as well as any other work required in Concrete Flatwork that is not identified on this list.

The final pay quantity shall be the actual quantity installed as determined by the Engineer.

Bid Item No. 10 – Trench Drain Connection

This bid item is a unit price bid per each connection made to the existing trench drainage system as specified on the plans and as directed by the Engineer.

This item shall consist of connecting trench drains to the existing drainage system and all other appurtenances required for a complete and in place drainage system. Refer to applicable sections of Plumbing and General Plumbing found in Bid Item No. 12.

Full compensation for all costs involved shall be included in the unit price bid per each connection to existing drain system.

Bid Item No. 11 – Re-route Existing Electrical/Plumbing on Wall

This item shall be bid lump sum and shall conform to these Specifications and Plans. The Contractor shall furnish the Engineer a Schedule of Values (cost break -down) for this contract lump sum item. Reference Section 9- 1.16B, “Schedule of Values,” of the State Standard Specifications, latest edition. Schedule of Values table shall be submitted to the Engineer for approval prior to start of work.

This item shall consist of inspection, installation, removal, capping, insulation removal and replacement and maintenance of electrical and or plumbing on wall or floor as shown on the Plans. Refer to applicable sections of General Conditions for Electrical Work and Basic Electrical Materials and Methods in Bid Item No. 13.

Full compensation for furnishing all items listed below, as shown on the Plans, and as directed by the Engineer shall be included in the lump sum price of the item. No additional payment will be made.

This item shall include the following: furnishing all labor, materials, tools, equipment, incidentals, all involved in inspection, installation, 90- day maintenance period, working in and around existing facilities and for doing all work involved in removal and capping of pipes as shown on 93 FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
plans and removal and installation of pipe insulation.

The sum of the amounts for the line items of work listed in the Schedule of Values table for this bid item shall be equal to the contract lump sum bid price. No adjustments in compensation will be made in the contract lump sum price due to differences between the quantities shown in the Schedule of Values furnished by the Contractor and the quantities required to complete the work as shown on the plans and as specified in these specifications.

The approved Schedule of Values may be used to determine partial payments during the progress of the work at the Engineer’s discretion.

Bid Item No. 12 – Surface Mounted Maintenance Lift

This item shall be bid lump sum and shall conform to these Specifications, as shown on the Plans and as directed by the Engineer.

This bid item shall consist of furnishing and installing the surface mounted maintenance lift, the complete installation of the underground conduit, conduit trenching, trenching slurry, any work involved with providing electrical service and air service as required by the Manufacturer and as specified on the Plans. Installation of lift shall be per manufacturer recommendations and at location shown on plans. Manufacturer shall provide the appropriate anchor bolts. Anchor bolts are post-installed and shall r equire a special inspection. The contractor shall coordinate and schedule this special inspection. No additional payment shall be made for Special Inspection.

All materials shall be furnished and installed by the Contractor, less the installation work performed by the manufacturer upon delivery of the lift system.

The contractor shall be responsible for delivery coordination of the surface mounted maintenance lift.

This bid item shall include full compensation for furnishing all labor, materials, tools, equipment, inspections and incidentals and for doing all the work involved in installing the surface mounted maintenance lift, complete and in place, shall be included in the lump sum price of this bid item.

Contractor shall not be compensated for any installation work that the manufacturer completes.

All costs associated with this item shall be included in the lump sum price and no additional payment will be made.

Bid Item No. 13 – Wall Cleaning and Painting

This item shall be bid lump sum and shall conform to these Specifications and Plans. The Contractor shall furnish the Engineer a Schedule of Values (cost break -down) for this contract lump sum item. Reference Section 9- 1.16B, “Schedule of Values,” of the State Standard Specifications, latest edition. Schedule of Values table shall be submitted to the Engineer for approval prior to start of work.

This bid item shall consist of all material required to prepare the walls for cleaning, including any material required to protect any ceiling, floor, or wall fixtures or appurtenances, all materials required to prepare the walls for the final coat of finish paint, all materials needed for the finish 94 FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
paint and all work and materials necessary to complete the cleaning, prepping and painting of the walls as specified on the Plans.

The sum of the amounts for the line items of work listed in the Schedule of Values table for this bid item shall be equal to the contract lump sum bid price. No adjustments in compensation will be made in the contract lump sum price due to differences between the quantities shown in the Schedule of Values furnished by the Contractor and the quantities required to complete the work as shown on the plans and as specified in these specifications.

The approved Schedule of Values may be used to determine partial payments during the progress of the work at the Engineer’s discretion.

95 FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

GENERAL PLUMBING
PART 1 – GENERAL

1.1 GENERAL CONDITIONS
A. The preceding General Conditions shall form a part of this Section with the same force and effect as though repeated here.

B. Drawings and general provisions of the contract, and these specifications , apply to this Section.

1.2 CODES AND REGULATIONS
A. All work and materials shall be in accordance with 2022 rules and regulations of applicable codes. Nothing in these Drawings or Specifications is to be construed to permit work not conforming to these codes. Should the Drawings or Specifications call for material or methods of construction of a higher quality or standard than required by these codes, the Drawings and Specifications shall govern. Applicable codes and regulations include, but are not necessarily limited to, the following:

California Building Code CCR Title 24, Part 2 California Electrical Code CCR Title 24, Part 3 California
Mechanical Code CCR Title 24, Part 4 California
Plumbing Code CCR Title 24, Part 5 California Energy
Code CCR Title 24, Part 6 California Fire
Code CCR Title 24, Part 9
Local Codes

1.3 DEFINITIONS
A. Provide: The term "provide" as used in these specifications or on the drawings shall mean furnish and install.

B. Piping: The term "piping" as used in these specifications or on the drawings shall mean all pipe, fittings, valves, hangers, insulation, etc. as may be required for a complete and functional system.

C. Ductwork: The terms "duct" or "ductwork" as used in these specifications or on the drawings shall mean all ducts, fittings, joints, dampers, hangers, insulation, etc. as may be required for a complete and functional system.

D. Wiring: The term "wiring" as used in these specifications or on the drawings shall mean all wiring, conduit, boxes, connections, transformers, relays, switches etc. as may be required for a complete and functional system.

1.4 PERMITS AND FEES

A. The Contractor shall take out all permits and arrange for all tests in connection with his work as required. All charges are to be included in the work.

96 FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

1.5 COORDINATION OF WORK
A. Examination: Before starting work, thoroughly examine existing and newly completed underlying and adjoining work and conditions on which the installation of this work depends. Report to the Engineer in writing all conditions which might adversely affect this work.

B. Layout: Layout of materials, equipment and systems is generally diagrammatic unless specifically dimensioned. Some work may be shown offset for clarity. The actual locations of all materials, piping, ductwork, fixtures, equipment, supports, etc. shall be carefully planned prior to installation of any work in order to avoid all interference with each other, or with structural, electrical, architectural or other elements.

C. Verification: If discrepancies are discovered between drawing and specification requirements, the more stringent requirement shall apply. All conflicts shall be called to the attention of the Engineer prior to the installation of any work or the ordering of any equipment. No work shall be prefabricated or installed prior to this coordination. No costs will be allowed to the Contractor for any prefabrication or installation performed prior to this coordination. Verify the proper voltage and phase of all equipment with the electrical plans.

D. Location of Utilities Prior to Trenching or Earthwork: The Contractor shall notify the Owner a minimum of two business days prior to beginning trenching or earthwork. Prior to this notification, the Contractor shall have marked all proposed trenches with paint and shall have contacted a utility locating company and have had this company mark all found underground utilities with paint. The Contractor shall then coordinate and arrange for a site visit with the Owner to review the proposed trenching and/or ear thwork areas.

Trenching and/or earthwork shall not begin until the Owner agrees. Repair and/or compensation for repair of marked utilities is the responsibility of the Contractor. The Owner retains the right to either self -perform the repair or require the Contractor to complete the repair, as directed by the Owner. If while performing the work, the Contractor discovers utilities that have not been marked, the Contractor shall immediately notify the Owner verbally and in writing.

1.6 GUARANTEE

A. Guarantee shall be in accordance with the General Conditions. The Contractor shall repair any defects due to faulty materials or workmanship and pay for any resulting damage to other work which appears within the guarantee period. These Specifications may extend the period of the guarantee for certain items. Where such extensions are called for, or where items are normally provided with guarantee periods in excess of that called for in the General Conditions, the certificate of guarantee shall be furnished to the Owner through the Engineer.

1.7 QUIETNESS

A. Piping, ductwork and equipment shall be arranged and supported so that vibration is a minimum and is not transmitted to the structure.
97 FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

1.8 DAMAGES BY LEAKS

A. The Contractor shall be responsible for damages caused by leaks in the temporary or permanent piping systems prior to completion of work and during the period of the guarantee, and for damages caused by disconnected pipes or fittings, and the overflow of equipment prior to completion of the work.

1.9 EXAMINATION OF SITE

A. The Contractor shall examine the site, compare it with Plans and Specifications, and shall have satisfied himself as to the conditions under which the work is to be performed.

No allowance shall subsequently be made in his behalf for any extra expense to which he may be put due to failure or neglect on his part to make such an examination.

1.10 COMPATIBILITY WITH EXISTING SYSTEMS

A. Any work which is done as an addition, expansion or remodel of an existing system shall be compatible with that system.

1.11 MATERIALS AND EQUIPMENT

A. Materials and equipment shall be new unless otherwise noted. Materials and equipment of a given type shall be by the same manufacturer. Materials and equipment shall be free of dents, scratches, marks, shipping tags and all defacing features at time of project acceptance. Materials and equipment shall be covered or otherwise protected during construction as required to maintain the material and equipment in new factory condition until project acceptance.

1.12 SUBMITTALS

A. Shop Drawings: Within 30 days of contract award, the Contractor shall submit six copies of shop drawings for all materials, equipment, etc. proposed for use on this project.

Material or equipment shall not be ordered or installed until written review is processed by the Engineer.

All shop drawings must comply with the following:

1. Shop drawings are required for all material and equipment items and shall include manufacturer's name and catalog numbers, dimensions, capacities, performance curves, and all other characteristics and accessories as listed in the specifications or on the drawings. Descriptive literature shall be current factory brochures and submittal sheets. Capacities shall be certified by the factory. facsimile submittals are not acceptable.

2. All shop drawings shall be submitted at one time in a neat and orderly fashion in a suitable binder with title sheet including Project, Engineer and Contractor, table of contents, and indexed tabs dividing each group of materials or item of 98 FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
equipment. All items shall be identified by the specification paragraph number for which they are proposed. All equipment shall also be identified by the mark number as indicated on drawings.

3. All capacities, characteristics, and accessories called for in the specifications or on the drawings shall be high-lighted, circled or underlined on the shop drawings.

Calculations and other detailed data indicating how the item was selected shall be included for items that are not scheduled. Data must be complete enough to permit detailed comparison of every significant characteristic which is specified, scheduled or detailed.

B. Substitutions: Manufacturers and model numbers listed in the specifications or on the drawings represent the standard of quality and features desired. Proposed substitutions shall comply with the Owner’s General Requirements. Calculations and other detailed data indicating how the item was selected shall be included. The Contractor shall assume full responsibility that substituted items or procedures will meet the specifications and job requirements and shall be responsible for the cost of redesign and modifications to the work caused by these items. At the Engineer's request, furnish locations where equipment similar to the substituted equipment is installed and operating along with the user's phone numbers and contact person. Satisfactory operation and service history will be considered in the acceptance or rejection of the proposed substitution.

C. Review: Submittals will be reviewed for general conformance with the design concept, but this review does not guarantee quantity shown, nor does it supersede the responsibility of the Contractor to provide all materials, equipment and installation in accordance with the drawings and specifications. The Contractor shall agree that shop drawing submittals processed by the Engineer are not Change Orders; that the purpose of shop drawing submittals by the Contractor is to demonstrate to the Engineer that the Contractor understands the design concept, that he demonstrates his understanding by indicating which equipment and material he intends to furnish and install and by detailing the fabrication and installation methods he intends to use. The Contractor shall agree that if deviations, discrepancies or conflicts between shop drawings and design drawings and specifications are discovered either prior to or after shop drawing submittals are processed by the Engineer, the design drawings and specifications shall control and shall be followed. If a resubmittal is required, submit a complete copy of the Engineer's review letter requiring such with the resubmittal.

1.13 MANUFACTURER'S RECOMMENDATIONS

A. All material, equipment, devices, etc., shall be installed in accordance with the recommendations of the manufacturer of the particular item. The Contractor shall be responsible for all installations contrary to the manufacturer's recommendations. The Contractor shall make all necessary changes and revisions to achieve such compliance.

Manufacturer's installation instructions shall be delivered to and maintained at the job site through the construction of the project.
99 FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

1.14 SCHEDULING OF WORK

A. All work shall be scheduled subject to the review of the Engineer and the Owner. No work shall interfere with the operation of the existing facilities on or adjacent to the site.

The Contractor shall have at all times, as conditions permit, a sufficient force of workmen and quantity of materials to install the work contracted for as rapidly as possible consistent with good work, and shall cause no delay to other Contractors engaged upon this project or to the Owner. HVAC equipment and functions, whether exi sting or new, shall be maintained in operating condition whenever the facility is occupied, unless otherwise approved by the Owner.

1.15 HAZARDOUS MATERIAL REMOVAL

A. All hazardous material removal will be by the Owner. Hazardous material is to be removed before the work is started. If the Contractor discovers hazardous material which has not been removed, the Contractor shall immediately cease work in that area and promptly notify the Owner.

1.16 OPENINGS, CUTTING AND PATCHING

A. The locations and dimensions for openings through walls, floors, ceilings, foundations, footings, etc. required to accomplish the work under this Specification Division shall be provided under this Division. Except as noted below, the actual openings and the required cutting and patching shall be provided by other Divisions. Coring through existing concrete or masonry walls, floors, ceilings, foundations, footings, etc., and saw cutting of concrete floors or asphaltic concrete required to accomplish the work under this Specification Division shall be provided under this Division. Patching of these surfaces shall be provided by other Divisions. Cutting or coring shall not impair the strength of the structure. Any damage resulting from this work shall be repaired at the Contractor’s expense to the satisfaction of the Engineer.

1.17 EXCAVATION AND BACKFILL

A. General: Barrel of pipe shall have uniform support on sand bed. Sand shall be free from clay or organic material, suitable for the purpose intended and shall be of such size that 90 percent to 100 percent will pass a No. 4 sieve and not more than 5 percent will pass a No. 200 sieve. Unless otherwise noted, minimum earth cover above top of pipe or tubing outside building walls shall be 24”, not including base and paving in paved areas.

B. Excavation: Width of trench at top of pipe shall be minimum of 16”, plus the outside diameter of the pipe, unless noted otherwise. Provide all shoring required by site conditions. Where over excavation occurs, provide compacted sand backfill to pipe bottom. Where groundwater is encountered, remove to keep excavation dry, using well points and pumps as required.

C. Backfill:

100
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

1. 6” Below, Around, and to 12” Above Pipe: Material shall be sand. Place carefully around and on top of pipe, taking care not to disturb piping, consolidate with vibrator.

2. One Foot Above Pipe to Grade: Material shall be sandy or silty loam, free of lumps, laid in 6” layers, uniformly mixed to proper moisture and compacted to required density. If backfill is determined to be suitable and required compaction is demonstrated by laboratory test, water compaction in 6” layers may be used, subject to review by Engineer.

D. Compaction: Compact to density of 95% within building and under walkways, driveways, traffic areas, paved areas, etc. and to 90% elsewhere. Demonstrate proper compaction by testing at top, bottom and one- half of the trench depth. Perform these tests at three locations per 100’ of trench.

1.18 CONTINUITY OF SERVICES
A. Existing services and systems shall be maintained except for short intervals when connections are made. The Contractor shall be responsible for interruptions of services and shall repair damage done to any existing service caused by the work. If utilities not indicated on the drawings are uncovered during excavation, the Contractor shall notify the Engineer immediately.

1.19 PROTECTIVE COATING FOR UNDERGROUND PIPING

A. All ferrous pipe below grade (except cast iron) shall have a factory applied protective coating of extruded high density polyethylene, 35 to 70 mils total thickness, X-Tru-Coat, Scotchkote. All fittings and areas of damaged coating shall be covered with two layer double wrap of 10 mil polyvinyl tape to total thickness of 40 mils. John- Mansville.

Protective coating shall be extended 6” above surrounding grade.

1.20 ACCESS DOORS

A. Provide access doors as required where equipment, piping, valves, ductwork, etc. are not otherwise accessible. Access doors shall match the wall or ceiling finish and fire rating as indicated on the Architectural drawings. 16-gage steel frame and 14-gage steel door with paintable finish, except in ceramic tile, where door shall be 16-gage stainless steel with satin finish. Continuous hinge. Deliver doors to the General Contractor for installation. Milcor. Unless otherwise noted, the minimum sizes shall be as follows:

1 valve up to 1-1/2” 12” x 12”
1 valve up to 3” 16” x 16”

1.21 CONCRETE ANCHORS

A. Steel stud with expansion wedge requiring a drilled hole – powder driven anchors are not acceptable. Minimum spacing shall be 12 diameters center to center and 10 diameters center to edge of concrete. Maximum allowable stresses for tension and shear 101
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
shall be 80% of the ICC Evaluation Service Report (ESR) values. Minimum concrete embedment shall be the nominal embedment listed in the ESR table. Hilti Kwik Bolt TZ.

1.22 EQUIPMENT ANCHORING AND OTHER SUPPORTS

A. Mechanical systems (equipment, ductwork, piping, conduit, etc.) shall be anchored in accordance with the CBC. All systems mounted on concrete shall be secured with a concrete anchor at each mounting point. All air handlers shall be mounted on spring isolators. Secure base plate as indicated above. Attachment of equipment, ductwork, piping, conduit, etc. supported on curbs or platforms shall be made to the side of curbs and platforms, where possible. Where screws or lag bolts must be installed through the top of a sheet metal cap, the installation shall be as follows. Pre-drill pilot hole. Fill pilot hole with polyurethane sealant. Install screw or lag bolt with a flat washer and an EPDM washer adjacent to the sheet metal.

1.23 SUPPORTS AND SEISMIC RESTRAINTS

A. Any structural element required to hang or support piping, ducts or equipment provided under this Division and not shown on other drawings shall be provided under this Division.

B. Mechanical systems (equipment, ductwork, piping, etc.) shall be provided with supports in accordance with the CBC.

1.24 PAINTING

A. Paint all black iron supports, hangers, anchors, etc. with two coats of rust resisting primer.

Also paint all uninsulated black iron piping exposed to weather with two coats of rust resisting primer.

1.25 SYSTEM IDENTIFICATION

A. Above Grade Piping: Provide markers on piping which is either exposed or concealed in accessible spaces. For piping systems, other than drain and vent lines, indicate the fluid conveyed or its abbreviation, either by pre-printed markers or stenciled marking, and include arrows to show direction of flow. Pre-printed markers shall be the type that wrap completely around the pipe, requiring no other means of fastening such as tape, adhesive, etc. Comply with ANSI A13.1 for colors. Locate markers at ends of lines, near major branches and other interruptions including equipment in the line, where lines pass through floors, walls or ceilings or otherwise pass into inaccessible spaces, and at 50' maximum intervals along exposed portions of lines. Marking of short branches and repetitive branches for equipment connections is not required.

B. Below Grade Piping: Bury a continuous, pre-printed, bright-colored, metallic ribbon marker capable of being located with a metal detector with each underground pipe. Locate directly over buried pipe, 6” to 8” below finished grade.

C. Equipment: All equipment shall be identified with a plastic laminated, engraved 102
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
nameplate which bears the unit mark number as indicated on the drawings (e.g. AC -4).

Provide 1/2" high lettering - white on black background. Nameplates shall be permanently secured to the exterior of the unit.

D. Valves: Provide brass valve tags with brass hooks or chains on all valves of each piping system, excluding check valves, valves within equipment, faucets, stops and shut-off valves at fixtures and other repetitive terminal units. Prepare and submit a tagged-valve schedule, listing each valve by tag number, location and piping service. Deliver to Owner through the Engineer.

1.26 CLEANING

A. Progressively and at completion of the job, the Contractor shall thoroughly clean all of his work, removing all debris, stain and marks resulting from his work. This includes but is not limited to building surfaces, piping, equipment and ductwork, inside and out. Surfaces shall be free of dirt, grease, labels, tags, tape, rust, and all foreign material.

1.27 OPERATION AND MAINTENANCE INSTRUCTIONS

A. Printed: Three copies of Operation and Maintenance Instructions and Wiring Diagrams for all equipment and parts list for all faucets, trim, valves, etc. shall be submitted to the Engineer. All instructions shall be clearly identified by marking them with t he same designation as the equipment item to which they apply (e.g. AC-3). All Wiring Diagrams shall agree with reviewed Shop Drawings and indicate the exact field installation. All instructions shall be submitted at the same time and shall be bound in a suitable binder with tabs dividing each type of equipment (e.g. Pumps, Fans, Motors, etc.). Each binder shall be labeled indicating "Operating and Maintenance Instructions, Project Title, Contractor, Date" and shall have a Table of Contents listing all items included.

B. Verbal: The Contractor shall verbally instruct the Owner's maintenance staff in the operation and maintenance of all equipment and systems. The controls contractor shall present that portion of the instructions that apply to the control system. The Engineer's office shall be notified 48 hours prior to this meeting.

C. Acknowledgment: The Contractor shall prepare a letter indicating that all operation and maintenance instructions (printed and verbal) have been given to the Owner, to the Owner's satisfaction. This letter shall be acknowledged (signed) by the Owner and submitted to the Engineer.

1.28 RECORD DRAWINGS

A. The Contractor shall obtain one set of prints for the project, upon which a record of all construction changes shall be made. As the work progresses, the Contractor shall maintain a record of all deviations in the work from that indicated on the drawings. Final location of all underground work shall be recorded by depth from finished gra de and by offset distance from permanent surface structures, i.e. building, curbs, and walks. In addition, the water, gas, sewer, under floor duct, etc. within the building shall be recorded by offset distances from building walls. An electronic copy of th e original drawings will 103
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
be made available to the Contractor. The Contractor shall transfer the changes, notations, etc. from the marked- up prints to the electronic copy. The record drawings (marked-up prints, electronic drawings disc and a hard copy) shall be submitted to the Engineer for review.

1.29 ACCEPTANCE TESTING

A. The Contractor shall perform, document and submit all acceptance testing as required by California Code of Regulations, Title 24, Part 6.

PART 2 - PRODUCTS (not used)

PART 3 - EXECUTION (not used)

PLUMBING
PART 1 - GENERAL

1.1 GENERAL PLUMBING PROVISIONS

A. The preceding General Plumbing Provisions shall form a part of this Division with the same force and effect as though repeated here.

1.2 SCOPE

A. Included: Provide all labor, materials and services necessary for complete, lawful and operating systems as shown or noted on the drawings or as specified here. The work includes, but is not necessarily limited to, the following:

1. Domestic water system.

2. Drain system (including condensate drain).

3. All equipment as shown or noted on the drawings or as specified.

PART 2 - PRODUCTS

2.1 PIPING MATERIALS

A. Water:

1. Cold Water Piping:

a. Inside Building, Within Five Feet of Building Walls, and All Above Grade:

1. Schedule 40 galvanized steel pipe, ASTM A120/A53. 150 psi galvanized malleable iron screwed fittings, ANSI B16.3.

OR
104
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

2. Hard temper seamless copper, ASTM B88. Wrought copper fittings, ANSI B16.22. Type L with brazed joints (1100F, min.). 1- 1/2" and smaller above grade may be soldered, 95-5 tin-antimony solder. All nipples shall be red brass (85% copper).

2. Valves and Specialties:

a. Valves:

1) General: Manufacturer's model numbers are listed to complete description. Equivalent models of Crane, Grinnell, Milwaukee, Nibco, Stockham or Walworth are acceptable. All valves of a particular type or for a particular service shall be by the same manufacturer. Butterfly valves may be substituted for 2- 1/2" and larger gate valves above grade; see specification below.

2) Gate Valve: 2" and Smaller: All bronze. Rising stem. Union bonnet.

Wedge disk. Malleable iron handwheel. 200 psi WOG. Stockham B- 105. 2-1/2" and Larger: Iron body, bronze mounted.

Non-rising stem. Wedge disk. 200 psi WOG. Flanged or AWWA hub end as applicable. Stockham G-612. Underground valves shall have square operating nut. Provide one operating "T" handle for underground valves.

3) Ball Valve: Full port. Bronze or brass body, cap, stem, disk and ball.

Screwed connection. Lever handle. TFE seat. O-ring seals. 300 psi WOG. Apollo, Grinnell, Jomar.

4) Plug Valve: Valves in gas piping systems must be UL listed for gas distribution. 4" and Smaller: Eccentric bronze or nickel plated semi- steel plug. Semi-steel body. Bronze bushings. Buna-N-rings. 175 psi WOG. DeZurik Series 400. 1-1/2" and smaller may be full port ball valves. Apollo, Jomar, Grinnell. 6" and Larger: Lubricated plug cock.

Cast iron or semi -steel body and plug. 200 psi WOG. Flanged.

Wrench handle. Provide one operating "T" handle for underground valves. Resun R-1431.

5) Valve Box: Precast reinforced concrete. Cast iron lid marked for service. Christy F22 in foot traffic areas; G5 in roadways.

d. Miscellaneous Specialties:

1) Union: 2" and Smaller: AAR malleable iron, bronze to iron ground seat. 300 psi. Grinnell. Size 2 -1/2" and Larger : Grooved pipe, synthetic gasket, malleable iron housing. Victaulic Style 77, Type "E" gasket, Grinnell.
105
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

2) Dielectric Coupling: Insulating union or flange rated for 250 psig.

EPCO.

3) Balancing Cock: Calibrated all bronze balancing/shutoff cock.

Integral pointer to indicate degree of valve opening. Taps for differential pressure gage, with check valves or shutoffs. 125 psi working pressure. Internal seals. Preformed insulation block.

Armstrong, Bell and Gossett, Flo-set. Taco.

B. Drain Piping (including Condensate): Same as inside building cold water piping:
hard temper seamless copper, Type L.

C. Miscellaneous Piping Items:

1. Pipe Support:

a. Pipe Hanger: Steel "J" hanger with side bolt for piping 4" and smaller; steel clevis hanger for piping 5" and larger. Load and jam nuts. Size and maximum load per manufacturer's recommendation. Felt liner for copper piping. Hanger and rod shall have galvanized finish. B-Line, Grinnell, Unistrut.

b. Isolating Shield: Galvanized steel shell and reinforcing ribs. 1/4" non- conducting hair felt pad. Pipe hanger in accordance with paragraph above.

Increase hanger size per manufacturer's recommendation. B-Line, Semco, Superstrut.

c. Construction Channel: 12-gage, 1-5/8" x 1-5/8" galvanized steel channel.

Single or multiple section. Self -locking nuts and fittings. B -Line, Grinnell, Unistrut.

2.2 PIPING INSULATION MATERIALS

A. General: All piping insulation materials shall have fire and smoke hazard ratings as tested under ASTM E-84 and UL 723 not exceeding a flame spread of 25 and smoke developed of 50.

B. Pre-Molded Fiberglass: Heavy density sectional pre-molded fiberglass with vapor barrier laminated all service jacket and pressure sealing vapor barrier lap. Thermal conductivity shall not exceed 0.25 Btu- in/hr-ft2-F at a mean temperature of 50F. Perm rating 0.02, ASTM E96. Puncture rating 50 Beach units, ASTM D781. Provide 3" (min.) wide tape of same material as lap for butt joints. For hot water piping, thickness shall be 1" for pipe sizes 2" and less; 1-1/2" thickness for pipe sizes 2- 1/2" and larger. Certainteed, Knauf, Johns- Manville, Owens-Corning.

C. Fiberglass Blanket: Unfaced. Thermal conductivity shall not exceed 0.25 Btu-in/hr-ft2-F at a mean temperature of 50F. 1-1/2" thickness. Knauf, Johns-Manville, Owens-Corning. 106
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

D. PVC Jacket (for pipe, fittings and valves): Pre -molded polyvinyl chloride (PVC) jackets,

0.020" thickness. Size to match application. Provide solvent weld adhesive and PVC vapor barrier pressure sealing tape by same manufacturer. Zeston.

E. Stretchable Glass Fabric: Reinforcing mesh. 10 X 20 continuous filament glass yarns per inch. Johns-Manville.

F. Vapor Barrier Coating: Childers CP-30, Foster 30-25.

G. Lagging Adhesive: Childers CP-50A, Foster 30-36.

H. Aluminum Jacketing: Aluminum pipe and fitting jacketing. 0.016" thickness for straight pipe. 0.024" thickness for fittings. Stucco- embossed finish. Integral moisture barrier.

Provide pre-fabricated aluminum strapping and seals by same manufacturer. Childers.

I. Outdoor Mastic: Childers CP-21, Foster 65-05.

J. Insulating Tape: Ground virgin cork and synthetic elastomeric. Black, odorless, and non-toxic. K factor 0.43 Btu- in/hr-ft2-F or less. Non-shrinking. For outdoor use, provide protective finish by same manufacturer. Halstead.

PART 3 - EXECUTION

1.1 PIPING INSTALLATION

A. General:

1. Piping Layout: Piping shall be concealed in walls, above the ceilings, or below grade unless otherwise noted. Exposed piping shall run parallel to room surfaces; location to be approved by the Engineer. No structural member shall be weakened by cutting, notching, boring or otherwise, unless specifically allowed by structural drawings and/or specifications. Where such cutting is required, reinforcement shall be provided as specified or detailed. All piping shall be installed in a manner to ensure unrestricted flow, eliminate air pockets, prevent any unusual noise, and permit complete drainage of the system. All piping shall be installed to permit expansion and contraction without strain on piping or equipment. Vertical lines shall be installed to allow for building settlement without damage to piping. Pipe sizes indicated on the drawings are nominal sizes unless otherwise noted. Provide secondary drain piping where required.

2. Joints:

a. Threaded: Pipe shall be cut square and reamed to full size. Threads shall be in accordance with ANSI B2.1. Joint compound or tape suitable for conveyed fluid shall be applied to male thread only. Joints shall be made with three threads exposed.
107
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

b. Welded or Brazed: Filler rod shall be of suitable or the same alloy as pipe.

Brazing filler metal shall have a minimum melting point of 1100F. Welding or brazing shall be performed by a Certified Welder or Brazer as certified by an organization/institution that uses standards recognized by the American Welding Society (AWS) and meets the requirements of the ASME Boiler and Pressure Vessels Code, Section 9.

c.

Open Ends: Open ends of piping shall be capped during progress of work to preclude foreign matter.

d. Electrical Equipment: Piping shall not be run over electrical panels, motor control centers or switchboards.

1. Fittings and Valves:

a. Standard Fittings: All joints and changes in direction shall be made with standard fittings. Close nipples shall not be used.

b. Reducers: Pipe size reduction shall be made with bell reducer fittings.

Bushings shall not be used.

c. Unions: A union shall be installed on the leaving side of each valve, at all sides of automatic valves, at equipment connections, and elsewhere as necessary for assembly or disassembly of piping.

d. Valves: All valves shall be full line size. Provide shut -off valve for each building and each equipment connection. Provide shut -off valve at each point of connection to existing piping. At equipment connections, valves shall be full size of upstream piping, except that gas valves within 18" of the point of connection to the equipment may be the same size as the equipment connection.

e. Valve Accessibility: All valves shall be located so that they are easily accessible. Valves located above ceilings shall be installed within 24" of the ceiling. For situations where this is not practical or where valves are greater than 10' above the floor, chain wheel operators shall be provided. Chain shall extend down to 7' above the floor. All such installations must have prior review by the Engineer.

2. Pipe Support:

a. General: Hangers shall be placed to support piping without strain on joints or fittings. Maximum spacing between supports shall be as specified below.

Actual spacing requirements will depend on structural system. Side beam clamps shall be provided with retaining straps to secure the clamp to the opposite side of the beam. Vertical piping shall be supported with riser clamp 108
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
at 20' on center (maximum). Support pipe within 12" of all changes in direction. Support individual pipes with pipe hanger. Copper piping systems which protrude through a surface for connection to a fixture stop or other outlet shall be secured with a drop ell, Grinnell No. 9788; nipple through surface shall be threaded brass.

1) Pressure Pipe:

Maximum Spacing*
Pipe Size (Inches) Between Supports (ft.)
Copper Sch. 40 Plastic
steel
1/2 6 6 4
3/4 6 8 4
1 6 8 4
1-1/4 6 10 4
1-1/2 6 10 4
2 10 10 4
2-1/2 10 10 4
3 10 10 4
4 10 10 4
6 10 10 4
8 10 10 4
10 10 10 4

*Based on straight lengths of pipe with couplings only. Provide additional supports for equipment, valves or other fittings. Plastic piping shall be supported per the manufacturer's recommendations. Seismic requirements may reduce maximum spacing.

2) Gravity Drain Pipe: Piping shall be supported at each length of pipe or fitting, but in no case at greater spacing than indicated above for pressure pipe.

b.

Hot and Cold Water Piping: All hot and cold water piping shall have isolating shield; no portion of this piping shall touch the structure without an isolating shield except at anchor points for fixture rough-in.

c. Trapeze: Trapeze hangers of construction channel and pipe clamps may be used. Submit design to Engineer for review.

3. Miscellaneous:

a. Escutcheons: Provide chrome plated metal escutcheons where piping penetrates walls, ceilings, or floors in finished areas.

b. Pipe Sleeves: All piping passing through concrete shall be provided with pipe sleeves. Allow 1" annular clearance between sleeve and pipe for piping 3" and smaller, otherwise 2" annular clearance. Piping through walls 109
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
below grade shall be sealed with Link-Seal.

c. Pipes Passing through Fire Rated Surfaces: Pipes passing through fire rated walls, floors, ceilings, partitions, etc. shall have the annular space surrounding the pipe or pipe insulation sealed with fire rated materials in accordance with the requirements of the fire authority having jurisdiction.

d. Thermometer or Pressure Gage Tap: Provide tee for instrument well.

Minimum size of pipe surrounding well shall be 1-1/2".

e. Concrete Thrust Blocks: Shall be constructed at all valves, tees, elbows, bends, crosses, reducers and dead ends in loose- joint pipe. Blocks shall cure a minimum of 7 days before pressure is applied. Concrete shall be 2500 psi mix.

f. Dielectric Couplings: Dielectric couplings shall be installed wherever piping of dissimilar metals are joined, except that bronze valves may be installed in ferrous piping without dielectric couplings.

B. Water Piping: Connections to branches and risers shall be made from top of main. Supply header in fixture battery shall be full size to last fixture, reducing in size only on individual connections to each fixture in battery. Minimum pipe size shall be 3/4", unless otherwise noted. Exposed fixture stops and flush valves shall be instal led with brass nipples for copper piping and galvanized nipples for galvanized piping. Nipples are to extend from outside of wall to fitting at header or drop behind finish wall surfaces. Pipe nipples shall be same size as stop or flush valve. Provide shut off for each building and each connection to equipment. Shock absorbers shall be installed in a vertical position as indicated on drawings. Only equipment mounted on vibration isolators shall be connected with flexible connections. Underground hot water and cold water piping which run parallel to each other shall be installed a minimum of 3 feet apart.

C. Drain Piping (Including Condensate): Install with constant pitch to receptacle, 1/4" per foot where possible, otherwise 1/8" per foot minimum. Provide TEE with clean- out plug at all changes of direction. Provide trap at each air handling unit to prevent air leakage.

Only equipment mounted on vibration isolators shall be connected with flexible connection. Except in equipment rooms, piping not concealed in wall structure, above ceilings or below floors shall be chrome plated brass.

D. PVC Piping: Shall be cut square and assembled prior to solvent weld. Apply primer per manufacturer's recommendations. Coat male joint fully with solvent, make joint before solvent dries and wipe exterior clean.

1.2 PIPING INSULATION INSTALLATION:

A. Cold Water Piping-Freeze Protection: All cold water piping exposed to weather shall be wrapped with insulating tape, 50% overlap. Cover valves to stem. Apply at least two coats of protective finish.
110
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

1.3 FIXTURE INSTALLATION

A. Floor Drains: Shall be placed parallel to room surfaces, set level, flush with floor, and adjusted to proper height to drain. Cover openings during construction to keep all foreign matter out of drain line.

B. Floor Mounted Fixtures: Shall be provided with proper support plates. Grout at the floor with waterproof ceramic tile grout.

C. Other Connections: Rough-in and connection for trim or fixtures supplied by others shall be included in this specification section.

1.4 TESTS AND ADJUSTMENTS

A. General: Unless otherwise directed, tests shall be witnessed by a representative of the Engineer. Work to be concealed shall not be enclosed until prescribed tests are made.

Should any work be enclosed before such tests, the Contractor shall, at his expens e, uncover, test and repair all work to original conditions. Leaks and defects shown by tests shall be repaired and entire work retested. Tests may be made in sections, however, all connections between sections previously tested and new section shall be included in the new test.

B. Gravity Systems:

1. Drains (Including Condensate): Drain connection shall be tested to ensure no leaks at joints or other locations.

1.5 DISINFECTION

A. Disinfect all domestic water piping systems in accordance with AWWA Standard C651, "AWWA Standard for Disinfecting Water Mains", and in accordance with administrative authority. Disinfection process shall be performed in cooperation with health department having jurisdiction and witnessed by a representative of the Engineer. During procedure signs shall be posted at each water outlet stating, "Chlorination - Do Not Drink". After disinfection, water samples shall be collected for bacteriological analysis. Certificate of Bacteriological Purity shall be obtained and delivered to the Owner through the Engineer.

Bid Item No. 13 – Surface Mounted Maintenance Lift

This item shall be bid lump sum and shall conform to these Specifications, as shown on the Plans and as directed by the Engineer.

This bid item shall consist of furnishing and installing the surface mounted maintenance lift, the complete installation of the underground conduit, conduit trenching, trenching slurry, any work involved with providing electrical service and air service as required by the Manufacturer and as specified on the Plans. Installation of lift shall be per manufacturer recommendations and at 111
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
location shown on plans. Manufacturer shall provide the appropriate anchor bolts. Anchor bolts are post-installed and shall require a special inspection. The contractor shall coordinate and schedule this special inspection. No additional payment shall be made for Special Inspection.

All materials shall be furnished and installed by the Contractor, less the installation work performed by the manufacturer upon delivery of the lift system.

The contractor shall be responsible for delivery coordination of the surface mounted maintenance lift.

This bid item shall include full compensation for furnishing all labor, materials, tools, equipment, inspections and incidentals and for doing all the work involved in installing the surface mounted maintenance lift, complete and in place, shall be included in the lump sum price of this bid item.

Contractor shall not be compensated for any installation work that the manufacturer completes.

All costs associated with this item shall be included in the lump sum price and no additional payment will be made.

GENERAL MECHANICAL PROVISIONS
PART 1 – GENERAL

1.1 GENERAL REQUIREMENTS

A. Drawings and Conditions of Contract, including General and Supplementary Conditions and these specifications, apply to this Division.

1.2 PRINCIPAL WORK IN THIS SECTION

A. Work in this Section includes providing labor, materials, equipment, services necessary, fabrication, installation and testing for fully operational and safe systems including all necessary materials, appurtenances and features whether specified or shown in the contract documents or not, in conformity with all applicable codes and authorities having jurisdiction for the following:

1. Mechanical work covered by Plumbing, General Plumbing Provisions, and this section, including, but not limited to:

a. Heating, ventilating and air conditioning systems and equipment.

b. Control systems.

c. Testing and balancing.

B. Provide cutting and patching, for the Mechanical Work.

1.3 RELATED WORK AND REQUIREMENTS

A. Carefully check the documents of each section with those of other sections and 112
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
Divisions. Ascertain the requirements of any interfacing materials or equipment being furnished and/or installed by those sections and Divisions, and provide the proper installation and/or required interface.

B. As a minimum requirement and condition, the Contractor shall provide CADD generated drawings (for the purpose of Layout Drawings, Coordinated Drawings, As-built Drawings and Record Drawings) with a proven layering standard. Deviation from this requirement shall be:

1. At the sole discretion of the Engineer.

2. Submitted as a substitution within the specified time frame.

1.4 QUALITY ASSURANCE

A. Supply all equipment and accessories in compliance with the applicable standards listed in article 1.7 of this section and with all applicable national, state and local codes.

B. All items of a given type shall be the products of the same manufacturer, unless otherwise specified herein.

1.5 SUBMITTALS

A. Submit the following items:

1. Names and qualifications of Test and Balance Agencies.

2. Name and qualifications of Controls Provider.

3. As-built Record Drawings (Submitted to Client).

4. Record Files (Submitted to Client).

5. Operating and Maintenance Manuals.

B. Items shall comply with the requirements as hereinafter specified.

1.6 SUBMITTALS – GENERAL REQUIREMENTS

A. Submit shop drawings, product data, samples and certificates of compliance required by these specifications and City of Fresno Standard Specifications.

B. In addition to the submittal requirements of General Plumbing, Plumbing, and this section, submit product data for the following items per the provisions of these specifications and City of Fresno Standard Specifications:

1. All Equipment and Fixtures indicated in Schedules on Drawings. 113
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

2. Ductwork accessories.

3. Ductwork typical construction and duct supports.

4. Duct sealing.

5. Manual and Automatic Dampers.

6. Insulation and acoustical lining.

7. Certified acoustical test performance data, for diffusers, registers, grilles and terminal air units, if specified.

8. Fan curves and sound data and motors for all fans.

9. Damper motors.

10. Controls system diagrams, materials, thermostats, humidistats, and all control devices.

11. Controls Sequence of Operations.

12. Motors and motor controllers.

C. If more than two submissions are required (initial submittal and one resubmittal) based on rejection or lack of compliance by submittal, then the Contractor shall:

1. Arrange for additional reviews by the Design Engineers.

2. Pay all costs for such additional reviews.

D. Corrections or comments made on the shop drawings during review do not relieve the Contractor from compliance with requirements of the drawings and specifications.

Shop drawing checking by the Engineer is only for review of general conformance with the design concept of the project and general compliance with the information given in the contract documents. The Contractor is responsible for:

1. Confirming and correlating all quantities and dimensions.

2. Selecting fabrication processes and techniques of construction.

3. Coordinating his work with that of all other trades.

4. Performing his work in a safe and satisfactory manner.

E. Substitutions:
114
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

1. Prior to Bid shall be in accordance with these specifications and the City of Fresno Standard Specifications.

2. After award of contract, submit separate substitution request for each substitution in accordance with the requirements hereinbelow. Support each request with:

a. Complete data substantiating compliance of proposed substitution with requirements stated in Contract documents.

b. Data relating to changes in construction schedule.

c. Any effect of substitution on other Work in this and other Divisions, and any other related contracts, and changes required in other work or products.

3. Contractor shall be responsible at no extra cost to Owner for any changes resulting from proposed substitutions which affect work of other Sections or Divisions, or related contracts.

4. Claims for additional costs caused by substitution that may subsequently become apparent shall be met by the Contractor.

5. Substitutions will not be considered for acceptance when acceptance will require revision of Contract Documents, unless Contractor bears cost of redesign.

a. Arrange for required redesign by Engineer.

b. Pay all costs for such redesign.

c. All subject to Engineer’s approval.

6. Approval of substitutions shall not relieve Contractor from full compliance with requirements of Contract documents.

F. As-built (Record) Drawings:

1. Shall be in accordance with these specifications and the City of Fresno Standard Specifications.

2. Provide after installation is complete. Final signoff and Client acceptance will not occur prior to submission of As-built drawings to Architect/Engineer.

3. Indicate as-built conditions and all revisions, fully illustrating all revisions made by all trades in the course of work.
115
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

4. Dimension physical locations of ductwork, and piping with reference elevations and distances above finished floors, below beams, from wall faces, underground (invert elevations) and from column lines.

5. Exact location, type and function of concealed valves, dampers, controllers, piping, air vents, piping drains and isolators.

6. Indicate all equipment sizes and capacities and tag numbers.

7. Provide drawing on reproducible bond.

8. These drawings shall be for as-built record purposes for the Owner’s use and are not considered shop drawings.

G. Operating Instructions, Maintenance Manuals and Parts Lists:

1. Before requesting acceptance of work, submit one set for review by Architect/Engineer.

2. After review, furnish two (2) printed and bound sets.

3. Include:

a. Installers name, address, telephone number and representatives name, and website address.

b. Manufacturer's name, model number, service manual, spare-parts list, and descriptive literature for all components, cross referenced and numbered on Record Drawings, and in accordance with Title 24 as required.

c. Maintenance instructions.

d. Listing of possible breakdown and repairs.

e. Instruction for starting, operation and programming.

f. Detailed and simplified one line, color coded flow and wiring diagram.

g. Field test report, including:
1) Instrument set points.
2) Normal operating values.
h. Name, address and phone number of contractors
equipment suppliers and service agencies.
116
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
i. Assemble manufacturer's equipment manuals in
chronological order, following the specification alpha- numeric system, in heavy duty 3-ring binders clearly titled on the spine and front cover with appropriate index dividers.

H. Special
Tools:

1. One set of any special tools required to operate, adjust, dismantle or repair equipment furnished under any section of this Division.

2. "Special tools": those not normally found in possession of mechanics or maintenance personnel.

3. Tag each item and cross reference in Maintenance Manual.

4. Turn over to Owner's representative or temporarily secure to unit at Engineer's instruction.

I. Quantity of Submittals Required:

1. Product Data (brochures):

a. Submit three (3) copies of product data.

b. Two (2) copies will be returned.

c. If comments are required, comment sheet(s) will be returned with each copy.

2. Samples:

a. Submit as required in each specification section.

1.7 REFERENCE STANDARDS

A. The Standards as referenced in this Specification shall be considered as attached and binding to the requirements of the Construction Documents. The Contractor is to be considered as knowledgeable of these Standards and their requirements for the performance of the Work.

1.8 CODE COMPLIANCE

A. In addition to complying with all other legal requirements, comply with current provisions of governing codes and regulations in effect during progress of the Work, and with the following:

117
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

1. Drawings and specification requirements shall govern where they exceed Code and Regulation requirements.

2. Where requirements between governing Codes and Regulations vary, the more restrictive provisions shall apply.

3. Nothing contained in Contract Documents shall be construed as authority or permission to disregard or violate legal requirements. The Contractor shall immediately draw the attention of the Architect to any such conflicts noted in the Contract Documents.

1.9 DESCRIPTION OF BID DOCUMENTS

A. General:

1. Words or phrases such as "The Contractor shall," "shall be," "furnish," provide," “connect,” "a," "an," "the," and "all" etc. may be omitted for brevity.

B. Specifications:

1. Specifications, in general, describe quality and character of materials and equipment and the Standards that govern.

2. Specifications are of simplified form and include incomplete sentences.

C. Drawings:

1. Drawings in general are diagrammatic and indicate scope, sizes, routing, locations, connections to equipment and methods of installation, but not necessarily offsets, obstructions or structural conditions. Locations on drawings may be distorted for purposes of clearness and legibility.

2. Contractor to provide additional offsets, fittings, hangers, supports, valves, drains as required for construction and coordination with work of other trades.

3. Before proceeding with work, check and verify all dimensions and carefully check space requirements with other Work to ensure that all equipment and materials can be installed in spaces allotted.

4. Assume all responsibility for fitting of materials and equipment to other parts of equipment and structure.

5. The Contractor is responsible for installing the work in such a manner that it will conform to the structure and architectural elements, avoid obstructions, maintain headroom, leave adequate clearance for proper maintenance and repairs, and provide clearances and access required by codes.

118
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

6. Make adjustments that may be necessary or requested in order to resolve space problems, preserve headroom, and avoid architectural openings, structural members and work of other trades.

7. Above items to be performed at no additional cost to the Owner.

D. Typical details, where shown on the drawings, apply to each and every item of the project where such items are applicable. Typical details are not repeated in full on the plans, and are diagrammatic only, but with the intention that such details shall be incorporated in full.

1.10 DEFINITIONS

A. "Piping": pipe, tube, fittings, flanges, valves, controls, strainers, hangers, supports, unions, traps, drains, insulation, and related items.

B. "Motor Controllers": manual or magnetic starters (with or without switches), individual pushbuttons or hand-off-automatic (HOA) switches controlling the operation of motors.

C. "Control" or "Actuating Devices": automatic sensing and switching devices such as thermostats, pressure, float, electro-pneumatic switches and electrodes controlling operation of equipment.

1.11 JOB CONDITIONS

A. Adjoining work of other Divisions shall be examined for interferences and conditions affecting this Division.

B. Examine site related work and surfaces before starting work of any Section.

1. Report to Engineer, in writing, conditions which will prevent proper provision of this work.

2. Beginning work of any Section without reporting unsuitable conditions to Engineer constitutes acceptance of conditions by Contractor.

3. Perform any required removal, repair or replacement of this work caused by unsuitable conditions at no additional cost to Owner.

C. Connections to existing work.

1. Unknown conditions will be addressed if reasonable.

2. Install new work and connect to existing work with minimum interference to existing facilities.

119
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

3. Temporary shutdowns of existing services:

a. At no additional charges.

b. At times not to interfere with normal operation of existing facilities.

c. Provide 48 hour notification.

4. Maintain continuous operation of existing facilities as required with necessary temporary connections between new and existing work.

5. Restore existing disturbed work to original condition.

D. Removal and relocation of existing work.

1. Disconnect, remove or relocate material, equipment, plumbing fixtures, piping and other work noted and required by removal or changes in existing construction.

2. Where existing pipes, conduits and/or ducts which are to remain prevent installation of new work as indicated, relocate, or arrange for relocation, of existing pipes, conduits and/or ducts.

3. Provide new material and equipment required for relocated equipment.

4. Plug or cap active piping or ductwork behind or below finish.

5. Do not leave long dead-end branches. Cap or plug as close as possible to active line.

6. Remove unused piping, ductwork and material.

7. Dispose of removed fixtures and equipment as directed.

8. Turn over removed fixtures and equipment to Owner as directed.

E. Special Traffic Requirements:

1. Maintain emergency and service entrances useable to pedestrian, truck, and ambulance traffic at all times.

2. Where trenches are cut, provide adequate bridging for above-mentioned traffic.

1.12 SCHEDULE OF WORK

A. Arrange work to conform to schedule of construction established or required to comply with Contract Documents.
120
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

B. In scheduling, anticipate means of installing equipment through available openings in structure.

C. Confirm in writing to Engineer, within 30 days of signing of contract, anticipated number of days required to perform test, balance, and acceptance testing of mechanical systems:

1. This phase must occur after completion of mechanical systems, including all control calibration and adjustment, and requires substantial completion of the building, including closure, ceilings, lighting, partitioning, etc.

2. Submit for approval at this time, names and qualifications of test and balancing agencies to be used.

1.13 NOISE REDUCTION

A. Cooperate in reducing objectionable noise or vibration caused by mechanical systems.

1. To extent of adjustments to specified and installed equipment and appurtenances.

B. Correct noise problems caused by failure to install work in accordance with Contract Documents. Include labor and materials required as result of such failure.

PART 2 - PRODUCTS

2.1 ACCESS DOORS

A. Size for proper access, adjusting and maintenance:

1. 12 in. x 12 in. minimum for valves, trap primers, shock absorbers, etc.

2. 24 in. x 24 in. for man access to concealed fans, coils, etc., unless indicated otherwise.

B. Provide as required by work in this Division.

C. Style, Color and Finish to match adjacent construction and as approved by Engineer.

PART 3 - EXECUTION

3.1 MANUFACTURER'S RECOMMENDATIONS

A. All material, equipment, devices, etc., shall be installed in accordance with the recommendations of the manufacturer of the particular item. The Contractor shall be 121
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
responsible for all installations contrary to the manufacturer's recommendations. The Contractor shall make all necessary changes and revisions to achieve such compliance. Manufacturer's installation instructions shall be delivered to and maintained at the job site through the construction of the project.

3.2 CUTTING AND PATCHING

A. Do not cut or drill structural members without consent of Engineer.

B. All cutting and repairing shall conform to Title 21 of California Administrative Code.

3.3 CONCRETE ANCHORS

A. Steel bolt with expansion anchor requiring a drilled hole – powder driven anchors are not acceptable.

B. Minimum concrete embedment shall be 4-1/2 diameters.

C. Minimum spacing shall be 12 diameters center to center and 6 diameters center to edge of concrete.

D. Maximum allowable stresses for tension and shear shall be 80% of the ICBO test report values. Hilti, Phillips, Wej-It.

3.4 EQUIPMENT ANCHORING

A. All equipment shall be securely anchored in accordance with CBC.

B. All equipment mounted on concrete shall be secured with a concrete anchor as specified above at each mounting point.

C. Secure base plate as indicated above.

3.5 SUPPORTS AND SEISMIC RESTRAINTS

A. All mechanical systems (all ductwork, piping, etc.) shall be provided with supports and seismic restraints in accordance with Seismic Hazard Level ‘A’ of the “Guidelines for Seismic Restraint Manual: Guidelines for Mechanical Systems”, current issue, as published by the Sheet Metal and Air Conditioning Contractors National Association, Inc. (SMACNA), Chantilly, Virginia and in accordance with CBC.

3.6 WATER PROOFING

A. Under General Construction Work.

B. Where any work pierces waterproofing, installation shall be subject to review.

122
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

1. Provide all necessary sleeves, caulking, flashing and flashing fittings required to make openings absolutely watertight.

3.7 ACCESS TO VALVES AND EQUIPMENT

A. Access shall be possible where valves, expansion joints, fire dampers, motors, filters, control devices, and any other equipment requiring access for servicing, repairs, or maintenance are located in walls, soffits, chases, and/or above ceilings.

B. Definition of Accessible:

1. Valves and dampers may be operated.

2. Control devices may be adjusted.

3. Fire dampers may be reset.

4. Equipment access panels may be opened.

5. Normal maintenance work such as replacement of filters, lubrication of bearings, etc., may be performed readily within arm's reach of access opening.

C. Install piping, equipment and accessories to permit easy access for maintenance.

D. Group concealed valves, expansion joints, controls, dampers and equipment requiring service access, so as to be freely accessible through access doors and to minimize the number of access doors required.

E. Relocate piping equipment and accessories as required, at no extra cost to afford proper maintenance access.

3.8 SYSTEM IDENTIFICATION

A. Above Grade Piping:

1. Provide markers on piping which is either exposed or concealed in accessible spaces.

2. For piping systems, other than drain and vent lines, indicate the fluid conveyed or its abbreviation, either by pre-printed markers or stenciled marking, and include arrows to show direction of flow.

3. Pre-printed markers shall be the type that wrap completely around the pipe, requiring no other means of fastening such as tape, adhesive, etc.

4. Comply with ANSI A13.1 for colors.
123
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

5. Locate markers at ends of lines, near major branches and other interruptions including equipment in the line, where lines pass through floors, walls or ceilings or otherwise pass into inaccessible spaces, and at 50' maximum intervals along exposed portions of lines.

6. Marking of short branches and repetitive branches for equipment connections is not required.

7. Seton or equal.

B. Below Grade Piping:

1. Bury a continuous, pre-printed, bright-colored, metallic ribbon marker capable of being located with a metal detector with each underground pipe.

2. Locate directly over buried pipe, 6” to 8” below finished grade.

C. Equipment:

1. All equipment shall be identified with a plastic laminated, engraved nameplate which bears the unit mark number as indicated on the drawings (e.g. AC-4).

2. Provide 1/2" high lettering - white on black background. Nameplates shall be permanently secured to the exterior of the unit.

D. Valves:

1. Provide brass valve tags with brass hooks or chains on all valves of each piping system, excluding check valves, valves within equipment, faucets, stops and shut-off valves at fixtures and other repetitive terminal units.

2. Prepare and submit a tagged-valve schedule, listing each valve by tag number, location and piping service.

3. Deliver to Owner through the Engineer.

3.9 CLEANING AND ADJUSTING

A. Work to be painted: Brush and clean work prior to concealing, painting and acceptance. Perform in stages if directed.

B. Painted or exposed work soiled or damaged: Clean, repair and paint to match adjoining work before final acceptance.

C. Remove debris from inside and outside of materials and equipment.

124
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
D. Flush out piping after installation.

E. Adjust valves and automatic control devices.

F. Traps, wastes and supplies: unobstructed.

3.10 FIELD QUALITY CONTROL

A. Tests:

1. Perform as specified in individual Divisions, and as required by authorities having jurisdiction.

B. Furnish written report and certification that tests have been satisfactorily completed.

C. Repair or replace defective work, as directed.

D. Pay for restoring or replacing damaged work due to tests, as directed.

E. Pay for restoring or replacing damaged work of others, due to tests, as directed.

GENERAL CONDITIONS FOR ELECTRICAL WORK

PART 1 - GENERAL

1.1 GENERAL CONDITIONS

A. The general provisions of the Contract, and these specifications, shall form a part of this Section, with the same force and effect as though repeated here. The provisions of this Section shall apply to all electrical Sections of these Specifications and shall be considered a part of these Sections.

1.2 QUALITY ASSURANCE

A. All work and materials shall fully comply with current rules and regulations of all applicable codes. Nothing in these Drawings or Specifications shall be interpreted as to permit any work not in compliance with these codes. Where work is detailed and/or specified to a more restrictive standard or higher requirement, that standard or requirement shall govern such work. Applicable codes include, but are not limited to, the following:

1. California Code of Regulations (CCR)
a. Title 8, Industrial Relations
b. Title 17, Public Health
c. Title 24, Building Standards

2. 2022 California Building Code.
125
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

3. 2022 California Fire Code.

4. 2022 California Electrical Code.

5. Local Codes.

B. All electrical components, devices and accessories shall be listed with Underwriters Laboratories, Inc. (or other testing agency acceptable to authorities having jurisdiction), shall meet their requirements, shall bear their label wherever standards have been established and label service is regularly furnished by that agency, and shall be marked for intended use.

1.3 PERMITS, FEES AND TAXES

A. The Contractor shall secure all necessary permits and pay all required fees and taxes.

He shall notify the proper authorities and have the work inspected and tested as required by jurisdictional requirements, pay all charges in connection therewith, and shall present to the Owner properly signed certificates of inspection. Acceptance of the work will not be considered until such certificates have been delivered.

B. The Owner shall pay all utility company charges related to the new services. This shall include any required street lighting charges.

1.4 TEMPORARY UTILITIES

A. The Contractor shall fulfill utility requirements for and pay all one -time and monthly charges for temporary construction utility usage.

B. The Contractor shall supply any supplemental temporary facilities required to provide construction power to the site (i.e. transformers, panels, outlet boxes).

1.5 EXISTING CONDITIONS

A. The Contractor shall carefully examine the site and existing buildings, compare them with Drawings and Specifications, and shall have satisfied himself as to the conditions to be encountered during the performance of the work. No subsequent allowance shall be made on his behalf for any additional expense he may incur due to failure or neglect of Contractor to examine site and to include existing conditions in bid.

B. The Contractor shall examine all record drawings made available by the Owner to locate existing underground systems, utilities, conduits, and pipes prior to installing the electrical distribution system. Any damage done to the existing systems during the course of the electrical work, whose locations could be reasonably determined, shall be repaired to the satisfaction of the Owner and the utility or agency involved, at the expense of the Contractor.

1.6 CONDUCT OF THE WORK

A. The Contractor shall maintain on the job a competent foreman or a superintendent at all 126
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
times to superintend the Work.

1.7 INTERPRETATION OF DRAWINGS AND SPECIFICATIONS

A. The Engineer’s decision will be final on interpretation of the Drawings and Specifications. Whenever the words “AS MAY BE DIRECTED”, “SUITABLE”, or “APPROVED EQUAL”, or other words of similar intent and meaning are used, implying that judgment is to be exercised, it is understood that it is in reference to the judgement of the Engineer.

1.8 SUBMITTALS

A. Shop Drawings and Product Data

1. Shop Drawings and Product Data shall comply with the following requirements:
a. The Contractor shall submit for review, complete sets of Shop Drawings and Product Data brochures for materials and equipment as required by each section of the Specifications.
b. All Shop Drawings and Product Data shall be submitted at one time in a neat and orderly fashion in a suitable binder with a Title Sheet including Project, Engineer and Contractor, Table of Contents, and indexed tabs dividing each group of materials or item of equipment. The Specification paragraph number for which they are proposed shall identify all items. The mark number as indicated on Drawings shall also identify all equipment and fixtures.
c. Shop Drawings and Product Data submittal shall include manufacturer’s name and catalog numbers, dimensions, loads, and all other characteristics and accessories as listed in the Specifications or on the Drawings. All loads, characteristics, and accessories called for in the Specifications or on the Drawings shall be highlighted, circled or underlined on the Shop Drawings and Product Data. Descriptive literature shall be current factory brochures and submittal sheets. d. Facsimile submittals are not acceptable.
e. Material or equipment shall not be ordered or installed until the Engineer processes the written review. Any item omitted from the submittal shall be provided as specified without substitution.
f. Prior to submission of the Shop Drawings and Project Data, Contractor shall review and certify that they meet the requirements of the Contract Documents.
g. A minimum period of two weeks, exclusive of transmittal time, will be required each time Shop Drawings and/or Product Data are submitted or resubmitted for review. The Contractor shall consider this time when scheduling a submittal date.

B. Submittal Review
127
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

1. Submittals will be reviewed for general conformance with the design concept, but this review does not guarantee quantity shown, nor does it supersede the responsibility of the Contractor to provide all materials, equipment and installation in accordance with the Drawings and Specifications.

2. The Contractor shall agree that Shop Drawings and Product Data submittals processed by the Engineer are not Change Orders and that the purpose of Shop Drawings and Product Data submittals by the Contractor is to demonstrate to the Engineer that the Contrac tor understands the design concept. The Contractor demonstrates his understanding by indicating which equipment and material he intends to furnish and install and by detailing the fabrication and installation methods he intends to use.

3. It shall be clearly understood that the noting of some errors, but the overlooking of others, does not grant the Contractor permission to proceed in error or in conflict with Contract Documents. The Contractor shall agree that if deviations, discrepancies or conflicts between Shop Drawings and Design Drawings and Specifications are discovered either prior to or after Shop Drawing submittals are processed by the Engineer, the Design Drawings and Specifications shall control and shall be followed.

4. If a resubmittal is required, submit a complete copy of the Engineer’s review letter requiring such with the resubmittal.

C. Substitutions

1. Substitutions shall comply with the following requirements:
a. Manufacturers, model numbers and other pertinent information listed in the Specifications or on the Drawings are intended to establish minimum standards of performance, function and quality. Unless otherwise noted, the Contractor may submit equivalent compatible UL -listed equipment from other manufacturers for review, as long as the minimum standards are met.
b. Calculations and other detailed data indicating how the item was selected shall be included for items that are not specified. Data must be complete enough to permit detailed comparison of every significant feature, function, performance, and quality characteristic that is specified, scheduled or detailed. The comparison must prove that the substituted item equals or exceeds the requirements of the specified item.
c. The Contractor shall assume full responsibility that substituted items or procedures will meet the Specification and job requirements and shall be responsible for the cost of redesign and modifications to the work caused by these items.
d. At the Engineer’s request, the Contractor shall furnish locations where equipment similar to the substituted equipment is installed and operating along with the user’s phone numbers and contact person. Satisfactory operation and service history will be considered in the acceptance or rejection of the proposed substitution.
128
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

D. Record Drawings

1. Record Drawings shall comply with the following requirements:
a. At the beginning of the Project, one print of each applicable Drawing will be issued to the Contractor specifically for use in preparing Record Drawings. As the work progresses, the Contractor shall maintain a record of all deviations in the work from that indicated on the Drawings. Final locations of all underground work shall be recorded by depth from finished grade and by offset distance from permanent surface structures, e.g. buildings, curbs, walks. The original Drawings will be made available to the Contractor, from which he shall have made, a set of reproducible Drawings. The Contractor shall then transfer the changes, notations, etc. from the marked- up prints to the reproducible Drawings. The Record Drawings (marked-up prints and reproducibles) shall be submitted to the Engineer for review, after first securing the Inspector’s verification by signature.

E. Operations and Maintenance Instructions

1. Operations and Maintenance Instructions shall comply with the following requirements:
a. Three copies of Operation and Maintenance Instructions and Wiring Diagrams for all equipment shall be submitted to the Engineer. All instructions shall be clearly identified by marking them with the same designation as the equipment item to which they appl y (e.g. UPS -1). All Wiring Diagrams shall agree with reviewed Shop Drawings and indicate the exact field installation.
b. All instructions shall be submitted at the same time and shall be bound in a suitable binder with tabs dividing each type of equipment (e.g. MCC, UPS, etc.). Each binder shall be labeled indicating “Operating and Maintenance Instructions, Project Title, Contractor, Date” and shall have a Table of Contents listing all items included.
c. The Contractor shall verbally instruct the Owner’s maintenance staff in the operation and maintenance of all equipment and systems. The Engineer’s office shall be notified 48 hours prior to this meeting. d. The Contractor shall prepare a letter indicating that all Operation and Maintenance Instructions (printed and verbal) have been given to the Owner, to the Owner’s satisfaction. This letter shall be acknowledged (signed) by the Owner and submitted to the Engineer.

1.9 COORDINATION

A. Electrical Drawings are essentially diagrammatic, unless specifically dimensioned.

Some work may be shown offset for clarity. The actual locations of all materials, conduits, fixtures, supports, etc. shall be carefully planned prior to installation of any work in order to avoid all interferences with each other, or with architectural, civil, 129
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
mechanical, plumbing, structural or other elements.

B. While the size and location of equipment are shown to scale wherever possible, all dimensions and conduit/conductor data shall be verified in the field.

C. Where the work requires connections to be made to equipment furnished and set in place by others, the Contractor shall obtain exact rough-in dimensions from the manufacturer of such equipment and he shall install the connections in a neat and workmanlike manner.

D. If discrepancies are discovered between Drawings and Specifications requirements, the more stringent requirement shall apply.

E. All conflicts shall be called to the attention of the Architect and the Engineer prior to the installation of any work or the ordering of any equipment.

F. No work shall be prefabricated or installed prior to this coordination. No additional compensation will be considered to the Contractor for any prefabrication or installation performed prior to this coordination.

1.10 SCHEDULING

A. All work shall be scheduled subject to the review of the Architect, Engineer and the Owner. No work shall interfere with the operation of the existing facilities on or adjacent to the site. The Contractor shall have at all times, as conditions permit, a sufficient force of workmen and quantity of materials to install the work for which contracted, as rapidly as possible consistent with good work, and shall cause no delay to other Contractors engaged upon this project or to the Owner.

1.11 WARRANTY

A. Guarantee shall be in accordance with the General Conditions. These Specifications may extend the period of the guarantee for certain items. Where such extension are called for, or where items are normally provided with guarantee periods in excess of that called for in the General Conditions, the Certificate of Guarantee shall be furnished to the Owner through the Engineer.

B. Contractor shall deliver to the Owner a written guarantee on all workmanship, materials and equipment for a period of one (1) year from the date of acceptance by the Owner.

Any work found to be faulty during that period of time shall be corrected at once, upon written notification, at the expense of the Contractor. This shall include repair or replacement of the premises that may be damaged as a result of faulty work and materials furnished.

PART 2 - PRODUCTS

2.1 MATERIALS AND EQUIPMENT

A. Materials and equipment shall be new unless otherwise noted. 130
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

B. Materials and equipment of a given type shall be by the same manufacturer.

C. Materials and equipment shall be covered or otherwise protected during construction as required to maintain the material and equipment in new factory condition until project acceptance. Upon completion of work and prior to final inspection, Contractor shal l thoroughly clean all exposed fixtures, trim and equipment, and shall leave the entire installation in neat, clean, and useable condition. Materials and equipment shall be free of dents, scratches, marks, shipping tags, and all defacing features at time of project acceptance.

D. The Contractor shall order materials and equipment in a timely manner to prevent any delay in the construction schedule, and he shall bear any penalty by vendors to meet schedules.

E. Verify all dimensional information to ensure proper clearance for installation of equipment. Check all materials and equipment after arrival on the jobsite and verify compliance with the Contract Documents.

PART 3 - EXECUTION

3.1 DEMOLITION

A. Demolished material shall be removed from Project site.

3.2 CUTTING AND PATCHING

A. The Contractor shall perform all cutting and drilling, or other work, required to provide openings in walls, ceilings, floors, footings, foundations or other structures necessary to accomplish work under this Specification Division. The cutting shall be performed by skilled mechanics of the trades involved.

B. The Contractor shall repair and refinish disturbed finish materials and other surfaces to accurately match adjacent undisturbed new or existing structures and surfaces and shall install new fireproofing where existing fire-stopping has been disturbed. The repair and refinishing of materials and other surfaces shall be by skilled mechanics of the trades involved.

C. All cuts are to be clean with no chipping. Where chipping occurs as a result of work in a cut area, a new clean cut shall be made immediately prior to patching.

3.3 EXCAVATION AND BACKFILL

A. The Contractor shall provide excavation and backfilling required to complete work detailed in the Drawings and Specifications. Unless otherwise noted, minimum earth cover above top of conduit outside building walls shall be 24”, not including base and paving in paved areas.

131
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
B. The location of all underground facilities shall be verified with the Owner and utility companies prior to the commencement of any excavation.

C. The Contractor shall contact Underground Service Alert (USA), at 1-800-642-2444, ten(10) days prior to doing any excavation or trenching, and shall advise USA of the work schedule and comply with their requirements.

D. The Contractor shall notify the Owner 72 hours prior to any excavation.

E. Provide all shoring required by site conditions. Where over -excavation occurs, provide compacted sand backfill. Where groundwater is encountered, remove to keep excavation dry, using well points and pumps as required.

F. The conduit shall be laid on firm soil cut true and even to afford bearing for the full length of the barrel of the conduit.

G. When the bottom uncovered at sub- grade is soft and, in the opinion of the Engineer, cannot support the conduit, a further depth shall be excavated and refilled to conduit foundation grade as required by the Engineer.

H. Backfill (where concrete encasement is not required):

1. Material 3” below, 3” around, and to 6” above conduit shall be sand. Place carefully around and on top of conduit, taking care not to disturb conduit.

Consolidate with vibrator.

2. Material from 6” Above Conduit to Grade shall be sandy or silty loam, free of lumps, laid in 6” layers, uniformly mixed to proper moisture and compacted to required density. If backfill is determined to be suitable and required compaction is demonstrated by laboratory test, water compaction in 6” layers may be used, subject to review by Engineer.

I. Compaction

1. Prior to compaction, moisten or aerate each layer as necessary to provide optimum moisture content. Compact each layer to required percentage of maximum dry density or relative dry density for each area classification. Do not place backfill or fill materia l on surfaces that are muddy, frozen, or contain frost or ice.

2. Under Structures, Building Slabs, Walkways, and Steps, compact top 6” of sub-grade and each layer of backfill or fill material at 92% maximum relative compaction. Compact upper 2’ of backfill in utility trenches or other excavations to 92% minimum relative compaction.

3. Under Pavement, compact top 8” of sub- grade immediately beneath the base course at 95% minimum relative compaction.

3.4 CONCRETE EQUIPMENT BASES

A. Equipment shall be anchored to a 6” concrete slab having minimum 3500PSI strength, 132
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
unless otherwise noted. The slab below electrical equipment shall have #4 reinforcing bars at 12” on center, each way, located at the mid-depth of the slab.

B. Concrete anchors shall be steel bolts with expansion anchors requiring a drilled hole, unless otherwise noted. Powder-driven anchors are not acceptable. Minimum concrete embedment shall be 4.5 diameters but not less than manufacturer’s requirements for minimum strength. Minimum spacing shall be 10 diameters center -to-center and 5 diameters center to edge of concrete but not less than manufacturer’s requirements for minimum strength. Maximum allowable stresses for tension and shear shall be 80% of the ICC-ES test report values.

C. Where applicable, concrete structures shall be submitted to the serving utility for their approval prior to installation.

3.5 SEISMIC ANCHORAGE AND BRACING

A. Equipment Anchorage

1. All electrical equipment and components shall be anchored and installed per the details on the approved construction documents. Where no detail is indicated, the following components shall be anchored or braced to meet the force and displacements requirements prescribed in the 2022 CBC, Sections 1617A.1.18 through 1617A.1.26. and ASCE 7-16 Chapter 13, 26, and 30:
a. All permanent equipment and components
b. Temporary or movable equipment that is permanently attached (e.g. hard wired) to building utility electrical service.
c. Movable equipment which is stationed in one place for more than 8 hours and heavier than 400 pounds are required to be anchored with temporary attachments.

2. The attachment of the following electrical components shall be positively attached to the structure, but need not be detailed on the plans. These components shall have flexible connections provided between the components and associated conduit.
a. Components weighting less than 400 pounds and have a center of mass located 4 feet or less above the adjacent floor or roof level that directly support the components.

b. Components weighting less than 20 pounds, or in the case of distributed systems, less than 5 pounds per foot, which are suspended from a roof or floor or hung from a wall.

For those elements that do not require details on the approved drawings, the installation shall be subject to the approval of the Civil Engineer of Record. The project inspector will verify that all components and equipment have been anchored in accordance with above requirements.

B. Electrical Distribution System Bracing
133
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

1. Electrical distribution systems shall be braced to comply with the forces and displacements prescribed in ASCE 7- 16 Section 13.3 as defined in ASCE 7- 16 Section 13.6.7, 13.6.6, 13.6.5, and 2019 CBC, Sections 1617A.1.23, 1617A.1.24, 1617A.1.25, and 1617A.1.26.

2. The bracing and attachments to the structure shall be detailed on the approved drawings or they shall comply with one of the OSHPD Pre-Approvals (OPM#) as modified to satisfy anchorage requirements of ACI 318, Chapter 17.

3. Copies of the manual shall be available on the jobsite prior to the start of hanging and bracing of the electrical distribution systems.

4. The Structural Engineer of Record shall verify the adequacy of the structure to support the hanger and brace loads.

3.6 CLEANING AND PROTECTION

A. The Contractor shall, progressively and at completion of the job, thoroughly clean all of his work including outlets, fittings, and devices, and inspect exposed finishes. The Contractor shall remove all burrs, dirt, grease, paint spots, stains, labels, tags, rust, foreign material, and construction debris resulting from his work.

B. The Contractor shall protect equipment and installations and maintain conditions to ensure that coatings, finishes, and cabinets are without damage or deterioration at time of Substantial Completion.

BASIC ELECTRICAL MATERIALS AND METHODS

PART 1 – GENERAL

1.1 SCOPE

A. See Electrical Work Section.

1.2 STANDARDS

A. NEMA 250 Standard for Enclosures for Electrical Equipment (1000 Volts Maximum)

PART 2 - PRODUCTS

2.1 CONCRETE PADS, PULL BOXES AND MANHOLES

A. At the Contractor’s option, he shall provide cast-in-place or pre-cast structures.

B. Concrete Forms and Reinforcement Materials shall be as specified on the plans and in Section 14 of the City of Fresno Standard Specifications.

C. Concrete shall be 3500-psi, 28-day compressive strength as specified on the plans and 134
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
in Section 14 of the City of Fresno Standard Specifications.

D. Weatherproof concrete pull boxes shall be manufactured by Christy Concrete Products or equal. All boxes shall have lids marked “Power”, etc. and shall be traffic -rated per CalTrans drawing ES-8

2.2 RACEWAYS AND FITTINGS

A. Galvanized rigid steel conduit (GRC) shall meet ANSI C80.1, and be heavy wall, hot dipped galvanized inside and out, with threaded ends, for use with threaded type fittings.

B. Galvanized intermediate metallic conduit (IMC) shall meet ANSI C80.6, be zinc -coated steel and have threaded fittings.

C. Rigid non-metallic conduit (RNC) shall meet NEMA TC 2, be Schedule 40 PVC, suitable for 90°C, with solvent cemented type NEMA TC3 fittings.

D. Liquid-tight flexible metallic conduit (LFMC) shall be same as FMC except with inert sunlight-resistant, mineral-oil-resistant watertight plastic outer jacket. Fittings shall be cast malleable iron body and gland nut, cadmium plated with one-piece brass grounding bushings threaded to interior of conduit. Spiral molded vinyl-sealing ring between gland nut and bushing and nylon-insulated throat.

E. All raceway fittings shall be specifically designed for the raceway type with which used.

2.3 CONDUCTORS

A. All conductors shall be delivered to the site in their original unbroken packages, plainly marked or tagged with UL labels, size, type of wire, type of insulation, name of the manufacturing company and trade name of the wire.

B. All conductors shall be minimum of 98% conductivity soft drawn copper. Conductors #8 AWG and larger shall be stranded copper with “THWN/THHN”, 600 Volt insulation.

Conductors #10 AWG and smaller shall be solid copper with “THWN/THHN”, 600 Volt insulation. Conductors used to supply equipment through VDF’s shall be stranded copper with “XHHW-2”, 600 Volt insulation.

C. Insulation shall be Thermoplastic Type rated at 75 degrees C. minimum.

2.4 PULL BOXES AND WIREWAYS

A. Pullboxes and Enclosures shall be NEMA 250, Type 3R or Type 4, for outdoor use.

B. Wireways shall be constructed in accordance with UL 870 for wireways, auxiliary gutters and associated fittings. Every component including lengths, connectors and fittings shall be UL Listed.

135
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
C. Wireways and auxiliary gutters shall have continuous removable cover secured with screws and keyhole slots. Hinged cover shall be provided where installed above suspended ceiling.

D. Fabricated sheet steel pull boxes shall be installed only in dry, protected locations and shall be furnished with knockouts and removable screw cover. Box shall be finished with one coat of zinc chromate and a coat of primer sealer and where exposed to public view shall be painted to match the surrounding surface.

E. Weatherproof sheet steel pull boxes shall be fabricated of code gauge galvanized sheet steel with two coats of rust resistant finish and shall be furnished with gasket and made completely weathertight.

2.5 WIRING DEVICES AND MATERIALS

A. Outlet Boxes shall meet NEMA OS1 and be galvanized code gauge steel. Boxes in masonry shall be square cornered. Boxes exposed to weather or in wet locations shall be Type FD cast metal with external threaded hubs and gasketed cover and shall meet NEMA FB1.

B. Outlet box extensions shall be U.L. listed and shall be attached to box with threaded metal screws.

C. Approved manufacturers of metal boxes are Circle AW, Crouse- Hinds, Steel City or equal.

D. Receptacles:

1. GFCI Receptacles:
a. GFCI receptacles shall be duplex, feed-through type, with integral NEMA WD 6, Configuration 5- 20R duplex receptacle arranged to protect connected downstream receptacles on same circuit. Design units for installation in a 2-3/4-inch deep outlet box without an adapter. b. Duplex GFCI receptacles shall be Hubbell or Leviton #GF5352 to match regular duplex receptacle.

2. Required Weather-Resistant Receptacles: All 15- and 20-ampere, 125- and 250- volt non-locking type receptacles located outdoors and in damp and wet locations shall be listed weather-resistant type.

3. Receptacles for Owner -furnished equipment shall match that equipment’s plug configuration.

4. Other Receptacles: Other receptacles shall match the plug configuration and ratings required for the utilization equipment that is served.

E. Device cover plates shall be provided and installed at all wiring devices, switches, outlets, and similar applications, and shall be as directed by architect. Pull boxes and junction boxes to which no fixture is to be attached shall be fitted with blank cover plates 136
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
painted to match surrounding. All cover plates installed on rated walls shall be brushed stainless steel. Cover plates installed at switches used for lighting control in all multiple occupant restrooms, all hallways and corridors, and in other locations where lockable cover plates are indicated on the Drawings shall be the dustproof locking stainless steel cover Legrand model WP26-L.

2.6 TERMINAL CABINETS AND CLOSETS

A. Cabinets and fronts shall be in accordance with NEMA Standard Publication No. PB1- 1971 and UL Standards No. 67. Fronts shall include doors and have flush, brushed stainless steel, cylinder tumbler -type locks with catches and spring loaded door pulls.

The flush lock shall not protrude beyond the front of the door. All locks shall be keyed like the panel board locks. Fronts shall have adjustable indicating trim clamps that shall be completely concealed when the doors are closed. Doors shall be mounted by completely concealed steel hinges. Fronts shall not be removable with the door in the locked position. A frame and card with a clear plastic covering shall be provided on the inside of the door. Fronts shall be of code gauge full finished steel with rust inhibiting primer and baked enamel finish.

2.7 PANELBOARDS

A. Furnish panelboards shown on plans and described herein. All cans shall be a minimum of 20” wide and 5.75” deep unless otherwise shown. They shall be totally flat or equal with flush keyed locks.

B. Fronts shall be cold rolled sheet steel painted with ANSI 61 gray enamel over a rust inhibitor. They shall be equipped with door, flush hinges, and flush proper cylinder tumbler lock, metal circuit card holder, and quarter turn adjustable trim clamps. Panel locks shall be keyed alike.

C. Panel shall consist of reinforced corrosion resistant galvanized sheet steel frame with silver plated copper bus bars and circuit breakers properly supported to prevent vibration breakage in handling. All terminals shall be solderless type suitable for specified conductors of size indicated.

D. Neutral bus shall be full size. Neutral bus shall be 200% rated when supplied from a double neutral feeder. Provide an equipment ground bus in each panelboard. In addition to the equipment ground bus, provide an isolated ground bus when supplied from a feeder which includes an isolated grounding conductor.

E. Branch circuit breakers shall be molded case, bolt-on, and fully interchangeable without disturbing adjacent units. All 2-pole and 3-pole breakers shall have common trips.

Circuit breakers supplying Class 1 transformers shall be lockable in the off position.

F. Branch panelboards and overcurrent protection devices shall have a minimum short circuit rating of 10,000 RMS symmetrical AIC (120/208V).

137
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
G. Distribution panelboards and overcurrent protection devices shall have a minimum short circuit rating of 42,000 RMS symmetrical AIC (120/208V).

H. All Panelboards shall be fully rated as shown on Drawings; series -rating shall not be allowed.

I. Panelboards shall bear an Arc -Flash Hazard Warning label in accordance with CEC Article 110.16.

J. Breakers for switching lights shall be type SWD, rated for switching duty. Breakers for mechanical equipment shall be HACR type.

K. All spaces shall have hardware.

2.8 DISCONNECTING DEVICES

A. Disconnecting devices shall be provided as shown and/or as required by NEC.

B. Motor-rated switches shall be toggle-type, quick make -quick break, rated 2 HP, 250 VAC, with number of poles as required. They shall be equipped with overload heaters rated for overload protection of loads controlled.

C. Motor-rated switches shall be flush- mounted adjacent to load controlled. Where flush mounting is not possible, switches shall be surface mounted in NEMA enclosure suitable for environment in which installed.

D. Disconnect switches shall be 250V or 600V class, rated heavy -duty, horsepower rated, quick-make, quick-break, dead-front type and provided with proper number of poles.

E. Disconnect Switches shall be self -contained in a NEMA 3R enclosure and externally operable from the front.

F. Fusible disconnect switches shall be equipped with rejection type clips suitable for UL Class R fuses up to 600A and suitable for UL Class L fuses above 600A. Fuse interrupting rating shall be 200,000 RMS symmetrical amperes.

G. Circuit breakers utilized as disconnecting devices shall comply with the requirements stated in other articles of this section and NEC.

2.9 FUSES

A. Subject to compliance with requirements, provide products by one of the following manufacturers:

1. Bussman

2. Gould Shawmut

3. Littlefuse.
138
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

B. Fuses 600 amperes and below shall be UL Class RK1, 200,000 RMS symmetrical amperes interrupting rating.

2.10 INDIVIDUAL MOTOR CONTROLLERS:

A. Individual Motor Controllers shall be mounted within the motor control center bucket.

B. Individual Motor Controllers shall be full-voltage non-reversing (FVNR) type combination magnetic starters for motors of ½ HP to 60 HP. Individual Motor Controllers shall be reduced voltage, non-reversing, autotransformer type combination magnetic starters for motors 75 HP and larger.

2.11 MAGNETIC STARTERS FOR MECHANICAL EQUIPMENT

A. All magnetic starters for mechanical equipment shall be furnished with integral 120VAC control transformers, sized to handle the starter and all controls connected to it – pilots, EP valves, etc.

B. All magnetic starters for mechanical equipment shall be provided with auxiliary contacts as required for interlock to EMS System. An allowance of at least one auxiliary contact per starter shall be estimated.

2.12 SUPPORTING DEVICES

A. Supporting devices shall be constructed of cold-formed steel, with a corrosion-resistant coating acceptable to authorities having jurisdiction.

B. Metal items for use outdoors or in damp locations shall be hot-dipped galvanized steel.

C. Slotted-steel channel supports shall have flanged edges turned toward the web, and 9/16-inch diameter slotted holes at a maximum of 2 inches on center, in the web.

1. Channel thickness shall be selected to suit structural loading.

2. Fittings and accessories shall be products of the same manufacturer as the channel supports.

D. Raceway and cable supports shall be manufactured clevis hangers, riser clamps, straps, threaded C-clamps with retainers, ceiling trapeze hangers, wall brackets, and spring- steel clamps or click-type hangers.

E. Pipe sleeves shall be ASTM A 53, Type E, Grade A, Schedule 40, galvanized steel, with plain ends.

F. Cable supports for vertical conduit shall be a factory -fabricated assembly consisting of threaded body and insulating wedging plug for non- armored electrical cables in riser conduits. Plugs shall have number and size of conductor gripping holes as required to 139
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
suit individual risers. Body shall be constructed of malleable- iron casting with hot -dip galvanized finish.

G. Concrete anchors shall be steel bolts with expansion anchors requiring a drilled hole.

Powder driven anchors are not acceptable.

H. Toggle bolts shall be all-steel springhead type.

2.13 ELECTRICAL IDENTIFICATION

A. Identification devices shall be a single type of product for each application category.

Colors shall be as prescribed by ANSI A13.1, NFPA 70, and these Specifications.

B. Raceway and cable labels shall comply with ANSI A13.1, Table 3, for minimum size of letters for legend and minimum length of color field for each raceway and cable size.

1. Pre-tensioned, wraparound plastic sleeves shall be a flexible, preprinted, color - coded, acrylic band sized to suit the diameter of the item it identifies.

2. Preprinted, flexible, self-adhesive, vinyl labels shall have a legend, over- laminated with a clear, weather- and chemical-resistant coating.

3. Color shall be black letters on orange background.

4. Legend shall indicate voltage.

C. Self-adhesive colored marking tape for raceways, wires and cables shall be vinyl tape, not less than 1 inch wide by 3 mils thick.

D. Underground Warning Tape shall be vinyl tape, compounded for permanent direct-burial service, not less than 6 inches wide by 4 mils thick, embedded with a continuous metallic strip or core, brightly-colored, continuously-printed with a legend that indicates the type of underground line.

E. Tape markers for wire shall be vinyl or vinyl -cloth, self-adhesive, wraparound type with preprinted numbers and letters.

F. Color-coding cable ties shall be made of Type 6/6 nylon, be self -locking type and of colors to suit coding scheme.

G. Engraved plastic labels, signs and instruction plates shall be made from black (or red as noted) Bakelite laminate engraving stock with a white core, punched or drilled for mechanical fasteners. It shall have a minimum thickness of 1/16-inch for signs up to 20 sq. in. and a minimum thickness of 1/8-inch for larger sizes.

H. Interior Warning and Caution signs shall comply with 29 CFR, Chapter XVII, Part 1910.145 and shall be weather-resistant, non-fading, preprinted, cellulose-acetate butyrate signs with 0.0396-inch, galvanized-steel backing, with colors, legend, and size appropriate to the application. They shall be equipped with 1/4- inch grommets in each corner for mounting.
140
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

I. Fasteners for nameplates and signs shall be self-tapping, stainless-steel screws or No. 10/32 stainless-steel machine screws with nuts and flat and lock washers.

J. Arc-Flash Hazard Warning labels shall be provided at electrical equipment such as switchboards and panelboards in accordance with CEC 110.16.

K. Circuit Identification – A typewritten circuit directory shall be provided at each panelboard and switchboard in accordance with CEC Article 408.4(A). The Contractor shall develop and prepare the circuit identification description based on the as-built condition.

L. Source of Supply Identification – All switchboards, panelboards and transformers shall have a typewritten label applied indicating the device or equipment where the power supply originates per CEC Article 408.4(B).

2.14 TOUCHUP PAINT

A. Touch-up paint shall be equipment manufacturer’s paint selected to match installed equipment finish.

B. Touch-up paint on galvanized surfaces shall be zinc -rich paint recommended by item manufacturer.

PART 3 - EXECUTION

3.1 ELECTRICAL INSTALLATION

A. All material, equipment, devices, etc., shall be installed in accordance with the recommendations of the manufacturer of the particular item. The Contractor shall be responsible for all installations contrary to the manufacturer’s recommendations. The Contractor shall make all necessary changes and revisions to achieve such compliance.

Manufacturer’s installation instructions shall be delivered to and maintained at the job site throughout the construction of the project.

B. The layout and installation of electrical work shall be coordinated with the overall construction schedule to prevent delay in completion of the project.

C. Dimensions and information regarding accurate locations of equipment and structural limitations and finish shall be verified with other sections.

D. The drawings do not show all raceway, wiring, offsets, bends, special fittings, junction or pull boxes necessary to meet job conditions. Items not shown as indicated, where are clearly necessary for proper operation or installation of systems shown, shall be provided as required, at no increase in contract price.

E. Materials and Components shall be installed level, plumb, and parallel and perpendicular to other building systems and components, unless otherwise indicated.

141
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
F. Electrical equipment, outlets, junctions and pull boxes shall be installed in accessible locations, avoiding obstructions, preserving maximum headroom, and keeping openings and passageways clear.

G. Equipment shall be installed to facilitate service, maintenance, and repair or replacement of components. It shall be connected for ease of disconnecting, with minimum interference with other installations. Minor adjustments in the locations of equipment shall be made where necessary providing such adjustments do not adversely affect function of the equipment. Major adjustments for the location of equipment shall be previously approved and detailed on the Record Drawings.

H. Right of Way shall be given to raceways and piping systems installed at a required slope.

3.2 PRECAST CONCRETE PULL BOXES AND MANHOLES

A. Contractor shall provide a minimum of 3-6” of sand base material suitable to receive the pullbox or manhole. The base material shall be compacted and graded level at proper elevation to receive the pullbox or manhole in relation to the conduit grade or gro und cover requirements as designated in the plans.

B. Sealants used between the joints of the pullbox or manhole are at the Contractor’s discretion unless otherwise specified. If grout is used, it should consist of two parts plaster sand to one part cement with sufficient water added to make the grout flow under its own weight. The grout should be poured into a water soaked groove and filled to the top of the groove unless a double amount is to be used as a further precaution against leakage. In this case, the mastic sealant should be placed on the two shoulders of the groove. The next section of pullbox or manhole should be placed while the foaming action is in process. Contractor shall verify grades with the Engineer and shall set holes and boxes level at proper grades.

C. All conduits penetrating the pull box or manhole shall have seals to prevent water from entering the raceway.

3.3 RACEWAY APPLICATION

A. Galvanized Rigid Steel Conduit (GRC) may be used in all locations. Where installed in direct contact with earth, conduit shall be wrapped with two layers of half -lapped 10-mil PVC tape for a total thickness of 40-mil or have a factory applied 40-mil PVC coating.

B. Galvanized Rigid Steel Conduit (GRC) shall be used where exposed to physical damage, indoors where exposed to moisture, in exposed outdoor installations, in systems higher than 600 volts, and where required by code.

C. Rigid Non-Metallic Conduit (RNC) Schedule 40 PVC may be used underground or below concrete slabs on grade. Rigid Non-Metallic Conduit (RNC) Schedule 80 PVC may be used to pass through concrete slabs. Rigid Non-Metallic Conduit (RNC) may be used in compliance with utility company requirements for utility service conduits. Rigid Non- Metallic Conduit (RNC) shall not be installed above grade or above finished floor level.

142
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
D. Liquid-tight Flexible Metallic Conduit (LFMC) may be used in all locations to make final connections to motors, transformers, or other mechanical equipment (not to exceed 24 inches in length) or lighting fixtures (not to exceed 72 inches in length). Where specifically approved by the Engineer, LFMC may be used to facilitate wiring in tight locations or in other conditions that make the use of other conduit impracticable.

3.4 RACEWAY INSTALLATION

A. General

1. Expansion joints shall be provided at building expansion joints or as required due to length of run or difference in temperatures.

2. All fittings that are exposed or in damp areas shall have sealing glands and proper gasket.

3. In general, all conduits shall be sloping to drain. Bends that place a trap in a conduit shall be avoided. Provided drip fitting as required. Dux-Seal high ends of all underground raceways.

4. All conduit runs shall be mechanically and electrically continuous from outlet to outlet. Conduit size or type shall not be changed between outlets.

5. All empty raceways shall be equipped with pull lines, capped and labeled. Pull lines shall be 3/16” polypropylene, No. 14 AWG zinc-coated steel or monofilament plastic line with not less than 200-lb tensile strength. Leave at least 24 inches of slack with identification tag at each end of the pull wire.

6. Minimum size of any conduit for lighting, power and signal shall be ¾” conduit unless shown otherwise.

7. Use temporary raceway caps to prevent foreign matter from entering. Immediately prior to installation of conductors, conduit shall be blown and swept free of foreign materials. All conduit stubs for future, both above and below grade, shall be capped. Run conduits for spare panelboard circuits to attic or accessible spaces.

8. Make conduit bends and offsets so ID is not reduced. Keep legs of bends in the same plane and straight legs of offsets parallel, unless otherwise indicated.

9. Make bends in exposed parallel or banked runs from same centerline to make bends parallel. Use factory elbows only where elbows can be installed parallel; otherwise, provide field bends for exposed parallel raceways.

10. There shall be no more than the equivalent of four quarter bends (360- degrees total) between pull points such as pull boxes, outlet boxes or conduit bodies, in one run of conduit.

11. Install raceways and cables at least 6 inches away from parallel runs of flues and steam or hot-water pipes. Locate horizontal raceway runs above water and steam piping.

12. Conduits shall be securely fastened to building structure at intervals not greater than ten feet.
143
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

13. Conduit shall be square cut and reamed if required to full size, with thread full cut and true.

14. Conduits shall be joined by approved couplings with ends of conduits tightly butted. Non-insulating compound shall be used in making up joints below grade or inside on grade to insure a watertight system.

15. Conduit connections to outlet boxes or cabinets shall be made with approved connectors, using locknuts and insulated throat bushings.

16. Complete raceway installation before starting conductor installation.

17. Contractor shall provide rubber grommets to fasten galvanized conduit to exterior structures made of dissimilar metals at all exterior locations to prevent galvanic corrosion.

18. Contractor shall provide rubber grommets to fasten galvanized conduit to supports which are also used by other systems utilizing piping of dissimilar metals to prevent galvanic corrosion.

B. Underground

1. Two or more power conduit runs installed in a common trench shall be separated horizontally by a minimum of four inches (4”).

2. All electrical conduit runs installed in a common trench with other utility company lines, plumbing pipes, or heating pipes shall be separated horizontally and vertically from such lines by a minimum of twelve inches (12”).

3. Conduits installed underground and not under buildings shall have a minimum of 24” of cover over the top of the conduit.

4. Utility service conduits shall be installed according to the serving utility’s requirements for material, depth of cover, and separation.

5. Rigid non-metallic conduit shall be laid on excavated firm bed, sealed watertight and unless with 24 inch earth cover, shall have 3 inch minimum concrete encasement unless under concrete. Plastic conduit without encasement shall be random lay, “snaked”, not pulled tight. Plastic conduit laid in areas of reinforcing steel shall be supported independently at each threaded fitting. Plastic conduit joints shall be full solvent welded.

6. Rigid non-metallic conduit installed underground and not below a building slab shall have a galvanized rigid steel long radius elbow installed at the terminating end where the transition from horizontal to vertical occurs.

C. In Concrete Slabs

1. Conduit installed within concrete slabs shall be Schedule 80 PVC rigid non- metallic conduit or full weight galvanized rigid steel conduit.

2. Conduits in concrete slabs 3 inches thick or less shall not be of size larger than ¾ inch nominal trade size, and wired to top of reinforcing steel. 144
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

3. Conduit installed in concrete slabs shall be installed in the middle third of the slab thickness where practical, and have at least 1-inch concrete cover.

4. Secure raceways to reinforcing rods to prevent sagging or shifting during concrete placement.

5. Conduit installed in concrete slabs shall be installed side-by-side horizontally and shall have no less than 1” spacing between each conduit to allow for concrete consolidation to prevent voids in the concrete. Conduits that are installed in concrete slabs shall be arranged such that they do not cross over other conduits within the concrete slab. Where crossing of conduits is unavoidable the crossing sets of conduits shall be installed below the slab. No more than 3 conduits shall be installed side- by-side in a concrete slab without special permission from the structural engineer.

6. Install conduit larger than 1- inch trade size parallel to or at right angles to main reinforcement. Where conduit is at right angles to reinforcement, place conduit close to slab support.

7. Contractor shall be responsible for damages to membrane and shall repair it.

D. Flexible Conduit

1. LFMC shall be used to connect motors and equipment subject to vibration, noise transmission, or movement to junction boxes, with a maximum length of 24- inches.

2. Install separate ground conductor across flexible connections.

3. Flexible conduits shall be independently suspended.

E. Hazardous Locations

1. Underground conduit within Class 1 areas shall be threaded rigid metal conduit or intermediate steel conduit per N.E.C. 511 and/or 514.

2. Underground conduit below Class 1 areas shall be rigid non-metallic conduit per N.E.C. 511 and/or 514.

3. Approved seal-off type fittings shall be used in Class 1 locations per N.E.C.

4. Fittings in hazardous areas shall be of the type approved for the particular hazard.

3.5 CONDUCTOR APPLICATION

A. Feeders and branch circuits shall be Type THHN/THWN insulated conductors in raceway.

B. Underground feeders and branch circuits shall be Type THWN or single- wire, Type UF insulated conductors in raceway.

145
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
C. Minimum conductor size shall be #12 for power and lighting, #14 for 120V control circuits and #18 for 24V control circuits.

D. Remote control, signaling and power -limited circuits shall be Type THHN/THWN insulated conductors in raceway for Classes 1, 2, and 3, unless otherwise indicated.

3.6 CONDUCTOR INSTALLATION

A. Conductors shall be continuous from outlet to outlet, no splices shall be made except within outlet or junction boxes.

B. Wiring at outlets shall be installed with at least 12 inches of slack conductor at each outlet.

C. Outlet and component connections shall be made to wiring systems and to ground.

Electrical connectors and terminals shall be tightened according to manufacturer’s published torque-tightening values. Torque values specified in UL 486A shall be used where manufacturer’s torque values are not indicated.

D. Wire in panels, cabinets, pull boxes, and wiring gutters shall be squared, labeled, and neatly grouped with cable ties and fanned out to the terminals.

E. All branch circuits, fixture wiring joints, splices, and taps for conductors #10 and smaller shall be made with 3M “Scotchlock” connectors, or approved equal.

F. All branch circuits, fixture wiring joints, splices, and taps for conductors #8 and larger shall be made with two- bolt type solderless connectors or T & B “color keyed” compression lugs.

G. Bolt-type solderless connectors shall be torqued with a torque wrench according to the manufacturer’s recommendations, and then retightened after 24-48 hours before taping.

Owners’ inspector shall be informed of this procedure during the waiting period and shall witness the act of retightening.

H. Connectors and lugs for terminating stranded conductors #8 and larger shall be machine crimp compression type.

I. All splices shall be taped with Scotch #88 plastic electrical tape with “Scotch Fill” where necessary for a smooth joint. Scotch #27 or #2520 shall be used for other than normal temperatures or conditions. All connections and splices shall be electrically perfect and in strict accordance with all code requirements.

J. No splices shall be made below grade in a manhole or pullholes without Engineer’s written approval, and then shall be encapsulated with 3M potting kits per 3M Specifications. For larger gauge wire where 3M potting kits are prohibited Contractor shall use submersible UL listed Polaris connectors by NSi.

3.7 WIREWAY AND AUXILIARY GUTTER APPLICATION
146
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

A. Wireways and auxiliary gutters shall be used above and below panelboards, lighting relay cabinets, and terminal cabinets to accommodate large concentrations of wires.

3.8 PULL BOXES AND WIREWAYS:

A. Boxes shall be installed square and plumb. An engraved nameplate shall be installed on each box indicating its function. Nameplate shall be installed on the exterior of each box in unfinished areas and on the interior of each box in finished areas.

B. Wireways shall be installed with strip -type connectors with self-retained mounting screws. Hangers with two piece, hook together features shall be used to permit preassembly of wireway and hanger bottom plate before hanging on a preinstalled upper bracket.

C. Pull and junction boxes shall be installed as shown to ease the pulling of wire and to comply with CEC requirements.

3.9 WIRING DEVICES AND MATERIALS

A. Outlets shall be mounted at 18” minimum above finished floor unless otherwise noted.

B. The locations of outlets shown on drawings shall be located with respect to work of others and to be symmetrical with room layout.

C. Outlets in architectural patterned surfaces such as tile and finish panels shall be centered on intersections of four panels or in exact center of panels, unless otherwise shown on architectural plans or directed by Architect.

D. Outlet boxes for concealed work shall be one- piece steel knock out type with zinc coating. Boxes shall not be smaller than 4” square nominal size, unless otherwise indicated. Extension rings, plaster rings, and covers shall be provided as necessary for flush finish.

E. Surface boxes of the cast metal threaded hub type with suitable gasketed covers shall be used for exposed conduit runs less than 5’ above a finished floor or where waterproof boxes are required.

F. Masonry boxes shall have conduit entrances to rear of box with depth as required to clear masonry.

G. Boxes shall be sized for number of conductors entering box.

H. Wiring devices shall be securely fastened to the outlet box. Where the outlet box covers are back from the finished walls, the device shall be built out with washers so that it is rigidly held in place to the box. Metal extenders shall be provided in flammable construction per CEC.

147
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
I. All device screw slots shall be left in a vertical orientation.

J. Connect wiring device grounding terminal to branch- circuit equipment grounding conductor and to outlet box with bonding jumper.

3.10 TERMINAL CABINETS

A. Terminal cabinets shall be installed level and identified with nameplate per schedule.

B. All conductors in terminal cabinets shall be squared, labeled and secured neatly with wire ties.

C. All terminal cabinets shall be installed with the top of the trim at 6’-0” above the finished floor, unless otherwise indicated on the drawings.

D. Where space permits, terminal cabinets shall be surface mounted where they are not visible to the public.

E. A typewritten directory shall be mounted behind plastic in a metal holder welded to the inside of each terminal cabinet door showing a complete description of terminations in each cabinet.

3.11 PANELBOARDS

A. All panels shall be installed with the top of the trim at 6’-0” above the finished floor, unless otherwise indicated on the drawings.

B. Where space permits, panels shall be surface mounted where they are not visible to the public.

C. A typewritten directory shall be mounted behind plastic in a metal holder welded to the inside of each panel door showing circuit numbers and complete description of all outlets on each circuit and an Arc -Flash Hazard Warning label shall be applied to each panelboard in accordance with CEC 110.16.

D. Labeling of all circuits at panel boards shall match the exact room names of each of the spaces. Verify exact room names with Owner prior to labeling.

3.12 DISCONNECT DEVICES

A. Thoroughly examine site conditions for acceptance of disconnects switch installation to verify conformance with manufacturer and specification tolerances. Do not commence with installation until all conditions are made satisfactory.

B. Coordinate locations of switches and equipment in the field to provide code required clearances in front of switches and to insure that switches are in sight of the controllers as described in NEC Article 430.

148
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
C. Install disconnect switches where indicated on the Drawings.

D. Install fuses in fusible disconnect switches.

E. Include construction channel and mounting hardware as required to support disconnect switch.

F. Provide engraved, machine screw retained nameplate on each disconnect switch. Name plate shall identify equipment and panelboard + branch circuit breaker.

3.13 SUPPORTING DEVICE APPLICATION

A. Hot-dip galvanized materials or nonmetallic channel and angle system components shall be used in damp locations and outdoors.

B. Steel materials shall be used in dry locations.

C. Support clamps for PVC raceways shall be click-type clamp system.

D. Strength of supports shall be adequate to carry present and future loads, times a safety factor of at least four with a minimum of 200-lb design load.

3.14 SUPPORT INSTALLATION

A. Install support devices to securely and permanently fasten and support electrical components.

B. Install individual and multiple raceway hangers and riser clamps to support raceways.

Provide U -bolts, clamps, attachments, and other hardware necessary for hanger assemblies and for securing hanger rods and conduits.

C. Support parallel runs of horizontal raceways together on trapeze- or bracket -type hangers.

D. Size supports for multiple raceway installations so capacity can be increased by a 25 percent minimum in the future.

E. Support individual horizontal raceways with separate, malleable- iron pipe hangers or clamps.

F. Install 1/4-inch diameter or larger threaded steel hanger rods, unless otherwise indicated.

G. Arrange supports in vertical runs so the weight of raceways and enclosed conductors is carried entirely by raceway supports, with no weight load on raceway terminals.

H. Simultaneously install vertical conductor supports with conductors.

I. Securely fasten electrical items and their supports to structures, according to the following 149
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
criteria, unless otherwise noted:

1. Wood – wood screws or screw-type nails.

2. Masonry – toggle bolts on hollow masonry units, expansion bolts on solid masonry units.

3. New Concrete – concrete inserts with machine screws and bolts.

4. Existing Concrete – expansion bolts.

5. Steel – welded threaded studs or spring- tension clamps on steel. Field welding shall comply with AWS D1.1. Welding to steel structure may be used only for threaded studs, not for conduits, pipe straps, or other items.

6. Light Steel – sheet-metal screws.

7. Fasteners shall be selected so the load applied to each fastener does not exceed 25 percent of its proof-test load.

3.15 ELECTRICAL IDENTIFICATION

A. Each conductor of every system shall be permanently tagged in each panelboard, pull box, J-box, etc., in compliance with the Occupational Safety and Health Administration (OSHA).

B. Brady labels shall be used to identify terminals and destination of feeders, branch circuits, signal and control circuits, etc., at all terminations, junction boxes and pull boxes, and shall be coordinated with the nameplates in all boxes and equipment.

C. All terminals in the switchboards, panels, relays, switches, devices, starter terminals, etc., shall have Brady labels for identification to identify both ends of all wiring.

D. The Contractor shall furnish and install 1” x 3” x 3/32” thick laminated black Bakelite nameplates with a white core (unless specifically shown as red) engraved to produce white letters on black background for all items of electrical equipment, including 2- pole and 3-pole circuit breakers, panelboards, starters, relays, time switches and disconnect switches.

E. All devices shall have their branch circuit identified on the back side of device plate with a permanent type black marker, i.e. CT A -21. Identify panelboard and circuit number from which receptacles are served. Use machine-printed, pressure-sensitive, abrasion- resistant label tape on face of plate and durable wire markers or tags within outlet boxes.

F. Coordinate names, abbreviations, colors, and other designations used for electrical identification with corresponding designations indicated in the Contract Documents or required by codes and standards. Use consistent designations throughout Project.

G. Panels having single- pole circuit breakers shall be provided with typed schedules mounted in welded metal holders behind plastic.

150
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
H. Clean surfaces that are to receive self-adhesive identification products before applying.

I. Where three or more switches are ganged, and elsewhere as indicated, identify each switch with approved legend engraved on wall plate.

J. Tag and label circuits designated to be extended in the future. Identify source and circuit numbers in each cabinet, pull and junction box, and outlet box. Color -coding may be used for voltage and phase identification.

K. Install continuous underground plastic markers during trench backfilling, for exterior underground power, control, signal, and communication lines located directly above power and communication lines. Locate 6 to 8 inches below finished grade. If width of multiple lines installed in a common trench or concrete envelope does not exceed 16 inches, overall, use a single line marker.

L. All power conductors shall be identified in accordance with the following schedule:

1. 120/208V, 3 Phase, 4 Wire System.
a. Phase A: Black.
b. Phase B: Red.
c. Phase C: Blue.
d. Neutral: White.
e. Ground: Green

2. 277/480V, 3 Phase, 4 Wire System.
a. Phase A: Brown.
b. Phase B: Orange.
c. Phase C: Yellow.
d. Neutral: White with a colored stripe or gray.
e. Ground: Green.

M. Install warning, caution, and instruction signs where required to comply with 29 CFR, Chapter XVII, Part 1910.145, and where needed to ensure safe operation and maintenance of electrical systems and of items to which they connect. Install engraved plastic-laminated instruction signs with approved legend where instructions are needed for system or equipment operation. Install metal-backed butyrate signs for outdoor items.

N. Install engraved- laminated emergency -operating signs with white letters on red background with minimum 3/8- inch high lettering for emergency instructions on power transfer, load shedding, and other emergency operations.

3.16 REFINISHING AND TOUCHUP PAINTING

A. The Contractor shall clean damaged and disturbed areas and apply primer, intermediate, and finish coats to suit the degree of damage at each location. He shall follow paint 151
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
manufacturer’s written instructions for surface preparation and for timing and application of successive coats.

B. Damage to galvanized finishes shall be repaired with zinc -rich paint recommended by manufacturer.

C. Damage to PVC or paint finishes shall be repaired with matching touchup coating recommended by manufacturer.

3.17 SYSTEM TESTING AND STARTUP

A. Refer to Specification Section 269500 “Electrical Acceptance Tests” for minimum required systems testing and startup.

3.18 TITLE 24 - PART 6 DOCUMENTATION OF INSTALLATION AND ACCEPTANCE FOR

ELECTRICAL POWER DISTRIBUTION SYSTEMS

A. The Contractor shall prepare and submit the following Certificates of Installation:

1. Electrical:
a. Certificate of Installation – Electrical Power Distribution (NRCI-ELE-01-E)

Bid Item No. 14 – Wall Cleaning and Painting

This item shall be bid lump sum and shall conform to these Specifications and Plans. The Contractor shall furnish the Engineer a Schedule of Values (cost break -down) for this contract lump sum item. Reference Section 9- 1.16B, “Schedule of Values,” of the State Standard Specifications, latest edition. Schedule of Values table shall be submitted to the Engineer for approval prior to start of work.

This bid item shall consist of all material required to prepare the walls for cleaning, including any material required to protect any ceiling, floor, or wall fixtures or appurtenances, all materials required to prepare the walls for the final coat of finish paint, all materials needed for the finish paint and all work and materials necessary to complete the cleaning, prepping and painting of the walls as specified on the Plans.

The sum of the amounts for the line items of work listed in the Schedule of Values table for this bid item shall be equal to the contract lump sum bid price. No adjustments in compensation will be made in the contract lump sum price due to differences between the quantities shown in the Schedule of Values furnished by the Contractor and the quantities required to complete the work as shown on the plans and as specified in these specifications.

The approved Schedule of Values may be used to determine partial payments during the progress of the work at the Engineer’s discretion.

PAINTING AND COATING – SITE CIVIL WORK

PART 1 GENERAL
152
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

1.1 WORK INCLUDED
A. Field painting including surface preparation, surface protection, clean up, and/or other appurtenant work.

B. All labor, materials, tools and equipment, and incidentals necessary and required for their completion.

C. All pipe, fittings, equipment, and structures are to be field coated except for those specific exceptions contained in this specification or identified on the drawings. The painting schedule included at the end of this specification summarizes the surfaces to be coated, the required surface preparation, and the coating systems to be applied. Coating notes on the drawings are used to show exceptions to the schedules, to extend the limits of coating systems, or to clarify or show details for application of the coating systems.

1.2 SUBMITTALS
A. Submittals shall be in accordance with the Standard General Conditions, 01 33 00 Submittal Procedures and the Supplementary Conditions.

1. Product technical data including:
a. Acknowledgement that products submitted meet requirements of standards referenced.
b. Performance criteria as required by the Engineer to determine quality. c. Manufacturer’s installation instructions and environmental parameters.
d. Material Safety Data Sheets.
e. Color samples.

1.3 AIR QUALITY REGULATORY COMPLIANCE
A. All paint shall conform to the applicable air quality regulations at the point of application.

Any paint material which cannot be guaranteed by the manufacturer to comply, whether specified by product designation or not, shall not be used.

B. The volatile organic compound (VOC) of coatings materials limits set forth in Rule460.1 of the San Joaquin Valley Unified Air Pollution Control District shall apply to this project.

The manufacturers' products listed in paragraphs 3.01 and 3.02 have been selected on the basis of their apparent compliance with Rule 460.1; however, it shall remain the Contractor's responsibility to ensure that all coatings materials furnished are in compliance with all regulatory agencies.

C. The product listed may meet the VOC requirement in the unthinned (as shipped) condition, but may exceed the VOC requirement if thinned to the manufacturer's allowable recommendations. In this situation, the product is not to be thinned beyond the limit 153
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
indicated in Rule 460.1, and if the product cannot be suitably thinned for the intended application method or temperature requirements, it will be necessary to use another manufacturer's product subject to acceptance by the Engineer.

D. It shall be the responsibility of the Contractor to ensure the compatibility of the field painting products which will be in contact with each other or which will be applied over shop painted or previously painted surfaces. Paint used in successive field coats shall be produced by the same manufacturer. Paint used in the first field coat over shop or field primed surfaces, or previously painted surfaces shall cause no wrinkling, lifting, or other damage to underlying paint.

E. All paint used for intermediate and finish coats shall be guaranteed by the paint manufacturer to be fumeproof. Paint shall be lead-free and mercury-free.

1.4 QUALITY OF WORK
A. All finishes shall be applied by skilled workmen in accordance with the best practices and standards of the painting trade. Brushes, rollers, all equipment, and the techniques used in applying finishes shall be of sufficient quality to assure the specified results. Work not conforming to this Specification shall be corrected by touching up or refinishing as directed by the Engineer.

B. It is the purpose and intent of this Specification to cover the complete paint finishing of all exterior and interior surfaces as scheduled or specified and all surfaces which normally require a paint finish for corrosion resistance, weather protection, finished appearance or utility. Finished surfaces shall be of the type of finish, color sheen film thickness and quality specified.

1.5 DELIVERY AND STORAGE
A. Painting materials shall be delivered to site in manufacturer's original containers with labels intact and seals unbroken. Painting materials and equipment shall be stored and protected against freezing and mixed in rooms assigned for that purpose. No chemicals, unauthorized thinners, or other materials, not included in the paint formulation shall be added to the paint for any purpose. All necessary precautions shall be taken to prevent fire. Rags or waste soiled with paint shall be removed from premises at end of each day's work, or shall be stored in covered metal containers.

1.6 EQUIVALENT PRODUCTS
A. Whenever a coating is specified using the name of a proprietary product or the name of a particular manufacturer or vendor, the specified coating shall be understood as establishing the type and quality of coating desired.

B. Other manufacturers' products will be accepted provided sufficient information is submitted to allow the Engineer to determine that the coatings proposed are equivalent to those named. Proposed coatings shall be submitted for review in accordance with these specifications.
154
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
C. Requests for review of equivalency will not be accepted from anyone except the Contractor, and such requests will not be considered until after the contract has been awarded.

D. Specific products for various applications shall be as specified in Part 2. In addition to the products named in Part 2, equivalent products of the following manufacturers will also be acceptable:

Ameron Carboline
Devoe
PPG (Pittsburgh) Sherwin Williams
Co. Sinclair
Tnemec
Valspar
E. Contractor shall provide verification that equivalent products are acceptable for the desired application.

1.7 REFERENCE STANDARDS
A. SSPC – Society of Protective Coatings, Pittsburgh, PA B. ASTM – American Society For Testing And Materials, West Conshohocken, PA

PART 2 PRODUCTS

2.1 GENERAL
A. All paint shall be the product of a recognized manufacturer exclusively engaged in the manufacture of painting material. All paints for wood and metal surfaces shall be well - ground and shall not skin, liver, curdle, or body excessively in the containers.

B. The paint shall not show laps or unevenness of color or texture. When applied to vertical surfaces, it shall not sag.

C. All exposed surfaces, including sides and edges, shall be painted. Hangers, brackets, fastenings and other miscellaneous items shall be painted with the same system as the adjacent material. Paint systems shall be in addition to shop primers.

D. Paint shall be stored inside and shall be protected against freezing. No adulterant, unauthorized thinner, or other material not included in the paint formation shall be added to the paint for any purpose.

E. Paint used in successive field coats shall be produced by the same manufacturer. Paint used in the first field coat over shop painted or previously painted surfaces shall cause no wrinkling, lifting, or other damage to underlying paint. Any paint system shall be the product of a single manufacturer.
155
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
F. All paint used for intermediate and finish coats shall be guaranteed by the paint manufacturer to be lead- free, mercury-free, and fumeproof. Where paint materials are referenced to Federal or military specifications, the reference shall define general type and quality required but is not intended to limit acceptable materials to an exact formulation.

G. For each paint, the Contractor shall follow the paint manufacturer's specific application instructions. Upon the Engineer's request, the Contractor shall furnish the following application instructions.

1. Surface preparation recommendations.

2. Type of primer to be used.

3. Maximum dry and wet mil thickness per coat.

4. Minimum and maximum curing times between coats.

5. Thinner to be used with each paint.

6. Ventilation requirements.

7. Atmospheric conditions during which the paint shall not be applied.

8. Allowable methods of application.

9. Maximum allowable moisture content and minimum age of plaster, concrete and wood surfaces at time of paint application.

10. Curing time before submergence in water.

H. The minimum number of coats and minimum total dry mil thickness of the system for each surface shall be as specified in the paint schedule.

2.2 PAINTING SCHEDULE
A. A schedule is appended to this section listing the surface preparation, primer, finish and dry mil thickness to be used on each surface to be coated.

2.3 PRIMERS AND PRETREATMENT
A. P-1 Epoxy Primer - Minimum dry thickness 4 mils. Devoe "Bar Rust 235H", Sherwin Williams “Macropoxy 646 FC Epoxy B58-600”, or Tnemec 69-1211 "Hi -Build Expoxoline."
B. P-2 Rust Inhibitive, non-submerged - Minimum dry thickness 3 mils. Devoe "Devran 203 Waterborne Epoxy Primer", Sherwin Williams “Macropoxy 646 FC Epoxy B58- 600” or Tnemec 135 "Chem Build."
C. P-3 Rust inhibitive, submerged - Minimum dry thickness 4.0 mils. Devoe "Bar Rust 235H", 156
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
Sherwin Williams “Macropoxy 646 FC Epoxy B58-600” or Tnemec 136 "Chem Build.” D. P-4 Primer for Wood – Maximum of 400 sq. ft/gal. Devoe 2010- 1200 "Ultra- Hide Durus Exterior Acrylic Primecoat", Sherwin Williams “A-100 Wood Primer B42W41” or Tnemec 151 “Elaso-Grip.”
E. P-5 Wallboard Primer – Maximum of 400 sq. ft/gal. Devoe1060- 1200 "Ultra- Hide Latex Primer- Sealer", Sherwin Williams “Preprite 200 Interior Latex Primer B28W200”, or Tnemec 51-792 "PVA Sealer."
F. P-6 High Build Acrylic – Maximum of 100 sq. ft/gal., Tnemec 180 WB Tneme- Crete, Sherwin Williams “Heavy Duty Block Filler B42W46”.

2.4 INTERMEDIATE AND FINISH PAINTS
A. F-1 Epoxy Resin - Minimum dry thickness 5 mils. Devoe "Bar Rust 235H", Sherwin Williams “Macropoxy 646 FC Epoxy B58-600”, or Tnemec 69 "Hi-Build" epoxy.

B. F-2 Gloss Acrylic Emulsion - Minimum dry thickness 2.0 mils Devoe “ Devflex 4208 Waterbone Acrylic Enamel”, Sherwin Williams “Shercryl Hi Performance Acrylic Gloss B66-300”, or Tnemec 1028.

C. F-3 Semi-gloss Acrylic Emulsion - Minimum dry thickness 2.5 mils Devoe “Devvflex 4216 HP Waterborne”, Sherwin Williams “Shercryl Hi Performance Acrylic Semi -Gloss B66- 350”, or Tnemec 1029 “Tuf Cryl”.

D. F-4 High Build Epoxy (Substitute for Coal Tar) - Minimum dry thickness 6 mils. Devoe “Devtar 5A HS”, Sherwin Williams “Targuard Coal Tar Epoxy B69B60”, or Tnemec “V69F Black"
E. F-5 Polyurethane O - Minimum dry thickness 2 mils. Devoe “Devthane 379H Aliphatic Urethane Gloss Enamel”, Sherwin Williams “Hi Solids Polyurethane CA B65j -300”, or Tnemec 1075 "Endurasheild."
F. F-6 Acrylic Epoxy – Minimum dry film thickness 4 mils. Tnemec 113 Tneme- Tufcoat, Sherwin Williams “ Waterbased Tile Clad Epoxy B73-100”.

G. F-7 High Build Acrylic – Maximum of 100 sq. ft./gal.Tnemec 180 WB Tneme-Crete, Sherwin Williams “Heavy Duty Block Filler B42W46”.

2.5 ALUMINUM SURFACES
A. All aluminum in contact with steel or concrete: Sherwin Williams “Macropoxy 646 FC Epoxy B58-600 series or approved equivalent..

2.6 SHOP COATINGS
A. Shop coatings shall be applied as indicated in the individual equipment and component specifications.
157
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
B. Electric motors, speed reducers, starters, and other self contained or enclosed components shall be shop primed or finished with a high grade, oil resistant enamel suitable for top coating in the field with an alkyd enamel.

C. All shop coatings shall be compatible with the pain system specified in the Painting Schedule contained at the end of this specification.

2.7 SURFACES NOT TO BE PAINTED
A. Except as otherwise required or directed, the following surfaces are to be left unpainted:

1. Exposed surfaces of aluminum (aluminum in contact with concrete is to be coated).

2. Polished or finished stainless steel. Unfinished stainless steel shall be painted.

3. Nickel or chromium.

4. Galvanized surfaces, except piping, conduit, electrical conduit, pipe supports, fasteners, hangers, bracing, brackets, and accessories.

5. Rubber and plastics, including fiberglass reinforced plastics.

6. Precast concrete.

2.8 SYSTEM IDENTIFICATION
A. Above Grade Piping: Provide markers on piping which is either exposed or concealed in accessible spaces. For piping systems, other than drain and vent lines, indicate the fluid conveyed or its abbreviation, either by preprinted marker or stenciled marking, and include arrows to show the direction of flow. Comply with ANSI A13.1 for colors. Locate markers at ends of lines, near major branches and other interruptions including equipment in the line, where lines pass through floor, walls or ceilings or otherwise pass into inacces sible spaces, and at 50' maximum intervals along exposed portion of lines. Marking of short branches and repetitive branches for equipment connections is not required.

B. Equipment: All equipment shall be identified with a plastic laminated, engraved nameplate which bears the unit mark number as indicated on the drawings (e.g. AC-4). Provide 1/2" high lettering, white on black background. Nameplates shall be permanently secured to the unit.

C. Valves: Provide valve tags on all valves of each piping system, excluding check valves, valves within equipment, faucets, stops and shut-off valves at fixtures and other repetitive terminal units. Provide brass tags or plastic laminate tags. Prepare and submit a tagged valve schedule, listing each valve by tag number, location and piping service. Mount in glazed frame where directed.

2.9 COLORS

A. All colors and shades of colors shall be as specifically indicated in the specifications or 158
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
plans, or, where not specifically indicated, selected from the manufacturer’s standard color samples by the Owner.

B. Electrical conduit shall be painted to match adjacent ceiling or wall surfaces as directed by the Engineer.

PART 3 EXECUTION

3.1 PRELIMINARY EXAMINIATION
A. Notify the Engineer in writing of any uncorrected defects in surfaces to be painted. Do not proceed with the finishing of surfaces in question until any discrepancies are corrected.

No work on any surface shall be started, unless the surface has been inspected and approved for painting by the Engineer.

3.2 SURFACE PREPARATION
A. The Contractor shall prepare the surfaces to be coated as specified under the paint schedule. Any surfaces to be coated which are not listed under the paint schedule shall be prepared in accordance with the manufacturer's instructions for the material to be applied.

B. All grease, oil, dirt, and other contaminants which may affect the bond between the coating and the surface shall be removed by a cleaning agent which will leave the surface clean and dry.

C. Cleaning and painting operations shall be performed in a manner which will prevent dust or other contaminants from getting on freshly painted surfaces.

D. Surfaces shall be free of cracks, pits, projections, or other imperfections which would prevent the formation of smooth, unbroken paint film, except for concrete block construction where a rough surface is an inherent characteristic.

E. When applying touch- up paint, or repairing previously painted surfaces, the surfaces to be painted shall be cleaned and sanded or wire brushed in such a manner that the edges of adjacent paint are feathered or otherwise smoothed so that they will not be noticeable when painted. All paint made brittle or otherwise damaged by heat or welding shall be completely removed.

F. Hardware items such as bolts, screws, washers, springs, and grease fittings need not be cleaned prior to painting if there is no evidence of dirt, corrosion, or foreign material.

G. All galvanized surfaces shall have a metal conditioner applied prior to the first prime coat.

H. All surfaces to be finished shall be clean and dry before any materials are applied. Use a moisture meter to determine moisture content as follows. The moisture content shall be less than 18% for wood; 8% for concrete or plaster.

1. Metal Surfaces - Where noted, the surface preparation for steel and other metals refer to the specifications for surface preparation by the latest revision of the Steel 159
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
Structures Painting Council. All metal work shall be cleaned of grease, oil and dirt by solvent cleaning (SSPC -SP1). Do not use hydrocarbon based solvents for cleaning prior to use of acrylic materials.
a. Method SP-2: Surface shall be wire brushed where required to remove loose rust and dirt, etc. (SSPC-SP2)
b. Method SP-3: Removal of loose rust, loose mill scale and other detrimental foreign matter to degree specified by power wire brushing, power impact tools or power sanders. (SSPC-SP3)
c. Method SP-6: Blast cleaning until at least two- thirds of each element of surface area is free of all visible residues. (SSPC-SP6) d. Method SP-10: Sandblast to near white condition. This method shall remove all rust and scale, but streaks and shadows in the metal will be acceptable. (SSPC-SP10)

2. Wood Surfaces
a. Method W-1: All unprimed millwork delivered to the jobsite shall be given the specified first coat on all surfaces immediately upon arrival. Give all unprimed woodwork the specified first coat as soon as possible following installation.

Prime any wood surface that is to be in contact with concrete, or a caulking material, with the specified first coat material before installation. Unless specified otherwise, all casings and trim, and all woodwork shall be free of oil, dirt, loose fibers, etc., sealed with a sanding sealer recommended by the coating manufacturer, and sanded smooth and dusted thoroughly before application of the priming coat. Give all knots, pitch pockets and sappy areas a preliminary coat of Dutch Boy Knot Sealer, or approved equivalent, prior to application of the prime coat.

3. Galvanized Surfaces
a. Method G-1: All galvanized surfaces shall be prepared for painting in strict conformity with the instructions of the manufacturer. All galvanized shall be cleaned per SSPC-SP7.

4. PVC Pipe
a. Method V-1: All wax and oil shall be removed from PVC plastic surfaces by wiping with a solvent of the type used for the specified primer.

3.3 PAINT APPLICATION
A. Apply all finishes evenly, free from sags, runs, crawls, brush marks, skips or other defects.

Apply products at the proper consistency and do not thin or otherwise alter them except in accordance with the manufacturer's printed directions. All coats shall be applied in such manner as to produce an even film of uniform thickness completely coating all corners 160
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
and crevices. All painting shall be done by thoroughly experienced workmen.

B. Care shall be exercised during spraying to hold the nozzle sufficiently close to the surfaces being painted to avoid excessive evaporation of the volatile constituents and loss of material into the air, or the bridging over of crevices and corners. Spray equipment shall be equipped with mechanical agitators, pressure gauges, and pressure regulators.

Nozzles shall be of proper size. Floors, roofs, and other adjacent areas and installations shall be satisfactorily protected by drop cloths or other precautionary measures. All over- spray shall be removed by approved methods or the affected surface repainted. Care shall be exercised to avoid lapping of paint on hardware of other unscheduled surfaces.

C. Each coat of material shall be thoroughly dry before the application of a succeeding coat.

In no case shall paint be applied at a rate of coverage per gallon which is greater than the maximum rate recommended by the manufacturer. Paint films showing sags, checks, blisters, teardrops, or fat edges will not be accepted. Paint containing any of these defects shall be entirely removed and the surface repainted.

D. Sandpaper enamels and varnishes lightly between coats and dust thoroughly before the application of a succeeding coat.

E. If the finish coat is to be colored, the prime coat and the intermediate coat shall be tinted to have a slight variation in color from each other and from the finish coat.

3.4 PRIMING
A. Edges, corners, crevices, welds, and bolts shall be given a brush coat of primer before the specified spot or touch-up painting of metal surfaces. Special attention shall be given to filling all crevices with paint.

B. Abraded and otherwise damaged portions of shop applied paint shall be repainted.

Welded seams and other uncoated surfaces, heads and nuts of field installed bolts, and surfaces where paint has been damaged by heat, shall be given a coat of the specified primer. This patch, spot, or touch- up painting shall be completed, and shall be dry and hard, before additional paint is applied.

3.5 LATEX PAINT
A. Latex paint shall be applied by brushing or rolling; spraying is not permitted. Latex paint shall not be thinned excessively.

3.6 MIXING AND THINNING
A. Paint shall be thoroughly mixed each time any is withdrawn from the container. Paint containers shall be kept tightly closed except while paint is being withdrawn.

B. Unless otherwise authorized, all paint shall be factory mixed to proper consistency and viscosity for hot weather application without thinning. Thinning will be permitted only as necessary to obtain recommended coverage at lower application temperatures. In no 161
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
case shall the wet film thickness of applied paint be reduced, by addition of paint thinner or otherwise, below that represented by the recommended coverage rate.

3.7 FILM THICKNESS FOR FERROUS METALS
A. It is intended that the dry film thickness and the continuity of painted ferrous metal surfaces be subject to continual field check by the Engineer. Dry film thickness shall be measured by the Contractor, using an approved Thickness Gauge, at locations selected by Engineer. Testing equipment provided shall be provided by Contractor and kept on site.

B. Measurement of Dry Coating Thickness shall conform with paint application Standard SSPC-PA2
C. Thickness and Holiday Checking - Thickness of coatings and paint shall be checked with a non-destructive, magnetic type thickness gauge.

D. Holiday Checking of all interior coated surfaces shall be tested with an approved holiday detection device. Non-destructive holiday detectors shall not exceed 100 volts nor shall destructive holiday detectors exceed the voltage recommended by the manufacturer of the coating system. For thicknesses between 10 and 20 mils (0.25mm and 0.50mm) a non-sudsing type wetting agent such as Kodak Photo- Flo, shall be added to the water prior to wetting the detector sponge. All pinholes shall be marked, repaired in accordance with the manufacturer's printed recommendations and re- tested. No pinholes or other irregularities w ill be permitted in the final coating. Holiday detection devices shall be operated in the presence of the Engineer.

E. Continuity shall be tested by a low voltage- wet sponge per RPO 188. Contractor shall perform continuity tests as required by the Engineer on surfaces that will be submerged.

3.8 ATMOSPHERIC CONDITIONS
A. Apply all material to dry and properly prepared surfaces when weather conditions are favorable for painting. No materials shall be applied when the temperature of the materials is below 50 degrees F, or when the temperature of the air, surface to be painted or substrate, is below (or likely to fall below) 50 degrees F. Final ruling on the favorability of weather conditions shall be in accordance with the recommendations of the manufacturer and/or the Engineer.

B. No coating or paint shall be applied to wet or damp surfaces, in rain, snow, fog, or mist, when the steel temperature or surrounding air temperature is less than 5 degrees above the dew point, nor in conditions not recommended by the manufacturer.

3.9 REPAIRING DAMAGED PAINT ON EQUIPMENT
A. Painted surfaces on equipment, which have become damaged prior to acceptance by the Owner, shall be repainted with the same or equivalent paint used in the original application.
162
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

3.10 PROTECTION OF SURFACES
A. Throughout the work the Contractor shall use drop cloths, masking tapes, and other suitable measures to protect all surfaces from accidental spraying, splattering, or spilling of paint. Contractor shall be liable for and shall correct and repair any damaged condition resulting from its operations or from the operations of all those who are responsible to the Contractor during the time its work is in progress and until the work is accepted. In case bituminous paints are spilled or dropped on any material exc ept metals, the spots shall, after surface cleaning, be spot painted with aluminum paint prior to applying the specified paint. Any exposed concrete or masonry not specified to be painted which is damaged by paint shall be either removed and rebuilt or, where so authorized by the Owner, painted with two coats of masonry paint.

3.11 CLEANUP
A. All cloths and cotton waste which might constitute a fire hazard shall be placed in metal containers or destroyed at the end of each work day. Upon completion of the work all staging, scaffolding and containers shall be removed from the site or destroyed in a manner approved by the Engineer.

3.12 PAINTING SCHEDULE

FINISH SURF.

PRIME 2ND 3RD
SYSTEM SURFACE PREP. COAT COAT COAT

1. New ferrous metal in
submerged or damp
environment including all
submerged mechanical
components.

SP-10 P-1 F-1 F-1

2. All exterior exposed new SP-2 or 3 P-2 F-2 F-2
structural and miscellane-
ous steel. All exterior
exposed surfaces of new
piping, pumps, motors,
electrical equipment and
other unsubmerged
mechanical and structural
items.

3. All surfaces of new
structural and miscellane-
ous steel pipe, pumps,
motors and electrical
SP-6 P-2 F-3 F-3
equipment panels exposed
inside building.

163
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

4. All interior exposed new
galvanized metalwork
including electrical conduit
inside buildings, including
fittings, boxes, supports and
accessories.

G-1 P-3 F-3 F-3

5. All exterior exposed new
galvanized metalwork
including roof flashings ad
other architectural items.

G-1 P-3 F-2 F-2

6. Exposed new PVC piping V-1 F-5 F-5

7. All new buried valves and SP-10 F-4 F-4
flanged joints and other
buried miscellaneous
ferrous piping and metal
surfaces (excluding cast
iron pipe). All exterior
surfaces of new cast iron
and steel piping exposed in
manholes, wet wells and
similar locations, including
valves, fittings, flanges,
bolts, supports, and
accessories. Miscellaneous
new castings, including
manhole rings and covers
and manhole steps. (One
coat, if not foundry dipped.)

8. Interior wood

P-4

F-2

F-2

9. Exterior wood

10. Interior dry wall

11. Exterior concrete block

12. Concrete
P-4

P-5

P-6

P-6
F-3

F-6

F-7

F-7
F-3

3.13 When conflicting painting specifications or requirements are encountered in the contract documents, the more restrictive specifications or requirements shall be required.

PAINTING - BUILDING
PART 1 – GENERAL

1.1 RELATED DOCUMENTS
164
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
A. Drawings and general provisions of the Contract, and these specifications , apply to this Section.

1.2 SUMMARY
A. This Section includes surface preparation and field painting, staining or refinishing of the following:

1. Exposed interior items and surfaces.

2. Surface preparation, priming, and finish coats specified in this Section are in addition to shop priming and surface treatment specified in other Sections.

1.3 DEFINITIONS
A. Definitions of gloss levels below are from "MPI Architectural Painting Specification Manual" (hereafter, "MPI Manual").

1. Gloss Level 1: Not more than 5 units at 60 degrees and 10 units at 85 degrees, according to ASTM D 523.

2. Gloss Level 3: 10 to 25 units at 60 degrees and 10 to 35 units at 85 degrees, according to ASTM D 523.

3. Gloss Level 4:
20 to 35 units at 60 degrees and not less than 35 units at 85 degrees, according to ASTM D 523.

4. Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D 523.

5. Gloss Level 6: 70 to 85 units at 60 degrees, according to ASTM D 523.

6. Gloss Level 7: More than 85 units at 60 degrees, according to ASTM D 523.

1.4 SUBMITTALS
A. Product Data: For each type of product. Include preparation requirements and application instructions.

B. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available for each type of finish-coat material indicated.

C. Samples for Verification: For each type of paint system and each color and gloss of topcoat.

1. Submit Samples on 8 inch square samples of actual material to be painted or stained.

For masonry surfaces, include a mortar joint.

2. Step coats on Samples to show each coat required for system.

3. Label each coat of each Sample.

4. Label each Sample for location and application area.

D. Product List: For each product indicated, include the following:

1. Cross-reference to paint system and locations of application areas. Use same designations indicated on Drawings and in schedules.

2. VOC content.

E. Coating Maintenance Manual: Submit with Closeout/Maintenance Submittals a Coating Maintenance manual; manual shall include a floor plan with rooms identified by name and 165
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
number, a finish schedule coordinated with the floor plan, designations of where each product/color/finish was used, product data pages, Material Safety Data Sheets, care and cleaning instructions, touch-up procedures, and color samples of each color and finish used.

1.5 QUALITY ASSURANCE
A. Applicator Qualifications: Engage an experienced applicator who has completed painting system applications similar in material and extent to that indicated for this Project with a record of successful in-service performance.

B. Source Limitations: Obtain block fillers, primers, and undercoat materials for each coating system from the same manufacturer as the finish coats.

1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to the Project Site in manufacturer's original, unopened packages and containers bearing manufacturer's name and label, and the following information:

1. Product name or title of material.

2. Product description (generic classification or binder type).

3. Manufacturer's stock number and date of manufacture.

4. Contents by volume, for pigment and vehicle constituents.

5. Thinning instructions.

6. Application instructions.

7. Color name and number.

8. VOC content.

B. Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45 deg F.

1. Maintain containers used in storage in a clean condition, free of foreign materials and residue.

2. Keep storage area neat and orderly. Remove oily rags and waste daily.

3. Take necessary measures to ensure that workers and work areas are protected from fire and health hazards resulting from handling, mixing, and application.

1.7 PROJECT CONDITIONS
A. Apply paints only when the temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F.

B. Do not apply paint in snow, rain, fog, or mist; or when the relative humidity exceeds 85 percent; or at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces.

C. Protection:

1. Cover or otherwise protect finished work of other trades, work not to be painted concurrently, landscaping, and adjacent property from damage.

2. When not in use, store paints in designated areas. Keep containers closed. At end of day's work, remove empty containers, paint soaked rags, and debris. Vent fumes. Take precautions to prevent fire.
166
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
D. Sequencing, Scheduling:

1. Coordinate removal and replacement of hardware, electrical fixtures and trim, and related work of other Sections.

2. Stain, prime, back paint, and pre-finish items before installation as required.

E. Cleaning and Disposal:

1. Do not use Project plumbing fixtures or piping systems for:
a. Cleaning painting equipment and utensils.
b. Disposal of waste from cleaning or disposal of paints.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Scheduled Paint Systems: Provide paint systems as scheduled on the Drawings and listed in Part 3 Article “Paint Systems” to comply with requirements in this Section.

1. Named Manufacturers' Products: Manufacturer and product designations indicated in the scheduled paint systems are for the purpose of establishing minimum requirements; unless otherwise indicated, paint products are based on products manufactured by the following:
a. Frazee Paints.
1) Subject to compliance with requirements, provide the named products or comparable products by one of the following:
a) Dunn-Edwards Paints.
b) Fuller O’Brien Paints.
c) Glidden Professional.
d) Sherwin Williams Paints.
e) Tnemec.

2.2 PAINT MATERIALS, GENERAL
A. Material Compatibility: Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.

1. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.

B. Material Quality: Provide manufacturer's best -quality paint material of the various coating types specified. Paint-material containers not displaying manufacturer's product identification will not be acceptable.

C. VOC Content: Paints and coatings applied at the Project site shall comply with VOC limits of 167
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
authorities having jurisdiction; VOC limits, exclusive of colorants added to a tint base, when calculated according to 40 CFR 59, Subpart D (EPA Method 24); and VOC limits of the California Green Building Standards Code (CGBSC), Section 5.504.4.3 and Table 504.4.3 as follows:

1. Flat Paints and Coatings: VOC not more than 50 g/L.

2. Nonflat Paints and Coatings: VOC not more than 100 g/L.

3. Nonflat High-Gloss Paints and Coatings: VOC not more than 150 g/L.

4. Dry-Fog Coatings: VOC not more than 150 g/L.

5. Floor Coatings: VOC not more than 100 g/L.

6. Pretreatment Wash Primers: VOC not more than 420 g/L.

7. Primers, Sealers, and Undercoaters: VOC not more than 100 g/L.

8. Rust Preventative Coatings Applied to Ferrous Metals: VOC not more than 250 g/L.

9. Shellacs, Clear: VOC not more than 730 g/L.

10. Shellacs, Pigmented: VOC not more than 550 g/L.

11. Stains: VOC not more than 250 g/L.

12. Clear Wood Finishes, Varnishes: VOC not more than 275 g/L.

13. Clear Wood Finishes, Lacquers: VOC not more than 275 g/L.

14. Zinc-Rich Industrial Maintenance Primers: VOC not more than 340 g/L.

D. Colors: Provide color selections made by the Engineer. Colors shall be factory mixed and match approved samples.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.

B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:

1. Concrete: 12 percent.

2. Masonry (Clay and CMU): 12 percent.

3. Wood: 15 percent.

C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.

D. Proceed with coating application only after unsatisfactory conditions have been corrected.

1. Application of coating indicates acceptance of surfaces and conditions.

E. Coordination of Work: Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers.

1. Notify the Engineer of anticipated problems using the materials specified over substrates primed by others.

168
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

3.2 PREPARATION
A. Comply with manufacturer's written instructions and recommendations in "MPI Manual" applicable to substrates and paint systems indicated.

B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.

1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection.

C. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and incompatible paints and encapsulants.

1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce paint systems indicated.

2. Schedule cleaning and painting so dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces.

D. Concrete and Masonry Substrates: Remove release agents, curing compounds, efflorescence, and chalk. Perform appropriate tests to determine alkalinity and moisture content of surfaces; testing shall be performed or witnessed by a certified representative of the paint manufacturer. Do not paint surfaces if moisture content or alkalinity of surfaces or mortar joints exceeds that permitted in manufacturer's written instructions.

1. Cracks and defects at concrete and masonry surfaces shall be filled with cement grout; match surface texture.

2. Clean concrete floors to be painted with a 5 percent solution of muriatic acid or other etching cleaner. Flush the floor with clean water to remove acid, neutralize with ammonia, rinse, allow to dry, and vacuum before painting.

E. Steel Substrates: Remove rust, loose mill scale, and shop primer if any. Clean using methods recommended in writing by paint manufacturer but not less than the following:

1. Steel Structures Painting Council's (SSPC), SSPC-SP 3, "Power Tool Cleaning." F. Shop-Primed Steel Substrates: Clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with the same material as used for shop priming to comply with SSPC-PA 1 for touching up shop-primed surfaces.

G. Galvanized-Metal Substrates: Remove grease and oil residue from galvanized sheet metal by mechanical methods to produce clean, lightly etched surfaces that promote adhesion of subsequently applied paints.

H. Wood Substrates: Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and sandpaper, as required.

1. Scrape and clean knots. Before applying primer, apply coat of knot sealer recommended in writing by topcoat manufacturer for exterior use in paint system indicated.

2. Sand surfaces that will be exposed to view, and dust off. 169
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

3. Prime, stain, or seal wood to be painted immediately on delivery. Prime edges, ends, faces, undersides, and backsides of wood.
a. When transparent finish is required, backprime with spar varnish. b. Backprime paneling on interior partitions where masonry, plaster, or other wet wall construction occurs on backside.
c. Seal tops, bottoms, and cutouts of unprimed wood doors with a heavy coat of varnish or sealer immediately on delivery.

4. After priming, fill holes and imperfections in the finish surfaces with putty or plastic wood filler. Sand smooth when dried.

I. Materials Preparation: Mix and prepare paint materials according to manufacturer's written instructions.

1. Maintain containers used in mixing and applying paint in a clean condition, free of foreign materials and residue.

2. Stir material before application to produce a mixture of uniform density. Stir as required during application. Do not stir surface film into material. If necessary, remove surface film and strain material before using.

3. Use only thinners approved by paint manufacturer and only within recommended limits.

J. Drywall: Fill any cracks or defects with drywall joint compound. Sand any rough spots smooth.

Do not raise nap on paper covering.

3.3 APPLICATION
A. General: Apply paints according to manufacturer's written instructions and recommendations in "MPI Manual." Paint/stain exposed surfaces, except where schedules indicate that a surface or material is not to be painted/stained or is to remain natural. If schedules do not specifically mention an item or surface to be painted, paint the item or surface the same as similar adjacent materials or surfaces whether or not schedules indicate colors. If the schedules do not indicate color or finish, the Engineer will select from standard colors and finishes available.

1. Use applicators and techniques suited for paint and substrate indicated.

2. Paint surfaces behind movable items same as similar exposed surfaces. Before final installation, paint surfaces behind permanently fixed items with prime coat only.

3. Paint both sides and edges of exterior doors and entire exposed surface of exterior door frames.

4. Paint front and backsides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces.

5. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.

6. Primers specified in painting schedules may be omitted on items that are factory primed or factory finished if acceptable to topcoat manufacturers.

7. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.

8. The term "exposed surfaces" includes areas visible when permanent or built-in fixtures, convector covers, covers for finned- tube radiation, grilles, and similar components are 170
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
in place. Extend coatings in these areas, as required, to maintain the system integrity and provide desired protection.

9. Do not paint prefinished items, concealed surfaces, finished metal surfaces, operating parts, and labels.
a. Prefinished items include the following factory-finished components:
1) Metal Doors.
2) Finished mechanical and electrical equipment.
3) Light fixtures.
4) Distribution cabinets.
b. Labels: Do not paint over Underwriters Laboratories (UL), Factory Mutual (FM), or other code-required labels or equipment name, identification, performance rating, or nomenclature plates.

B. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.

C. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.

D. Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration.

1. The number of coats and the film thickness required are the same regardless of application method. Do not apply succeeding coats until the previous coat has cured as recommended by the manufacturer. If sanding is required to produce a smooth, even surface according to manufacturer's written instructions, sand between applications.

2. Omit primer on metal surfaces that have been shop primed and touchup painted.

3. If undercoats, stains, or other conditions show through final coat of paint, apply additional coats until paint film is of uniform finish, color, and appearance. Give special attention to ensure edges, corners, crevices, welds, and exposed fasteners receive a dry film thickness equivalent to that of flat surfaces.

4. Allow sufficient time between successive coats to permit proper drying. Do not recoat surfaces until paint has dried to where it feels firm, does not deform or feel sticky under moderate thumb pressure, and where application of another coat of paint does not cause the undercoat to lift or lose adhesion.

E. Application Procedures: Apply paints and coatings by brush, roller, spray, or other applicators according to manufacturer's written instructions and recommendations in "MPI Manual."

1. Brushes: Use brushes best suited for the type of material applied. Use brush of appropriate size for the surface or item being painted.

2. Rollers: Use rollers of carpet, velvet back, or high-pile sheep's wool as recommended by the manufacturer for the material and texture required.

3. Spray Equipment: Use airless spray equipment with orifice size as recommended by the manufacturer for the material and texture required. 171
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
F. Minimum Coating Thickness: Apply paint materials no thinner than manufacturer's recommended spreading rate. Provide the total dry film thickness of the entire system as recommended by the manufacturer.

G. Block Fillers: Apply block fillers to concrete masonry block at a rate to ensure complete coverage with pores filled.

H. Prime Coats: Before applying finish coats, apply a prime coat of material, as recommended by the manufacturer, to material that is required to be painted or finished and that has not been prime coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears, to ensure a finish coat with no burn through or other defects due to insufficient sealing.

I. Stipple Enamel Finish: Roll and redistribute paint to an even and fine texture. Leave no evidence of rolling, such as laps, irregularity in texture, skid marks, or other surface imperfections.

J. Completed Work: Match approved samples for color, texture, and coverage. Remove, refinish, or repaint work not complying with requirements.

K. Painting Plumbing, HVAC, Electrical, Communication, and Electronic Safety and Security Work: Paint the following work where exposed to view at applications indicated:
a. Uninsulated metal piping.
b. Uninsulated plastic piping.
c. Pipe hangers and supports.
d. Metal conduit.
e. Plastic conduit.

3.4 CLEANING AND PROTECTION
A. At the end of each workday, remove empty cans, rags, rubbish, and other discarded paint materials from the site.

B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.

C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Engineer, and leave in an undamaged condition.

D. Provide "Wet Paint" signs to protect newly painted finishes. Remove temporary protective wrappings provided by others to protect their work after completing painting operations.

E. Correction of Defective Work:

1. Repair abraded, damaged or incomplete paint surfaces by methods acceptable to Engineer. Spot repairs to be well-blended into adjacent work. For large repairs, re-coat entire plane or building element in which damaged area occurs.

2. Defaced surfaces of work not to be painted shall be cleaned and their original finish 172
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
restored.

F. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.

3.5 PAINT SYSTEMS
(Interior and exterior paint systems are on the following pages)

A. Interior Paint Systems:

SURFACE PAINT SYSTEM COATS MANUFACTURER’S DESIGNATION
(1) Gypsum
Drywall
P12.A Flat, Latex First Coat
Second Coat
Third Coat
C153
C129
C129
Ultra Tech Primer
Ultra Tech Flat
Ultra Tech Flat
P12.B Semi-Gloss
Latex
First Coat
Second Coat
Third Coat
C153
C136
C136
Ultra Tech Primer
Ultra Tech SG
Ultra Tech SG
P12.C Eggshell
Enamel Latex
First Coat

Second Coat
Third Coat
061

022
022
Pigmented PVA Sealer Aqua
Seal
Lo Glo
Lo Glo
(Textured) P12.D Flat One Coat 019 Luxwall RTU
(2) Wood P13.A Semi-Gloss
Latex
First Coat
First Coat
Second Coat
168
124
124
Prime Plus
Mirro Glide SG
Mirro Glide SG
P13.B Eggshell
Enamel, Latex
First Coat
Second Coat
Third Coat
168
022
022
Prime Plus
Lo Glo
Lo Glo
P13.C Lacquer
Velvet
Stain
First Coat
Second Coat
Third Coat

15700
27520
27520
Minwax 250
Sanding Sealer
High Solids Velvet Lacquer
High Solids Velvet Lacquer
P13.D Lacquer
Semi-Gloss
Stain
First Coat
Second Coat
Third Coat

15700
27540
27590
Minwax 250
Sanding sealer
High Solids S.G. Lacquer
High Solids S.G. Lacquer
P13.E Lacquer
Gloss
Stain
First Coat
Second Coat
Third Coat

15700
27590
27590
Minwax 250
Sanding Sealer
High Solids Gloss Lacquer
High Solids Gloss Lacquer
P13.F Varnish
Velvet
Stain
First Coat
Second Coat
Third Coat

A68
A68
A68
Minwax 250
Wood Classics
Wood Classics
Wood Classics
173
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
P13.G Varnish Semi-
Gloss
Stain
First Coat
Second Coat
Third Coat

A68
A68
A68
Minwax 250
Wood Classics
Wood Classics
Wood Classics
(2A) Telecom.

Plywood
Backbd.

P13.H Intumescent
Paint
Primer

First Coat
Second Coat
(Primer if req. by
intumescent paint mfr)
Flame Stop IM
Flame Stop IM

SURFACE PAINT SYSTEM COATS MANUFACTURER’S DESIGNATION
(3) Ferrous
Metal
P14.A Flat Latex First Coat
Second Coat
Third Coat
C309
C129
C129
Universal Metal Prime
Ultra Tech Flat
Ultra Tech Flat
P14.B Semi-Gloss
Latex
First Coat
Second Coat
Third Coat
C309
C136
C136
Universal Metal Prime
Ultra Tech SG
Ultra Tech SG
(3)
Cont.

Ferrous
Metal
(Cont.)
P14.C Eggshell
Latex
First Coat
Second Coat
Third Coat
C309
C132
C132
Universal Metal Prime
Ultra Tech EG
Ultra Tech EG
(4) Galvanize
d Metal/
Aluminum
P15.A Flat Latex
First Coat
Second Coat
Third Coat
C309
C129
C129
Universal Metal Prime
Ultra Tech Flat
Ultra Tech Flat
P15.B Semi-Gloss
Latex
First Coat
Second Coat
Third Coat
C309
C136
C136
Acrylic Metal Prime
Ultra Tech SG
Ultra Tech SG
P15.C Eggshell
Latex
First Coat
Second Coat
Third Coat
C309
C132
C132
Universal Metal Prime
Ultra Tech EG
Ultra Tech EG
(5) Plaster,
Concrete,
Brick
P16.A Flat Latex First Coat
Second Coat
Third Coat
168
C129
C129
Prime Plus
Ultra Tech Flat
Ultra Tech Flat
P16.B Semi-Gloss
Latex
First Coat
Second Coat
Third Coat
168
C136
C136
Prime Plus
Ultra Tech SG
Ultra Tech SG
P16.C Eggshell
Latex
First Coat
Second Coat
Third Coat
C309
C132
C132
Universal Metal Prime
Ultra Tech EG
Ultra Tech EG
(6) Concrete
Block
P17.A Flat latex First Coat
Second Coat
Third Coat
C302
C129
C129
Ultra Tech
Ultra Tech Flat
Ultra Tech Flat
P17.B Semi-Gloss
Latex
First Coat
Second Coat
Third Coat
C302
124
124
Ultra Tech
Mirro Glide SG
Mirro Glide SG
P17.C Eggshell
Latex
First Coat
Second Coat
Third Coat
C302
022
022
Ultra Tech
Lo Glo
Lo Glo
174
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1
(7) Acoustical
Ceiling
Tile/
Plaster
P18.A Latex One Coat to
Cover
019 Luxwall RTU
(8) Ceramic
Tile like
Finishes
P19.A Epoxy First Coat
Second Coat
Third Coat
B51
B70
B70
W450 Multi Purpose Primer
W211 Waterbased Epoxy
W211 Waterbased Epoxy

SURFACE PAINT SYSTEM COATS MANUFACTURER’S DESIGNATION
(9) Ceiling
and Wall
w/ misc.

Pipes &
Conduit
Exposed,
Trusses &
Beams
w/Spray-
on Fire
Insulation
P20.A Latex
Dryfall
One Coat 504 Latex Dryfall White or Black

175
FAX Maintenance Building Steam Bay Renovation, Bid File No. 12600496

670645v1

EXHIBIT A
Fresno Area Express Improvement
Project
Geotechnical Investigation Report
P
repared for:

City of Fresno
2223 G Street, FAX Maintenance
Fresno, California 93076
Prepared by:

Stantec Consulting Services Inc.
735 East Carnegie Drive, Suite 280
San Bernardino, CA 92408
Project No. 2270445501
October 18, 2018
(Revised November 1, 2018)
Stantec Consulting Services Inc.
735 East Carnegie Drive, Suite 280
San Bernardino, California 92408
October 18, 2018 (Revised November 1, 2018)
M
r. Brian Barr
Fresno Department of Transportation / FAX Maintenance Division 2223 G Street
Fresno, California 93706
R
E: GEOTECHNICAL INVESTIGATION REPORT
Fresno Area Express Improvement Project
2223 G Street
Fresno, California 93706
D
ear Mr. Barr:

This letter transmits Stantec ’s geotechnical investigation report for the proposed Fresno Area Express (FAX) Improvement Project located in Fresno, California. The purpose of this report is to evaluate the subsurface conditions and provide geotechnical recommendations for the proposed improvements at the FAX maintenance yard.

We appreciate the opportunity to work with you on this project. If you have any questions, please call us at the numbers below.

Respectfully submitted,
STANTEC CONSULTING SERVICES INC.

Ja
ret Fischer, PE Maurice Amendolagine, PE, GE
Principal Engineer Senior Geotechnical Engineer
Phone: (909) 335-6116 ext. 8209 Phone: (858) 633-4296 Fax: (909) 335-6120 Fax: (619) 296-6199
[email protected] [email protected]

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT
Table of Contents

1. INTRODUCTION ............................................................................................................. 1 1 .1 PROPOSED DEVELOPMENT .............................................................................................. 1

1.2 PURPOSE AND SCOPE OF WORK .................................................................................... 1

1.2.1 Purpose ............................................................................................................ 1

1.2.2 Scope of Work ................................................................................................. 1

2. FIELD INVESTIGATION .................................................................................................... 3 2 .1 PRE-DRILLING PROCEDURES ............................................................................................ 3

2.2 DRILLING OPERATIONS ..................................................................................................... 3

2.3 SAMPLING .......................................................................................................................... 3

2.4 CONE PENETRATION TESTS ............................................................................................... 4

3. LABORATORY TESTING .................................................................................................. 5

4. GE
OLOGIC SETTING AND SITE CONDITIONS ............................................................... 6 4 .1 REGIONAL GEOLOGY ...................................................................................................... 6

4.2 S URFACE CONDITIONS ..................................................................................................... 6

4.3 SUBSURFACE CONDITIONS ............................................................................................... 6

5. GEOLOGIC HAZARDS ................................................................................................... 8 5 .1 FAULTING AND SURFACE FAULT RUPTURE ...................................................................... 8

5.2 CALIFORNIA BUILDING CODE SEISMIC CRITERIA .......................................................... 8

5.3 LIQUEFACTION AND DYNAMIC SETTLEMENT .................................................................. 9

5.4 LIQUEFACTION INDUCED LATERAL SPREADING ............................................................ 9

5.5 FLOODIN G, TSUNAMIS AND SEICHES .............................................................................. 9

5.6 EXPANSIVE SOILS ............................................................................................................. 10

6. CONCLUSIONS ............................................................................................................ 11

7. R
ECOMMENDATIONS .................................................................................................. 12 7 .1 EARTHWORK .................................................................................................................... 12

7.1.1 Si te Preparation ............................................................................................ 12

7.1.2 Remedial Grading ........................................................................................ 12

7.1.3 Fill Placement and Compaction ................................................................ 13

7.1.4 Yielding Subgrade Conditions .................................................................... 13

7.1.5 Dewatering .................................................................................................... 14

7.1.6 Expansive Soil ................................................................................................ 14

7.1.7 Imported Material......................................................................................... 14

7.1.8 Site Excavation Characteristics .................................................................. 14

7.1.9 Oversized Material ........................................................................................ 14

7.1.10 Temporary Excavations ............................................................................... 14

7.1.11 Temporary Cantilever Shoring .................................................................... 15

7.1.12 Braced Shoring System ................................................................................ 15

7.1.13 Pipelines ......................................................................................................... 15

7.1.14 Surface Drainage ......................................................................................... 16

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

7.1.15 Grading Plan Review ................................................................................... 16

7.2 FOUNDATIONS ................................................................................................................. 16

7.2.1 Shallow Foundations .................................................................................... 16

7.2.2 Canopy Foundations ................................................................................... 17

7.2.3 Foundation Settlement ................................................................................ 17

7.2.4 Lateral Resistance ........................................................................................ 17

7.2.5 Foundation Plan Review .............................................................................. 18

7.2.6 Foundation Excavation Observations ....................................................... 18

7.3 SLABS-ON-GRADE ........................................................................................................... 18

7.3.1 Interior Slabs on Grade ................................................................................ 18

7.3.2 Exterior Slabs on Grade (Sidewalks) ........................................................... 19

7.4 CORROSIVITY ................................................................................................................... 19

7.5 PAVEMENT ....................................................................................................................... 20

7.6 POST INVESTIGATION SERVICES ..................................................................................... 21

8. CLOSURE ...................................................................................................................... 23

9. REFERENCES ................................................................................................................. 25

LIST OF TABLES
Table 1. Faults in Site Vicinity ....................................................................................................... 8 Table 2. 2016 CBC Seismic Parameters and Peak Ground Acceleration ............................ 8 Table 3. Gradation for Capillary Moisture Break .................................................................... 19 Table 4. Flexible Pavement Sections ........................................................................................ 20 Table 5. Concrete Pavement Parameters .............................................................................. 21 Table 6. Recommended Concrete Pavement Sections ...................................................... 21

LIST OF FIGURES
Figure 1 - Site Location Map
Figure 2 – Site Vicinity Map
Figure 3 – Subsurface Exploration Map

LIST OF APPENDICES
BORING LOGS ........................................................................................... A.1 LABORATORY TEST RESULTS ....................................................................... B.1

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Introduction
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 1

1. INTRODUCTION
This report presents the results of Stantec’s geotechnical investigation for the proposed improvements to the existing FAX maintenance facility in Fresno, California. The project location is shown on the Site Location Map, Figure 1 and the approximate area of the proposed development is shown on the Site Vicinity Map, Figure 2.

1.1 PROPOSED DEVELOPMENT
We understand the proposed FAX maintenance facility improvements will include construction of a 20-foot by 50-foot addition and a 25-foot by 90-foot addition to the existing bus carwash, three solar parking canopies totaling approximately 15,400 square feet (sf), two new guard shacks, removal of the four existing underground storage tanks, and replacement of approximately 2.5 acres of pavement and landscape areas. The site is currently at the proposed rough grade elevation. The area of the proposed site improvements is shown on the Subsurface Exploration Map, Figure 3.

1.2 PURPOSE AND SCOPE OF WORK

1.2.1 Purpose
The purpose of this report is to evaluate the subsurface conditions at the site and provide geotechnical recommendations for design and construction of the proposed project. This report has been prepared in general accordance with accepted geotechnical eng ineering principles and in general conformance with the approved proposal.

1.2.2 Scope of Work
Our scope of work consisted of the following:
• Review available subsurface information for the site and nearby locations, • Perform a site reconnaissance to evaluate general geotechnical and site conditions, • Perform a field subsurface exploration program consisting of drilling nine hollow stem auger (HSA) borings and two cone penetrometer test (CPT) soundings, • Perform geotechnical laboratory tests on selected samples, • Perform geotechnical engineering analyses, and

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Introduction
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 2

• Preparation of this geotechnical investigation report for the proposed project.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Field Investigation
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 3

2. FIELD INVESTIGATION

2.1 PRE-DRILLING PROCEDURES
Underground Service Alert (USA) was notified before commencing subsurface exploration activities to identify underground utilities that could conflict with the proposed borings. In addition, a private utility locator was retained to clear the boring locations for potential conflicts with underground utilities.

2.2 DRILLING OPERATIONS
Nine test borings (B-1 through B-9) were drilled using a CME 65 drill rig equipped with hollow-stem augers on August 24, 2018 through August 25, 2018 by Technicon Engineering Services, Inc . The borings were advanced to depths of approximately 5.5 feet to 51.5 feet below the existing ground surface (bgs), and their approximate locations are shown on the Subsurface Exploration Map, Figure 3. The borings were logged by a Stantec field geologist, who also collected samples of the materials encountered for examination and laboratory testing.

2.3 SAMPLING
Relatively undisturbed samples were obtained using a modified California (CAL) sampler, which is a ring -lined split tube sampler with a 3 -inch outer diameter and 2½ -inch inner diameter. CAL sampling followed ASTM D3550 (Standard Practice for Ring -Lined Barrel Sampling of Soils) procedures. Disturbed samples were obtained using a Standard Penetration Test (SPT) sampler, which is a split tube sampler with a 2 -inch outer diameter and 1⅜ -inch inner diameter. SPTs were performed in general accordance with ASTM D1586 (Standard Test Method for Penetration Test and Split-Barrel Sampling of Soils), and D6066 (Standard Practice for Determining the Normalized Penetration Resistance of Sands for Evaluation of Liquefaction Potential). Disturbed bulk samples were also obtained from the drill cuttings.

The CAL and SPT samplers were driven with a 140-pound weight dropping 30 inches. The number of blows per 6-inch increment is noted on the borings logs. T echnicon provided hammer energy reports dated July 16, 2015 and January 24, 2016 . The reports indicate that the average hammer energy efficiency on the drill rig used at the project was 81.4% and 80% , respectively.

Samples were classified in the field using the Unified Soil Classification System (USCS), in accordance with ASTM D2488 (Standard Practice for Description and Identification of Soils [Visual- Manual Method]) procedures. The laboratory testing confirmed or modified field classifications as necessary for presentation on the boring logs. Soil samples were removed from the samplers, placed in appropriate containers, and transported in accordance with ASTM D4220 (Standard Practice for Preserving and Transporting Soil Samples). Upon completion, borings were backfilled

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Field Investigation
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 4

with soil and capped with concrete in the upper three feet . The boring logs are included in Appendix A.

2.4 CONE PENETRATION TESTS
Two CPT’s were completed on September 24, 2018 by Middle Earth Geo Testing Inc. under th e direction of a Stantec engineer. The CPT soundings were performed in general accordance with ASTM D6441 (Standard Test Method for Mechanical Cone Penetration Tests of Soils).

The CPT’s were advanced using a truck mounted CPT rig to a maximum depth of app roximately

51.5 feet bgs at the locations shown on Figure 2. Piezo-cone penetrometers were advanced using a push rod equipped with an instrumented penetrometer tip. Relatively continuous tip, side friction, and dynamic pore pressure data were collected for each CPT sounding. Upon completion, the non -collapsed portion of the CPT holes were filled with grout. The CPT report is included in Appendix A.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Laboratory Testing
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 5

3. LABORATORY TESTING
The following laboratory tests were performed in general accordance with ASTM, California, and AASHTO Test procedures:
• In-Situ Moisture and Density (ASTM D2216)
• Direct Shear (ASTM D3080)
• Sieve Analysis (ASTM D422 and ASTM C136)
• No. 200 Sieve Wash (ASTM D1140)
• Atterberg Limits (ASTM D4318)
• R-Value (ASTM D2844)
• Chemical Tests for Corrosion Potential (CA DOT test methods) The laboratory test results are presented in Appendix B.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Geologic Setting and Site Conditions
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 6

4. GEOLOGIC SETTING AND SITE CONDITIONS

4.1 REGIONAL GEOLOGY
The site is located in the southern portion of the Great Valley Geomorphic Province in Central California. This region is characterized as a 50-mile-wide and 400-mile-long sediment- filled trough in which the sediments have been deposited, almost continuously, since the Jurassic period.

Geology of the Great Valley generally consists of marine and continental deposits resting on a basement complex of metamorphic and igneous rocks. Locally, the site resides within the San Joaquin Valley. Geology within the San J oaquin Valley and the project area mainly consists of Jurassic to recent, marine, alluvial, and lake deposits that are several thousand feet thick.

The regional surficial geology is described as Quaternary Alluvial Fan deposits of the Holocene era consisting of granitic sand and silt (CDMG, 1965).

4.2 SURFACE CONDITIONS
The site is occupied by the existing FAX maintenance yard, which is approximately 11 acres in size, located within the larger City of Fresno complex , which is approximately 38 acres in size, that encompasses several other departments. The FAX maintenance yard includes large paved parking and driveway areas, a n 11,000 sf administrative building, a 40,000 sf service building, an 8,000 sf carwash, a 19,000 sf and 34,000 sf solar canopy, and landscape areas. The project site is bound by G Street followed by vacant land to the northeast, the eastbound onramp to California (CA) Highway 180 from northbound CA Highway 99 to the northwest and southwest, and the City of Fresno Sanitation, Sewer Maintenance, and General Services divisions to the southeast.

The project site area is generally flat. Based on Google Earth®, the ground surface ranges from an approximate elevation of 284 feet at the southwestern portion of the site to 288 feet at the northeastern portion of the site (WGS84 Datum).

4.3 SUBSURFACE CONDITIONS
The materials encountered in our borings consist of undocumented fill (Af) and Quaternary Age Alluvial Sand deposits (Qf). A brief description of the subsurface conditions is provided in this section. Detailed descriptions of the su bsurface conditions are provided in the boring log s included in Appendix A.

Undocumented Fill - Undocumented fill was encountered in soil boring B5 completed at the site and extends to a depth of approximately 4.3 feet bgs. An approximate 5 to 14 -inch thick pavement section consisting of asphalt concrete with and without crushed rock base course was

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Geologic Setting and Site Conditions
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 7

encountered at the exploration locations B2 through B9. The fill material underlying the pavement section at soil borin g B5 generally consists of silty sand (Unified Soil Classification Symbol (USCS):

SM).

Alluvial Fan Deposits (Qf) – Recent Holocene deposits were encountered from the ground surface in all soil borings , with the exception of soil boring B -5, and extend to depths of at least 51.5 feet bgs. The Holocene deposits encountered at the soil boring locations primarily consist of sand with variable amounts of silt and clay (SW, SP, SW-SM, SP-SM, SC, and SM), sandy clay (CL), and sandy silt (ML). The sandy deposits encountered were very loose to very dense and generally moist. The fine-grained deposits were very stiff to hard and moist.

Groundwater - Groundwater was not encountered during this investigation. We understand that groundwater was encountered as shallow as 103 feet bgs in a groundwater monitoring well located approximately 1.7 miles east of the site (Technicon, 2015) and approximately 5 feet higher in elevation. Groundwater levels may fluctuate in the future due to rainfall, irrigation, broken pipes, or changes in site drainage.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Geologic Hazards
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 8

5. GEOLOGIC HAZARDS

5.1 FAULTING AND SURFACE FAULT RUPTURE
The site is located in a seismically active area. The estimated distance from the site to selected nearby mapped active faults is presented in the table below.

Table 1. Faults in Site Vicinity
Fault
Distance
(miles) (1)
Maximum Moment
Magnitude (1)
Great Valley 11 39.5 6.6
Great Valley 12 39.5 6.4
Great Valley 13 (Coalinga) 40.6 7.1
Great Valley 14 (Kettleman Hills) 46.0 7.2
Great Valley 10 47.2 6.5
Great Valley 9 52.4 6.8
Ortigalita 60.4 7.1
San Andreas – Creeping Segment 65.1 --
1 Measured from 2008 National Seismic Hazard Maps - USGS (USGS, 2008).

As noted above, the closest known active fault is the Great Valley 11 Fault, located approximately

39.5 miles southwest of the site. No active faults are known to underlie or project toward the site.

Therefore, the probability of surface fault rupture at the site from a known active fault is considered low.

5.2 CALIFORNIA BUILDING CODE SEISMIC CRITERIA
A geologic hazard likely to affect the project is ground-shaking as a result of movement along an active fault zone in the vicinity of the subject site. The seismic parameters in accordance with the 2016 California Building Code (CBC) are presented below:

Table 2. 2016 CBC Seismic Parameters and Peak Ground Acceleration Parameter Value
Site Coordinates Latitude : 36.74278°
Longitude : -119.8083°
Mapped Spectral Acceleration Value at Short Period: Ss 0.663g Mapped Spectral Acceleration Value at 1-Second Period: S1 0.264g Seismic Site Classification D
Short Period Site Coefficient: Fa 1.270
1-Second Period Site Coefficient: Fv 1.872
Site Class Adjusted Acceleration Value at Short Period: SMS 0.841g Site Class Adjusted Acceleration Value at 1-Second Period: SM1 0.494g

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Geologic Hazards
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 9

Table 2. 2016 CBC Seismic Parameters and Peak Ground Acceleration Parameter Value
Design Spectral Response Acceleration at Short Periods: SDS 0.561g Design Spectral Response Acceleration at 1-Second Period: SD1 0.329g Peak Ground Acceleration adjusted for Site Class Effects: PGAM 0.321g ASCE 7-10 – Report generated through USGS Seismic Design Maps website (USGS, 2018).

5.3 LIQUEFACTION AND DYNAMIC SETTLEMENT
Liquefaction is the transformation of a deposit of soil from a solid state to a liquefied state as a consequence of increased pore pressure and reduced effective stress. Often, this transformation results from the cyclic loading of an earthquake and the soil acquires “mobility” sufficient to permit both horizontal and vertical movements. Soils that are most susceptible to liquefaction are clean, loose, saturated (below groundwater), and uniformly graded sands. The vast majority of liquefaction hazards are associated with sandy soils and silty soils of low plasticity. Cohesive soils are generally not considered susceptible to soil liquefaction , although they can be subject to cyclic softening if they are soft enough, and if the seismic demand is relatively high .

The site is not located in a California Geological Survey Liquefaction Hazard Zon e. This zone is defined as areas where historical occurrence of liquefaction, or local geological, geotechnical and groundwater conditions indicate a potential for permanent ground displacements such that mitigation would be required.

Loose to very dense cohesionless soil is generally present from ground surface to a depth of at least 51.5 feet at the site. This soil is generally not susceptible to liquefaction due to the depth to groundwater. Accordingly, the onsite soils are not considered to be susceptible to liquefaction induced settlement.

5.4 LIQUEFACTION INDUCED LATERAL SPREADING
Liquefaction induced lateral spreading can occur in areas of sloping ground, or towards a free face. Given the low potential for liquefaction, the depth to groundwater and soil conditions, the potential for liquefaction induced lateral spreading is considered low .

5.5 FLOODING, TSUNAMIS AND SEICHES
The site is not located within a FEMA flood zone, therefore, damage due to flooding is considered low.

The site property is not located within a Tsunami Inundation Area; therefore, damage due to tsunamis is considered low.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Geologic Hazards
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 10

5.6 EXPANSIVE SOILS
The near -surface soils (upper approximate 10 feet) have a low expansion potential. Our soil classifications and laboratory test results show that the near surface (upper 10 feet) samples tested are granular with non-plastic fines. Accordingly, mitigation for expansive soils is not considered necessary for onsite soils at this site.

If imported soils are used for earthwork, Stantec recommends that the proposed soils be tested for expansion potential prior to import. Imported soils should be approved by the Geotechnical Engineer before being imported.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Conclusions
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 11

6. CONCLUSIONS
Based on our field exploration, laboratory testing and engineering and geologic analyses, it is our opinion that the subject property is suitable for construction of the proposed retail gasoline facility from a geotechnical engineering and engineering geology viewpoint; however, there are existing geotechnical conditions associated with the s ite that warrant mitigation and/or consideration during the planning stages. The main geotechnical conclusions for the project are pre sented in the following paragraphs.
• The site is underlain by shallow undocumented fill and Quaternary Age Alluvial Fan deposits from the ground surface in all soil borings and extend to depths of at least 51.5 feet bgs. The undocumented fill and alluvial fan deposits encountered primarily consist of sand with variable amounts of silt and clay (SW, SP, SW -SM, SP-SM, SC, and SM), sandy clay (CL), and sandy silt (ML). Undocumented fill extends to a depth of approximately 4.3 feet in one of the borings performed. • Groundwater was not encountered during this investigation. We understand that groundwater was encountered as shallow as 103 feet bgs in a groundwater monitoring well located approximately 1.7 miles east of the site ( Technicon, 2015 ) and approximately 5 feet higher in elevation.
• The liquefaction and lateral spread potential at the site is considered low. • Based on the low potential for liquefaction induced settlement, conventional shallow foundations appear to be a suitable option for support of the propose d bus wash building addition and parking lot canopies.
• No active faults are known to underlie or project toward the site. Therefore, the probability of surface fault rupture occurring at the site from a known active fault is considered low.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Recommendations
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 12

7. RECOMMENDATIONS

7.1 EARTHWORK
The following recommendations are provided regarding specific aspects of the proposed earthwork construction. These recommendations should be considered subject to revision based on additional geotechnical evaluation of the conditions observed by the Geotechnical Engineer during grading operations.

7.1.1 Site Preparation
Site preparation should begin with the removal of existing buried slabs and foundations, vegetation, highly organic soil, leach lines, septic tanks , and any other unsuitable materials , as applicable. Existing underground utilities within the proposed construction areas should be completely removed and/or rerouted. Grading should conform to the guidelines presented in the 2016 California Building Code (CBC, 201 6), as well as the pertinent requirements of the City of Fresno and Fresno County.

7.1.2 Remedial Grading
Bus Wash Foundation and Guard Shack Areas:

To provide uniform support for the proposed bus wash additions and guard shack buildings , removal of the existing soils to a minimum depth of 2 feet below the bottom of the footings across the entire structure footprint is recommended. Removal, replacement, and compaction should be completed laterally at least five feet beyond the outside edge of the footings or slab unless constrained by existing structures . The bottom of the over excavation should be scarified to a depth of 8 -inches, moisture conditioned to within 2 percentage points of the optimum moisture content and compacted to at least 90% relative compaction based on the ASTM D1557 laboratory test procedure. All references to optimum moisture content and relative compaction in this report are based on this test method.

Concrete Pavement and Hardscape:

Remedial grading for pavement and hardscape areas should include scarifying the upper 12 inches of the subgrade soil, moisture conditioning to slightly above the optimum moisture content, and recompacting to a dry density of at least 95% of the laboratory maximum dry density.

Subgrade elevation is defined as the top of soil elevation provided in the grading plan.

Hardscape subgrade should be compacted to at least 90% relative compaction.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Recommendations
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 13

Field Observations:

The Geotechnical Engineer should check the bottom of excavations. If soft, loose, or otherwise unsuitable soils are encountered, the depth of removal may need to be extended.

7.1.3 Fill Placement and Compaction
Excavated materials determined by the Geotechnical Engineer to be satisfactory can be reused as compacted fill. We anticipate that the majority of the excavated materials can be re -used as compacted fill soils . The Geotechnical Engineer should approve the fill material before placement.

Where large compaction equipment is used, f ill should be placed in 6 - to 8-inch thick loose , horizontal lifts, moisture conditioned to within 2 percentage points of the optimum moisture content and compacted to at least 9 0% relative compaction. Thinner lifts will be required for smaller compaction equipment. The maximum dry density and optimum moisture content for the evaluation of relative compaction should be determined in accordance with ASTM D1557.

7.1.4 Yielding Subgrade Conditions
The soil encountered at the bottom of the remedial grading excavations can exhibit “pumping” or yielding if they become saturated in response to periods of significant precipitation, such as during the winter rainy season. If this occurs , corrective measures should be performed with oversight from the Geotechnical Engineer.

In order to help stabilize t he yielding subgrade soils within the bottom of the removal areas, the contractor can consider the placement of stabilization fabric or geo-grid over the yielding areas, depending on the relative severity of the yielding.

Mirafi 600X (or approved equivalen t) stabilization fabric may be used for areas with low to moderate yielding conditions. Geo-grid such as Tensar TX-5 may be used for areas with moderate to severe yielding conditions. Uniform sized, ¾ - to 2-inch crushed rock should be placed over the stabilization fabric or geo -grid. A 6 - to 12 -inch thick section of crushed rock will typically be necessary to stabilize yielding ground.

If significant voids are present in the crushed gravel, a filter fabric should be placed over the crushed gravel to prevent migration of fines into the gravel and thus potential settlement of the overlying fill. Fill soils, which should be placed and compacted in accordance with the recommendations presented herein, should then be placed over the fabric or geo -grid until design grades are reached. The crushed gravel and stabilization fabric or geo-grid should extend at least 5 feet laterally beyond the limits of the yielding areas.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Recommendations
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 14

7.1.5 Dewatering
Groundwater was not encountered during our investigation to a maximum depth of 51.5 feet bgs.

Accordingly, we do not anticipate that groundwater will be a significant consideration for this project.

7.1.6 Expansive Soil
The near -surface soils (upper approximate 10 feet) have a low expansion potential. Our soil classifications and laboratory test results show that the near surface (upper 10 feet) samples tested are granular with non -plastic fines. Accordingly, mitigation for expansive soils is not considered necessary at this site. The grading and foundation recommendations presented in this report reflect a low expansion potential.

7.1.7 Imported Material
Imported materials, if used for fill, should be predominately granular, contain no rocks or lumps greater than 3 inches in maximum dimension, and have an Expansion Index less than 20, and a Plasticity Index less than 15 . Imported materials should be reviewed and approved by the Geotechnical Engineer before being brought to the site.

7.1.8 Site Excavation Characteristics
It is anticipated that excavations can be achieved with conventional earthwork equip ment in good working order.

7.1.9 Oversized Material
Excavations may generate oversized material. Oversized material is defined as rocks or cemented clasts greater than 3 inches in largest dimension. Oversized material should be broken down to no greater than 3 inches in largest dimension for use in fill or be removed from the site .

7.1.10 Temporary Excavations
The existing native soils can be considered Type B for excavation in accordance with OSHA and Cal-OSHA requirements. Temporary excavations should be shored or excavated with a slope not steeper than 1:1 (horizontal to vertical) in accordance with OSHA and Cal- OSHA requirements.

The excavations should be inspected daily by the contractor’s Competent Person before personnel are allowed to enter the excavation. Any zones of potential instability, sloughing or raveling should be brought to the attention of the Geotechnical Engineer and corrective action implemented before personnel begin working in the excavation. Excavated soils should not be stockpiled behind temporary excavations within a distance equal to the depth of the excavation.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Recommendations
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 15

Stantec should be notified if other surcharge loads are anticipated so that lateral load criteria can be developed for the specific situation. If temporary slopes are to be maintained during the rainy season, berms are recommended near the tops of slopes to prevent runoff water from entering the excavation and eroding the slope faces.

7.1.11 Temporary Cantilever Shoring
Temporary excavations to depths up to approximately 20 feet bgs are anticipated for removal of the existing USTs. Where cantilevered shoring is used in lieu of sloping the temporary excavation sidewalls, the sho ring design may be tentatively based upon an ultimate active earth pressure equal to a fluid weighing 40 pounds per cubic foot (pcf) . Passive pressures above the groundwater level may be based on a fluid weighing 300 pcf.

These pressures are based on level ground conditions in front and behind the wall. The earth pressures indicated above do not include a safety factor; therefore, the shoring design should include an appropriate safety factor for the overall performance of the system.

7.1.12 Braced Shoring System
For braced shoring above the groundwater level , a uniform rectangular pressure distribution should be used from top to bottom of the shoring equivalent to the following, Bracing: 30H psf/ft

where H is the depth of the excavation, in feet.

These pressures are based on level ground conditions in front and behind the wall. The earth pressures indicated above do not include a safety factor; therefore, the shoring design should include an appropriate safety factor for the overall performance of the s ystem.

7.1.13 Pipelines
Typical pipe bedding as specified in the Standard Specifications for Public Works Construction (GREENBOOK) may be used. As a minimum, it is recommended that pipe be supported on at least 4 inches of granular bedding material, such as 3/4 -inch rock or clean coarse sand with less than 5 percent fines and a sand equivalent of 40 or more as evaluated by ASTM D2419.

The bedding should extend from the bottom of the trench to at least 1 foot above the top of the pipe. Sand bedding should be mec hanically compacted to at least 90 percent relative compaction. Jetting of sand bedding should not be permitted.

Onsite material, imported select material, or 2-sack cement/sand slurry may be used as backfill in trenches above the pipe bedding. The mate rial selected should match the engineering

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Recommendations
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 16

characteristics of the soils adjacent to the trench. Utility trench backfill beneath structures and hardscape should be compacted to at least 90% relative compaction.

The modulus of soil reaction (E’) is used to c haracterize the stiffness of soil backfill placed along the sides of buried flexible pipelines. For the purpose of evaluating deflection due to the load associated with trench backfill over the pipe, a value of 1,500 pounds per square inch (lbs/in 2) is recommended for the general site conditions assuming granular bedding material (sand or gravel) is placed around the pipe.

7.1.14 Surface Drainage
Final surface grades around structures should be designed to collect and direct surface water away from the structure a nd toward appropriate drainage facilities. The ground around the structure should be graded so that surface water flows rapidly away from the structure without ponding. In general, we recommend that the ground adjacent to the structure slope away at a gradient of at least 2%. Densely vegetated areas where runoff can be impaired should have a minimum gradient of at least 5% within the first 5 feet from the structure. Roof gutters with downspouts that discharge directly into a closed drainage system are r ecommended on structures. Drainage patterns established at the time of fine grading should be maintained throughout the life of the proposed structures. Site irrigation should be limited to the minimum necessary to sustain landscape growth. Should excessive irrigation, impaired drainage, or unusually high rainfall occur, saturated zones of perched groundwater can develop. Saturated soil zones may result in increased maintenance and could impact structure stability.

7.1.15 Grading Plan Review
Stantec should review the grading plans and earthwork specifications to ascertain whether the intent of the recommendations contained in this report have been implemented, and that no revised recommendations are needed due to changes in the development scheme.

7.2 FOUNDATIONS

7.2.1 Shallow Foundations
Conventional shallow foundations (spread footings/strip footings) are considered suitable for support of the proposed bus wash building expansion provided the recommendations in this report are incorporated into the design.

The following foundation recommendations are minimum criteria based on geotechnical considerations. They should not be considered a structural design, nor should they be considered to preclude more restrictive criteria by governing agencies or the structural engineer. The design of the foundation system should be performed by the project structural engineer.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Recommendations
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 17

Conventional Shallow Foundations:

An allowable bearing pressure of 2,500 pounds per square foot (psf) may be used for conventional square or rectangul ar shallow foundations founded in properly compacted fill prepared in accordance with the recommendations of this report. The bearing capacity can be increased by one third for transient loading conditions such as earthquake and wind.

Additional parameters for shallow foundations are provided below.

Minimum Footing Width: 18 inches for continuous footings 24 inches for square/rectangular footings
Minimum Footing Depth: 18 inches below lowest adjacent soil grade Minimum Reinforcement: Two No. 5 bars at both top and bottom in continuous footings.

7.2.2 Canopy Foundations
Typical shallow drilled pier footings for the parking canopy columns are expected to provide adequate support for the proposed structures provided that the recommendations provided herein are incorporated in the design. We understand that typical canopy column footings will consist of reinforced concrete dri lled piers having a minimum diameter or width of 2.0 feet and embedded a minimum depth of 10 feet bgs. Based on these assumptions and the anticipated subsurface conditions, an allowable bearing pressure of 4,000 psf may be used in the design. For resistance to transient lateral loads, such as earthquake and wind loads, the aforementioned allowable bearing capacity may be increased by one-third.

7.2.3 Foundation Settlement
The following settlements are estimated.

Settlement: Less than 1-inch total settlement
½ inch differential settlement over 30 feet

7.2.4 Lateral Resistance
Lateral loads will be resisted by friction between the bottoms of footings and passive pressure on the faces of footings and other structural elements below grade. An allowable coefficient of friction of 0.3 can be used.

Passive pressure can be computed using an ultimate equivalent fluid pressure of 300 lbs/ft 3 for
level ground conditions. Reductions for sloping ground should be made. The upper 1 foot of soil should not be relied on for passive support unless the ground is covered with pavements or slabs.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Recommendations
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 18

The earth pressure indicated above does not include a safety factor; therefore, the footing design should include an appropriate safety factor for the overall performance of the system.

7.2.5 Foundation Plan Review
Stantec should review the foundation plans to ascertain that the intent of the recommendations in this report has been implemented and that revised recommendations are not necessary as a result of changes after this report was completed.

7.2.6 Foundation Excavation Observations
A representative working under direct supervision of the Geotechnical Engineer should observe the foundation excavations prior to forming or placing reinforcing steel.

7.3 SLABS-ON-GRADE

7.3.1 Interior Slabs on Grade
The top 24 inches of material below interior concrete slabs-on-grade should have an expansion index of 20 or less. The project structural engineer should design the interior concrete slabs -on- grade floor. However, we recommend a minimum thickness of 5 inches.

A vapor barrier should be placed beneath slabs where moisture sensitive floor coverings will be installed. If plastic is used, a minimum 10 -mil is recommended. The plastic should comply with ASTM E1745. Installation should comply with ASTM E1643. Current co nstruction practice typically includes placement of a 2-inch thick sand cushion between the bottom of the concrete slab and the moisture vapor retarder/barrier. This cushion can provide some protection to the vapor retarder/barrier during construction and may assist in reducing the potential for edge curling in the slab during curing. However, the sand layer also provides a source of moisture to the underside of the slab that can increase the time required to reduce vapor emissions to limits acceptable for the type of floor covering placed on top of the slab. The slab can be placed directly on the vapor retarder/barrier. The floor covering manufacturer should be contacted to determine the volume of moisture vapor allowable and any treatment needed to redu ce moisture vapor emissions to acceptable limits for the particular type of floor covering installed. The project team should determine the appropriate treatment for the specific application.

In addition to the moisture vapor barrier, a capillary moisture break can be constructed below the slab to further reduce moisture transmission from the subgrade soil, if desired. The capillary moisture break should consist of at least 4 -inches of clean, free -draining gravel or crushed rock placed below the moisture va por retarder/barrier. The components of the capillary moisture break should meet the particle-size gradation presented in Table 3.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Recommendations
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 19

Table 3. Gradation for Capillary Moisture Break
Gradation for Capillary Moisture Break
Sieve Size Percentage Passing Sieve
1 inch 100
3/4 inch 30-75
1/2 inch 5–10
3/8 inch 0-2

7.3.2 Exterior Slabs on Grade (Sidewalks)
Exterior slabs not subject to vehicular traffic should have a minimum thickness of 4 inches and be reinforced with at least No. 3 bars at 24 inches on center each way or fibermesh. Slabs should be provided with crack control joints placed in accordance wi th the American Concrete Institute (ACI) guidelines. The project architect or civil engineer should select the final joint patterns.

7.4 CORROSIVITY
Three samples of the onsite soils were tested to provide a preliminary indication of the corrosion potential of the onsite soils. The test results are presented in Appendix B. A brief discussion of the corrosion test results is provided in the following text. • The samples tested had a soluble sulfate concentration of 45 parts per million (ppm) to 57 ppm, which indicates the samples have a low sulfate corrosion potential relative to concrete. It should be noted that soluble sulfate in the irrigation water supply, and/or the use of fertilizer may cause the sulfate content in the surficial soils to increase with time. This may result in a higher sulfate exposure than that indicated by the test results reported herein. Studies have shown that the use of improved cements in the concrete, and a low water-cement ratio will improve the resistance of the concrete to sulfate exposure.
• The sample s tested had a chloride concentration of 34 ppm to 41 ppm , which indicates the samples have a low chloride corrosion potential relative to metal. • The samples tested had a minimum resistivity of 5,246 ohm-cm to 7,228 ohm-cm, which indicates the samples have a moderate corrosive potential. • The samples tested had a pH of 7.3 to 8.9 , which indicates the sample s are slightly to strongly alkaline.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Recommendations
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 20

Caltrans currently considers a site to be corrosive to foundation elements if one or more of the following conditions exist: Chloride concentration is greater than or equal to 500 ppm, sulfate concentration is greater than or equal to 1,500 ppm, or the pH is 5.5 or less.

Based on Caltrans criteria, the test results indicate the site is not considered to be a corrosive environment for structures. However, other samples at the site could yield significantly different concentrations to those described above. Therefore, addition al testing may be performed to further evaluate corrosion during the planning or construction stages and to evaluate the as - graded corrosion potential of the onsite soils after site grading. We recommend evaluation by a corrosion engineer should be performed.

7.5 PAVEMENT

7.5.1 Asphalt Concrete Pavement
An R -Value of 40 has been assumed for preliminary design of pavement sections based on laboratory test results and visual observation of the on-site material in the upper 5 feet. The actual R-value of the subgrade soils should be determined after grading to provide final pavement design. Flexible pavement sections have been calculated in general conformance with Caltrans guidelines. The project civil engineer and owner should review the pavement designations to determine appropriate locations for pavement thickness. Based on an assumed R-value of 40, the following pavement structural sections have been calculated.

Table 4. Flexible Pavement Sections
Traffic Type Traffic Index Asphalt Concrete
(inches)
Aggregate Base*
(inches)
Automobile Parking 5.0 3 4.5
Automobile Drive Lanes 5.5 3 5.0
Medium Truck Traffic 6.0 4 5.0
Heavy Truck Traffic 7.0 4.5 6.5
*Aggregate Base should conform to Class 2 Aggregate Base in accordance with the Caltrans Standard Specifications or Crushed Miscellaneous Base in accordance with the Standard Specifications for Public Works Construction.

Prior to placing base materials, the upper 12 inches of the subgrade soil should be scarified, moisture conditioned to slightly above the optimum moisture content, and recompacted to a dry density of at least 95% of the laboratory maximum. The base material should also be compacted to slightly above the optimum moisture content and a dry density of at least 95% of the laboratory maximum.

Rigid concrete pavement (described below) should be placed in driveway entrance aprons and trash bin loading/storage areas. Concrete pavement design is provided in the following section.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Recommendations
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 21

7.5.2 Concrete Pavement
Concrete pavements have been calculated in general conformance with the procedure recommended by the American Concrete Institute (ACI 330R-08) using the parameters presented in Table 5. The following design parameters were used in our analyses.

Table 5. Concrete Pavement Parameters
Design Parameter Value
Modulus of Subgrade Reaction (k) 150 pci
Modulus of Concrete Rupture (MR) 550 psi
Concrete Compressive Strength 3,700 psi
Traffic Categories (TC) A and C
Average Daily Truck Traffic (ADTT) 10 and 100

Based on the parameters above, we recommend the following minimum concrete pavement thickness.

Table 6. Recommended Concrete Pavement Sections
Traffic Type Pavement Thickness (inches) Aggregate Base (inches)
Automobile Parking and Driveways
(TC = A) 6 6
Heavy Truck Traffic and Fire Lane
Areas (TC = C) 8 6
The project civil engineer should confirm whether the assumed ADTT is appropriate for the anticipated traffic level. Concrete compressive strength for pavement should be at least 3,700 psi. Minimum reinforcement should consist of #3 bars on 24 -inch centers . Crack control joints should be placed in accordance with the American Concrete Institute (ACI) guidelines.

Prior to placing concrete, the upper 12 inches of the subgrade soil should be scarified, moisture conditioned to slightly above the optimum moist ure content, and recompacted to a dry density of at least 90% of the laboratory maximum.

7.6 POST INVESTIGATION SERVICES
Post investigation services are an important and necessary continuation of this investigation, and it is recommended that Stantec be retain ed as the Geotechnical Engineer to perform such services. Final project grading and foundation plans, foundation details and specifications should be reviewed by Stantec prior to construction to check that the intent of the recommendations

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Recommendations
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 22

presented herein have been applied to the design. Following review of plans and specifications, observation during construction should be performed to correlate the findings of this exploration with the actual subsurface conditions exposed.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

Closure
November 1, 2018
fj v:\1858\active\2270445501\05_report_deliv\deliverables\reports\fresno_area_express_geotech_rpt_20181101.docx 23

8. CLOSURE
Our conclusions, recommendations, and discussions presented herein are based upon an evaluation and interpretation of the findings from the field and laboratory programs, with interpolation and extrapolation of subsurface conditions between and beyond the ex ploration locations. This report contains information that is valid as of the report’s date and to the extent directly known to Stantec. However, conditions can change with the passage of time or construction subsequent to this report’s preparation that may invalidate, either partially or wholly, the conclusions and recommendations presented herein.

Inherent in most projects performed in the heterogeneous subsurface environment, continuing subsurface explorations and analyses may reveal conditions that are different than those described in this report. The findings and recommendations contained in this report were developed in accordance with generally accepted, current professional principles and practice ordinarily exercised, under similar circumstances, by geotechnical engineers and engineering geologists practicing in this locality. No other warranty, express or implied, is made .

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

References
November 1, 2018

9. REFERENCES
American Society for Testing and Materials (ASTM), 2008, Annual Book of ASTM Standards, Volume

04.08, Construction: Soil and Rock (I), Standards D 420 - D 5876.

American Society of Civil Engineers (ASCE), 2010, Minimum Design Loads for Buildings and Other Structures, ASCE Document ASCE/SEI 7-10.

California Building Code, 2016, Chapters 16 and 18.

California Geological Survey (CGS), 2008, http://www.consrv.ca.gov/cgs .

California Department of Conservation, Division of Mines and Geology (CDMG), 2003, Digital Images of Official Maps of Alquist-Priolo Earthquake Fault Zones of California.

California Division of Mines and Geology (CDMG), 2008, Guidelines for Evaluating and Mitigating Seismic Hazards in California, Special Publication 117, adopted March 13, 1997, revised and re-adopted September 11, 2008.

California Department of Transportation (Caltrans), March 7, 2014, Highway Design Manual, Chapters 630 and 850.

Caltrans, 2010, Memo to Designers 10-5, Protection of Reinforcement against Corrosion Due to Chlorides, Acids and Sulfates.

Google Earth®, 2018, Version 7.3.1.45071.5
Martin, G., Lew, M., Arulmoli, K., Baez, J., Blake, T., Earnest, J., Gharib, F., Goldhammer, J., Hsu, D., Kupferman, S., O’Tousa, J., Real, C., Reeder, W., Simantob, A., & Youd, T. (1999).

Recommended Procedures for Implementation of DMG Special Publication 117 Guidelines for Analyzing and Mitigating Liquefaction Hazard in California. Los Angeles, USA: The Southern California Earthquake Center.

Southern California Earthquake Center (SCEC) (1999), Recommended Procedures for Implementation of DMG Special Publication 117, Guidelines for Analyzing and Mitigating Liquefaction Hazards in California, University of Southern California, p. 60.

Technion Engineering Services, Inc. (Technicon), April 24, 2015, Monitoring Well Installation Report, Carey Oil Mini-Mart No. 2, 30 and 50 East Divisadero Street, Fresno, California, Technicon Project No. 12460.010
United States Geological Survey (USGS) Website, Seismic Design Maps, 2010 ASCE -7, https://earthquake.usgs.gov/designmaps/us/application.php, Accesse d October 14 , 2018.

FRESNO AREA EXPRESS IMPROVEMENT PROJECT

GEOTECHNICAL INVESTIGATION REPORT

References
November 1, 2018

USGS, 2005, Geologic Map of the Fresno, California, Scale 1:250,000.

USGS, 1981, Fresno North, California Quadrangle, 7.5 Minute Series (topographic), scale 1:24,000 .

FIGURES

SITE
REFERENCE: USGS 7.5 X 15 MINUTE QUADRANGLE; FRESNO NORTH, 1981. 2 12000 14000100008000
0 60004000

SCALE IN MILE
2000
1 02000
2 SCALE IN FEET

CALIFORNIA
FILEPATH:V:\1858\active\2270445501\05_report_deliv\dwgs_design\cad_figures\fax_figures.dwg modified by JFischer on Oct 14, 2018 at 11:12 N
FAX:PHONE:
735 EAST CARNEGIE DRIVE, SUITE 280
SAN BERNARDINO, CA 92408
(909) 335-6116 (909) 335-6120
FOR:

CHECKED BY:DRAWN BY:JOB NUMBER: APPROVED BY: DATE:

FIGURE:
1 SITE LOCATION MAP
JEFJEFJEF2270445501 10/14/18

FRESNO AREA EXPRESS

MAINTENANCE FACILITY
2223 G STREET
FRESNO, CALIFORNIA 93706
CA HIGHWAY 180

G STREET

E DIVISADERO STREET
B4
B8
B9
B1
B2
B3
B6
B5
B7
CPT1
CPT2
0120240

SCALE (FEET)
FILEPATH:V:\1858\active\2270445501\05_report_deliv\dwgs_design\cad_figures\fax_figures.dwg modified by JFischer on Oct 15, 2018 at 14:08 FAX: PHONE:
735 EAST CARNEGIE DRIVE, SUITE 280
SAN BERNARDINO, CA 92408
(909) 335-6116 (909) 335-6120
No warranty is made by Stantec as to the accuracy, reliability, or completeness of these data. Original data were compiled from various sources. This information may not meet National Map Accuracy Standards. This product was developed electronically, and may be updated without notification. Any reproduction may result in a loss of scale and or information.

N
FOR:

CHECKED BY: DRAWN BY: JOB NUMBER:APPROVED BY:DATE:

FIGURE:
2 SITE VICINITY MAP
JEF JEF JEF 227044550110/14/18

FRESNO AREA EXPRESS

MAINTENANCE FACILITY
2223 G STREET
FRESNO, CALIFORNIA 93706
LEGEND

APPROXIMATE LOCATION OF

SOIL BORING

APPROXIMATE LOCATION OF

CPT SOUNDING

APPROXIMATE LOCATION OF PROPOSED BUS WASH

EXPANSION

APPROXIMATE LOCATION OF PROPOSED PARKING
CANOPY

APPROXIMATE LOCATION OF EXISTING UNDERGROUND

STORAGE TANKS (TO BE REMOVED)

APPROXIMATE LIMITS OF PROPOSED PARKING AREA
B9
CPT2
B4
B8
B9
B1
B2
B3
B6
B5
B7
CPT1
CPT2
060120

SCALE (FEET)
FILEPATH:V:\1858\active\2270445501\05_report_deliv\dwgs_design\cad_figures\fax_figures.dwg modified by JFischer on Oct 15, 2018 at 14:08 No warranty is made by Stantec as to the accuracy, reliability, or completeness of these data. Original data were compiled from various sources. This information may not meet National Map Accuracy Standards. This product was developed electronically, and may be updated without notification. Any reproduction may result in a loss of scale and or information.

N
LEGEND

APPROXIMATE LOCATION OF

SOIL BORING

APPROXIMATE LOCATION OF

CPT SOUNDING

APPROXIMATE LOCATION OF PROPOSED BUS WASH

EXPANSION

APPROXIMATE LOCATION OF PROPOSED PARKING
CANOPY

APPROXIMATE LOCATION OF EXISTING UNDERGROUND

STORAGE TANKS (TO BE REMOVED)

APPROXIMATE LIMITS OF PROPOSED PARKING AREA
B9
CPT2
FAX: PHONE:
735 EAST CARNEGIE DRIVE, SUITE 280
SAN BERNARDINO, CA 92408
(909) 335-6116 (909) 335-6120
FOR:

CHECKED BY: DRAWN BY: JOB NUMBER:APPROVED BY:DATE:

FIGURE:
3 SUBSURFACE EXPLORATION MAP
JEF JEF JEF 227044550110/14/18

FRESNO AREA EXPRESS

MAINTENANCE FACILITY
2223 G STREET
FRESNO, CALIFORNIA 93706

APPENDIX A

BORING LOGS

>50% OF COARSE

FRACTION PASSES
ON NO 4. SIEVE

WELL-GRADED GRAVEL

POORLY-GRADED GRAVEL

SILTY GRAVEL

CLAYEY GRAVEL

WELL-GRADED SAND

POORLY-GRADED SAND

SILTY SAND

CLAYEY SAND

LEAN CLAY
SILT

ORGANIC CLAY OR SILT

FAT CLAY

ELASTIC SILT

ORGANIC CLAY OR SILT
*
NUMBER OF BLOWS OF 140 LB HAMMER FALLING 30 INCHES TO DRIVE A 2 INCH O.D. (1-3/8 INCH I.D.) SPLIT-BARREL SAMPLER THE LAST 12 INCHES OF AN 18-INCH DRIVE (ASTM-1586 STANDARD PENETRATION TEST).
*
Modified California (2.5" I.D.)
-
-
-
-
-
GW
GP
GM
GC
SW
SP
SM
SC
CL
ML
OL
CH
MH
OH
-
*CLEAN
GRAVELS <5%
FINES

PRIMARILY ORGANIC MATTER, DARK IN COLOR, AND ORGANIC ODOR *GRAVELS WITH
FINES >12% FINES
* UNDRAINED SHEAR STRENGTH IN KIPS/SQ. FT. AS DETERMINED BY LABORATORY

TESTING OR APPROXIMATED BY THE STANDARD PENETRATION TEST, POCKET

PENETROMETER, TORV
ANE, OR VISUAL OBSERVATION.

ADDITIONAL TESTS

HIGHLY ORGANIC SOILS

COARSE-GRAINED SOILS
>50% RETAINED ON
NO. 200 SIEVE

FINE-GRAINED SOILS
>50% PASSESNO. 200 SIEVE
"A"LINE
PEAT

SILTS AND CLAYS
LIQUID LIMIT<50

SILTS AND CLAYS
LIQUID LIMIT>50
LIQUID LIMIT (%)
CH

CL OH & MH
-
-
*CLEAN SANDS
<5% FINES
*SANDS AND
FINES >12% FINES

INORGANIC
>50% OF COARSE

FRACTION RETAINED
ON NO 4. SIEVE

SOIL GROUP NAMES & LEGEND

PLASTICITY CHART
CL-ML
SANDS
No Recovery
0 - 0.25

0.25 - 0.5

0.5-1.0

1.0 - 2.0

2.0 - 4.0
OVER 4.0

PENETRATION RESISTANCE (RECORDED AS BLOWS / FOOT)

VERY SOFT
SOFT

MEDIUM STIFF
STIFF

VERY STIFF
HARD
0 - 2
2 - 4
4 - 8
8 - 15
15 - 30
OVER 30
0 - 4
4 - 10
10 - 30
30 - 50
OVER 50

SILT & CLAYSAND & GRAVEL

VERY LOOSE
LOOSE

MEDIUM DENSE
DENSE

VERY DENSE
PT
WATER
LEVEL
BLOWS/FOOT*CONSISTENCYBLOWS/FOOT*RELATIVE DENSITY
PLASTICITYINDEX(%)
* Dual symbols required for fines content between 5% and 12% UNIFIED SOIL CLASSIFICATION (ASTM D-2487)

FINES CLASSIFY AS ML OR CL

FINES CLASSIFY AS CL OR CH
PI>7 AND PLOTS>"A" LINE
PI>4 AND PLOTS<"A" LINE
LL (oven dried)/LL (not dried)<0.75
PI PLOTS >"A" LINE
PI PLOTS <"A" LINE
LL (oven dried)/LL (not dried)<0.75
0 10
20 30
40 50
60 70
80 Cu>4 AND 1<Cc<3
Cu>4 AND 1>Cc>3

FINES CLASSIFY AS ML OR CL

FINES CLASSIFY AS CL OR CH
Cu>6 AND 1<Cc<3
Cu>6 AND 1>Cc>3

ORGANIC

INORGANIC

ORGANIC

GRAVELS
0 -
-
-
-
-
-
-
-
-

CHEMICAL ANALYSIS (CORROSIVITY)

CONSOLIDATED DRAINED TRIAXIAL

CONSOLIDATION

CONSOLIDATED UNDRAINED TRIAXIAL

DIRECT SHEAR

POCKET PENETROMETER (TSF)
Percent Passing #200 SIEVE

R-VALUE
SIEVE ANALYSIS: % PASSING

MATERIAL

TYPES CRITERIA FOR ASSIGNING SOIL GROUP NAMES GROUP
SYMBOL
COR
CD
CN
CU
DS
PP
#200
RV
SA
Shelby Tube

LEGEND TO BORING LOGS AND SOIL DESCRIPTIONS

UU UNCONSOLIDATED

UNDRAINED TRIAXIAL

PLASTICITY INDEX

EXPANSION INDEX

CYCLIC TRIAXIAL

TORVANE SHEAR

UNCONFINED COMPRESSION
(WITH SHEAR STRENGTH

IN KSF)
EI
TC
TV
UC
(1.5)
PI

SAMPLER TYPES
SPT
STRENGTH** (KSF)
Rock Core Grab Sample
10 20 30 40 50 60 70 80 90 100 110 120
-

SM

QUATERNARY ALLUVIAL FAN DEPOSITS
(Qf)
SILTY SAND ; SM; 10YR 4/4 dark yellowish
brown; 70% fine to medium grained sand;
30% fines; moist; no staining; no odor.

Hole terminated at 5.5 feet.

Backfilled
with soil
cuttings
B1-2'
B1-5'
PAGE 1 OF 1
USCS
Graphic
Log
COMPLETED:

COMPLETED:

Description
DRILLING COMPANY: Technicon Engineering Services, Inc.

DRILLING EQUIPMENT: CME 65
DRILLING METHOD: Hollow Stem Auger
SAMPLING EQUIPMENT: Split Spoon
9/25/18
9/25/18
9/25/18
9/25/18
CHECKED BY: J. Fischer
LONGITUDE: 119° 48' 32.92"
Time &
Depth
(feet)
5 10
15 20
PROJECT NUMBER: 2270445501
DRILLING:

INSTALLATION:

STARTED

STARTED
LOGGED BY: J. Sargent
LATITUDE: 36° 44' 34.76"
NORTHING (ft):

WELL CASING DIAMETER (in): ---
GROUND ELEV (ft): 286
WELL DEPTH (ft): ---
EASTING (ft):

BOREHOLE DEPTH (ft): 5.5
BOREHOLE DIAMETER (in): 6
TOC ELEV (ft):

LOCATION: 2223 G Street, Fresno, California
PROJECT:Fresno Area Express Facility
B1
INITIAL DTW (ft): NE
STATIC DTW (ft): NE
WELL / TEST PIT / BOREHOLE NO:

GEO FORM 304 FAX_BORING_LOGS_FINAL.GPJ SECOR INTL.GDT 10/19/18 Borehole
Backfill
Depth
(feet)
5 10
15 20
Blow
Count
Geotechnical
Lab Testing
Sample
Time
Sample ID
PID
Reading
(ppmv)
SM
SC
ML
3" Asphalt Concrete (AC)
6" Aggregate Base (AB)

QUATERNARY ALLUVIAL FAN DEPOSITS
(Qf)
SILTY SAND ; SM; 10YR 4/4 dark yellowish
brown; 79% fine to coarse grained sand;
21% fines; moist; no staining; no odor.

Loose below 5 feet.
60% fine to medium grained sand; 40%
fines; very dense; friable below 10 feet.

CLAYEY SAND ; SC; 10YR 4/6 dark
yellowish brown; 55% very fine to fine
grained sand; 45% medium plasticity fines;
moist; very dense; no staining; no odors.

SANDY SILT ; ML; 2.5Y 4/2 dark grayish
brown; 40% very fine to fine grained sand;
60% non-plastic fines; moist; very stiff; no
staining; no odors.

Hole terminated at 21.5 feet.

Backfilled
with soil
cuttings
4 4
5 6
5 6
4 32
50-5"
11 32
50-2"
6 7
9 SA
DS
MD
MD
B2-2'
B2-5'
B2-7'
B2-10'
B2-15'
B2-20'
PAGE 1 OF 1
USCS
Graphic
Log
COMPLETED:

COMPLETED:

Description
DRILLING COMPANY: Technicon Engineering Services, Inc.

DRILLING EQUIPMENT: CME 65
DRILLING METHOD: Hollow Stem Auger
SAMPLING EQUIPMENT: Split Spoon
9/25/18
9/25/18
9/25/18
9/25/18
CHECKED BY: J. Fischer
LONGITUDE: 119° 48' 32.48"
Time &
Depth
(feet)
5 10
15 20
PROJECT NUMBER: 2270445501
DRILLING:

INSTALLATION:

STARTED

STARTED
LOGGED BY: J. Sargent
LATITUDE: 36° 44' 34.28"
NORTHING (ft):

WELL CASING DIAMETER (in): ---
GROUND ELEV (ft): 285
WELL DEPTH (ft): ---
EASTING (ft):

BOREHOLE DEPTH (ft): 21.5
BOREHOLE DIAMETER (in): 6
TOC ELEV (ft):

LOCATION: 2223 G Street, Fresno, California
PROJECT:Fresno Area Express Facility
B2
INITIAL DTW (ft): NE
STATIC DTW (ft): NE
WELL / TEST PIT / BOREHOLE NO:

GEO FORM 304 FAX_BORING_LOGS_FINAL.GPJ SECOR INTL.GDT 10/19/18 Borehole
Backfill
Depth
(feet)
5 10
15 20
Blow
Count
Geotechnical
Lab Testing
Sample
Time
Sample ID
PID
Reading
(ppmv)
SM
SW-
SM
CL
SC
SP
5" AC
1" AB

QUATERNARY ALLUVIAL FAN DEPOSITS
(Qf)
SILTY SAND ; SM; 10YR 4/4 dark yellowish
brown; 80% fine to coarse grained sand;
20% fines; moist; no staining; no odor.

Loose below 5 feet.

WELL GRADED SAND WITH SILT ;
SW-SM; 10YR 4/4 dark yellowish brown;
94% fine to caorse grained sand; 6% fines;
moist; very dense below 10 feet.

Medium dense below 15 feet.

SANDY CLAY ; CL; 10YR 6/3 pale brown;
30% fine to medium grained snad; 70% low
to medium plasticity fines; moist; very stiff;
mottled texture; minor iron staining; no odor
(Pocket Penetrometer (PP) = 2.5 tons per
square foot (TSF)).

CLAYEY SAND ; SC; 10YR 5/4 yellowish
brown; 60% fine to medium grained sand;
40% low to medium plasticity fines; moist;
medium dense; no staining; no odor.

POORLY GRADED SAND ; SP; 10YR 6/2
light brownish gray; 90% medium grained
sand; 5% coarse grained sand; 5% fines;
moist; soil very loose in sampler; no staining;
no odor.

Backfilled
with soil
cuttings
3 4
5 3
3 4
4 11
50-5"
4 13
13 25
10 11
SA
DS
SA,
MD
MD
B3-2'
B3-5'
B3-7'
B3-10'
B3-15'
B3-20'
PAGE 1 OF 3
USCS
Graphic
Log
COMPLETED:

COMPLETED:

Description
DRILLING COMPANY: Technicon Engineering Services, Inc.

DRILLING EQUIPMENT: CME 65
DRILLING METHOD: Hollow Stem Auger
SAMPLING EQUIPMENT: Split Spoon
9/25/18
9/25/18
9/25/18
9/25/18
CHECKED BY: J. Fischer
LONGITUDE: 119° 48' 31.64"
Time &
Depth
(feet)
5 10
15 20
PROJECT NUMBER: 2270445501
DRILLING:

INSTALLATION:

STARTED

STARTED
LOGGED BY: J. Sargent
LATITUDE: 36° 44' 34.55"
NORTHING (ft):

WELL CASING DIAMETER (in): ---
GROUND ELEV (ft): 286
WELL DEPTH (ft): ---
EASTING (ft):

BOREHOLE DEPTH (ft): 51.5
BOREHOLE DIAMETER (in): 6
TOC ELEV (ft):

LOCATION: 2223 G Street, Fresno, California
PROJECT:Fresno Area Express Facility
B3
INITIAL DTW (ft): NE
STATIC DTW (ft): NE
WELL / TEST PIT / BOREHOLE NO:

GEO FORM 304 FAX_BORING_LOGS_FINAL.GPJ SECOR INTL.GDT 10/19/18 Borehole
Backfill
Depth
(feet)
5 10
15 20
Blow
Count
Geotechnical
Lab Testing
Sample
Time
Sample ID
PID
Reading
(ppmv)
SW
CL
SM
SM
WELL GRADED SAND ; SW; 10YR 6/2
light brownish gray; 95% fine to coarse
grained sand; 5% fines; moist; loose; no
staining; no odor.

SANDY CLAY ; CL; 10YR 6/2 light brownish
gray; <5% coarse grained sand; 30% very
fine to fine grained sand; 70% medium
plasticity fines; moist; hard; no staining; no
odor (PP = 3.75 TSF).

SILTY SAND ; SM; 10YR 4/6 dark yellowish
brown; 65% very fine to medium grained
sand; 35% fines; moist; dense; no staining;
no odor.
<5% fine rounded gravel; 75% fine to coarse
grained sand; 25% fines; medium dense
below 40 feet.

SILTY SAND WITH GRAVEL ; SM; 10YR
4/6 dark yellowish brown; 15% fine gravel;
65% fine to coarse grained sand; 20% fines;
moist; dense; no staining; no odor.

Backfilled
with soil
cuttings
3 4
6 3
15 37
12 23
21 9
12 13
8 10
25 B3-25'
B3-30'
B3-35'
B3-40'
B3-45'
PAGE 2 OF 3
USCS
Graphic
Log
COMPLETED:

COMPLETED:

Description
DRILLING COMPANY: Technicon Engineering Services, Inc.

DRILLING EQUIPMENT: CME 65
DRILLING METHOD: Hollow Stem Auger
SAMPLING EQUIPMENT: Split Spoon
9/25/18
9/25/18
9/25/18
9/25/18
CHECKED BY: J. Fischer
LONGITUDE: 119° 48' 31.64"
Time &
Depth
(feet)
30 35
40 45
PROJECT NUMBER: 2270445501
DRILLING:

INSTALLATION:

STARTED

STARTED
LOGGED BY: J. Sargent
LATITUDE: 36° 44' 34.55"
NORTHING (ft):

WELL CASING DIAMETER (in): ---
GROUND ELEV (ft): 286
WELL DEPTH (ft): ---
EASTING (ft):

BOREHOLE DEPTH (ft): 51.5
BOREHOLE DIAMETER (in): 6
TOC ELEV (ft):

LOCATION: 2223 G Street, Fresno, California
PROJECT:Fresno Area Express Facility
B3
INITIAL DTW (ft): NE
STATIC DTW (ft): NE
WELL / TEST PIT / BOREHOLE NO:

GEO FORM 304 FAX_BORING_LOGS_FINAL.GPJ SECOR INTL.GDT 10/19/18 Borehole
Backfill
Depth
(feet)
30 35
40 45
Blow
Count
Geotechnical
Lab Testing
Sample
Time
Sample ID
PID
Reading
(ppmv)
SM SILTY SAND ; SM; 2.5Y 5/3 light olive
brown; 70% very fine to fine grained sand;
30% fines; moist; dense; no staining; no
odor.

Hole terminated at 51.5 feet.

Backfilled
with soil
cuttings
17 26
18 B3-50'
PAGE 3 OF 3
USCS
Graphic
Log
COMPLETED:

COMPLETED:

Description
DRILLING COMPANY: Technicon Engineering Services, Inc.

DRILLING EQUIPMENT: CME 65
DRILLING METHOD: Hollow Stem Auger
SAMPLING EQUIPMENT: Split Spoon
9/25/18
9/25/18
9/25/18
9/25/18
CHECKED BY: J. Fischer
LONGITUDE: 119° 48' 31.64"
Time &
Depth
(feet)
55 60
65 70
PROJECT NUMBER: 2270445501
DRILLING:

INSTALLATION:

STARTED

STARTED
LOGGED BY: J. Sargent
LATITUDE: 36° 44' 34.55"
NORTHING (ft):

WELL CASING DIAMETER (in): ---
GROUND ELEV (ft): 286
WELL DEPTH (ft): ---
EASTING (ft):

BOREHOLE DEPTH (ft): 51.5
BOREHOLE DIAMETER (in): 6
TOC ELEV (ft):

LOCATION: 2223 G Street, Fresno, California
PROJECT:Fresno Area Express Facility
B3
INITIAL DTW (ft): NE
STATIC DTW (ft): NE
WELL / TEST PIT / BOREHOLE NO:

GEO FORM 304 FAX_BORING_LOGS_FINAL.GPJ SECOR INTL.GDT 10/19/18 Borehole
Backfill
Depth
(feet)
55 60
65 70
Blow
Count
Geotechnical
Lab Testing
Sample
Time
Sample ID
PID
Reading
(ppmv)
SM
4" AC
5" AB

QUATERNARY ALLUVIAL FAN DEPOSITS
(Qf)
SILTY SAND ; SM; 10YR 4/4 dark yellowish
brown; 3% coarse grained sand; 77% fine to
medium grained sand; 20% fines; moist; no
staining; no odor.

Loose below 5 feet.

Medium dense below 7 feet
60% very fine to fine grained sand; 40%
fines; very dense below 10 feet.

Hole terminated at 11.5 feet.

Backfilled
with soil
cuttings
3 6
9 4
4 6
18 50-5"
SA
MD
MD
B4-2'
B4-5'
B4-7'
B4-10'
PAGE 1 OF 1
USCS
Graphic
Log
COMPLETED:

COMPLETED:

Description
DRILLING COMPANY: Technicon Engineering Services, Inc.

DRILLING EQUIPMENT: CME 65
DRILLING METHOD: Hollow Stem Auger
SAMPLING EQUIPMENT: Split Spoon
9/24/18
9/24/18
9/24/18
9/24/18
CHECKED BY: J. Fischer
LONGITUDE: 119° 48' 29.9"
Time &
Depth
(feet)
5 10
15 20
PROJECT NUMBER: 2270445501
DRILLING:

INSTALLATION:

STARTED

STARTED
LOGGED BY: J. Sargent
LATITUDE: 36° 44' 35.72"
NORTHING (ft):

WELL CASING DIAMETER (in): ---
GROUND ELEV (ft): 286
WELL DEPTH (ft): ---
EASTING (ft):

BOREHOLE DEPTH (ft): 11.5
BOREHOLE DIAMETER (in): 6
TOC ELEV (ft):

LOCATION: 2223 G Street, Fresno, California
PROJECT:Fresno Area Express Facility
B4
INITIAL DTW (ft): NE
STATIC DTW (ft): NE
WELL / TEST PIT / BOREHOLE NO:

GEO FORM 304 FAX_BORING_LOGS_FINAL.GPJ SECOR INTL.GDT 10/19/18 Borehole
Backfill
Depth
(feet)
5 10
15 20
Blow
Count
Geotechnical
Lab Testing
Sample
Time
Sample ID
PID
Reading
(ppmv)
SM
SM
CL
SP
5" AC
6" AB
ARTIFICIAL FILL (Af)
SILTY SAND ; SM; 10YR 4/4 dark yellowish
brown; 3% fine to coarse gravel; 74% fine
grained sand; 23% fines; moist; no staining;
no odor; minor brick fragments.

QUATERNARY ALLUVIAL FAN DEPOSITS
(Qf)
SILTY SAND ; SM; 10YR 4/4 dark yellowish
brown; 3% fine to coarse gravel; 74% fine
grained sand; 23% fines; moist; loose; no
staining; no odor.
4% fine to coarse gravel; 81% fine to
medium grianed sand; 15% fines; medium
dense below 7 feet.
60% very fine to fine grained sand; 40%
fines; very dense below 10 feet
SANDY CLAY ; CL; 10YR 5/4 yellowish
brown; 40% very fine to fine grained sand;
60% low to medium plasticity fines; moist;
very stiff (PP = 3.25 TSF).

POORLY GRADED SAND ; SP; 2.5Y 6/4
light yellowish brown; 95% fine to medium
grained sand; 5% fines; moist; medium
dense.

Hole terminated at 21.5 feet.

Backfilled
with soil
cuttings
2 3
4 5
6 6
6 33
50-2"
8 10
12 7
10 11
CORR,

R-VALUE
SA
DS
SA
MD
MD
B5-Bulk
B5-2'
B5-5'
B5-7'
B5-10'
B5-15'
B5-20'
PAGE 1 OF 1
USCS
Graphic
Log
COMPLETED:

COMPLETED:

Description
DRILLING COMPANY: Technicon Engineering Services, Inc.

DRILLING EQUIPMENT: CME 65
DRILLING METHOD: Hollow Stem Auger
SAMPLING EQUIPMENT: Split Spoon
9/24/18
9/24/18
9/24/18
9/24/18
CHECKED BY: J. Fischer
LONGITUDE: 119° 48' 29.32"
Time &
Depth
(feet)
5 10
15 20
PROJECT NUMBER: 2270445501
DRILLING:

INSTALLATION:

STARTED

STARTED
LOGGED BY: J. Sargent
LATITUDE: 36° 44' 36.56"
NORTHING (ft):

WELL CASING DIAMETER (in): ---
GROUND ELEV (ft): 288
WELL DEPTH (ft): ---
EASTING (ft):

BOREHOLE DEPTH (ft): 11.5
BOREHOLE DIAMETER (in): 6
TOC ELEV (ft):

LOCATION: 2223 G Street, Fresno, California
PROJECT:Fresno Area Express Facility
B5
INITIAL DTW (ft): NE
STATIC DTW (ft): NE
WELL / TEST PIT / BOREHOLE NO:

GEO FORM 304 FAX_BORING_LOGS_FINAL.GPJ SECOR INTL.GDT 10/19/18 Borehole
Backfill
Depth
(feet)
5 10
15 20
Blow
Count
Geotechnical
Lab Testing
Sample
Time
Sample ID
PID
Reading
(ppmv)
SM
CL
5" AC
4" AB

QUATERNARY ALLUVIAL FAN DEPOSITS
(Qf)
SILTY SAND ; SM; 10YR 4/4 dark yellowish
brown; 70% fine to medium grained sand;
30% fines; moist; no staining; no odor.

Loose below 5 feet.
80% fine to medium graiend sand; 20%
fines; loose below 7 feet.
10YR 5/6 strong brown; 65% very fine to fine
grained sand; 35% fines; very dense below
10 feet.

SANDY CLAY ; CL; 2.5Y 5/3 light olive
brown; 44% very fine to fine grained sand;
56% medium to high plasticity fines; moist;
hard; no staining; no odor (PP = 5.0 TSF).

Stiff; reduction in fines plasticity; some
mottling; minor iron oxide staining below 20
feet (PP = 1.75 TSF).

Backfilled
with soil
cuttings
5 4
3 4
5 6
5 44
42 25
50-4"
5 4
5 DS
#200,
AL,
MD
B6-2'
B6-5'
B6-7'
B6-10'
B6-15'
B6-20'
PAGE 1 OF 2
USCS
Graphic
Log
COMPLETED:

COMPLETED:

Description
DRILLING COMPANY: Technicon Engineering Services, Inc.

DRILLING EQUIPMENT: CME 65
DRILLING METHOD: Hollow Stem Auger
SAMPLING EQUIPMENT: Split Spoon
9/25/18
9/25/18
9/25/18
9/25/18
CHECKED BY: J. Fischer
LONGITUDE: 119° 48' 31.75"
Time &
Depth
(feet)
5 10
15 20
PROJECT NUMBER: 2270445501
DRILLING:

INSTALLATION:

STARTED

STARTED
LOGGED BY: J. Sargent
LATITUDE: 36° 44' 33.58"
NORTHING (ft):

WELL CASING DIAMETER (in): ---
GROUND ELEV (ft): 286
WELL DEPTH (ft): ---
EASTING (ft):

BOREHOLE DEPTH (ft): 31.5
BOREHOLE DIAMETER (in): 6
TOC ELEV (ft):

LOCATION: 2223 G Street, Fresno, California
PROJECT:Fresno Area Express Facility
B6
INITIAL DTW (ft): NE
STATIC DTW (ft): NE
WELL / TEST PIT / BOREHOLE NO:

GEO FORM 304 FAX_BORING_LOGS_FINAL.GPJ SECOR INTL.GDT 10/19/18 Borehole
Backfill
Depth
(feet)
5 10
15 20
Blow
Count
Geotechnical
Lab Testing
Sample
Time
Sample ID
PID
Reading
(ppmv)
SP-
SM
Very stiff below 25 feet (PP = 1.5 TSF)
Hard below 30 feet.

POORLY GRADED SAND WITH SILT ;
SP-SM; 2.5Y 5/3 light olive brown; 90% very
fine to fine grained sand; 10% fines; moist;
dense; no staining; no odor.

Hole terminated at 31.5 feet.
4 8
13 7
19 26
B6-25'
B6-30'
PAGE 2 OF 2
USCS
Graphic
Log
COMPLETED:

COMPLETED:

Description
DRILLING COMPANY: Technicon Engineering Services, Inc.

DRILLING EQUIPMENT: CME 65
DRILLING METHOD: Hollow Stem Auger
SAMPLING EQUIPMENT: Split Spoon
9/25/18
9/25/18
9/25/18
9/25/18
CHECKED BY: J. Fischer
LONGITUDE: 119° 48' 31.75"
Time &
Depth
(feet)
30 35
40 45
PROJECT NUMBER: 2270445501
DRILLING:

INSTALLATION:

STARTED

STARTED
LOGGED BY: J. Sargent
LATITUDE: 36° 44' 33.58"
NORTHING (ft):

WELL CASING DIAMETER (in): ---
GROUND ELEV (ft): 286
WELL DEPTH (ft): ---
EASTING (ft):

BOREHOLE DEPTH (ft): 31.5
BOREHOLE DIAMETER (in): 6
TOC ELEV (ft):

LOCATION: 2223 G Street, Fresno, California
PROJECT:Fresno Area Express Facility
B6
INITIAL DTW (ft): NE
STATIC DTW (ft): NE
WELL / TEST PIT / BOREHOLE NO:

GEO FORM 304 FAX_BORING_LOGS_FINAL.GPJ SECOR INTL.GDT 10/19/18 Borehole
Backfill
Depth
(feet)
30 35
40 45
Blow
Count
Geotechnical
Lab Testing
Sample
Time
Sample ID
PID
Reading
(ppmv)
SM
SP
SW
3" AC
9" AB

QUATERNARY ALLUVIAL FAN DEPOSITS
(Qf)
SILTY SAND ; SM; 10YR 4/4 dark yellowish
brown; 4% fine gravel; 82% fine to medium
grained sand; 14% fines; moist; no staining;
no odor.
10% fine rounded gravel; 65% fine to
medium grained sand; 25% fines; medium
dense below 5 feet
80% very fine to fine grained sand; 20%
fines; very dense below 7 feet.
65% very fine to fine grained snad; 35%
fines.

POORLY GRADED SAND ; SP; 10YR 6/3
pale brown; 95% fine grained sand; 5% fines;
moist; medium dense; no staining; no odor.

WELL GRADED SAND ; SW; 10YR 5/4
yellowish brown; 95% fine to coarse grained
sand; 5% fines; moist. medium dense; no
staining; no odor.

Backfilled
with soil
cuttings
14 11
7 12
27 32
9 32
35 8
7 9
7 16
20 SA
MD
MD
MD
B7-2'
B7-5'
B7-7'
B7-10'
B7-15'
B7-20'
PAGE 1 OF 2
USCS
Graphic
Log
COMPLETED:

COMPLETED:

Description
DRILLING COMPANY: Technicon Engineering Services, Inc.

DRILLING EQUIPMENT: CME 65
DRILLING METHOD: Hollow Stem Auger
SAMPLING EQUIPMENT: Split Spoon
9/24/18
9/24/18
9/24/18
9/24/18
CHECKED BY: J. Fischer
LONGITUDE: 119° 48' 29.87"
Time &
Depth
(feet)
5 10
15 20
PROJECT NUMBER: 2270445501
DRILLING:

INSTALLATION:

STARTED

STARTED
LOGGED BY: J. Sargent
LATITUDE: 36° 44' 34"
NORTHING (ft):

WELL CASING DIAMETER (in): ---
GROUND ELEV (ft): 284
WELL DEPTH (ft): ---
EASTING (ft):

BOREHOLE DEPTH (ft): 31.5
BOREHOLE DIAMETER (in): 6
TOC ELEV (ft):

LOCATION: 2223 G Street, Fresno, California
PROJECT:Fresno Area Express Facility
B7
INITIAL DTW (ft): NE
STATIC DTW (ft): NE
WELL / TEST PIT / BOREHOLE NO:

GEO FORM 304 FAX_BORING_LOGS_FINAL.GPJ SECOR INTL.GDT 10/19/18 Borehole
Backfill
Depth
(feet)
5 10
15 20
Blow
Count
Geotechnical
Lab Testing
Sample
Time
Sample ID
PID
Reading
(ppmv)
SP-
SM
CL
POORLY GRADED SAND WITH SILT ;
SP-SM; 10YR 6/3 pale brown; 85% fine
grained sand; 15% fines; moist; loose; no
staining; no odor.

SANDY CLAY ; CL; 2.5Y 5/2 grayish brown;
40% very fine to fine grained sand; 60%
medium plasticity fines; moist; hard; no
staining; no odor (PP = 3.5 TSF).

Hole terminated at 31.5 feet.
4 5
5 6
29 30
B7-25'
B7-30'
PAGE 2 OF 2
USCS
Graphic
Log
COMPLETED:

COMPLETED:

Description
DRILLING COMPANY: Technicon Engineering Services, Inc.

DRILLING EQUIPMENT: CME 65
DRILLING METHOD: Hollow Stem Auger
SAMPLING EQUIPMENT: Split Spoon
9/24/18
9/24/18
9/24/18
9/24/18
CHECKED BY: J. Fischer
LONGITUDE: 119° 48' 29.87"
Time &
Depth
(feet)
30 35
40 45
PROJECT NUMBER: 2270445501
DRILLING:

INSTALLATION:

STARTED

STARTED
LOGGED BY: J. Sargent
LATITUDE: 36° 44' 34"
NORTHING (ft):

WELL CASING DIAMETER (in): ---
GROUND ELEV (ft): 284
WELL DEPTH (ft): ---
EASTING (ft):

BOREHOLE DEPTH (ft): 31.5
BOREHOLE DIAMETER (in): 6
TOC ELEV (ft):

LOCATION: 2223 G Street, Fresno, California
PROJECT:Fresno Area Express Facility
B7
INITIAL DTW (ft): NE
STATIC DTW (ft): NE
WELL / TEST PIT / BOREHOLE NO:

GEO FORM 304 FAX_BORING_LOGS_FINAL.GPJ SECOR INTL.GDT 10/19/18 Borehole
Backfill
Depth
(feet)
30 35
40 45
Blow
Count
Geotechnical
Lab Testing
Sample
Time
Sample ID
PID
Reading
(ppmv)
SM
SP-
SM
SC
SP-
SM
SM
5" AC

QUATERNARY ALLUVIAL FAN DEPOSITS
(Qf)
SILTY SAND ; SM; 10YR 4/4 dark yellowish
brown; 86% fine to medium grained sand;
14% fines; moist; no staining; no odor.

POORLY GRADED SAND WITH SILT ;
SP-SM; 2.5Y 6/4 light yellowish brown; 90%
very fine to fine grained sand; 10% fines;
moist; loose; no staining; no odor.

Dense below 7 feet.

CLAYEY SAND ; SC; 10YR 4/6 dark
yellowish brown; 60% very fine to fine
grained sand; 40% medium to high plasticity
fines; moist; very dense; no staining; no
odor.

POORLY GRADED SAND WITH SILT ;
SP-SM; 10YR 6/2 light brownish gray; 85%
very fine to fine grained sand; 15% fines;
moist; very dense; no staining; no odor.

SILTY SAND ; SM; 2.5Y 5/4 light olive
brown; 60% very fine grained sand; 40%
fines; moist; loose ; no staining; no odor.

Hole terminated at 21.5 feet.

Backfilled
with soil
cuttings
2 3
2 11
10 30
14 14
50-5"
13 29
27 4
6 6
SA
SA
MD
MD
B8-2'
B8-5'
B8-7'
B8-10'
B8-15'
B8-20'
PAGE 1 OF 1
USCS
Graphic
Log
COMPLETED:

COMPLETED:

Description
DRILLING COMPANY: Technicon Engineering Services, Inc.

DRILLING EQUIPMENT: CME 65
DRILLING METHOD: Hollow Stem Auger
SAMPLING EQUIPMENT: Split Spoon
9/24/18
9/24/18
9/24/18
9/24/18
CHECKED BY: J. Fischer
LONGITUDE: 119° 48' 26.87"
Time &
Depth
(feet)
5 10
15 20
PROJECT NUMBER: 2270445501
DRILLING:

INSTALLATION:

STARTED

STARTED
LOGGED BY: J. Sargent
LATITUDE: 36° 44' 33.95"
NORTHING (ft):

WELL CASING DIAMETER (in): ---
GROUND ELEV (ft): 287
WELL DEPTH (ft): ---
EASTING (ft):

BOREHOLE DEPTH (ft): 21.5
BOREHOLE DIAMETER (in): 6
TOC ELEV (ft):

LOCATION: 2223 G Street, Fresno, California
PROJECT:Fresno Area Express Facility
B8
INITIAL DTW (ft): NE
STATIC DTW (ft): NE
WELL / TEST PIT / BOREHOLE NO:

GEO FORM 304 FAX_BORING_LOGS_FINAL.GPJ SECOR INTL.GDT 10/19/18 Borehole
Backfill
Depth
(feet)
5 10
15 20
Blow
Count
Geotechnical
Lab Testing
Sample
Time
Sample ID
PID
Reading
(ppmv)
SM
SC
8" AC
6" AB

QUATERNARY ALLUVIAL FAN DEPOSITS
(Qf)
SILTY SAND ; SM; 7.5YR 4/6 strong brown;
83% very fine to fine grained sand; 17%
fines; moist; no staining; no odor.
75% very fine to fine grained sand; 25%
fines; loose below 5 feet.

Very dense below 7 feet.

CLAYEY SAND ; SC; 10YR 6/3 pale brown;
60% very fine to fine graiend sand; 40%
medium plasticity fines; moist; very dense;
no staining; no odor.

Medium dense below 20 feet.

Hole terminated at 21.5 feet.

Backfilled
with soil
cuttings
6 7
8 24
50-2"
18 50-2"
9 28
30 9
15 19
CORR
SA
SA
MD
MD
B9-Bulk
B9-2'
B9-5'
B9-7'
B9-10'
B9-15'
B9-20'
PAGE 1 OF 1
USCS
Graphic
Log
COMPLETED:

COMPLETED:

Description
DRILLING COMPANY: Technicon Engineering Services, Inc.

DRILLING EQUIPMENT: CME 65
DRILLING METHOD: Hollow Stem Auger
SAMPLING EQUIPMENT: Split Spoon
9/25/18
9/25/18
9/25/18
9/25/18
CHECKED BY: J. Fischer
LONGITUDE: 119° 48' 25.74"
Time &
Depth
(feet)
5 10
15 20
PROJECT NUMBER: 2270445501
DRILLING:

INSTALLATION:

STARTED

STARTED
LOGGED BY: J. Sargent
LATITUDE: 36° 44' 34.18"
NORTHING (ft):

WELL CASING DIAMETER (in): ---
GROUND ELEV (ft): 287
WELL DEPTH (ft): ---
EASTING (ft):

BOREHOLE DEPTH (ft): 21.5
BOREHOLE DIAMETER (in): 6
TOC ELEV (ft):

LOCATION: 2223 G Street, Fresno, California
PROJECT:Fresno Area Express Facility
B9
INITIAL DTW (ft): NE
STATIC DTW (ft): NE
WELL / TEST PIT / BOREHOLE NO:

GEO FORM 304 FAX_BORING_LOGS_FINAL.GPJ SECOR INTL.GDT 10/19/18 Borehole
Backfill
Depth
(feet)
5 10
15 20
Blow
Count
Geotechnical
Lab Testing
Sample
Time
Sample ID
PID
Reading
(ppmv)

APPENDIX B

LABORATORY TEST RESULTS

SUMMARY OF SOIL DENSITY TEST RESULTS
ASTM D 2216
Boring
Location
Sample
Depth
(ft)
Wet Density
(lb/ft3)
Dry Density
(lb/ft3)

Moisture
Content
(percent)

B2-15’ 15 120.4 114.4 5.2
B3-10’ 10 120.3 111.9 7.6
B3-20’ 20 87.4 85.8 1.8
B4-5’ 5 123.4 117.7 4.9
B4-10’ 10 128.4 116.3 10.5
B5-10’ 10 117.6 114.3 2.9
B5-20’ 20 105.3 98.5 6.9
B6-15’ 15 130.0 113.4 14.6
B7-5’ 5 116.3 111.6 4.2
B7-10’ 10 117.4 107.2 9.5
B7-20’ 20 107.1 99.7 7.4
B8-7’ 7 118.9 114.6 3.7
B8-15’ 15 117.8 108.2 8.8
B9-10’ 10 113.9 109.7 3.9
B9-20’ 20 105.2 100.8 4.4

APPENDIX/DIVIDER TITLE

Gradation Analysis
ASTM D 422
Project Name FAX Facility Improvement Project Project Number 2270445501 Source Grab Lab ID B2-2'
Date Received 09-28-2018
Preparation Method ASTM D 1140 Method A Preparation Date 09-28-2018 Particle Shape Test Date 09-29-2018
Particle Hardness
Sample Dry Mass (g) 340.80 Analysis based on total sample.

Moisture Content (%) 4.7
Grams % % % Gravel 0.3
Sieve Size Retained Retained Passing % Sand 78.8
% Fines 20.9
Fines Classification ML
D10 (mm) N/A
D30 (mm) N/A
D60 (mm) N/A
Cu N/A
No. 4 1.00 0.3 99.7 Cc N/A
No. 8 12.90 3.8 95.9
No. 16 36.10 10.6 85.3 Classification
No. 30 53.20 15.6 69.7
No. 50 58.60 17.2 52.5
No. 100 68.30 20.0 32.5
No. 200 39.40 11.6 20.9
Pan 71.30 20.9 ---
Comments
Reviewed By
Silty Sand (SM)
Classification determined by ASTM D 2487. -200
material classification determined by visual assessment, ASTM D 2488.
6 3 2 1 3/4 3/8 4 10 16 30 40 100 200

0.00 10.00

20.00 30.00

40.00 50.00

60.00 70.00

80.00 90.00
100.00

0.0010.010.11101001000
Percent Passing
Diameter (mm)
Particle Size Distribution
Sieve Size in inches Sieve Size in sieve numbers
File: FAX_Maintenance_Facility_B2-2_Sieve.xlsm Sheet: Report Preparation Date: 1-2008
Revision Date: 4-2008
Stantec Consulting Services Inc.

Laboratory Document
Prepared By: JW
Approved By: TLK
JF
Gradation Analysis
ASTM D 422
Project Name FAX Facility Improvement Project Project Number 2270445501 Source Grab Lab ID B3-2'
Date Received 09-28-2018
Preparation Method ASTM D 1140 Method A Preparation Date 09-28-2018 Particle Shape Test Date 09-29-2018
Particle Hardness
Sample Dry Mass (g) 314.10 Analysis based on total sample.

Moisture Content (%) 4.1
Grams % % % Gravel 0.3
Sieve Size Retained Retained Passing % Sand 80.0
% Fines 19.7
Fines Classification ML
D10 (mm) N/A
D30 (mm) N/A
D60 (mm) N/A
Cu N/A
No. 4 0.90 0.3 99.7 Cc N/A
No. 8 9.40 3.0 96.7
No. 16 31.20 9.9 86.8 Classification
No. 30 45.10 14.4 72.4
No. 50 56.70 18.1 54.4
No. 100 71.30 22.7 31.7
No. 200 37.60 12.0 19.7
Pan 61.90 19.7 ---
Comments
Reviewed By
Silty Sand (SM)
Classification determined by ASTM D 2487. -200
material classification determined by visual assessment, ASTM D 2488.
6 3 2 1 3/4 3/8 4 10 16 30 40 100 200

0.00 10.00

20.00 30.00

40.00 50.00

60.00 70.00

80.00 90.00
100.00

0.0010.010.11101001000
Percent Passing
Diameter (mm)
Particle Size Distribution
Sieve Size in inches Sieve Size in sieve numbers
File: FAX_Maintenance_Facility_B3-2_Sieve.xlsm Sheet: Report Preparation Date: 1-2008
Revision Date: 4-2008
Stantec Consulting Services Inc.

Laboratory Document
Prepared By: JW
Approved By: TLK
JF
Gradation Analysis
ASTM D 422
Project Name FAX Facility Improvement Project Project Number 2270445501 Source Mod Cal Lab ID B3-10'
Date Received 09-28-2018
Preparation Method ASTM D 1140 Method A Preparation Date 09-28-2018 Particle Shape Test Date 09-29-2018
Particle Hardness
Sample Dry Mass (g) 318.30 Analysis based on total sample.

Moisture Content (%) 3.4
Grams % % % Gravel 0.0
Sieve Size Retained Retained Passing % Sand 94.3
% Fines 5.7
Fines Classification ML
D10 (mm) 0.1257
D30 (mm) 0.3524
D60 (mm) 0.8896
Cu 7.08
Cc 1.11
No. 8 18.50 5.8 94.2
No. 16 76.20 23.9 70.2 Classification
No. 30 88.50 27.8 42.4
No. 50 51.60 16.2 26.2
No. 100 47.00 14.8 11.5
No. 200 18.30 5.7 5.7
Pan 18.20 5.7 ---
Comments
Reviewed By
Well Graded Sand (SW-SM) with Silt
Classification determined by ASTM D 2487. -200
material classification determined by visual assessment, ASTM D 2488.
6 3 2 1 3/4 3/8 4 10 16 30 40 100 200

0.00 10.00

20.00 30.00

40.00 50.00

60.00 70.00

80.00 90.00
100.00

0.0010.010.11101001000
Percent Passing
Diameter (mm)
Particle Size Distribution
Sieve Size in inches Sieve Size in sieve numbers
File: FAX_Maintenance_Facility_B3-10_Sieve.xlsm Sheet: Report Preparation Date: 1-2008
Revision Date: 4-2008
Stantec Consulting Services Inc.

Laboratory Document
Prepared By: JW
Approved By: TLK
JF
Gradation Analysis
ASTM D 422
Project Name FAX Facility Improvement Project Project Number 2270445501 Source Grab Lab ID B4-2'
Date Received 09-28-2018
Preparation Method ASTM D 1140 Method A Preparation Date 09-28-2018 Particle Shape Test Date 09-29-2018
Particle Hardness
Sample Dry Mass (g) 317.40 Analysis based on total sample.

Moisture Content (%) 3.1
Grams % % % Gravel 2.4
Sieve Size Retained Retained Passing % Sand 77.4
% Fines 20.2
Fines Classification ML
D10 (mm) N/A
D30 (mm) N/A
D60 (mm) N/A
3/8" 5.50 1.7 98.3 Cu N/A
No. 4 2.10 0.7 97.6 Cc N/A
No. 8 8.10 2.6 95.1
No. 16 24.50 7.7 87.3 Classification
No. 30 38.40 12.1 75.2
No. 50 58.50 18.4 56.8
No. 100 75.80 23.9 32.9
No. 200 40.50 12.8 20.2
Pan 64.00 20.2 ---
Comments
Reviewed By
Silty Sand (SM)
Classification determined by ASTM D 2487. -200
material classification determined by visual assessment, ASTM D 2488.
6 3 2 1 3/4 3/8 4 10 16 30 40 100 200

0.00 10.00

20.00 30.00

40.00 50.00

60.00 70.00

80.00 90.00
100.00

0.0010.010.11101001000
Percent Passing
Diameter (mm)
Particle Size Distribution
Sieve Size in inches Sieve Size in sieve numbers
File: FAX_Maintenance_Facility_B4-2_Sieve.xlsm Sheet: Report Preparation Date: 1-2008
Revision Date: 4-2008
Stantec Consulting Services Inc.

Laboratory Document
Prepared By: JW
Approved By: TLK
JF
Gradation Analysis
ASTM D 422
Project Name FAX Facility Improvement Project Project Number 2270445501 Source Grab Lab ID B5-2'
Date Received 09-28-2018
Preparation Method ASTM D 1140 Method A Preparation Date 09-28-2018 Particle Shape Test Date 09-29-2018
Particle Hardness
Sample Dry Mass (g) 297.20 Analysis based on total sample.

Moisture Content (%) 4.8
Grams % % % Gravel 2.7
Sieve Size Retained Retained Passing % Sand 74.2
% Fines 23.1
Fines Classification ML
D10 (mm) N/A
D30 (mm) N/A
D60 (mm) N/A
Cu N/A
No. 4 8.00 2.7 97.3 Cc N/A
No. 8 8.40 2.8 94.5
No. 16 17.70 6.0 88.5 Classification
No. 30 34.70 11.7 76.9
No. 50 58.40 19.7 57.2
No. 100 64.30 21.6 35.6
No. 200 36.90 12.4 23.1
Pan 68.80 23.1 ---
Comments
Reviewed By
Silty Sand (SM)
Classification determined by ASTM D 2487. -200
material classification determined by visual assessment, ASTM D 2488.
6 3 2 1 3/4 3/8 4 10 16 30 40 100 200

0.00 10.00

20.00 30.00

40.00 50.00

60.00 70.00

80.00 90.00
100.00

0.0010.010.11101001000
Percent Passing
Diameter (mm)
Particle Size Distribution
Sieve Size in inches Sieve Size in sieve numbers
File: FAX_Maintenance_Facility_B5-2_Sieve.xlsm Sheet: Report Preparation Date: 1-2008
Revision Date: 4-2008
Stantec Consulting Services Inc.

Laboratory Document
Prepared By: JW
Approved By: TLK
JF
Gradation Analysis
ASTM D 422
Project Name FAX Facility Improvement Project Project Number 2270445501 Source SPT Lab ID B5-7'
Date Received 09-28-2018
Preparation Method ASTM D 1140 Method A Preparation Date 09-28-2018 Particle Shape Test Date 09-29-2018
Particle Hardness
Sample Dry Mass (g) 318.80 Analysis based on total sample.

Moisture Content (%) 4.1
Grams % % % Gravel 3.9
Sieve Size Retained Retained Passing % Sand 81.2
% Fines 14.9
Fines Classification ML
D10 (mm) N/A
D30 (mm) N/A
D60 (mm) N/A
3/8" 5.40 1.7 98.3 Cu N/A
No. 4 7.10 2.2 96.1 Cc N/A
No. 8 9.40 2.9 93.1
No. 16 19.60 6.1 87.0 Classification
No. 30 29.40 9.2 77.8
No. 50 59.00 18.5 59.3
No. 100 90.00 28.2 31.0
No. 200 51.40 16.1 14.9
Pan 47.50 14.9 ---
Comments
Reviewed By
Silty Sand (SM)
Classification determined by ASTM D 2487. -200
material classification determined by visual assessment, ASTM D 2488.
6 3 2 1 3/4 3/8 4 10 16 30 40 100 200

0.00 10.00

20.00 30.00

40.00 50.00

60.00 70.00

80.00 90.00
100.00

0.0010.010.11101001000
Percent Passing
Diameter (mm)
Particle Size Distribution
Sieve Size in inches Sieve Size in sieve numbers
File: FAX_Maintenance_Facility_B5-7_Sieve.xlsm Sheet: Report Preparation Date: 1-2008
Revision Date: 4-2008
Stantec Consulting Services Inc.

Laboratory Document
Prepared By: JW
Approved By: TLK
JF
Materials Finer Than 75μm (No. 200) Sieve
ASTM D 1140
Project Name FAX Facility Improvement Project Project Number 2270445501 Source Mod Cal Lab ID B6-15'
Date Received 09-28-2018
Preparation Method ASTM D 1140 Method A Test Date 09-28-2018 Initial Sample Wet Mass (g) 321.70 Moisture Content (%) 18.7 Initial Oven Dry Sample Mass (g) 271.10
Final Oven Dry Sample Mass (g) 120.70
Materials Finer Than 75μm (No. 200) Sieve (g) 150.40
Percent Finer Than 75μm (No. 200) Sieve (%) 55.5
Comments
Reviewed By
File: FAX_Maintenance_Facility_B6-15_-200.xlsm Sheet: Wash_Only Preparation Date: 1-2008
Revision Date: 4-2008
Stantec Consulting Services Inc.

Laboratory Document
Prepared By: JW
Approved By: TLK
JF

ATTERBERG LIMITS
Project FAX Facility Improvement Project Project No. 2270445501 Source CM Lab ID B6-15'
Tested By M.P. Test Method ASTM D 4318 % + No. 40 20
Test Date 10-01-2018 Prepared Dry Date Received 09-28-2018 Wet Soil and
Tare Mass
(g)
Dry Soil and
Tare Mass
(g)
Tare Mass
(g)
Number of
Blows
Water Content
(%) Liquid Limit

19.94 18.45 13.61 27 30.8

21.21 19.38 13.68 19 32.1

23.48 21.05 13.87 13 33.8 31

PLASTIC LIMIT AND PLASTICITY INDEX
Wet Soil and
Tare Mass
(g)
Dry Soil and
Tare Mass
(g)
Tare Mass
(g)
Water
Content
(%) Plastic Limit Plasticity Index

22.91 21.33 13.47 20.1 20 11
Remarks:

Reviewed By
20 22
24 26
28 30
32 34
36 38
40 10
MOISTURE CONTENT, %

NUMBER OF BLOWS
Liquid Limit
20 30 4025 50
File: FAX_Maintenance_Facility_B6-15_PI.xlsm Sheet: LIMIT Preparation Date: 10-1998
Revision Date: 1-2008
Stantec Consulting Services Inc
Laboratory Document
Prepared By: JW
Approved By: TLK
JF
USCS = CL
Gradation Analysis
ASTM D 422
Project Name FAX Facility Improvement Project Project Number 2270445501 Source Grab Lab ID B7-2'
Date Received 09-28-2018
Preparation Method ASTM D 1140 Method A Preparation Date 09-28-2018 Particle Shape Test Date 09-29-2018
Particle Hardness
Sample Dry Mass (g) 314.90 Analysis based on total sample.

Moisture Content (%) 8.7
Grams % % % Gravel 4.0
Sieve Size Retained Retained Passing % Sand 82.2
% Fines 13.8
Fines Classification ML
D10 (mm) N/A
D30 (mm) N/A
D60 (mm) N/A
3/8" 5.40 1.7 98.3 Cu N/A
No. 4 7.10 2.3 96.0 Cc N/A
No. 8 9.40 3.0 93.0
No. 16 19.60 6.2 86.8 Classification
No. 30 29.40 9.3 77.5
No. 50 59.00 18.7 58.7
No. 100 90.00 28.6 30.2
No. 200 51.40 16.3 13.8
Pan 43.60 13.8 ---
Comments
Reviewed By
Silty Sand (SM)
Classification determined by ASTM D 2487. -200
material classification determined by visual assessment, ASTM D 2488.
6 3 2 1 3/4 3/8 4 10 16 30 40 100 200

0.00 10.00

20.00 30.00

40.00 50.00

60.00 70.00

80.00 90.00
100.00

0.0010.010.11101001000
Percent Passing
Diameter (mm)
Particle Size Distribution
Sieve Size in inches Sieve Size in sieve numbers
File: FAX_Maintenance_Facility_B7-2_Sieve.xlsm Sheet: Report Preparation Date: 1-2008
Revision Date: 4-2008
Stantec Consulting Services Inc.

Laboratory Document
Prepared By: JW
Approved By: TLK
JF
Gradation Analysis
ASTM D 422
Project Name FAX Facility Improvement Project Project Number 2270445501 Source Grab Lab ID B8-2'
Date Received 09-28-2018
Preparation Method ASTM D 1140 Method A Preparation Date 09-28-2018 Particle Shape Angular Test Date 09-29-2018
Particle Hardness Hard and Durable
Sample Dry Mass (g) 325.00 Analysis based on total sample.

Moisture Content (%) 3.5
Grams % % % Gravel 0.0
Sieve Size Retained Retained Passing % Sand 86.3
% Fines 13.7
Fines Classification ML
D10 (mm) N/A
D30 (mm) N/A
D60 (mm) N/A
Cu N/A
Cc N/A
No. 16 2.20 0.7 99.3 Classification
No. 30 48.70 15.0 84.3
No. 50 111.50 34.3 50.0
No. 100 86.90 26.7 23.3
No. 200 31.30 9.6 13.7
Pan 44.40 13.7 ---
Comments
Reviewed By
Silty Sand (SM)
Classification determined by ASTM D 2487. -200
material classification determined by visual assessment, ASTM D 2488.
6 3 2 1 3/4 3/8 4 10 16 30 40 100 200

0.00 10.00

20.00 30.00

40.00 50.00

60.00 70.00

80.00 90.00
100.00

0.0010.010.11101001000
Percent Passing
Diameter (mm)
Particle Size Distribution
Sieve Size in inches Sieve Size in sieve numbers
File: FAX_Maintenance_Facility_B8-2_Sieve.xlsm Sheet: Report Preparation Date: 1-2008
Revision Date: 4-2008
Stantec Consulting Services Inc.

Laboratory Document
Prepared By: JW
Approved By: TLK
JF
Gradation Analysis
ASTM D 422
Project Name FAX Facility Improvement Project Project Number 2270445501 Source SPT Lab ID B8-5'
Date Received 09-28-2018
Preparation Method ASTM D 1140 Method A Preparation Date 09-28-2018 Particle Shape Test Date 09-29-2018
Particle Hardness
Sample Dry Mass (g) 261.90 Analysis based on total sample.

Moisture Content (%) 3.3
Grams % % % Gravel 0.0
Sieve Size Retained Retained Passing % Sand 90.4
% Fines 9.6
Fines Classification ML
D10 (mm) 0.0771
D30 (mm) 0.1916
D60 (mm) 0.3757
Cu 4.87
Cc 1.27
No. 16 1.90 0.7 99.3 Classification
No. 30 40.10 15.3 84.0
No. 50 92.90 35.5 48.5
No. 100 74.90 28.6 19.9
No. 200 27.00 10.3 9.6
Pan 25.10 9.6 ---
Comments
Reviewed By
Poorly Graded Sand (SP-SM) with Silt
Classification determined by ASTM D 2487. -200
material classification determined by visual assessment, ASTM D 2488.
6 3 2 1 3/4 3/8 4 10 16 30 40 100 200

0.00 10.00

20.00 30.00

40.00 50.00

60.00 70.00

80.00 90.00
100.00

0.0010.010.11101001000
Percent Passing
Diameter (mm)
Particle Size Distribution
Sieve Size in inches Sieve Size in sieve numbers
File: FAX_Maintenance_Facility_B8-5_Sieve.xlsm Sheet: Report Preparation Date: 1-2008
Revision Date: 4-2008
Stantec Consulting Services Inc.

Laboratory Document
Prepared By: JW
Approved By: TLK
JF
Gradation Analysis
ASTM D 422
Project Name FAX Facility Improvement Project Project Number 2270445501 Source Grab Lab ID B9-2'
Date Received 09-28-2018
Preparation Method ASTM D 1140 Method A Preparation Date 09-28-2018 Particle Shape Test Date 09-29-2018
Particle Hardness
Sample Dry Mass (g) 419.80 Analysis based on total sample.

Moisture Content (%) 3.8
Grams % % % Gravel 0.4
Sieve Size Retained Retained Passing % Sand 83.0
% Fines 16.6
Fines Classification ML
D10 (mm) N/A
D30 (mm) N/A
D60 (mm) N/A
Cu N/A
No. 4 1.70 0.4 99.6 Cc N/A
No. 8 0.50 0.1 99.5
No. 16 2.00 0.5 99.0 Classification
No. 30 49.80 11.9 87.1
No. 50 141.50 33.7 53.4
No. 100 113.90 27.1 26.3
No. 200 40.60 9.7 16.6
Pan 69.80 16.6 ---
Comments
Reviewed By
Silty Sand (SM)
Classification determined by ASTM D 2487. -200
material classification determined by visual assessment, ASTM D 2488.
6 3 2 1 3/4 3/8 4 10 16 30 40 100 200

0.00 10.00

20.00 30.00

40.00 50.00

60.00 70.00

80.00 90.00
100.00

0.0010.010.11101001000
Percent Passing
Diameter (mm)
Particle Size Distribution
Sieve Size in inches Sieve Size in sieve numbers
File: FAX_Maintenance_Facility_B9-2_Sieve.xlsm Sheet: Report Preparation Date: 1-2008
Revision Date: 4-2008
Stantec Consulting Services Inc.

Laboratory Document
Prepared By: JW
Approved By: TLK
JF
Compaction Characteristics of Soil
Using Modified Effort
ASTM D 1557 - Method B
Project FAX Maintenance facility Project No. 2270445501 Source B2-Bulk (0-5') Sample ID B2-Bulk
Description Silty-Sand F-C SM Dark Brown Date Received 09/28/2018 Visual Notes Date Tested 09/30/2018
Test Fraction (%) 0.0 Oversized Fraction (%) 0.0
Gs of Test Fraction 2.7 Estimated Gs of Oversized Fraction 0.0 ASTM C 127 Oversized Fraction Sieve 3/4" MC of Oversized Fraction (%) 0.0 Mold Weight (g) 4254.8 Preparation Method Moist Rammer Type Manual Wet Soil Dry
& Mold Wet Soil Wet Soil Dry Soil Water Unit Weight
Weight (g) Weight (g) & Tare (g) & Tare (g) Tare (g) Content (%) (pcf) 6269 2014 506.40 492.10 0.00 2.9 129.2
6367 2112 414.70 395.60 0.00 4.8 133.0
6447 2192 501.50 470.00 0.00 6.7 135.6
6409 2155 516.20 474.50 0.00 8.8 130.7
Maximun Dry Unit Weight (pcf) 135.7
Optimum Moisture Content (%) 6.6
Corrected Maximun Dry Unit Weight (pcf) N/A
Corrected Optimum Moisture Content (%) N/A
Comments
Moisture Content Determination
126
128
130
132
134
136
138
0 2 4 6 8 10 12
Dry Unit Weight (pcf)
Moisture Content (%)
Zero Air Voids
Gs = 2.7
File: FAX_Maintenance_Facility_Bulk2_Max.xlsm Sheet: Report Preparation Date: 4-2010
Revision Date: N/A
Stantec Consulting Services Inc.

Laboratory Dacument
Prepared By: JW
Approved By: TLK
Reviewed By: JF
Project Name: FAX Maintenance Facility Tested By: NG Date: 10/03/18 Project No.: 2270445501 Computed By: JP Date: 10/06/18
Boring No.: B2 Checked by: AP Date: 10/06/18
Sample No.: ‐ Depth (ft): 5
Sample Type: Mod. Cal.

Soil Description: Silty Sand
Test Condition: Inundated Shear Type: Regular
Wet
Unit Weight
(pcf)
Dry
Unit Weight
(pcf)
Initial
Moisture
Content (%)
Final
Moisture
Content (%)
Initial Degree
Saturation
(%)
Final Degree
Saturation
(%)
Normal
Stress
(ksf)
Peak
Shear Stress
(ksf)
Ultimate
Shear
Stress (ksf)
1 0.673 0.673
2 1.320 1.320
4 2.580 2.544
ASTM D 3080
119.0 113.9 4.5 16.1 25 91

DIRECT SHEAR TEST RESULTS
0 1
2 3
0 0.1 0.2 0.3
Shear Deformation (Inches)
Shear Stress (ksf)
1 ksf 2 ksf 4 ksf
0 1
2 3
4 012345678
Normal Stress (ksf)
Shear Stress (ksf)
Peak: C=100 psf; ɸ=31˚
Ultimate: C=100 psf; ɸ=31˚
Normal Stress:

Project Name: FAX Maintenance Facility Tested By: NG Date: 10/04/18 Project No.: 2270445501 Computed By: JP Date: 10/06/18
Boring No.: B3 Checked by: AP Date: 10/06/18
Sample No.: ‐ Depth (ft): 5
Sample Type: Mod. Cal.

Soil Description: Silty Sand w/traces of clay
Test Condition: Inundated Shear Type: Regular
Wet
Unit Weight
(pcf)
Dry
Unit Weight
(pcf)
Initial
Moisture
Content (%)
Final
Moisture
Content (%)
Initial Degree
Saturation
(%)
Final Degree
Saturation
(%)
Normal
Stress
(ksf)
Peak
Shear Stress
(ksf)
Ultimate
Shear
Stress (ksf)
1 0.684 0.672
2 1.248 1.236
4 2.436 2.388

DIRECT SHEAR TEST RESULTS
ASTM D 3080
126.2 116.5 8.4 14.8 50 90
0 1
2 3
0 0.1 0.2 0.3
Shear Deformation (Inches)
Shear Stress (ksf)
1 ksf 2 ksf 4 ksf
0 1
2 3
4 012345678
Normal Stress (ksf)
Shear Stress (ksf)
Peak: C=100 psf; ɸ=30˚
Ultimate: C=100 psf; ɸ=30˚
Normal Stress:

Project Name: FAX Maintenance Facility Tested By: NG Date: 10/03/18 Project No.: 2270445501 Computed By: JP Date: 10/06/18
Boring No.: B5 Checked by: AP Date: 10/06/18
Sample No.: ‐ Depth (ft): 5
Sample Type: Mod. Cal.

Soil Description: Silty Sand, fine‐grained
Test Condition: Inundated Shear Type: Regular
Wet
Unit Weight
(pcf)
Dry
Unit Weight
(pcf)
Initial
Moisture
Content (%)
Final
Moisture
Content (%)
Initial Degree
Saturation
(%)
Final Degree
Saturation
(%)
Normal
Stress
(ksf)
Peak
Shear Stress
(ksf)
Ultimate
Shear
Stress (ksf)
1 0.684 0.684
2 1.248 1.248
4 2.508 2.436

DIRECT SHEAR TEST RESULTS
ASTM D 3080
114.3 110.1 3.8 17.9 19 91
0 1
2 3
0 0.1 0.2 0.3
Shear Deformation (Inches)
Shear Stress (ksf)
1 ksf 2 ksf 4 ksf
0 1
2 3
4 012345678
Normal Stress (ksf)
Shear Stress (ksf)
Peak: C=150 psf; ɸ=30˚
Ultimate: C=100 psf; ɸ=30˚
Normal Stress:

Project Name: FAX Maintenance Facility Tested By: NG Date: 10/03/18 Project No.: 2270445501 Computed By: JP Date: 10/06/18
Boring No.: B6 Checked by: AP Date: 10/06/18
Sample No.: ‐ Depth (ft): 7
Sample Type: Mod. Cal.

Soil Description: Silty Sand, fine‐grained
Test Condition: Inundated Shear Type: Regular
Wet
Unit Weight
(pcf)
Dry
Unit Weight
(pcf)
Initial
Moisture
Content (%)
Final
Moisture
Content (%)
Initial Degree
Saturation
(%)
Final Degree
Saturation
(%)
Normal
Stress
(ksf)
Peak
Shear Stress
(ksf)
Ultimate
Shear
Stress (ksf)
1 0.936 0.672
2 1.716 1.392
4 2.928 2.544

DIRECT SHEAR TEST RESULTS
ASTM D 3080
117.4 112.5 4.3 16.7 23 90
0 1
2 3
4 0 0.1 0.2 0.3
Shear Deformation (Inches)
Shear Stress (ksf)
1 ksf 2 ksf 4 ksf
0 1
2 3
4 012345678
Normal Stress (ksf)
Shear Stress (ksf)
Peak: C=300 psf; ɸ=33˚
Ultimate: C=100 psf; ɸ=32˚
Normal Stress:

Project Name: FAX Maintenance Facility Tested By: NG Date: 10/03/18 Project No.: 2270445501 Computed By: JP Date: 10/06/18
Boring No.: B9 Checked by: AP Date: 10/06/18
Sample No.: ‐ Depth (ft): 5
Sample Type: Mod. Cal.

Soil Description: Silty Sand, fine‐grained
Test Condition: Inundated Shear Type: Regular
Wet
Unit Weight
(pcf)
Dry
Unit Weight
(pcf)
Initial
Moisture
Content (%)
Final
Moisture
Content (%)
Initial Degree
Saturation
(%)
Final Degree
Saturation
(%)
Normal
Stress
(ksf)
Peak
Shear Stress
(ksf)
Ultimate
Shear
Stress (ksf)
1 0.780 0.636
2 1.471 1.220
4 2.616 2.340
ASTM D 3080
110.3 107.8 2.3 18.8 11 90

DIRECT SHEAR TEST RESULTS
0 1
2 3
0 0.1 0.2 0.3
Shear Deformation (Inches)
Shear Stress (ksf)
1 ksf 2 ksf 4 ksf
0 1
2 3
4 012345678
Normal Stress (ksf)
Shear Stress (ksf)
Peak: C=200 psf; ɸ=31˚
Ultimate: C=100 psf; ɸ=29˚
Normal Stress:

CORROSION TEST RESULTS
Client Name: Stantec AP Job No.: 18-0960
Project Name: FAX Maintenance Facility Date: 10/02/18
Project No.: 2270445501
Boring Sample Depth Soil Type pH Sulfate Content Chloride Content No. Type (feet) (ppm) (ppm)
B2 Bulk - SM 8.9 57 40
B5 Bulk - SM 8.7 45 34
B9 Bulk - SM 7.3 45 41

NOTES: Resistivity Test and pH: California Test Method 643 Sulfate Content : California Test Method 417 Chloride Content : California Test Method 422
ND = Not Detectable
NA = Not Sufficient Sample
NR = Not Requested
6804
Minimum
Resistivity (ohm-cm)
5246

7228

Project Name: FAX Maintenance Facility
Project Number: 2270445501
Boring No.: B5
Sample Type: Bulk Depth (ft.): -
Location: N/A
Soil Description: Silty Sand, fine-grained
Mold Number G H I
Water Added, g 41 36 31
Compact Moisture(%) 8.9 8.4 7.8
Compaction Gage Pressure, psi 200 250 250
Exudation Pressure, psi 126 304 550
Sample Height, Inches 2.4 2.4 2.4
Gross Weight Mold, g 2913 2918 2895
Tare Weight Mold, g 1827 1836 1818
Net Sample Weight, g 1086 1082 1077
Ex
pansion, inchesx10-4 011
Stability 2,000 (160 psi) 13/20 12/19 12/18
Turns Displacement 4.53 4.55 4.54
R-Value Uncorrected 79 80 81
R-Value Corrected 78 79 80
Dry Density, pcf 126.0 126.0 126.1
Traffic Index 8.0 8.0 8.0
G.E. by Stability 0.42 0.40 0.38
G.E. by Expansion 0.00 0.00 0.00
Gf = 1.34, and 0.6 %
Retained on the ¾"
*Not Applicable
Remarks
By Exudation:

By Expansion:

At Equilibrium:
(by Exudation)

R-VALUE
79 *N/A
79 R-VALUE TEST DATA
ASTM D2844
Tested By:

Computed By: 10/05/18
Date:

Date:

Date:
10/02/18
10/06/18Checked By:

ST
KM
AP
0 10
20 30
40 50
60 70
80 90
100
0100 200 300 400 500 600 700 800

R-VALUE

EXUDATION PRESSURE - PSI

0.00 1.00

2.00 3.00

4.00 0.00 1.00 2.00 3.00 4.00
COVER THICKNESS BY STABILOMETER (FT.)
COVER THICKNESS BY EXPANSION (FT.)