BID SCHEDULE

OLIVE AVE AND IRIS COURT AREA STREET REHABILITATION
PROJECT NO. 44059

ESTIMATED
NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT
1 Mobilization LS 1
39,440.00.39,440.00
2 Water Pollution Control LS 1
2,000.00 2.000.00
3 Traffic Control LS 1
20,000.00 20,000.00
4 Micro Edge Grind SF 16,500

0.75 12,375.00
5 Pavement Digouts / Repairs"! SF .. Ub

5.50 22,330.00
6 ARAM (3/8") SY 5,730

8.00 45,840.00
7 Type Il Slurry Seal TON 80
450.00 310,000.00
8 Access Ramp with Truncated Domes EA
5,200.00.460,800.00
9 Cross Gutter and Spandrel SF 920

34.00 31,280.00
10 Standard Residential Driveway SF 225

15.00 3,375.00
11 Alley Return with Access Ramps SF 700

34.00 23,800.00
12 Remove and Reconstruct 8" Curb & Gutter LF 120

95.00 11,400.00
13 Remove and Reconstruct Sidewalk SF 2,040

9.00 18,360.00
Remove and Reconstruct 6" Thick Driveway
14 Sidewalk SF 320

15.00 4,800.00
15 Parkway Culvert EA 1
6,500.00 1,500.00
16 Adjust Manhole to Grade EA 14
750.00 10,500.00
17 Adjust Water Valve to Grade EA 18
1,150.00 20,700.00
18 Traffic Striping and Signing LS 1
5,000.00 5,000.00
19 Street Light Conduit and Wiring Repair LF 100

85.00 8.500.00
Base Bid Total$ 369,000.00

TO BE SUBMITTED WITH BID
BD-14

BID SCHEDULE

OLIVE AVE AND IRIS COURT AREA STREET REHABILITATION
PROJECT NO. 44059

ESTIMATED
NO. ITEM UNIT QUANTITY | UNIT PRICE AMOUNT
Alternate Bid Items (2)
20 4" Cold Mill SF 11,000

2.00 22,000.00
21 Asphalt Concrete TON 275
180.00 49,500.00
16a Adjust Manhole to Grade EA 1
3,500.003,500.00
17a Adjust Water Valve to Grade EA 2
3,000.00 6,000.00
Alternate Bid Total $ 81, 000.00
Unit prices are required for all bid items.

The Bidder shall total his/her bid. Unit prices shall prevail in case amount disagrees with extension.

Project shall be awarded on the Base Bid. If applicable, the City may elect to use Bid Alternates after award.

Changes to either Unit Price or Amount shall be striked-out and initialed (1) The unit cost for this item is final and is exempt from any changes in quantities, 25% over or under the estimated amount per Section 3 of the Standard Specifications.
(2) Prospective bidders shall provide price for alternate bid items. Failure to provide alternate prices shall result in rejection of bid. These Alternate Bid Items are in addition to the Base Bid Items.

Company Hardy & Harper. Inc.

Name Kristen S. Paulino. Corporate Secretary
Signature
Address 32 Rancho Circle
City & Zip Code Lake Forest. CA 92630
Phone Number 714-444-1851
License 215952