Agenda Report
Fullerton City Council
MEETING DATE: March 15, 2022
TO: CITY COUNCIL / SUCCESSOR AGENCY
SUBMITTED BY: jeffrey w. collier, ACTING City Manager
PREPARED BY: meg mcwade, public works director
David grantham, PRINCIPAL CIVIL engineer
Melissa rendon, assistant engineer
SUBJECT: EUCLID STREET IMPROVEMENTS (FERN TO BASTANCHURY)
SUMMARY
Award $1,599,338.70 construction contract to Towo Enterprise Inc. for Euclid Street Improvements Project – Fern to Bastanchury.
RECOMMENDATION
Approve plans and specifications for the Euclid Street Improvements Project – Fern to Bastanchury.
Approve the following appropriations in Project 44048 Euclid Street Improvements Project:
Transfer $1,900,000 RMRA / SB1 Funds from Project 44400 Annual Arterial Street Program to Project 44048 Euclid Street Improvements Project (Fund 74).
Transfer $70,000 Drainage Capital Outlay Funds from Project 52591 Annual Storm Drain Repair to Project 44048 Euclid Street Improvements Project (Fund 74).
Award $1,599,338.70 construction contract for the Euclid Street Improvements Project to Towo Enterprise Inc. and authorize City Manager, or designee, to execute the contract, in a form approved by the City Attorney.
Authorize Public Works Director to approve any future change orders for construction and professional engineering construction support services within the approved project budget.
PRIORITY POLICY STATEMENT
This item matches the following Priority Policy Statement:
Infrastructure and City Assets.
FISCAL IMPACT
The FY 2021-22 CIP Budget has funding available for this project from RMRA / SB1 Funds. Staff recommends a $1,900,000 budget transfer of SB1 Fund from Project 44400 Annual Arterial Street Program to Project 44048 Euclid Street Improvements Project and a $70,000 budget transfer of Drainage Capital Outlay Funds from Project 52591 Annual Storm Drain Repair to Project 44048 Euclid Street Improvements Project.
Staff attached a budget Data Sheet / Summary of Bids and the contractor’s Bid Schedule for reference. (Attachments 1 and 2 respectively).
DISCUSSION
City Council approved the use of RMRA / SB1 revenues for rehabilitation of Euclid Street from Fern Drive to Bastanchury Road, an approximate length of 0.70 miles, plus Valley View Place from Euclid Street to cul-de-sac, an approximate length of 0.10 miles. See Attachment 3 for project limits.
These roadway segments are ideal candidates for rehabilitation per the Orange County Transportation Authority and its Pavement Management Program (PMP) guidelines. The current Pavement Condition Index (PCI) scores for Euclid Street range from 30-33 (Very Poor), with Valley View Place having a score of 15.
Project improvements will also include:
Pavement rehabilitation involving grind and overlay of the roadway pavement.
Replacement of deteriorated curbs, gutters, sidewalk, cross gutters, spandrels and construction of new ADA access ramps.
Replacement of aged corrugated metal storm drain pipe.
Reconstruction of selected steep and damaged driveway approaches within Valley View Place.
Repair of broken trail fencing along the Bud Turner Trail, adjacent to Euclid Street.
Installation of asphalt concrete sidewalk along Bud Turner trail.
The City upgraded the traffic signal at Euclid Street and Valencia Mesa Drive to provide vehicular video detection in preparation for this project. This improvement will help with the traffic control and signal operation during the construction phase and eliminate the need and maintenance of in ground detectors upon completion of the project. The City previously upgraded the Euclid Street and Bastanchury Road traffic signal to video detection.
The City received six bids on February 16, 2022 for the Euclid Street Improvements Project. Towo Enterprise Inc. of Fullerton submitted the lowest responsible bid in the amount of $1,599,338.70. The low bid as submitted is approximately 3% below the Engineer’s estimate of $1,654,400. Staff has evaluated the bid documents and considers them acceptable. Staff recommends award of the project contract to Towo Enterprise Inc.
Staff anticipates construction will begin in May 2022 and conclude in August 2022.
Staff prepared an environmental assessment in accordance with the California Environmental Quality Act Guidelines and determined that the project is categorically exempt.
Attachments:
Attachment 1 – Budget Data / Summary of Bids
Attachment 2 – Bid Schedule
Attachment 3 – Project Location Map
Attachment 4 – Standard Contract / Agreement