BID SCHEDULE

EUCLID STREET IMPROVEMENT PROJECT
PROJECT NO. 44048

ESTIMATED
NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT
1 MOBILIZATION LS 1 $100,000.00 $100,000.00
2 WATER POLLUTION CONTROL LS 1 $15,000.00 $15,000.00
3 TRAFFIC CONTROL LS 1 $50,000.00 $50,000.00
4 ADJUST MANHOLE TO GRADE EA 19 $1,000.00 $19,000.00
5 ADJUST WATER VALVE TO GRADE EA 24 $1,000.00 $24,000.00

RELOCATION /REPARI OF STREET LIGHTING
SYSTEM LF 200 $150.00 $30,000.00

REMOVE AND RECONSTRUCT CURB AND
7 LF 653 $65.00 $42,445.00
GUTTER
8 REMOVE AND RECONSTRUCT SIDEWALK SF 4,942 $9.50 $46,949.00 9 REMOVE AND RECONSTRUCT CONCRETE
MODIFIED RESIDENTIAL DRIVEWAY SF 857 $15.00 $12,855.00

REMOVE AND RECONSTRUCT AC PVMT
10 SF 525 $5.00 $2,625.00

RESIDENTIAL DRIVEWAY
11 REMOVE AND CONSTRUCT CURB RAMP EA 10 $4,200.00 $42,000.00 12 REMOVE AND RECONSTRUCT
SPANDREL/CROSS GUTTER SF 1,781 $20.00 $35,620.00
13 CONSTRUCT PCC SIDEWALK SF 4,933 $7.50 $36,997.50
14 CONSTRUCT AC SIDEWALK SF 15,181 $4.00 $60,724.00
15 COLD MILL (2.5") SF 243,873 $0.40 $97,549.20
16 GRIND (3"') SF 16,677 $0.50 $8,338.50
17 ROADWAY EXCAVATION (1) CY 1,660 $90.00 $149,400.00
18 ARAM SY 27,097 $5.50 $149,033.50
19 AC PAVEMENT TON 3,361 $92.00 $309,212.00
20 TRAFFIC SIGNING & STRIPING LS 1 $40,000.00 $40,000.00 21 TRAFFIC SIGNAL INTERCONNECT CONDUIT LF 2,513 $80.00 $201,040.00 22 TRAFFIC SIGNAL PULLBOX EA 8 $1,200.00 $9,600.00
23 DRAINAGE JUNCTION STRUCTURE EA 1 $12,000.00 $12,000.00

TO BE SUBMITTED WITH BID
BD-13

BID SCHEDULE

EUCLID STREET IMPROVEMENT PROJECT
PROJECT NO. 44048

ESTIMATED
NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT
24 18" RCP LF 85 $290.00 $24,650.00
25 STORM DRAIN PIPE CONCRETE COLLAR EA 2 $5,000.00 $10,000.00 26 TRAIL FENCING LF 235 $180.00 $42,300.00
27 REMOVE AND RECONSTRUCT RETAINING LF 80 $350.00 $28,000.00 WALL
Base Bid Total $ 1,599,338.70
(1) = The unit cost for this item is final and is exempt from any changes in quantities, 25% over or under the estimated amount per Section 7 of the Standard Specifications. Quantities are not guaranteed Unit prices are required for all bid items. Failure to provide alternate prices shall result in rejection of Bid.

The Bidder shall total their bid. Unit prices shall prevail in case amount disagrees with extension.

Project shall be awarded on the Base Bid. If applicable, the City may elect to use Bid Alternates after award.

Items of work not specifically listed shall be included in the bid prices for related work.

Changes to either Unit Price or Amount shall be striked-out and initialed.

Company Towo Enterprise Inc
Name Yun Su Chung
Signature 1 па
Address 2536 Fender Ave Suite D
City & Zip Code Fullerton, CA 92831
Phone Number 714-770-0379
License 986567