January 28, 2022
Gar Huang
City of Fullerton
303 West Commonwealth Avenue
Fullerton
, CA 9
2832
Subject
:
Proposal for
Engineering Design Services
Christlieb Well 15A R
ehabilitation (CIP
#
53034)
Dear
Gar
:
The City of Fulle
rton (City
)
is
request
ing
assistance
from JIG Consultan
ts (JIG) to
review
available well
information,
perform engineering design,
and prepare
bid document
s for the Christ
lieb Well 15A
Re
habilitation project.
Well 15A is located at 1501 Pacific Drive
, south
east of the Oran
gethorpe School
Park.
The well was constructed in 1992 using the reverse rotary me thod
, with a 20
-
inch casing to a
depth of 329
feet below ground surface
(bgs)
,
and
a 16
-
inch casing
to a
depth of 1350 feet
b
gs.
T
he City
intends to rehabili
tate Chri
stlieb Well 15A
simi
lar to the
redevelo
pment
process
established
for
Well
3A.
According to City staff,
the existing well pump
for Well 3A was removed and a
detailed video inspection
was performed
.
ENGEO, the
project
hydrogeologist, recommended the
redevelopment method
for Well 3A
which included
wire brushing, acid treatment, double swab air
-
lift
ing, pumping development, pump testing,
and disinfection.
J
IG
has te
amed with ENG
EO fo
r hydrogeological services
. As is typical, the recommendation is to p
ull the
current
pump and perform a detailed video inspection prior to recommending the red
evelopment process. In
support of the City
’
s requ
est to expedite
and streamline
this project
, our team will proceed based on the City
’
s
direc
tive to u
tilize the same
redevelopment process
from Well 3A
. Our team will review
and finalize the
City
’
s
Draft
Bid
Specifications for the
C
hristlieb Well 15A R
ehabilitation
.
A separate section for o
ptional
tasks
are also
included in this proposal
.
SCOPE OF WORK
The following
is o
ur
understanding of the
minimum
required
scope of
services
.
1. Review of Available Information
–
Collect
available information
o
n
Christlieb
W
e
ll
15A
including
existing well pump.
Document
s
to be
reviewed
includes
the following:
A.
Well Reference Data
B.
Downhole vi
deo l
og
C.
Record drawings for the
Christlieb Well 15A W
ellhead Facilities
D.
Existing
Byron Jackson pump curve
E.
Draft Bid Specific
ations
Visit the project site and
take note of
site construct
s and requirements for well red
eve
lopment.
2. Prepare
Bid Docume
nts and Site Plan
Exhibit
–
Update and supplement
the
Draft Bid
Specifications
including the following items:
A.
Si
ze and recommend a
replacement
vertical turbine well pump.
Co
nfi
rm
the dimen
sions of the
proposed discharge head w
ill align with existing disch
arge pip
e
.
Co
nfirm
motor ho
rsepower of new pump a
gainst
existing
MCC
.
City of Fullerton
Engineering Design Services for Christlieb Well 15A R
ehabilitation
January 2
8 , 202
2 Pa
g
e
2 of
3 B.
Prepare
a
site plan
in exhibit form (11x17 format)
showing location of e
xisting improvement
s
,
fencing, sound
wall
s
,
and settling tank
(s)
.
C.
Prepare
project bid form
with written descriptio
ns of measurement and payment for each bid item.
D.
Update th
e front
end/
boiler plate documents as needed.
E.
Prepare
su
pplement
al
specification section
s
in CSI format for the replacement well pump and motor
,
includ
ing material requirements
, installation, an
d star
t
-
up.
F.
Review the Orange County W
a
ter
District Well
3A technical specifications and revise for
C
hristl
ieb
Well 15A. This
will result in supplement
al specification
sections for
w
ire brushing, initi
al and
progress video surveys, acid trea
tment
,
double swab ai
r
-
lift redev
elopment, pumping development,
pumping tests
,
a
nd
well disinfection
.
Package the Bid Docu
ment
s and submit for City review. Collect
review comments, update as needed,
and
resubmit f
or final. All su
bmittals will be in pdf and Word
format.
OPTIO
NAL
SCOPE OF WORK
The following opt
ional tasks are
recommended in support of this project.
If deemed necessary, the City has
the option to authorize
individual tasks as listed below.
1. Bi
d
Phase Servi
ces
–
Assi
st City
during bid phase by attending the pre
-
b
id
meeting and
an
swering
Contractor
questions.
2. Limited
Construction Administration
–
JIG
will support the City by performing
construction
administration services including the following:
A.
Attend the preconstruction meeting
B.
R
evi
ew
ver
tical turbine well pump
submittal and resubmittals
C.
Respond to
three
Request
for Information
(RFI).
3. Obse
rvation
Service
s for Well
Redevelopment
–
ENGEO
will
coordinate
and direct the
C
ontractors work
to witness the
initial video survey and subsequent progress surveys.
P
rovide par
t
-
time inspection
services
during mobilization and demobil
ization, and set up of chemical tanks, discharge storage
tanks, and
discharge pipelines.
O
bserve chemical mixing and
placement, agitation,
followed by removal,
neutralization, and discharge to the s
to
rm drain.
O
bserve the
C
ontractor’s effor
ts to properly treat the
water to meet NPDES discharge requirements and
water quality monitoring.
P
rovide independent
monitoring and documentation of field
parameters (pH, chlorine residual, and turbidity) and dail y
discharge flow rate, volum
es, and
duration.
D
irect redevelopment of the well by double swab airlifting and then pumping
development. Obtaining
depth
-
specific information regarding sand production during airlifting and
during the pumping tests will
be key
in
formation during development.
P
lan and direct the
step drawdown and constant rate pumping
tests to verify the yield and specific capacity of the well,
and measure sand production. Water quality
samples will be collected as directed by the City,
placed
i
n
ice
-
chilled containers and coolers, and
delivered to the City’s water quality testing laboratory under
proper chain of
-
custody documentation
within 24 hours of collection.
T
he City will
be responsible for the water quality testing
costs.
P
repare a repor
t summarizing the
pumping tests and provide recommendations for the permanent pump depth and long
-
term pumping
rates.
4. Observation Services for
Replacement Pump Installation and Startup
–
JIG
will
perform observation
ser
vices for the
replacement well pump i
nst
allation including startup
and
functionality testing. Field
inspector will be on site
up to 40
hours
of
observation
work and will document construction activities
complete with photos with daily inspection reports.
5. Prepare Summary Report
–
Assemble
the field dat
a, laboratory test results, and prepare a report
summarizing the well rehabilitation activiti
es, redevelopment,
and pu
mping test results.
The pumping test
results will be
analyzed to determine the well yield, specific capacity, sand production , and
City of Fullerton
Engineering Design Services for Christlieb Well 15A R
ehabilitation
January 2
8 , 202
2 Pa
g
e
3 of
3 recommendations
for the long
-
term pumping rate and pump depth setting. The
Summary
R
eport will
include a photo
log of
the work progress and critical elements.
A D
raft
Summary
R
eport will be
submitted for review. The
F
inal
Summary
R
eport will incorpor
ate one round of comments from the City.
FEE SUMMARY
J
IG
will complete the above Scope of W
ork for a total consultant fee of
$27,950
. A breakdown of the fe
e is
presented in the attached Fee Proposal.
The Fee Proposal also include
s
estimated fees for the Op
tional Scope
of Work
which are not included in the total.
We appreciate this opportunity to
again be part of
the City
’
s team
.
If you hav
e
questions regardi
ng this
proposal, please do not hesitate
to contact our office.
Sincerely,
JI
G
C
ONSUL
TANTS
J
oseph Gut
ierrez, PE, PMP
Pr
esident / Senior Project Manag
er
Hrly
Rate
$170
Hrly
Rate
$145
Hrly
Rate
$100
Hrly
Rate
$145
Hrly
Rate
$56
Task
Description
Hours
Fee
Hours
Fee
Hours
Fee
Hours
Fee
Hours
Fee
ENGEO
SCOPE OF WORK
1 Review of Available Information / Site Visit
8 $1,360
16 $2,320
0 $0
0 $0
0 $0
$3,680
$80
$3,630
$7,390
2 Prepare Bid Documents and Site Plan Exhibit
20 $3,400
42 $6,090
35 $3,500
0 $0
16 $896
$13,886
$74
$6,600
$20,560
TOTAL
28 $4,760
58 $8,410
35 $3,500
0 $0
16 $896
$17,566
$154
$10,230
$27,950
OPTIONAL SCOPE OF WORK
1 Bid Phase Services
2 $340
8 $1,160
0 $0
0 $0
0 $0
$1,500
$40
$2,750
$4,290
2 Limited Construction Administration
8 $1,360
8 $1,160
0 $0
0 $0
0 $0
$2,520
$40
$0
$2,560
3 Observation Services for Well Redevelopment
0 $0
0 $0
0 $0
0 $0
0 $0
$0
$0
$58,300
$58,300
4 Observation Services for Replacement Pump Install/Startup 4 $680
0 $0
0 $0
40 $5,800
2 $112
$6,592
$88
$0
$6,680
5 Prepare Summary Report
0 $0
8 $1,160
0 $0
0 $0
6 $336
$1,496
$4
$8,800
$10,300
Subtotal
Direct
Costs
Total Fee
Admin
Sub
CAD Designer
Inspector
CITY OF FULLERTON
Project Mgr
Fee Proposal
Engineering Design Services - Christlieb Well 15A Rehabilitation (CIP #53034) Project Eng
JIG
CONSULTANTS