050322 PW Christlieb Well 15A Rehabilitation Inspection Quote

City Council - Successor Agency - Housing Authority
May 3, 2022

Document
050322 PW Christlieb Well 15A Rehabilitation Inspection Quote
Meeting
May 3, 2022
Body
City Council - Successor Agency - Housing Authority
Original file
213 KB
Text extracted from the city's file for reading and search. Open the original on fullerton.legistar1.com. That file is the official record.

318 W. Katella Ave
nue
, Suite A

Orange, CA 92867

Office
(714) 978
.
4407

Fax
(7
14) 908.4654

www.j
igconsulta
nts.com

January 28, 2022

Gar Huang

City of Fullerton

303 West Commonwealth Avenue

Fullerton
, CA 9
2832

Subject
:

Proposal for
Engineering Design Services

Christlieb Well 15A R
ehabilitation (CIP

#
53034)

Dear

Gar
:

The City of Fulle
rton (City
)
is
request
ing

assistance
from JIG Consultan
ts (JIG) to
review
available well
information,
perform engineering design,
and prepare
bid document
s for the Christ
lieb Well 15A
Re
habilitation project.

Well 15A is located at 1501 Pacific Drive
, south
east of the Oran
gethorpe School

Park.

The well was constructed in 1992 using the reverse rotary me thod
, with a 20
-
inch casing to a

depth of 329
feet below ground surface

(bgs)
,
and

a 16
-
inch casing

to a

depth of 1350 feet
b
gs.

T
he City

intends to rehabili
tate Chri
stlieb Well 15A
simi
lar to the

redevelo
pment
process

established

for
Well
3A.

According to City staff,
the existing well pump
for Well 3A was removed and a
detailed video inspection
was performed
.

ENGEO, the
project
hydrogeologist, recommended the

redevelopment method

for Well 3A
which included

wire brushing, acid treatment, double swab air
-
lift
ing, pumping development, pump testing,
and disinfection.

J
IG
has te
amed with ENG
EO fo
r hydrogeological services
. As is typical, the recommendation is to p
ull the
current

pump and perform a detailed video inspection prior to recommending the red
evelopment process. In
support of the City
’
s requ
est to expedite
and streamline
this project
, our team will proceed based on the City
’
s
direc
tive to u
tilize the same
redevelopment process
from Well 3A
. Our team will review
and finalize the
City
’
s
Draft
Bid
Specifications for the
C
hristlieb Well 15A R
ehabilitation
.

A separate section for o
ptional
tasks
are also
included in this proposal
.

SCOPE OF WORK

The following
is o
ur
understanding of the
minimum
required
scope of
services
.

1. Review of Available Information

–

Collect
available information
o
n
Christlieb
W
e
ll
15A
including
existing well pump.

Document
s

to be
reviewed
includes
the following:

A.

Well Reference Data

B.

Downhole vi
deo l
og

C.

Record drawings for the
Christlieb Well 15A W
ellhead Facilities

D.

Existing
Byron Jackson pump curve

E.

Draft Bid Specific
ations

Visit the project site and
take note of

site construct
s and requirements for well red
eve
lopment.

2. Prepare
Bid Docume
nts and Site Plan

Exhibit

–

Update and supplement
the
Draft Bid
Specifications
including the following items:

A.

Si
ze and recommend a
replacement

vertical turbine well pump.

Co
nfi
rm
the dimen
sions of the
proposed discharge head w
ill align with existing disch
arge pip
e
.

Co
nfirm
motor ho
rsepower of new pump a
gainst
existing
MCC
.

City of Fullerton

Engineering Design Services for Christlieb Well 15A R
ehabilitation

January 2
8 , 202
2 Pa
g
e
2 of
3 B.

Prepare
a
site plan
in exhibit form (11x17 format)
showing location of e
xisting improvement
s
,
fencing, sound
wall
s
,

and settling tank
(s)
.

C.

Prepare

project bid form

with written descriptio
ns of measurement and payment for each bid item.

D.

Update th
e front
end/
boiler plate documents as needed.

E.

Prepare
su
pplement
al

specification section
s

in CSI format for the replacement well pump and motor
,
includ
ing material requirements
, installation, an
d star
t
-
up.

F.

Review the Orange County W
a
ter
District Well
3A technical specifications and revise for
C
hristl
ieb
Well 15A. This
will result in supplement
al specification
sections for
w
ire brushing, initi
al and
progress video surveys, acid trea
tment
,

double swab ai
r
-
lift redev
elopment, pumping development,
pumping tests
,
a
nd
well disinfection
.

Package the Bid Docu
ment
s and submit for City review. Collect
review comments, update as needed,
and

resubmit f
or final. All su
bmittals will be in pdf and Word
format.

OPTIO
NAL

SCOPE OF WORK

The following opt
ional tasks are
recommended in support of this project.

If deemed necessary, the City has
the option to authorize
individual tasks as listed below.

1. Bi
d
Phase Servi
ces

–

Assi
st City
during bid phase by attending the pre
-
b
id
meeting and

an
swering
Contractor

questions.

2. Limited
Construction Administration

–

JIG
will support the City by performing
construction
administration services including the following:

A.

Attend the preconstruction meeting

B.

R
evi
ew
ver
tical turbine well pump
submittal and resubmittals

C.

Respond to
three
Request

for Information

(RFI).

3. Obse
rvation

Service
s for Well
Redevelopment

–

ENGEO
will
coordinate

and direct the
C
ontractors work
to witness the

initial video survey and subsequent progress surveys.

P
rovide par
t
-
time inspection

services
during mobilization and demobil
ization, and set up of chemical tanks, discharge storage

tanks, and
discharge pipelines.

O
bserve chemical mixing and

placement, agitation,

followed by removal,
neutralization, and discharge to the s
to
rm drain.

O
bserve the

C
ontractor’s effor
ts to properly treat the
water to meet NPDES discharge requirements and
water quality monitoring.

P
rovide independent
monitoring and documentation of field

parameters (pH, chlorine residual, and turbidity) and dail y
discharge flow rate, volum
es, and

duration.

D
irect redevelopment of the well by double swab airlifting and then pumping

development. Obtaining

depth
-
specific information regarding sand production during airlifting and

during the pumping tests will
be key

in
formation during development.

P
lan and direct the

step drawdown and constant rate pumping
tests to verify the yield and specific capacity of the well,

and measure sand production. Water quality
samples will be collected as directed by the City,
placed

i
n

ice
-
chilled containers and coolers, and
delivered to the City’s water quality testing laboratory under

proper chain of
-
custody documentation
within 24 hours of collection.

T
he City will

be responsible for the water quality testing

costs.

P
repare a repor
t summarizing the

pumping tests and provide recommendations for the permanent pump depth and long
-
term pumping

rates.

4. Observation Services for
Replacement Pump Installation and Startup

–

JIG
will

perform observation
ser
vices for the
replacement well pump i
nst
allation including startup
and

functionality testing. Field
inspector will be on site
up to 40

hours
of
observation

work and will document construction activities
complete with photos with daily inspection reports.

5. Prepare Summary Report

–

Assemble
the field dat
a, laboratory test results, and prepare a report
summarizing the well rehabilitation activiti
es, redevelopment,

and pu
mping test results.

The pumping test
results will be

analyzed to determine the well yield, specific capacity, sand production , and
City of Fullerton

Engineering Design Services for Christlieb Well 15A R
ehabilitation

January 2
8 , 202
2 Pa
g
e
3 of
3 recommendations

for the long
-
term pumping rate and pump depth setting. The
Summary
R
eport will
include a photo
log of

the work progress and critical elements.

A D
raft
Summary
R
eport will be

submitted for review. The
F
inal

Summary
R
eport will incorpor
ate one round of comments from the City.

FEE SUMMARY

J
IG
will complete the above Scope of W
ork for a total consultant fee of
$27,950
. A breakdown of the fe
e is
presented in the attached Fee Proposal.

The Fee Proposal also include
s
estimated fees for the Op
tional Scope
of Work

which are not included in the total.

We appreciate this opportunity to
again be part of
the City
’
s team
.

If you hav
e
questions regardi
ng this
proposal, please do not hesitate
to contact our office.

Sincerely,

JI
G
C
ONSUL
TANTS

J
oseph Gut
ierrez, PE, PMP

Pr
esident / Senior Project Manag
er

Hrly
Rate
$170
Hrly
Rate
$145
Hrly
Rate
$100
Hrly
Rate
$145
Hrly
Rate
$56
Task
Description
Hours
Fee
Hours
Fee
Hours
Fee
Hours
Fee
Hours
Fee
ENGEO

SCOPE OF WORK
1 Review of Available Information / Site Visit
8 $1,360
16 $2,320
0 $0
0 $0
0 $0
$3,680
$80
$3,630
$7,390
2 Prepare Bid Documents and Site Plan Exhibit
20 $3,400
42 $6,090
35 $3,500
0 $0
16 $896
$13,886
$74
$6,600
$20,560
TOTAL
28 $4,760
58 $8,410
35 $3,500
0 $0
16 $896
$17,566
$154
$10,230
$27,950

OPTIONAL SCOPE OF WORK
1 Bid Phase Services
2 $340
8 $1,160
0 $0
0 $0
0 $0
$1,500
$40
$2,750
$4,290
2 Limited Construction Administration
8 $1,360
8 $1,160
0 $0
0 $0
0 $0
$2,520
$40
$0
$2,560
3 Observation Services for Well Redevelopment
0 $0
0 $0
0 $0
0 $0
0 $0
$0
$0
$58,300
$58,300
4 Observation Services for Replacement Pump Install/Startup 4 $680
0 $0
0 $0
40 $5,800
2 $112
$6,592
$88
$0
$6,680
5 Prepare Summary Report
0 $0
8 $1,160
0 $0
0 $0
6 $336
$1,496
$4
$8,800
$10,300
Subtotal
Direct
Costs
Total Fee
Admin
Sub
CAD Designer
Inspector

CITY OF FULLERTON
Project Mgr
Fee Proposal
Engineering Design Services - Christlieb Well 15A Rehabilitation (CIP #53034) Project Eng
JIG

CONSULTANTS