070522 PW Glenwood-Ford Area Water Main Replacement Project JIG Proposal

City Council - Successor Agency - Housing Authority
July 5, 2022

Document
070522 PW Glenwood-Ford Area Water Main Replacement Project JIG Proposal
Meeting
July 5, 2022
Body
City Council - Successor Agency - Housing Authority
Original file
256 KB
Text extracted from the city's file for reading and search. Open the original on fullerton.legistar1.com. That file is the official record.

318 W. Kate
lla Av
e
nue
, Suite A

Orang
e, CA 92
867

Office
(714) 978
.
4407

Fax
(7
14)
908.46
54 www.jig
consultants.c
om

June 3, 2022

Gar

H
uang

Assistant
Engineer

City of
Fullerton

Public Works

303
W
Commonwealth Ave

F
ullerton
, CA 92
832

Subject
:

Proposal for
Engineering
Desi
gn
Services

Glenwood/
Ford
Area
W
at
erline and Street
Improvements

De
ar

G
ar
:

JIG C
onsultants (JIG)
is
pleased

to su
bmit this propo
sal for engineering design service
s on
the
Glenwood/Ford Area
Waterline and Street

Improvements
.

This project is part of the City of Fullerton
’
s
ongoing effort to
replace

aging infrastructu
res a
nd meet futu
re
development

f
ire flow needs
.

The follow
ing
design services are included in this proposal:

Waterline Replacement

Construction

of a
pproximately
11 ,
000

lineal feet

(
2 .
0 mi
.
)

of

8 -
inch
PVC

waterline

on Highland Ave,

Glenhaven Ave, El Camino Dr,

Ford Ave, Ma
lden Ave, Fern Dr, Glenwood Ave
, Tamarack Dr,
Union Ave
, an
d Vista Verde Dr.

Construction of new fire hydrants
,
val
ves, ser
vices
,

and all water appurtenances associated with the
new water main replacement

Abandonment of existing main, fire hydr
ants, servic
es
, and all replace
d water appu
rtenances.

Trench Pavement

re
storation

Street

Improvements

Grind
and

overlay

existing deteriorated
asphalt concrete paving
surfaces

Construct new
ADA compliant access ramps at street inter
sections

Replace existin
g concrete curb and gutter
at
deteriorated
or cracked

locations

SCOPE

OF W
ORK

The Scope o
f Work wi
ll be

as follows:

1. Proje
ct
Administration and Coordination

Project Management

–

Perform
overall project manageme
nt f
or the duration of the project. Project
m
anagement du
ties will include
coordinating with city staff,
coordinating with subconsultant,
budge
t and

labor oversight,
preparing schedule and updates,
and
pr
eparing progress status reports/invoices
.

Kick
-
off
Meeting

-

Up
on
receipt of a writte
n

Notice to

Pr
o
ceed, conduct a
virtual
kick
-
o
ff meeting with
C
ity staff to review the project scope,
develop

a p
roject s
chedule, and confirm del
ive
rables. The pr
oject

schedule shall include each task and subtasks, mileston es, critical path
designation
,

and

a

schedule

fo
r
pro
gress meetings
.

Project Mi
les
tone / Meetings
–

Prepare
a
p
roject

execution sche
dule

with major
mile
ston
es
. P
resent to
C
ity st
aff for approval.

This proposal includes attendance
to three meetings (kickoff, progress
, and final review meetin
g
s).

City of F
ullerton

Engineering Design Services for
Glenwood/Ford
Area Infrastructure Improvements

June

3 , 2022

Pa
g
e

2 of
3 2.

P
rel
i
minary Design (
60% Milestone)

Upon comple
t
ing
field data c
ollection,
potholing
and
g
eotechn
ical
investigat
ions

(if authorized)
,

compi
le
all gathered information and prepare
preliminary

level design
construction plans. The

pre
liminary design
plans shall inc
lude

a

reco
m
mended
alignment o
f the waterline, connectio
ns to existing se
r
vices,

f
i
r
e

s
e
r
v
i
c
e

u
p
g
r
a
d
e
,

removal of va
lves an
d

flexible

couplings, and valve replacements.

The 60% milestone
will also
contain

limits o
f

pavement
, curb, and gutter removal

a
nd re
placem
e
nt
.

Submit
digital
co
py
(pdf)
of the
preliminary constru
ction plans to the

C
ity

for review.

3. Detailed Design (90% Mi
lestone)

B
a
sed
on com
m
en
ts received from the
C
ity
,
prepare

detailed construction plans,
specifications, and
estimate for t
he propose
d imp
r
o
veme
nts. Constructi
on

plans shall be
prepared

using AutoCAD on
24 ”

x

36 ”

format
drawings.

S
p
ecif
i
c
ations

shall includ
e
Special

Conditions

and T
echnical Specifications. The
constru
ction plans and specifications shall be pre
pared
,
stamped,

an
d signed
by a
P
r
ofes
sional Engineer

r
egistered in California.

The
cons
truction

p
lan
set will in
clu
de the fo
l
lowing sheets:

Sheet No
.

Descrip
tion

1 Title

Sheet

2 Water Improvements

Plan
–

Highland
Avenue

3 Wa
ter Improvement
s

Plan

–

Glenhaven
Avenue

& El

Cam
ino Dr

4 W
ater
Improvement
s

Plan

–

Ford Avenue & Fern Drive

5 Water Improvements

Pl
an
–

Glenwood Avenue & Tamarack Drive

6 Water I
mprovements

Plan

–

Malden Avenue

7 Water Improvemen
ts

Plan

–

Highland

Ave,
Union Avenue
,

& Vista Verde Drive

8 Concrete I
mprovements

–

Overall
Site Plan

9 Concrete
Im
pr
ovements
Detai
ls

10 Concrete Improvement
D
etails

1 1

Street
Improvements
–

Grinding
and Overlay

1 2

Connection Details & Miscellaneous

Civil Details

1 3

Connection Details & Miscellaneous

Civil Details

P
repare Engineer
’
s Opinion of Prob
able Construction C
osts.

Submi
t

digital copy
(pdf) of the constr
u
ction plan
s,
s
pecifi
cations, and estimate to the City for review.

O
btain City comments
and update the
doc
u
ments as need
ed prior to final.

4. Final PS&E (100% Milesto
ne)

Upon appr
oval of the
de
tailed d
esign
, pr
ep
are the fin
al
bid docu
m
ents which represents 100% mileston
e.

Submi
t
to the City the final bid documents w
hic
h inc
ludes
one signed and stamped

full size

c
opy of the
c
onstruction plans, one
unbound signed and sta
mped copy of
the specif
icati
ons, an
d final est
imate.

Su
b
mit USB wit
h

digital and native copies of the
b
id

docum
ents.

5. Optional
-

Geote
ch
nical Investigations

Soil
Bo
ri
ng
Sam
pling

–

Drill

borehol
es

at 1000 f
eet intervals
along the subject project areas
up to

10 feet
de
pth for a total of 14
b
oring
s.

C
oll
ect
s
oil samples for testing

to d
e
fine the

soils

properties

affecting

the

design

and

construction

of

new

wa
ter
main

and

its appurtenances.

O
bta
in a no
-
fee
encroachment permit for

geotechnical
work
. Traffic control during
geotechnical

investigations

will u
t
ili
ze t
he MUTCD or WATCH manual.

B
ore
holes will be backfilled with native
material and
pavement re
sto
red using

cold a
sphalt mix.

Laboratory
Testing

–

Collected samples will be tested for the following:

W
ater
con
tent

Unit d
ry w
eight

City of F
ullerton

Engineering Design Services for
Glenwood/Ford
Area Infrastructure Improvements

June

3 , 2022

Pa
g
e

3 of
3 

Atterberg limits

Gra
in
size analysis

Direct shear

Corrosivity Analysis
–

pH,

su
lfates, chloride i
on, electrical resistivity

R
-
Va
lue

Geotechnical I
nvestigation
Report

–

Prepare
geotechnical
investigations
report

cover
ing
the following

it
ems:

Boring log with field and laboratory d
ata

Stratification based on visual soil (and rock) classification

Gro
undwater levels observed

(if encountered) during and after completion of drilling

Site boring location plans

Subsurface exploration procedures

Descri
ption of subsurface conditions

Earthw
ork and backfilling requirements

Recommendat
ions fo
r later
al earth pressures and tempor
ary shoring

R
-
Value test results

Recommended new pavement structural sections based on Traffic Index provide
d by the City

Submit
digital copy (pdf) of the
G
eotechnical

I
nvestigation

R
eport for City
’
s revi
ew
.

6. Optional
–

Utility
Potholing

P
othole the
proposed alignment
at major utility crossings
(i.e., gravity
sewer mains, storm drains
)

and
proposed connection points

or as instructed by City staff
. A p
roposed pothole map sh
all be provided to
the City
fo
r review and comment prior to performing the potholing
activities.

This proposal is based on
potholing of
20 utilities.

O
bta
in a no
-
fee
encroachment permit for

potholing

work
. Traffic control during
potholing operatio
ns

will
u
tili
ze t
he MUTCD or WATCH manu
al.

Potholes

will be b
ackfilled with native material and
pavement
re
sto
red using

cold a
sphalt mix.

After the potholing
is
complete, a
PDF

copy
of the
pothole report shall be provided

to the City
.

The
pothole report shall include

v
erification of type, size,

material,
top and bot
tom elevations of existing
utilities
,

and location of potholes using cross ties to existing
su
rface improvements.

P
othole locations will be plotted on the project topographic map u sing swing tie distanc
es from existing
aboveground improvements. Pothole locations will not be field
surveyed for horizontal or vertical
information.

F

EE SUMMARY

J
IG will comp
l
ete the

above
Non
-
Opti
onal
Scope of Work

for a total consult
ant
fe
e

of
$
82 ,
960
.

A

b
reakdown

o
f

t
he
fee

is presente
d in the
attached
F
e
e Proposal.

CLOS

ING STATEM
E
NT

W
e

appreciat
e this opportun
ity

to be of service to
the

City
.

We l
oo
k forward to working with your staff and
starting on

this project.

If you have questi
ons re
g
arding this

p
rop
osal,
plea
s
e do not

hesitat
e to c
o
ntact our
offic
e
.

Si
ncerely
,

JI
G
C

ONSULTA
NTS

Josep
h Gut
ie
rrez,

PE, PMP

Presid
ent / Senior Pr
oje
ct
Man
a
g
e
r

Enc
.

Hrly Rate
$175
Hrly Rate
$150
Hrly Rate
$135
Hrly Rate
$85
Terracon
T2UE
Task
Description
Hours
Fee
Hours
Fee
Hours
Fee
Hours
Fee
Geotech
Potholes
1 Project Administration and Coordination
Project Management
24 $4,200
0 $0
0 $0
0 $0
$4,200
$0
$0
$0
$4,200
Kick-off Meeting
1 $175
0 $0
1 $135
0 $0
$310
$0
$0
$0
$310
Project Milestone / Meetings
4 $700
0 $0
4 $540
0 $0
$1,240
$0
$0
$0
$1,240
2 Preliminary Design (60% Milestone)
23 $4,025
66 $9,900
178
$24,030
4 $340
$38,295
$0
$0
$0
$38,295
3 Detailed Design (90% Milestone)
18 $3,150
53 $7,950
143
$19,305
4 $340
$30,745
$0
$0
$0
$30,745
4 Final PS&E (100% Milestone)
5 $875
14 $2,100
36 $4,860
1 $85
$7,920
$0
$0
$250
$8,170
5 Optional - Geotechnical Investigations (14 borings)
0 $0
0 $0
0 $0
0 $0
$0
$33,800
$0
$0
$33,800
6 Optional - Potholing (20 Potholes)
0 $0
0 $0
6 $810
0 $0
$810
$0
$25,400
$0
$26,210
75 $13,125
133
$19,950
362
$48,870
9 $765
$82,710
$0
$0
$250
$82,960
Sub
TOTAL (Optional Task - Not Included)
Total Fee
Project Engineer
City of Fullerton
Project Mgr.

Direct
Costs
Fee Proposal
Engineering Design Services - Glenwood/Ford Area Infrastructure Improvements Admin
Subtotal
Civil Engineer
JIG

CONSULTANTS