070522 PW Solar Streetlight Retrofit Pilot Project Quote

City Council - Successor Agency - Housing Authority
July 5, 2022

Document
070522 PW Solar Streetlight Retrofit Pilot Project Quote
Meeting
July 5, 2022
Body
City Council - Successor Agency - Housing Authority
Original file
34 KB
Text extracted from the city's file for reading and search. Open the original on fullerton.legistar1.com. That file is the official record.

Quote # Q22-1627 - FULLERTON-EVERGREEN CIRCUIT LTG Date: 6/9/2022

DANA HUFFMAN

CITY OF FULLERTON
303 W. COMMONWEALTH AVE
FULLERTON, CA 92832
PH: 714-738-6858
Job/Project Name:

FULLERTON-EVERGREEN CIRCUIT LTG

SLSQ: KS1
Remarks: CREDIT CARDS ARE ACCEPTED - VISA, MASTERCARD, AMEX Qty Mfg Description Unit Price

PRICING IS DIRECT TO THE CITY OF FULLERTON ONLY

19 GRID CS-SIE-2731-III-25K-DD-2 -SIEGE ALL IN ONE (AIO) SOLAR LED AREA LIGHT $2,775.00

4 GRID CS-SIE-2731-III-30K-DD-2 -SIEGE ALL IN ONE (AIO) SOLAR LED AREA LIGHT $2,775.00

SUBTOTAL BEFORE TAX $63,825.00
1 TAX TOTAL TAX (7.75%) $4,946.44

1 GRID SHIPPING $450.00

PLEASE MAKE P.O. OUT TO GRIDSHIFT SOLUTIONS

C/O SOUTH COAST LIGHTING & DESIGN

TOTAL: $69,221.44

MFG TERMS
Prices firm for entry by: 30 Days Shipment by: PER QUOTE Lead Time: 10-14 Weeks **ANCHOR BOLTS SHIPPED PRIOR MAY BE SUBJECT TO A FREIGHT CHARGE NOT TO EXCEED $250.00**
**AT TIME OF ORDER, WE WILL REQUIRE AN ADDITIONAL NOTE WHICH STATES THAT OUR MFG IS CLEARED TO DELIVER MATERIAL TO YOU.

~ PLEASE INCLUDE THE SOUTH COAST LIGHTING QUOTE # ON YOUR PO ~ PLEASE SEND ORDERS TO: YOUR INSIDE SALES REPRESENTATIVE AND [email protected]

1. ANY CHANGES WILL REQUIRE A NEW QUOTE. IF THE COMPLETE QUOTE IS NOT USED THEN A NEW QUOTE WILL BE NEEDED.

2. CITY OF LOS ANGELES PROJECTS THAT ARE QUOTED WILL REQUIRE AT LEAST 25 WORKING DAYS FOR STRUCTURAL CALCS & SUBMITTALS.

3. ALL PROJECTS WILL REQUIRE 10-25 DAYS OR LESS FOR STRUCTURAL CALCS & SUBMITTALS.

4. SOUTH COAST LIGHTING & DESIGN, INC (SCL) OR ITS MANUFACTURERS WILL NOT

ASSUME RESPONSIBILITY IF YOU DO NOT VERIFY YOUR WRITTEN REQUEST WITH THIS QUOTED BILL OF MATERIALS.

5. SALES TAX IS NOT INCLUDED UNLESS STATED ON QUOTE. IF SALES TAX IS TO BE ADDED AT TIME OF THE ORDER THEN A NEW QUOTE WILL BE ISSUED.

6. THIS QUOTATION IS SUBJECT TO MANUFACTURER'S TERMS AND CONDITIONS.

7. THIS QUOTATION IS MADE WITHOUT BENEFIT OF COMPLETE PLANS AND SPECIFICATIONS. IT IS YOUR RESPONSIBILITY TO INSURE THIS QUOTE ACCURATELY REPRESENTS YOUR BILL OF MATERIAL. IF A SUBSTITUTION IS QUOTED, SCL WILL NOT GUARANTEE APPROVAL UNLESS STATED ON THE QUOTE. THE QUOTE IS BASED ON PART NUMBERS.

8. ANY CHANGES WILL REQUIRE A NEW QUOTE. IF THE COMPLETE QUOTE IS NOT USED THEN A NEW QUOTE WILL BE NEEDED.

9. A SEPARATE P.O. MAY BE REQUIRED FOR EACH MANUFACTURER AT TIME OF THE ORDER. SOUTH COAST LIGHTING WILL COORDINATE ALL DELIVERIES TO OCCUR WITHIN A 30 DAY TIME FRAME.

10. SOURCE INSPECTIONS OR OUT OF STATE INSPECTION CHARGES ARE NOT INCLUDED UNLESS SPECIFICALLY SPELLED OUT ON THIS QUOTE. THESE CHARGES ARE THE RESPONSIBILITY OF OTHERS.

11. CAL-TRANS PROJECTS WILL REQUIRE DESIGN YEAR, LUMINAIRE MAST ARM LE NGTH, SIGNAL MAST ARM LENGTH, TENON LOCATIONS, ETC., ETC., PRIOR TO ORDER. ORDERS CANNOT BE RELEASED WITHOUT THIS INFORMATION. 8.3 REQUIREMENTS ARE NOT INCLUDED UNLESS STATED ON THIS QUOTE.

12. LAMPS, PHOTOCELLS, FUSES, SPARE PARTS, OR SPECIAL PRODUCT REQU IREMENTS, ARE NOT INCLUDED UNLESS STATED ON QUOTE.

13. ACCEPTANCE OF ORDER IS CONTINGENT UPON CREDIT APPROVAL.

14. THE RESPONSIBILITY OF SETTING UP ANY AND ALL INSPECTIONS WITH THE CITY OF

LA OR ANY OTHER CITIES REQUIRING INSPECTIONS, IS UP TO THE ELECTRICAL OR GENERAL CONTRACTOR AND IS NOT THE RESPONSIBILITY OF SCL & MFG. IF THE

CONTRACTOR WOULD LIKE SCL TO HELP ARRANGE THESE INSPECTIONS, SCL WILL NEED A WRITTEN LETTER AUTHORIZING US TO DO SO. ANY AND ALL COSTS ABOVE ANY ALLOWANCE GIVEN IN A QUOTE ARE THE RESPONSIBILITY OF THE CONTRACTOR.

15. FREIGHT ALLOWED QUOTES INCLUDE TWO HOURS OF OFFLOADING TIME.

ADDITIONAL CHARGES AT $200 PER HOUR APPLY IF DELIVERY OFFLOADING TIME EXCEEDS THE MAXIMUM TWO HOUR LIMIT.

16. IF ANY TEMPORARY LIGHTING IS REQUIRED DUE TO A DELAY, IT WILL NEED TO BE DISCUSSED PRIOR. SOUTH COAST OR ANY OF ITS MANUFACTURERS WILL NOT PAY FOR ANY LABOR OR THE COST OF MATERIAL WITHOUT PRIOR APPROVAL.

17. IF A DETAIL-U IS REQUIRED, THERE MAY BE AN ADDER FOR IT; PLEASE INQUIRE WITH YOUR SALESMAN OR INSIDE ASSOCIATE FOR THE ADDER.

18. BY REQUEST, UP TO 3 PAINT CHIPS MAY BE SENT OUT TO THE END-USER AT NO EXTRA CHARGE; ANY ADDITIONAL PAINT CHIPS (FOR SAMPLING OR FOR RECORDS, ETC) REQUESTED MAY INCUR A CHARGE CONTINGENT ON SHIP-TO LOCATION.

19. SUPPLIER'S OBLIGAITION TO REPAIR OR REPLACE ANY DEFECTIVE PRODUCT SHALL

NOT INCLUDE ANY OBLIGATION TO REIMBURSE THE PURCHASER FOR TRANSPORTATION,

INSTALLATION, REMOVAL, UNAUTHORIZED REPAIRS, OR ANY OTHER EXPENSES THAT

MAY BE INCURRED BY THE PURCHASER OR OTHERS IN RELATION TO ANY PRODUCT DEFECT. ANY CHARGES ASSOCIATED WITH A REPAIR MUST BE JUSTIFIED, DOCUMENTED AND SUBMITTED FOR WRITTEN APPROVAL BY THE MANUFACTURER.

Printed: 06/09/22 Per: Jason Henderson Email: [email protected]