Cities Index.
092022 PW Cannon-Sheppard Water Main Replacement JIG Consultants Proposal

City Council - Successor Agency - Housing Authority
September 20, 2022

Document
092022 PW Cannon-Sheppard Water Main Replacement JIG Consultants Proposal
Meeting
September 20, 2022
Body
City Council - Successor Agency - Housing Authority
Original file
453 KB
Text extracted from the city's file for reading and search. Open the original on fullerton.legistar1.com. That file is the official record.

318 W. Kate
lla Av
e
nue
, Suite A

Orang
e, CA 92
867

Office

(714) 978
.
4407

Fax
(7
14)
908.46
54 www.jig
consultants.c
o
m

August 19, 2022

Gar

H
uang

Assistant
Engineer

City of
Fullerton

Public Works

303
W
Commonwealth Ave

F
ullerton
, CA 92
832

Subject
:

Proposal for
Engineering
Desi
gn
Services

5304
3 Cannon
-
Sheppard

Area
W
at
er

Main Replacement

De
ar

G
ar
:

JIG C
onsultants (JIG)
is
pleased

to su
bmit this propo
sal for engineering design service
s on
the
Cannon
-
Sheppard
Area
Water

Main Replacement
.

This project is part of the City of Fullert
on
’
s ongoing effort to
replace

aging infrastructu
res a
nd meet
f
utu
r
e
deve
lopm
ent

f
ire flow needs
.

The follow
ing
design services are
included in this proposal:

Water
l
i
n
e

Replacement

Construction

of a
pproximately
4 ,
7 00

lineal feet

(
0 .
9 mi
.
)

of

8 -
inch
PVC

waterline

on
Frances
Avenue,
Cannon Lane, Sheppard Drive, Har
mony
Place,

and Dorothy Drive
.

Construction of new fire hydrants
,
val
ves, ser
vices
,

and all water appurtenances associated with the
new water main replacement

Abandonment of existing main, fire hydr
ants, servic
es
, and all replace
d water appu
rtenances.

Trench P
aveme
nt

re
s
toration

SCOPE

OF W
ORK

See attached Exhibit A for project location and limits
.

The design process shall be broken into three phases
:

P
hase 1
:

Survey

JIG
’
s Phase 1 proposal includes
field survey and preparation of a
basemap
f
or
the
Cannon
-
Shepp
ard

Area
Water
Main Replacement
.

The combined linear footage
for
Phase 1 survey

is a
ppro
ximately
4 ,
700

feet.

The field
survey

s
hall be
appropriate
d

for
street improvements

and
shall include th
e following:

A.

Research and
plot

street

centerline, right
-
of
-
way
l
ines, and lot lines based on record

maps and
m
onume
n
ts.

B.

Survey
cross secti
ons
every 25 ft
with
centerlines.

C.

Ground survey of
all features up to the street
right
-
of
-
way

i
ncluding but not limited to ramps,

curbs,
gutters, cross gutters, spandrels, driveways
,

sidewalks, power poles, street lights,

walls, fenc
e
s,
hydrants,

pedestals, trees, signs, utility boxes, back flow devices, w ater

meters, gas meters, manholes,
catch basins, striping, edges of existing, and all other

features necessary for street design.

D.

G
round survey of water valves (rim and

top of valve
n
ut elevation
).

E.

Ground survey of sewer manholes (rim and invert in and out

elevations).

F.

Ground survey of storm drain manholes (rim and invert in and out elevations).

City of F
ullerton

En
gineer
i
ng Design Ser
vice
s
for
5304
3 Cannon
-
Sheppard

Area
Water
Main Replacement

Aug
ust

19 , 2022

Pa
g
e

2 of
4 G.

Ground survey of catch basins (rim, lo
c
al depression, and inverts i
n and out elevations)

H.

G
r
ound survey
of existing access ramps (BCR to ECR).

I.

Prepare
and process pr
e
-
construction corner records when authorized

by the City upon receipt of
100% Construction Plans in accordance with Orange County

Surveyor

requirements. Corner records
shall be filed for all found centerline monuments and ties within the

survey limits. Th
e corner records
will be legibly drawn and sea
led by a Professional Land Surveyor

and clearly indicate the location(s)
of monument
s found. It is assumed that once the County has

completed their examination of the
documents, post
-
construction corner records

will be filed with the

County Surveyor.

Corner
Records for e
xisting mo
numents wi
ll be billed at $660

per monument.

The
total am
ount
will
be calcula
ted upon determin
ing the

number of mon
um
ent
s
during the kickoff meeting
.

Count
y filing and plan check fee
s
shall be
provided by the City
.

For estimating purpose
s, fees are
expected to be $2000.

J.

Draw in all underground and overhead util
ities. The City will request and supply the

location maps
from the

other utility companies and supply all available City As -
builts.

Deliverables
:

1. Base
m
ap in PDF at 40
scale
.

2. B
ase
m
ap

in CAD at 40 scale using Fullerton
’
s layering standards.

3. Any field notes s
uch as manhole dips, water valve, depts, etc.

4. A
SCII p
oint file.

5. Co
rner Records for
monument preservation

P
hase 2:

Project De
sign

JIG

shall design and
p
r
epare Water
Main Replacement PS&E in a format acceptable to

the City.

A.

JIG will

perform

general project
management including coordinating with subcontractors
, City staff,

and pr
eparing
monthly

invoice statements.

B.

JIG will administer coordination
meetings an
d pr
epare

minutes
for distribution to attendees.

At
a
minimum,

a

kick
-
off meeting and meetings followin
g the 60%
an
d 90%

comments

will be
schedule
d
and

will

be virtual o
r in
-
person at the City
’s discretion
.

A
dditional
me
etings may be requested by the
City as needed.

C.

DDW Wa
i
ver and
Exhibits: JIG will prepare up to
five

waivers and exhibits for DDW Waiver
app
lication. DDW ex
hibits will

be submitted to the City of

Fullerto
n an
d updated as n
e
eded to obtain
the waivers

D.

Prepare pothole plan
exhibit and submit to the City for approval.

O
btain no
-
fee enc
roachment permit
from the
City
, mobilize and perform potholing
operations of up to 10 utilities. Pavement restoration
shall be in
a
ccordance

with

Cit
y
of Fullerton
Standard
No.
315
.

Traffic control during pothole
operations will be based on the MUTCD.

Preparation of
Tr
affic Control Plans
for po
t
holing
operations

are
e
xcl
uded.

E.

P
rel
i
minary Design (
3 0% Milestone)

-

At 30%, t
he submittal
will consist of
the completed survey and
simple layout of

the plans,

including place
holder blocks.

F.

P
rel
i
minary Design (
60% Milestone)

-

At 60%, the submittal
sh
all

include a basic prelimi
nary design.

Construction notes

and

g
eneric details
wil
l

be in
cluded
. Design

alternatives may be requested along
with p
relimina
r
y
e
stimates for the alternatives only.

G.

D
etailed Design (90% Mi
lestone)

-

T
he

90%

submittal
will

integrate all
City
comments fro
m the
60%, including any

chosen alternatives. Generic

d
etails
will

b
e tailored to the project where

possible
,
and
conn
ection details will be adde
d
.

JIG

sh
all

provide the plans in PDF format,

s
pecifications in
Microsoft Word, and
e
stimates in

Mi
crosoft Exce
l.

City of F
ullerton

En
gineer
i
ng Design Ser
vice
s
for
5304
3 Cannon
-
Sheppard

Area
Water
Main Replacement

Aug
ust

19 , 2022

Pa
g
e

3 of
4 H.

Detailed Design (
10 0% Mi
lestone)

-

At 100%, the subm
i
ttal
will i
n
corporate

all comments from the
90%
, and

address

all
Q
A/QC

modifications
.

J
IG

shall not
proceed to
final
milestone

until directed by
the City
.

I.

F
inal PS&
E

(Final Milestone)

-

For the Final
set, the PS&E shall be as complete as possible and shal l
integrate a
ll

comments.

JIG

shall provide the following:

Plans:

Prepare
construction

p
lans in
1 ”
=40
’

scale on
24”

x

36”

sheet format.

Construction plans shall
be horizontal
alignment only.

As
construction will
most
ly
be in residential street
s
, preparation of
Traffic Control Plans
is

not
included in
this proposal.

Traffic control
fo
r

waterline construction will based on the MUTCD.

The
cons
truction

p
lan
set will in
clu
de the fo
l
lowing sheets:

Sheet No
.

Descrip
tion

1 Title

Sheet

2 Water Imp
r
ovements

Plan
–

Frances Avenue & Cannon Lane

3 Water Imp
rovement
s

Plan
–

Harmony Place & Sheppard Dr
ive

4 Wa
ter Improvement
s

Plan

–

Do
rothy Lane & Sheppard Drive

Specifications:

P
repare
specifications including City

front end documents, and techn
ical
specifications in C
SI
6 -
Digit format
.

Deliverables
:

1. Pothole Exhibit

2. Utility pothole
summary
report
in PDF

3. DDW Waiver exh
ibits in PDF

4. 30% Milestone
–

Plans
in PDF
, estimate in
Excel

for
mat

5. 60% Milestone
–

Plans
in PDF, es
timate in
Excel

format

6. 90% Mile
sto
ne
–

Plans
in PDF, specifications in
Word, and
estimate in Excel

for
mat

7. 100% Milestone
-

Plans
in PDF, specifications in
Word, and
estimate in Excel

for
mat

8. Final Milestone
–

Mylar
for Sh
eet 1
, all other sheets to b
e full s
ize bond,
specifications in PDF

and Word format,
estimate in PDF and Excel format
, AutoCAD files for construction plans

Phase 3
:

Construction Support

A.

Assist the City in responding to Request for Information (RFIs).

This
proposal

is based on up to five
RFI
’
s

B.

At the end of construction, r
eceive redline

as
-
built markups from the Contractor. Prepare record
drawings and submit to the City
for review
and filing purposes.

Deliverables
:

1. R
esponses to RFI
’
s

2. One
full
size mylar
copy

of the
completed
project record dra
wing

City of F
ullerton

En
gineer
i
ng Design Ser
vice
s
for
5304
3 Cannon
-
Sheppard

Area
Water
Main Replacement

Aug
ust

19 , 2022

Pa
g
e

4 of
4 F

EE SUMMARY

J
IG will comp
l
ete the

above
Scope o
f Work

for a total consult
ant
fe
e

of
$
1 0
4 ,
600
.

A

b
r
ea
kdown

o
f

t
he
fee

is
presente
d in the
attached
F
e
e Proposal.

SCHEDULE

A

Gantt

s
tyle
P
roject
S
chedule has been prepa
red base
d on the
above
Scope o
f Work
. The
P
roject
S
chedule is
attached to this proposal.

CLOS

ING STATEM
E
NT

W
e

appreciat
e this opportun
ity

to be of service to
the

City
.

We
l
oo
k for
ward

to working with your s
taff

and
starting on

this
proje
c
t.

If you have qu
esti
ons re
g
arding this

p
rop
o
sa
l,
plea
s
e do not

hesitat
e to c
o
ntact our
offic
e
.

Si
ncerely
,

JI
G
C

ONSULTA
NTS

Josep
h Gut
ie
rrez,

PE, PMP

Presid
ent / Senior Pr
oje
ct
Man
a
g
e
r

En
c
.

Exhib
it A
–

Location
Map

LEMON ST

SKYLINE DR

SHEPPARD DR

LUANNE AVE

FRANCES AVE

LONGVIEW
DR

VIRGINIA RD

CANNON LN

DOROTHY DR

BERKELEY AVE

SHADOW LN

HORNET W
AY

PRIVATE DR

DOROTHY LN

TOUSSAU DR

FERN DR

HILLCREST DR

VALLEY VIEW DR

HARMONY PL

PRIVATE DR

PRIVATE DR

VIRGINIA RD

DOROTHY LN
Cannon-Sheppard Project Area
Hrly Rate
$185
Hrly Rate
$150
Hrly Rate
$140
Hrly Rate
$85
Truxaw
T2UE
Hours
Fee
Hours
Fee
Hours
Fee
Hours
Fee
Surrvey
Potholes
0 $0
0 $0
0 $0
0 $0
$0
$45,770
$0
$0
$45,770
2 $370
2 $300
8 $1,120
0 $0
$1,790
$0
$0
$0
$1,790
16 $2,960
0 $0
0 $0
0 $0
$2,960
$0
$0
$0
$2,960
6 $1,110
6 $900
0 $0
3 $255
$2,265
$0
$0
$45
$2,310
1 $185
2 $300
12 $1,680
0 $0
$2,165
$0
$0
$0
$2,165
0 $0
0 $0
6 $840
0 $0
$840
$0
$11,850
$0
$12,690
4 $740
10 $1,500
16 $2,240
2 $170
$4,650
$0
$0
$0
$4,650
9 $1,665
26 $3,900
42 $5,880
4 $340
$11,785
$0
$0
$0
$11,785
7 $1,295
20 $3,000
32 $4,480
3 $255
$9,030
$0
$0
$0
$9,030
4 $740
10 $1,500
16 $2,240
2 $170
$4,650
$0
$0
$0
$4,650
3 $555
7 $1,050
11 $1,540
1 $85
$3,230
$0
$0
$250
$3,480
1 $185
2 $300
7 $980
0 $0
$1,465
$0
$0
$0
$1,465
1 $185
2 $300
8 $1,120
0 $0
$1,605
$0
$0
$250
$1,855
54 $9,990
87 $13,050
158
$22,120
15 $1,275
$46,435
$45,770
$11,850
$545
$104,600
Prepare Basemap with Underground and Overhead Utilities Final PSE (Final Milestone)
Respond to RFI's
Prepare Record Drawings
Utility Potholing (10 Potholes)
Phase 3: Construction Support
Project Management
Meetings (Kickoff, 60% and 90% Milestones)
DDW Waiver and Exhibits (5 waivers)
Preliminary Design (30% Milestone)
Preliminary Design (60% Milestone)
Detailed Design (90% Milestone)
Detailed Design (100% Milestone)
Sub
TOTAL
Total Fee
Project Engineer
City of Fullerton
Project Mgr.

Direct
Costs
Fee Proposal
Engineering Design Services - 53043 Cannon Sheppard Area Water Main Replacement Admin
Subtotal
Civil Engineer
Scope of Work Phases
Phase 1: Survey
Phase 2: Project Design
Field Survey and Base Map (Rancho Verona, Yucca, Street Improvement) JIG

CONSULTANTS
ID
Task Name
Duration
Start
Finish
1 Notice to Proceed
1 day
Mon 9/26/22
Mon 9/26/22
2 Receive PO
1 day
Mon 9/26/22
Mon 9/26/22
3 Project Management and Meetings
148 days
Tue 9/27/22
Thu 4/20/23
4 Kick-Off Meeting
1 day
Tue 9/27/22
Tue 9/27/22
5 Progress Meetings
57 days
Wed 2/1/23
Thu 4/20/23
6 Progress Meeting (60%)
1 day
Wed 2/1/23
Wed 2/1/23
7 Progress Meeting (90%)
1 day
Thu 4/20/23
Thu 4/20/23
8 Preliminary Design
192 days
Wed 9/28/22
Thu 6/22/23
9 Utility and Record Drawing Check
10 days
Wed 10/26/22
Tue 11/8/22
10 Field Survey and Base Map
30 days
Wed 9/28/22
Tue 11/8/22
11 Tie-Down of Existing Monuments
5 days
Fri 6/16/23
Thu 6/22/23
12 Prepare 30% Preliminary Drawings
10 days
Wed 11/9/22
Tue 11/22/22
13 Submit 30% Preliminary Drawings
0 days
Tue 11/22/22
Tue 11/22/22
14 City Review
10 days
Wed 11/23/22
Tue 12/6/22
15 Site Investigations
25 days
Thu 2/2/23
Wed 3/8/23
16 Prepare Pothole Plan and Application
5 days
Thu 2/2/23
Wed 2/8/23
17 Permitting for Potholes
5 days
Thu 2/9/23
Wed 2/15/23
18 Utility Potholing
5 days
Thu 2/16/23
Wed 2/22/23
19 Prepare Pothole Report
10 days
Thu 2/23/23
Wed 3/8/23
20 Final Design Services
157 days
Wed 12/7/22
Thu 7/13/23
21 Prepare 60% Milestone
30 days
Wed 12/7/22
Tue 1/17/23
22 Submit 60% Milestone
0 days
Tue 1/17/23
Tue 1/17/23
23 City Review
10 days
Wed 1/18/23
Tue 1/31/23
24 Prepare 90% Milestone
30 days
Thu 2/23/23
Wed 4/5/23
25 Submit 90% Milestone
0 days
Wed 4/5/23
Wed 4/5/23
26 City Review
10 days
Thu 4/6/23
Wed 4/19/23
27 Prepare 100% Milestone
30 days
Fri 4/21/23
Thu 6/1/23
28 Prepare DDW Waivers
10 days
Fri 5/19/23
Thu 6/1/23
29 Submit 100% Milestone and Waivers
0 days
Thu 6/1/23
Thu 6/1/23
30 City Review
10 days
Fri 6/2/23
Thu 6/15/23
31 Prepare Final Submittal
20 days
Fri 6/16/23
Thu 7/13/23
32 Submit Bid Documents
0 days
Thu 7/13/23
Thu 7/13/23
9/26
9/26
4/20
9/27
4/20
2/1
4/20
6/22
11/8
11/8
6/22
11/22
11/22
12/6
3/8
2/8
2/15
2/22
3/8
7/13
1/17
1/17
1/31
4/5
4/5
4/19
6/1
6/1
6/1
6/15
7/13
7/13
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
2023

CITY OF FULLERTON
Engineering Design Services Cannon-Sheppard Area Water Main Replacement

PROJECT SCHEDULE
JIG

CONSULTANTS

← All documents from this meeting