RE: Request for Proposal
Engineering Services for the Equipping of Well 7A and Pipeline Replacement
Dear Steven Conner:
The City of Fullerton (“City”) is requesting a proposal for engineering services for the equipping of Well 7A and replacement of part of the transmission line. City is also seeking bid assistance, construction support, and pipeline assessment services.
BACKGROUND
The City-owned wellfield property, “Main Plant,” is located at 627 West La Palma Avenue, Anaheim, CA 92801. Main Plant presently consists of four operational wells (Well 3A, Well 5, Well 6, and Well 8), one well (Well 4) scheduled to be abandoned, and Well 7A, which was drilled and capped in 2021. While Wells 5, 6, and 8 are relatively shallow (300 to 410 bgs) and range in production from 1,250 gpm to 1,700 gpm, Well 3A has perforations that range from 580 to 1,280 bgs and has historically produced around 2,200 gpm. Since February 2020, Well 3A has been offline due to elevated levels of perfluorooctanoic acid (PFOA) and perfluorooctane sulfonate (PFOS)—two constituents of the family of chemicals known as per- and polyfluoroalkyl substances (PFAS). A new PFAS water treatment plant will be constructed to treat Well 3A discharge starting in Fall 2022 with a tentative commission date of Summer 2023.
Well 7A is 1,390 feet deep with perforations from 550 to 1,370 bgs. Water quality samples were taken during pump testing, and the results suggest Well 7A discharge will also require PFAS treatment. Coordination will be required with the Orange County Water District (OCWD) to ensure the treatment facilities are ready to receive and treat Well 7A flow. Effluent from the new treatment plant will be disinfected and sent directly into the existing 18” diameter transmission line.
Well 7A pump test results suggest this well could produce 4,000 gpm or more. The Consultant shall design a 3,500 gpm vertical turbine pump with a variable frequency drive (VFD) to reach 4,000 gpm and all associated piping, valves, electrical equipment, and appurtenances. In addition, Well 7A should be enclosed in such a manner that will meet the City of Anaheim noise ordinance and minimize noise pollution to the surrounding residents.
The Consultant will also be tasked with designing the replacement of a section of the existing 18” diameter steel transmission line (Attachment A). Constructed in 1959, the approximate 800 LF of 18” diameter steel pipeline has experienced six water main breaks in the last decade. Part of this line will be replaced during the PFAS water treatment facility project (Attachment B) with the remaining approximate 500 LF replaced under this project scope. This transmission line is in a City easement that runs underneath a City of Fullerton-owned parking lot leased to the nearby church and church-owned property.
Request for Proposal
Engineering Services for the Equipping of Well 7A and Pipeline Replacement During the pipeline replacement work, the Consultant will also be tasked with investigating the condition of the 16” transmission line that runs north on Harbor Boulevard. There have not been any main breaks on the approximately 1,950-ft long, 16-inch diameter cast iron pipeline but its installation may have originated from the 1910’s. The 24-inch diameter SCCP pipeline existing west from Main Plant is not part of this project. The discharge pressure through these distribution pipelines had been 120 psi but has since been reduced due to high pressure concerns.
The Well 7A project is a recipient of two grants: 1) United States Department of the Interior, Bureau of Reclamation WaterSMART Drought Response Program and 2) State of California, Department of Water Resources Proposition 84 Integrated Regional Water Management (IRWM) Implementation Grant program. The project design will need to incorporate both grant requirements. The deadline for both grants is March 31, 2025, and Well 7A should be online well before this deadline.
SCOPE OF WORK
Project Management and Administrative Services
1. Task 1 – Project management
The Consultant shall promote efficient communication between Consultant, City of Fullerton, and others as required. For all meetings, Consultant shall prepare agendas and meeting minutes. The minutes shall be sent to the City within five (5) working days after each meeting. The Project Manager shall be accompanied by the appropriate engineering staff or subconsultant representatives necessary to conduct the meetings.
As part of progress payment requests, Consultant shall provide documentation of achieved progress.
a. Kick-off Meeting
The Consultant shall meet with City staff to review the scope and approach of the project, identify team members’ involvement, and identify project constraints and anticipated long lead items. The Consultant shall submit a list of existing documentation requests prior to the kick-off meeting. At the meeting, the Consultant shall submit an initial schedule with critical milestones.
b. Coordination meetings
The Consultant shall coordinate monthly progress conference calls to review project progress and issues to be resolved. The Consultant shall prepare any figures or other documents that may aid in discussions.
c. Agency coordination and Permitting
Consultant shall identify and prepare a list of all permits and clearances necessary for carrying out well equipping and pipeline replacement work. Consultant shall prepare all required documentation that the City of Fullerton or the Contractor will need to pull permits for this project (unless noted otherwise).
The City will issue payments separately for all fees required by the agencies. At a minimum, the Consultant shall prepare documentation for the following agencies:
i. Division of Drinking Water (DDW)
The City will be the primary contact for DDW. The City will prepare and submit the application for an amended domestic water supply permit. The Consultant shall assist in providing any information that is required for the amended permit.
Request for Proposal
Engineering Services for the Equipping of Well 7A and Pipeline Replacement ii. City of Anaheim
The Consultant shall coordinate with the City of Anaheim Building Department and City of Anaheim Public Works department (if necessary) in identifying and preparing all documents required for the Contractor to pull permits without incident or delay. The documents are expected to include, but not be limited to, plans, structural calculations, and a noise study.
In addition, the Consultant shall be responsible for coordinating and receiving all necessary approvals with the City of Anaheim Public Utilities Electric Services Division for all power requirements for Well 7A. The City desires to have the new electrical service tied with either (or both) of the City’s two existing electric meters as the City hopes to convert this meter to a TOU schedule, which requires a minimum monthly maximum demand of 500 kW. iii. CEQA
For CEQA, the City plans to file a notice of exemption for this project. iv. Instrumentation and Controls (I&C)
The Consultant shall coordinate and schedule a meeting with the City’s I&C integrator, Systems Integrated (SI) early in the design process. SI will be responsible for the SCADA automation, cyber security, and physical security (camera) components. The Consultant will be responsible for providing complete process control narratives that describe all operation modes. The Consultant is expected to address all comments received from SI throughout the design phase.
2. Task 2 – Research and Field Reconnaissance
a. Existing documentation review
The Consultant shall review all existing plans and other documentation related to this project. The City will provide all applicable plans, base map file, and pumping test and water quality results from Well 7A testing. The Consultant shall collect and review all available groundwater data, current operations, existing utilities, site electrical usage and any geotechnical reports available in the region.
The Consultant shall also review the grant agreements (specifically the Federal WaterSMART Drought Response Program agreement) for requirements to incorporate into the design. The City will provide the Well 7A Drilling specifications which included grant requirement language and forms. An excerpt from the Federal grant agreement can be reviewed as Attachment C.
b. Field Reconnaissance
Consultant shall conduct site visits and document all observed existing conditions. c. Perform any geotechnical investigations and potholing required to complete the design. d. Conduct any surveying required to complete site plan and grading plan. All survey electronic files should be made available to the City.
Request for Proposal
Engineering Services for the Equipping of Well 7A and Pipeline Replacement
3. Task 3 – Well Equipping and Distribution Pipeline PS&E With regards to the specifications, the City will provide the Invitation to Bid, Supplemental Information to Bidders, Sample Agreement and Bonds, General Specifications, Federal Provisions and Bid Forms, and Bid Documents.
The Consultant shall prepare the Special Provisions or Technical Specifications, copies of permits, construction plans (including CAD files), final engineer’s construction cost estimate and bid schedule, estimated construction schedule, and any other required documents so that the City may bid, award, and complete the Well 7A equipping and pipeline replacement work.
The plans should, as a minimum, include:
Title sheet, sheet index, vicinity map, location map
Abbreviations and symbols
Construction notes
Piping schedule and equipment schedule (if applicable) Site plan
Grading plan
Yard piping plan
Erosion control plan
Water main plans and profiles
Structural plan, sections, and details
Mechanical plan, sections, and details
Electrical site plan and MCC elevation
Single-line diagram and control schematics
Instrumentation and Controls
a. Prepare all items required for constructing, operating, and maintaining Well 7A. b. Design for all tie-ins with the new PFAS water treatment plant and storm drain facilities. c. Design the 18-inch diameter pipeline replacement in a manner that minimizes disturbances to the aboveground users. The existing pipeline is in a 10-ft wide easement and the new pipeline should be installed in the same location. The limit of replacement s h o u l d e n d a t o r b e f o r e t h e e x i s t i n g C i t y of Anaheim right-of-way. Note: Pipeline replacement construction work can only occur from October to April. Consultant shall assist the City in working with the private owner to minimize impact. d. Design a connection for portable generator hookup and appropriate lighting for O&M activities. Coordinate with the City’s SCADA consultant, SI, in locating the light posts with cameras.
e. Prepare all structural documentation, inclu ding calculations. The Consultant shall propose structure(s) enclosing the new moto r and VFD that will meet City of Anaheim requirements and prepare a noise study prepared by a licensed professional. f. Work with SI to provide all controls required for a reliable, functional system. SI will integrate the new equipment with the existing SCADA system. g. Review and sign the City’s WQMP and SWPPP Determination forms provided by the City (see Attachment D). Language should be included in the plans and specifications should a SWPPP be required.
Request for Proposal
Engineering Services for the Equipping of Well 7A and Pipeline Replacement h. Prepare bid schedule, engineer cost estimates for all bid items, estimated working days, and projected construction schedule
i. Consultant will also be tasked with investig ating the 16-inch diameter transmission line on Harbor Blvd (see Task 6) during the replacement of the 18-inch diameter pipeline.
Language will need to be included in the specif ication to instruct the Contractor to work with the Consultant in coordinating this investigation. j. For long-lead items, the City may consider pr e-purchasing these select materials. Those specifications should be developed in a manner that is compliant with the public contract code and grant requirements as well as provided at the 90% design phase. In the fee proposal, the Consultant shall consider this as an optional task. Consultant should note which materials are expected to be long-lead items.
The Consultant shall submit the following deliverables for City review. The Consultant shall virtually meet with the City to discuss comments after every deliverable besides “Final.” The City of Fullerton’s building department will also review the 100% Plans and calculations. The Consultant shall consider incorporation of building department plan check comments in their proposal.
Plans Specifications Cost Estimates
60% Electronic (pdf) Electronic (pdf; Word) Electronic (pdf) 90% Electronic (pdf) Electronic (pdf; Word) Electronic (pdf) 100% Electronic (pdf) Electronic (pdf; Word) Electronic (pdf) Final
(signed & stamped)
Electronic (pdf; CAD files)
Four (4) sets of 24”x36”
Electronic (pdf; Word)
Three (3) sets Electronic (pdf; Excel)
4. Task 4 – Bid Assistance
a. Attend in-person pre-bid meeting and record minutes of the meeting. b. Assist City staff as required in the bid process including answer ing bidder's questions (assume ten) and assisting in addendums (assume two).
5. Task 5 – Well Equipping and Pipeline Construction Support Services The Consultant shall provide the following tasks:
a. Attend pre-construction meeting.
b. Review all Contractor submittals (assume 20). Witness factory testing should not be assumed.
c. Respond to all Contractor RFIs and requests for clarifications (assume 15). d. Review potential change order(s) as needed.
6. Task 6 – Pipeline Investigation
During the pipeline construction work, the Co nsultant shall investigate and assess the condition of the 16-inch diameter transmission line on Harbor Blvd to the isolation valve located in the City of Fullerton. Should it be determined that the pipe needs replacement or rehabilitation, the Consultant shall recommend replacement or rehabilitation methods. The assessment and recommendations shall be documented in a technical memorandum for City review.
Request for Proposal
Engineering Services for the Equipping of Well 7A and Pipeline Replacement
7. Task 7 – Additional Items
The Consultant is encouraged to suggest any additional tasks that may be required to equip Well 7A and to replace part of the transmission line. In the fee proposal, the Consultant should consider these items as optional tasks.
PROPOSAL
Proposal shall not exceed 20 pages in length (resumes may be included separately in appendix).
The proposal should include the following:
Project Approach
o Description of services to be provided based on the Consultant's understanding of the project scope. Include anticipated a pproach, tasks necessary for successful completion, and suggestions or special concerns that the City should be made aware.
Work to be done by subconsultant(s) shall be clearly identified. Relevant Experience
o Provide a list of similar projects completed or on-going in the last five (5) years and the names, email addresses, and telephone numbers of the clients. Provide descriptions of firm’s responsibilities, key personnel, and pertinent experience, including duration of project and cost of services.
Key Personnel
o Table with percentage of time each member will contribute to this project. o A resume of all project personnel, including subconsultants, describing experience and qualifications. Identify the individual who will be the project manager and have overall responsibility for the project. This individual shall be a licensed professional engineer. Key personnel assigned to the project shall not be reassigned without the prior written approval from the City.
Project Schedule
o A schedule showing the time to complete major items of work. Fee Breakdown/Rate Schedule
o A breakdown of fees by task and subtask for all work described in the project tasks.
Include only names of people who will be working on the proposed project and their estimated hours for the individual tasks on the fee schedule. o Include rate schedule, which will remain the same throughout the project duration.
Submit one (1) electronic copy of the proposal by 5 p.m., July 28, 2022. The proposal will become the property of the City of Fullerton and will not be subject to return. The proposal must be signed by an official authorized to commit the firm.
Any inquiries and questions related to this RFP shall be exclusively communicated by email to [email protected].
Note - All licensed engineers in “responsible charge” working on this City project are required to disclose all disciplinary actions against them. Provide a copy of the actions with submittal of proposal. Please provide a statement if there are no disciplinary actions.
The proposal prepared in response to this RFP shall be prepared at the sole cost and expense of the firm and with the expressed understanding that no claims against the City for reimbursement will be accepted.
This request for proposal does not obligate the City of Fullerton to accept the proposal, negotiate with the firm, award a contract, or proceed with the development of any project proposed in Request for Proposal
Engineering Services for the Equipping of Well 7A and Pipeline Replacement response to this RFP. The awarding of any contract shall be subject to such prior governmental approvals or determinations as may be required or appropriate.
The City reserves the right, at its discretion, to pursue any or all of the following actions related to this RFP: issue an open RFP; issue addenda; request additional information; negotiate contract on basis of original proposal and/or additional information; permit the correction of errors and waive minor deviations; reject, replace, and approve any and all subconsultants; and issue subsequent RFPs, based on refinements of concepts proposed in response to this RFP.
The content of the RFP and the firm’s proposal will become an integral part of the contract but may be modified by the provisions of the contract.
SCHEDULE
The city is anticipating issuing the Notice to Proceed in October 2022.
We look forward to your proposal submitted no later than 5 p.m. on July 28, 2022. If you have any questions, please do not hesitate to contact me.
Sincerely,
Tiffany Foo, P.E.
Civil Engineer
[email protected]
Attachments:
Attachment A – Pipeline Replacement Map
Attachment B – Main Plant PFAS Water Treatment Plant Drawings Attachment C – Bureau of Reclamation Grant Requirements Attachment D – City of Fullerton NPDES Program Forms