BID PROPOSAL

RESIDENTIAL STREET REHABILITATION
PROJECT NO. 44065

ESTIMATED
NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT
1 Mobilization LS 1
50,000050,000.00
2 Water Pollution Control LS 1

10.000.010.000.0
Traffic Control LS 1

04.4650044,465.00
Remove and Recontruct Sewer MH (<10' Depth) EA 3

45.0000 135,000.00
5 Sidewalk SF 3,100

14.0043,400.ºº
6 Curb, Curb and Gutter LF 445
105. 28,925.ºº
7 Alley Returns wi Access Ramps SF 6,500

31.00 201,500.0º
8 Typical Alley Pavement Section SF 620

31.00 19,220.00
9 Access Ramps EA 5
10,000.00 50.000.00
10 Cold Mill 2' SF 3900 0.55
2,145.°º
11 Cold Mill 3" SF 60,000

0.55 33,000.
12 Pavement Digouts/Repairs SF 3,950
1600° 63,200.0°
13 Slurry Seal (Type I!) SF 92,100

0.45 41,445.ºº
14 Asphalt Concrete TON 100
230.0º 23.000.00
15 Asphalt Rubber Hot Mix TON 1,400
145.00 203.000.00
16 Adjust Manhole Cover to Grade EA 8

1.40000 11,200.00
17 Adjust Water Valve to Grade EA 30
1,100.ºº33,000.00
18 Adjust OCSD Manhole to Grade EA 1
2,500.°º 2.500.00
19 Street Light Conduit LF 100
100º° 10,000.00
20 'Traffic Signing and Striping LS 1

35.00000 35.000.00
Base Bid Total$ 1,060,000.°

TO BE SUBMITTED WITH BID
BD-16

BID PROPOSAL

RESIDENTIAL STREET REHABILITATION
PROJECT NO. 44065

ESTIMATED
NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT
Additive Bid Alternates - Pomona Alleys
1 Cold Mill 3" SF 26,600

1.30 34.580.00
2 Asphalt Rubber Hot Mix TON 500
218.00 109.000.º0
3 Adjust Water Valve to Grade EA
1,200.0° 1.200.00
Bid Alternates Total $ 144,780.00
Unit prices are required for all bid items.

The Bidder shall total his/her bid. Unit prices shall prevail in case amount disagrees with extension.

Project shall be awarded on the Base Bid. If applicable, the City may elect to use Bid Alternates after award.

Changes to either Unit Price or Amount shall be striked-out and initialed.

Items of work not specifically listed shall be included in the bid prices for related work. For all work required and shown on the construction plans and specifications for which no specific bid item or price is listed in the bid schedule, it shall be understood that such work, equipment, labor, tools, and materials shall be provided as part of the listed bid items and no additional compensation will be paid therefor.

If the City determines that any of the unit bid prices are significantly unbalanced to the potential detriment of the City, the bid may be considered non-responsive.

Company Hardy & Harper, Inc.

Name Michael Murray. Vice President
Signature
Address 32 Rancho Circle
City & Zip Code Lake Forest. lA 92630
Phone Number 714-444-1851
License Number 215952