Text extracted from the city's file for reading and search. Open the original on fullerton.legistar1.com. That file is the official record.

318 W. Kate
lla Av
e
nue
, Suite A

Orang
e, CA 92
867

Office
(714) 978
.
4407

Fax
(7
14)
908.4
6 5
4 www.jig
consultants.c
om

December 2, 2022

Gar

H
uang

Assistant
Engineer

City of
Fullerton

Public Works

303
W
Commonwealth Ave

F
ullerton
, CA 92
832

Subject
:

Proposal for
Engineering
Desi
gn
Services

Sunny Hills
-
Twilight Area W
a
ter
Main Replacement

De
ar

G
ar
:

JIG

C
onsultants (JIG)
is
pleased

to su
bmit this propo
sal for engineering design service
s on
the
Sunny Hills
-
Twilight Area Water Main Replacement
.

This project is part of the City of Fullerton
’
s ongoing effort to
replace

aging infrastructu
res a
nd m
eet futu
re
development

f
ire flow needs
.

The follow
ing
design services are
included in this proposal:

Waterline Replacement

Replacement of existing 4
-
inch
,
6 -
inch

and 8
-
inch

waterm
ain

in residential streets,
a
pproximately

2.23 miles

in length,
with

8 -
inch
P
VC

waterline

in the following locations:

o

Las
Palmas Drive
(
Potrero
Drive to Greenmeadow Drive
)

o

Potrero Drive
(
Las
R
i
e
ndas Drive to
Las Palmas Drive
)

o

La
s R
i
e
ndas Drive
(
Cul
-
de
-
sac to
Madonna Drive
)

o

Tunales Drive
(
La
R
iendas Drive to
L
as Palmas Drive
)

o

Twilig
h
t Drive (
Las Riendas Drive to Sunn
y Hi
lls Road)

o

Rosehedge Drive (La
s Riendas Drive to Sunny Hills Road)

o

Lovell Place (Twilight Drive to cul
-
de
-
sac)

o

Sunny Hills Road (Cul
-
de
-
sac to Las Palmas Drive)

Construction of new fire hydrants
,
val
ves, ser
vices
,

and
all water appurtenances associated with the
new water main replacement

Abandonment of exis
ting main, fire hydr
ants, servic
es
, and all replace
d wat
er appu
rtenances.

Trench Pavement

re
storation

in residential streets
.

See
Figure 1 for location of
Sunny Hi
ll
s
-
Twilight Area

Watermain Replace
ment.

Bid
documents are
expected
i
n
completed form on or before
August

2023.

SCOPE

OF W
ORK

The Scope o
f Work wi
ll be

as follows:

1. Proje
ct
Administration and Coordination

Project M
anagement

–

Perform
overall project managem
e
nt f
or the d
uration of the project. Project
m
anagement du
ties will include
coordinating with city staff,
coordinating with subconsultant,
budge
t and

labor oversight,
preparing schedule and updates,
and
pr
eparing
progress status reports/invoices
.

Kick
-
off

Meeting

-

Up
on
receipt of a writte
n

Notice to

Pr
o
ceed, conduct a
virtual
kick
-
o
ff meeting with
C
ity staff to review the project scope,
develop

a p
roject s
chedule, and confirm
del
ive
rables. The pr
oject

schedule sh
all include each task and subtasks,
milesto
n
es, critical

path
designation
,

and

a

schedule

fo
r pro
gress meetings
.

City of F
ullerton

Engineering Design

Ser
vices for
Sunny Hills
-
Twilight Area
Water
m
ain Replacement

December 2
, 2022

P
a
g
e

2 of
3 Project Mi
les
tone / Meetings
–

Prepare
a
p
roject

execution sche
dule

with major mile
ston
es
. P
resent to
C
ity st
aff for approval.

This proposal in
cludes attendance to
four

meetings (kickoff
,
6 0%
progress
,
90%
progress
,
and final review meetin
g
s).

2. P
rel
i
minary

Design (
60% Milestone)

Upon comple
t
ing
field data c
olle
ction,
compi
le all gathered information and prepare
preli
minary

le
vel
design
construction plans. The

pre
liminary design
plans shall

in
c
lude

a

reco
m
mended
alignment o
f the
waterline, connectio
ns to exi
sting se
r
vices,

f
i
r
e

s
e
r
v
i
c
e

u
p
g
r
a
d
e
,

removal of va
lves
an
d

flexible

couplings,
and valve replacements.

Submit
d
igital
co
py
(pdf)
of the
preliminary constru
ction plans to the

C
ity

for re
view.

3. Detailed Design (90% Mi
lestone)

B
a
sed
on com
m
en
ts received from

the
C
ity

and information collected from utility potholi
ng (Task
5 )
,
prepare

detailed construction plans,
specifi
cations,
and estimate for t
he propos
e
d imp
r
o
veme
nts.

Constructi
on

plans sh
all be
prepared

using AutoCAD on
24 ”

x

36 ”

format
drawings.

S
p
ecif
i
c
a
tions

shall
includ
e
Special

Conditions

and T
echnical Spe
cifications. The constru
ction plans and specifications sh
all
be pr
e
pared
,
stamped,

an
d signed

by a
P
r
ofes
sional Engineer

r
egistered

in California.

The
cons
truction

p
lan
set will in
clu
de the fo
l
lowing

sheets:

Sheet No
.

Descrip
tion

1 Title

Sheet

2 Wat
er Improvements

Plan
–

Las Riendas

Drive

3 Wa
ter Improvement
s

Plan

–

Las Riendas

Dr
ive

4 Water Improvements

Pl
an
–

Las Palmas Dri
ve

5 Water Improvement
s Plan
–

Las
Palmas Drive

6 Water Improvement
s Plan
–

Sunny
H
ills

7 Water Imp
rovement
s P
lan
–

Sunny
Hills

8 Water Improvements Plan
–

Potrero
Drive

and Tunales Drive

9 Water Improvements Plan
–

T
wilight Drive
,
Lovell Place
, and
R
osehe
dge Drive

10 Connection Details & Miscellaneous

Civil Details

11 Connection Details & Misce
llaneous

Civil
Details

12 Connection Details & Mi
scell
a
ne
ous Civil Details

P
repare Engineer
’
s Opinion of Prob
able Construct
ion C
osts.

Submi
t

digital
copy
(pdf) of the constr
u
ction
plan
s,
s
p
ecifi
cations, and estimate to the City for review.

O
btain City comments
and update the
doc
u
ments as need
ed prior to fin
al.

4. Final PS&
E (100% Milesto
ne)

Upon appr
oval of the
de
tailed d
esign
,

pr
ep
are the fin
al
bid doc
u
m
ents which represents 100% mi
leston
e.

Submi
t
to the City the final bid documents w
hic
h inc
ludes
one signed and stamped

full size

c
opy of the
c
onstruction pla
ns, one
unbound

signed and sta
mped copy of
the specif
icati
ons, an
d fina
l est
imate.

Su
b
mit USB wi
t
h

digital and native copies of

the
b
id

docum
ents.

5. Utility
Potholing

P
othole the
proposed alignment
at major utility crossings
(i.e., gravity
sewer mains, storm drains
)

and
p
roposed

connection points

or as instructed by City staff
. A p
roposed pothole map s
h
all be provided to
the City
fo
r review
and comment prior to performing the potholing
activities.

This proposal is based on
potholing of
1 0

utilities.

O
bta
in a no
-
fee
encroa
chment
permit for

potholing

work
. Traffic control during

potholing operatio
ns

will

u
tili
ze t
he MUTCD or WATCH man
u
al.

Poth
oles

will be b
ackfilled with native material and
pavement
re
sto
red using

cold a
sphalt mix.

City of F
ullerton

Engineering Design

Ser
vices for
Sunny Hills
-
Twilight Area
Water
m
ain Replacement

December 2
, 2022

P
a
g
e

3 of
3 After the potholing
is
complete, a
PDF

copy

of the

pothole report shall be provided

to the City
.

Th
e
pothole report shall inc
lude

v
erification of type, size
,

materia
l,
top and bot
tom elevations of existing
utilities
,

and location of potholes using cross ties to existing
su
rface improvements.

P
othol
e locat
ions will be plotted on the project topographic m
ap u
sing swing tie distanc
es from existing
aboveground im
provement
s. Pothole locations will not be
field
surveyed for horizontal or vertical
information.

EXCEPTIONS AND CLARIFICATIONS

A.

The

City will pe
rform utility research and will provide
collected

record

drawings
.

B.

The City will
p
rovide field survey and topograp
hic mapping o
f the project sites.

To
meet the project
schedule, the topographic map
will be available
and
transmitted to JIG during the k
ick
-
off meeting.

C.

Geotechnical investigatio
ns
are

not inc
luded in the scope of work.

D.

Preparation of traffic control pl
ans are not included in the scope of work.

E.

Bid
phase
services

a
re not included in the scope of work.

F.

C
onstruction administration
, manageme
nt or inspection are not included in the scope

of w
ork.

F

EE SUMMA
RY

J
IG will comp
l
ete the

above
Scope of Work

for a total consult
ant
fe
e

of
$
99 ,
745
.

A

b
reakdown

o
f

t
he
fee

is
presente
d in the
attached
F
e
e Proposal.

SCHED
ULE

J
IG
prepared a G
an
t
t chart sched
ule
showing the s
cope of services and task dur
ations for this pro
ject. The
Project Schedule is attached to this proposal.

CLOS

ING STATEM
E
NT

W
e

appreciat
e this opportun
ity

to be of service to
the

City
.

We l
oo
k forward to

working with your staff and
startin
g on

this project.

If you have questi
ons re
g
ar
ding this

p
rop
osal,

plea
s
e do not

hesitat
e to c
o
ntact our
offic
e
.

Si
ncerely
,

JI
G
C

ONSULTA
NTS

Josep
h Gut
ie
rrez,

PE, PMP

Presid
ent / Senior Pr
oje
ct
Man
a
g
e
r

Enc
.

HERMOSA DR

LAS PALMAS DR

PUENTE ST
TW
ILIG
HT DR

LAS RIENDAS DR

CIENAGA DR

ARBOLADO DR

SUNNY HILLS RD

TETON DR

SUNNY W
O
OD DR

ARBOL DR

EL MIRADOR DR

EGERER PL
M

ADONNA DR

PECAN ST

TUNALES DR

ROSARITA DR

LAS FALDAS DR
SEQ

UOIA AVE
GREENM
EADOW
DR

LOVELL PL

BRIARWOOD DR

POINSETTIA AVE

ROSEHEDG
E DR

ALTURA DR

POTRERO DR

FERN AVE

EADINGTON DR

LINDEN W
AY

PASEO PL

EL ADOBE PL

PUEBLO PL

CIELO PL

OLEANDER ST
NIETO
PL

BONITA PL
SAN M

IGUEL DR

HAMELL RD

SAN PABLO DR

SAN RAMON DR
HIDEAW
AY LN

ARAGON PL
TERM
INO
PL

DEL CERRO PL

TEAK ST

PEAR ST

SKINNER PL

SAN JUAN DR

LARIAT PL

LA LOMA PL

SARAH PL
SAN M

ARCOS PL

LAS RIENDAS CT
SAN M

IGUEL DR

ROSARITA DR

PASEO PL
GREENM
EADOW
DR

PUEBLO PL

PUENTE ST

LINDEN WAY
M

ADONNA DR

LAS RIENDAS DR

CIENAGA DR

ROSEHEDG
E DRTW

ILIGHT DR

LAS RIENDAS DR

PASEO PL
53039 Sunny Hills-Twilight Project Area Sunny Hills-Twilight Area Hermosa Area (for reference)
FIGURE 1

Sub
Hrly Rate
$185
Hrly Rate
$150
Hrly Rate
$145
Hrly Rate
$85
T2UE
Task
Description
Hours
Fee
Hours
Fee
Hours
Fee
Hours
Fee
Potholes
1 Project Administration and Coordination
Project Management
28 $5,180
0 $0
0 $0
0 $0
$5,180
$0
$0
$5,180
Kick-off Meeting
2 $370
0 $0
2 $290
0 $0
$660
$0
$0
$660
Project Milestone / Meetings
6 $1,110
0 $0
6 $870
0 $0
$1,980
$0
$0
$1,980
2 Preliminary Design (60% Milestone)
17 $3,145
52 $7,800
139
$20,155
4 $340
$31,440
$0
$0
$31,440
3 Detailed Design (90% Milestone)
17 $3,145
52 $7,800
139
$20,155
4 $340
$31,440
$0
$0
$31,440
4 Final PS&E (100% Milestone)
9 $1,665
26 $3,900
70 $10,150
2 $170
$15,885
$0
$150
$16,035
5 Potholing (10 Potholes)
0 $0
0 $0
8 $1,160
0 $0
$1,160
$11,850
$0
$13,010
79 $14,615
130
$19,500
364
$52,780
10 $850
$87,745
$11,850
$150
$99,745
TOTAL
Total Fee
Project Engineer
City of Fullerton
Project Mgr.

Direct
Costs
Fee Proposal
Engineering Design Services - Sunny Hills-Twilight Area Watermain Replacement Admin
Subtotal
Civil Engineer
JIG

CONSULTANTS
ID
Task Name
Duration
Start
Finish
1 Notice to Proceed
1 day
Mon 12/12/22
Mon 12/12/22
2 Receive PO
1 day
Mon 12/12/22
Mon 12/12/22
3 Project Management and Meetings
169 days
Tue 12/13/22
Fri 8/4/23
4 Kick-Off Meeting
1 day
Tue 12/13/22
Tue 12/13/22
5 Progress Meetings
108 days
Wed 3/8/23
Fri 8/4/23
6 Progress Meeting (60%)
1 day
Wed 3/8/23
Wed 3/8/23
7 Progress Meeting (90%)
1 day
Thu 6/15/23
Thu 6/15/23
8 Progress Meeting (100%)
1 day
Fri 8/4/23
Fri 8/4/23
9 Preliminary Design
60 days
Wed 12/14/22
Tue 3/7/23
10 Utility and Record Drawing Check
10 days
Wed 12/14/22
Tue 12/27/22
11 Prepare 60% Preliminary Drawings
40 days
Wed 12/28/22
Tue 2/21/23
12 Submit 60% Preliminary Drawings
0 days
Tue 2/21/23
Tue 2/21/23
13 City Review
10 days
Wed 2/22/23
Tue 3/7/23
14 Site Investigations
25 days
Thu 3/9/23
Wed 4/12/23
15 Prepare Pothole Plan and Application
5 days
Thu 3/9/23
Wed 3/15/23
16 Permitting for Potholes
5 days
Thu 3/16/23
Wed 3/22/23
17 Utility Potholing
5 days
Thu 3/23/23
Wed 3/29/23
18 Prepare Pothole Report
10 days
Thu 3/30/23
Wed 4/12/23
19 Final Design Services
92 days
Thu 4/13/23
Fri 8/18/23
20 Prepare 90% Milestone
40 days
Thu 4/13/23
Wed 6/7/23
21 Submit 90% Milestone
0 days
Wed 6/7/23
Wed 6/7/23
22 City Review
5 days
Thu 6/8/23
Wed 6/14/23
23 Prepare 100% Milestone
30 days
Fri 6/16/23
Thu 7/27/23
24 Submit 100% Milestone
0 days
Thu 7/27/23
Thu 7/27/23
25 City Review
5 days
Fri 7/28/23
Thu 8/3/23
26 Prepare Final Submittal
10 days
Mon 8/7/23
Fri 8/18/23
27 Submit Bid Documents
0 days
Fri 8/18/23
Fri 8/18/23
12/12
12/12
8/4
12/13
8/4
3/8
6/15
8/4
3/7
12/27
2/21
2/21
3/7
4/12
3/15
3/22
3/29
4/12
8/18
6/7
6/7
6/14
7/27
7/27
8/3
8/18
8/18
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
2023

CITY OF FULLERTON
Engineering Design Services Sunny Hills-Twilight Area Watermain Replacement

PROJECT SCHEDULE
JIG

CONSULTANTS

← All documents from this meeting