CITY OF FULLERTON

AMENDMENT NUMBER ONE TO THE AGREEMENT
WITH
WACHTER, INC.

This Amendment Number One (“Amendment”) to the Professional Services Agreement (“Agreement”) is entered into by and between the CITY OF FULLERTON (“City”), a municipal corporation, and Wachter, Inc., a Kansas corporation (“Consultant”).

WHEREAS, City and Consultant entered into the Agreement on October 5, 2021, to provide certain closed circuit television network replacement services for the following City of Fullerton properties as referenced in Exhibit A of the agreement until project completion.

WHEREAS, City and Consultant entered into Amendment Number One on January 3, 2023, to expand the scope of service to add closed circuit television network (CCTV) services at the Hunt Library to maintain compatibility and conformity with existing cameras already installed at existing City facilities attached hereto as Exhibit “A” and incorporated herein by this reference.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree to amend the Agreement as follows:

1. Section 1.1 titled “Scope of Services” Exhibit A of the Agreement is hereby amended to include the scope of services to be performed at the Hunt Library.

2. Section 2.1 titled “Compensation” Exhibit A of the Agreement is amended to include the cost of closed-circuit television network (CCTV) replacement services to be performed at the Hunt Library.

3. Section 6.0 titled “General Provisions” is amended to insert a new Subsection 6.27 titled “Executive Order N-6-22” as follows:

6.27 Executive Order N-6-22. On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. The EO directs state agencies to terminate contracts with, and to refrain from entering any new contracts with, individuals or entities that are determined to be a target of Economic Sanctions. Accordingly, should the City determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for termination of this agreement. The City shall provide Contractor advance written notice of such termination, allowing Contractor at least 30 calendar days to provide a written response. Termination shall be at the sole discretion of the City.

Contractor shall immediately notify City in writing upon being subjected to Economic Sanctions or upon being charged by a government agency of conducting prohibited transactions within the meaning of Executive Order N-6-22.

4. Except as set forth in this Amendment, all other provisions of the Agreement shall remain the same and in full force and effect.

5. All terms not defined herein shall have the same meaning and use as set forth in the Agreement, as amended.

IN WITNESS WHEROF, the parties hereto have caused this Amendment to be executed by and through their respective authorized officers.

CITY OF FULLERTON

_____________________________ Date: ___________________ City Manager

CONSULTANT

______________________________ Date:____________________ Wachter, Inc. - Phil Kennedy, Vice President

APPROVAL AS TO FORM

_________________________
Richard D. Jones, City Attorney

Wachter, Inc. 16001 West 99th Street Lenexa, KS 66219 wachter.com John Irwin, Director of Business Development Office: 949 829 9700 Cell: 949 680 9250 [email protected]

Wachter Proposal

Statement of Confidentiality

This proposal and supporting materials contain confidential and proprietary business information of Wachter, Inc.

These materials may be printed or photocopied for use in evaluating the proposed project but are not to be shared outside of your organization.

Proposal # 80671 v2 Hunt Library Video and Access Control Proposal Issued: 10/18/2022 Proposal Valid until: 11/18/2022 for City of Fullerton

2 wachter.com | [email protected]
10/18/2022 — Proposal # 80671 v2 for City of Fullerton — Hunt Library Video and Access Control Wachter at a Glance
Thanks
The Wachter Advantage
Introduction

Thank you for the opportunity to provide the following
proposal for the City of Fullerton project.

We appreciate your consideration of Wachter — our
goal is to deliver a successful project and build a lasting partnership with your firm.

Founded: 1930
Corporate Structure: Privately Held
Total Employees: 1,400
Headquarters: Lenexa, KS
Regional Offices: 12

Wachter is a leading nationwide solutions integrator
offering managed services, electrical systems, IT
networks, Audiovisual, industrial automation, and safety and security solutions.

Wachter designs, installs, and maintains these complex
systems, providing clients with a competitive edge by
increasing productivity, lowering operational costs, and streamlining internal processes.

Wachter is here to keep critical systems delivering a return on your investment.

Technical Overview
Based on information provided by City of Fullerton at the time of proposal, Wachter, Inc. (“Wachter”) proposes the following:

1. Furnish and install a Video Surveillance Solution (VSS) expansion consisting of (18) IP cameras that will be administered through an existing Milestone Video Management Software (VMS) platform. Wachter will add an additional Milestone Recording server to support the cameras in this scope of work. The new server shall utilize City of Fullerton’s existing network infrastructure.

2. Furnish and install a Physical Access Control System (PACS) expansion consisting of (7) controlled doors with various door hardware to be managed by a centrally located controller. System shall utilize City of Fullerton’s existing network infrastructure.

3 wachter.com | [email protected]
10/18/2022 — Proposal # 80671 v2 for City of Fullerton — Hunt Library Video and Access Control Pricing
Project Pricing
Project Pricing
Professional Services $ 5,918.85
Material & Hardware $ 51,995.14
Cloud Storage Backup $ 45,411.18
Installation Labor $ 40,911.11
Installation Materials $ 6,706.97
Rental Tools/Equipment $ 843.16
Miscellaneous $ 405.00
Shipping (Estimated) $ 1,436.61
Sales Taxes (7.75%) $ 3,734.17
TOTAL $ 157,362.19

Project Scope of Work
Preparations & Design

1. Wachter has provided this proposal for budgetary pricing with a basic generalized design and/or scope of work.

2. To meet the timeline and gather applicable information with minimal risk to Wachter or City of Fullerton; this pricing is only a budgetary estimate assuming generic hardware and standard installation/configuration.

3. Upon award of the bid, Wachter will either furnish or review client furnished 100% design and update the proposal scope and pricing.

Materials

1. Wachter's intent is to order materials to deliver at or before we arrive onsite; if PO is issued more than 1-month prior to our expected start date, material pricing shall be refreshed before order.

2. See Appendix A for a detailed list of materials.

4 wachter.com | [email protected]
10/18/2022 — Proposal # 80671 v2 for City of Fullerton — Hunt Library Video and Access Control Staging & Pre-Configuration

1. Receive equipment at Wachter’s Mt. Laurel, NJ ISO 27001 facility to conduct staging and configuration.

2. Upon receipt, inventory equipment and report any discrepancies that may affect the project.

3. Unbox, label, and record pertinent information for tracking of any serialized hardware.

4. Configure VSS equipment, if applicable, with the following:
a. Network Parameters
b. Usernames / Passwords
c. Video Stream / Recording settings
d. Naming Conventions

5. Configure PACS equipment, if applicable, with the following:
a. Network Parameters
b. Usernames / Passwords
c. Access Levels
d. Naming Conventions

6. If applicable, upgrade endpoint devices’ firmware/software to the latest supported version.

7. Re-package equipment, label boxes, and ship to City of Fullerton location for installation.

Labor

1. Video Surveillance Solution (VSS) – Wachter will furnish and install:
a. Headend, located in the MDF/IDFs (Wachter Furnished & Installed):
i. (1) Seneca Certainty 224TB Server
b. Cameras (Wachter Furnished & Installed):
i. (5) Axis P3727-PLE Cameras

1. (5) Wall mount brackets

2. (5) Outdoor pendant kits
ii. (8) Axis M3057-PLVE Cameras
iii. (3) Axis P3267-LV Cameras
iv. (1) Axis Q6100/Q6135 Combination PTZ/Multisensor Camera c. Speakers (Wachter Furnished & Installed):
i. (1) Axis C1310-E Network Speaker
d. Cabling:
i. (16) Cat6, UTP cable(s)
ii. Tested via cable qualifier
iii. Drops will be housed using Surface Mount Boxes (SMB) as applicable for each drop location. iv. 10-Feet of slack will be coiled at the Work Area Outlet (WAO) and 10-Feet at the ER/TR/TE. v. Patch cords for the WAO will by furnished by Wachter and installed by Wachter.

5 wachter.com | [email protected]
10/18/2022 — Proposal # 80671 v2 for City of Fullerton — Hunt Library Video and Access Control e. Engineering & Installation - Wachter Engineer(s) will configure the equipment listed above:
i. Wachter Engineering shall perform the following services remotely:

1. Verification of IP Assignments and Network Connectivity

2. Configuration of Video Storage and Retention:
a. (180) Day(s) of Video Retention
b. (20) Frames Per Second

3. Configuration of motion detection parameters based on scene activity ii. Wachter Engineer(s) will coordinate remotely with Wachter Technician(s) to commission and validate the operation of the installed system and its peripheral components.

2. Physical Access Control System (PACS) – Wachter will furnish and install:
a. Headend, located in the MDF/IDFs (Wachter Furnished & Installed):
i. (1) Rack-mounted S2 Network Node with (4) S2 ACM blades ii. (1) Rack-mounted power supply with backup batteries b. Door Hardware (Portions Provided by Others):
i. (1) Mag Lock
ii. (1) Electric Strike
iii. (7) Door Position Switch (“DPS”)
iv. (7) Request-to-exit (“REX”) motion detector
v. (6) Push-to-exit (“PTE”) emergency button
vi. (7) MultiClass SE proximity reader
vii. All other door locking hardware provided by subcontractor locksmith c. Cabling:
i. Based on the topology of the solution, the controller(s) will be positioned in the ER/TR. ii. Each controller will be connected to the existing network via Cat6 UTP cable. iii. Door hardware will be connected to the controller with the appropriate composite or individual security cable(s).
iv. Doors within concrete or block walls will require conduit provided by EC/GC. v. Doors within drywall will have the cable(s) fished within the drywall. d. Engineering & Installation - Wachter Engineer(s) will configure the equipment listed above i. Wachter Engineering shall perform the following services remotely:

1. Verification of IP Address and Network connectivity for Controller and/or Nodes

2. Door Configurations and Settings

3. Wachter support for additional configurations, enrollments, and rules activity can be provided and may result in additional charges to be applied via the change order process.
ii. Wachter Engineer(s) will coordinate remotely with Wachter Technician(s) to commission and validate the operation of the installed system and its peripheral components.

6 wachter.com | [email protected]
10/18/2022 — Proposal # 80671 v2 for City of Fullerton — Hunt Library Video and Access Control Deliverables

1. As part of Wachter SOP, a sign-off form or work order will be required to be signed by City of Fullerton representative and by the Wachter lead technician.

2. All photos taken of completed work will be provided in electronic format, as part of acceptance.

Client Requirements

1. Wachter assumes that City of Fullerton acknowledges and agrees to facilitate the following:
a. A valid Purchase Order, to be received by Wachter prior to equipment purchase. b. Any information regarding the scope of work, environment, or conditions that may affect the schedule, installation, or equipment specifications.
c. A copy of the most recent facility drawing indicating areas of concern. d. Sufficient wall or rack space in frame locations to accommodate security appliances. e. Owner is responsible for moving furniture or other obstructions that may affect or delay the project. f. Client/Owner furnished and/or existing equipment will be in good working order. i. Any Client/Owner furnished equipment will be onsite prior to Wachter arriving. g. City of Fullerton’s existing network infrastructure should have available ports and PoE for new devices. h. Permanent power required for system head-end or distribution components must be available in agreed upon locations.
i. If permanent power is not provided by Wachter, it must be coordinated at project kickoff. ii. If required, Wachter can provide electrical installation services for the project upon request with associated pricing adjustments.
i. Provide timely site security clearance and unobstructed access as required. j. Remote access shall be provided via VPN, WebEx, or other remote client application. k. Any necessary roof penetrations by a licensed roofing contractor.

2. Any necessary penetrations to the roof, shall be performed by the building owner or General Contractor; so as to maintain the roofing warranty.

3. City of Fullerton will have site internet connections online prior to start date and will provide ISP information to Wachter technicians prior to start date.

4. City of Fullerton to supply route/switching hardware. a. All client provided equipment is sufficient in accommodating the devices supplied within the proposed solution.

5. It is assumed all support licensing of client VMS is current. If products are expired, City of Fullerton may need to bring current or purchase new maintenance licensing.

6. City of Fullerton or the General Contractor shall provide required door hardware for (5) of the (7) access- controlled doors, as specified in the Scope of Work.

7 wachter.com | [email protected]
10/18/2022 — Proposal # 80671 v2 for City of Fullerton — Hunt Library Video and Access Control

7. Fire and Life Safety code requires that magnetic locks be integrated into the fire system to release on a fire alarm. It will be the responsibility of the Client or GC’s fire installation team to wire the fire relay to integrate with the access control system in accordance with Fire Department regulations.

8. It is the responsibility of client to organize required meetings with Wachter and existing alarm vendor for system integrations.

9. Appropriate network address schema for system configuration and staging.

10. City of Fullerton is required to sign off within five (5) business days from the project completion date to report any work not performed under the scope of work; any reporting after this period will be billed under a separate agreement.

Notes & Assumptions
This proposal was prepared according to the information provided at the time of bid; any elements not specifically identified within this scope of work or provided information will be considered ‘Out-of-Scope.’ Additional and/or ‘Out- of-Scope’ items can be addressed with options and pricing adjustment to complete the project additions.

1. Space will be available on the property for secure storage of materials; no container is included in this proposal.

2. A scissor and/or boom type lift is required for this scope of work and is included in this pricing.

3. Any existing cable pathway (cable tray, J-hooks, conduit, etc.) is to be utilized for the cable installation during this project.

4. The EC will be responsible to provide/install all conduit or sleeves and any other cable penetrations needed during the cabling portion of this project (Unless otherwise noted in the Scope of Work section of this proposal.

5. Wachter will work with City of Fullerton to determine dates required onsite.

6. Wachter will be able to perform the work at each site location from start through completion without interruption.

7. Material expedition is not included; all material shipments will be at the ground shipment or freight level.

8. If Client/Owner provided escort is required, delays in work caused by escort or their availability may result in adjustments to pricing in order to complete the project.

9. If any requirements for onsite technicians to be vaccinated for Covid-19 are identified or communicated after the submission of this proposal, onsite labor rates may require adjustment via the change order process.

10. All engineering services shall be conducted remotely. If on-site engineering is required, additional charges will be applied via the change order process.

11. Wachter selected camera mounts based on information provided by client at the time of furnishing this proposal. If additional information during installation identifies changes in mount requirements, Wachter shall provide requirements with adjusted proposal to complete the project.

12. All PTZ cameras to be controlled through video management software, if a joystick solution is desired please contact your account manager or project manager for available options.

8 wachter.com | [email protected]
10/18/2022 — Proposal # 80671 v2 for City of Fullerton — Hunt Library Video and Access Control

13. Camera licensing is limited to the scope of this project, if existing licensing or support is expired Wachter shall provide options to bring support or licensing to a current state.

14. During the project if any existing VSS cameras are identified as requiring repair or replacement, Wachter shall provide options to address the issues with adjusted pricing.

15. If client requests the re-use of existing CAT5/6 cabling runs, Wachter assumes cables are in adequate condition.

If any type of cable repair or replacement is required Wachter shall provide options for a solution and any necessary proposal adjustments to complete the project.

16. Based on information provided, Wachter assumes that camera cabling for installation(s) is within CAT5/6 distance standards. If the client is unaware of existing network equipment location and it is identified during installation distances or POE requirements are exceeded, Wachter will provide options for a solution with an updated scope and adjust pricing as required.

17. Additional programming and controller configuration, including additional credentials, access levels/rules, door configurations. etc., to be completed by client.
a. Wachter support for these activities can be provided with adjusted pricing to complete the project.

18. Access control project scope is limited to the doors, controllers, and door hardware devices outlined in this proposal.

19. Wachter assumes the following:
a. The power budget in Wachter-provided power supplies shall meet the requirements of all components to be installed, including components provided by others. If additional information or scope changes indicate a change to the power budget requirements, Wachter will provide options for a solution with an updated scope and adjusted pricing as required.
b. All doors are properly aligned and in good working order with only minimal adjustments required once locking hardware is installed. If adjustments or repairs are needed, Wachter can provide solutions with an updated scope and adjusted pricing as required.
c. Door locking hardware is estimated and assumed based upon standard equipment and information provided at the time of this proposal. Should pricing for this hardware differ from the estimate, or additional information identify required changes to hardware, labor costs, etc., a change order may be necessary.
d. Licensing for existing physical access control system is assumed to be sufficient in accommodating the devices identified in this proposal.

20. Door and ACS hardware is based upon site walk photos. Upon award, site walk to be completed to verify hardware and SoW. Should necessary hardware differ from the estimated equipment outlined in this proposal, Wachter will provide options for changes with an updated scope of work and adjusted pricing as required.

21. Troubleshooting existing ACS hardware or software is not within this scope of work. If troubleshooting existing hardware or software is required, additional charges will be applied via the change order process.

9 wachter.com | [email protected]
10/18/2022 — Proposal # 80671 v2 for City of Fullerton — Hunt Library Video and Access Control

22. Specialty wiring or configuration for ADA doors are not included in this scope of work. Should specialty wiring or configuration for ADA doors be required, Wachter will provide options for a solution with an updated scope and adjusted pricing as needed.

23. Materials and software pricing is based on market rates as of June 2022. Pricing is budgetary and subject to change based on market rates at the time of execution if executed outside of 30 days from issuance.

24. This proposal assumes prevailing wage requirements.

25. Network rack to be supplied by others and must be installed prior to project start date.

26. Wachter assumes all networking equipment is capable of POE with adequate power budget and available ports.

If requirements are not met additional charges may apply equipment via the change order process to add the additional required equipment.

27. Permitting fees not included in this proposal.

Schedule

1. This proposal is based upon the information provided and the following schedule information or assumptions:
a. Start Date: TBD
b. End Date: TBD
c. Blackout Dates/Holidays:
i. New Year’s Day
ii. Memorial Day
iii. Independence Day
iv. Labor Day
v. Thanksgiving Day
vi. Christmas Day
Project Management
Your project management team is composed of experienced project managers and project coordinators. Your project manager will run your project and serve as your Single Point of Contact (SPOC) for the project lifecycle. Wachter uses Trust, our web-based project management application, to provide secure, on-demand, real-time access to your project data and status.

Communications
The Wachter project manager will communicate and provide reporting to the City of Fullerton project team, per agreed- upon requirements. All reporting and task management will include summaries of any milestone status during daily communications with the field crew if applicable. If any issues are identified they will be escalated, handled in an expeditious manner, and recorded in Trust.

10 wachter.com | [email protected]
10/18/2022 — Proposal # 80671 v2 for City of Fullerton — Hunt Library Video and Access Control On-site Service and Maintenance
Service and Maintenance is not included in this contract; however, Wachter encourages adherence to the manufacturer’s recommended maintenance and routine care to ensure performance and extend the life of your system.

Wachter can provide a separate Nationwide Service & Maintenance Agreement built-to-suit if desired; otherwise, additional onsite needs or technical support will be billed as Time and Materials upon request.

Contact [email protected] for more information.

Wachter offers service and support services to our clients after project completion. After 30 days of project completion engineering technical support services are available at $150.00 an hour to troubleshoot and evaluate any requests or problems. If it is deemed from initial troubleshooting or the request requires on site cabling, technician services are available at $75 per hour with a trip charge based on distance to nearest local Wachter office.

Warranty
Wachter, Inc. is committed to providing defect-free goods and services to its Clients. Training, inspection, testing, documentation, and other processes are followed to ensure all applicable standards are met.

Wachter, Inc. warrants all labor to be free of workmanship defects for a period of 12 months from the date the work is performed. During this 12-month period, Wachter will promptly repair, at no cost to City of Fullerton, any defects that are a direct result of labor workmanship. All materials are warrantied according to the manufacturer’s provided warranty.

Should you have any quality questions or concerns, please contact your project manager, or feel free to contact our quality department at [email protected].

Liability
Neither party will be liable to the other party by reason of any failure in performance of this Agreement if the failure arises out of acts of God, acts of the other party, acts of governmental authority, fires, strikes riots or war, Coronavirus (COVID-19) or any cause beyond the reasonable control of that party. If any such event delays performance, the time allowed for such performance will be appropriately extended; provided however, that nothing contained in this Section shall preclude either party from exercising its rights of termination herein.

11 wachter.com | [email protected]
10/18/2022 — Proposal # 80671 v2 for City of Fullerton — Hunt Library Video and Access Control Terms & Conditions
Please visit the following webpage for Wachter’s Terms & Conditions: https://wachter.com/terms-conditions/ Use of Client Information
Wachter frequently uses our projects to develop case studies or modify best practices. Case studies are shared internally and externally as part of ongoing sales and marketing. Members of our staff or marketing firm may contact key Client personnel to gather insights on the project’s outcome.

12 wachter.com | [email protected]
10/18/2022 — Proposal # 80671 v2 for City of Fullerton — Hunt Library Video and Access Control Authorization / Signature
By signing and returning this page, City of Fullerton authorizes Wachter, Inc. to order, schedule, and commit the materials, labor, and management resources necessary to perform the Statement of Work for Hunt Library Video and Access Control as stated in this proposal, Number 80671 v2, dated 10/18/2022.

City of Fullerton

Signature Date

Printed Name Title

Wachter, Inc.

Signature Date

Printed Name Title

13 wachter.com | [email protected]
10/18/2022 — Proposal # 80671 v2 for City of Fullerton — Hunt Library Video and Access Control Appendix A — Bill of Materials
Hunt Library Video and Access Control — Bill of Materials Mfg. Part # Description Qty.

Axis 02218-001 AXIS P3727-PLE 5
Axis 5507-641 AXIS T91H61 WALL MOUNT 5
Axis 01513-001 AXIS T94N01D PENDANT KIT 5
Axis 02109-001 AXIS M3057-PLVE MkII 8
Axis 02329-001 AXIS P3267-LV 3
Axis 01711-001 AXIS Q6100-E 60HZ 1
Axis 01959-004 AXIS Q6135-LE 60HZ 1
Axis 5506-951 AXIS T91G61 WALL MOUNT 1
Axis 01796-001 AXIS C1310-E NETWORK HORN SPEAKER 1
S2 S2-NN-E2R- NETWORK NODE IN RACK MOUNT 1
S2 S2-ACM LENELS2 ACCESS CONTROL APPLICATION 3
HES 8000C-630 8000C Universal Electric Strike 1
Securitron M82BD 1800 Securitron Mag Lock 1
Altronix MAXIMAL3RD Altronix Accessory Power 1
Altronix BT1212 Rechargeable Battery 12VDC/12AH for Use with 2 Altronix BL3 Battery Leads, 18 inch, 18AWG, Pair, RedAnd 1 GRI 194-12WG-W Recessed 1” Steel Door/SPDT/Wide Gap 7
Bosch DS160 High Performance Request-to-Exit Sensor PIR 7 HID 40NKS-00- Signo40, Wall mount, 13.56mHz &125kHz, 7
HES SD-7202GC- Pushbutton, Square, Illuminated, 1-Gang, 12 or 24 6 Seneca C18210- Certainty 18 bay Server - 224TB 1
Tigertech SBX-CAM-3YR Storage Bridge - 3YR Annual License per Camera, 18 Tigertech WTB-3YR 1TB Cloud Storage HOT With Premium Support - 150 Milestone XPPPLUSDL XProtect Professional + Device License (DL) 18 Milestone Y3XPPPLUSDL 3 Years Care Plus for XProtect Professional+ DL 18

14 wachter.com | [email protected]
10/18/2022 — Proposal # 80671 v2 for City of Fullerton — Hunt Library Video and Access Control

Hunt Library Video and Access Control — Bill of Materials Mfg. Part # Description Qty.

Panduit CPPL24WBLY Patch Panel - 24-Port - Modular/Unloaded Mini-Com - Black 1 Panduit CJ688TGBL Modular Jack - Cat6 - Black 31
Panduit CMBBL-X Blank Module - Black 1
Panduit UTPSP3BUY 3' - Cat6 - Patch Cable - Blue 22
Generic 3/4-EMT Electroplated Steel EMT Conduit, 3/4 in., 10 ft. L 29 Arlington EMT75 Conduit Bushing, EMT, Insulating, Push-On, 3/4 in. 29 ABB (Thomas and
Betts)
TK112A Steel City® Compression Coupling, Zinc Plated Steel, EMT Conduit, 3/4 in.
24 ABB (Thomas and
Betts)
TC112A Steel City® Compression Connector, Zinc Plated Steel, EMT Conduit, 3/4 in.
24 Raco 2083 3/4 in. 1 Hole Push On EMT Conduit Strap 75 Crouse Hinds (Eaton) 1B Conduit Hanger With Bolt, Steel, Size 1, For 3/4 in.

Rigid/IMC/EMT Conduit
51 BRIDGEPORT

FITTINGS
4361-DC Combination Coupling, Zinc Die Cast, EMT to Liquid Tight, 3/4 in.
17 CROUSE HINDS
(EATON)
TP432 4 Square Box, Steel, Welded, 2-1/8 in. D, (8) 3/4 in. Side KO 58

CROUSE HINDS
(EATON)
TP472 4 in. Square Box Cover, Steel, UL Listed, Flat, Blank 39 Southwire 55094322 Southwire3/4 in. x 50 ft. Ultratite Liquidtight Flexible Non- Metallic PVC Conduit
1 Halex 26152 3/4 in. Electrical Metallic Tube (EMT) 1-Hole Straps (20-Pack) 1 Southwire 58133757 3/4 in. Liquidtight NM Straight PVC Conduit Fitting Connector (20-Pack)
1 Southwire 58133957 3/4 in. Liquidtight NM 90 Degree PVC Conduit Fitting Connector (20-Pack)
1 Generic 106128 3/4 in. x 4 ft. x 8 ft. Ground Contact Pressure Treated Pine Performance Rated Sheathing
1 L H Dottie 14H114 Tapcon Screws (100 PK) 1
L H Dottie TBC42 Toggle Bolts (100 PK) 1
3M MP+STICK Fire Sealant 1
General 7131800 Cat6 - Standard - Plenum - Blue - (Pull-Pac) 5 Panduit UTPSP10BUY 10' - Cat6 - Patch Cable - Blue 10
Panduit CBX1WH-A SMB - 1-Port - Curved - White 11
Ideal 85-366 RJ45 Modular Plug - Cat6 - Clear - (25pk) 2 Brady M21-750-499 Continuous Labels - 3/4" - BMP21/125 - White 1 Brady M21-1250-427 Wrap Labels - 1.25" - BMP21/200 - White 1 3M 1700-3/4X60FT Electrical Tape 4
Velcro 31086 Velcro - 3/4"x75' - Plenum - Black 1
Greenlee 430G Poly Line Fish Tape, Graybar Bucket, 6500 ft. 1 WCW 4461140 Composite/Banana Cable (If used, is pulled to each door) 2