January 13, 2023
Gar
Huang
Ci
ty of Fullerton
303 West Commonwealth Avenue
Fullerton
, CA 9
2832
Subject:
Additional Engineering
Services for
Hollydale Area
Water Main
Replacement
Purchase Order
No. C000266
Dear
Gar
:
JIG
C
onsultants
(JIG)
is requesting
a v
ariance to Purcha
se Order
C000266
for additional services re
quested
by
the City of Fullerton
on the
Hollydale Area
Water Main
Replacement project.
The additional scope
is
descr
ibed
as follows:
1. Extend
Project Limits
on Mir
a
mar Dr
ive (Hollydale
Drive to Anita Place
) and Anita P
lace
A.
Extend topographic survey and
mapping
for
the
additional area
. Dip existing
sewer and storm
drain ma
nholes
and provide in
vert elevati
ons on the topographic base map.
B.
Plot utilities
(received from
t
he City
of Fullerton
and o
utside a
gencies)
on
t
opographic ma
p.
C.
Pothole four additiona
l
utilities
in the
extended pro
ject limits
.
D.
Repair
pavement for
all
p
otholes with hot mix asphalt per City of Fullerton Standard No
. 315.
E.
P
repare
final design
documents
f
or waterline
plan
for additional area.
Prepare
en
largement
details
for tie
-
in to existing wate
rl
ines
.
This includes
90% and 100% milestones.
2. Incorporate PRV S
ta
tion on Miramar Drive
between Pressure Zones 3 and 4A
A.
Update
final design
documents
for
constru
ction of PRV
station on Mira
mar Drive
.
B.
PRV Station will include diaphra
gm valve,
pipin
g, support
s, precast vault, hatch, and
connections.
JIG is request
ing
addi
tional c
o
mpensation to pe
rform the scope of work listed abov
e. The additional
compensation is s
ummarized in
the attached Fee
Summary.
I
f you have questi
ons regarding this
request, please do
n
ot hesitate to contact our office.
Sincerely,
JI
G
CO
NSULTANTS
Joseph
G
utierrez, PE, PMP
President /
Project Manager
Enc.
Hrly Rate
$185
Hrly Rate
$150
Hrly Rate
$140
Hrly Rate
$85
Pothole
Survey
Markup
Hours
Fee
Hours
Fee
Hours
Fee
Hours
Fee
Hours
Fee
Fee
Fee
10%
Fee
Fee
1 - Extend Project Limits on Miramar Drive and Anita Place Extend Topographic Survey and Dip MHs
0 $0
0 $0
2 $280
0 $0
2 $280
$0
$10,300
$1,030
$0
$11,610
Plot Utilities on Basemap
0 $0
0 $0
4 $560
0 $0
4 $560
$0
$0
$0
$0
$560
Potholing of four additional utilities
0 $0
0 $0
2 $280
0 $0
2 $280
$3,750
$0
$375
$0
$4,405
Repair Pavement for Potholes with Hot Asphalt Mix
0 $0
0 $0
0 $0
0 $0
0 $0
$7,700
$0
$770
$0
$8,470
Prepare Final Design Documents
1 $185
16 $2,400
32 $4,480
0 $0
49 $7,065
$0
$0
$0
$0
$7,065
2 - Incorporate PRV Station on Miramar Drive between Zones Prepare Final Design Documents
2 $370
8 $1,200
24 $3,360
0 $0
34 $4,930
$0
$0
$0
$0
$4,930
Total
3 $555
24 $3,600
64 $8,960
0 $0
91 $13,115
$11,450
$10,300
$2,175
$0
$37,040
CITY OF FULLERTON
Project Manager
JIG Consultants
In-house
Direct
Costs
Fee Proposal
Additional Engineering Services - Hollydale Area Water Main Replacement Admin
Total
Civil Engineer
Project Engineer
Subconsultants
JIG
CONSULTANTS
T2 Utility Engineers
5622 Research Dr.
Suite A
Huntington Beach, CA 92649
USA
Phone 714.487.5783
Fax 714.893.1369
Email [email protected]
www.T2ue.com
January 12, 2023
Joseph Gutierrez, PE, PMP, Env SP
JIG Consultants
318 West Katella Avenue, Suite A
Orange, CA 92867
(714) 978-4407
Via e-mail: [email protected]
Subject: City of Fullerton
Hollydale Area Improvements
T2 Proposal No. 22CA251-R1
Mr. Gutierrez,
Thank you for requesting that T2 Utility Engineers, Inc. (T2) prepare a cost proposal for utility investigation services for the subject project including testholes in the City of Fullerton.
Project Scope
Task: Testholes: T2 will provide testholing at an estimated ten (14) locations for confirmation/identification of subsurface utilities, as directed by Client. Specific testhole locations are currently unknown, but will be identified by the Client during the design phase of the project. If additional testholes are requested, they will be billed at the rate shown on the Estimate Sheet.
Testhole Assumptions
• Project is subject to Prevailing Wage requirements .
• Client will provide utility records for use in loc ating utilities to be testholed. • Traffic Control Plans are NOT required.
• WATCH Manual Traffic Control will be used, T2 to p rovide. • A no-fee Permit will be issued by the City.
• All work shall be completed during regular weekday business hours. • Testholes shall be backfilled with the native soil s. • Native soils are free of contamination.
• If contamination is encountered during the investi gation, T2 will handle the testing and disposal of soils (additional service).
• Surface restoration shall be cold patch asphalt mi x (temporary), concrete patch, or compacted native, depending on location.
• Hot mix asphalt restorations are required.
• Post-investigation survey of the testhole location s will be performed by the Client. • Removal of USA marks are NOT required.
Deliverables
T2 will provide a “Testhole Data Sheet” for each te sthole completed. This form will include swing tie s from existing visible features to the testhole location, depth to top and bottom of utility from existing grade, material type, and size of utility if found. Horizontal position of the utility will be marked with a nail/disk or stake for accurate identification during survey.
Recommendation:
Subsurface Utility Engineering identifies existing subsurface utility data, maps the locations of underground utilities, and classifies the accuracy of the data based on standardized quality levels. The data allows for developing strategies and making informed design decisions to manage risks to avoid utility conflicts and delays. If a utility conflict arises, viable alternatives can be determined to resolve the issue before any damage is done, which almost always results in a significant cost-savings.
With projects such as this, it is highly recommended that the owner include a thorough utility investigation prior to design. Relying strictly on records and testholes has proven to fall short of meeting the design requirements.
It is our recommendation that the owner implement a proven strategy using the American Society of Civil Engineers standard ASCE 38-22. Many wastewater facilities, including Orange County Sanitation District, have implemented the ASCE 38-22 as a standard practice for all their major projects.
This standard guideline describes four quality levels of utility depiction:
Quality Level D - Information derived from existing records or oral recollections.
Quality Level C - Information obtained by surveying and plotting visible above-ground utility features and by using professional judgment in correlating this information to Quality Level D.
Quality Level B - Information obtained through the application of appropriate surface geophysical methods to determine the existence and approximate horizontal position of subsurface utilities.
Quality Level A - Precise horizontal and vertical location of utilities obtained by the actual exposure and subsequent measurement of subsurface utilities, usually at a specific point.
Schedule
Schedule will be coordinated with JIG Consultants following notice to proceed.
Fee
The scope unit rates and effort are described in the attached project estimate. The total project price may vary due to unknown field conditions; however only the actual units and hours worked will be invoiced.
T2ue proposes to provide these services for the following not-to-exceed without prior approval fee:
Testholes: $ 22,220
Limitations
T2 does not guarantee that all documented or undocu mented existing utilities will be designated by geophysical prospecting or located by testholes. Services provided by T2 does not relieve the construction excavator from notifying the appropriate entities including but not limited to Dig Alert.
Terms & Conditions
Terms and Conditions will be reviewed and agreed upon following project award.
JIG Consultants
City of Fullerton - Hollydale Area Improvements
Utility Investigation - Testholes
T2 Proposal No.: 22CA251-R1
PROJECT ESTIMATE - PREVAILING WAGE
Potholing
Vacuum Excavation Truck (Potholing) Asphalt 14 holes @ $880.00 per hole $12,320.00 Vacuum Excavation Truck (Potholing) Natural Ground 0 holes @ $785.00 per hole $0.00 Pothole Exceeding 7.0 feet in Depth 0 Feet $130.00 per foot $0.00 Premarking & Verification of Utility Testholes 4 hours @ $245.00 per hour $980.00 Subtotal $13,300.00
Utility Designating
Utility Designating 2 Man Crew and Equipment (Includes Dipping) 0 hours @ $365.00 per hour $0.00 Subtotal $0.00
Senior Project Manager 1 hours @ $210.00 per hour $210.00 Project Manager 1 hours @ $150.00 per hour $150.00
SUE Manager 3 hours @ $145.00 per hour $435.00
CADD Technician 4 hours @ $85.00 per hour $340.00
Administrative Support 1 hours @ $85.00 per hour $85.00 Subtotal $1,220.00
Permits - Estimated Cost 1 each @ $0.00 plus 10% $0.00
Stamped Traffic Control Plans 0 each @ $2,000.00 per each $0.00 Maintenance of Traffic Set-ups (Daily Rate) 0 each @ $1,400.00 per each $0.00 Subtotal $0.00
Hot Mix Ashpalt Restoration 1 each @ $7,000.00 per day $7,700.00 Aquaphalt Restoration 0 days @ $50.00 per each $0.00
Subtotal $7,700.00
TOTAL $22,220.00
* If permanent asphalt or concrete patch is required by City, County, State or Property Owner ** T2 will make every attempt to work with the City to minimize costs on pavement restorations
January 12, 2023
Permits & Maintenance of Traffic
Miscellaneous Potential Expenses
Acceptance
We will honor this proposal for 90 days. If accepte d, please sign below and return this letter to my attention.
T2 looks forward to the opportunity to work with JIG on this project. We are confident these services will benefit the continued design and construction efforts on the proposed project.
Please contact me with any questions.
Sincerely,
T2 Utility Engineers, Inc.
Arthur Glen Robison, PE
Project Manager
Date Accepted: _________________
Company: _____________________
Signature: _____________________
Print Name: ____________________
Title: __________________________
December 22, 2022
949-768-0731 ● 1340 Reynolds Avenue, Suite 110, Irvine, CA 92614 ● www.KDMMeridian.com
Matthew McCormac
JIG Consultants KDM P2212-16v2
318 W Katella Ave, Ste. A (Job No. 22-COF-08)
Orange, CA 92867
Subject: Topographic Survey for Water Main Design
Extension of Miramar Drive, Fullerton
Dear Matthew,
KDM Meridian appreciates this opportunity to provide JIG Consultants with this proposal for survey work. The following is our project understanding, scope of work, notes -assumptions-exclusions, estimated schedule, and fees.
Project Understanding
The City of Fullerton will design and construct improvements to the water main in the Extension of Miramar Drive, Fullerton. A topographic survey and pre -construction corner records (as necessary), are being requested. The extension area requested is shown on the attached exhibit and consists of approximately 1425 linear feet of street, and approximately ten potential existing centerline monuments.
Scope of Work
1. Record Information
a. Obtain record maps and related survey information (e.g., tie-sheets, corner records and benchmarks) from the City of Fullerton and County of Orange.
2. Control Datums:
a. Horizontal: CCS83, Zone 6
b. Vertical: City of Fullerton Datum
3. Control Survey
a. Survey and identify existing benchmarks and existing exposed centerline monuments (those at existing surface).
4. Field Topographic Survey
a. Collect survey points at no less than a 50 -foot interval for ramps, curb and gutter, cross - gutters, spandrels, driveways, power poles, streetlights, hydrants, pedestals, trees, signs, utility boxes, water and gas meters, valve boxes, manholes, catch basins, monitoring wells, and striping.
b. Utility Detail
i. Catch Basins – Locate openings, local depressions, access rims, and pipe inverts. ii. Water Valves – Locate access rims and depths to top of nut. iii. Sewer Manholes – Locate access rims, depths to inverts, and note manhole material.
JIG Consultants 2 of 2
Extension of Miramar Drive, Fullerton KDM P2212-16v2
P:\2022\12\P2212-16\P2212-16v2.docx
KDM Meridian ● 949-768-0731 ● 1340 Reynolds Avenue, Suite 110, Irvine, CA 92614 ● www.KDMMeridian.com
5. Deliverables
a. Topographic b ase mapping in AutoCAD drawing format at 1” = 40’ scale consisting of surveyed points, linework, DTM with 1’ contours (limited to asp halt areas), record centerlines, street rights-of-way, and property lines.
b. Surveyed points in ASCII file format.
c. Notes, sketches, and photographs.
d. Signed and sealed topographic survey in PDF format.
Notes, Assumptions, and Exclusions
1. Monument preservation is not included within the topographic base mapping scope and fees.
Following provision of 100% design plans, the monuments requiring preservation will be determined and agreed upon with City and then required field work and pre -construction corner records will be prepared and filed.
2. Field survey will be completed as described within the project understanding and scope of services for the project. No other work is inferred or intended unless otherwise stated within this proposal.
Estimated Schedule
Topographic Base Mapping will be c ompleted within 2-3 weeks from receipt of NTP, barring inclement weather.
Fixed Fees
Topographic base mapping $ 10,300
Pre-Construction Monument Preservation (Each Monument) $ 500/ea.
Thank you for this opportunity to provide surveying services to JIG Consultants. Please contact our office if you have any questions.
Sincerely,
Richard Maher, PLS
President
Attached: Miramar Extension Area v2 Survey Request - Exhibits