BID PROPOSAL
FULLERTON POOCH PARK RELOCATION
PROJECT NO. 54270
ESTIMATED
NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT
MOBILIZATION 1 LS $16,998.07 $16,998.07
2 WATER POLLUTION CONTROL 1 LS $36,619.40 $36,619.40
3 TRAFFIC CONTROL 1 LS $5,459.24
$5,459.24
4 DEMOLITION 1 LS $32,660.40 $32,660.40
5 EARTHWORK & GRADING 1 LS $30,799.72 $30,799.72
6 ASPHALT CONCRETE 90 TON $369.03 $33,212.70
7 CONCRETE CURB & GUTTER (8" CF) 30 LF $62.12 $1,863.60 8 CONCRETE CURB (4" CF) 160 LF $39.99 $6,398.40
9 SIDEWALK - STREET 380 SF $9.60 $3,648.00
10 ACCESS RAMP 2 EA $1,521.15 $3,042.30
11 DRIVEWAY APPROACH 360 SF $14.27 $5,137.20
12 REDWOOD HEADER 290 LF $10.39 $3,013.10
13 TRAFFIC SIGNING & STRIPING 1 LS $8,239.86 $8,239.86
14 WATER SERVICE & PIPING 250 LF $53.27 $13,317.50
15 CONCRETE FLATWORK (5" THICK) 7500 SF $10.69 $80,175.00 16 CONCRETE HEADER (12" WIDE) 665 SF $23.12 $15,374.80
17 DECORATIVE GRAVEL (3" DEPTH) 340 SF $5.30 $1,802.00
18 6' TALL FENCING 1120 LF $116.35 $130,312.00
19 6' GATE (DOUBLE - 10' OPENING) 2 EA $2,561.61 $5,123.22 20 6' GATE (SINGLE - 4' WIDE) EA $2,816.06 $11,264.24
21 FRONT CHAIN LINK FENCE EXTENSION 1 LS $3,626.83 $3,626.83 22 15' × 60' SHADE STRUCTURE 1 EA $102,339.12 $102,339.12 23 15' x 30' SHADE STRUCTURE 1 EA $51,172.85 $51,172.85 24 SOLAR LIGHTING (INCLUDING FIXTURES, 10 EA $18,535.54 $185,355.40
POLE AND FOUNDATION)
25 BENCH 9 EA $2,279.95 $20,519.55
26 BOTTLE FILLER STATION WITH DRAIN LINE
2 EA $9,719.36 $19,438.72
AND SUMP
TO BE SUBMITTED WITH BID
BD-14
BID PROPOSAL
FULLERTON POOCH PARK RELOCATION
PROJECT NO. 54270
ESTIMATED
NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT
27 INSTALL TRASH RECEPTABLE (FURNISHED BY
6 EA
CITY) 502.54 3,015.24
28 DOG BAG WASTE DISPENSER 5 EA 990.29 4.951.45
29 HOSE BIB HYDRANT 2 EA 7,554.68 15,113.36
30 IRRIGATION SYSTEM 1 LS 41,528.92 41, 528.92
31 TURF REPAIR (INCL. SOIL PREPARATION, FINE LS
GRADING & 90-DAY MAINTENANCE) 1 27,085.94 27,08594
Base Bid Total $ 919,196.28
BID ALTERNATIVE 'A'
6' OMEGA II FENCE
A1 1120 LF 131.68 147,481.60
(REPLACES ITEM 19)
A2 OMEGA II DOUBLE SWING GATE
2 EA 4,286.40 8,572.80
(REPLACES ITEM 20)
OMEGA II SINGLE SWING GATE
A3 4 EA 1,908.39 7,433.56
(REPLACES ITEM 21)
Bid Alternative 'A' Total $ 103,687.96
Unit prices are required for all bid items.
The Bidder shall total his/her bid. Unit prices shall prevail in case amount disagrees with extension.
Project shall be awarded on the Base Bid. If applicable, the City may elect to use Bid Alternates after award.
Changes to either Unit Price or Amount shall be striked-out and initialed.
Items of work not specifically listed shall be included in the bid prices for related work. For all work required and shown on the construction plans and specifications for which no specific bid item or price is listed in the bid schedule, it shall be understood that such work, equipment, labor, tools, and materials shall be provided as part of the listed bid items and no additional compensation will be paid therefor.
If the City determines that any of the unit bid prices are significantly unbalanced to the potential detriment of the City, the bid may be considered non-responsive.
Company. Urban Habitat
Name Brett Brennan
Signature
Address CPO Box 1177
City & Zip Code_La Quinta, CA 92247
Phone Number 760-345-1101
License Number 963744