Contract
No.: FS12-19 Date
Prepared: 04/13/23
Buying
Agency: Contractor:
Contact
Person:
Prepared
By:
Phone: Phone:
Fax: Fax:
Email: Email:
Product
Code: FS19VC08 Description:
$785,017.00
Cost Cost
$298,188.00
Subtotal B: $298,188.00
Cost Cost
$2,716.00
Subtotal C: $2,716.00
0.25%
2 $1,085,921.00 = Subtotal D: $2,171,842.00
Subtotal E: $2,000.00
Cost Cost
$159,372.86 $4,886.64
$21.00 Subtotal F: $164,280.50
$2,338,122.50
CONTRACT PRICING WORKSHEET
For MOTOR VEHICLES Only
This Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents MUST be faxed to H-GAC @ 713-993-4548. Therefore please type or print legibly.
City of Fullerton South Coast Fire Equipment/Pierce Manufacturing Adam Loeser Kevin Newell
714-853-3348 909-673-9900
[email protected] [email protected]
Pierce Velocity, 4- Door Full Tilt Cab, Aluminum Long Body, 1250 gpm mid-mounted Pump A. Product Item Base Unit Price Per Contractor's H-GAC Contract:
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable. (Note: Published Options are options which were submitted and priced in Contractor's bid.) Description Description
Description Description
Subtotal From Additional Sheet(s):
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary E. H-GAC Order Processing Charge (Amount Per Current Policy) Subtotal From Additional Sheet(s):
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit Price plus Published Options (A+B). For this transaction the percentage is:
D. Total Cost Before Any Applicable Trade-In / Other Allowances / Discounts (A+B+C) Quantity Ordered: X Subtotal of A + B + C:
Tire Fee
Delivery Date: 36-40 months G. Total Purchase Price (D+E+F):
F. Trade-Ins / Other Allowances / Special Discounts / Freight / Installation Description Description
Sales Tax Performance Bond