Cities Index.
050223 FD Fire Apparatus Purchase Fire Quint Quote

City Council - Successor Agency - Housing Authority
May 2, 2023

Document
050223 FD Fire Apparatus Purchase Fire Quint Quote
Meeting
May 2, 2023
Body
City Council - Successor Agency - Housing Authority
Original file
150 KB
Text extracted from the city's file for reading and search. Open the original on fullerton.legistar1.com. That file is the official record.

Contract
No.: FS12-19 Date
Prepared: 03/21/23
Buying
Agency: Contractor:

Contact
Person:

Prepared
By:

Phone: Phone:

Fax: Fax:

Email: Email:

Product
Code: FS19VA09 Description:
$1,767,566.00
Cost Cost
$228,569.00
Subtotal B: $228,569.00
Cost Cost
$45,082.00
Subtotal C: $45,082.00

2.26%
1 $2,041,217.00 = Subtotal D: $2,041,217.00
Subtotal E: $2,000.00
Cost Cost
$148,818.14 $4,592.74
$17.50 Subtotal F: $153,428.38
$2,196,645.38

CONTRACT PRICING WORKSHEET
For MOTOR VEHICLES Only
This Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents MUST be faxed to H-GAC @ 713-993-4548. Therefore please type or print legibly.

City of Fullerton South Coast Fire Equipment/Pierce Manufacturing Adam Loeser Kevin Newell
714-853-3348 909-673-9900
[email protected] [email protected]
Chassis, 4-Door Full Tilt Aluminum Cab, Formed Aluminum Body, Tandem axle, 100' mid-mounted Ladder A. Product Item Base Unit Price Per Contractor's H-GAC Contract:

B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable. (Note: Published Options are options which were submitted and priced in Contractor's bid.) Description Description
Description Description
Subtotal From Additional Sheet(s):

C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary E. H-GAC Order Processing Charge (Amount Per Current Policy) Subtotal From Additional Sheet(s):

Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit Price plus Published Options (A+B). For this transaction the percentage is:

D. Total Cost Before Any Applicable Trade-In / Other Allowances / Discounts (A+B+C) Quantity Ordered: X Subtotal of A + B + C:

Tire Fee
Delivery Date: 38-41 months G. Total Purchase Price (D+E+F):

F. Trade-Ins / Other Allowances / Special Discounts / Freight / Installation Description Description
Sales Tax Performance Bond

← All documents from this meeting