SUMMARY
Award $2,413,236.50 construction contract to Big Ben, Inc. for Project 44061 Associated Infrastructure Improvements – Bastanchury Road to Imperial Highway Project.
RECOMMENDATION
Approve plans and specifications for Project 44061 Associated Infrastructure Improvements – Bastanchury Road to Imperial Highway.
Approve replacing bid schedule base bid item #41, Traffic Signing and Striping with Bid Alternate Item #1, Traffic Re-striping of Existing.
Approve the following appropriations in Project 44061 Associated Infrastructure Improvements – Bastanchury Road to Imperial Highway:
$1,305,000 RMRA / SB1 Funds budget transfer from Project 44400 Annual Arterial Street Reconstruction, Rehabilitation and Repair $40,000 Measure M2 Funds budget transfer from Project 46027 Signal Operation Enhancement $58,000 Measure M2 Funds budget transfer from Project 46037 Neighborhood Traffic Management $227,000 Sewer Enterprise Funds budget transfer from Project 51419 Annual Sewer Replacement Project $1,420,000 Water Funds budget transfer from Project 53250 Water Main System Replacement and Upgrade.
Award $2,413,236.50 construction contract for the Associated Infrastructure Improvements – Bastanchury Road to Imperial Highway Project to Big Ben, Inc. and authorize City Manager, or designee, to execute contract, in a form approved by the City Attorney.
Authorize Public Works Director, or designee, to approve any future change orders for construction and professional engineering construction support services within the approved project budget.
CITY MANAGER REMARKS
The City Manager recommends award a $2,413,236.50 construction contract to Big Ben, Inc.
This item will authorize staff to begin construction on the paving project.
Staff will come back to the City Council for further discussion and action on the lane reduction options.
PRIORITY POLICY STATEMENT
This item matches the following Priority Policy Statement:
Infrastructure and City Assets.
FISCAL IMPACT
The Fiscal Year 2022-23 CIP Budget has sufficient funding for Project 44061 Associated Infrastructure Improvements – Bastanchury Road to Imperial Highway. Staff recommends the following budget transfers:
$1,305,000 RMRA / SB1 Funds from Project 44400 Annual Arterial Street Reconstruction, Rehabilitation and Repair $40,000 Measure M2 Funds from Project 46027 Signal Operation Enhancement $58,000 Measure M2 Funds from Project 46037 Neighborhood Traffic Management $227,000 Sewer Enterprise Funds from Project 51419 Annual Sewer Replacement Project $1,420,000 Water Funds from Project 53250 Water Main System Replacement Program to Project 44061 Associated Road Infrastructure Improvements – Bastanchury Road to Imperial Highway.
Staff attached a Budget Data Sheet / Summary of Bids and the Contractor’s Bid Schedule for reference (Attachments 1 and 2, respectively).
DISCUSSION
This project involves the following infrastructure improvements on Associated Road between Bastanchury Road and Imperial Highway:
Repair water main
Repair sewer main
Replace sewer manholes from Rolling Hills Drive to Imperial Highway Repair curb, gutter and sidewalk damage
Construct curb ramps
Rehabilitate existing paving with slurry seal between Bastanchury Road and Rolling Hills Drive Add grind and overlay between Rolling Hills Drive and Imperial Highway Proposed striping revisions for the length of the project.
Pavement rehabilitation totals approximately 1.29 miles. The project limits currently have the following Pavement Condition Index (PCI):
Street
Limits
PCI
Associated Road
Bastanchury Road to Craig Circle
68 (Fair)
Associated Road
Craig Circle to Rolling Hills Drive
77 (Good)
Associated Road
Rolling Hills Drive to Imperial Highway
29 (Very Poor)
Segments improved with slurry seal would raise the respective PCI scores approximately 10 points. Segments improved with grind and overlay would have PCI scores reset to 100 (Very Good).
Proposed Roadway Reclassification and Lane Reduction
Staff has coordinated with commissions, committees and the community on a potential lane reduction on Associated Road between Bastanchury Road to Imperial Highway. The base bid for this project included a proposed lane reduction, however, staff recommends replacing this bid item with the alternative bid item (to re-stripe in-kind) to keep the infrastructure improvements on schedule to start construction in July.
Staff plans to revise the lane reduction design and present at a community meeting for additional input followed by presentation to City Council for consideration in early summer.
Staff received four bids on May 5, 2023 for the Associated Road Infrastructure Improvements – Bastanchury Road to Imperial Highway Project. Big Ben Inc. of Irvine submitted the lowest responsible base bid totaling $2,508,236.50. The low base bid as submitted is approximately 3.6% below the engineer’s $2,603,000 estimate. Staff evaluated the bid. Staff evaluated the base bid price presented by each bidder before accounting for any bid alternates and must award to the responsible base bid lowest bidder. Staff recommends awarding the project to Big Ben, Inc.
Staff expects construction to start in July 2023 and completed by end of 2023.
Staff has prepared an environmental assessment in accordance with the California Environmental Quality Act guidelines determined the project categorically exempt.
Attachments:
Attachment 1 – Budget Data / Summary of Bids
Attachment 2 – Bid Schedule
Attachment 3 – Project Location Map
Attachment 4 – Standard Contract / Agreement
cc: City Manager Eric J. Levitt
Associated Road Infrastructure Improvements Bastanchury to Imperial May 16, 2023 - Page 2