The Tracks
At Fullerton Station
The original design of hotel only
proposal.
ORIGINAL HOTEL DESIGN – PRE 2022 REVISION
Revised design to incorporate
housing into project after
numerous inputs from
community outreach and
communication with the city.
First Revision of including Housing 8/31/2022
Revised design to incorporate
brick elements, metal panel,
metal awing and separate
architectural style of apartment
into project after meetings with
city staffs and council members
Second Revision on 9/26/2022
Revised design to incorporate
different color scheme to reflect
previous hotel design with
sustainable design strategies of
both hotel and apartment into
project after meetings with city
staffs and council members
Third Revision on 9/29/2022
Revised design to incorporate
traditional architectural styles on
both hotel and apartment into
project after meetings with city
staffs and council members and
special interests groups
including but not limited to
Fullerton Heritage Group.
Fourth Revision on 11/15/2022
Revised design to incorporate
enhanced art deco
architectural styles on
apartment façade into project
after meetings with city staffs
and council members and
special interests groups
including but not limited to
Fullerton Heritage Group.
Fifth Revision on 1/16/2023
Revised design to incorporate
different traditional architectural
styles with different color
schemes on both hotel and
apartment into project after
meetings with city staffs and
council members and special
interests groups including but
not limited to Fullerton Heritage
Group.
Sixth & Seventh Revision on 1/25/2023 & 1/27/2023
Revised design to incorporate
additional details on
architectural styles on both
hotel and apartment into
project after meetings with city
staffs and council members and
special interests groups
including but not limited to
Fullerton Heritage Group.
Current Proposed Design 3/14/2023