City of Fullerton Main Plant PFAS Upgrade
GROUP ITEM TYPE DESCRIPTION QTY Cost
A 1 ENC NEMA 12 Enclosure 96"X36"X20" 1 3,495.00$
2 ENC Back Panel 1 835.00$
3 ENC LED Light 2 34.00$
4 ENC Door Switch 1 17.00$
5 ENC Key Operated Selector Switch, Right Release 1 210.00$ 6 ENC Contact Block, Two Pole 2 137.00$
7 ENC Wire Duct Straight, 4"x4" 6 104.00$
8 ENC Wire Duct Cover, 4" 6 28.00$
9 ENC Wire Duct Straight 2"X4" 18 241.00$
10 ENC Wire Duct Cover 2" 18 46.00$
11 ENC Wire Duct Straight, 1.5"x4" 12 154.00$
12 ENC Wire Duct Cover, 1.5" 12 35.00$
13 ENC Wire Duct Straight, 1"x1" 6 35.00$
14 ENC Wire Duct Cover, 1" 6 14.00$
15 ENC Wire Duct Straight 0.75"X2" 6 50.00$
16 ENC Wire Duct Cover 0.75" 6 10.00$
17 ENC Wire Duct Attachment Rivet 576 116.00$
18 ENC 6-Port Ground Bar 1 28.00$
19 ENC Isolation Standoffs 2 38.00$
20 ENC Push Button Operator 1 67.00$
21 ENC Name Plate 1 58.00$
22 ENC -$
23 ENC -$
24 ENC -$
25 ENC -$
26 ENC -$
27 ENC -$
B 1 NET Unmanaged Industrial Ethernet Switch, 8-Port 1 258.00$ 2 NET Multi-Protocol Equipment Protector, PoE 1 66.00$
3 NET CAT5e Network Cable-BLUE 1 7.00$
4 NET CAT5e Network Cable-RED 1 7.00$
5 NET Subscriber Radio to (Upper Acacia or Las Palmas) 1 2,960.00$ 6 NET
equipment & engineering required to support PFAS a Main Plant City of Fullerton Main Plant PFAS Upgrade
C 1 PLC CompactLogix Controller 2 9,454.00$
2 PLC CompactLogix Power Supply, 24VDC 2 1,538.00$
3 PLC CompactLogix Analog Input, 8 Channel 5 6,614.00$
4 PLC CompactLogix Analog Output, 8 Channel 2 4,938.00$ 5 PLC CompactLogix Discrete Input, 32 Point, Source Out 5 3,563.00$ 6 PLC CompactLogix Discrete Output, 32 Point, Sink/Source 3 2,626.00$ 7 PLC 8-Channel Analog Input/Output Termination Module 5 660.00$ 8 PLC Digital Input Wiring Module, 32 Point 4 592.00$
9 PLC 16 Channel Relay Output Board 2 360.00$
10 PLC Interface Adapter, PLC Analog Input Module 5 500.00$ 11 PLC Interface Adapter, PLC Digital Input Module 4 560.00$ 12 PLC Interface Adapter, PLC Digital Output Module 2 280.00$ 13 PLC Cable, Analog Input Module 5 362.00$
14 PLC Cable, Digital Input Module 4 290.00$
15 PLC Cable, Digital Output Module 2 145.00$
16 PLC -$
17 PLC -$
18 PLC -$
19 PLC -$
D 1 PWR Power Distribution Board 1 880.00$
2 PWR 24 VDC Power Supply - 10A 2 224.00$
3 PWR 12 V Rechargeable Battery 2 365.00$
4 PWR Circuit Breaker, 16A 15 542.00$
5 PWR GFI Din Rail Mount Duplex Receptacle 1 72.00$
6 PWR -$
7 PWR -$
8 PWR -$
9 PWR -$
10 PWR -$
City of Fullerton Main Plant PFAS Upgrade
E 1 TRM 35 MM Din Rail 20 35.00$
2 TRM Terminal Block, 4mm 100 109.00$
3 TRM End Barrier 40 85.00$
4 TRM Marker Card 25 2.00$
5 TRM Terminal Block, Grounding 30 408.00$
6 TRM Center Bridge Jumper 30 162.00$
7 TRM Partition Plate 30 84.00$
F 1 WIR Hook-Up Wire, 16 GA 1015 TEW, BLU 100 13.00$
2 WIR Hook-Up Wire, 16 GA 1015 TEW, BLK 100 13.00$
3 WIR Hook-Up Wire, 16 GA 1015 TEW, RED 100 13.00$
G 1 RLY Time Delay Relay 1 68.00$
2 RLY Relay Socket, 2 Pole 1 11.00$
3 RLY -$
4 RLY -$
5 RLY -$
6 RLY -$
7 RLY -$
8 RLY -$
9 RLY -$
10 RLY -$
H 1 HMI Hope Industrial 23-inch Monitor 1 1,632.00$
2 HMI HMI 1 1,880.00$
3 HMI Industrial Keyboard/Mouse 1 410.00$
4 HMI Popout Keyboard Tray 1 720.00$
5 HMI Small Form Factor Protocol Converter 1 360.00$
6 HMI -$
7 HMI -$
8 HMI -$
9 HMI -$
10 HMI -$
49,620.00$
54,384.00$
104,004.00$ total cost PFAS expansion
Hardware Subtotal
labor to support PFAS expansion
fname lname date hours cost / hr total cost jobcode_1 jobcode_2 407-10-09 notes Edgar Flores 5/3/2023 2 $135.00 $270.00 Fullerton Main Plant PFAS TT Engineering Working with Jose to get all the field equipment and their specifications within the Fullerton SharePoint into one location for Larry
Jose Sanchez 5/3/2023 2 $135.00 $270.00 Fullerton Main Plant PFAS TT Engineering Grabbing the new docs that we need from the SharePoint and uploading them to our SharePoint Larry Pomatto 5/3/2023 2 $250.00 $500.00 Fullerton Main Plant PFAS TT Engineering work on I/O list Jose Sanchez 5/17/2023 6 $135.00 $810.00 Fullerton Main Plant PFAS TT Engineering Organizing all of the DOCs within the SharePoint
Uploading all of the submittals
Documenting the current set of IO with their respective hardware Creating IO reference sheet for the IO links.
Edgar Flores 5/18/2023 3 $135.00 $405.00 Fullerton Main Plant PFAS TT Engineering Helping Jose with the spreadsheet requested by Larry, mapping the Field equipment used in the spec/plans to the submittals from the Fullerton SharePoint.
Jose Sanchez 5/18/2023 4 $135.00 $540.00 Fullerton Main Plant PFAS TT Engineering Ripping out the section of the spec that includes the references for Tag Number relevant to the hardware submittals
Larry Pomatto 5/19/2023 2 $250.00 $500.00 Fullerton Main Plant PFAS TT Engineering Meeting with Edgar and Jose to go over the excel spreadsheet for the field equipment. Ran through it with us how to find the submitted submittals to the City of Fullerton about the field devices and the tag numbers they are associated with in order to match the P&IDs.
Edgar Flores 5/19/2023 4 $135.00 $540.00 Fullerton Main Plant PFAS TT Engineering Meeting with Larry and Jose to go over the excel spreadsheet for the field equipment. Ran through it with us how to find the submitted submittals to the City of Fullerton about the field devices and the tag numbers they are associated with in order to match the P&IDs.
Helping Jose with the searching of information within the submittals.
Jose Sanchez 5/19/2023 8 $135.00 $1,080.00 Fullerton Main Plant PFAS TT Engineering 2 Roll over hours, constructing documentation for larry tag numbers on pid and spec and hardware submittal inconsistencies
Larry Pomatto 5/19/2023 4 $250.00 $1,000.00 Fullerton Main Plant PFAS TT Engineering Meeting with Edgar and Jose to go over the excel spreadsheet for the field equipment. Ran through it with us how to find the submitted submittals to the City of Fullerton about the field devices and the tag numbers they are associated with in order to match the P&IDs.
Helping Jose with the searching of information within the submittals.
Jose Sanchez 5/23/2023 2 $135.00 $270.00 Fullerton Main Plant PFAS TT Engineering Worked on the tag number issues with larry Larry Pomatto 5/23/2023 2 $250.00 $500.00 Fullerton Main Plant PFAS TT Engineering Worked on the tag number issues with Jose Edgar Flores 5/24/2023 7 $135.00 $945.00 Fullerton Main Plant PFAS TT Engineering Worked with Jose and Larry to create the IO spreadsheet referencing the issues within the submittals in Fullerton. Updated the terminal points on where we are to lay out wires and marked the submittals for the field equipment that is still missing the hardware submittals.
Jose Sanchez 5/24/2023 7 $135.00 $945.00 Fullerton Main Plant PFAS TT Engineering Working on the IO Sheet with larry and Edgar Larry Pomatto 5/24/2023 7 $250.00 $1,750.00 Fullerton Main Plant PFAS TT Engineering Working on the IO Sheet with Jose / Edgar Edgar Flores 5/26/2023 2 $135.00 $270.00 Fullerton Main Plant PFAS TT Engineering Added legend for the spreadsheet sent to Fullerton Jose Sanchez 5/26/2023 4 $135.00 $540.00 Fullerton Main Plant PFAS TT Engineering Roll over hours from this week used - making IO sheet Edgar Flores 5/30/2023 2 $135.00 $270.00 Fullerton Main Plant PFAS TT Engineering Worked with Jose and Larry to get the responses to the Tetra tech IO spreadsheet for his meeting Jose Sanchez 5/30/2023 2 $135.00 $270.00 Fullerton Main Plant PFAS TT Engineering Working with Larry on the response to Fullerton response.
Larry Pomatto 5/30/2023 2 $250.00 $500.00 Fullerton Main Plant PFAS TT Engineering worked with Edgar / Jose to respond to TT I/O spreadsheet for meeting with Fullerton Edgar Flores 6/7/2023 1 $135.00 $135.00 Fullerton Main Plant PFAS TT Engineering Worked with Larry and Jose to update the IO spreadsheet, I will then have to go into the drawings and update all the terminal connections with the findings from the hardware submittals Jose Sanchez 6/7/2023 2 $135.00 $270.00 Fullerton Main Plant PFAS TT Engineering Working with larry and Edgar regarding the io list Larry Pomatto 6/7/2023 2 $250.00 $500.00 Fullerton Main Plant PFAS TT Engineering I/O list updating spreadsheet Edgar and Jose.
Jose Sanchez 6/8/2023 2 $135.00 $270.00 Fullerton Main Plant PFAS TT Engineering Meeting with larry and Edgar. Worked on the excel spreadsheet Larry Pomatto 6/8/2023 2 $250.00 $500.00 Fullerton Main Plant PFAS TT Engineering Meeting with larry and Edgar. Worked on the excel spreadsheet Edgar Flores 6/21/2023 5 $135.00 $675.00 Fullerton Main Plant PFAS TT Engineering Updating the drawings package for Main Plant PFAS, using the IO spreadsheet Larry, Jose and I generated to identify the terminal blocks and termination contacts that I will be including for the Modules. Removed the digital input points for the motor high temp that is no longer used. Updating the wire numbers if the field equipment submittals indicate it in the wiring schematic and leaving our Jose Sanchez 6/21/2023 5 $135.00 $675.00 Fullerton Main Plant PFAS TT Engineering Updating drawings package for Main Plant PFAS, using the IO spreadsheet Larry & Edgar generated to identify the terminal blocks and termination contacts that I will be including for the Modules.
Larry Pomatto 6/21/2023 5 $250.00 $1,250.00 Fullerton Main Plant PFAS TT Engineering meeting to updating the drawings package for Main Plant PFAS, using the IO spreadsheet Edgar, Jose Edgar Flores 6/22/2023 4 $135.00 $540.00 Fullerton Main Plant PFAS TT Engineering Continuing to work on the drawings updates.
Edgar Flores 6/23/2023 8 $135.00 $1,080.00 Fullerton Main Plant PFAS TT Engineering Spoke with Larry about how I should go about displaying the wiring for the terminal blocks, we agreed on a method. Going through the IO spreadsheet and verifying with the submittals that the terminal block numbers and identifiers are matching and that we did not make a mistake during the spreadsheet creation. Updated those onto the digital input boards. larry Pomatto 6/23/2023 2 $250.00 $500.00 Fullerton Main Plant PFAS TT Engineering Worked with Edgar presenting I/O wiring and terminal block numbering for spreadsheet / drawings Edgar Flores 6/26/2023 8 $135.00 $1,080.00 Fullerton Main Plant PFAS TT Engineering Finished the updates to the digital inputs, had to change the terminal connections for the Chem pumps for the first terminal block T7 from 1 to 3 since 1 is the normally closed and 3 is the normally open. Also the Subm006.1 submittal mentioned that the in local signal does not need to be hardwired to the PLC so made the 4 signals for the 4 pumps into spares.
Edgar Flores 6/27/2023 6 $135.00 $810.00 Fullerton Main Plant PFAS TT Engineering Finished the updates to the Main Plant PFAS drawing package, sent it out to Larry.
Edgar Flores 7/6/2023 1 $135.00 $135.00 Fullerton Main Plant PFAS TT Engineering Meeting with Jose and Larry to discuss the BOM with regards to our and the Fullerton plans BOM Edgar Flores 7/6/2023 1 $135.00 $135.00 Fullerton Main Plant PFAS TT Engineering Gathered together an entire package for the drawings and the cutsheets for the Main Plant PFAS submittal, updated the enclosure from 24" to 20" and updated the cutsheet as well as the BOM.
Edgar Flores 7/6/2023 1 $135.00 $135.00 Fullerton Main Plant PFAS TT Engineering Meeting with Larry, Jose, and Tiffany from Fullerton to discuss the model numbers for the bill of materials and to explain to her why we chose the Allen Bradley modules over the ones they specified in their plans. We will be updating the part numbers for all the parts to the manufacturer part numbers and send the complete package back to Tiffany.
Jose Sanchez 7/6/2023 3 $135.00 $405.00 Fullerton Main Plant PFAS TT Engineering 1 hour meeting in the morning with larry and Edgar regarding the status of the Fullerton pfas submittals and hardware. 1 Hour for the creation of the needed documents for the meeting including the BOM SI vs BOM TT SPEC, sent out to larry the pdfs of the panel and the bom excel. 1 more 1 hour meeting with Edgar tiffany and larry about the BOM and submittal and why we are choosing the use the Allen Bradely hardware.
Larry Pomatto 7/6/2023 2 $250.00 $500.00 Fullerton Main Plant PFAS TT Engineering Meeting with Edgar, Jose, and Tiffany from Fullerton to discuss the model numbers for the bill of materials and to explain to her why we chose the Allen Bradley modules over the ones they specified in their plans.
Edgar Flores 7/10/2023 5 $135.00 $675.00 Fullerton Main Plant PFAS TT Engineering Going through each part on the Bill of Materials and finding the Manufacturer part numbers. Updated all the parts that were not SI parts and updated the drawings.
Jose Sanchez 7/11/2023 1 $135.00 $135.00 Fullerton Main Plant PFAS TT Engineering Helped Edgar with the drawings.
Edgar Flores 7/12/2023 2 $135.00 $270.00 Fullerton Main Plant PFAS TT Engineering Modified the word document that is used for the hardware submittal and changed all the part numbers to the new manufacturer part numbers, exported it as a PDF and slapped all the cutsheets into each section. Lastly, inserted the updated drawings and sent it out to Larry for review.
Edgar Flores 7/13/2023 4 $135.00 $540.00 Fullerton Main Plant PFAS TT Engineering Main Plant PFAS, created a drawing for the ethernet switch to show the connections that will be going out of the switch. Updated the table of contents to include a communications section. Updated the electrical symbols drawings to add ethernet cables, usb cables, and surge arrestor to the legend.
Assembled the drawings with the cutsheets into a submittal package and sent it out to Tiffany. She sent back the approval with some noted information, put that into the SharePoint.
Edgar Flores 8/8/2023 1 $135.00 $135.00 Fullerton Main Plant PFAS TT Engineering Looked through the Fullerton SharePoint to find the submittal for the Leak Detection Panel, quickly looked to see if they had included a wiring schematic but only one page was provided with little information. Downloaded it and sent it to Larry to review for Tiffany.
Total Hrs. 147
$23,525.00Total Cost