BID PROPOSAL
CURB/GUTTER AND SIDEWALK RECONSTRUCTION FISCAL YEAR 2022-23 44794

BASE BID

ESTIMATED
NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT
1 MOBILIZATION LS 1 $ 10,000"0 " 10,000 °
2 WATER POLLUTION CONTROL LS 1 $5,000-00 $5,000'"'
3 TRAFFIC CONTROL LS 1 $ 10,00000 ₩ 10,000°0
4 REMOVE AND REPLACE STD SIDEWALK SF 15,500 * 13:°° $ 201,50000 5 REMOVE AND REPLACE 6" THICK SIDEWALK SF 1,200 15.00 $ 18,000 0º REMOVE AND REPLACE CURB DRAIN EA 2 $ 800°0 1,600 °°
REMOVE AND REPLACE CURB AND GUTTER LF 300 120:°°
7 $ 36,000"°
(6" HEIGHT)
REMOVE AND REPLACE CURB AND GUTTER 120:00
8 LF 1,400 $ 168,000'''
(8" HEIGHT)
REMOVE AND REPLACE 15'00
9 SF 1,200 $ 18,000 °°

RESIDENTIAL/COMMERCIAL DRIVEWAY

STREET LIGHT AND CONDUIT AND WIRING
10 LS 100 $60:" $ 6,000•0°
REPAIR
Base Bid Total $ # 474,100."

REPLACEMENT BID

ESTIMATED
NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT
REPLACES BASE BID ITEM 7
TA REMOVE AND REPLACE CURB AND GUTTER LF $120.0°
300 $36, 000"0
(6" HEIGHT). CONTRACTOR RESPONSIBLE TO

PROTECT FIBER OPTICS
REPLACES BASE BID ITEM 8
8A REMOVE AND REPLACE CURB AND GUTTER LF 1,400 # 120.001 (8" HEIGHT). CONTRACTOR RESPONSIBLE TO 168,000°M

PROTECT FIBER OPTICS
Replacement Bid Total $ # 204, 000."°
Project shall be awarded on the Base Bid. If applicable, Replacement Bid prices maybe selected for award.

SiFi Networks owns the fiber optic facilities. For this project, SiFi Networks has the right to either repair damage at their cost (Base Bid); or choose the Replacement Bid prices and therefore require the Contractor to be responsible to protect the fiber optic and costs to repair any damage. See project plans and specifications for information.

Unit prices are required for all bid items.

The Bidder shall total their bid. Unit prices shall prevail in case amount disagrees with extension.

Changes to either Unit Price or Amount shall be striked-out and initialed.

TO BE SUBMITTED WITH BID
BD-14

ESTIMATED

UNIT PRICE
Items of work not specifically listed shall be included in the bid prices for related work. For all work required and shown on the construction plans and specifications for which no specific bid item or price is listed in the bid schedule, it shall be understood that such work, equipment, labor, tools, and materials shall be provided as part of the listed bid items and no additional compensation will be paid therefor.

If the City determines that any of the unit bid prices are significantly unbalanced to the potential detriment of the City, the bid may be considered non-responsive.

Company CS Concrete Construction, Inc
Name Jay b parna
Signature
Address 10142 Shoemaker Ave
Cily & zip Code Santa Fe Springs, CA 90670
Phone Number (562) 717-2222
License 720989 Class-A

TO BE SUBMITTED WITH BID
BD-15