ATTACHMENT 1 – BUDGET DATA SHEET

RANCHO-VERONA AREA WATER MAIN REPLACEMENT
Project No.: 53042
Source of Funds
Existing Budget:

Water Fund $225,000
Proposed Budget Transfers:

Water Funds from Project 53250 $2,375,000
TOTAL $2,600,000
Estimated Expenditures
Construction Contract $1,850,900
Project Design and Coordination $200,000
Estimated Surveying, Inspection, Testing,
and Contract Administration (10%) $185,090
Contingencies (15%) $277,635
TOTAL $2,513,625
Summary of Bids
Bid Opening: January 18, 2024
Engineer’s Estimate: $2,299,700
Contractor
Location
Bid Total

1. Big Ben Inc.

Irvine
$1,850,900

2. Dominguez General Engineering, Inc.

Pomona
$2,137,600

3. All Cities Engineering, Inc
Ontario
$2,215,400

4. Stephen Doreck Equipment Rentals, Inc.

Pico Rivera
$2,254,710

5. CEM Construction Corporation
Montebello
$2,277,450

6. T.E. Roberts, Inc.

Irvine
$2,313,748

7. Palp, Inc DBA Excel Paving
Long Beach
$2,525,545

8. GCI Construction, Inc.

San Clemente
$2,869,760

9. Teichart Energy & Utilities Group, Inc
Long Beach
$3,155,010
(1) = Submitted bid amount was $2,185,500, however, miscalculation of the total amount was submitted by the Contractor. The correct bid total is $2,215,400. (2) = Submitted bid amount was $2,894,060, however, miscalculation of the total amount was submitted by the Contractor. The correct bid total is $2,869,760.