1 Stephen Bise
From: Vanessa Acosta <[email protected]>
Sent: Friday, November 15, 2024 11:30 AM
To: Stephen Bise
Cc: Jessica Fernandez
Subject: RE: (External):RE: Walk-on-Wilshire
Hi Stephen – below is the note I received from one of our planning managers:

SCE needs to be able to access our facilities. This includes for planned work, regular maintenance, and operations, and for emergencies. Additionally, we will need to be able to get our vehicles and line trucks to access our facilities, so there needs to be unobstructed access for our vehicles and personnel at all times.

Let me know if you would like to coordinate a call with my team and yours.

Thank you,

Vanessa Acosta Russolino
Local Public Affairs
M. 626-482-9112
GO1 460F, In-Office Days: Tuesday & Wednesday
www.sce.com/outage

From: Stephen Bise <[email protected]>
Sent: Tuesday, November 12, 2024 5:27 PM
To: Vanessa Acosta <[email protected]>
Cc: Jessica Fernandez <[email protected]>
Subject: (External):RE: Walk-on-Wilshire

Hi Vanessa, Following up on this. Please let me know i f you have a ny questi ons. Regards, Stephen Bise, PE , TE Dire ctor of Public Works City of F ullerton p: 7 14. 7 38. 68 52 e: Stephen.  Bise @ cityoffullert on.  com 303 W. Commonwealt h Ave. Fullerton,

Hi Vanessa,
Following up on this. Please let me know if you have any questions.

Regards,

2 Stephen Bise, PE, TE
Director of Public Works
City of Fullerton

p: 714.738.6852
e: Stephen.Bise @cityoffullerton.com

303 W. Commonwealth Ave.

Fullerton, CA 92832
www.cityoffullerton.com

From: Stephen Bise
Sent: Thursday, October 24, 2024 3:31 PM
To: [email protected]
Cc: Jessica Fernandez < [email protected] >
Subject: Walk-on-Wilshire

Hi Vanessa,
Our City Council recently extended the Walk-on-Wilshire closure to January 31, 2025 and directed staff to review the feasibility of a full street closure (Malden to Harbor; see below). We are requesting SCE review if/how the potential closure may affect SCE facilities. The area will still be accessible to emergency vehicles and necessary maintenance personnel, but would be restricted to all other vehicular traffic. A memo with your disposition would be helpful as we analyze the feasibility of the closure. Please reach out if you have any questions.

3 Regards,

Stephen Bise, PE, TE
Director of Public Works
City of Fullerton

p: 714.738.6852
e: Stephen.Bise @cityoffullerton.com

303 W. Commonwealth Ave.

Fullerton, CA 92832
www.cityoffullerton.com

Disclaimer: This electronic transmission, and any documents attached hereto, may contain confidential and/or legally privileg ed information. The information is intended only for use by the recipient named above. If you have received this electronic message in error, please notify the sender and delete the electronic message. Any disclosure, copying, distribution, or use of the contents of information received in error is strictly prohibited.

SoCalGas
2191 E. Birch St.

Brea, CA 92821

November 19, 2024
City of Fullerton
Department of Public Works
Attn: Stephen Bise, Director of Public Works
303 W. Commonwealth Ave.

Fullerton, CA 92832

RE: ResoluƟon No. 2024-XXX. Walk on Wilshire pilot program Pursuant to your request, this leƩer is to provide the City of Fullerton (City) with informaƟon regarding impacts to the natural gas infrastructure as it evaluates the feasibility of permanently closing 200’ of segment on Wilshire Ave., between Malden Ave. and N. Harbor Blvd., as pictured in the aƩachment hereto (the Affected Area).

Southern California Gas Company (SoCalGas) currently transmits and distributes gas to its customers located within the City’s limits pursuant to that certain franchise agreement (City ordinance No. 463) between it and the City, dated January 3, 1939 (Franchise). Based on SoCalGas’ limited review, none of our currently exisƟng natural gas infrastructure appear to be impacted by a permanent closure of the Affected Area provided the Affected Area remains part of the public right of way. However, as a regulated public uƟlity under the jurisdicƟon of the California Public UƟliƟes Commission (CPUC), SoCalGas maintains its obligaƟon to serve customers if requested in the future. Furthermore, SecƟon 8 of the Franchise states, “[t]he grantee of this franchise shall construct, install and maintain all pipes and appurtenances in accordance with and in conformity with all of the ordinance’s rules and regulaƟons heretofore and hereaŌer adopted by the legislaƟve body of this City.” Beyond this corridor, underground natural gas infrastructure has been idenƟfied throughout the City, wherein SoCalGas is responsible for maintaining and operaƟng its pipelines and appurtenances in accordance with state and federal laws. Therefore, adequate access shall be maintained at all Ɵmes to such faciliƟes. If permanent or semi-permanent fixtures are installed, such as furnishings or infrastructure adjacent to or above uƟlity infrastructure, all elements are subject to removal when SoCalGas requires access. It should be noted that SoCalGas’ costs incurred in connecƟon with the removal or repairs will be the sole responsibility of the customer served from the pipeline that has impaired access.

In the event future street closures are to be considered, SoCalGas will be pleased to work with the City and staff to conduct further research to determine any impacts. We thank you for your Ɵme. Please do not hesitate to contact me should you have any quesƟons or wish to discuss.

Sincerely,
Clarissa Serpas
Public Affairs Manager

AƩachment 1
(Map of Affected Area)

Please note: This map indicates the general locaƟon of pipelines. SoCalGas makes no representaƟons or warranƟes to City or any of its agents, contractors or representaƟves that such data may be relied upon for field work and such data shall not be a subsƟtute for the City’s required conflict check and dig alert obligaƟons prior to starƟng any field work.

WALK ON WILSHIRE

REPUBLIC SERVICES
To: Michell Duron
From: Carlene Weaver
CC: Jorge Llerena, Michael Hernandez
Date: 12/09/24
Re: Walk on Wilshire
COMMENTS: After a walk-through of the location, services can be provided with some modifications. If Merchant Farmers Bank will allow Republic to stage our containers in their parking lot as noted in the aerial view (Wilshire option B) We could place the mini pkrs for Wilshire Prom and The Cellar via scout service so that our truck has direct access to the dump without the driver having to perform any backing. The scout driver will then return the containers to their original locations. This can be scheduled early in the morning for less impact on locations.

Another more detailed option would require multiple changes:

A. 1st parking space on Whiting must be eliminated just before the alley entrance.

B. The alley is very narrow for trucks, and vehicles coming in opposite directions will not have passing room.

C. The gate between Merchant Farmers Bank's parking lot and The Cellar needs to be removed so the driver can exit after dumping the bins inside The Cellar.

D. 1st two parking stalls in The Cellars parking lot need to be removed so the truck has turning access.

E. Wilshire Prom Apts already has pull-out service but will need to be relocated to a different location, possibly Merchant Farmers Bank or next to The Cellars container.

F. The driver is concerned about other delivery vehicles in the location when servicing and the very minimal maneuvering room.

Note: blue arrows are truck moving forward, red arrows truck in reverse

CELLAR BINS

LOCATED
HERE

MINI PKRS STAGED FOR PICK UP
IN ALLEY WAY . WE WILL NEED TO

CHANGE THE LOCATION, SUGGEST
N PARKING LOT BEHIND BANK.

STAGE MINI PKRS FOR WILSHIRE

PROMENADE FOR TRUCK TO DUMP
Note: blue arrows are truck moving forward.

Place min PKRs from Wilshire Prom and The Cellar into parking lot behind Farmers Merchant Bank ( need approval) . Eliminating all backing and removal of parking spaces

CELLAR BINS

LOCATED HERE

MINI PKRS STAGED FOR PICK UP
IN ALLEY WAY . WE WILL NEED TO

CHANGE THE LOCATION, SUGGEST
N PARKING LOT BEHIND BANK.

Stage bins for The Cellar and
Wilshire promenade via scout
service. Eliminate all backing for
servicing containers.