PO Number:Duration: This quote is valid for until March 1, 2025Freight:Prepaid and AddTerms: Net 45 DaysPages: 1 of 4 22013 Lakeland AveLake Forest, CA 92630(714) 269-8190(714) 559-1959QUOTE2025001.1CTYFULXV-SOLUTIONS,Fullerton SCADA System UpgradeProject01/03/2025Attn:Ronnie AcostaCITY OF FULLERTONdirectShip To:CITY OF FULLERTON 1580 W. COMMONWEALTH AVEFULLERTON, CA 92833(714)-738-6374From: Servando [email protected] (714) 269-8190Bill To:CITY OF FULLERTON 1580 W. COMMONWEALTH AVEFULLERTON, CA 92833office(714)559-1959 Thank you for the opportunity to offer you this quote!AVEVA System Platform (Wonderware) SCADA System Upgrade ProjectThis is a Time and Materials (T&M) proposal for XV Solutions to provide the City of Fullerton integration services to perform a system upgrade, including infrastructure (hardware and software) setup, from Wonderware version 2014 to AVEVA System Platform version 2023 R2Scope of work for this project consists of: overseeing the installation of new hardware at the City of Fullertons server room, configuring all of the new hardware that will host the AVEVA System Platform v 2023 R2, migrating the version 2014 system to the new platform, testing to ensure the new system can reach every existing field RTU/PLC, stations, devices, valves, flow meters, pressure transmitters, intrusion alarms and other devices that are currently operational in the existing system, and managing the transition from the 2014 system to the new 2023 R2 platform. PROJECT RESPONSIBILITIESXV SOLUTIONS 1.Coordinate with City IT to install the new server rack, rack up all of the new equipment, install the new 220v line power for theemergency UPS, and add new networking connections from new rack to existing equipment2.Configure the new hardware, including networking, power, I/O, and hardware/software configuration for Dell Servers, SAN, Tap eDrive, KVM management console, and VMWare vSphere cluster.3.Create new Windows Servers (v2022) VMs for the Aveva System Platform v2023 R2 environment, including operating systems and Domain Controllers, and Aveva System Platform configuration4.Convert existing Galaxy from Wonderware v2014 to Aveva System Platform v2023 R2, this upgrade will be done in parallel in order to not disrupt the water production operations and system minimize downtime.5.Transition operations from version 2014 to version 2023 R2, coordinate with Water Production staff.6.Documentation: create documentation for Hypervisor system, with high availability configs and operation documentation that includes networking diagrams, system installation and configuration parameters as well as back up and restore procedures.NOTES:1. This project does not include rebuilding or redesigning the graphical elements of the SCADA user interface. The current interface is using an older standard for SCADA HMIs; the new standard is to use situational awareness graphics, but the effort to redesign the user interface should be undertaken after this project is complete, so that the new user interface takes advantage of the new features in the latest version of Aveva System Platform.2. Upon inspection of the event logs on the current system, we noticed a number of configuration warnings and some errors. This project is not meant to correct those and its expected that these configuration errors and warning may still persist after the upgrade to version 2023 R2.CITY OF FULLERTON1. The City will procure all of the software and hardware needed for this project and deliver it to the server room2. The Citys IT team will help rack and stack the hardware onto the rack3. Run network and power cabling to the power distribution units on the rack PO Number:Duration: This quote is valid for until March 1, 2025Freight:Prepaid and AddTerms: Net 45 DaysPages: 1 of 4 22013 Lakeland AveLake Forest, CA 92630(714) 269-8190(714) 559-1959QUOTE2025001.1CTYFULXV-SOLUTIONS,Fullerton SCADA System UpgradeProject01/03/2025Attn:Ronnie AcostaCITY OF FULLERTONdirectShip To:CITY OF FULLERTON 1580 W. COMMONWEALTH AVEFULLERTON, CA 92833(714)-738-6374From: Servando [email protected] (714) 269-8190Bill To:CITY OF FULLERTON 1580 W. COMMONWEALTH AVEFULLERTON, CA 92833office(714)559-1959 Quantity Part Number/Description Availability*TaxPriceExtension1 Install server cabinet and rack equipmentCoordinate with IT to install the server rack, then rack and stack the equipment onto the rack, including: APC UPS, 3 Dell Servers, Tape Drive and SAN device1 Estimated TBDN$3,000.00 $3,000.001Configure the new hardware including cabling for networking, power, and hardware/software configuration3 Dell Servers, setup as ESXi Hosts1 SAN1 Tape DriveKVM Management ConsoleVMWare vSphere Cluster, primary and secondary ESXI Hosts with High Availability2 Cisco switches, includes programming vlans and routingAPC 16kVA UPS with External Bypass, oversee rack & stack, and perform startup. The City's Facilities Team will do the electrical work. 1 Estimated TBDN$24,000.00 $24,000.001Create new Windows Server 2022 VMs for the Aveva System Platform v2023 R2 environment, including operating system setup and Wonderware Software installs2 Domain Controllers (primary and backup)2 RDS servers (primary and backup)1 Historian (primary)1 Galaxy Server1 ThinManager1 Veeam Server, configure vmware image regular backups and 1-tier backup to tape1 IDE Dev with Historian Client3 Thin Clients1 Estimated TBDN$20,000.00 $20,000.00Subtotal $47,000.00 PO Number:Duration: This quote is valid for until March 1, 2025Freight:Prepaid and AddTerms: Net 45 DaysPages: 1 of 4 22013 Lakeland AveLake Forest, CA 92630(714) 269-8190(714) 559-1959QUOTE2025001.1CTYFULXV-SOLUTIONS,Fullerton SCADA System UpgradeProject01/03/2025Attn:Ronnie AcostaCITY OF FULLERTONdirectShip To:CITY OF FULLERTON 1580 W. COMMONWEALTH AVEFULLERTON, CA 92833(714)-738-6374From: Servando [email protected] (714) 269-8190Bill To:CITY OF FULLERTON 1580 W. COMMONWEALTH AVEFULLERTON, CA 92833office(714)559-1959 Quantity Part Number/Description Availability*TaxPriceExtension1 Convert existing Galaxy from Wonderware v2014 to Aveva System Platform v2023 R2Convert GalaxyConvert GraphicsMigrate DIO and configure Redundant DIOs, includes 2 new objects per field RTU/PLCMigrate HistorianInstall and configure TopView and all the alarms, will need new VOIPTest all the sites, make sure we are getting data, historizing, trending and receiving alarms properly1 Estimated TBDN$32,000.00 $32,000.001Transition Operations from the version 2014 to the version 2023 R2 platform.Create new user accounts for OperatorsDeliver training on how to access v2023 R2, Coordinate with Water Production to take down version 2014 and run solely on v2023 R2Monitor the system to ensure we are receiving telemetry updates from field devicesand alarms are working properly 1 Estimated TBDN$8,000.00 $8,000.001 DocumentationHypervisor System DocumentationOperational Documentation plus Network, System Installation and configuration documentation1 Estimated TBD N$8,500.00 $8,500.00Subtotal $48,500.00 PO Number:Duration: This quote is valid until March 1, 2025Freight:Prepaid and AddTerms: Net 45 DaysPages: 7 of 7 22013 Lakeland AveLake Forest, CA 92630(714) 269-8190(714) 559-1959QUOTE2025001.1CTYSAXV-SOLUTIONS, Fullerton SCADA System Upgrade Project01/01/2025Attn:Ronnie AcostaCITY OF FULLERTONdirectShip To:CITY OF FULLERTON 1580 W. COMMONWEALTH AVEFULLERTON, CA 92833(714)738-6374From: Servando [email protected] (714) 269-8190Bill To:CITY OF FULLERTON 1580 W. COMMONWEALTH AVEFULLERTON, CA 92833office(714)559-1959 TBase Quotation Pricing SummaryAvailability:Taxable: Non-Taxable:$0.00$95,500.00-Part availability is subject to change and is based on the availability at the time this quote was created.-Time in transit is subject to change depending on the "Ship To" address that is provided by the customer at the time the order is placed and the method in which customer requests that the part(s)ship.-For "In Stock" parts, orders must be received by 3:00PM PST to ship sameday.-For Factory Stock parts, please allow approximately one week for delivery via our standard shipping methods.Subtotal:$95,500.00ax (9.25%):$0.00Freight:$0.00TOTAL: $95,500.00
020425 PW Cybersecurity Upgrades for City's Water SCADA System XV Solutions Proposal & Professional Service Agreement
City Council - Successor Agency - Housing Authority
February 4, 2025
- Document
- 020425 PW Cybersecurity Upgrades for City's Water SCADA System XV Solutions Proposal & Professional Service Agreement
- Meeting
- February 4, 2025
- Body
- City Council - Successor Agency - Housing Authority
- Original file
- 1.2 MB
Text extracted from the city's file for reading and search. Open the original on fullerton.legistar1.com. That file is the official record.