052025 PW South Gilbert Rehabilitation Project Bid Schedule

City Council - Successor Agency - Housing Authority
May 20, 2025

Document
052025 PW South Gilbert Rehabilitation Project Bid Schedule
Meeting
May 20, 2025
Body
City Council - Successor Agency - Housing Authority
Original file
107 KB
Text extracted from the city's file for reading and search. Open the original on fullerton.legistar1.com. That file is the official record.

•'

BID SCHEDULE

SOUTH GILBERT STREET REHABILITATION
PROJECT NO. 44081

ESTIMATED
NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT
1 MOBILIZATION 1 LS
38,685 39,685
2 WATER POLUTION CONTROL 1 LS 10,000
10,600
3 TRAFFIC CONTROL 1 LS
50,000 50,000
4 REMOVE FENCE/GATE, POSTS, AND 80 LF
FOOTINGS 15 1,200
REMOVE AND REPLACE 8" CURB AND
5 GUTTER 130 LF
100 13,000
REMOVE AND REPLACE 4" THICK
6 2,900 SF
SIDEWALK 13 37,700

REMOVE AND REPLACE ACCESS CURB
6 EA
RAMPS 1,500 45,000

REMOVE AND REPLACE STD ALLEY
8 630 SF
RETURN AND ACCESS CURB RAMPS 38 23,940
REMOVE AND REPLACE ALLEY GUTTER 25 SF 38 950
10 COLD MILLING 47,500 SF • 95 45,125
11 PAVEMENT DIGOUTS/REPAIRS* 5,200 SF 2.
10,400
12 ASPHALT CONCRETE PAVEMENT 1,500 TON 110
165,000

REPLACE SEWER MANHOLE FRAME AND
13 5 EA 2,000
COVER AND ADJUST TO GRADE 10,000

ADJUST WATER VALVE BOX TO GRADE
14 11 EA 2,000
AND UPDATE PER CITY STD 22,000

ADJUST MANHOLE COVER TO GRADE
15 2 EA 2,000 4,000
(STORM DRAIN)

RELOCATION/REPAIR OF STREET
16 100 LF 120
LIGHTING SYSTEM* 12,000
17 TRAFFIC SIGNING AND STRIPING 1 LS
15,000 15,000
Base Bid Total $ 505, 000."
Unit prices are required for all bid items.

The Bidder shall total his/her bid. Unit prices shall prevail in case amount disagrees with extension.

Project shall be awarded on the Base Bid. If applicable, the City may elect to use Bid Alternates after award.

Items of work not specifically listed shall be included in the bid prices for related work. For all work required and shown on the construction plans and specifications for which no specific bid item or price is listed in the bid schedule, it shall be understood that such work, equipment, labor, tools, and materials shall be provided as part of the listed bid items and no additional compensation will be paid therefor.

TO BE SUBMITTED WITH BID