ATTACHMENT 3
BID SCHEDULE
UNION PACIFIC PARK RENOVATION - PHASE II
PROJECT NO. 54056
ESTIMATED
NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT
1 MOBILIZATION 1 LS #30)067-45#30,067.45
2 STOPPATER POLLUTION PREVENTION PLAN 1 LS #24,983.75 #24, 983.75 3 CLEARING AND GRUBBING 1 LS Ha, 116.02 $19,116.02
4 DEMOLITION & REMOVALS 1 Ls #40,786.44$40,786-441
5 EARTHWORK & GRADING 1 LS #62, 722.41$62, 722.41
6 CONCRETE MOW CURB 258 LF $26.72 #6,893.76
7 CONCRETE MOW CURB - MODIFIED 186 LF $28.160 #5,237.76 8 CONCRETE CURB 100 LF $30.22 $|3022.00
9 CURB RAMP WITH TRUNCATED DOMES 1 EA #2312.48$2312.48
10 TRUNCATED DOMES - CAST-IN-PLACE 2 EA $1,991.8| $3,983.62 11 CONCRETE HARDSCAPE - 4" THICK 6,465 SF #8.3| $ 53,724.15 12 CONCRETE HARDSCAPE - 4" THICK W/ WWM 3,900 SF $9.22 $35,958.00 13 CONCRETE HARDSCAPE - 4" THICK, COLORED 345 SF $9.35 # 3,225.75 14 CONCRETE DRAINAGE GUTTER OPENING EA $ 847.72 #847.72 15 DECOMPOSED GRANITE 2,390 SF $3.14 #1,504.60
16 AGGREGATE BASE 55 cr $6.94 $381.70
17 ASPHALT CONCRETE 15 TON #11016.98 $15,254.70
18 SEAL COAT 6,300 SF #1.39 #8,757.00
19 BOLLARD - REMOVABLE 4 EA #1,324.29 $ 51297!6
20 HANDRAIL - PEDESTRIAN RAMP 35 L +1278.26519739.10
21 PVC SLEEVE 60 LF $7.75 #2,441.25
22 1" WATER PIPE & FITTINGS 315 LF $5•31 #1,672.65
23 DRINKING FOUNTAIN 1 EA #9 /891.67 #9,891.67
TO BE SUBMITTED WITH BID
BD-17
ATTACHMENT 3
BID SCHEDULE
UNION PACIFIC PARK RENOVATION - PHASE I|
PROJECT NO. 54056
ESTIMATED
NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT
24 DELIVER & INSTALL CITY FURNISHED ITEMS 1 LS #2,600. 04#2,600.04 25 FENCING - THREE-RAIL WHITE VINYL 470 LF #53.56#25,173.20 26 FENCING - CHAINLINK - 4' HIGH 240 L $84.47#20,272.80 27 FENCING - CHAINLINK GATE - 4' HIGH 1 EA #3,732.68 $|3, 732.69 28 STRIPING - SPORT COURT 1 LS #47,379.24 $47, 379.26
29 SIGNING & STRIPING 1 LS #12,119.20 #12, 119.20
30 SOIL PREPARATION 1 LS $5,790.25 #5,790.25
31 SHRUBS - 1 GAL 111 EA #9.93 #11102.23
32 SHRUBS - 3 GAL 45 EA #26.80 #1,206.00
33 SHRUBS - 5 GAL 165 EA $19.94 #3,290.10
34 TURF 26,700 SF $1.12 $29,904.00
35 BARK MULCH 4,100 SF # 0.54 #2,214.00
36 WOOD MULCH 13,200 SF $ 0•54 $7,128.00
37 LANDSCAPE MAINTENANCE PERIOD- 90 DAYS 1 LS #5,768.22 #5,768-22 Base Bid Total $ 511, 501•12
Unit prices are required for all bid items.
The Bidder shall total his/her bid. Unit prices shall prevail in case amount disagrees with extension.
Project shall be awarded on the Base Bid. If applicable, the City may elect to use Bid Alternates after award.
Changes to either Unit Price or Amount shall be striked-out and initialed.
Items of work not specifically listed shall be included in the bid prices for related work. For all work required and shown on the construction plans and specifications for which no specific bid item or price is listed in the bid schedule, it shall be understood that such work, equipment, labor, tools, and materials shall be provided as part of the listed bid items and no additional compensation will be paid therefor.
If the City determines that any of the unit bid prices are significantly unbalanced to the potential detriment of the City, the bid may be considered non-responsive.
Company Urban Habitat
Name Brett Brennan
Signature
963744
License Number
TO BE SUBMITTED WITH BID