012026 PW Public Works Department Fee Schedule Engineering Fee Schedule Analysis

City Council - Successor Agency - Housing Authority
January 20, 2026

Document
012026 PW Public Works Department Fee Schedule Engineering Fee Schedule Analysis
Meeting
January 20, 2026
Body
City Council - Successor Agency - Housing Authority
Original file
596 KB
Text extracted from the city's file for reading and search. Open the original on fullerton.legistar1.com. That file is the official record.

PUBLIC WORKS
ENGINEERING FEE SCHEDULE
FEE STUDY
Unit Current Rate Full Cost
Current Cost
Recovery
Fee in FY 25- 26
(Full Cost)
1 Development Services
2 Entitlement Review Deposits
3 Review Conceptual Grading Plan,
Preliminary Hydrology/Hydraulics
Report, and Preliminary Soils Report
deposit $ 3,000 3,000 $ 100% 3,000 $ 4 Review Preliminary Priority and Non-
Priority Water Quality Management
Plan (WQMP)
deposit 2,000$ 2,000 $ 100% 2,000 $ 5 Sewer Generation Study Review deposit $ - 4,000 $ 0% 4,000$ 6 Traffic Study Review deposit $ - 3,000 $ 0% 3,000$ 7 Tentative Parcel and Tract Map deposit $ - 5,000 $ 0% 5,000$ 8 Mapping
9 Final Tract Maps deposit 10,000 $ 10,000 $ 100% 10,000 $ 10 Final Parcel Maps deposit 5,000 $ 5,000 $ 100% 5,000 $ 11 Lot Line Adjustments each $825, plus consultant
hourl
y rate
4,086$ N/A 4,086$
12 Map to revert subdivided land to
acreage
each 3,136 $ 3,136 $ 100% 3,136 $ 13 Certificate of Correction each $327, plus consultant hourly rate
2,586$ N/A 2,586$
14 Certificate of Compliance each $957, plus consultant hourly rate
2,586$ N/A 2,586$
15 Miscellaneous Licensed Land Surveyor
Review
deposit $500 min. plus
consultant hourly rate
2,500$ N/A 2,500$
16 Grading Plan Review, Inspection, & Bonds
17 Single Family Residence - Flat deposit - $ 2,000$ N/A 2,000$ 18 Single Family Residence - Hillside deposit - $ 5,000$ N/A 5,000$ 19 Multi-Family Residence: < 20 Units deposit - $ 7,500$ N/A 7,500$ 20 Multi-Family Residence: > 20 Units deposit - $ 10,000$ N/A 10,000$ 21 Commercial / Industrial Developments deposit - $ 5,000$ N/A 5,000$ 22 Grading Bond - Flat Land cubic yard 2.20 $ 2.75 $ 80% 2.75$ 23 Grading Bond - Slope/hillside cubic yard 2.75 $ 3.50 $ 79% 3.50$ 24 Fire Plan Check/Inspection each 135 $ 250 $ 54% 250$ 25 Inspection outside of normal business
hours
per hour 135 $ 327 $ 41% 327$ 26 Reinspection fees assessed under
section provisions
each 63 $ 63 $ 100% 63 $ Fee/Charge
Public Works Fee Schedule Engineering Page  1 of 5
PUBLIC WORKS
ENGINEERING FEE SCHEDULE
FEE STUDY
Unit Current Rate Full Cost
Current Cost
Recovery
Fee in FY 25- 26
(Full Cost)Fee/Charge
27 Water Quality Management Plan (WQMP) Review & Inspection 28 Priority WQMP Review and Inspection deposit 601 $ 4,000 $ 15% 4,000$ 29 Non-Priority WQMP Review and
Inspection
deposit 300 $ 1,500 $ 20% 1,500$ 30 Best Management Practice (BMP)
Inspection
each - $ 500 $ N/A 500$ 31 Environmental Inspection / National Pollution Discharge Elimination System (NPDES) 32 High Priority Inspection each - $ 274 $ N/A 274$ 33 Low/Medium Priority Inspection each - $ 251 $ N/A 251$ 34 Plan Check and Inspection
35 Off-site plan check & inspection for
public right-of-way improvement with an
estimated cost over $10,000
deposit $638 plus 7% of the
estimated cost in
excess of $10,000
1,293$ N/A 1,293$
36 Over-the-Counter or building permit
review with valuation less than $50,000
each 55 $ 161 $ 34% 161$ 37 Building permit review with valuation
greater than $50,000
each 231 $ 520 $ 44% 520$ 38 Public Works Permits
39 Encroachment Permits
40 Process encroachment permit
application
each - $ 131 $ N/A 131$ 41 Curb Ramp each - $ 915 $ N/A 915$ 42 Driveway (non-arterial) each 322 $ 806 $ 40% 806$ 43 Driveway (arterial) each 322 $ 915 $ 35% 915$ 44 Streetwork
45 1-100 feet each - $ 806 $ N/A 806$ 46 101-300 feet each - $ 1,351$ N/A 1,351$ 47 301-500 feet each - $ 1,897$ N/A 1,897$ 48 501-1000 feet each - $ 2,442$ N/A 2,442$ 49 1001-1500 feet each - $ 2,987$ N/A 2,987$ 50 1501-2000 feet each - $ 3,532$ N/A 3,532$ 51 Sewer Lateral each - $ 806 $ N/A 806$ 52 Curb Coring, Parkway Drain, or Curb
Drain
each 52 $ 320 $ 16% 320$ 53 Temporary street occupancy or closure each/day 225 $ 349 $ 64% 349$ 54 Overtime Inspection hour 1.5 fully loaded
inspection rate
327$ N/A 327$
Public Works Fee Schedule Engineering Page  2 of 5
PUBLIC WORKS
ENGINEERING FEE SCHEDULE
FEE STUDY
Unit Current Rate Full Cost
Current Cost
Recovery
Fee in FY 25- 26
(Full Cost)Fee/Charge
55 Utility Permit
56 Initial Annual Permit Issuance each 177 $ 459 $ 39% 459$ 57 Supplemental Permit Issuance each 52 $ 102 $ 51% 102$ 58 Plan check and inspection
59 Monitoring Wells Permit (Public Property)
60 Annual Permit per well 225 $ 420 $ 54% 420$ 61 New Construction Permit per well 483 $ 806 $ 60% 806$ 62 New Construction Cash Bond per well 5,000 $ 5,000 $ 100% 5,000 $ 63 Cash Bond - Life of the Well per well 5,000 $ 5,000 $ 100% 5,000 $ 64 Destruction Permit per well 322 $ 567 $ 57% 567$ 65 Small Wireless Facilities (Small Cell) Permit
66 Application fee for installation of small
wireless facility on existing City
facility/pole
each 500 $ 500 $ 100% 500 $ 67 Application fee for each new pole
intended to support one or more small
wireless facility.
each 1,000 $ 1,000 $ 100% 1,000 $ 68 Recurring site fee (per year) for locating
a small wireless facility in the public
right-of-way
each 270 $ 270 $ 100% 270 $ 69 Encroachment Permits for small
wireless facilities on Public Right of Way
each - $ 1,133$ N/A 1,133$ 70 Transportation Permit (Vehicle Over Weight/Size Limit) 71 Single occurrence each 16 $ 16 $ 100% 16 $ 72 Annual permit each 90 $ 90 $ 100% 90 $ 73 Variance To Permit each - $ 210 $ N/A 210$ 74 Additional Fee if Inspection is required each - $ 218 $ N/A 218$ 75 Resident Parking Permits
76 Permits for personal passenger
vehicles owned by resident of permit
parking area
each 10 $ 15 $ 67% 15$ 77 Guest permits for residents of permit
parking area
each 2 $ 2 $ 100% 2 $ 78 Resident permits for new vehicles
acquired by residents with valid permit
each 2 $ 2 $ 100% 2 $ 79 Replacement for damaged permit upon
exchange of permit
each 2 $ 2 $ 100% 2 $ 80 Downtown Employee Parking Permit each 6 $ 6 $ 100% 6 $ 81 Miscellaneous Permits
82 Block party each - $ - $ N/A - $ 83 Special Events on Public Property -
less than 500 attendants
each 1,000 $ 1,000 $ 100% 1,000 $ 84 Special Event on Public Property -
greater than 500 attendants
each - $ 2,000$ N/A 2,000$ 85 Harbor Blvd Banner each 66 $ 105 $ 63% 105$ Actual Cost of staff time
Public Works Fee Schedule Engineering Page  3 of 5
PUBLIC WORKS
ENGINEERING FEE SCHEDULE
FEE STUDY
Unit Current Rate Full Cost
Current Cost
Recovery
Fee in FY 25- 26
(Full Cost)Fee/Charge
86 Permit Compliance & Assurance
87 Guarantee compliance with any
restrictions in work hours (lane
closures) stated on a permit
deposit 2,000$ 2,000 $ 100% 2,000 $ 88 Pay for any cleanup or repairs that the
City finds necessary to have done due
to the contractors' inattention or failure
to correct the problem in a timely
manner. Deductions for repair and/or
cleanup shall be at the cost of the work
plus the Cit
y's overhead
deposit 2,000$ 2,000 $ 100% 2,000 $ 89 Guarantee trench has not failed after 6
months of acceptance
90 Residential Street deposit 1,250 $ 1,250 $ 100% 1,250 $ 91 Arterial Street deposit 2,500 $ 2,500 $ 100% 2,500 $ 92 Guarantee protection and/or restoration
of public property to its original
condition after a special event in which
attendance is estimated at 500 or less.

Deductions for cleaning and/or repair
shall be for City crew labor, material,
and overhead costs
deposit - $ 1,000$ N/A 1,000$ 93 Guarantee protection and/or restoration
of public property to its original
condition after a special event in which
attendance is estimated at 500 or
greater. Deductions for cleaning and/or
repair shall be for City crew labor,
material, and overhead costs
deposit 1,000$ 2,000 $ 50% 2,000$ 94 Guarantee protection and/or restoration
of City water mains Deductions for
cleaning and/or repair shall be for City
crew labor, material, and overhead
costs.
- New service, fire hydrants,
abandonments
deposit - $ 5,000$ N/A 5,000$ 95 Guarantee protection and/or restoration
of City water mains Deductions for
cleaning and/or repair shall be for City
crew labor, material, and overhead
costs.
- Backflow
preventers, new meters
deposit - $ 500 $ N/A 500$ 96 Penalty fee for failure to obtain permit
prior to work for construction /
improvements
each - $ Double the
actual permit fee
N/A Double the actual
permit fee
97 Penalty fee for failure to obtain permit
prior to work specifically for Grading
Permits
each - $ 8,000$ N/A 8,000$ 98 Standard Outdoor Dining (Public Property)
99 Standard Outdoor Dining Application each 286 $ 286 $ 100% 286 $ 100 Lease Rates square
foot/month

0.60$ 0.60 $ 100% 0.60 $ 101 Paid Parking Revenue Replacement stall/month 60 $ 60 $ 100% 60 $ 102 Restoration Deposit square foot 3 $ 2.50$ 100% 2.50 $ Public Works Fee Schedule Engineering Page  4 of 5
PUBLIC WORKS
ENGINEERING FEE SCHEDULE
FEE STUDY
Unit Current Rate Full Cost
Current Cost
Recovery
Fee in FY 25- 26
(Full Cost)Fee/Charge
103 Encroachment Agreement
104 New Encroachment Agreements each 1,018 $ 1,579 $ 64% 1,579$ 105 Renew Existing Encroachment
Agreements
each 637 $ 885 $ 72% 885$ 106 Traffic Engineering Services
107 Overnight Parking Exemption Review each 523 $ 729 $ 72% 729$ 108 Crossing Guard Study (School District) each 925 $ 1,295 $ 71% 1,295$ 109 Transportation & Circulation
Commission (T&CC) Decision Appeals
each 231 $ 418 $ 55% 418$ 110 Miscellaneous Traffic Related Requests each 438 $ 627 $ 70% 627$ 111 Speed Lump Study each - $ 618 $ N/A 618$ 112 Speed Survey each 19 $ 299 $ 6% 299$ 113 Miscellaneous Fees
114 Change of existing street address or
addition of new street address
each 193 $ 251 $ 77% 251$ 115 Permit Extension each 112 $ 219 $ 51% 219$ 116 8.5" x 11" sheet each 0.15 $ 0.18 $ 83% 0.18$ 117 Large Sheet (>= 11"x17") each - $ 1.32 $ N/A 1.32$ Public Works Fee Schedule Engineering Page  5 of 5