[GOLDEN COAST CONSTRUCTION] RESPONSE DOCUMENT REPORT
ITB No. 44797
44797 Curb & Gutter Sidewalk 24-26

[GOLDEN COAST CONSTRUCTION] RESPONSE DOCUMENT REPORT
Invitation For Bid - 44797 Curb & Gutter Sidewalk 24-26

Page 8 ends

PRICE TABLES
TABLE 1
Line Item Description Quantity Unit of
Measure
Unit Cost Total
1 MOBILIZATION 1 LS $14,918.29 $14,918.29
2 WATER POLLUTION CONTROL 1 LS $5,000.00 $5,000.00
3 TRAFFIC CONTROL 1 LS $5,528.00 $5,528.00
4 REMOVE AND REPLACE STD SIDEWALK 14,648 SF $11.24 $164,643.52 5 REMOVE AND REPLACE STD SIDEWALK (6" THICK) 344 SF $13.88 $4,774.72 6 REMOVE AN REPLACE CURB & GUTTER (6" HEIGHT) 82 LF $64.23 $5,266.86 7 REMOVE AN REPLACE CURB & GUTTER (8" HEIGHT) 417 LF $68.63 $28,618.71 8 PCC CURB ONLY (VARYING HEIGHT) 96 LF $65.93 $6,329.28 9 STREET LIGHT AND CONDUIT AND WIRING REPAIR 100 LF $49.13 $4,913.00 TOTAL $239,992.38