031726 PW Asset Management Software Vertosoft Quote
Meeting
March 17, 2026
Body
City Council - Successor Agency - Housing Authority
Pages
2
Original file
517 KB
Text extracted from the city's file for reading and search. Open the original on fullerton.legistar1.com. That file is the official record.

1602 Village Market Blvd SE, Suite 320
Leesburg, VA20175 USA
Cage Code: 7QV38
UEI Number Y7D5MXRU2839
DUNS# 080431574
Federal Tax ID: 81-3911287
Business Size: Small Business
Date: 2/19/2026, 12:48 PM
Phone: 571 707-4130
Fax: 571-291-4119
Email: [email protected]
Vertosoft Contact: Carly Moore
Phone: (540) 998-8361
Email: [email protected]
Vertosoft Quote for OpenGov - City of Fullerton, CA
Contract: Sourcewell: 060624-VTO
Quote #: Q-19265
Expires On: 03/28/2026
Ship To
City of Fullerton, CA
Marcelo Rivas
[email protected]
Quote For:

Name:

Company:

City of Fullerton, CA
Email:

Phone:

PAYMENT TERMS DELIVERY METHOD PAYMENT METHOD VERTOSOFT CUST ID SUPPLIER REF Net 30 Electronic Check/ACH/Credit Card
Overall POP Start Date: 3/30/2026
Overall POP End Date: 3/29/2029
Term 1 3/30/2026 - 3/29/2027
PART # DESCRIPTION QTY UNIT PRICE EXTENDED
OG-TWAQ-B200300M-
AR-3Y
Asset Management - Between $200-300 Million - 3Y 1.00 $23,145.00 $23,145.00

OG-TWAW-
B200300M-AR-3Y
Facilities Domain - Between $200-300 Million - 3Y 1.00 $17,854.00 $17,854.00 OG-TWHT-B200300M-
AR-3Y
OpenGov 311 - Between $200-300 Million - 3Y 1.00 $25,000.00 $25,000.00 OG-TWAY-B200300M-
AR-3Y
Parks & Recreation Domain - Between $200-300 Million - 3Y 1.00 $16,532.00 $16,532.00 OG-TWBB-B200300M-
AR-3Y
Stormwater Domain - Between $200-300 Million - 3Y 1.00 $15,114.00 $15,114.00

Page 1 of 3 ends

PART # DESCRIPTION QTY UNIT PRICE EXTENDED
OG-TWBC-B200300M-
AR-3Y
Transportation Domain - Between $200-300 Million - 3Y 1.00 $17,854.00 $17,854.00 OG-TWAZ-B200300M-
AR-3Y
Wastewater Collection - Between $200-300 Million - 3Y 1.00 $16,532.00 $16,532.00 OG-TWBF-B200300M-
AR-3Y
Water Distribution Domain - Between $200-300 Million - 3Y 1.00 $16,532.00 $16,532.00 OG-TWBG-B200300M-
AR-3Y
Water Treatment Domain - Between $200-300 Million - 3Y 1.00 $15,114.00 $15,114.00 OG-PSBG-B200300M-
OT-0Y
Professional Services Deployment - Prepaid - Between $200-300 Million - 0Y
854.00 $215.05 $183,652.70
Term 1 TOTAL: $347,329.70
Billed as incurred and not to exceed
PART # DESCRIPTION QTY UNIT PRICE EXTENDED
OG-Travel-Expense-
Reimb
OpenGov - designed for reimbursable travel expenditures. **Estimate expense
16,800.00 $1.00 $16,800.00
Billed as incurred and not to exceed TOTAL: $16,800.00
Term 2 3/30/2027 - 3/29/2028
PART # DESCRIPTION QTY UNIT PRICE EXTENDED
OG-TWAQ-B200300M-
AR-3Y
Asset Management - Between $200-300 Million - 3Y 1.00 $24,302.25 $24,302.25

OG-TWAW-
B200300M-AR-3Y
Facilities Domain - Between $200-300 Million - 3Y 1.00 $18,746.70 $18,746.70 OG-TWHT-B200300M-
AR-3Y
OpenGov 311 - Between $200-300 Million - 3Y 1.00 $26,250.00 $26,250.00 OG-TWAY-B200300M-
AR-3Y
Parks & Recreation Domain - Between $200-300 Million - 3Y 1.00 $17,358.60 $17,358.60 OG-TWBB-B200300M-
AR-3Y
Stormwater Domain - Between $200-300 Million - 3Y 1.00 $15,869.70 $15,869.70 OG-TWBC-B200300M-
AR-3Y
Transportation Domain - Between $200-300 Million - 3Y 1.00 $18,746.70 $18,746.70 OG-TWAZ-B200300M-
AR-3Y
Wastewater Collection - Between $200-300 Million - 3Y 1.00 $17,358.60 $17,358.60 OG-TWBF-B200300M-
AR-3Y
Water Distribution Domain - Between $200-300 Million - 3Y 1.00 $17,358.60 $17,358.60 OG-TWBG-B200300M-
AR-3Y
Water Treatment Domain - Between $200-300 Million - 3Y 1.00 $15,869.70 $15,869.70 Term 2 TOTAL: $171,860.85

Page 2 of 3 ends

Term 3 3/30/2028 - 3/29/2029
PART # DESCRIPTION QTY UNIT PRICE EXTENDED
OG-TWAQ-B200300M-
AR-3Y
Asset Management - Between $200-300 Million - 3Y 1.00 $25,517.37 $25,517.37

OG-TWAW-
B200300M-AR-3Y
Facilities Domain - Between $200-300 Million - 3Y 1.00 $19,684.03 $19,684.03 OG-TWHT-B200300M-
AR-3Y
OpenGov 311 - Between $200-300 Million - 3Y 1.00 $27,562.49 $27,562.49 OG-TWAY-B200300M-
AR-3Y
Parks & Recreation Domain - Between $200-300 Million - 3Y 1.00 $18,226.53 $18,226.53 OG-TWBB-B200300M-
AR-3Y
Stormwater Domain - Between $200-300 Million - 3Y 1.00 $16,663.18 $16,663.18 OG-TWBC-B200300M-
AR-3Y
Transportation Domain - Between $200-300 Million - 3Y 1.00 $19,684.03 $19,684.03 OG-TWAZ-B200300M-
AR-3Y
Wastewater Collection - Between $200-300 Million - 3Y 1.00 $18,226.53 $18,226.53 OG-TWBF-B200300M-
AR-3Y
Water Distribution Domain - Between $200-300 Million - 3Y 1.00 $18,226.53 $18,226.53 OG-TWBG-B200300M-
AR-3Y
Water Treatment Domain - Between $200-300 Million - 3Y 1.00 $16,663.18 $16,663.18 Term 3 TOTAL: $180,453.87
Annual invoices will be delivered by the start of each consecutive annual period. Payment of invoices shall be annually in advance. Any Professional Services shall be performed pursuant to the attached Statement of Work, if any Quote Terms
By purchasing the products and services described in this order form, the Customer is expressly agreeing to the End User Agreement published at https://www.vertosoft.com/terms-and-conditions-opengov Taxes: Sales tax shall be added at the time of an invoice, unless a copy of a valid tax exemption or resale certificate is provided.

Credit Card Orders: Additional fees may apply if paying by credit card.

All Purchase Orders must include: End User Name, Phone Number, Email Address, Purchase Order Number, Government Contract Number or Our Quote Number, Bill-To and Ship-To Address (Cannot ship to a PO Box), Period of Performance (if applicable), and a Signature of a duly Authorized Representative.

Page
3 of 3

Statement of Work City of Fullerton, CA

Creation Date: 02/05/2026 SoW Expiration Date: 05/05/2026 Document Number: PS-11026.1 Created by: Brittany Worthy

PS-11026.1 1

Table of Contents OpenGov Statement of Work 3 1. Project Scope and Understanding 3 2. Exhibits 3 3. OpenGov Responsibilities 3 4. Customer Responsibilities 3 5. Project Delivery 4 6. Estimated Schedule 4 7. Acceptance Procedure 4 8. Modifications 5 9. Communication and Escalation Procedure 5 Exhibit 1: Implementation Activities 6 OpenGov Implementation Methodology Overview 6 Enterprise Asset Management 6 Initiate 7 Validate 7 Configure 7 Train 9 Launch 14 311 Request Management 14 Initiate 14 Validate 15 Configure 15 Train 19 Launch 20 Exhibit 2: Technical Requirements 20 Government App Builder Technical Requirements 20 PS-11026.1 2

OpenGov Statement of Work

1. Project Scope and Understanding This Statement of Work (“SOW”) outlines the Professional Services OpenGov will provide

to

City

of

Fullerton,

CA

(“Customer”)

under

the

applicable

Order

Form.

Professional

Services

or

technical

requirements

not

listed

in

this

SOW

are

out

of

scope.

2. Exhibits The following exhibits are incorporated by reference and are part of this SOW: 2.1. Exhibit 1: Implementation Activities 2.1.1. Enterprise Asset Management (EAM) 2.1.2. Government App Builder 2.2. Exhibit 2: Technical Requirements 2.2.1. Government App Builder 3. OpenGov Responsibilities OpenGov will provide a framework for planning, communication, progress tracking, and

coordination

for

activities

in

Exhibit

1. In

collaboration

with

Customer,

OpenGov

will

develop

and

maintain

the

Project

Plan.

The

“Project

Plan”

is

a

detailed,

living

document

that

defines

how

the

project

will

be

executed,

including

tasks,

timelines,

milestones,

and

team

assignments.

OpenGov

will

monitor

progress

against

the

Project

Plan,

coordinate

adjustments

to

tasks

and

schedules

as

needed,

and

conduct

status

meetings

as

agreed

to

by

the

parties.

OpenGov

will

provide

weekly

status

reports,

a

Project

Charter,

and

a

RAID

register

(Risks,

Actions,

Issues,

and

Decisions).

The

“Project

Charter”

is

a

high-level

document

outlining

the

project’s

purpose,

goals,

key

stakeholders,

success

criteria,

and

major

milestones.

4. Customer Responsibilities The Customer will appoint a primary point of contact with authority to make binding decisions

(“Customer’s

Project

Manager”).

This

person

will

coordinate

internal

resources,

assign

subject

matter

experts

(“SMEs”),

and

oversee

implementation.

Responsibilities

include

attending

status

meetings,

making

timely

decisions,

providing

requested

information,

escalating

issues

internally,

and

collaborating

on

the

Project

Plan

and

Change

Order

process,

if

applicable.

Customer acknowledges that the success of this project is contingent on its full participation.

Customer

must

provide

data

within

ten

(10)

business

days

of

a

request,

maintain

consistent

data

formats

and

access

throughout

the

project,

and

allocate

the

necessary

Customer

resources

and

time

to

support

deliverables

and

meet

agreed-upon

timelines.

PS-11026.1 3

Any failure by Customer to meet its responsibilities under this SOW (each, a “Customer

Delay”)

will

automatically

suspend

the

affected

obligations

of

OpenGov

for

the

duration

of

the

Customer

Delay

and

for

a

reasonable

restart

period

thereafter.

All

affected

milestones,

delivery

dates,

and

service-level

commitments

will

be

extended

on

a

day-for-day

basis

(or

as

otherwise

reasonably

necessary)

to

account

for

the

Customer

Delay,

and

may

result

in

an

adjustment

of

the

fees

if

OpenGov

incurs

additional

time,

materials,

or

other

costs

as

a

result.

Under

no

circumstances

will

any

consequence

of

a

Customer

Delay

constitute

a

breach

by

OpenGov

of

this

SOW

or

of

the

Agreement,

nor

will

OpenGov

be

liable

for

any

failure

to

meet

a

performance

obligation

that

is

caused,

in

whole

or

in

part,

by

a

Customer

Delay.

5. Project Delivery OpenGov will perform services under this SOW remotely and provide up to three (3) onsite

trips

for

project-related

activities.

Customer

will

provide

a

suitable

workspace,

including

a

conference

room

with

attendee

capacity,

non-public

Wi-Fi,

and

AV

equipment.

Travel

expenses

are

estimated

not

to

exceed

$16,800.

OpenGov

may

use

a

combination

of

OpenGov

personnel

and

OpenGov-trained

implementation

partners

to

deliver

the

services

described

in

this

SOW.

6. Estimated Schedule The estimated duration of this work is twelve (12) months. The specific timeline, including

order

of

delivery

of

the

product(s),

will

be

determined

during

the

project

planning

activities

in

the

Initiate

Phase.

Services

are

estimated

to

begin

within

two

(2)

weeks

and

no

later

than

four

(4)

weeks

from

contract

signature.

OpenGov

reserves

the

right

to

adjust

the

schedule

based

on

the

availability

of

Customer

or

OpenGov

resources,

and

the

timeliness

of

deliverables

provided

by

the

Customer.

7. Acceptance Procedure OpenGov will submit completed deliverables to the Customer’s Project Manager for review.

Within

five

(5)

business

days

of

receipt,

the

Customer’s

Project

Manager

will

either

provide

written

acceptance

or

a

list

of

requested

revisions.

In

the

event

there

are

requested

revisions,

the

subsequent

review

period

for

acceptance

will

follow

the

same

timeline

until

final

acceptance.

If

Customer

does

not

respond

within

this

period,

the

deliverable

will

be

deemed

accepted.

Once

a

deliverable

is

accepted,

any

requested

changes

will

require

a

paid

Change

Order.

Acceptance milestones and review timelines will be tracked in the Project Plan.

Both

parties

acknowledge

that

delays

in

task

completion

or

unresolved

issues

may

impact

the

project

timeline.

If

OpenGov

determines

in

good

faith

that

Customer

is

PS-11026.1 4

not fulfilling its responsibilities under this SOW, OpenGov may place services on hold

following

a

minimum

of

five

(5)

business

days’

written

notice.

The

notice

will

specify

the

actions

needed

to

progress

the

project.

During

the

hold

period,

OpenGov

may

reallocate

resources

without

penalty

and

will

not

be

responsible

for

resulting

delays.

8. Modifications The fees and estimated timeline are based on the scope and assumptions in this SOW.

If

either

party

determines

that

a

change

to

the

scope

is

necessary,

the

parties

will

collaborate

to

define

the

required

modification,

which

may

result

in

fee

adjustments

based

on

OpenGov’s

standard

rates.

All

modifications

must

be

documented

in

a

written

Change

Order

and

signed

by

both

parties

(“Change

Order”)

.

Examples

of

changes

include

revisions

to

the

project

timeline,

deliverables,

or

resource

allocation.

9. Communication and Escalation Procedure OpenGov and Customer agree to maintain regular communication in alignment with the

Project

Plan

to

ensure

progress,

resolve

questions

promptly,

and

minimize

risk.

Both

parties

will

raise

any

issues

or

concerns

in

a

timely

manner.

If

challenges

are

not

resolved

through

standard

project

discussions,

Customer

and

OpenGov

Project

Managers

will

escalate

to

their

respective

executive

leadership

teams

to

jointly

determine

a

resolution

and

align

on

a

path

to

successful

implementation.

PS-11026.1 5

Exhibit 1: Implementation Activities OpenGov Implementation Methodology Overview Every OpenGov implementation follows a five-phase hybrid methodology designed to ensure a structured

and

collaborative

deployment.

The

phases

are:

1. Initiate – OpenGov provisions access and performs initial system setup. 2. Validate – OpenGov works with the Customer to confirm requirements and review initial configurations.

3. Configure – OpenGov completes system configuration as outlined in this SOW. 4. Train – OpenGov provides training to system administrators and/or end users, as applicable. 5. Launch – OpenGov provides post-go-live support and transitions the Customer to OpenGov’s

Customer

Success

Team.

Each implementation is structured around these phases. Deliverables, sign-offs, and completion criteria

are

aligned

to

the

relevant

phase.

Enterprise Asset Management Use Cases Build for Enterprise Asset Management: ● Transportation ● Parks and Rec ● Facilities ● Stormwater ● Water Distribution ● Water Treatment ● Wastewater Collection / Sanitary Sewer PS-11026.1 6

Initiate

OpenGov will: ● Setup a hosted sandbox and a hosted production OpenGov Asset Management environment,

if

one

does

not

already

exist
● Conduct one (1) remote session to review customer assets (see asset section below),

source

data,

GIS

capabilities,

Esri

authentication,

and

single

sign

on

identity

provider

(if

applicable).

OpenGov Assumptions: ● OpenGov assumes that the customer is responsible for performing quality control measures on

its

data

in

EAM.

Completion Criteria: ● The project kicked off with an initial project timeline delivered.

Validate
OpenGov will: ● Provide a three-day (3-day) onsite validation workshop to increase our understanding

of

Customer

business

and

functional

goals.

Through

workshops

and

interviews,

OpenGov

will

identify

best

fit

scenarios

for

OpenGov

Asset

Management

and

provide

a

brief

including

any

challenges

as

well

as

recommendations

for

OpenGov

Asset

Management

best

practices

relevant

to

Customer

implementation.
● Provide a template file to be utilized by Customer staff to populate resources, libraries,

and

users/roles

data

that

OpenGov

will

import

into

OpenGov

Enterprise

Asset

Management.
● Provide up to two (2) remote sessions for Customer technical GIS staff to configure Esri

Feature

Services

for

the

bidirectional

GIS

integration

and

authentication.

Completion Criteria: ● Completion of validation workshop.

Configure

Configurations

OpenGov will: ● Provide configuration services, including: o Up to ten (10) custom fields and up to two (2) custom layouts per asset type listed

in

the

Assets

section

below
o Up to thirty (30) custom fields and up to ten (10) custom layouts to be utilized in

any

of

the

shared

areas

of

the

system,

such

as

Tasks
o Up to twenty (20) automations o Up to twenty (20) preventative maintenance plans PS-11026.1 7
● Provide up to seven (7) sessions of configuration review to ensure configurations resulting

from

the

validation

workshop

effectively

support

all

workflows

and

processes

discussed,

and

to

reinforce

such

configurations

with

customer

stakeholders

to

adequately

prepare

to

train-the-trainer

training.

OpenGov Assumptions: ● Implementation of any custom modification developed by OpenGov; your internal staff; or any

third-party

is

not

included

in

the

scope

of

this

project

unless

specifically

listed

above.

Data Services OpenGov will: ● Provide one sandbox and one production data load service through standard import/export

functionality.

OpenGov

will

provide

template

documents

for

data

population.

Once

populated

by

Customer

staff,

OpenGov

will

load

the

data

into

Customer

sandbox

or

production

OpenGov

Asset

Management

environment.

Data

loads

may

include

data

such

as:
o Parent level asset records o Asset location (spatial x/y) attributes o Parent level resource (Labor, Equipment Material, Vendor) records o Resource Rate (Labor, Equipment, Material) records o Standard system libraries OpenGov Assumptions: ● OpenGov assumes that the customer is responsible for performing quality control measures on

its

data

in

EAM.
● Data conversion services from other software system(s) or sources (including Navigator databases)

are

not

included

in

the

scope

of

this

project

unless

specifically

listed

above.

Assets
OpenGov will:
● Provide installation and training on the following asset types: o Transportation (8) ▪ Bridge; Light Fixture; Pavement; Sign; Guardrail; Marking; Pavement Area;

Support
o Parks and Recreation (10) ▪ Athletic Space; Fence; Park; Park Structure; Playground Equipment; Bench;

Landscape

Area;

Park

Amenity;

Playground;

Tree
o Facilities (25) ▪ Facility; Other Site Construction; Selective Building Demolition; Site Improvement;

Site

Preparation; Facility

Floor;

Basement

Construction; Conveying; Exterior

Enclosures; Facility

Electrical; Facility

Equipment; Fire

Protection; Foundations; Furnishings; HVAC; Interior

Construction; Interior

Finishes; Plumbing;

Roofing; Site

PS-11026.1 8
Electrical Utilities; Site Mechanical Utilities; Spaces; Special Construction; Stairs; Superstructure
o Stormwater (9) ▪ Storm Basin; Storm Channel; Storm Culvert; Storm Facility; Storm Inlet;

Storm

Manhole;

Storm

Outlet;

Storm

Pipe;

Storm

Pump
o Water Distribution (9) ▪ Water Backflow; Water Facility; Water Hydrant; Water Lateral; Water Main;

Water

Meter;

Water

Pump;

Water

Valve;

Water

Storage

Tank
o Water Treatment Plant (34) ▪ Water Treatment Plant; Water Treatment Plant Blowers; Water Treatment

Plant

Compressors;

Water

Treatment

Plant

Electrical

Generator;

Water

Treatment

Plant

Facility;

Water

Treatment

Plant

HVAC

Equipment;

Water

Treatment

Plant

Instrumentation;

Water

Treatment

Plant

Motors;

Water

Treatment

Plant

Processes;

Water

Treatment

Plant

Pump;

Water

Treatment

Plant

Screens;

Water

Treatment

Plant

Structure;

Water

Treatment

Plant

UV;

Water

Treatment

Plant

Valves;

Water

Treatment

Plant

Floor;

Basement

Construction;

Conveying;

Exterior

Enclosures;

Facility

Electrical;

Facility

Equipment;

Fire

Protection;

Foundations;

Furnishings;

Interior

Construction;

Interior

Finishes;

Plumbing;

Roofing;

Site

Mechanical

Issues;

Special

Construction;

Stairs;

Superstructure;

Selective

Building

Demolition;

Site

Preparation;

Site

Improvement;

Other

Site

Construction

o Wastewater Collection / Sanitary Sewer (7) ▪ Sewer Cleanout; Sewer Facility; Sewer Force Main; Sewer Lateral; Sewer

Main;

Sewer

Manhole;

Sewer

Pump
o Up to three (3) Custom Asset Type(s) to be determined during Validation Workshop.

Completion Criteria: ● Customer sign-off on ability to login and access to the sandbox.

Train

Foundational Training
● Provide remote train-the-trainer training, up to two (2) hours, on overall system navigation

and

functionality

to

help

familiarize

Customer

staff

with

the

software

environment

and

its

common

functions.

Training

topics

include:
o Dashboards o Standard KPI/ROI Gadgets o Logins/Permission o Layers o Filters o Maps PS-11026.1 9
o Grids o System Navigation o Views (List & Detail) o Standard Reports o Attachments o Requests, Work, Assets, Resources, Reports, and Administrator Tabs OpenGov assumptions: ● OpenGov assumes that the customer is responsible for testing its workflows, automations, integrations,

and

configurations

within

the

EAM

and

will

update

the

configurations

as

part

of

its

testing

and

training

activities.

Train the Trainer Training Event
● Provide a three-day (3-day) onsite "train-the-trainer" training event. The training agenda

will

be

defined

and

agreed

upon

by

both

OpenGov

and

Customer

project

manager.

To

avoid

redundancy,

and

to

utilize

service

time

efficiently,

training

may

cover

a

subset

of

the

assets

listed

in

the

Asset

section

of

the

scope.

Topics

may

include

any

of

the

following:
o Request Management: ▪ Requests ▪ Requesters ▪ Task Creation from Requests ▪ Issue library (including settings such as Applies to Asset and Non-Location)
▪ OpenGov recommended best practices for Request and Requester Management
o Work Management: ▪ Create Task(s) (Asset/Non-Asset) ▪ Assignments (Add, Edit, Remove) ▪ Task Menu Actions ▪ Related Work Items ▪ Create Work Order ▪ Associate Task to Work Order ▪ Repeat Work Orders ▪ Work Order Menu Actions ▪ Enter Resources ▪ Timesheets ▪ Activity library (including settings such as Applies to Asset, Inspection,

Key

Dates,

Cost,

and

Productivity)
▪ OpenGov recommended best practices for Work Management o Asset Management: ▪ Asset Details ▪ Preventative Maintenance Plans ▪ Inspections ▪ Linked assets (if applicable) ▪ Container/Component Relationships (if applicable) ▪ OpenGov recommended best practices for Asset Management PS-11026.1 10
o Resource Management: ▪ Resource Details ▪ Labor/Equipment Rates ▪ Material Management (Stock, Usage, Adjustments) ▪ Vendor Price Quotes ▪ OpenGov recommended best practices for Resource Management o OpenGov Mobile: ▪ Overall system functionality (Navigation, Interface, Maps, Attachments,

Sorting)
▪ Work Management ● Create and Update Tasks (Asset/Non-Asset) ● Assign Tasks ● Enter Resources ● Inspections ▪ Asset Management ● Create and Update Assets ▪ Request Management ● View and Update Requests ● View Requester information ● Create Task from Request ▪ OpenGov recommended best practices for mobile device use o Administrator: ▪ Administrator: ● User Administration, Role Administration, Asset Administration, Record

Filter

Administration,

Import/Export,

Scheduled

Process

Log,

Error

Log
▪ Settings: ● System Settings, Map Administration, Geocode Settings, GIS Integration

settings,

Asset

Color

Manager
▪ Manager: ● Layout Manager, Library Manager, Preventative Maintenance, Asset Condition

Manager,

Notification

Manager,

Structure

Manager,

Automation

Manager

End User Training Event
● Provide a three-day (3-day) onsite end user training event. The training agenda will be

defined

and

agreed

upon

by

both

OpenGov

and

Customer

project

manager.

To

avoid

redundancy,

and

to

utilize

service

time

efficiently,

training

may

cover

a

subset

of

the

assets

listed

in

the

Asset

section

of

the

scope.

Topics

may

include

any

of

the

following:
o Request Management: ▪ Requests ▪ Requesters ▪ Task Creation from Requests ▪ Issue library (including settings such as Applies to Asset and Non-Location)

PS-11026.1 11
▪ OpenGov recommended best practices for Request and Requester Management
o Work Management: ▪ Create Task(s) (Asset/Non-Asset) ▪ Assignments (Add, Edit, Remove) ▪ Task Menu Actions ▪ Related Work Items ▪ Create Work Order ▪ Associate Task to Work Order ▪ Repeat Work Orders ▪ Work Order Menu Actions ▪ Enter Resources ▪ Timesheets ▪ Activity library (including settings such as Applies to Asset, Inspection,

Key

Dates,

Cost,

and

Productivity)
▪ OpenGov recommended best practices for Work Management o Asset Management: ▪ Asset Details ▪ Preventative Maintenance Plans ▪ Inspections ▪ Linked assets (if applicable) ▪ Container/Component Relationships (if applicable) ▪ OpenGov recommended best practices for Asset Management o Resource Management: ▪ Resource Details ▪ Labor/Equipment Rates ▪ Material Management (Stock, Usage, Adjustments) ▪ Vendor Price Quotes ▪ OpenGov recommended best practices for Resource Management o OpenGov Mobile: ▪ Overall system functionality (Navigation, Interface, Maps, Attachments,

Sorting)
▪ Work Management ● Create and Update Tasks (Asset/Non-Asset) ● Assign Tasks ● Enter Resources ● Inspections ▪ Asset Management ● Create and Update Assets ▪ Request Management ● View and Update Requests ● View Requester information ● Create Task from Request ▪ OpenGov recommended best practices for mobile device use o Administrator: ▪ Administrator:

PS-11026.1 12
● User Administration, Role Administration, Asset Administration, Record

Filter

Administration,

Import/Export,

Scheduled

Process

Log,

Error

Log
▪ Settings: ● System Settings, Map Administration, Geocode Settings, GIS Integration

settings,

Asset

Color

Manager
▪ Manager: ● Layout Manager, Library Manager, Preventative Maintenance, Asset Condition

Manager,

Notification

Manager,

Structure

Manager,

Automation

Manager

Core Training:
● Provide remote train-the-trainer training, up to two (2) sessions on OpenGov Asset Builder.

Training

topics

include:
o OpenGov Asset Management Administrator ▪ Structure Manager ▪ Library Manager ▪ Layout Manager ▪ User/Role Configurations o OpenGov recommended best practices for expanding the system’s use and/or

building

assets
● Provide Preventative Maintenance Plans remote train-the-trainer training, up to four

(4)

sessions.

Training

topics

include:
o Preventative Maintenance o OpenGov recommended best practices for proactive asset management ● Provide Advanced Inspections, Asset Condition Manager, and Asset Risk remote train-the-trainer

training,

up

to

six

(6)

sessions.

Training

topics

include:
o Performance Management ▪ Prediction Groups ▪ Minimum Condition Groups ▪ Activities and Impacts ▪ Criticality Factor ▪ Install/Replaced Dates o Business Risk Exposure ▪ Risk ▪ Consequence of Failure ▪ Probability of Failure o OpenGov recommended best practices for Asset Risk Functionality , advanced

inspections

and

condition

management
● Provide Internal Request remote train-the-trainer training, up to two (2) sessions.

Training

topics

include:
o Internal Requests ▪ Users ▪ Views
PS-11026.1 13
▪ Issue Library settings and management o OpenGov recommended best practices for advanced request management ● Provide Advanced Material Management and Material Planning remote train-the-trainer

training,

up

to

eight

(8)

sessions.

Training

topics

include:
● Material Locations ● Material Transfers ● Material Orders ● Settings: o Vendor Price Quotes o Re-order points ● Material Planning o Status Default o Workflow Setup o Notifications ● OpenGov recommended best practices for advanced material management and

Material

Planning.

Completion Criteria ● Core Training and train-the-trainer has been conducted.

Launch
OpenGov will: ● Provide remote, up to eight (8) hours, web conferences, of working sessions to answer any questions

following

solution

acceptance.

Completion Criteria: ● Go Live Support has been conducted. 311 Request Management
Initiate OpenGov will: ● Conduct a project kickoff to align goals, roles, scope, and approach. ● Provision Government App Builder environment; configure initial roles ● Run discovery/working sessions to confirm high ‑ level requirements across channels (web, and

mobile
‑
browser).
● Create initial configuration backlog in shared workspace Customer will: ● Identify stakeholders; ensure attendance at kickoff and working sessions.

PS-11026.1 14
● Confirm environment access and user roles. ● Provide process documentation (current service catalog, scripts, categories), reporting

examples,

and

regulatory/retention

requirements.
● Review and approve initial configuration backlog and project schedule.

Assumptions: ● OpenGov will use standard templates and intake patterns unless otherwise agreed in

writing.
● Branding and content style guides provided by Customer (if applicable) Completion Criteria: ● Kickoff completed with documented actions. ● Access confirmed for core users. ● Initial backlog and plan approved. ● Shared workspace established.

Validate

OpenGov will: ● Facilitate validation workshop to confirm requirements, dependencies, and acceptance

criteria

across

intake

channels,

routing

rules,

SLAs,

and

reporting.
● Present refined backlog, timeline, and resource plan for sign ‑ off. ● Validate user access, permissions, and environment readiness. ● Update artifacts based on feedback prior to configuration. Customer will: ● Attend validation with decision ‑ makers and SMEs (call center, departmental responders,

IT/GIS).
● Confirm access to needed systems and tools (GIS, work order/asset mgmt, ERP/finance,

SSO,

legacy

data).
● Review and sign off on backlog and plan. ● Resolve internal dependencies that could block configuration. Assumptions: ● Any additional requirements identified will be assessed for scope and schedule impact. Completion Criteria: ● Customer sign ‑ off on plan and backlog. ● Access validated. ● No outstanding blockers to start Configure. ● Readiness checkpoint logged in project documentation.

Configure

Service Catalog
PS-11026.1 15
OpenGov will: ● Define catalog taxonomy and metadata; configure categories, subcategories, and article

templates
● Provide enablement on ongoing content governance. Customer will: ● Supply existing catalog lists and knowledge content; designate content owners ● Review layouts and content structure; approve final catalog and initial article set. Assumptions: ● Content writing and localization are Customer responsibilities unless otherwise contracted.
● External website CMS updates (outside of the 311 portal) are out of scope. Completion Criteria: ● Service catalog configured and linked to intake workflows. ● Initial knowledge base articles published. ● Governance approach documented.

Service Request Intake & Form (Web & Browser Accessible Mobile) OpenGov will: ● Configure up to five (5) request types including: data tables, fields, validations, conditional

logic,

attachments,

and

layouts.

● Implement address capture and geocoding using standard capabilities and/or GIS integration

when

in

scope.
● Conduct review sessions and iterate to finalize. Customer will: ● Provide field ‑ level requirements, current scripts, categories, and mandatory data elements.
● Participate in reviews; provide consolidated feedback. ● Validate permissions, logic, and layouts for internal and resident users ● Approve final configurations. Assumptions: ● Designs leverage standard form capabilities and controls; custom web or native mobile

apps

are

out

of

scope

unless

explicitly

stated
● Public site branding assets provided by Customer. Completion Criteria: ● Forms/tables configured and tested ● Address capture/geocoding validated (if in scope). ● Required data capture confirmed ● Customer approval received.

PS-11026.1 16

Workflow, Triage & Routing OpenGov will: ● Configure routing rules, ownership groups, task states, reassignment, and collaboration

steps.
● Implement prioritization logic and triage forms. ● Document workflows and test with Customer. Customer will: ● Provide current process maps, ownership matrices, and escalation criteria. ● Participate in testing and refinement; approve final logic. Assumptions: ● Automation will use standard workflow options; custom code is out of scope unless listed.
● Location ‑ based routing requires GIS layers and data provided by Customer. Completion Criteria: ● Workflows live with routing functioning. ● Ownership groups and queues configured. ● Approval received from Customer.

SLAs, Notifications & Escalation OpenGov will: ● Configure SLA timers (acknowledgment, first response, resolution), indicators, and dashboards.
● Set up resident communications (email/SMS when in scope) and status updates ● Configure escalations to supervisors and leadership. Customer will: ● Provide SLA definitions per category and business hours/holiday calendars. ● Approve notification templates and escalation paths. ● Validate end ‑ to ‑ end SLA behavior. Assumptions: ● SMS/email providers and associated fees are Customer responsibilities unless otherwise

contracted.
● Two ‑ way messaging outside of standard capabilities may require a Change Order. Completion Criteria: ● *SLAs operational with monitoring in dashboards ● Notifications and escalations tested ● Customer approval received.

Integration with OpenGov Enterprise Asset Management (EAM) PS-11026.1 17
OpenGov will: ● Enable bi-directional sync so 311 Request Management requests can create EAM work

orders

when

criteria

are

met,

and

status

updates

in

EAM

reflect

back

to

311

and

the

public

status

page

where

appropriate.
● Define decision rules for work-order creation (e.g., by category/high-alert flag). ● Map fields between 311 Request Management and EAM (request ID, category, asset/location,

status

codes,

dates).
● Implement API-based integration or agreed method; handle error validation and retries.
● Configure read-backs of EAM status/progress for resident-friendly display on the status

page.
● Provide technical runbook and data-mapping documentation. Customer Responsibilities: ● Provide or confirm EAM environment details, credentials, and test data; confirm asset/address

cross-walks.
● Validate mapping, status cross-reference, and acceptance criteria. ● Coordinate with any internal EAM administrators for endpoint access/windows. Boundaries & Assumptions ● Scope is limited to OpenGov 311 Request Management ↔ OpenGov EAM integration; other

third-party

systems

are

out

of

scope.
● Integration follows standard, supported API capabilities; custom EAM extensions are

excluded.

Completion Criteria: ● End-to-end tests demonstrate work-order creation and status synchronization; integration

documentation

delivered;

stakeholder

approval

received.

Reporting & Dashboards OpenGov will: ● Configure reports (up to 10), filters, and visualizations; enable exports suitable for council/board/public

dashboards

(up

to

6 unique

dashboards)
● Provide enablement on managing report parameters and publishing. Customer will: ● Define KPIs and reporting needs; provide examples of internal and public reporting. ● Review layouts and logic; test exports; designate owners for ongoing reporting. Assumptions: ● Reports rely on data available in configured tables or approved imports/integrations.
● Complex, custom templates outside of standard exports may require a Change Order.

Completion Criteria:

PS-11026.1 18
● Reports and dashboards live with accurate data. ● Permissions verified; export formats tested ● Customer approval received.

Train

Administrator & Dispatcher Training OpenGov will: ● Deliver live virtual training; provide documentation and recordings. ● Cover core admin tasks (form edits, report creation, workflow adjustments, SLA configuration,

permission

controls).
● Assign practice scenarios. Customer will: ● Identify admin/dispatcher users; attend training; complete practice exercises; confirm

understanding

of

responsibilities.

Assumptions: ● Training delivered remotely unless otherwise specified. ● Attendees are available at scheduled times. Completion Criteria: ● Admin training completed; access confirmed for relevant users. ● Practice scenarios validated ● Customer confirms readiness to manage configuration post ‑ launch.

Agent/Field Staff Enablement OpenGov will: ● Deliver role ‑ based sessions and quick ‑ reference guides. ● Demonstrate status updates, assignment, and completion workflows. Customer will: ● Ensure attendance; provide device policies and any mobile restrictions. ● Validate that training aligns to field operation needs. Assumptions: ● Device procurement and management are Customer responsibilities. ● Offline mode support is limited to generally available capabilities. Completion Criteria: ● Agent/field sessions delivered; materials distributed. ● Readiness sign ‑ off received from departmental leads.

Public/User-Facing Collateral
PS-11026.1 19
OpenGov will: ● Draft how ‑ to guides with screenshots and FAQs; deliver PDF and web ‑ optimized formats.
● Review drafts with Customer for accuracy; finalize collateral. Customer will: ● Review and provide feedback; approve final content; handle distribution and any localization.

Assumptions: ● Content reflects current forms and processes at go ‑ live. ● Accessibility/translation needs identified by Customer. Completion Criteria: ● Guides finalized and approved; published via Customer channels.

Launch

OpenGov will: ● Monitor adoption; resolve configuration questions and issues. ● Conduct final stakeholder review; transition to Customer Success. Customer will: ● Monitor usage; report issues; attend final review; sign solution acceptance. Assumptions: ● Hypercare support is time ‑ boxed per the Project Plan. ● Post ‑ launch enhancements will be prioritized via Customer Success or Change Orders.

Completion Criteria: ● Hypercare window closed; known issues addressed or queued. ● Stakeholder review completed; solution acceptance signed.

Exhibit 2: Technical Requirements
Government App Builder Technical Requirements
● Migration ○ No historical data migration
PS-11026.1 20
● Flat File Integrations ○ Customer must ■ Provide OpenGov with the export file (a delimited file) from the external system
■ Automate the export and/or import of data into and out of the external system.
● API Integrations ○ Customer is responsible for: ■ Providing OpenGov with access to the API and/or access to technical staff from

that

vendor.
■ Access to a test instance of the third party API including a URL, authentication

credentials,

and

relevant

documentation.

■ Changes to scope resulting from a change in a third-party vendor’s (if applicable)

API.
■ Testing expected workflows and data in both test and production environments
○ To display a location on a map, the third party system must be able to provide location

data

via

their

API,

as

shapes

or

coordinates.

Text

addresses

are

limited

to

populating

address

fields.

PS-11026.1 21