License # 125897 C-10Dear,Date:To:Attn:From:Regarding:LINEQTYUNITPRICE1 42EA550.00$ Total7. Relocation or maintanace of any temporary Streetlight is EXCLUDED DESCRIPTIONRetrofit (42) streetlights fixtures to new solar powered fixture (Wire/Fixture provided by others)Major Traffic Control per MUTCD Provided23,100.00$ AMOUNT

1. Engeneering, plancheck, permit, bonds,inspections,utility fees,high voltage, surveying is EXCLUDED2. Specilty cement work and cement finish work over 30"X30" is EXCLUDED3. Striping, street sign or regulatory signs are EXCLUDED9. All material to be provided by others. 23,100.00$ EXCLUSIONS & CONDITIONSPurchase Order Number: _____________________________________________Name of Customer: __________________________________________________4. Traffic control per W.A.T.C.H. manual standards only. Traffic control per engineered plan is EXCLUDED PROPOSAL Pedro CamposREVISION # 5/19/20262750 Moore ave. Fullerton CA 92833Phone: (714) 870-0217 Fax: (714) 738-3571City of FullertonMike MartinezSASCO appreciates the opportunity to submit an proposal. SASCO proposes to furnish all labor, materials, taxes, and licenses to complete the electrical scope of work with the following clarifications, inclusions and exclusions. This estimate assumes all work to be done during normal working hours (7am-3pm) with reasonable access to work area. Please sign and email [email protected] Mike MartinezFullerton Solar Streetlight RetrofitNorth Derek DrPROPOSAL GOOD FOR 30 DAYS

5. Weekend and night work is EXCLUDED (unless specified)6. Troubleshooting existing power or any high voltage splicing is EXCLUDED8. Extra work to be charged as T&M rates with a 4-hour Min Labor charge per workerTo Process, A Signed Approval Is Required:Signature/Title: Date:_________________