ATTACHMENT 2 – BID SCHEDULE
CANDLEWOOD AREA STREET REHABILITATION PROJECT
Project No.: 44086
ONYX PAVING COMPANY, INC.
Line Item
Description
Quantity
Unit of Measure
Unit Cost
Total
1 MOBILIZATION
1 LS
$27,695.00
$27,695.00
2 WATER POLLUTION CONTROL
1 LS
$8,000.00
$8,000.00
3 TRAFFIC CONTROL
1 LS
$26,000.00
$26,000.00
4 REMOVE AND REPLACE STANDARD 4” SIDEWALK
2,460
SF
$14.00
$34,440.00
5 INSTALL BRICK PAVERS
120
SF
$24.00
$2,880.00
6 REMOVE AND REPLACE STANDARD 6” CURB & GUTTER
110
LF
$111.00
$12,210.00
7 REMOVE AND REPLACE CURB RAMP
20 EA
$5,000.00
$100,000.00
8 REMOVE AND REPLACE SPANDREL & CROSS GUTTER
1,100
SF
$28.00
$30,800.00
9 ROADWAY EXCAVATION & REMOVALS
35 CY
$100.00
$3,500.00
10 COLDMILL – 1.5"
149,000
SF
$0.40
$59,600.00
11 COLDMILL – 4"
14,000
SF
$1.10
$15,400.00
12 AC DIGOUT
8,150
SF
$6.50
$52,975.00
13 AC PAVEMENT
1,830
TON
$110.00
$201,300.00
14 ADJUST MH TO GRADE WITH NEW FRAME & COVER
16 EA
$800.00
$12,800.00
15 ADJUST WATER VALVE TO GRADE
15 EA
$600.00
$9,000.00
16 SIGNING & STRIPING
1 LS
$12,000.00
$12,000.00
17 TRAFFIC LIGHT CONDUIT AND WIRING REPAIR
100
LF
$134.00
$13,400.00
TOTAL
$622,000.00