Cities Index.
item 13 Approval of a Subdivision Agreement and Final Tract Map No. 19273 with GGBROOKHURST, 2024, LLC., for the property located at 13252 Brookhurst Street, Garden Grove. (Action Item)

Garden Grove City Council
August 13, 2024

Document
item 13 Approval of a Subdivision Agreement and Final Tract Map No. 19273 with GGBROOKHURST, 2024, LLC., for the property located at 13252 Brookhurst Street, Garden Grove. (Action Item)
Meeting
August 13, 2024
Body
Garden Grove City Council
Original file
16 KB
Text extracted from the city's file for reading and search. Open the original on agendasuite.org. That file is the official record.

Item Description Unit Cost Quantity Unit Cost

ON-SITE
4" A.C. OVER 7" A.B. (AUTO DRIVEWAYS) 4.00 $ 11,458 SF 45,832$ 3" A.C. OVER 6" A.B. (PARKING STALLS) 3.00 $ 736 SF 2,208$ ENHANCED PAVING 5.00 $ 786 SF 3,930$
CURB AND GUTTER PER CITY OF GARDEN GROVE STD.

PLAN NO. B-114, TYPE "D" (6" CF) 24.00$ 222 LF 5,328$ CURB ONLY PER CITY OF GARDEN GROVE STD. PLAN NO. B-
112, TYPE "A-6" (6" CF) 22.00$ 415 LF 9,130$
4" PCC FLATWORK 6.00 $ 5,896 SF 35,376$
ROLLED CURB & GUTTER PER O.C.P.W STD. PLAN 120 24.00 $ 184 LF 4,416$ ROLLED CURB PER O.C.P.W STD. PLAN 1201 22.00 $ 244 LF 5,368$ 2' RIBBON GUTTER 20.00 $ 63 LF 1,260$
3' RIBBON GUTTER 24.00 $ 37 LF 888$
DECOMPOSED GRANITE 24.00 $ 161 SF 3,864$
CURB RAMP PER CALTRANS STD. NO. A88A CASE F 2,500.00 $ 1 EA 2,500$ TRENCH REPAIR 3.00 $ 346 SF 1,038$

4.0' CATCH BASIN PER CITY OF GARDEN GROVE STD PLAN
NO. B-201 6,000.00$ 2 EA 12,000$
CURB INLET CATCH BASIN FILTER 1,000.00 $ 2 EA 2,000$ AREA DRAIN 200.00 $ 47 EA 9,400$
60" HDPE STORAGE PIPE 400.00 $ 140 LF 56,000$
12" PVC 80.00 $ 200 LF 16,000$
8" PVC 70.00 $ 152 LF 10,640$
6" PVC 60.00 $
370 LF 22,200$
4" PVC 50.00 $ 177 LF 8,850$
2" SCH 40 PVC 50.00 $ 2 LF 100$
HDPE/PVC TEE 250.00 $ 23 EA 5,750$
HDPE/PVC ELBOW 250.00 $ 14 EA 3,500$
LIFT STATION WITH PUMP 7,000.00 $ 1 EA 7,000$
HDPE MANHOLE 6,000.00 $ 1 EA 6,000$
RAISED BIO-TREATMENT PLANTER 20.00 $ 664 SF 13,280$ PARKWAY DRAIN PER CITY OF GARDEN GROVE STD. PLAN
NO. B-209 400.00$ 10 LF 4,000$

CUT-IN TEE CONNECTION PER PIPE MANUFACTURER
STANDARDS 300.00$ 11 EA 3,300$
Sub-Total On-Site 301,158 $
5% Engineering & Staking: 15,058$
APPROVED BY: ________________________ Sub Total: 316,216 $ 10% Contingencies 31,622 $
DATE: _________________
TOTAL ON-SITE COST: 347,837$
City of Garden Grove

ENGINEERING COST ESTIMATE
PROJECT NO: TRACT 19273
LOCATION: 113252 BROOKHURST STREET, GARDEN GROVE, CA 92844 BY: CA Engineering DATE: 6/11/2024
6/13/2024 Page 1 of 3 S:\Engineering\491-21 COST ESTIMATE.xls Item Description Unit Cost Quantity Unit Cost

OFF-SITE

CURB & GUTTER PER CITY OF GARDEN GROVE
STD. PLAN NO. B-114, TYPE "D" (6" CF) 25.00$ 40 LF 1,000$ CURB ONLY PER CITY OF GARDEN GROVE STD.

PLAN NO. B-112, TYPE "A-6" (6" CF) 23.00$ 84 LF 1,932$

CURB & GUTTER PER CITY OF GARDEN GROVE
STD. PLAN NO. B-113, TYPE "C-8" (8" CF) 27.00$ 49 LF 1,323$ DRIVEWAY PER CITY OF GARDEN GROVE STD.

PLAN NO. B-120, OPTION #3 5,000.00$ 2 EA 10,000$
FULL DEPTH AC 5.00 $ 228 SF 1,140$
SAWCUT AND REMOVE EXISTING A.C.

PAVEMENT 4.00$ 498 LF 1,992$
1' GRIND & OVERLAY 5.00 $ 248 SF 1,240$

PARKWAY DRAIN PER CITY OF GARDEN GROVE
STD. PLAN NO. B-209 400.00$ 8 LF 3,200$
ABANDON EXISTING WATER/FIRE SERVICE 3,000.00$ 1 EA 3,000$ ABANDON EXISTING SEWER LATERAL 3,000.00 $ 1 EA 3,000$ 8" EXTRA STRENGTH VCP SEWER MAIN PER
CITY OF GARDEN GROVE STD. PLAN NO. S-111
& CAPC
250.00$ 68 LF 17,000$
4' SEWER MANHOLE PER CITY OF GARDEN
GROVE STD. NO. S-100 20,000.00$ 2 EA 40,000$
6" x 6" TEE & GATE VALVE PER CITY OF GARDEN
GROVE STD. NO. B-750 11,000.00$ 2 EA 22,000$

DUCTILE IRON VERTICAL OFFSET PER CITY OF
GARDEN GROVE STD. NO. B-765 180.00$ 170 LF 30,600$ 1" AIR & VACUUM RELEASE PER CITY OF
GARDEN GROVE STD. NO. B-740 5,000.00$ 1 EA 5,000$

TRENCH BACKFILL & STREET REPAIR PER CITY
OF GARDEN GROVE STD. NO. B-134 4.00$ 395 SF 1,580$ Sub-Total Off-Site 144,007 $
5% Engineering & Staking: 7,200 $
APPROVED BY: ________________________ Sub Total: 151,207 $ 10% Contingencies 15,121 $
DATE: _________________
TOTAL OFF-SITE COST: 166,328 $
City of Garden Grove

ENGINEERING COST ESTIMATE
PROJECT NO: TRACT 19273
LOCATION: 113252 BROOKHURST STREET, GARDEN GROVE, CA 92844 BY: CA Engineering DATE: 6/11/2024
6/13/2024 Page 2 of 3 S:\Engineering\491-21 COST ESTIMATE.xls Item Description Unit Cost Quantity Unit Cost
SEWER
8" PVC SDR 35 SEWER MAIN PER CITY OF
GARDEN GROVE STD. PLAN NO. S-106 & CAPC 150.00$ 388 LF 58,200$ 4" PVC SDR 35 LATERAL PER CAPC 100.00 $ 497 LF 49,700$

SEWER CLEANOUT PER CITY OF GARDEN
GROVE STD. PLAN NO. S-105 & CAPC 2,000.00$ 2 EA 4,000$ 4' SEWER MANHOLE PER O.C.P.W. STD. PLAN
NO. 1504 20,000.00$ 2 EA 40,000$
WATER
6" PVC (C900) DR 14 CL 305 PER CITY STD AND
SPEC 160.00$ 497 LF 79,520$
1" COPPER SERVICE & METER PER CITY OF
GARDEN GROVE STD. NO. B-721 3,200.00$ 30 EA 96,000$

ANCHOR BLOCK PER CITY OF GARDEN GROVE
STD. NO. B-711 400.00$ 4 EA 1,600$

FIRE HYDRANT PER CITY OF GARDEN GROVE
STD. NO. B-702 12,000.00$ 1 EA 12,000$
6" GATE VALVE PER CITY OF GARDEN GROVE
STD. NO. B-752 1,500.00$ 1 EA 1,500$
45° ELBOW PER CITY OF GARDEN GROVE STDS. 500.00$ 4 EA 2,000$ Sub-Total Sewer & Water 344,520 $
5% Engineering & Staking: 17,226 $
APPROVED BY: ________________________ Sub Total: 361,746 $ 10% Contingencies 36,175 $
DATE: _________________
SEWER & WATER COST: 397,921 $
City of Garden Grove

ENGINEERING COST ESTIMATE
PROJECT NO: TRACT 19273
LOCATION: 113252 BROOKHURST STREET, GARDEN GROVE, CA 92844 BY: CA Engineering DATE: 6/11/2024
6/13/2024 Page 3 of 3 S:\Engineering\491-21 COST ESTIMATE.xls