Cities Index.
item 10 Award a contract to All Cities Engineering, Inc. for the construction of the Chapman Avenue and Dale Street Water Improvements Project, Project No. CP1361000. (Cost: $4,129,980)(Action Item)

Garden Grove City Council
October 22, 2024

Document
item 10 Award a contract to All Cities Engineering, Inc. for the construction of the Chapman Avenue and Dale Street Water Improvements Project, Project No. CP1361000. (Cost: $4,129,980)(Action Item)
Meeting
October 22, 2024
Body
Garden Grove City Council
Pages
2
Original file
228 KB
Text extracted from the city's file for reading and search. Open the original on agendasuite.org. That file is the official record.

Item 437/2024
Final

City of Garden Grove

INTER-DEPARTMENT MEMORANDUM

To:

Lisa L. Kim From: William E. Murray
Dept:

City Manager Dept: Public Works
Date: 10/22/2024

Subject: Award a contract to All Cities Engineering, Inc. for the construction of the Chapman Avenue and Dale Street Water Improvements Project, Project No.

CP1361000. (Cost: $4,129,980)(Action Item)

OBJECTIVE

For City Council to award a contract to All Cities Engineering, Inc. for the construction of Project No. CP1361000 – Chapman Avenue and Dale Street Water Improvements Project.

BACKGROUND

The City’s 2020 Water Master Plan Update has identified 228 miles of Asbestos Concrete (AC) pipeline installed in the 1950s to be replaced under the Water Main Replacement Program, as these pipes are nearing the end of their design useful life. At the same time, the Master Plan recommends that the City target smaller diameter mains in its replacement program and prioritize areas with lowest fire flow availability.

In considering the above criteria, the Chapman Avenue and Dale Street Water Improvement Project area was selected. The project consists of constructing new 8- inch water mains and abandoning existing undersized 4 and 6-inch AC water mains in the unincorporated area of Orange County. The entire project consists of installing approximately 9,800 linear feet of 8- inch Polyvinyl chloride Pipe (PVC). The scope of work also includes furn ishing fittings and appurtenances, trenching, shoring, backfilling, compaction, asphalt repair and replacement, street replacement and pipe disinfection and testing. It includes the construction of approximately 19 fire hydrant assemblies, 208 water servic e connections and three (3) connections to the existing water system.

DISCUSSION

On October 9, 2024, at 11:00 a.m., 11 bids were received and opened by the City Clerk’s Office (see Bid Summary Sheet). The lowest responsive bidder is All Cities Engineering, Inc. with a total bid of $ 4,129,980. The licenses and references of the contractor have been reviewed and verified by staff and all other documentation is in order. The anticipated contract schedule is as follows:

Item 437/2024

Page 2 of 2 ends

Award contract October 22, 2024
Begin construction December 2, 2024
Complete construction May 30, 2025

FINANCIAL IMPACT

The cost of the construction contract for Project No. CP1361000 – Chapman Avenue and Dale Street Water Improvements Project is $4,129,980. It will be funded by the Water utility fund.

This project is included in the adopted Fiscal Year 2024-2025 Capital Improvement Plan budget.

RECOMMENDATION

It is recommended that the City Council:

 Award a contract to All Cities Engineering, Inc. for $4,129,980 for the construction of Project No. CP1361000, Chapman Ave nue and Dale St reet Water Improvement Project; and

 Authorize the City Manager, or designee, to execute the agreements on behalf of the City, and make minor modifications as appropriate.

By: Jessica Polidori, Associate Engineer

ATTACHMENT(S)