Attachment 4
Before and After Illustration
1 City of Garden Grove
BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Current Fee
Current
Cost Recovery
Target
Cost Recovery
Year 1 Phase-In
FY 25/26
Year 2 Phase-In
FY 26/27
Year 3 Phase-In
FY 27/28 Charge Basis Note
CPI
Adjust
Application
1 Director’s Review
a) Existing Single Family $175 7% 100% $916 $1,657 $2,398 Fixed Y b) Duplex and Triplex $1,600 22% 100% $3,537 $5,475 $7,412 Fixed Y c) All Others $600 25% 100% $1,199 $1,799 $2,398 Fixed Y 2 Front yard determination $175 8% 100% $807 $1,439 $2,071 Fixed Y 3 Street Vacation $1,850 22% 100% $4,067 $6,285 $8,502 Fixed Y 4 Zone Change $2,700 34% 100% $4,416 $6,132 $7,848 Fixed Y 5 Site Plan $3,375 28% 100% $6,247 $9,118 $11,990 Fixed Y 6 General Plan Amendment $2,925 45% 100% $4,130 $5,335 $6,540 Fixed Y 7 Specific Plan Actual Cost + 15% 100% 100% Actual Cost + 15% Actual Cost + 15% Actual Cost + 15% T&M N 8 Conditional Use Permit
a) Conditional Use Permit Entertainment new category 100% $1,599 $3,197 $4,796 Fixed Y b) Conditional Use Permit Alcohol new category 100% $1,599 $3,197 $4,796 Fixed Y c) Conditional Use Permit - All Other $3,150 36% 100% $5,007 $6,863 $8,720 Fixed Y 9 Animal Conditional Use Permit $300 $300 $300 $300 Fixed N 10 Variance
a) Existing Single-family Residential Lot $500 9% 100% $2,150 $3,800 $5,450 Fixed Y b) All Others $2,525 35% 100% $4,081 $5,638 $7,194 Fixed Y 11 Tentative Tract Map
a) Base Fee $3,788 39% 100% $5,759 $7,730 $9,701 Fixed Y b) Per Lot Fee $17 31% 100% $30 $42 $55 Fixed Y
12 Tentative Parcel Map
a) Base Fee $2,138 30% 100% $3,787 $5,436 $7,085 Fixed Y b) Per Lot Fee $17 31% 100% $30 $42 $55 Fixed Y
13 Lot Line Adjustment $1,465 28% 100% $2,721 $3,976 $5,232 Fixed Y 14 Planned Unit Development $4,725 44% 100% $6,747 $8,769 $10,791 Fixed Y 15 Modification to Approved Plans 50% cost of current
fee
varies varies 50% cost of current
fee
50% cost of current
fee
50% cost of current
fee
Fixed N
16 Home Occupation Permits $150 $150 $150 $150 Fixed N
Activity Description
2 City of Garden Grove
BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Current Fee
Current
Cost Recovery
Target
Cost Recovery
Year 1 Phase-In
FY 25/26
Year 2 Phase-In
FY 26/27
Year 3 Phase-In
FY 27/28 Charge Basis Note
CPI
AdjustActivity Description
17 Ordinance Amendments $2,625 33% 100% $4,366 $6,107 $7,848 Fixed Y 18 Interpretation of Use
a) Zoning Administrator $325 6% 100% $2,070 $3,814 $5,559 Fixed Y b) Planning Commissions $575 10% 100% $2,236 $3,898 $5,559 Fixed Y 19 Environmental Impact Report Actual Cost + 15% 100% 100% Actual Cost + 15% Actual Cost + 15% Actual Cost + 15% T & M N 20 Environmental Impact Report Monitoring $50 23% 100% $106 $162 $218 Per Hour Y 21 Negative Declaration $775 9% 100% $3,351 $5,926 $8,502 Fixed Y 22 Addendum (when technical Studies required) n/a - new n/a - new 100% $2,834 $5,668 $8,502 Fixed Y 23 Notice of Exemption $200 20% 100% $460 $721 $981 Fixed Y 24 In-Fill Exemptions (Class 32) n/a - new n/a - new 100% $1,308 $2,616 $3,924 Fixed Y 25 Mitigated Negative Declaration $1,050 10% 100% $4,261 $7,471 $10,682 Fixed Y 26 Time Extension 50% of original fee varies varies 50% of original fee, not to exceed $3,488
50% of original fee,
not to exceed $3,488
50% of original fee,
not to exceed $3,488
Fixed N
27 Letters of Zoning Confirmation $85 19% 100% $202 $319 $436 Fixed Y 28 Letters of Flood Plain $85 19% 100% $202 $319 $436 Fixed Y 29 CC&R's Review $300 13% 100% $999 $1,699 $2,398 Fixed Y 30 Ministerial Screening $100 11% 100% $357 $615 $872 Fixed Y 31 Pre-Application Review $50 2% 100% $760 $1,470 $2,180 Fixed Y 32 Modification to Conditions of Approval 50% cost of current fee
varies varies 50% cost of current
fee
50% cost of current
fee
50% cost of current
fee
Fixed N
33 Wireless Telecommunications
a) Facility Technical Review Actual Cost + 15% 100% 100% Actual Cost + 15% Actual Cost + 15% Actual Cost + 15% T & M N b) Master Plan Fee Actual Cost + 15% 100% 100% Actual Cost + 15% Actual Cost + 15% Actual Cost + 15% T & M N 34 Minor Modifications $100 3% 100% $1,375 $2,649 $3,924 Fixed Y 35 SB 9 - 2 Unit Development $100 4% 100% $866 $1,632 $2,398 Fixed Y 36 SB 2 - Urban Lot Split $100 3% 100% $1,375 $2,649 $3,924 Fixed Y 37 Administrative Hours Extension n/a - new n/a - new 100% $545 $1,090 $1,635 Fixed Y 3 City of Garden Grove
BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Current Fee
Current
Cost Recovery
Target
Cost Recovery
Year 1 Phase-In
FY 25/26
Year 2 Phase-In
FY 26/27
Year 3 Phase-In
FY 27/28 Charge Basis Note
CPI
AdjustActivity Description
38 Density Bonus Application n/a - new n/a - new 100% $291 $581 $872 Fixed Y 39 SB 330 Pre-Housing Application $100 100% $291 $581 $872 Fixed N 40 Development Agreements n/a - new n/a - new 100% $1,017 $2,035 $3,052 Fixed Y 41 SB 330 Replacement Housing n/a - new n/a - new 100% $363 $727 $1,090 Fixed Y 42 Annexations (Developer Initiated) n/a - new n/a - new 100% $1,453 $2,907 $4,360 Fixed Y 43 Traffic Study Review n/a - new n/a - new 100% $872 $1,744 $2,616 Fixed Y Plan Check
44 Single Family Residential (Up to three houses) 20% of bldg permit fee, NTE $50
varies 100% 20% of bldg permit
fee, NTE $50
20% of bldg permit
fee, NTE $50
20% of bldg permit
fee, NTE $50
Fixed N
45 All Other Residential 10% of bldg permit
fee, NTE $500
varies 100% 10% of bldg permit
fee, NTE $500
10% of bldg permit
fee, NTE $500
10% of bldg permit
fee, NTE $500
Fixed N
46 Tenant Improvements 20% of bldg permit
fee, NTE $50
varies 100% 20% of bldg permit
fee, NTE $50
20% of bldg permit
fee, NTE $50
20% of bldg permit
fee, NTE $50
Fixed N
47 Commercial and Office 10% of bldg permit
fee, NTE $500
varies 100% 10% of bldg permit
fee, NTE $500
10% of bldg permit
fee, NTE $500
10% of bldg permit
fee, NTE $500
Fixed N
Appeals
48 Appeals $480 28% 100% $901 $1,323 $1,744 Fixed Y
4 City of Garden Grove
BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee
Current
Cost Recovery
Target
Cost Recovery
Year 1 Phase-In
FY 25/26
Year 2 Phase-In
FY 26/27
Year 3 Phase-In
FY 27/28 Charge Basis Note
CPI
Adjust
Administrative Fees (Applicable to all permit types)
1 Issuance Fee
a) Single Permit $35 54% 100% $45 $55 $64 Y
b) Combination Permit $70 73% 100% $79 $88 $97 Y
2 Supplemental Permit Issuance Fee $15 47% 100% $21 $26 $32 Y 3 Refunds (No Work Done) 80% less Issuance Fee 80% less Issuance Fee 80% less Issuance Fee 80% less Issuance Fee N 4 Certificate of Occupancy - In conjunction with final inspection approval
No Charge No Charge No Charge No Charge N
5 Certificate of Occupancy - When no inspection required (Reissuance)
$25 39% 100% $38 $51 $64 Y
6 Research and processing of code modification (one hour minimum)
$90 47% 100% $124 $159 $193 Y
7 Research and processing of alternative materials/methods (one hour minimum)
$90 47% 100% $124 $159 $193 Y
8 Application for plan duplication $30 $30 $30 $30 N
9 Investigation Inspection Fee Equal to Permit Fee,
not less than $75
Equal to Permit Fee Equal to Permit Fee Equal to Permit Fee N 10 Reinspection Fee $130 67% 100% $151 $172 $193 Y
11 Overtime Inspection Fee (per hour; 2 hour minimum) $90 39% 100% $137 $184 $232 Y 12 Strong Motion Instrumentation (SMI) Fee Calculation
a) Residential $0.50 or valuation x
.00010
$0.50 or valuation x
.00013
$0.50 or valuation x
.00013
$0.50 or valuation x
.00013
N
b) Commercial $0.50 or valuation x
.00021
$0.50 or valuation x
.00028
$0.50 or valuation x
.00028
$0.50 or valuation x
.00028
N
13 Building Standards (SB 1473) Fee Calculation (Valuation) a) $1 - $25,000 $1 $1 $1 $1 N
b) $25,001 - $50,000 $2 $2 $2 $2 N
c) $50,001 - $75,000 $3 $3 $3 $3 N
d) $75,001 - $100,000 $4 $4 $4 $4 N
e) Each Add'l $25,000 or fraction thereof Add $1 Add $1 Add $1 Add $1 N Activity Description
5 City of Garden Grove
BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee
Current
Cost Recovery
Target
Cost Recovery
Year 1 Phase-In
FY 25/26
Year 2 Phase-In
FY 26/27
Year 3 Phase-In
FY 27/28 Charge Basis Note
CPI
Adjust
1 Building Plan Check Fees - Building
a) Plan Review Fee, if applicable 65% 100% 100% 65% 65% 65% [a] N i) Increase fee by percentage if the building is subject to state disabled access standards
10% 100% 100% 10% 10% 10% [a] N
ii) Increase fee by percentage if the project is subject to state energy conservation standards
10% 100% 100% 10% 10% 10% [a] N
iii) Increase fee by percentage if the building is or project is located in a flood hazard overlay zone
2% 100% 100% 2% 2% 2% [a] N
(If more than one increase applies, they shall be
cumulative)
b) Supplemental plan review (per hour; one hour minimum) $85 44% 100% $121 $157 $193 Y [a] Includes up to three plan checks. The City will bill hourly for additional plan review required.
Activity Description
6 City of Garden Grove
BUILDING FEES
Total Valuation Current Permit Fee CPI
$1 to $2,000 $40.00
$2,001 to $25,000 $92.00 for the first $2,000 plus $13.25 for each add'l $1,000 or fraction thereof, to and including $25,000
Y
$25,001 to $50,000 $404.75 for the first $25,000 plus $10.25 for each add'l $1,000 or fraction thereof, to and including $50,000
Y
$50,001 to $100,000 $671.00 for the first $50,000 plus $6.50 for each add'l $1,000 or fraction thereof, to and including $100,000
Y
$100,001 to $500,000 $1,086.00 for the first $100,000 plus $5.15 for each add'l $1,000 or fraction thereof, to and including $500,000
Y
$500,001 to $1,000,000 $3,226.00 for the first $500,000 plus $4.40 for each add'l $1,000 or fraction thereof, to and including $1,000,000
Y
$1,000,001 and up $5,576.00 for the first $1,000,000 plus $2.85 for each add'l $1,000 or fraction thereof, to and including $5,000,000
Y
Determination of Valuation for Fee-Setting Purposes
● Project valuations shall be based on the total value of all construction work, including all finish work, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment. If, in the opinion of the Building Official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the Building Official. Final building permit valuation shall be set by the Building Official. For determining project valuations for new construction, the Building Official may use data published by the International Code Council (ICC) (building valuation data table, typically updated in February and August of each year). The final building permit valuation shall be set at an amount that allows the City to recover its costs of applicant plan check, permit and inspection activities.
Note: For construction projects with permit fees calculated using Section B, additional fees apply for permit issuance. Additional fees may apply for services provided by other City Departments (e.g. Planning Review), and Fees Collected on Behalf of Other Agencies (e.g. State of California). Additional fees apply for plan review, when applicable.
B. Permit Fee for New Buildings, Additions, Tenant Improvements, Residential Remodels, and Combined Mechanical, Electrical, and/or Plumbing Permits
7 City of Garden Grove
BUILDING FEES
Total Valuation Year 1 Phase-In FY 25/26 CPI
$1 to $2,000 $74.92
$2,001 to $25,000 $109.58 for the first $2,000 plus $15.36 for each add'l $1,000 or fraction thereof, to and including $25,000
Y
$25,001 to $50,000 $462.83 for the first $25,000 plus $14.82 for each add'l $1,000 or fraction thereof, to and including $50,000
Y
$50,001 to $100,000 $833.33 for the first $50,000 plus $8.11 for each add'l $1,000 or fraction thereof, to and including $100,000
Y
$100,001 to $500,000 $1,238.67 for the first $100,000 plus $7.11 for each add'l $1,000 or fraction thereof, to and including $500,000
Y
$500,001 to $1,000,000 $4,080.67 for the first $500,000 plus $4.68 for each add'l $1,000 or fraction thereof, to and including $1,000,000
Y
$1,000,001 and up $6,419.33 for the first $1,000,000 plus $3.98 for each add'l $1,000 or fraction thereof, to and including $5,000,000
Y
Determination of Valuation for Fee-Setting Purposes
● Project valuations shall be based on the total value of all construction work, including all finish work, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment. If, in the opinion of the Building Official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the Building Official. Final building permit valuation shall be set by the Building Official. For determining project valuations for new construction, the Building Official may use data published by the International Code Council (ICC) (building valuation data table, typically updated in February and August of each year). The final building permit valuation shall be set at an amount that allows the City to recover its costs of applicant plan check, permit and inspection activities.
Note: For construction projects with permit fees calculated using Section B, additional fees apply for permit issuance. Additional fees may apply for services provided by other City Departments (e.g. Planning Review), and Fees Collected on Behalf of Other Agencies (e.g. State of California). Additional fees apply for plan review, when applicable.
B. Permit Fee for New Buildings, Additions, Tenant Improvements, Residential Remodels, and Combined Mechanical, Electrical, and/or Plumbing Permits
8 City of Garden Grove
BUILDING FEES
Total Valuation Year 2 Phase-In FY 26/27 CPI
$1 to $2,000 $109.83
$2,001 to $25,000 $127.17 for the first $2,000 plus $17.12 for each add'l $1,000 or fraction thereof, to and including $25,000
Y
$25,001 to $50,000 $520.92 for the first $25,000 plus $18.99 for each add'l $1,000 or fraction thereof, to and including $50,000
Y
$50,001 to $100,000 $995.67 for the first $50,000 plus $7.91 for each add'l $1,000 or fraction thereof, to and including $100,000
Y
$100,001 to $500,000 $1,391.33 for the first $100,000 plus $8.86 for each add'l $1,000 or fraction thereof, to and including $500,000
Y
$500,001 to $1,000,000 $4,935.33 for the first $500,000 plus $4.65 for each add'l $1,000 or fraction thereof, to and including $1,000,000
Y
$1,000,001 and up $7,262.67 for the first $1,000,000 plus $4.29 for each add'l $1,000 or fraction thereof, to and including $5,000,000
Y
Determination of Valuation for Fee-Setting Purposes
● Project valuations shall be based on the total value of all construction work, including all finish work, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment. If, in the opinion of the Building Official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the Building Official. Final building permit valuation shall be set by the Building Official. For determining project valuations for new construction, the Building Official may use data published by the International Code Council (ICC) (building valuation data table, typically updated in February and August of each year). The final building permit valuation shall be set at an amount that allows the City to recover its costs of applicant plan check, permit and inspection activities.
Note: For construction projects with permit fees calculated using Section B, additional fees apply for permit issuance. Additional fees may apply for services provided by other City Departments (e.g. Planning Review), and Fees Collected on Behalf of Other Agencies (e.g. State of California). Additional fees apply for plan review, when applicable.
B. Permit Fee for New Buildings, Additions, Tenant Improvements, Residential Remodels, and Combined Mechanical, Electrical, and/or Plumbing Permits
9 City of Garden Grove
BUILDING FEES
Total Valuation Year 3 Phase-In FY 27/28 CPI
$1 to $2,000 $144.75
$2,001 to $25,000 $144.75 for the first $2,000 plus $18.88 for each add'l $1,000 or fraction thereof, to and including $25,000
Y
$25,001 to $50,000 $579.00 for the first $25,000 plus $23.16 for each add'l $1,000 or fraction thereof, to and including $50,000
Y
$50,001 to $100,000 $1,158.00 for the first $50,000 plus $7.72 for each add'l $1,000 or fraction thereof, to and including $100,000
Y
$100,001 to $500,000 $1,544.00 for the first $100,000 plus $10.62 for each add'l $1,000 or fraction thereof, to and including $500,000
Y
$500,001 to $1,000,000 $5,790.00 for the first $500,000 plus $4.63 for each add'l $1,000 or fraction thereof, to and including $1,000,000
Y
$1,000,001 and up $8,106.00 for the first $1,000,000 plus $4.55 for each add'l $1,000 or fraction thereof, to and including $5,000,000
Y
Determination of Valuation for Fee-Setting Purposes
● Project valuations shall be based on the total value of all construction work, including all finish work, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment. If, in the opinion of the Building Official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the Building Official. Final building permit valuation shall be set by the Building Official. For determining project valuations for new construction, the Building Official may use data published by the International Code Council (ICC) (building valuation data table, typically updated in February and August of each year). The final building permit valuation shall be set at an amount that allows the City to recover its costs of applicant plan check, permit and inspection activities.
Note: For construction projects with permit fees calculated using Section B, additional fees apply for permit issuance. Additional fees may apply for services provided by other City Departments (e.g. Planning Review), and Fees Collected on Behalf of Other Agencies (e.g. State of California). Additional fees apply for plan review, when applicable.
B. Permit Fee for New Buildings, Additions, Tenant Improvements, Residential Remodels, and Combined Mechanical, Electrical, and/or Plumbing Permits
10 City of Garden Grove
BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee
Current
Cost Recovery
Target
Cost Recovery
Year 1 Phase-In
FY 25/26
Year 2 Phase-In
FY 26/27
Year 3 Phase-In
FY 27/28 Charge Basis Note
CPI
Adjust
Electrical Permit Fees
1 Electrical Plan Review (Greater of a or b)
a) Base Fee 85% 100% 100% 85% 85% 85% N
b) Minimum Fee $80 83% 100% $86 $91 $97 Y
2 Building & Utilities Safety Inspection $130 90% 100% $135 $140 $145 Y 3 Electrical Meter Reset $30 81% 100% $32 $35 $37 Y
System Fees
4 New construction on residential units $0.065 81% 100% $0.070 $0.075 $0.081 Y 5 New construction on residential garages $0.055 81% 100% $0.059 $0.064 $0.068 Y 6 Temporary power pole
a) First $60 81% 100% $65 $70 $75 Y
b) Each Additional $20 81% 100% $22 $23 $25 Y
Unit Fee Schedule
7 Receptacle, switch, lighting outlets & fixtures
a) First 20 (each) $1.00 81% 100% $1 $1 $1 Y
b) Each Additional $0.75 81% 100% $1 $1 $1 Y
8 Pole: power, light, etc. (includes on light fixture)
a) First $9.50 81% 100% $10 $11 $12 Y
b) Each Additional light fixture on single pole $4.00 81% 100% $4 $5 $5 Y 9 Residential appliance (each) $9.50 81% 100% $10 $11 $12 Y 10 Non-Residential appliance (each) $9.50 81% 100% $10 $11 $12 Y 11 Power apparatus (each)
a) Not over 1 HP/kW/kVA/kVAR $9.50 81% 100% $10 $11 $12 Y b) Over 1 but not over 10 HP/kW/kVA/kVAR $12.00 81% 100% $13 $14 $15 Y c) Over 10 but not over 50 HP/kW/kVA/kVAR $25.00 81% 100% $27 $29 $31 Y d) Over 50 but over 100 HP/kW/kVA/kVAR $45.00 81% 100% $49 $52 $56 Y e) Over 100 HP/kW/kVA/kVAR $70.00 81% 100% $76 $81 $87 Y 12 Busways, floor ducts and special raceways (per 100 feet or fraction thereof)
$9.50 81% 100% $10 $11 $12 Y
13 Signs: outline lighting and marquees
a) Supplied by one branch $50.00 81% 100% $54 $58 $62 Y b) Additional circuits in same device $9.50 81% 100% $10 $11 $12 Y 14 Services
a) 600 V max - 200 amps max $30.00 81% 100% $32 $35 $37 Y b) 600 V max - 201 to 1,000 amps $65.00 81% 100% $70 $75 $81 Y c) Over 1,000 amps or over 600 V $125.00 81% 100% $135 $145 $155 Y Activity Description
11 City of Garden Grove
BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee
Current
Cost Recovery
Target
Cost Recovery
Year 1 Phase-In
FY 25/26
Year 2 Phase-In
FY 26/27
Year 3 Phase-In
FY 27/28 Charge Basis Note
CPI
AdjustActivity Description
15 Switchboard, Motor Control Center, etc.
a) First $40.00 81% 100% $43 $46 $50 Y
b) Each additional section over one $30.00 81% 100% $32 $35 $37 Y 16 Subpanels/Distribution Panels
a) Single Phase $30.00 81% 100% $32 $35 $37 Y
b) Three Phase $65.00 81% 100% $70 $75 $81 Y
17 Swimming Pool/Spa $65.00 81% 100% $70 $75 $81 Y
18 Fireworks Booth Electrical (per booth) $37.50 81% 100% $41 $44 $47 Y 12 City of Garden Grove
BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee
Current
Cost Recovery
Target
Cost Recovery
Year 1 Phase-In
FY 25/26
Year 2 Phase-In
FY 26/27
Year 3 Phase-In
FY 27/28 Charge Basis Note
CPI
Adjust
Mechanical Permit Fees
1 Mechanical Plan Review (Greater of a or b)
a) Base Fee 85% 100% 100% 85% 85% 85% N
b) Minimum Fee $80 83% 100% $86 $91 $97 Y
2 Furnace
a) Up to 100,000 BTU $30 81% 100% $32 $35 $37 Y
b) 100,001 through 1,000,000 BTU $45 81% 100% $49 $52 $56 Y c) More than 1,000,000 BTU $75 81% 100% $81 $87 $93 Y
3 Installation or relocation of floor furnace, suspended heater, wall heater, or unit heater
$30 81% 100% $32 $35 $37 Y
4 Installation of appliance vent only (not included in appliance permit)
$22 81% 100% $24 $26 $27 Y
5 Repair alteration or addition to any heating, cooling, refrigeration or absorption system
$30 81% 100% $32 $35 $37 Y
6 Evaporative cooler $30 81% 100% $32 $35 $37 Y
7 Boilers, Compressors and Absorption Systems
a) Up to 3 h.p. or 100,000 BTUs $30.00 81% 100% $32 $35 $37 Y b) Up to 15 h.p. or 500,000 BTUs $35.00 81% 100% $38 $41 $43 Y c) Up to 30 h.p. or 1,000,000 BTUs $45.00 81% 100% $49 $52 $56 Y d) Up to 50 h.p. or 1,750,000 BTUs $75.00 81% 100% $81 $87 $93 Y e) Over 50 h.p. or 1,750,000 BTUs $125.00 81% 100% $135 $145 $155 Y 8 Air Handling Unit
a) Up to 2,000 CFM $30.00 81% 100% $32 $35 $37 Y
b) 2,001 CFM - 10,000 CFM $45.00 81% 100% $49 $52 $56 Y c) More than 10,000 CFM $75.00 81% 100% $81 $87 $93 Y
9 Ventilation and Exhaust
a) Vent fan connected to single duct $22.00 81% 100% $24 $26 $27 Y b) Separate ventilation system (e.g. domestic range hood) $22.00 81% 100% $24 $26 $27 Y c) Type I Commercial Ventilation Hood $45.00 81% 100% $49 $52 $56 Y d) Type II Commercial Ventilation Hood $30.00 81% 100% $32 $35 $37 Y 10 Fire Damper (each) $9.50 81% 100% $10 $11 $12 Y
11 Decorative Fireplace $30.00 81% 100% $32 $35 $37 Y
12 Each appliance or piece of equipment regulated by the UMC but not specifically mentioned herein
$30.00 81% 100% $32 $35 $37 Y
Activity Description
13 City of Garden Grove
BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee
Current
Cost Recovery
Target
Cost Recovery
Year 1 Phase-In
FY 25/26
Year 2 Phase-In
FY 26/27
Year 3 Phase-In
FY 27/28 Charge Basis Note
CPI
Adjust
Plumbing Permit Fees
1 Plumbing Plan Review (Greater of a or b)
a) Base Fee 85% 100% 100% 85% 85% 85% Y
b) Minimum Fee $80 83% 100% $86 $91 $97 Y
2 Fixtures and Vents
a) For each plumbing fixture or trap not specifically listed below, or set of fixtures on one trap (including water and drainage piping and backflow prevention)
$10 81% 100% $10 $11 $12
Y
b) Garbage disposal $10 81% 100% $10 $11 $12 Y
c) Diswasher $10 81% 100% $10 $11 $12 Y
d) Automatic Washing Machine $10 81% 100% $10 $11 $12 Y 3 Sewers, Disposal Systems and Interceptors
a) Building Sewer
i) First 100 ft. $30.00 81% 100% $32 $35 $37 Y
ii) Each Additional 100 ft. $9.50 81% 100% $10 $11 $12 Y b) Cesspool/Leachline Replacement
i) One cesspool or leachline $75.00 81% 100% $81 $87 $93 Y ii) Each Additional $35.00 81% 100% $38 $41 $43 Y
c) Private Sewage Disposal System $95.00 81% 100% $103 $110 $118 Y d) Industrial waste pre-treatment interceptors, including trap and vent
$95.00 81% 100% $103 $110 $118 Y
e) Each occupancy termination of a sewer system/building drain $30.00 81% 100% $32 $35 $37 Y f) Rainwater system, per drain $9.50 81% 100% $10 $11 $12 Y 4 Water Piping, Water Treating and Water Heaters
a) Water Piping
i) First 100 ft. $30.00 81% 100% $32 $35 $37 Y
ii) Each Additional 100 ft. $9.50 81% 100% $10 $11 $12 Y b) Water treating equipment, water softeners, etc. $9.50 81% 100% $10 $11 $12 Y c) Industrial waste pre-treatment interceptor, sand trap, receptor
$95.00 81% 100% $103 $110 $118 Y
d) Water Heater (and vent) $30.00 81% 100% $32 $35 $37 Y e) Occupancy termination of water service $30.00 81% 100% $32 $35 $37 Y 5 Gas System
a) Up to 5 Outlets $18.50 81% 100% $20 $21 $23 Y
b) Each Additional Outlet $3.50 81% 100% $4 $4 $4 Y
Activity Description
14 City of Garden Grove
BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee
Current
Cost Recovery
Target
Cost Recovery
Year 1 Phase-In
FY 25/26
Year 2 Phase-In
FY 26/27
Year 3 Phase-In
FY 27/28 Charge Basis Note
CPI
AdjustActivity Description
6 Lawn Sprinklers, Vacuum Breakers, and Backflow Prevention Devices
a) Lawn Sprinklers (SFDs) including backflow protection device
i) First Backflow Device $9.50 81% 100% $10 $11 $12 Y
ii) Each Additional Backflow Device $2.50 81% 100% $3 $3 $3 Y b) Non-residential sprinklers with atmospheric type vacuum breakers or backflow prevention device
i) 1 to 5 Devices $15.00 81% 100% $16 $17 $19 Y
ii) Each Additional Device $3.50 81% 100% $4 $4 $4 Y
c) Non-residential sprinklers with non-atmospheric backflow prevention device
i) 2" and smaller - per device $15.00 81% 100% $16 $17 $19 Y ii) Over 2" - per device $17.50 81% 100% $19 $20 $22 Y
7 On-site fire hydrant
a) First $125.00 81% 100% $135 $145 $155 Y
b) Each Additional $95.00 81% 100% $103 $110 $118 Y
8 Swimming pools, spas, and hot tubs (piping, fixtures, and appurtenant devices)
$65.00 81% 100% $70 $75 $81 Y
9 Each appliance or piece of equipment regulated by the Plumbing but not specifically mentioned herein
$9.50 81% 100% $10 $11 $12 Y
15