Prepared by: The Solís Group 2 September 2025 Contents ____
EXECUTIVE SUMMARY ................................................................................................. 3 Community Workforce Agreement ............................................................................... 3 Skilled & Trained Workforce ......................................................................................... 3 Prevailing Wage ............................................................................................................. 3 Local Hire ........................................................................................................................ 3
City of Garden Grove
CWA Administration
Board Report
September 2025
Prepared by: The Solís Group 3 September 2025
EXECUTIVE SUMMARY
This Board Report reviews construction projects covered by the City of Garden Grove’s Community Workforce Agreement (CWA) since 2021.
The Solís Group (TSG) has bee n contracted by The City of Garden Grove (The City) to perform CWA services. Among various requirements, the CWA requires contractors to use union labor, pay employee fringe benefits through a union trust fund and has a 30% local worker utilization goal. That is, there is a goal that 30% of all construction hours be performed by local workers.
Since 2021, there have been 18 construction projects that have been covered by the CWA.
Community Workforce Agreement
TSG has scheduled and hosted Pre-Job Conferences between contractors and the building trades, ensuring work was properly assigned to a union, and maintained consistent communication with all stakeholders throughout construction.
Throughout construction, TSG has collected Certified Payroll Reports (CPRs) and related compliance documentation.
To date, there have been no major issues related to the CWA. TSG has guided union and non-union contractors through the CWA process. In particular, TSG has guided inspectors and soils and material testers and communicated with the respective unions in order to meet compliance.
There have not been any strikes nor threat of strikes or work stoppages on any of the covered projects.
Skilled & Trained Workforce
The CWA requires contractors to use a skilled and trained workforce, as described in Public Contract Code Section 2600.
Prevailing Wage
Throughout the course of construction and to-date, TSG has not received any public or worker complaints regarding potential prevailing wage violations.
Local Hire
CWA §3.5 establishes a local hire goal of 30%. Overall, the combined Local Hire achieved is
24.45%.
The Local Area is broken up into three tiers as described below:
City of Garden Grove
CWA Administration
Board Report
September 2025
Prepared by: The Solís Group 4 September 2025 • Tier 1 – Zip codes that make up City of Garden Grove
• Tier 2 – Zip codes from any cities adjacent to Garden Grove • Tier 3 – All of Orange County plus individuals that meet the following criteria:
o Veterans
o Graduates of high schools located in Garden Grove
o Graduates of Building Trades Pre-apprenticeship programs o Disadvantaged individuals
Garden Grove Local Hire Performance by Tier
(30% of Hours)
Project Cumulative %
All Projects Total 111,604.36 -
Local Workforce Hours 27,283.14 24.45%
Non-Local 84,321.22 75.55%
Tier 1 Workforce Hours 3,409.08 3.05%
Tier 2 Workforce Hours 18,418.46 16.50%
Tier 3 Workforce Hours 4,811.63 4.31%
Note: highlighted rows represent finished projects
Projects Total
Hours
Local
Hours
Local %
(30% Goal)
Tier 1
Hours
Tier 1
%
Tier 2
Hours
Tier 2
%
Tier 3
Hours Tier 3 %
Non-
Local
Hours
Non-
Local
%
All Projects 112,613.71 26,874.67 23.86% 3,409.08 3.03% 18,549.46 16.47% 4,916.13 4.37% 85,739.04 76.14% Tier 1
3.05%
Tier 2
16.50%
Tier 3
4.31%Non-Local
75.55%
Local Hire
24.45%
LOCAL HIRE HOURS (30% GOAL)
City of Garden Grove
CWA Administration
Board Report
September 2025
Prepared by: The Solís Group 5 September 2025 Projects Total
Hours
Local
Hours
Local %
(30% Goal)
Tier 1
Hours
Tier 1
%
Tier 2
Hours
Tier 2
%
Tier 3
Hours Tier 3 %
Non-
Local
Hours
Non-
Local
%
Arterial Streets
Rehabilitation 10,108.11 1,629.18 16.12% 195.00 1.93% 1,061.00 10.50% 373.18 3.69% 8,478.93 83.88% Acacia-
Josephine Storm
Drain
9,437.00 2,064.50 21.88% 641.00 6.79% 867.50 9.19% 556.00 5.89% 7,372.50 78.12% Euclid-
Westminster 3,617.50 513.00 14.18% 128.00 3.54% 272.00 7.52% 113.00 3.12% 3,104.50 85.82% Traffic Signal
Installation 5,038.45 563.45 11.18% 2.66 0.05% 180.94 3.59% 379.85 7.54% 4,443.00 88.18% Various Streets
Rehab 10,416.25 3,709.25 35.61% 896.25 8.60% 2,222.00 21.33% 591.00 5.67% 6,707.00 64.39% Various
Residential
Recon 2023
22,370.65 6,390.25 28.57% 370.50 1.66% 5,721.33 25.58% 298.42 1.33% 15,980.40 71.43% Arterial Streets
Slurry 2023 9,006.81 689.56 7.66% 10.92 0.12% 393.98 4.37% 284.66 3.16% 8,317.25 92.34% Residential
Street Rehab
2023
2,275.00 386.00 16.97% 64.00 2.81% 278.50 12.24% 43.50 1.91% 1,889.00 83.03% Arterial Streets
Rehab 2023 10,539.95 3,231.73 30.66% 809.25 7.68% 1,799.46 17.07% 623.02 5.91% 7,308.22 69.34% Various
Residential
Rehab 2024
1,928.75 572.75 29.70% 195.50 10.14% 201.75 10.46% 175.50 9.10% 1,356.00 70.30% Traffic Signal
Mod at Various
23-24
CP1356000
(Comet Electric)
3,389.00 112.00 3.30% 96.00 2.83% 0.00 0.00% 16.00 0.47% 3,277.00 96.70% Traffic Signal
Mod at Nelson 962.34 320.00 33.25% 0.00 0.00% 268.00 27.85% 52.00 5.40% 642.34 66.75% Traffic Signal
Mod at
Newland
852.34 264.00 30.97% 0.00 0.00% 220.00 25.81% 44.00 5.16% 588.34 69.03% 2024 Arterial
Streets Rehab
(RJ Noble)
12,450.71 3,133.00 25.16% 0.00 0.00% 2,436.75 19.57% 696.25 5.59% 9,317.71 74.84% 2024 Various
Streets Micro-
Surfacing
CP1346000 (RJ
Noble)
7,161.03 2,512.50 35.09% 0.00 0.00% 1,996.75 27.88% 515.75 7.20% 4,648.53 64.91% Harbor &
Garden Grove
Intersection
CP1303000
(Excel Paving)
1,223.47 225.50 18.43% 0.00 0.00% 202.50 16.55% 23.00 1.88% 997.97 81.57% City of Garden Grove
CWA Administration
Board Report
September 2025
Prepared by: The Solís Group 6 September 2025 Projects Total
Hours
Local
Hours
Local %
(30% Goal)
Tier 1
Hours
Tier 1
%
Tier 2
Hours
Tier 2
%
Tier 3
Hours Tier 3 %
Non-
Local
Hours
Non-
Local
%
2025 Residential
Streets
CP1446000
(Hardy&Harper)
52.00 52.00 100.00% 0.00 0.00% 0.00 0.00% 52.00 100.00% 0.00 0.00% 2025 Various
Streets
Rehabilitation
Project
CP1442000 (RJ
Noble)
1,784.35 506.00 28.36% 0.00 0.00% 427.00 23.93% 79.00 4.43% 1,278.35 71.64% City of Garden Grove
CWA Administration
Board Report
September 2025
Prepared by: The Solís Group 7 September 2025 Projects Total
Hours
Local
Hours
Local %
(30%
Goal)
Veteran
Hours
Vete
ran
%
GG HS
Grad
Hours
GG HS
Grad %
Disadva
ntaged
Hours
Disadva
ntaged
%
MC3
Grad
Hours
MC3 Grad
%
All Projects 112,613.71 26,830.67 23.83% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Arterial
Streets
Rehabilitati
on
10,108.11 1,629.18 16.12% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Acacia-
Josephine
Storm
Drain
9,437.00 2,064.50 21.88% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Euclid-
Westminst
er
3,617.50 513.00 14.18% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Traffic
Signal
Installation
5,038.45 563.45 11.18% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Various
Streets
Rehab
10,416.25 3,709.25 35.61% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Various
Residential
Recon 2023
22,370.65 6,390.25 28.57% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Arterial
Streets
Slurry 2023
9,006.81 689.56 7.66% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Residential
Street
Rehab
2023
2,275.00 386.00 16.97% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Arterial
Streets
Rehab
2023
10,539.95 3,231.73 30.66% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Various
Residential
Rehab
2024
1,928.75 572.75 29.70% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Traffic
Signal Mod
at Various
23-24
CP1356000
(Comet
Electric)
3,389.00 112.00 3.30% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Traffic
Signal Mod
at Nelson
962.34 320.00 33.25% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Traffic
Signal Mod
at Newland
852.34 264.00 30.97% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% 2024
Arterial
Streets
Rehab (RJ
Noble)
12,450.71 3,133.00 25.16% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% City of Garden Grove
CWA Administration
Board Report
September 2025
Prepared by: The Solís Group 8 September 2025
-End Report-
Projects Total
Hours
Local
Hours
Local %
(30%
Goal)
Veteran
Hours
Vete
ran
%
GG HS
Grad
Hours
GG HS
Grad %
Disadva
ntaged
Hours
Disadva
ntaged
%
MC3
Grad
Hours
MC3 Grad
%
2024
Various
Streets
Micro-
Surfacing
CP1346000
(RJ Noble)
7,161.03 2,512.50 35.09% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% Harbor &
Garden
Grove
Intersectio
n
CP1303000
(Excel
Paving)
1,223.47 225.50 18.43% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% 2025
Residential
Streets
CP1446000
(Hardy&Ha
rper)
52.00 8.00 15.38% 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00% 2025
Various
Streets
Rehabilitati
on Project
CP1442000
(RJ Noble)