Document
item 14 Approval of an Amended and Restated National Pollution Discharge Elimination System Stormwater Permit Implementation Agreement with the County of Orange and Orange County Flood Control District. (Acti
Meeting
April 28, 2026
Body
Garden Grove City Council
Original file
248 KB
Text extracted from the city's file for reading and search. Open the original on agendasuite.org. That file is the official record.

18 ADDENDUM B
January 1, 2026 through June 30, 2027
Water Loss Control Technical Assistance Tasks

TASKS
1 PROJECT ADMINISTRATION
Project administration:

Partner with E Source and the larger MWDOC group (Required) භ Communication
භ Systems of data collection and management
භ Travel expenses
භ Invoicing
$2,200 Project administration

TASK 2 WATER AUDIT COMPILATION
Task 2: Water audit compilation:

Estimate apparent and real water
loss. Assess data availability and
quality
භ Water audit data collection and review
භ Raw billing data validation (study of completeness and consistency, pro-rating to reduce lag-time effects) භ Water audit compilation
භ Water audit documentation in preparation for level 1 validation $11,240 Task 2: Water audit compilation

TASK 3 SOURCE OR PRODUCTION METER VOLUMETRIC ACCURACY TESTING Task 3: Source/Production meter volumetric accuracy testing:

Design and conduct a volumetric source meter accuracy test Establish a field-validated water-supplied baseline for the water audit Document test procedures for future meter accuracy investigation භ Site visit and test design
භ Volumetric accuracy test with comparat ive meter or reservoir reference volume භ Data chain assessment (“loop audit” or SCADA calibration), if relevant භ Test results analysis and documentation
භ Test procedure documentation
$9,270 Task 3: Volumetric production meter accuracy test, per meter.

TASK 4 BILLING DATA CHAIN ASSESSMENT
Task 4: Detailed custom billing data chain assessment:

Assess billing data for potential errors and/or inconsistencies භ Mapping of meter read collection and billing process
භ Comparison of raw data across billing data manageme nt platforms (read collection system, billing data system, and reporting system)
භ Identification of data transmission errors - misreads, zero reads, dropped reads, duplicated reads, etc.

Varies Task 4: Billing data chain assessment.
19 TASK 5 COMPONENT ANALYSIS
Task 5a: Component analysis of real losses – Gap Analysis:

Assess repair data in preparation for a real loss component analysis. x Collection of leakage repair documentation
x Evaluation and summarization of repair data
x Identification of gaps in repair documentation
x Memo documenting recommendations for repair data improvements and documentation

Task 5b: Component analysis of real losses:

Establish the distribution system’s unique leakage profile Determine cost-effective leakage management strategies for the short-, medium-, and long-term x Collection of leakage repair documentation
x Evaluation of repair process documentation
x Determination of unique leakage profile (b ackground, unreported, and reported leakage) x Analysis of cost -effective intervention against leakage x Leak management program design
Task 5c: Component analysis of apparent losses:

Assess customer meter inaccuracy
Value apparent losses
Design an apparent loss management strategy
5c-1: Small Meter Test Strategy & Sample - $7,680
x Facilitate discussions to understand ag ency goals for customer meter testing x Develop test strategy based on agency goals
5c-2: Small Meter Test Sample - $3,280
x Develop meter sample based on pre-defined test strat egy (if test strategy has not been defined, consider signing up for Small Meter Test Strategy & Sample)
5c-3: Small Meter Test Data Analysis - $7,920
x Analyze small customer meter test data
x Note: Agency must complete small customer meter testin g to execute this task. See shared services contract for customer meter testing options and costs if necessary. 5c-4: Large Meter Test Design - $3,960
x Develop large meter test design including testing schedule x Test design employs least cost of ownership model to prioritize large meters for testing 5c-5: Large Meter Test Data Analysis - $6,080 typical cost (discuss pricing with E Source. Pricing based on test data and billing data availability)
x Analyze large customer meter test data
x Note: Agency must complete large cu stomer meter testing to execute this task. See shared services contract for customer meter testing options and costs if necessary. $5,560 Task 5a: Component analysis of real losses – Gap Analysis $16,180 Task 5b: Component analysis of real losses

$8,560
$3,660
$8,840
$4,420
Varies
Task 5c: Component analysis of apparent losses (meter testing budget through Shared Service Contract is also required if testing cannot be conducted in-house) 5c-1: Small Meter Test Strategy & Sample
5c-2: Small Meter Test Sample
5c-3: Small Meter Test Data Analysis
5c-4: Large Meter Test Design
5c-5: Large Meter Test Data Analysis $6,780, typical (discuss pricing with E Source. Pricing based on test data and billing data availability)
20 TASK 6 SWRCB WATER LOSS STANDARD ASSISTANCE
Task 6a: Information Order Response Assistance:

Document response to Information Orders from the SWRCB related to compliance with the Water Loss Standard.
භ Compilation of results and findings from related activities to date භ Memo documenting response to Information Order
Task 6b: Off --Ramp Assistance:

Document compliance with Off-Ramp criteria
භ Collection of relevant dat a and supporting documents භ Document activities and/or data proving compliance with each Off -Ramp criterion භ Compilation of Off -Ramp request
Task 6c: Economic Model Custom Input Evaluation:

Calculate custom inputs and compile supporting documents for the SWRCB’s economic model. භ Request and compilation of relevant data (e.g. l eak repair documentation, leak detection results, financial data, infrastructure data, etc.)
භ Review of data collected to identify wh at custom inputs may be calculated භ Calculation of customized value for input s where the minimum data threshold is met භ Compilation of supporting document s for input adjustment application භ Assistance with creating memo to the SWRCB, requesting custom input adjustment Task 6d: Questionnaire Response Assistance
Document responses to SWRCB required reporting (Data Quality, Pressure Management, Asset Management, and/or Leak Registry)
භ Request and compilation of relevant data
භ Review of data collected
භ Calculation and/or narration of response to each question භ Review of responses with agency staff
භ Assistance with submitting response to questionnaire

$ Varies,
Discuss
with E
Source
Task 6a: Information Order Response Assistance
$6,060 Task 6b: Off-Ramp Assistance
$ Varies,
Discuss
with E
Source

Task 6c: Economic Model Custom Input Evaluation
$ Varies,
Discuss
with E
Source

Task 6d: Questionnaire Response
21 TASK 7 WATER LOSS TEAM DEVELOPMENT
Task 7a: Team Development Process Maps:

Establish a water loss team roster
Document processes related to water audit data collection භ Interviews with staff
භ Identification of key water loss team members
භ Document and map water loss data collection processes

Task 7b: Educational Workshops:

In-person educational workshop with agency staff to provide water loss background and connect day-to-day tasks with water loss calculation.

Workshops will offer an opportunity to elicit feedback from staff and prepare them for upcoming projects and data requests.
භ Development of slides and materials for meeting
භ Travel to agency
භ Facilitation of educational workshop
$7,560 Task 7a: Team Development Process Maps
$5,680 Task 7b: Educational Workshops

TASK 8 LEAK SIMULATION MODEL
Task 8: Leak Simulation Model:

Quantify the impacts of leak detection technique accuracy on achievable overall system loss rates and projected workload
Evaluate the cost-benefit of leakage control strategies under varying assumptions of fundamental leakage characteristics.
භ Collection of leakage repair documentation
භ Assessment of unique leakage profile
භ Consider sub -system level infrastructure characteristics and their impact on loss rates, including pipe- segment level data for likelihood and consequence of failure, if available. භ Provide an intuitive visualization of the water distribution system that shows how leakage control strategies are implemented and their resulting impact on individual leaks and system-level leakage rates.
භ Estimate future system -wide loss rates under varying assumptions for leakage characteristics and loss recovery efforts that can be compared with state regulatory targets or other performance goals. භ Project the workload required to implement and mainta in various leakage management strategies, including manual acoustic leak detection, automated acoustic noise loggers, satellite leak detection. $ Varies,
Discuss
with E
Source

Task 8: Leak Simulation Model
22 TASK 9 WATER LOSS PILOT PROGRAM MANAGEMENT AND EVALUATION Task 9: Water Loss Pilot Program Management and Evaluation:

Develop a pilot plan to assess the effectiveness of leakage management technologies/strategies භ Collection of previous water audits and repair data
භ Development of pilot plan detailing the leakage management techniques to be piloted, scale of implementation, and level of effort required from participating agency staff භ Work with participating agency to vet and manage technology providers භ Tracking and collection of data during pilot implementation භ Recommend metrics to evaluate the su ccess of the pilot program and identify data collection necessary to calculate metrics
භ Report on the performance of each pilot technolog y and recommend next steps necessary for full system implementation
$ Varies,
Discuss
with E
Source

Task 9: Water Loss Pilot Program Management and Evaluation

TASK 10 WATER LOSS STANDARD COMPLIANCE PLAN
Task 10: Water Loss Standard Compliance Plan:

Develop a Water Loss Compliance Plan to assist with meeting the Water Loss Standard භ Review the participating agency’s Water Loss Standard modeled by the SWRCB භ Evaluate data uncertainty and recommendations for data improvement භ If available, consider results of leak simulation mo del, real loss component analysis, and/or pilot results භ Develop a timeline, cost estimate, and key milestones associated with the Water Loss Compliance Plan, based on existing data sources
$ Varies,
Discuss
with E
Source

Task 10: Water Loss Standard Compliance Plan

TASK 11 MISCELLANEOUS WATER LOSS TECHNICAL ASSISTANCE
Task 11: Miscellaneous Water Loss Technical Assistance
For tasks not covered in Tasks 1-10, provide agency technical assistance for water loss analysis and/or compliance with State regulations.
භ Assess level of support and associated costs through consultation with E Source භ E Source to provide cost proposal before proceeding
භ Cost proposal shall be developed in accordance with hourly rates in Technical Assistance Program Contract
$ Varies,
Discuss
with E
Source

Task 11: Miscellaneous Water Loss Technical Assistance

Addendum B
January 1, 2026 through June 30, 2027
Water Loss Control Technical Assistance Tasks

Participating Agency: _________________
Cost Sheet for Selected Water Loss Control Services with E Source

Tasks: (All tasks are performed by E Source)

Task
Cost
Selected
Service
Met Funding
Request
(up to 50%
of task cost)
Task 1 – Project Administration and Progress Reporting (Required) $2,200 $2,200 Task 2 – Water Audit Compilation $11,240 $
Task 3 – Source or Production Meter Volumetric Accuracy Testing $9,270 $ Task 4 – Custom Detailed Billing Data Chain Assessment Varies Task 5 – Component Analysis
Task 5a: Component Analysis of Real Losses – Gap Analysis Task 5b: Component Analysis of Real Losses
Task 5c: Component Analysis of Apparent Losses
$5,560
$16,180
Varies

$
$
$

Task 6 – SWRCB Water Loss Standard Assistance
Task 6a: Information Order Response Assistance
Task 6b: Off-Ramp Assistance
Task 6c: Economic Model Custom Input Evaluation
Task 6d: Questionnaire Response Assistance
Varies
$6,060
Varies
Varies

$
$
$
$

Task 7 – Water Loss Team Development
Task 7a: Team Development Process Maps
Task 7b: Educational Workshops
$7,560
$5,680

$
$

Task 8 – Leak Simulation Model Varies $
Task 9 – Water Loss Pilot Plan and Evaluation Varies $
Task 10 – Water Loss Compliance Plan Development
Task 10a: Water Loss Compliance Plan Development
Task 10b: Water Loss Compliance Plan Updated
Varies
$
$

Task 11 – Miscellaneous Water Loss Technical Assistance Varies $ Rollover Funds to be Applied: $
New Amount to be Invoiced
(Task Totals Less Rollover Funds)

Total:

$

This Cost Sheet may be updated upon mutual consent of the parties as indicated in writing.

By: By:

Date: Date:

Harvey De La Torre, General Manager Title:

Municipal Water District of Orange County Agency:

City of Garden Grove
City of Garden Grove
Lisa L. Kim, City Manager
22,480
10,040
Large meter
test design/
data analysis
34,720